You are on page 1of 35

Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)


SITE NAME: Emirates Bank Head Oice !Al"#hor$
Site %ode : &'B()*+
Ta,le o %ontents
-. Technical Site Survey Report
*. Site /ocation and Buildin0 Inormation
1. %apacity
2. Antenna /ocation 3 types
). Bill o 4uantities
5. Sectori6ation
7. E8uipment Room &ra9in0
:. ;loor <lan /ayouts
+. System Schematics &ra9in0s
-(. EIR< Ta,le
--. Antenna /ocation <ictures
-*. Transmitter Test <lots
-1. E=istin0 %overa0e <lots
-2. Assumptions
TSSR d> Emirates Bank H.O. ?"(2 <a0e - o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
@REEN;IE/& ROO;TO< IBS
TSS &ate: Motorola
%A Su,contractor:
<>R<OSE O; &O%>MENT
To agree et!een all "arties "resent at the TSS on oth the design as !ell as the Health # Safet$ arrangements% as
stated in the local reg&lations' This doc&ment is% !hen f&ll$ signed% the go-order for "re"aring the Engineering (ackage
and to egin the final lease negotiations'
)ith the signing of this doc&ment &ndersigned "ersons agree !ith the asic la$o&t and the Health # Safet$
arrangements of this site'
*. TSS ATTEN&EES %ONTA%T &ETAI/S
<resent at TSS
Name And %ompany
Mo,ile B oice
Num,er
E"Mail Address
%andidate
Accepted
CBN
Si0nature
Telecom *m"lementation
(ro+ect Engineer ,
-adio Net!ork (lanning
Engineer ,
./.0/12/30 4MT5678MOTO-O9A':OM
-aed Al-M&ghann$
Transmission Engineer ,
NOK*A (9OS)
:) Engineer ,
:) Engineer , (artner
Electrical Engineer ,
(artner
Site Ac;&isition - (artner
9andlord -e"resentati<e
:omments' (if re+ected candidate state reasons !h$)
1. SITE IN;ORMATION
1.-: Site <osition
TSSR d> Emirates Bank H.O. ?"(2 <a0e * o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
(lot No (O Bo=
Address Emirates Bank Head Office (Al-Khor)
:it$ >&ai Emirate >&ai
Site :o-Ordinates (>ecimal) 9atit&de 2/?@0A1'63BN 9ongit&de //?@7AC'0.BE
Altit&de at gro&nd le<el (m)
Site Sec&rit$ >etails
:&rrent land &se E=isting &ilding
%omments:
1.*: /andlord
Name NDA (O Bo=
Address Emirates Bank Head Office (Al-Khor)
:it$ >&ai
9andlord re"resentati<e Tele"hone N&mer
:o&rtes$- dra!ings re;&ired otained
>ra!ings other o"erators a<ailale NDA (ermit dra!ings -e;&ired NDA
%omments :
2. HEA/TH 3 SA;ETC
2.- Speciic risks and ha6ards
associated 9ith this site
Ees No Notes:
a) Asestos
) (oorl$ lit access ro&te (nat&ralDartificial)
c) FerminD(igeons
d) B&ried ser<ices
e) Gn"rotected machiner$
f) Ad+acent gas "i"es D e;&i"ment
g) Traffic
h) Tri""ing haHardsDsli""er$ s&rfaces
i) HaHardo&s s&stances
2.* Temporary Aorks Ees No Notes
a) Are an$ tem"orar$ traffic arrangements
re;&ired to accommodate <ehic&lar traffic
and "edestrians d&ring constr&ctionI
) Are an$ tem"orar$ !orks and D or
s"ecific method statements re;&ired for
constr&ction d&e to the "ro=imit$ of the site
to gas "i"es% e;&i"ment etcI
c) Are there an$ tem"orar$ arrangements to
"rotect the !orkforceDmemers of the
"&lic% e'g' arriers% or !ill an$ e
necessar$I
%omments:
TSSR d> Emirates Bank H.O. ?"(2 <a0e 1 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
l) 9andlord access r&les: NON
m) 9imitations to access ho&rs NON
n) Noise "rod&ction limits NON
%omments:
).-: E=istin0 ;acilities !;or construction$ Ees No Notes:
a) (arking s"ace a<ailaleI
) :anteen% changing room% toiletI
c) 5irst aid a<ailaleI
d) 5ire e=ting&isherI
%omments:
5. STR>%T>RE
5.-: Buildin0 Structure
It is the responsi,ility o the &esi0n %onsultantB%ontractor to determine the suita,ility o the e=istin0 structure
or the proposed loadin0.
a) :onstr&ction (:oncrete frame% steel frame etc) :oncrete% 4lass and Jeson
) Age of &ilding Old
c) (ara"ets Height = !idth (m)
:onstr&ction
:o"ing
d) 9oad earing :ol&mn centres (m)
Elements )all S"acing (m)
e) No of 5loors and height of floors (m)
Basements K 4ro&nd K C floors
f) 9ift shaft room !all s"ecification
g) 9ift shaft room !all thickness (mm)
%omments :
5.*: BTS Installation
*ndoor BTS ho&sing ShelterD:ain *nternal -oom 9ocation Basement
A<' s"ace 9 = B (m) >ims (9 = B = H)m 3 = 1 = 1 m
'

