You are on page 1of 12

CEBU-P0-11-C-0098

Rev-P1

CONTENTS

Sr. No.

Subject

Page No.

1.0

General Plumbing Requirements

2.0

Plumbing requirement for CEBU Power Plant

3.0

Definition of the Terms used

4.0

Plumbing requirement for Various Buildings :

(A)

Plumbing requirement for Administration Building

(B)

Plumbing requirement for Control Building

(C)

Plumbing requirement for ESP/Ash Control House

(D)

Plumbing requirement for Hypochlorination Building

(E)

Plumbing requirement for Main Guard House

(F)

Plumbing requirement for Main Warehouse

(G)

Plumbing requirement for Second Guard House

(H)

Plumbing requirement for Sewage Treatment System

(I)

Plumbing requirement for Water/Waste water Treatment Building

10

CEBU-P0-11-C-0098

Rev-P1

CEBU-P0-11-C-0098

1.0 GENERAL PLUMBING REQUIREMENTS :


Plumbing systems directly affect the health and safety of the public and thus they are
distinguished from other piping systems by the following general requirements :
1. The design, materials and installation of the systems are directly regulated by a plumbing code.
2. System design must be approved by an authorised code official charged with the responsibility
of ensuring plumbing code compliance.
3. A permit for installation of the systems must be obtained from the authority having jurisdiction.
4. The systems shall be installed by an individual duly licensed by the authority having jurisdiction
for determining the competence of an individual to obtain a plumbing installation license. This may
not be required in some jurisdictions.
5. The installed systems are required to be inspected and approved by an authorised code
official charged with the responsibility of code enforcement.
2.0 PLUMBING REQUIREMENT FOR CEBU POWER PLANT :
For the CEBU Project, the instantaneous Plumbing Requirement for various buildings is provided
from the Potable water distribution header.
All Potable water shall be supplied from Potable Water Pump (P0HGB10AP001, P0HGB20AP001)
( Reference P&ID Dwg. No. : CEBU-P0-11-D-0013 )
The estimation of water demand for various buildings has been done in accordance with the
National Plumbing Codes Handbook Second Edition
The instantaneous plumbing requirement is estimated for the following buildings :
a) Administration Building
b) Control Building
c) ESP/Ash Control House
d) Hypochlorination Building
e) Main Guard House
f) Main Warehouse
g) Second Guard House
h) Sewage Treatment System
i) Water/Waste water Treatment Building
3.0 DEFINITION OF THE TERMS USED :
Plumbing fixture :
A plumbing fixture is any approved receptacle specifically designed to receive human and other
waterborne waste and discharge that waste directly into the sanitary drainage system, usually
with the addition of water.
Fixture units :
The fixture unit (FU) is an arbitrary, comparative value assigned to a specific plumbing fixture,
device, or piece of equipment. FU values represent the probable flow that the concerned fixture will
discharge into a drainage system or use (demand) from a potable water supply system, compared
to other fixtures.

Page 1 of 10

Rev-P1

CEBU-P0-11-C-0098

Rev-P1

4.0 PLUMBING REQUIREMENT FOR VARIOUS BUILDINGS :


DOMESTIC WATER SERVICE AND PLUMBING
COLD WATER SUPPLY TO ADMINISTRATION BUILDING
REFERENCE
* Guide to water supply rules published by international law book services, Malaysia
* National Plumbing Code Hand Book Second Edition published by McGraw-Hill Book Company, inc
A) WATER DEMANDS FOR ADMINISTRATION BUILDING
Total number of fixture units(From National Plumbing Code)
Plumbing fixtures
W.W.C
Urinal
Lavatory
Electrical water heater
Shower
Service sink
Kitchen sink
Mop sink
Floor drain
F.U total
Flow rate (GPM)

Q'ty
15
12
14
11
5
2
2
3
12

Cold water
F.U
Total
5
75
5
60
1.5
21
5.1
56.1
3
15
3
6
3
6
2.25
6.75
-

Remarks

Hot water

245.85
75

Refer to Fig.20.2 Table for estimation demand, Table F102 of the code
Refer to Fig.20.3 Load values assigned to fixtures, Table F101 of the code
Refer to Document No :
(i) CEBU-P0-17-D-6018/06. Page No. 1 of 1, Rev. 0 .
Administration building : Water Supply Schematic Diagram
(ii) CEBU-P0-17-D-6018/07. Page No. 1 of 1, Rev. 0 .
Administration building : Drainage Schematic Diagram

Page 2 of 10

CEBU-P0-11-C-0098

Rev-P1

DOMESTIC WATER SERVICE AND PLUMBING


COLD WATER SUPPLY TO CONTROL BUILDING
REFERENCE
* Guide to water supply rules published by international law book services, Malaysia
* National Plumbing Code Hand Book Second Edition published by McGraw-Hill Book Company, inc
B) WATER DEMANDS FOR CONTROL BUILDING
Total number of fixture units(From National Plumbing Code)
Plumbing fixtures

