You are on page 1of 1

GSPublisherEngine 0.0.100.

100
MINISTRY OF PUBLIC WORKS
ARCHITECTURAL DEPARTMENT
FOR THE GOVERNMENT OF THE REPUBLIC OF KENYA
CHIEFARCHITECT
NAME SIGNATURE DATE
DRAWNBY
UNIT LEADER
PROJECT ARCH
DIV. HEAD
ARCH. N. N. KUREBA .
R. O. OCHIENG
S. M. NDIRITU
P. S. WASIKE
PROPOSED MULTI -STOREY OFFI CE BLOCK
ON PLOT L.R. No. 209/11456
FOR THE KENYA NATI ONAL ASSEMBLY
DRAWING TITLE
IT IS ILLEGAL TO USE IT FOR PURPOSES OF
CONSTRUCTION OR TO REPRODUCE IT IN
PARTOR IN WHOLE WITHOUT THE
AUTHOR'S PRIOR CONSENT.
THIS DRAWING IS THE
COPYRIGHT OF THE ARCHITECT
DWG NO. PROJECT/ JOB NO.
NOTES
All work to be carried out in accordance with Council
regulations.
1.
Dimensions are in millimetres unless otherwise stated.
They are to be read and NOT measured.
Check all dimensions on site.
2.
PV means permanent ventilation and must be provided
above all the doors and windows except WC doors.
3.
4. ARCHITECTURAL drawings must be used in conjunction
with STRUCTURAL, ELECTRICAL, MECHANICAL and any
other relevant consultants' drawings.
5. Any discrepancies in this drawing must be reported to
the Architect before construction commences.
REVISIONS
All reinforced concrete work is to be in accordance
with structural engineer's details.
6.
NO. DATE REVISION/ ISSUE
PROJECT
e-mail: mmi@mmiarch.com
P.O.Box 44934-00100, Nairobi Tel:3742710/1/2 Fax:254-02-3742717
mutiso menezes international
ARCHITECT'S SIGNATURE
_____________________________________Date_________________
architectural, planning and interior design consultants.
Quantity Surveyors.
Electrical and Mechanical Engineers.
Structural and Civil Engineers.
P.O.Box 44660 - 00100, Nairobi Tel:254-20-2729595 Fax:254-20-2716838
e-mail: info@quantech.com
e-mail: wce@kenyaweb.com
P.O.Box 20198 - 00200, Nairobi Tel: 254-20-2721492 Fax: 254-20-2722881
e-mail: mecoyconsultants@gmail.com
P.O.Box 21714 - 00505, Nairobi Tel:254-20-3876690/1/2 Fax:254-20-3876693
Quantech Consultancy
CLIENT
Wanjohi Consulting Engineers
Mecoy Consultants Ltd.
CLIENT'S SIGNATURE
____________________________________Date___________________
The Kenya National Assembly - P.S.C.
2381
1:125
A 1. Car Li f t s rel ocat ed.
2. Col umns at Gr i ds 6/K revi sed t o 2 no.
f or each and moved. 11.10.2010
3. KNA TOWER ground fl oor l evel revi sed to
900 mm above Kerb Level . Kerb Level i s
150 mm above Count y Rd. (1664 m i n
TOPO survey).
4.Ramp i ntroduced between Conti nental
House. 14.10.2010
B.
15.5.2012
Basement 4 (Parking) floor omitted.
Tunnel to County Hall omitted.
1 no. health club floor changed to office floor.
Health Club consolidated into 1 level only.
Swimming pool, machine room and void above it omitted.
Glass roof over swimming pool omitted. Void to be
blocked up with concrete and finished to match
rest of floor. Use of the resulting space to be assigned.
Car lifts omitted in Phase 1 but shatfts retained.
1.
2.
3.
4.
5.
6.
MINISTRY OF PUBLIC WORKS
PROJECT MANAGERS
P.O. Box 30260-00100 Nairobi. Tel. 254-20-2723101
Ministry Of Works Building - Ngong Road, Nairobi.
Email: info@publicworks.go.ke
CONSULTANTS
GROUND FLOOR PLAN
SCALE ON A1 A
B
C
D
E
F
DATE___________________
CLIENT'S
SIGNATURE________________________
C. Parkings reduced to 5.2M from edge of column to
wall,driveway increased to 6.2M
15.07.2014
1.
