NOTES:
The purpose of this list is to provide general reference to WECC reporting requirements for submitting new dynamics modeling data due to adoption of new dynamic models or for replacing existing dynamics data due to the retirement of old dynamic models
This list provides the implementation schedule for recently developed and newly approved WECC dynamic models
This list also provides the dynamics data retirement schedule for models planned for removal from the WECC Approved Dynamics Model Library
REMTF Developed Phase 2 Generic Wind and Solar Models are intended to replace all existing wind/solar dynamic model records
Targeted for Removal from WECC Master Dynamics Data File and not approved status on the WECC Approved Dynamic Model Library

Type 1 WIND TURBINE GENERATOR MODELS - FIXED SPEED, INDUCTION GENERATORS


Equipment
Representation
Generator
Excitation
Turbine
Pitch Controller

GE PSLF

PTI PSS/E

PowerWorld

MVWG Approval
Date

wt1g

WT1G1

wt1g, WT1G1

approved 1/21/11

wt1t
wt1p
wt1p_b

WT12T1
WT12A1
WT12A1

wt1t, WT12T1
wt1p, WT12A1
wt1p_b, WT12A1

approved 1/21/11
approved 1/21/11
approved 3/19/14

SRWG Basecase
Implementation
Begin Date
7/18/2014
with 2015 HS4-OP &
2015 LS1-OP

SRWG Basecase
Implementation
Completion Date
6/5/2015
with 2020-21 HW1

MVWG Library
Removal Date

next MVWG Meeting

Comments

use new wt1p_b instead

Type 2 WIND TURBINE GENERATOR MODELS - INDUCTION GENERATORS WITH VARIABLE ROTOR RESISTANCE
Equipment
Representation
Generator
Excitation
Turbine
Pitch Controller

GE PSLF

PTI PSS/E

PowerWorld

MVWG Approval
Date

SRWG Basecase
Implementation
Begin Date

wt2g
wt2e
wt2t
wt2p
wt1p_b

WT2G1
WT2E1
WT12T1
WT12A1
WT12A1

wt2g, WT2G1
wt2e, WT2E1
wt2t, WT12T1
wt2p, WT12A1
wt1p_b, WT12A1

approved
approved
approved
approved
approved

7/18/2014 with 2015


HS4-OP & 2015 LS1OP

8/28/09
8/28/09
8/28/09
8/28/09
3/19/14

SRWG Basecase
Implementation
Completion Date
6/5/2015
with 2020-21 HW1

MVWG Library
Removal Date

next MVWG Meeting

Comments

use new wt1p_b instead

Type 3 WIND TURBINE GENERATOR MODELS - DOUBLY-FED ASYNCHRONOUS WITH ROTOR-SIDE CONVERTER
Equipment
Representation
Plant Controller
Generator/Converter
Electrical Controls
Turbine
Aerodynamics
Pitch Controller
Torque Controller

GE PSLF

PTI PSS/E

PowerWorld

MVWG Approval
Date

repc_a
wt3g
regc_a
wt3e
reec_a
wt3t
wtgt_a
wtga_a
wt3p
wtgp_a
wtgq_a

REPCAU1
WT3G1
REGCAU1
WT3E1
REECAU1
WT3T1
WTDTAU1
WTARAU1
WT3P1
WTPTAU1
WTTQAU1

repc_a
wt3g, WT3G1
regc_a
wt3e, WT3E1
reec_a
wt3t, WT3T1
wtgt_a
wtgar_a
wt3p, WT3P1
wtgpt_a
wtgtrq_a

approved
approved
approved
approved
approved
approved
approved
approved
approved
approved
approved

3/19/14
8/28/09
3/19/14
8/28/09
3/19/14
8/28/09
3/19/14
3/19/14
8/28/09
3/19/14
3/19/14

SRWG Basecase
Implementation
Begin Date

7/18/2014
with 2015 HS4-OP &
2015 LS1-OP

SRWG Basecase
Implementation
Completion Date

6/5/2015
with 2020-21 HW1

MVWG Library
Removal Date

Comments

not approved 6/05/15

replace all existing records with REMTF Phase 2 models

not approved 6/05/15

replace all existing records with REMTF Phase 2 models

not approved 6/05/15

replace all existing records with REMTF Phase 2 models

not approved 6/05/15

replace all existing records with REMTF Phase 2 models

MVWG Library
Removal Date

Comments

not approved 6/05/15

replace all existing records with REMTF Phase 2 models

not approved 6/05/15

replace all existing records with REMTF Phase 2 models

not approved 6/05/15

replace all existing records with REMTF Phase 2 models

MVWG Library
Removal Date

Comments

Type 4 VARIABLE SPEED GENERATORS WITH FULL CONVERTER INTERFACE


Equipment
Representation
Plant Controller
Generator/Converter
Electrical Controls
Turbine