Q'ty

Low flushing cistern (W.W.C)


Ablusion tap (Faucet)
Urinal
Wash Basin (Lavatory)
Electrical water heater
Shower
Service sink
Floor drain
F.U total
Flow rate (GPM)

5
5
5
8
5
2
1
13

Cold water
F.U
Total
5
25
1.5
7.5
5
25
1.5
12
5.1
25.5
3
6
3
3
104
45

Remarks

Hot water
Kitchen Sink

Refer to Fig.20.2 Table for estimation demand, Table F102 of the code
Refer to Fig.20.3 Load values assigned to fixtures, Table F101 of the code
Refer to Document No :
(i) CEBU-P0-17-D-0422/12. Page No. 1 of 2, Rev. P1 .
Control building : Ground floor toilet layout & plumbing detail
(ii) CEBU-P0-17-D-0422/12. Page No. 2 of 2, Rev. P1 .
Control building : Second floor Toilet, tea room, wash area layout & plumbing detail

Page 3 of 10

CEBU-P0-11-C-0098

Rev-P1

DOMESTIC WATER SERVICE AND PLUMBING


COLD WATER SUPPLY TO ESP/ASH CONTROL HOUSE
REFERENCE
* Guide to water supply rules published by international law book services, Malaysia
* National Plumbing Code Hand Book Second Edition published by McGraw-Hill Book Company, inc
C) WATER DEMANDS FOR ESP/ASH CONTROL HOUSE
Total number of fixture units(From National Plumbing Code)
Plumbing fixtures

Q'ty

Low flushing cistern (W.W.C)


Ablusion tap (Faucet)
Urinal
Wash Basin (Lavatory)
Electrical water heater
F.U total
Flow rate (GPM)

3
3
2
3
2

Cold water
F.U
Total
5
15
1.5
4.5
5
10
1.5
4.5
5.1
10.2
44.2
27.5

Remarks

Hot water

Refer to Fig.20.2 Table for estimation demand, Table F102 of the code
Refer to Fig.20.3 Load values assigned to fixtures, Table F101 of the code
Note : The type & quantity of Plumbing fixtures is assumed as per the specific building's requirement

Page 4 of 10

CEBU-P0-11-C-0098

Rev-P1

DOMESTIC WATER SERVICE AND PLUMBING


COLD WATER SUPPLY TO HYPOCHLORINATION BUILDING
REFERENCE
* Guide to water supply rules published by international law book services, Malaysia
* National Plumbing Code Hand Book Second Edition published by McGraw-Hill Book Company, inc
D) WATER DEMANDS FOR HYPOCHLORINATION BUILDING
Total number of fixture units(From National Plumbing Code)
Plumbing fixtures

Q'ty

Low flushing cistern (W.W.C)


Ablusion tap (Faucet)
Urinal
Wash Basin (Lavatory)
Electrical water heater
Shower
Eye washer
Safety shower
F.U total
Flow rate (GPM)

1
1
2
2
1
1
1
1

Cold water
F.U
Total
5
5
1.5
1.5
5
10
1.5
3
5.1
5.1
3
3
1.5
1.5
3
3
32.1
24

Remarks

Hot water

Refer to Fig.20.2 Table for estimation demand, Table F102 of the code
Refer to Fig.20.3 Load values assigned to fixtures, Table F101 of the code
Note : The type & quantity of Plumbing fixtures is assumed as per the specific building's requirement

Page 5 of 10

CEBU-P0-11-C-0098

Rev-P1

DOMESTIC WATER SERVICE AND PLUMBING


COLD WATER SUPPLY TO MAIN GUARD HOUSE
REFERENCE
* Guide to water supply rules published by international law book services, Malaysia
* National Plumbing Code Hand Book Second Edition published by McGraw-Hill Book Company, inc
E) WATER DEMANDS FOR MAIN GUARD HOUSE
Total number of fixture units(From National Plumbing Code)
Plumbing fixtures

Q'ty

Low flushing cistern (W.W.C)


Ablusion tap (Faucet)
Urinal
Wash Basin (Lavatory)
Electrical water heater
Shower
Service sink
F.U total
Flow rate (GPM)

2
2
2
4
3
1
1

Cold water
F.U
Total
5
10
1.5
3
5
10
1.5
6
5.1
15.3
3
3
3
3
50.3
29.2

Remarks

Hot water
Kitchen Sink

Refer to Fig.20.2 Table for estimation demand, Table F102 of the code
Refer to Fig.20.3 Load values assigned to fixtures, Table F101 of the code
Note : The type & quantity of Plumbing fixtures is assumed as per the specific building's requirement

