Datos:
0 : 2.40 Ton/m
f'c :
h:
a:
b:
c:
250
1.70
0.85
0.30
0.85
t : 0.30
0.00
j:
PD : 0.30
Kg/m
m.
m.
m.
m.
m.
m.
j
m.
PD
H : 0.30 m.
T : 0.00 m.
B : 2.00 m.
PT : 2.00 m.
1.-Presion activa
Pa = KA2(PT + T) =
Relleno
2 : 1.60
PT
2
EA
PT/3
EP
3
TERRENO
O
a
1.07 Ton/m
2.-Empuje activo de relleno:
EA = 1/2 Pa (PT + T) = 1.07 Tonm
3.- Componente horizontal
EAH = EAcos = 1.07 Ton.
4.- Componente vertical
EAV = EAsen = 0.00 Ton.
Ton/m
KA =
c
B
FV
Ton/m
Ton/m
Pa
Pza.
#
3
4
5
EAV
EPH
Ton/m
F.S volteo 2.0
F.S desliza 1.5
Ton/m
C : 0.00
2 : 30
: 0
Terreno:
1 :
1.60
C : 0.00
1 : 30
a : 17.49
RELLENO
MC-1
Tel: 311-107-23-26
H=
0.30
d=
0.25
m.
r=
0.05
m.
FC =
1.55
m.
5.- Empuje pasivo del terreno de 8.- Calculo de momento negativo que
1 2
cimentacion en el frente del muro
provoca el vuelco
R2
Max
M- = EAHPT/3 = 0.711 Tonm
R1
KP = tan(45 + 1 / 2) = 3.00
Max = 2.70
Ton/m
9.- Factor de seguridad contra volteo
EPH = 1/2KP1PD + 2CPD1/2
Min = 4.62
M+
Ton/m
EPH = 0.216 Ton.
F.S. =
= 12.2 > 2.0 Cumple
=
2 = 3.81
3.52
M
Ton/m
1
considerando un factor de reduccin del
empuje pasivo de 2/3
EPH = 0.22 2/3 = 0.14 Ton.
6.- Pesos:
(b + t)h
W1 =
0 = 1.22 Ton.
2
(h + T+ h)c
W2 =
2 = 2.31 Ton.
2
W3 = HB0 = 1.44 Ton.
(a + a') j
W4 =
2 = 0.00 Ton.
2
10.- Factor
deslizamiento
F.S. =
de
seguridad
contra
F+
FR + EPH
=
FEAH
1
B
A
R1 =
R2 =
(Max+ 1)
a=
2.64
Ton
c=
3.58
Ton
1.93
Kg
Min
Ton/m
2
(Min+ 2)
2
FC R1
VU1 =
100 d
f'c bd
Vc > Vdu
Cumple
S1 =
a
3
Max + 21
Max + 1
MU = R1 (a - S1) =
= 17.808
= 0.4058 m.
1820 Kg-m
AS = 100d =
8.33
Se tomara Min
cm
2h
= 0.22 Tonm
9
= 0.00333
Con # 5
Av100
S=
= 24 cm. 20 cm.
As
5.00 cm
ASt = 0.002d B =
S=
20
39.6 cm.
M u = Vu
Con #
cm
h
EA1
As = 100b' = 9.50 cm
Con Varilla del # 5
Separacion Calculada
as*100
S=
= 21 cm 20
As
Pa3 = KA2h/3 = 0.30 Ton
P h
EA3 = a2
= 0.09 Tonm
6
Vu = 1.7EA1 = 145.57 Kg
M u = Vu
h
= 0.03 Tonm
9
= 0.00333
As = 100b' = 9.50 cm
Con Varilla del # 5
Separacion Calculada
as*100
S=
= 21 cm 20
As
cm
cm
0.30
Pa1
Pa1 = KA2h = 0.91 Ton
P h
EA1 = a1
= 0.77 Tonm
2
# 5 @ 20 Vert.
# 3 @ 10 Horiz..
0.57
Vu = 1.7EA1 =
1310 Kg
Con recubrimiento de : 2 cm. Resulta :
b' = 29 cm.
Vu
Vu=
= 0.54 Kgcm
100d
Vc = 0.53 f'c = 8.38
Vu = 0.54 < Vc = 8.38
Cumple
h
= 0.74 Tonm
3
Para un fy = 4200 Kgcm
0.5 fy
= 13.54 Kg/cm
Rn =
10.85 f'c
0.85f'c
2 (Mu/100d)
1=
1 fy
0.85 f'c
= 0.00333
# 5 @ 20 Vert.
# 3 @ 10 Horiz..
M u = Vu
0.57
]
# 5 @ 20 Vert.
# 3 @ 10 Horiz.
Mu
= 7 cm. < b' Cumple
Rnb
As = 100b' = 9.50 cm
b'' =
0.57
# 5 @ 20 cm.
Separacion Calculada
S=
as*100
21
20
cm
# 5 @ 20 cm.
As
1.70
as*100
13
10
0.30
cm
0.30
As
Pa2 = KA22h/3 =
0.60 Ton
Pa22h
EA2 =
= 0.34 Tonm
6
Vu = 1.7EA1 = 582.28 Kg
0.85
0.30
0.85