AD: 9ocation
TSSR d> Emirates Bank H.O. ?"(2 <a0e 2 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
1. TECHNICAL SITE SURVEY REPORT
INDOOR COVERAGE SOLUTION
SITE NAME: Emirates Bank Head Office (Al-Khor)
TSSR d> Emirates Bank H.O. ?"(2 <a0e ) o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
*.<roDect location
TSSR d> Emirates Bank H.O. ?"(2 <a0e 5 o 1)
;i0 *.a /ocation o the proDect
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
*. SITE IN;ORMATION
SiteD:andidate N&mer: BS:D-N: N&mer
Site Name: Emirates Bank Head Ofce (Al-Khor)
Site Address: Emirates Bank Head Ofce (Al-Khor)
:oordinate 9atit&de: 2516'!"#$% :oordinates 9ongit&de: 551&''!6($E
-egion: >&ai Lone: >&ai
BTS T$"e: (s"ecif$) :o-locate: (s"ecif$) Batter$ ack &": (s"ecif$)
E;&i"ment T$"e: (24)
Multimode
Nokia UltraSite
EDGE BTS
((S-@0
E;&i"ment T$"e: (14)
Ultrasite WCDMA
Supreme
((S-@0
Site Access (rotocol: NON
:omments:
:hecked B$ Jamil
1. /AN&/OR& %ONTA%T IN;ORMATION:
Name: Address: Tele"hone: 5a= N&mer:
2. S>R?EC IN;ROMATION
@0-@.-2..6
TSSR d> Emirates Bank H.O. ?"(2 <a0e 7 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
S&r<e$ >ate:
5&nction:
:&stomer -e"resentati<e: Name: :om"an$:
Site Ac;&isition:
:onstr&ction )orks:
Telecom *m"lementation:
-adio Net!ork (lanning: Ashish #umar Motorola
Transmission (lanning:
9andlord -e"resentati<e:
:omments: :hecked B$ Jamil
*B. Buildin0 Inormation
Emirates Bank Head Office (Al-Khor) is an old &ilding !hich is located in Al-khor area' This &ilding consists of
TSSR d> Emirates Bank H.O. ?"(2 <a0e : o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
Basement K gro&nd K C 5loors' The &ilding is constr&cted of concrete% !ooden% +eson and glass' offices are
distri&ted thro&gh all the ank'
Some of the ank areas are restricted (the asement) !hich !e canMt f&ll$ access'

