Approval for Material Sample

OUTGOING

Rev.
Date Issued

Date Required INCOMINGDat


Reply
e Issued

BBVN-FIVE-S2-SCAMASA-0001-14
14/02/28

14/03/14

14/03/10

Certificates for Pesticide

Anti Termite Treatment: Termimesh Rev.1

Certificate of Quality, Certificate of Origin,


Ocean Bill of Lading, Company Profile,
Catalogue, Sample

Anti Termite Treatment: Termimesh. Rev.2

14/03/05

14/03/10

Author/Copy
Delivered to

Mr. Tung

BBVN-FIVE-S2-SCAMASA-0002-14/R2

BBVN-FIVE-S2-SCAMASA-0003-14

14/05/02

14/05/08

C
Certificate of Analysis, Certificate of Quality
Control for Import Pesticide, Certificate for
Pesticide registration (official)

Geotextile ARITEX ART20

Specification of Non-Woven Geotextile, Result


of Geotextile official, Sample

Teinco Company Profile (in English) + 8 contracts as reference


experience
Geotextile ARITEX ART20

Profile in English + 8 contracts

BBVN-FIVE-S2-SCAMASA-0003-14/R1

14/03/13
BBVN-FIVE-S2-SCAMASA-0004

14/04/15

14/04/18

14/04/16
BBVN-FIVE-S2-SCAMASA-0005

14/03/17
14/03/24
BBVN-FIVE-S2-SCAMASA-0005/R1

14/04/07

14/04/10
14/04/21

BBVN-FIVE-S2-SCAMASA-0006

14/03/24

14/03/25

Mrs. Lan
A

Company profile, Brochure, Inspection


certificate of raw material, Transportation
capacity of company in Vietnamese

B
Letter of Guaranty for Transportation of Dbar
to B.Braun Project; Letter of Guaranty for
Quality of Billets Using for Production of Steel
Dbar Supplied to B. Braun Project

14/03/19

Hoang

A
Sample, Mill Test certificate, Inspection
certificate, 1 A3 size drawing

Hoang

Purlin
Purlin Rev1 (revised based on comments in AMASA-0005 dated 24- Sample
Mar-2014)
Purlin_rev1

Sample for Material Sticker

14/03/13

Hoang

Marubeni Itochu Steel


Purlin

14/03/10
C

1 A3 paper

Steel (Kyoei Steel Vietnam Co., LtdO


Marubeni Itochu Steel

A/B

Mrs. Lan

Concrete Grade & Slump Rev.1


Steel (Kyoei Steel Vietnam Co., Ltd)

BBVN-FIVE-S2-SCAMASA-0004 (ADD)

Tung

Re-submit sample

Concrete grade & Slump

14/03/17

14/03/19

14/03/28
14/03/11

Tung

Tung

Concrete grade & Slump (Rev.1)

14/03/13

14/03/17

Concrete grade & Slump


14/03/10

14/03/04

Tung

Anti Termite Treatment: Termimesh. Rev.2

14/05/07

14/03/07

Tung

14/03/10
Additional document

Status

Date
delivered

Tung

Anti Termite Treatment Termimesh Rev.1

14/03/18

14/03/27
BBVN-FIVE-S2-SCAMASA-0002-14

Anti-Termite Product LENFOS - 50EC

14/03/21
14/03/17

BBVN-FIVE-S2-SCAMASA-0001/R2

Attachment

Anti Termite Treatment Product - LENFOS 50EC [Pesticide (Hop Tri LENFOS leaflet, Certificate for Pesticide
company)]
registration (official), Certificate of quality
control for import pesticide (official),
certificates of analysis (4 pages)
14/03/03

BBVN-FIVE-S2-SCAMASA-0001-14/R1

Title

C
Hoang
B

Hoang

14/03/24

Approval for Material Sample


OUTGOING

Rev.
Date Issued

Date Required INCOMINGDat


Reply
e Issued
14/03/24

BBVN-FIVE-S2-SCAMASA-0007

14/03/24

14/04/03

14/04/07

14/03/24

14/03/25
14/03/28

BBVN-FIVE-S2-SCAMASA-0008/R1

14/04/03

14/04/07
14/04/05

BBVN-FIVE-S2-SCAMASA-0008/R2

14/04/14

14/04/17
14/04/17

BBVN-FIVE-S2-SCAMASA-0009

14/03/25

14/03/28
14/03/29

BBVN-FIVE-S2-SCAMASA-0009/R1

14/04/25

14/04/25
14/04/25

BBVN-FIVE-S2-SCAMASA-0010

14/04/02

14/04/05
14/04/05

BBVN-FIVE-S2-SCAMASA-0010
(ADD.01)

BBVN-FIVE-S2-SCAMASA-0011

14/05/17

14/05/20

14/04/02

14/04/05

14/05/19

14/05/13

14/05/15

14/05/12

14/05/15

14/05/15

14/05/23

14/05/28

14/05/29

14/05/29

14/06/5

BBVN-FIVE-S2-SCAMASA-0012
14/04/03

14/04/07

Hoang

Sand for Backfill

C
Test report by VIBM (Vietnam Institute for
Building Materials)

14/05/31

Hoang

Sand for Backfill Rev.1

Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve
for Backfill
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve
for Backfill
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve
for Backfill Rev.1
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve
for Backfill Rev.2
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve
for Backfill Rev.2
Crush rock range 2-10mm, less than 10% passing the 2.36mm sieve
for Backfill Rev.2
List of FM Approval Materials