2. Distance between grids K1 and L reduced to 5.6m
3. Number of columns reduced in basement levels
Urinals Urinals
L[01]21
L[01]25
L
[0
1
]2
6
L
[
0
1
]
2
0
L
[
0
1
]
2
0
1
7
, 2
3
5
1
5
, 3
4
5
2
, 1
7
0
200
1,300
200
2,500
200
36,150
200
8,700
200
7,450
200
5
, 1
0
0
2
0
0
200 3,250 200 14,400 200
7
, 8
1
7
2
0
0
200 2,600 200 11,600
200
2,875
150
200 2,400
400
2,900 400 2,500 200 2,900 400 2,700 200 2,700 400
2 0 0
4 , 9 0 0
4 0 0
2 , 2 0 0
2 0 0
3 , 2 0 0
2 0 0
2 , 2 0 0
4 0 0
200 17800 200
15,700 2,400
2
0
0
1
, 3
3
0
2
0
0
200 2,750 200 2,100 200 3,550 200 3,550 200 5,050 200
5
, 0
9
1
2
0
0
2
0
0
7
, 7
4
0
2
0
0
2
0
0
2
, 0
1
7
2
0
0
5
, 5
2
4
2
0
0
200 5,800 200 8,100
2
0
0
5
, 3
0
0
2
0
0
200
6,100
200
2,500 200 2,500 200 200
2
, 2
0
0
2
0
0
1 , 3 0 0
2 0 0
2 , 4 0 0
2 0 0
1 , 2 0 0
2 0 0
2
0
0
4
, 0
0
0
2
0
0
2
, 9
1
7
2
0
0
3
1
0
1
, 7
0
0
2
8
9
9
1
6
0
0
1
, 0
0
0
2
0
0
3
, 3
0
0
2
0
0
1
, 2
0
0
2
0
0
3
, 9
0
0
2
0
0
200 2,800 200 17,950 200
2
0
0
1
, 3
3
0
2
0
0
3
, 1
1
0
1
0
0
3
, 0
0
0
2
0
0
200 2,800 200 8,700 200 5,950 200 1,300
200
4 0 0
7 0 0 1 0 06 0 0 1 0 07 0 0 2 0 0
5
5
0
5
, 8
0
0
6
0
0
200 1,300 200 3,250 200 2,600 200 5,700
200 1,300 200
2
0
0
2
, 8
0
0
2
0
0
2
, 9
1
9
2
0
0
2
, 8
0
0
2
0
0
4
, 7
1
0
2
0
0
2,600 750 5,200 800 5,200 800
1
, 8
9
2
5
2
2
1
, 0
6
3
1
, 6
1
4
2
, 7
2
6
3
, 8
9
3
8
9
3
6
1
5
1
, 2
5
0
2
, 7
4
6
2
, 7
4
6
1
, 2
5
0
6
1
5
8
9
3
3
, 8
9
3
2
, 7
2
6
1
, 7
0
1
9
7
6
5
2
2
1
, 6
1
2
6
2
5
5
, 6
2
5
5
, 1
7
5
4
, 9
0
0
3
0
0
7,200 6,000 6,000 6,000 6,000 6,000 6,000 6,000 5,702
248 200 1,050
925 5,600 6,000 5,600
475
5
0
, 7
7
5
75,600
EXTENSION TO ST. JOHNS GATE
EXTENSION TO ST. JOHNS GATE
E
X
T
E
N
S
I O
N
T
O
C
O
U
N
T
Y
R
O
A
D
200
1,050
100
900
100
900
100
900
100
300 850
100
850
100
850
200
850
100
850
100
850 300
100
900
100
900
100
900
100
900
100
1 , 4 6 0
56,957
2 0 0
1 0 5 0
1 0 0
1 0 5 0
4 0 0
1,200
1,200
1,200
200 800 1,600
150
2
, 5
0
0
2
, 5
0
0
4
, 0
0
0
6
, 0
0
0
4
, 0
0
0
6
, 0
0
0
200 4,300
1
, 6
0
0
1
, 4
5
0
3
, 2
9
0
2
0
0
4
, 0
0
0
2
0
0
875
875
2
0
0
2
0
0
2
0
0
1
, 8
0
0
2
0
01
0
0
200
200
200
200 5,750 300 5,700 300
500
200 5,050 200
3
, 1
0
0
1
0
0
2
, 1
0
0
2
0
0
2
0
0
4
, 8
1
1
2
0
0
1
0
0
9
0
0
6,908 400 2,350 200
850 1,100 850
850 1,100 850
3
, 0
9
5
1
0
0
2
, 1
0
6
2
0
0
4
, 9
0
0
4
0
0
2
, 2
0
0
2
0
0
3
, 1
9
3
2
0
0
2
, 2
0
0
4
0
0
8
, 7
9
3
6
0
0
4
, 0
9
3
9
0
0
5
0
0
6
0
0
1
, 1
0
0
