You are on page 1of 1

1

2
3
4
5
6
8 9 10
11
12
13
14
15
16
7
17
KITCHEN
Laminated wooden flooring
BATHROOM1
Tiles
18,4m|
DRESSING ROOM
Laminated wooden flooring
19,5m|
MAIN BEDROOM
Laminated wooden flooring
17,4m|
LOUNGE AREA
Laminated wooden flooring
OPEN PLAN
DINNING AREA
OPEN PLAN
STUDY AREA
SCULLERY
Tiles
11m|
GUEST WC
Tiles
7,3m|
Bath
hwb
hwb
WC
sink WC
hwb
hwb Sh
1
2
2
1
2 1
2
1
1 2
2 1
1
2
BIC
BIC
Build in
drawers
&seating
BIC
OPEN PLAN MAIN SPACE
Laminated wooden flooring
148,4m|
FRIDGE
W1 W1 W1 W1 W1 W1
W2 W2
W2 W3 W3 W4
D1 D1
D1
D1
D3
D4
D2
Remove wall
&make good
build new
75mmRhino
high spec
dry-walling
build new75mm
Rhino high spec
dry-walling
75mmRhino
high spec
dry-walling
build new
75mmRhino
high spec
dry-walling build new
220mmwall &
make good
build new
110mmwall &
make good
build new16mmsupawood
box to be covered with
metal sheeting, to enclose pillars
&make good
build newBIC
Install new
floor to
ceiling
mirrors
Install new
floor to
ceiling
mirrors
build new16mmsupawood
box to be covered with
metal sheeting, to enclose pillars
&make good
build new16mmsupawood
box to be covered with
metal sheeting, to enclose pillars
&make good
build new16mmsupawood
box to be covered with
metal sheeting, to enclose pillars
&make good
build new16mmsupawood
box to be covered with
metal sheeting, to enclose pillars
&make good
build new16mmsupawood
box to be covered with
metal sheeting, to enclose pillars
&make good
build new16mmsupawood
box to be covered with
metal sheeting, to enclose
pillars &make good
build new16mmsupawood
box to be covered with
metal sheeting, to enclose pillars
&make good
Existing window Existing window Existing window Existing window Existing window
Existing window Existing window Existing window Existing window
Existing window Existing window
Existing 1520 x 2100mm
fire escape door
Existing door Existing door
Existing door
Install new
door as per
spec &make
good
Install new
door as per
spec &make
good
Install new
door as per
spec &make
good
ENTRANCE
Install newgas
fire place with
metal trimas per spec
Build newlevel
&make good
Build newlevel
&make good
Install all new
sanitary ware as
per spec
Install newfolding
sliding doors as per spec
Install newfolding
sliding doors as per spec
D4
D4
Install all new
sanitary ware as
per spec
Install all new
custom-made
vanity
Install all new
sink as per spec
Install newcpb
Install newcpb Hob
Install all new
custom-made
vanity
Existing staircase
&balustrade
work top Island
900mmh
Install newhob, extractor
fan &oven as per spec
under counter
oven below
double
cpb
fold out
corner
cpb
300mm
pull out
spice
200mm
tray cpb
build new
sliding door
cpb
900mmh
pull out bin
below
(a
p
p
lia
n
c
e
b
y
p
u
rc
h
a
s
e
r)
Existing window
20mmsplash back cpb above
cpb above
1
3
0
4
0
1
9
6
0
1
5
0
0
0
3
6
0
2
2
0
3
0
1
1
0
3
8
2
1
7
5
4
3
2
1
7
5
2
6
2
8
7
5
1
3
2
5
3
6
0
1
9
6
0
19145
612 1400 439 1400 2085 1400 1515 1400 2709 1400 1515 1400 1870
360 4578 75 6190 270 2572 130 1149 3464
110
30
220
4
8
8
5
1
5
0
0
0
3
6
0
9
7
0
8
1
3
3
2
1
7
3
6
0
4
3
9
5
3
0
0
0
3
6
0
1
7
2
0
1
3
0
4
4
9
5
1
0
1
0
4
2
8
5
19145
1380 1370 1490 620 190 620 1500 860 1160 3432 860 2221 860 2581
1455 360 500 1455 250 1396 474 133 2807
6
0
0
4342 600
75
1370 474 220 2492 360 360
4455
8
0
0
2
2
5
6
3565
813 813 739
600
100
3
9
2
5
270
600 1800
9
0
0
4
0
2
8
1402
352
1
4
7
572
4
1
7 1
1
0
3
2
0
2
5
600
866 700 2412
1
0
2
0
912
6190
5
1
6
7
270
998
2247
3
4
7
1
2
7
1
5
250 1455
9
7
0
100 000
100 150
100 300
100 000
100 300
100 300
100 300
100 000 100 000
100 000
100 000
A A
B
B
FLOOR PLAN
S C A L E 1 : 5 0
N
PROJ ECT
DRAWI NG
REV:
REG NO:
DWG NO:
DATE:
REV DATE DESCRI PTI ON
* All work, including mechanical and electrical work, is to be done in accordance with the National Building Regulations.
* All materials and workmanship are to comply with the relevant S.A.B.S. codes.
* This drawing is to be deemed to include all that is required for and consistent with good building practice regardless of any
specific omissions.
* This drawing is not to be scaled. Figured dimensions are to be used. All dimensions are in millimetres unless otherwise stated.
* This drawing must be read in conjunction with all relevant drawings and specifications.
* All dimensions and levels must be checked on site by the Contractor before putting any work in hand.
* Any discrepancies on the drawings are to be brought to the Architects attention by the Contractor before putting
any work in hand.
* The Contractor must obtain the Architects written confirmation of any instructions which involve a variation to the
contract before putting that work in hand.
* All voids, suspended ceilings and partitions to be rodent-proofed in accordance with the Government rodent-proofing regulations.
* The Architects retain Copyright of this Drawing.
NOTES:
1:50
BACHELOR FLAT
FLOOR PLAN
SCALE:
as is design
DRAWN BY
ADELE STEYNBERG
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P
R
O
D
U
C
E
D
B
Y
A
N
A
U
T
O
D
E
S
K
E
D
U
C
A
T
IO
N
A
L
P
R
O
D
U
C
T
P R O D U C E D B Y A N A U T O D E S K E D U C A T I O N A L P R O D U C T
P
R
O
D
U
C
E
D
B
Y
A
N
A
U
T
O
D
E
S
K
E
D
U
C
A
T
IO
N
A
L
P
R
O
D
U
C
T

You might also like