Hoang
C
Test result by VIBM (Vietnam Institute for
Building Materials)
C

A
Tung

List of FM Approval Materials

List of FM Approval Materials_Rev.1 (Revised based on comments


in AMASA_0009 dated 11-Apr-2014)
List of EM Approval material _ Rev1

Steel plate for steel structure (Thickness 6mm, 8mm, 10mm, 12mm,
16mm, 20mm, 30mm, 40mm)
Steel plate for steel structure (Thickness 6mm, 8mm, 10mm, 12mm,
16mm, 20mm, 30mm, 40mm)
Steel plate for steel structure (Thickness 6mm, 8mm, 10mm, 12mm,
16mm, 20mm, 30mm, 40mm)_Additional Documents for AMASA0010 dated 2-Apr-201

Status
A

Tung
B

Hoang
B
Test Result
Hoang QC

Color Paint Catalogue for Steel structure


14/04/17

BBVN-FIVE-S2-SCAMASA-0011/R1
BBVN-FIVE-S2-SCAMASA-0011/R1
(ADD.01)
BBVN-FIVE-S2-SCAMASA-0011/R2
BBVN-FIVE-S2-SCAMASA-0011/R3

Author/Copy
Delivered to

Sample for Material Sticker

Sand for Backfill Rev.1


10-Apr-14

BBVN-FIVE-S2-SCAMASA-0008

Attachment

Sand for Backfill

14/03/25
14/03/28

BBVN-FIVE-S2-SCAMASA-0007/R1

Title

Hoang

Color Paint Catalogue for Steel structure

Color Paint Catalogue for Steel structure_Rev.1

Hoang QC

Color Paint Catalogue for Steel Structure_Rev.1_Additional


Documents

ISO 12944 for lifetime of paint

Color Paint for Steel structure_Rev.2 revised based on comments in


AMASA-0011_Rev.1 dated 15-May-2014
Color Paint for Steel structure_Rev.3 revised based on comments in
AMASA-0011_Rev.2 dated 28-May-2014

Sample (INTERLAC-645)

XYPEX (Crystalline Waterproof Coating system)

Introduction, Spec Data, Xypex Concentrate,


Vietnam Projects references, Vinh Hiep HungXypex-Method Statement, Material safety data
sheet, Selected Projects & SAMPLE
(powder&plate)

Hoang QC

Sample (INTERLAC-645)

Hoang QC

Hoang QC

Tung

Date
delivered
14/03/24

Approval for Material Sample


OUTGOING

Rev.
Date Issued

Date Required INCOMINGDat


Reply
e Issued
12-Apr-14

BBVN-FIVE-S2-SCAMASA-0012 (ADD)

14/04/17

Attachment

Author/Copy
Delivered to

XYPEX (Crystalline Waterproof Coating system)


XYPEX (Crystalline Waterproof Coating system)_Additional
Documents

14/04/21

Title

B
C/O & C/Q
Tung
Tung

BBVN-FIVE-S2-SCAMASA-0012
(ADD.02)/R1
BBVN-FIVE-S2-SCAMASA-0013

BBVN-FIVE-S2-SCAMASA-0014

14/05/13

14/05/16

14/04/07

14/04/10

14/05/14

14/04/24

14/04/28

10-Apr-14

14-Apr-14

14/04/18

Hight intension Bolts (D16, D20, D24) hot dip galvanized

14/06/17

14/04/23

14/04/24

Certificate of Origin (C/O), Certificate of


Qualtiy (C/Q)

Hoang

Hight intension Bolts (D16, D20, D24) hot dip galvanized

High Tension Bolts (D16, D20, D24) hot dip galvanized_Rev.1


(Revised based on comments in AMASA_0013 dated 14-Apr-2014)

Wall Tile for Wet area (Toilet & Changing room)


14/04/14

BBVN-FIVE-S2-SCAMASA-0014/R1

B+C

XYPEX (Crystalline Waterproof Coating system)_Sample

14/04/14
BBVN-FIVE-S2-SCAMASA-0013/R1

Status

Hoang

01 Sample

Tung

Wall Tile for Wet area (Toilet & Changing room)


Ceramic Tile for Black Corridor (CR1), Wet Areas (CR2), Exterior 2 company catalogues, Test report, Techinical
Terrace (CR3), Toilet Wall (CR4) supplied by Viet Ceramic & Bach Specifications, Samples
Ma Ceramic
Ceramic Tile for Black Corridor (CR1), Wet Areas (CR2), Exterior
Terrace (CR3), Toilet Wall (CR4) supplied by Viet Ceramic & Bach
Ma Ceramic

C
Tung

Date
delivered

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Approval for Mechanical, Electrical Plumbing


Attachment

MV Cable & MV Terminal kit

14/04/04

Steel conduit (Smartube)

14/03/26

AHU-2units Rev.1

14/03/26

14/03/24

Air Conditioning

14/03/24

14/03/17

Air Cooled Chiller

14/03/17

14/03/17

AHU-2units

14/03/17

Plumbing System u.PVC Pipe&Fitting

Plumbing system-PPR pipe & fitting

Air Cooled Chiller Rev.1 based on comments AMEP-0001 dated


17Mar2014
AHU-2units Rev.2

VRV III Air Conditioning Rev.1

Transformer & LV busduct (feeder)

08-Apr-14

04-Apr-14

08-Apr-14

12-Apr-14
11-Apr-14
08-Apr-14
04-Apr-14
08-Apr-14

Plumbing system-HDPE pipe & fitting


LV Busway Production

14/03/22

Air Cooled Chiller

14/03/31

14/04/05

Air Cooled Chiller Rev.1 based on comments AMEP-0001 dated


17Mar2014

14/03/17

14/03/22

AHU (AIR HANDLING UNIT w/VSD) - 2 units

14/03/24

14/03/31

AHU - 2 units Rev.1

14/04/01

14/04/08

AHU-2units Rev.2

AHU No.3&4 Data sheet,


AHU AT6 Catalogue, Supply
fan curve diagram, Exhaust fan
curve diagram, fan motor
catalogue, damper actuator
catalogues, heat wheel
catalogues