8
4
8
7
9
8
400
600
100
4
, 6
9
3
9
0
0
1
, 2
5
9
7
9
5
7
5
0
9
0
0
5
5
0
1
, 8
0
0
1
, 0
5
0
7
0
0
1
, 5
0
0
364
2,000
1
, 4
0
0
400 800 900
950
200
73
900 1,302
6
5
0
2
, 1
0
0
6
5
0
2
, 1
0
0
900 1,100 1,800 1,100 1,100 2,318 1,481 1,100 700
1
, 2
0
0
2
, 4
0
0
1
, 4
2
7
4
, 3
2
5
2
0
0
1
, 3
0
0
2
0
0
200 1,800 200 1,800
200
1,700
600
2 0 0
8 , 5 7 0
2 0 0
2
0
0 9
0
0
1,200
1
, 3
7
5
0.000
0.00
-1200
0.000
-1200
0.000
-1200
0.000
-1200
0.000
0.000
0.000
r.c steps
to S.E detail
Treads = 300 mm
Risers = 150 mm
extent of canopy above
extent of extended
basement parking below
extent of extended
basement parking below
R.C steps
to S.E detail
Treads = 300 mm
Risers = 150 mm
r.c ramp
to S.E detail
rise= 1 in 12
mechanical duct
mechanical duct
200 mm thick
rc wall to S.E detail
Pressurisation
duct
r.c ramp
to S.E detail
rise= 1 in 12
Planters to detail
refer to detail L[91]01
fire cabinet plan
refer to detail L[52]07-09
Decorative column
refer to detail L[21]01-03
A[21]01-03
External security grille
refer to detail L[21]18
External security grille
refer to detail L[21]19
Decorative column
refer to detail L[21]01-03
A[21]01-03
Decorative column
refer to detail L[21]01-03
A[21]01-03
Decorative column
refer to detail L[21]01-03
A[21]01-03
Decorative column
detail L[21]01-03,A[21]01-03
Basement ventilation duct
refer to detail L[22]01-03
A[22]01-02
Basement ventilation duct
refer to detail L[22]01-03
A[22]01-02
Basement ventilation duct
refer to detail L[22]01-03
Basement ventilation duct
refer to detail L[22]01-03
A[22]01-02
VIP entrance steps
refer to detail L[24]07-08
VIP entrance ramp
refer to detail L[24]13-14
Public entrance ramp
refer to detail L[24]13-14
commitee lifts lobby
refer to detail L[42]23-24
RC staircase to S.E detail
Treads = 300 mm
Risers = 160.7 mm
Detail L[44]01-02, A[44]01-02
Fire escape staircase
to S.E detail
Treads = 300 mm
Risers = 160.7 mm
refer to detail L[44]03-04
Fire escape staircase
to S.E detail
Treads = 300 mm
Risers = 160.7 mm
VIP reception
refer to layout L[72]04-06
Planters to detail
refer to detail L[91]01
R.C wall to SE detail
Bulletproof glass to specialist
Turnstile to detail
new ms grille
new sliding gate
new sliding gate
barrier
new sliding gate
existing ms grille
proposed
ms grille
to detail
extent of extended
basement parking below
300 mm thick,full floor height
R.C sheer wall to S.E detail
Full height frameless
glass screen.