Page 6 of 10

CEBU-P0-11-C-0098

Rev-P1

DOMESTIC WATER SERVICE AND PLUMBING


COLD WATER SUPPLY TO MAIN WAREHOUSE
REFERENCE
* Guide to water supply rules published by international law book services, Malaysia
* National Plumbing Code Hand Book Second Edition published by McGraw-Hill Book Company, inc
F) WATER DEMANDS FOR MAIN WAREHOUSE
Total number of fixture units(From National Plumbing Code)
Plumbing fixtures

Q'ty

Low flushing cistern (W.W.C)


Ablusion tap (Faucet)
Urinal
Wash Basin (Lavatory)
Electrical water heater
Shower
F.U total
Flow rate (GPM)

2
2
2
2
1
2

Cold water
F.U
Total
5
10
1.5
3
5
10
1.5
3
5.1
5.1
3
6
37.1
25.5

Remarks

Hot water

Refer to Fig.20.2 Table for estimation demand, Table F102 of the code
Refer to Fig.20.3 Load values assigned to fixtures, Table F101 of the code
Note : The type & quantity of Plumbing fixtures is assumed as per the specific building's requirement

Page 7 of 10

CEBU-P0-11-C-0098

Rev-P1

DOMESTIC WATER SERVICE AND PLUMBING


COLD WATER SUPPLY TO SECOND GUARD HOUSE
REFERENCE
* Guide to water supply rules published by international law book services, Malaysia
* National Plumbing Code Hand Book Second Edition published by McGraw-Hill Book Company, inc
G) WATER DEMANDS FOR SECOND GUARD HOUSE
Total number of fixture units(From National Plumbing Code)
Plumbing fixtures

Q'ty

Low flushing cistern (W.W.C)


Ablusion tap (Faucet)
Urinal
Wash Basin (Lavatory)
Electrical water heater
Service sink
F.U total
Flow rate (GPM)

1
1
1
3
2
1

Cold water
F.U
Total
5
5
1.5
1.5
5
5
1.5
4.5
5.1
10.2
3
3
29.2
23

Remarks

Hot water
Kitchen Sink

Refer to Fig.20.2 Table for estimation demand, Table F102 of the code
Refer to Fig.20.3 Load values assigned to fixtures, Table F101 of the code
Note : The type & quantity of Plumbing fixtures is assumed as per the specific building's requirement

Page 8 of 10

CEBU-P0-11-C-0098

Rev-P1

DOMESTIC WATER SERVICE AND PLUMBING


COLD WATER SUPPLY TO SEWAGE TREATMENT SYSTEM
REFERENCE
* Guide to water supply rules published by international law book services, Malaysia
* National Plumbing Code Hand Book Second Edition published by McGraw-Hill Book Company, inc
H) WATER DEMANDS FOR SEWAGE TREATMENT SYSTEM
Total number of fixture units(From National Plumbing Code)
Plumbing fixtures

Q'ty

Low flushing cistern (W.W.C)


Ablusion tap (Faucet)
Urinal
Wash Basin (Lavatory)
Electrical water heater
Shower
F.U total
Flow rate (GPM)

1
1
1
1
1
1

Cold water
F.U
Total
5
5
1.5
1.5
5
5
1.5
1.5
5.1
5.1
3
3
21.1
20

Remarks

Hot water

Refer to Fig.20.2 Table for estimation demand, Table F102 of the code
Refer to Fig.20.3 Load values assigned to fixtures, Table F101 of the code
Note : The type & quantity of Plumbing fixtures is assumed as per the specific building's requirement

Page 9 of 10

CEBU-P0-11-C-0098

Rev-P1

DOMESTIC WATER SERVICE AND PLUMBING


COLD WATER SUPPLY TO WATER/WASTEWATER TREATMENT BUILDING
REFERENCE
* Guide to water supply rules published by international law book services, Malaysia
* National Plumbing Code Hand Book Second Edition published by McGraw-Hill Book Company, inc
I) WATER DEMANDS FOR WATER/WASTEWATER TREATMENT BUILDING
Total number of fixture units(From National Plumbing Code)
Plumbing fixtures

Q'ty

Low flushing cistern (W.W.C)


Ablusion tap (Faucet)
Urinal
Wash Basin (Lavatory)
Electrical water heater
Shower
Eye washer
Safety shower
F.U total
Flow rate (GPM)

1
1
1
1
1
1
1
1

Cold water
F.U
Total
5
5
1.5
1.5
5
5
1.5
1.5
5.1
5.1
3
3
1.5
1.5
3
3
25.6
22

Remarks

Hot water

Refer to Fig.20.2 Table for estimation demand, Table F102 of the code
Refer to Fig.20.3 Load values assigned to fixtures, Table F101 of the code
Note : The type & quantity of Plumbing fixtures is assumed as per the specific building's requirement

Page 10 of 10

You might also like