14/03/17

14/03/22

VRVIII Air Conditioning

Specification, VRV brochure,

14/03/29

14/04/04

VRV III Air Conditioning Rev.1

VRV Tabulation list, 15


catalogues of CDU 1 to 5 and
Indoor Cooling/Heating

14/03/31

14/04/04

LV Busway Production

Canalis KSC, 630A Canalis,


630A End Feed-end cover,
Plug in

14/03/31

14/04/03

14/08/08

14/08/13

BBVN-FIVE-S2-SCAMEP-0006

14/03/31

BBVN-FIVE-S2-SCAMEP-0007

BBVN-FIVE-S2-SCAMEP-0008

BBVN-FIVE-S2-SCAMEP-0003
BBVN-FIVE-S2-SCAMEP-0003/R1

BBVN-FIVE-S2-SCAMEP-0004

BBVN-FIVE-S2-SCAMEP-0005
BBVN-FIVE-S2-SCAMEP-0005 (A)

BBVN-FIVE-S2-SCAMEP-0009

14/04/05

Plumbing System u.PVC Pipe&Fitting

14/04/02

14/04/06

Plumbing system-PPR pipe & fitting

Mr. Quang

Plumbing system-HDPE pipe & fitting

Mr. Quang

14/04/19

14/04/23

14-Apr-14

BBVN-FIVE-S2-SCAMEP-0011

14/04/28

14/05/02

BBVN-FIVE-S2-SCAMEP-0012

14/03/31

14/04/04

Plumging system - HDPE pipe & Fittings _ Rev.2

A/B

HVAC system/ u.PVC pipe & Fitting (Condensate Drain Pipe)

Mr.Ujiie

HVAC system/ u.PVC pipe & Fitting (Condensate Drain Pipe)

14/05/07

Diesel Generating Sets

Technical Detail Desciption,


Drawing, Catalogue

Mr. Quang

PVC conduit and fitting (SP)

Brochure & Certificate

Mr. Quang

Certificate & Brochure

Mr. Quang/Mr.Diem

14/04/19

PVC conduit and fitting (SP)


PVC conduit and fitting (SP)_Rev.1

14/04/17

PVC conduit and fitting (SP)_Rev.1

14/04/04

Steel conduit (Smartube)

Brochure & Certificate

Mr. Quang

14/04/14

14/04/19

Steel conduit (Smartube).Rev1

Company Profile & Brochure

Mr. Quang/Mr. Diem

Mr. Quang/Diem

14/04/17

Steel conduit (Smartube).Rev1

14/05/06

14/05/10

14/05/28

Steel Conduit and Fittings_Rev2

Catalogue & Supplier Profile

14/07/14

14/07/19

14/07/18

Steel Conduit & Fittings _Rev.2 (Additional Document)

Catalogue

14/03/31

14/04/04

Flexible conduit for underground (Baan)

Brochure & Certificate

Mr. Quang

Cerfiticate, Capacity &


Experience Report

Mr. Quang/Mr. Diem

14/04/04
14/04/19
14/04/23

Flexible conduit for Underground (BAAN)_Rev.1

B/A

14/06/02

BBVN-FIVE-S2-SCAMEP-0015

12-Apr-14

19-Apr-14

B/B/A
B/A

Flexible conduit for underground (BAAN)


Flexible conduit for underground (Baan)_Rev.1

N/A

14/03/31

14/04/14

B/A

Mr. Quang

14/04/23

14/04/04
14/04/14

Plumbing system-HDPE pipe & fitting_Rev.1


Plumbing system-HDPE pipe & fitting_Rev.2

14/04/24

10-Apr-14

Quang/Ujiie

Plumbing system-HDPE pipe & fitting_Rev.1


14/04/11

BBVN-FIVE-S2-SCAMEP-0014/R1
BBVN-FIVE-S2-SCAMEP-0014/R2

Mr. Quang

14/04/01

BBVN-FIVE-S2-SCAMEP-0009/R2

BBVN-FIVE-S2-SCAMEP-0014

Mr. Quang

Relays, Thermo meter, Feeder Mr. Quang


busway copper contact,
Flexible LinkEdgewise

14/04/06

BBVN-FIVE-S2-SCAMEP-0013/R2
BBVN-FIVE-S2-SCAMEP-0013/R2
(ADD.01)

Quang

Transformer & LV busduct (feeder)

14-Apr-14

BBVN-FIVE-S2-SCAMEP-0013/R1

Specification, 2 A4size
Trung
drawings, AL-KO AHU AT6
brochure, Form Material &
Equipment Approval record
signed by Sub-contractor dated
10-Mar-2014

14/04/08

14/04/02

BBVN-FIVE-S2-SCAMEP-0013

Trung

Technical Description Details

10-Apr-14

BBVN-FIVE-S2-SCAMEP-0012/R1

Trung

MV Cable & MV Terminal kit 36kV

BBVN-FIVE-S2-SCAMEP-0009/R1

BBVN-FIVE-S2-SCAMEP-0010

Specification, chiller selection


software, 2 A4 size drawings

MV Cable & MV Terminal kit


14/08/12

LV Cable

12-Apr-14

14/03/17

BBVN-FIVE-S2-SCAMEP-0002/R1
BBVN-FIVE-S2-SCAMEP-0002/R2

Date Delivered to
Author

Lighting Protection

12-Apr-14

BBVN-FIVE-S2-SCAMEP-0002

Status

14/04/07

12-Apr-14

BBVN-FIVE-S2-SCAMEP-0001/R1

4
Author/Delivered to

14/04/16

11-Apr-14

BBVN-FIVE-S2-SCAMEP-0001

Title

Mr.Quang

12-Apr-14

OUTGOIING

Rev.