400 mm thick x 1725 mm rc column
to S.E detail
position of water bowser
r.c steps
to S.E detail
Treads = 300 mm
Risers = 150 mm
FHR
cabinet
ESCALATORS
to E.E details
steps
up
ramp
up
SCREENING AREA
REFUSE CHUTE
To M.E Detail
LIFT LOBBY
Layout L[42]11-13
LI FT
up
ST. JOHN'S GATE
PARKING
S E C
U
R
I T
Y
C
O
N
T
R
O
L
R
O
O
M
DRIVERS' ROOM
SECURITY ROOM
Layout L[72]10-12
Porcelain tiles
BEVERAGE STORE
SECURITY
VIP
LIFT
VIP
LIFT
PUBLIC LOUNGE
Porcelain tiles
MP's LOUNGE
r amp
up
MP's ENTRANCE
PUBLIC ENTRANCE
Detail L[24]09-10
S E C
U
R
I T
Y
G
U
A
R
D
S
steps
up
steps
up
TO CONTINENTAL
HOUSE
ramp to basement
Landscaping by
specialist
L[01]08 GROUND FLOOR PLAN
steps
up
SECURITY OFFICE
BMS ROOM
Porcelain tiles
up
pv
ENTRANCE PORCH
concrete paving blocks
concrete paving blocks
pv
VOI D
A u t o m
a t e d b i-p a r t i n g
g l a s s d o o r
Frameless glass
swing door
STRONG
ROOM
A B C D E F G H J
1
2
3
4
5
6
8
9
10
11
12
13
14
16
17
18
19
20
21
7
15
K L M
22
23
24
K1 N
211
A B C D E F G H J K L M K1 N
1
2
3
4
5
6
8
9
10
11
12
13
14
16
17
18
19
20
21
7
15
22
23
24
211
GOODS HOIST
Detail L[42]14-16
RECEPTION
Detail L[72]01-03
PUBLIC LOBBY
100mm
dia. SVP
100mm
dia. SVP
D U C T
D U C T
DUCT
Frameless glass
swing door
S t r o n g r o o m
d o o r
SECURITY OFFICER
SECURITY GUARDS
BAR
Layout L[73]01,A[73]01-04
pv
RECEPTION
LOBBY
Porcelain tiles
LOBBY
WATER FEATURE
Detail L[96]01-02
A[96]01
pv
H2O
CO2
FE
1 1/2 h r f i r e
r e s i s t a n t d o o r
VI P
LI FT
VI P
LI FT
VI P
LI FT
VI P
LI FT
LI FT
LI FT
WC WC WC WC WC
WHB WHB
W H B
W H B
W H B
WC WC WC WC WC
W H B
W H B
WHB WHB
WHB
W H B
W H B
W H B
WHB
V A N I T Y T O P
V A N I T Y T O P
W H B
2.5 m wide gap
14.0 m COUNTY RD.
falls
falls
falls
falls
concrete paving tiles
to specification
new 225 mm di a.
drai n pi pe to C.E detai l
new NCC Man Hol e
to C.E detai l
exi sti ng
IC
new 225 mm di a.
drai n pi pe to C.E detai l
GATE
HOUSE
LI FT
pv
VOI D
16' 16'
5' 5'
J'
J'
16'
A
B
A
B
A
B
16''
GENERAL LOBBY 2
PUBLIC LOBBY 1
VIP LOBBY 3
Granito tiles
Granito tiles
ARMOURY
up
YARD
Terazzo
STORE
DECK
cer . ti l es
cer . ti l es
H2O
CO2
FE
200 1,800
150
1,100 200 2,200
200
2,350 400 5,865 4,785 200 1,800 200
3
0
0
4
, 9
0
0
5
, 1
7
5
5
, 6
2
5
6
2
5
1
, 6
1
2
5
2
2
9
7
6
1
, 7
0
1
2
, 7
2
6
3
, 8
9
3
8
9
3
6
1
5
1
, 2
5
0
2
, 7
4
6
2
, 7
4
6
1
, 2
5
0
6
1
5
8
9
3
3
, 8
9
3
6
5
0
2
, 0
7
6
1
, 6
1
4
1
, 0
6
3
5
2
2
1
, 8
9
2
3
0
0
1
6
, 6
2
5
400
4,900 400
Electrical
duct
m.s handrail & balustrade,
1100mm high finished floor
level to detail
Decorative columns to S.E's
details (refer to L[21]01-03
& A[21]01-03)
Decorative columns to S.E's
details (refer to L[21]01-03
& A[21]01-03)
RECEPTION /SECURITY
FIRE
HOSE
REEL
FIRE
HOSE
REEL
TOM.EDETAILS&
MANUFACTURERS
SPECIFICATIONS.
TOM.EDETAILS&
MANUFACTURERS
SPECIFICATIONS.
TOM.EDETAILS&
MANUFACTURERS
SPECIFICATIONS.
TOM.EDETAILS&
MANUFACTURERS
SPECIFICATIONS.
TOM.EDETAILS&
MANUFACTURERS
SPECIFICATIONS.
TOM.EDETAILS&
MANUFACTURERS
SPECIFICATIONS.
AIR
LOCK
VIP LADIES
Porcelain tiles
AIR
LOCK
VIP GENTS.
Porcelain tiles
AIR
LOCK
PUBLIC LADIES
Porcelain tiles
PUBLIC GENTS.
Porcelain tiles
AIR
LOCK
DISABLED
WC
Porcelain tiles
DISABLED
WC
Porcelaintiles
pv
L[01]08

You might also like