TSSR d> Emirates Bank H.O. ?"(2 <a0e + o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
5. %ONSTR>%TION IN;ORMATION: (ENG*(MENT 9O:AT*ON% BTS AN> BBG 5O- 24 AN> 14)
E;&i"ment 9ocation: (room
t$"e% corridor etc') (24)
AHG -oom
a<ailale in the
Basement
E;&i"ment 9ocation O<erall :ondition:
(4oodDModerateD(oor)(24) Moderate
E=isting >amages on
*nstallation Areas: (S"ecif$)
(24)
NDA
Strengthening or Modification of
E=isting Str&ct&re -e;&ired: (EesDNo)
(24)
No
5ree S"ace for Ne!
E;&i"ment S$stem: (EesDNo)
(24)
Ees
E;&i"ment >eli<er$ $:
(:raneD9iftDStairsDOther)(24) 9iftDStairs
E;&i"ment 9ocation: (room
t$"e% corridor etc')(14)
AHG -oom
a<ailale in the
Basement
E;&i"ment 9ocation O<erall :ondition:
(4oodDModerateD(oor)(14) Moderate
E=isting >amages on
*nstallation areas: (S"ecif$)
(14)
NDA
Strengthening or Modification of
E=isting Str&ct&re -e;&ired: (EesDNo)
(14)
No
5ree S"ace for Ne!
E;&i"ment S$stem: (EesDNo)
(14)
Ees
E;&i"ment >eli<er$ $:
(:raneD9iftDStairsDOther)(14) 9iftDStairs
%omments:' :hecked $ Jamil Arafat
TSSR d> Emirates Bank H.O. ?"(2 <a0e -( o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
7. A% <OAER &ISTRIB>TION:
E=isting Ne! Needed Ne!
K)h Meter T$"e:
K)h Meter 9ocation:
Main A: >istri&tion Board T$"e:
Main A: >istri&tion 9ocation:
Main A: S&""l$ :ale SiHe: (mm2)
Main A: S&""l$ :ale 9ength: (m)
Main A: BreakerD5&se SiHe:
Main A: BreakerD5&se SiHe and
N&mer
Main A: :ale "rotection T$"e:
((F: or Metal (i"e% (F: or Metal
:ond&it)
:omments:
:. SITE @RO>N&IN@ SCSTEM
E=isting Ne! Needed Ne!
E;&i"ment gro&nd location
E;&i"ment gro&nd collector siHe:
(mm2)
E;&i"ment gro&nd cond&ctor siHe:
(mm2)
A: gro&nd collector siHe: (mm2)
A: gro&nd cond&ctor siHe: (mm2)
4ro&nding B&sar T$"e and
N&mer:
:omments:
TSSR d> Emirates Bank H.O. ?"(2 <a0e -- o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
+. TRANSMISSION SCSTEM IM</EMENTATION
Site t$"e: (SingleDH&DNode) Transmission T$"e:
(O"ticalD9eased
lineDM)-)
S$stem im"edance: S$stem T$"e:
(6/D@..D@2.) (E@DT@DJT2DSTM.D
STM@Dother)
*m"edance :on<erter Needed:
(EesDNo)
Transmission E;&i"ment T$"e:
M)- 9ink: E;&i"ment Bearing: 5ar Antenna S&""ort T$"e: *GDOG :aling >isc SiHe:
(No:) T$"e: (deg) End: Height: T$"e: (m)
(mDA49)
E=istin0 Ne9 Needed Ne9
M)- *GDOG EM( T$"e and
N&mer:
M)- *GDOG :onnector
T$"e:
>>5 E;&i"ment T$"e and
N&mer:
(:M :ale T$"e:
(:M :onnector T$"e and
N&mer:
Transmission :ale
(rotection T$"e ((F: or
Metal (i"e% (F: or Metal
:ond&it)
)omments*
TSSR d> Emirates Bank H.O. ?"(2 <a0e -* o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
-(. E4>I<MENT S<E%I;I%ATION
Base station t$"e:(24)
Multimode
Nokia UltraSite
EDGE BTS
Base station t$"e:(14)
UltraSite
WCDMA BTS
Supreme
:onfig&ration: BTS @ (7) T-O :onfig&ration: Node-B@ (3) T-O
(o!er re;&irement ("er :ainet): 12 A S( (o!er re;&irement ("er :ainet): 12 A S(
(o!er cons&m"tion ("er :ainet): Ma= (>:) 13.. ) (o!er cons&m"tion ("er :ainet): Ma= (>:) 166. )
>imensions:(h = ! = d) mm("er
:ainet)
@7..P0..P/6. mm
>imensions (h = ! = d) mm ("er
:ainet)
@7..P0..P0.. mm
)eight ("er :ainet): Ma= 26. Kg )eight ("er :ainet): Ma= 2C. Kg
:omments:
2. Antenna /ocation 3Types:
>esign a""roach is clearl$ ased on ma=im&m co<erage for the &sers !ho are sitting near the glass !indo!s
and making s&re that the$ are al!a$s on the dominant indoor net!ork all the time'
Ens&re a minim&m co&"ling loss et!een the moiles and antenna in order to meet minim&m GEMs "o!er'
MinimiHe the n&mer of Antenna locations in order to make the design o"tim&m and cost effecti<e'
S"ecific design a""roach has een made to take care of 9ift loies so that the "enetration loss does not affect
the signal strength inside the lifts'
:o<erage inside the car "ark in the asements has een ens&red'
All -ooms are made &" from :oncrete% +eson% !ooden Board and 4lasses'
Total /3 antennas are "ro"osed to e distri&ted across the &ildings'
TSSR d> Emirates Bank H.O. ?"(2 <a0e -1 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
Sectorization
This &ilding is going to e sectoriHed $ 2 sectors' The follo!ing tale sho!s floors "er sector'
TSSR d> Emirates Bank H.O. ?"(2 <a0e -2 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
7. E8uipment Room &ra9in0s and /ocation:
5ig&re elo! sho!s the 4SM room 9a$o&t located at the -oof To" floors'