BBVN-FIVE-S2-SCAMEP-0015/R1
BBVN-FIVE-S2-SCAMEP-0015/R1

BBVN-FIVE-S2-SCAMEP-0016
BBVN-FIVE-S2-SCAMEP-0016/R1

BBVN-FIVE-S2-SCAMEP-0017

INCOMING
Date Received

Date
Required
Reply

14/04/16

LV Cable

14/04/25

14/05/02

14/05/09

Mr. Quang

14/05/23

14/06/3

14/06/09

LV Cable_Rev.1 (Revised based on comments in AMEP_0015 dated


16/J64-Apr-2014)
LV Cable_Rev.1 (Revised based on comments in AMEP_0015 dated
16/J64-Apr-2014)

Mr. Quang

12-Apr-14

16-Apr-14

Lighting Protection

Mr.Quang

14/04/28

14/05/2

Lighting Protection_Rev.1 Revised based on comments AMEP_0016


dated 16-APR-2014

Quang/Diem

14/04/15

14/04/18

14/06/05

Title

Approval for Mechanical, Electrical Plumbing


Attachment

Date Delivered

VAV for Circulation Corridor


14/04/24

VAV for Circulation Corridor

Author/Delivered to

Status

VariTrane VAV Terminal


Catalogue

Mr. Quang

A/B

BBVN-FIVE-S2-SCAMEP-0018

14/05/06

14/05/13

14/05/28

Process Chilled Water Insulation

Technical Detail Description,


Catalogue

Mr. Quang

BBVN-FIVE-S2-SCAMEP-0019

14/04/15

14/014/18

14/04/17

RO Water System (Pipe & Fitting and Valve)

Mr. Quang

14/05/24

14/06/06

Pipe & Fitting for RO


Catalogue, Valve for RO
Catalogue
Tabulation, Technical Detail
Description. Catalogue

14/04/22

14/04/28

14/05/07

Fire Alarm System

Intelligent Fire Control Panel, smoke


detector, heat detector, alarm bell,
manual call point, deam detector, duct
smoke detector, laser smoke detector,
telephone jack, relay control module,
monitor module, control module, fault
isolator, horn trobe, phone
communication module, lamp driver
module (for renovation of MIMIC
panel)

Quang, Diem

14/05/15

14/05/22

14/05/31

(15 items) Fire Alarm System


Catalogue & Supplier Profile
[FM Approval] Intelligent Fire Control Panel IFC 302(E), smoke detector
2951J, heat detector 5951J, alarm bell SSM24-6, manual call point JBG12LX, beam detector FSB-200/FSB-200s, duct smoke detector D4240,
laser smoke detector 7351J, telephone jack FPJ, relay control module
M300RJ, monitor module M301MJ, fault isolator M500XJ, horn trobe
CHSR, phone communication module M500FPJ, lamp driver module
LDM-32

Quang/ Trung

14/04/23

14/04/26

Flexible Thermelly Insulation Duct Connection

Mr. Quang

BBVN-FIVE-S2-SCAMEP-0019/R1

BBVN-FIVE-S2-SCAMEP-0020

BBVN-FIVE-S2-SCAMEP-0020/R1

BBVN-FIVE-S2-SCAMEP-0021

BBVN-FIVE-S2-SCAMEP-0022

14/04/23

14/04/26

BBVN-FIVE-S2-SCAMEP-0023

14/04/24

14/04/26

RO Water System (Pipe & Fitting and Valve)_Rev.1 Revised based on


comments in AMEP-0019 dated 17-April-2014

14/05/05

Flexible Thermelly Insulation Duct Connection

14/05/14

Glasswool Insulation for Cleanroom Ducts

Certificate of Compliance FM
Approval Class 4924,
Catalogue

Mr. Quang

Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting

Tabulation & Catalogue

Mr. Quang

FM 200 Piping, Tabulation &


Catalogue

Quang/Trung

Tabulation & Catalogue

Quang/Trung

A/B

Tabulation & Catalogue

Quang/Trung

Tabulation, Technical Detail


Description & Catalogue

Quang/Trung

FIKE Technical detail


description, drawing and
catalogue
FM 200 C/W Control Panel and Accessories_Rev.1 Revised upon AMEP Tabulation, Calculation,
0024 dated 19-May-2014
Catalogue
FM 200 C/W Accessories_Rev.2 (Superseded the approved FM 200 c/w Technical Data Sheet
Accessories_Rev.1 in AMEP24/R1 dated 25-June-2014)

Quang/Trung

Quang/Trung

Quang/Trung

Preaction Sprinkers (Quick


Response Upright), Quick
Response Sprinkler heads,
Standard Sprinkler Heads
VIKING Technical Detail
desciption, Catalogue
Tabulation, Catalogue

Quang

Quang

Technical Data Sheet

Quang

HVAC_Hepa Filter (AAF)_Size 1060x460x69mm

Technical Detail Description,


Drawing, Catalogue

Quang/Trung

HVAC_Hepa Filter (AAF)_Size 1060x1060x69mm

Technical Detail Description,


Drawing, Catalogue

Quang/Trung

14/04/25

Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting


Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting (FM 200
System)_Rev.1 Revised based on comments in AMEP_0023 dated 25Apr-2014
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting (above
Ground Floor) _Rev.1 Revised based on comments in AMEP_0023
dated 25-Apr-2014
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting
(Underground)_Rev.1 Revised based on comments in AMEP_0023 dated
25-Apr-2014
Galvanized Pipe Medium Grade SCHED 40 for Fire Fighting
(Underground)_Rev.2 Revised based on comments in AMEP_0023/R1
(C) dated 15-May-2014
Denso Tape
Pipe Fittings (JIS)

BBVN-FIVE-S2-SCAMEP-0023/R1 (A)

14/05/10

14/05/15

14/05/29

BBVN-FIVE-S2-SCAMEP-0023/R1 (B)

14/05/10

14/05/15

14/05/28

BBVN-FIVE-S2-SCAMEP-0023/R1 (C)

14/05/10

14/05/15

14/05/15

BBVN-FIVE-S2-SCAMEP-0023/R2 (C)