GE PSLF

PTI PSS/E

PowerWorld

MVWG Approval
Date

SRWG Basecase
Implementation
Begin Date

repc_a
wt4g
regc_a
wt4e
reec_a
wt4t
wtgt_a

REPCAU1
WT4G1
REGCAU1
WT4E1
REECAU1
WT4T1
WTDTAU1

repc_a
wt4g, WT4G1
regc_a
wt4e, WT4E1
reec_a
wt4t
wtgt_a

approved
approved
approved
approved
approved
approved
approved

7/18/2014
with 2015 HS4-OP &
2015 LS1-OP

MVWG Approval
Date

SRWG Bassecase
Implementation
Begin Date

approved
approved
approved
approved

7/18/2014
with 2015 HS4-OP &
2015 LS1-OP

3/19/14
8/28/09
3/19/14
8/28/09
3/19/14
8/28/09
3/19/14

SRWG Basecase
Implementation
Completion Date

6/5/2015
with 2020-21 HW1

PV POWER PLANT MODELS


Equipment
Representation

GE PSLF

PTI PSS/E

PowerWorld

Plant Controller
Grid Interface
Electrical Controls
Distributed PV

repc_a
regc_a
reec_b
pvd1

REPCAU1
REGCAU1
REECBU1

repc_a
regc_a
reec_b

3/19/14
3/19/14
3/19/14
3/19/14

SRWG Basecase
Implementation
Completion Date
6/5/2015
with 2020-21 HW1

Used to represent distribution-connected small PV plants or multiple PV plants aggregated at a high voltage bus

Page 1 of 2

WECC Newly Approved Dynamic Model Implementation Schedule


Version July 2014
NOTES:
The purpose of this list is to provide general reference to WECC reporting requirements for submitting new dynamics modeling data due to adoption of new dynamic models or for replacing existing dynamics data due to the retirement of old dynamic models
This list provides the implementation schedule for recently developed and newly approved WECC dynamic models
This list also provides the dynamics data retirement schedule for models planned for removal from the WECC Approved Dynamics Model Library
REMTF Developed Phase 2 Generic Wind and Solar Models are intended to replace all existing wind/solar dynamic model records
Targeted for Removal from WECC Master Dynamics Data File and not approved status on the WECC Approved Dynamic Model Library

UNAPPROVED WIND AND SOLAR POWER PLANT MODELS THAT REQUIRE REPLACEMENT WITH REMTF PHASE 2 WIND AND SOLAR MODELS
Equipment
Representation

Generator

Electrical Controls

Turbine
Wind/Solar Projects

GE PSLF

PTI PSS/E

PowerWorld

gewtg
GEWTG1
gewtg, GEWTGU1
genwri
genwri
motor1
CIMTR4
motor1, CIMTR4
pv1g
exwtge
EXWTGE1
exwtge
exwtgfc
EXWTGFC1
exwtgfc
exwtg1
exwtg1
pv1e
wndtge
WNDTGE1
wndtge
wndtrb
wndtrb
synchronous generator models used to represent wind/solar projects

MVWG Approval
Date

SRWG Basecase
Implementation
Begin Date

not approved
not approved
not approved
not approved
not approved
not approved
not approved
not approved
not approved
not approved
not approved

7/18/2014 with 2015


HS4-OP & 2015 LS1OP

SRWG Basecase
Implementation
Completion Date

6/5/2015
with 2020-21 HW1

MVWG Library
Removal Date

not approved for use in


WECC

Comments
replace all existing records with REMTF Phase 2 models
replace all existing records with REMTF Phase 2 models
not approved to represent Type 1 wind generators; replace all existing records with REMTF Phase 2 models
replace all existing records with REMTF Phase 2 models
replace all existing records with REMTF Phase 2 models
replace all existing records with REMTF Phase 2 models
replace all existing records with REMTF Phase 2 models
replace all existing records with REMTF Phase 2 models
replace all existing records with REMTF Phase 2 models
replace all existing records with REMTF Phase 2 models
synchronous generator models are not approved by MVWG to represent wind/solar projects; replace all existing records with REMTF Phase 2 models

RELAY MODELS
Equipment
Representation
Voltage Protection
Frequency Protection
Curve based inverse time
overcurrent relay
Equation based inverse
time overcurrent relay
Curve based inverse time
overcurrent relay
Equation based inverse
time overcurrent relay
Curve based inverse time
overcurrent relay
Equation based inverse
time overcurrent relay
Curve based inverse time
overcurrent relay
Equation based inverse
time overcurrent relay

Bus Voltage

GE PSLF

PTI PSS/E

PowerWorld

MVWG Approval
Date

lhvrt
lhfrt

VTGTPAT
FRQTPAT

lhvrt
lhfrt

approved 8/9/13
approved 8/9/13

locti

TIOCR1

locti, TIOCR1

>= 300 kV

approved 8/9/13
tiocrs
locti

tiocrs
TIOCR1

locti, TIOCR1

>= 200 kV

approved 8/9/13
tiocrs
locti

tiocrs
TIOCR1

locti, TIOCR1

>= 100 kV

approved 8/9/13
tiocrs
locti

tiocrs
TIOCR1

Due 4/25/2014 with


2019-20HW1 Case

Due 9/12/2014 with


2015HS4-OP

Due 9/11/2015 with


2016HS3-OP

Data Submittal Required per WECC DPM


Data Submittal Required per WECC DPM
Data Submittal Required per WECC DPM
Data Submittal Required per WECC DPM
Data Submittal Required per WECC DPM
Data Submittal Required per WECC DPM
Data Submittal Required per WECC DPM

approved 8/9/13
tiocrs

Comments
Data Submittal Optional - Can be used with any generator model
Data Submittal Optional - Can be used with any generator model

locti, TIOCR1

<= 100 kV
tiocrs

SRWG Basecase
Implementation
Completion Date

TBD
Data Submittal Required per WECC DPM

Page 2 of 2