You are on page 1of 1

DTR Maintenance Technician - Step 1 OJT Last Updated: 6-Nov-13

Name: Appraiser:
Seniority Date: Report Date:
Drilling Tools & Remedial Current Grade: Area/GM/Location:
Comments by supervisor:
Tool Components
Identify
Component(s
)
Explain
Function
Assemble /
Disassemble
Appraiser
Initials
Date
- Knowledge of purpose of tool
- Knowledge of casing size and weight to be retrieved
- Knowledge of Grapple types
- Knowledge of Grapple identification
- Knowledge of Spear identification
- Assembly/Disassembly tooling
- Bottom Sub
- Dog Nut
- Slip mandrel Key
- Thrust Bearing
- Socket head Screw
- Lock Dog
- Upper Bushing
- Lower Bushing
- Roller Bearing (Optional)
- Make up torque for all connections
- Make up torque for all retainer bolts/screws
- Function Test
2M Spear Service Manual Reviewed by Trainee
Definitions of Elements
Name:




Identify Component(s) - employee should be able to name the components correctly and identify any tools that are typically used in conjunction with these tools.
Assemble / Disassemble - employee must demonstrate the ability to assemble and disassemble tools correctly.
Pre-Job Inspection - employee must identify what key inspection points are for each tool and explain its importance to the successful application of the tool.
Appraiser Initials & Date - As the employee successfully completes each step, the associated box should be marked. When all boxes for a specific tool category are checked,
then the supervisor or manager will initial and date showing completion of requirements.
Explain Function - employee should be able to describe how tools are used and understand the numerical identification system in order to properly communicate with the
district personnel.
2M Rotating Spear
Appraiser Initials & Date - As the employee successfully completes each step, the associated box should be marked. When all boxes for a specific tool category are checked,
then the supervisor or manager will initial and date showing completion of requirements.
To be signed by Operations Manager when complete

Signature: Date:
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked
Checked Checked Checked

You might also like