14/05/31

14/06/12

14/06/03

14/04/28

14/05/2

14/05/19

14/06/02

14/06/13

14/06/25

14/09/17

14/09/22

14/09/22

14/04/28

14/05/02

14/05/21

Sprinkler Head System

BBVN-FIVE-S2-SCAMEP-0025/R1

14/06/02

14/06/12

14/07/03

BBVN-FIVE-S2-SCAMEP-0025/R1(ADD.01)

14/10/02

14/10/06

14/10/07

Sprinkler Head System (Preaction Sprinkers (Quick Response Upright


and Pendant), Quick Response, Sprinkler heads, Standard Sprinkler
Heads, Sprinkler Guard )_Rev.1 Revised upon AMEP-0025 dated 21May-2014
ESPR Upright Sprinkler for Warehouse Under Duct- VIKING VK520
K14.0 (Additional Material for approved in AMEP_0025 dated 03-July2014)

BBVN-FIVE-S2-SCAMEP-0026

14/04/29

14/05/05

BBVN-FIVE-S2-SCAMEP-0027

14/04/29

14/05/05

BBVN-FIVE-S2-SCAMEP-0024
BBVN-FIVE-S2-SCAMEP-0024/R1
BBVN-FIVE-S2-SCAMEP-0024/R2

BBVN-FIVE-S2-SCAMEP-0025

Catalogue

Randy/Quang

14/05/28

B/B/A

FM 200 C/W Control Panel and Accessories

B/B/A

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply
14/05/17

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

Drawings

6
Author/Delivered to

Status

BBVN-FIVE-S2-SCAMEP-0028

14/05/14

Quang/Vuong

BBVN-FIVE-S2-SCAMEP-0029

14/05/14

14/05/17

14/05/20

HVAC_ Chilled Water Pipe (Tread Seal for Screw type) for Compressor Catalogue
Chilled Water and Instrument on Piping

Quang

B/A

BBVN-FIVE-S2-SCAMEP-0030

14/05/14

14/05/17

14/05/20

Compressor System_Compressor Pipe Tread Seal for Screw type piping


tread seal

Catalogue

Quang

BBVN-FIVE-S2-SCAMEP-0031

14/05/14

14/05/17

14/05/22

HVAC System_VRV Indoor and Refrigerant Pipe Support

Technical Detail Description & Quang


Catalogue

14/04/29

14/05/05

14/05/07

Galvanized Ducts and Fittings for Low Pressure (SSSC)

Catalogue

Quang/Vuong

14/05/23

14/06/02

14/05/28

HVAC System_Galvanized Ducts and Fittings for Low Pressure _Rev.1


Revised based on comments in AMEP-0032 dated 7-May-2014

Tabulation, Technical Data

Quang

14/04/29

14/05/05

14/05/07

Galvanized Duct and Fittings for Medium Pressure

Catalogue

Quang/Vuong

14/05/19

14/06/02

14/05/28

Galvanized Duct and Fittings for Medium Pressure_Rev.1

14/04/29

14/05/05

14/05/07

Spiral Duct and Fittings

14/05/19

14/06/02

14/05/28

Spiral Duct and Fittings_Rev.1

Hepa Filter Box (INOCHI)_Top Open&Dimension 1145x1145x400mm;


Top Open&Dimension 11145x1145x400; Bottom Open&Dimension
1145x545x400mm; Bottom Open&Dimension 1145x1145x400mm

BBVN-FIVE-S2-SCAMEP-0032
BBVN-FIVE-S2-SCAMEP-0032/R1

BBVN-FIVE-S2-SCAMEP-0033
BBVN-FIVE-S2-SCAMEP-0033/R1

BBVN-FIVE-S2-SCAMEP-0034
BBVN-FIVE-S2-SCAMEP-0034/R1

BBVN-FIVE-S2-SCAMEP-0035

C
A/B

C
A

Catalogue

Quang/Vuong

C
A/B

14/05/02

14/05/08

14/05/09

Butterfly valve and OS&Y gate valves for fire fighting

Trung

BBVN-FIVE-S2-SCAMEP-0035/R1

14/05/21

14/06/03

14/05/26

Fire fighting system_OS&Y Gate valves for FF System Hose reel -18
Tabulation, Catalogue
gate valve, tamper switch (supervisory switch) - OSYSU-1, Automatic air
vent - AV-0100, Butterfly valve - HPW Series

Randy

B/B/A

BBVN-FIVE-S2-SCAMEP-0035/R1
(ADD.01)

14/06/05

14/06/11

14/06/11

Fire fighting system_OS&Y Gate valves for FF System _ Rev.1


(ADD.01) _ Revised based on comments in AMEP-0035/R1 dated 26May-2014

Trung

14/06/03

14/06/09

14/06/27

Balancing Valve (PCW, AHU and Compressor) and Motorized Valve for Tabulation, Catalogue
Chiller and AHU

Mr. Quang

14/10/14

14/10/18

14/10/18

Motorized Valve for AHU (Johnson Control)

Catalogue, Technical Data

Quang/Ujiie

14/10/31

14/11/06

Motorized Valve for AHU (Johnson Control)

Catalogue, Technical Data,


BBVN-S2-SC-LTR-0087

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-0037

14/05/02

14/05/08

14/05/22

Alarm valve and Pre-action valve for fire fighting system

Catalogue

Trung

A/B/B

BBVN-FIVE-S2-SCAMEP-0037 A

14/07/28

14/08/02

14/08/04

Pre-action valve double interlock type (Superseded the pre-action valve


single interlock in AMEP-37 dated 19-May-2014 following designer
comments)