TSSR d> Emirates Bank H.O. ?"(2 <a0e -) o 1)
;i0 -.a @SM Room in the Basement ;loor
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
The ollo9in0 sho9s the e8uipment location in the AH> room.
TSSR d> Emirates Bank H.O. ?"(2 <a0e -5 o 1)
;i0 -., AH> Room in the Basement ;loor
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
Basement - /evel:
TSSR d> Emirates Bank H.O. ?"(2 <a0e -7 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
@round ;loor:
TSSR d> Emirates Bank H.O. ?"(2 <a0e -: o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
Me66anine ;loor:

TSSR d> Emirates Bank H.O. ?"(2 <a0e -+ o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
-
st
;loor:
TSSR d> Emirates Bank H.O. ?"(2 <a0e *( o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
*
nd
;loor:
TSSR d> Emirates Bank H.O. ?"(2 <a0e *- o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
1
rd
;loor:
TSSR d> Emirates Bank H.O. ?"(2 <a0e ** o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
2
th
;loor:
TSSR d> Emirates Bank H.O. ?"(2 <a0e *1 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
)
th
;loor:
TSSR d> Emirates Bank H.O. ?"(2 <a0e *2 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
5
th
;loor:
TSSR d> Emirates Bank H.O. ?"(2 <a0e *) o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
7
th
;loor:
TSSR d> Emirates Bank H.O. ?"(2 <a0e *5 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
:
th
;loor:
TSSR d> Emirates Bank H.O. ?"(2 <a0e *7 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
+
th
;loor:
TSSR d> Emirates Bank H.O. ?"(2 <a0e *: o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
+. System Schematics:
TSSR d> Emirates Bank H.O. ?"(2 <a0e *+ o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
TSSR d> Emirates Bank H.O. ?"(2 <a0e 1( o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
-(. A. EIR< Ta,le E <assive &AS !&%S$:
TSSR d> Emirates Bank H.O. ?"(2 <a0e 1- o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
-(. B. EIR< Ta,le E <assive &AS !>MTS$:
TSSR d> Emirates Bank H.O. ?"(2 <a0e 1* o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
--. Antenna /ocation <ictures
(ict&ring !as not allo!ed in the Bank eca&se of sec&rit$ iss&es'
TSSR d> Emirates Bank H.O. ?"(2 <a0e 11 o 1)
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
-*. Transmitter Test <lots:
The follo!ing "lots are sho!ing the Transmitter test "lots for some antennas'
TSSR d> Emirates Bank H.O. ?"(2 <a0e 12 o 1)
;i0 -*., TT <lot or Ant";*"-
Legend
!"e# S$% (dBm)
-3/ to -0.
-0. to -0/
-0/ to -6.
-6. to -6/
-6/ to -7.
-7. to -7/
-7/ to -C.
-C. to -@./
Legend
!"e# S$% (dBm)
-3/ to -0.
-0. to -0/
-0/ to -6.
-6. to -6/
-6/ to -7.
-7. to -7/
-7/ to -C.
-C. to -@./
;i0 -*.a TT <lot or Ant";-"-
Technical Site Survey Report

Site Name: Emirates Bank Head Office (Al-Khor)
-1. E=istin0 %overa0e <lots:
The fig&re elo! "ro<ides the d& e=isting co<erage "lots inside the &ilding
'
-2. Assumptions:
There are no restrictions regarding r&nning co-a=ial cales% cale tra$s and rele<ant e;&i"ment installation% from
the &ilding administration'
All cale lengths need to e confirmed efore installation'
9ocation of "ro"osed antenna ma$ change s&+ect to a""ro<al from &ilding o!ner'
All e="osed -5 cales to e ro&ted in cond&its !itho&t dist&ring &ilding aesthetic looks'
All "artitions inside all &ildings made from :oncrete% !ooden Board and 4lasses'
:hanges to the str&ct&re design affect the <alidit$ of the -5 design'
Basement and meHHanine floors are restricted areas% !e did not get the dra!ings for it' The dra!ings a<ailale
in the TSS- are ro&ghl$ sketched'
TSSR d> Emirates Bank H.O. ?"(2 <a0e 1) o 1)
;i0.-1 E=istin0 &> R= /ev <lot
Legend
!"e# S$% (dBm)
-3/ to -0.
-0. to -0/
-0/ to -6.
-6. to -6/
-6/ to -7.
-7. to -7/
-7/ to -C.
-C. to -@./

You might also like