Catalogue, Technical detail


description

Quang

Catalogue

Quang/Diem

BBVN-FIVE-S2-SCAMEP-0036

BBVN-FIVE-S2-SCAMEP-0036 A
BBVN-FIVE-S2-SCAMEP-0036 A/R1

BBVN-FIVE-S2-SCAMEP-0038

Catalogue

Tabulation, Catalogue

14/05/02

14/05/08

14/05/09

Lighting system

BBVN-FIVE-S2-SCAMEP-0038/R1

14/05/14

14/05/21

14/05/29

Lighting system_Rev.1 Revised based on comments in AMEP-0038


dated 9-May-2014

BBVN-FIVE-S2-SCAMEP-0038/R1
(ADD.01)

14/06/05

14/06/09

14/06/25

14/06/26

14/07/01

14/06/27

Lighting System_(Additional) Exit Light for exit road (revised based on


comments in AMEP-38/R1 (ADD) dated 25-June-2014

Tabulation, Catalogue

14/05/02

14/05/08

14/05/28

BMS system

Catalogue

14/07/09

BMS system

BBVN-FIVE-S2-SCAMEP-0038 (A)

BBVN-FIVE-S2-SCAMEP-0039
BBVN-FIVE-S2-SCAMEP-0039 (ADD)

Tabulation, Lighting -1x18W,


2x13W, Exits, High bay
150W, Road pole lamp,
3x36W, 2x28W
(Weatherproof), 2x28W,
3x14W, Road Pole Lamp,
3x14W
Lighting system_Rev.1 (Add.01)_ Revised based on comments in AMEP- Catalogue
0038/R1 dated 29-May-2014

C
B/B/A

B/A+C

Diem

B
B

BBVN-FIVE-S2-SCAMEP-0040

14/05/03

14/05/09

14/05/28

Copper pipe & Fitting

Catalogue

Quang

B/B/A

BBVN-FIVE-S2-SCAMEP-0041

14/05/14

14/05/17

14/05/20

Water Supply System_Water Heater (ARISTON)

Techinical detail description & Quang


Catalogue

BBVN-FIVE-S2-SCAMEP-0042

14/05/06

14/05/13

14/05/28

Chiller Pipe Insulation

Technical Detail Description,


Catalogue, FM Certificate

Mr. Quang

B/B/A

BBVN-FIVE-S2-SCAMEP-0043

14/05/06

14/05/13

14/05/28

VRV Insulation (Refrigirant Pipe and Condensate Drain)

Catalogue, Technical Detail


Description, FM certificate

Mr. Quang

B/B/A

B/A

Date Delivered to
Author

OUTGOIING

Rev.

Date
Required
Reply

INCOMING
Date Received

14/05/06

14/05/13

14/05/14

Flexible Joint Model Z-3000 & Flexible Joint Model Z-9000

14/05/31

14/06/13

14/06/02

HVAC&CDA_Flexible Joint for Chiller Piping and CDA Piping - SF600_Rev.1 (Revised based on comments in AMEP-0044 dated 14-May2014)

BBVN-FIVE-S2-SCAMEP-0045

14/05/07

14/05/10

14/05/23

BBVN-FIVE-S2-SCAMEP-0046

14/05/09

14/05/15

14/06/03

BBVN-FIVE-S2-SCAMEP-0044
BBVN-FIVE-S2-SCAMEP-0044/R1

BBVN-FIVE-S2-SCAMEP-0046/R1

BBVN-FIVE-S2-SCAMEP-0047
BBVN-FIVE-S2-SCAMEP-0047/R1

BBVN-FIVE-S2-SCAMEP-0048

Title

Approval for Mechanical, Electrical Plumbing


Attachment

Date Delivered

Mr. Quang

Quang/Ujiie

Air Compressor

Technical Detail Description,


Catalogue

Mr. Quang

14/05/15

Sanitary Wares

Sanitary Ware Tabulation,


Quang/ Khoa
Under Counter Top Basin,
Wall Hung Basin, Auto Sensor
Basin Tap, Water Closet, Wall
Hung Urinal w Automatic
Flush Valve, Automatic Flush
Valve, Shower Mixer
Complete, Pantry Sink, Faucet
for Pantry Sink, Accessories

14/06/10

14/06/10

Sanitary Wares_Rev.1 Revised based on comments in AMEP-0046 dated Tabulation, faucet automatic,
15-May-2015
shower

Quang/ Khoa

14/05/10

14/05/15

14/05/28

Supply Fan

Quang/Diem

14/06/03

14/06/09

14/06/05

Supply Fan_Rev.1 (revised based on comments in AMEP-0047 dated 28- Catalogue of Supply Fan
May-2014)
Equipment No. OAF-PII-01

Mr. Quang

Quang/Ujiie

C/C/B

14/05/10

14/05/15

14/05/28

Smoke Exhaust Fan

14/06/02

14/06/09

14/06/13

Smoke Exhaust Fan_Rev.1 Revised based on comments in AMEP-0048


dated 28-May-2014 (RFC submitted paralelly for this AMEP)

BBVN-FIVE-S2-SCAMEP-0048/R2

14/06/26

14/07/01

14/07/05

14/05/10

14/05/15

14/05/28

14/06/03

14/06/09

14/06/05

14/05/10

14/05/17

14/05/31

BBVN-FIVE-S2-SCAMEP-0049/R1

BBVN-FIVE-S2-SCAMEP-0050
BBVN-FIVE-S2-SCAMEP-0050/R1
BBVN-FIVE-S2-SCAMEP-0050/R2

Status

Technical Detail Description,


Catalogue
Technical Detail Description,
Catalogue

BBVN-FIVE-S2-SCAMEP-0048/R1

BBVN-FIVE-S2-SCAMEP-0049

7
Author/Delivered to

Catalogues of Ventilation Fan


Equipment No. OAF-PII-01

Catalogues of Smoke Exhaust


Equipment No. FSFE-PII-01;
PAEF-PII-01
Catalogue of smoke exhaust
fan Equipment No.FSFE-PII01; PAEF-PII-01

C/A+B+C

Exhaust Fan

Catalogues of Ventilation Fan


Equipment No. EAFG-PII-01,
EAFG-PII-02; EAF1-PII-01,
EAF1-PII-02
Exhaust Fan_Rev.1 revised based on comments in AMEP-0049 dated 28- Catalogue of Supply Fan
Mr. Quang
May-2014) RFC submitted paralelly for this AMEP
Equpment No. EAFG-PII-01;
EAFG-PII-02; EAF1-PII-01;
EAF1-PII-02

CCTV System (Indoor PTZ IP dome camera, outdoor PTZ IP dome


camera, Indoor fixed camera, FOC (fiber optic converter)

14/06/13

14/06/18

14/06/23

14/06/25

CCTV System_Indoor PTZ dome camera, Outdoor PTZ IP dome


Camera, IP indoor fixed dome camera, FOC (fiber optic
converter)_Rev.2 Revised based on comments in AMEP-0050/R1 dated
13-June-2014

14/05/10

14/05/17

14/05/19

HVAC System: Black carbon steel pipe SCHED 40 for chilled water

14/05/31

14/06/14

14/06/02

Technical detail description,


Catalogue
HVAC System: Black carbon steel pipe SCHED 40 for chilled
Technical detail description,
water_Rev.1 Revised based on comments in AMEP-0051 dated 16-May- Catalogue
2014

14/05/10

14/05/15

14/05/19

HVAC System: Black carbon steel pipe fittings for chilled water

14/05/31

14/06/14

14/06/02

HVAC System: Black carbon steel pipe fittings for chilled water_Rev.1
Revised based on comments in AMEP-0052 dated 19-May-2014

Technical detail description,


Catalogue
Technical detail description,
Catalogue

BBVN-FIVE-S2-SCAMEP-0053

14/05/16

14/05/20

14/05/22

HVAC System_Chilled Water Pipe Support

Catalogue

Quang

BBVN-FIVE-S2-SCAMEP-0054

14/05/15

14/05/19

14/06/05

HVAC_Buffer Tank & Buffer Tank Insulation Location of installation


3
AHU room (Buffer tank capacity 5m ) (NAM AN)

Technical detail description,


Catalogue

Quang

B/B+C

BBVN-FIVE-S2-SCAMEP-0054 A

14/11/05

14/11/12

Buffer Tank Insulation - BASF Elastopor MH 2149 (Superseded the


approved buffer tank insulation in AMEP-54 dated 5-June-2014

Technical Data Sheet

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-0055

14/05/14

14/05/17

14/05/20

Fire Fighting System_Fire Fighting Tread Seal for Screw type Piping
Tread Seal (TOMBO)

Catalogue

Quang

BBVN-FIVE-S2-SCAMEP-0056

14/05/14

14/05/17

14/05/21

Fire Fighting System (Fire Extinguisher CO2&ABC, Fire Hydrant Pillar, Catalogue
Hosereel cabinet (indoor type), Fire Hose reel (Indoor with Accessories),
Fire Hydrant cabinet outdoor & Fire hydrant (outdoor with accessories))

Quang

14/06/18

14/06/23

14/07/04

Fire Hose Reel & Extinguisher; Drum Hose Reel for Clean Room,
Circulation Corridor, Office Ground Floor, Warehouse, above Ceiling
Clean Room, Office 1st Floor, External and Transformer Room 1,2,3,
Stage 1_Rev.1 Revised based on comments in AMEP-0056 dated 21May-2014

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-0051
BBVN-FIVE-S2-SCAMEP-0051/R1

BBVN-FIVE-S2-SCAMEP-0052
BBVN-FIVE-S2-SCAMEP-0052/R1

BBVN-FIVE-S2-SCAMEP-0056/R1

Tabulation, technical detail


desciption, catalogue

Tabulation, Catalogue,
Drawings

Diem

Quang/Ujiie

Quang/Ujiie

C
B

B/A+B+C

Date Delivered to
Author

OUTGOIING

Rev.

INCOMING
Date Received

14/05/14

14/05/21

Process Cooling Water System_SUS 304 Pipe Use for Process Cooling
Water

..

14/06/02

Process Cooling Water System_SUS 304 Pipe Use for Process Cooling
Water_Rev.1

14/05/14

14/05/17

14/05/20

Process Cooling Water System_SUS 304 Pipe Fittings Use for Process
Cooling Water & Fittings

Tabulation, Technical Detail


Description & Catalogue

Quang

14/05/15

14/05/17

14/05/21

Quang

14/06/13

14/06/23

Compressed Air System_Copper Pipe Fittings for Compressed Air (Use


for Compressor air Piping inside production area and above walkable
ceiling connected on GI pipe)
Compressed Air System_Copper Pipe Fittings for Compressed Air (Use
for Compressor air Piping inside production area and above walkable
ceiling connected on GI pipe)_Rev.1 Revised based on comments in
AMEP-0059 dated 21-May-2014

Catalogue

14/05/31

Technical Detail Description,


Catalogue

Quang

14/05/15

14/05/19

14/05/21

Quang

14/06/13

14/06/03

Compressed Air System_Copper Pipe for Compressed Air (Use for


Compressor air Piping inside production area and above walkable ceiling
connected on GI pipe)
Compressed Air System_Copper Pipe for Compressed Air (Use for
Compressor air Piping inside production area and above walkable ceiling
connected on GI pipe)_Rev.1 Revised based on comment in AMEP-60
dated 21-May-2014

Catalogue

14/05/30

Technical Detail Description,


Catalogue

Quang/Randy/Ujiie

14/05/15

14/05/29

14/06/13

(1) Network Video Recorder; (2) Reader Controller & Card Reader
Catalogue, Tabulation
Interface Module-Lenel LNL-1320 Series, LNL-2220; (3) nput Control
Module-Lenel LNL1100 Series 2; (4) Door Contact-Position Sensor
1078C-N; (5)Door Holder-YLI YD-602; (6) Door Alarm - AV Gad Eye
spy II pro; (7) Card Reader & Card Reader w/Time Tracking - HID R10;
(8) Pir Sensor - AV Gad Eye spy II pro; (9) Emergency Door Release
Break Glass - YLI ABK-900A, Fire Proofl (10) Exit Push Button - YLI
ABK-802

Quang/Randy

14/07/14

14/07/19

14/07/18

Card Reader & Card Reader with Time Tracking_Rev.1 - HID-R10900N (Superseded the Card Reader & Card Reader with time trackingHID-R10-6100B, 6108B, 6109B in AMEP-61 dated 13-June-2014)

catalogue

Quang/Randy

BBVN-FIVE-S2-SCAMEP-062

14/05/16

14/05/30

14/06/05

HVAC System _ Non-Clean room Duct Sealant (APOLLO A100)

Catalogue

Quang

BBVN-FIVE-S2-SCAMEP-063

14/05/16

14/05/30

14/06/05

HVAC System_Cleanroom Duct Sealant (Terostat MS930)

Catalogue

Quang

BBVN-FIVE-S2-SCAMEP-064

14/05/16

14/05/30

14/06/05

Compressed Air System_GI Black Steel Pipe Medium Grade Schedule 40 Tabulation. Catalogue

Quang

A/B

14/05/16

14/05/30

14/05/21

Compressed Air System_GI Black Steel Pipe Fittings (DN50, DN80)

Tabulation, Catalogue

Quang

14/05/31

14/06/12

14/06/03

Compressed Air System_GI Black Steel Pipe Fittings (DN50,


DN80)_Rev.1 Revised based on Comments in AMEP-0065 dated 21May-2014

Tabulation, Catalogue

Quang

14/05/16

14/05/30

14/06/05

Water Supply System_Water Pump & Water Pump Control Panel

Catalogue, Manufacturer
Letter, Technical Data &
Drawing

Quang

14/06/14

14/06/20

14/06/20

Water Supply System_Water Pump & Water Pump Control Panel_Rev.1 Catalogue, Manufacturer
Revised based on Approval RFC-023 dated 6-June-2014 (SMZLetter, Technical Data &
140606/D147)
Drawing

Quang/Khoa

BBVN-FIVE-S2-SCAMEP-067

14/05/16

14/05/30

14/06/05

Sewage Pump_SP-01 to SP-02 Pump pit, SP-03 to SP-04 Pump pit


(external)

Catalogue, Manufacturer
Letter

Quang

BBVN-FIVE-S2-SCAMEP-068

14/05/16

14/05/30

14/06/06

MVAC System_Primary Chilled Water Pump CHWP


03(200x150CNHA), Secondary Chilled Water Pump SCHWP-01-03
150x125 FS4KA5 37

Manufacturer Letter, Technical Quang


Data

BBVN-FIVE-S2-SCAMEP-069

14/05/19

14/06/02

Electrical Cable & Accessories for Control System: (1) 12C MM Fiber
Optic Cable (Indoor) - B9B042, (2) 4C Multimode Outside Plant Fiber
Optic Cable - B9A171, (3) 14AWG Twisted Pair Cable - 5120UL, (4)
Shielded 6-core AWG22 Cable - 5504FE, (5) Shield 2-core AWG18
Cable - 5300FE, (6) Shield 4-core AWG22 Cable - 5502FE, (7) UTP
Category 6 Network Cable - 2413, (8) Faceplate Kit Shutter - 21110361, (9) Category 6 SL Series Jacks -1375055-1

Tabulation, Technical Detail


Description, Catalogue

Randy/Quang

BBVN-FIVE-S2-SCAMEP-069/R1

14/06/14

14/06/21

14/06/25

Electrical Cable & Accessories for Control System: (1) 12C MM Fiber
Optic Cable (Indoor) - B9B042, (2) 4C Multimode Outside Plant Fiber
Optic Cable - B9A171, (3) 14AWG Twisted Pair Cable - 5120UL, (4)
Shielded 6-core AWG22 Cable - 5504FE, (5) Shield 2-cor_Rev.1

Tabulation, Technical Detail


Description, Catalogue

Quang

BBVN-FIVE-S2-SCAMEP-069/R2

14/10/31

14/11/06

14/11/03

Faceplate Kit Shutter - AMP (Model: 2-1427030-1, 2-1427030-2),


Suppersed the approved faceplate kit shutter in AMEP-69/R1 dated 25June-2014

Technical Detail

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-069 (A)
BBVN-FIVE-S2-SCAMEP-069 [B]
BBVN-FIVE-S2-SCAMEP-069 [C]

14/06/27

14/07/03

14/07/09

14/08/14

14/08/15

Electrical Cable & Accessories for Control System: 14AWG pair cable;
14AWG Twisted pair cable; TCVN 5738:2001
Fiber Optic Cable

14/08/18

14/08/23

14/08/22

Technical Detail Description, Quang/Diem


Catalogue
Technical Detail Description, Quang
Catalogue
Fire Alarm Cable 14AWG Twisted Pair Cable-5100FZE & 14AWG Pair Manufacturer Letter, Technical Quang
Cable-5100UZE (Superseded AMEP-69 [A] dated 9-July-2014)
Data Sheet

14/08/09

BBVN-FIVE-S2-SCAMEP-069 [D]

14/08/23

14/08/27

14/08/28

Catelogy 6 UTP Cable Cut Sheet - AMP (Superseded the UTP Catelogy Manufacturer Letter, Catalog
6 inn approved AMEP_069/R1 dated 25 June 2014)

BBVN-FIVE-S2-SCAMEP-0057/R1

BBVN-FIVE-S2-SCAMEP-0058

BBVN-FIVE-S2-SCAMEP-0059
BBVN-FIVE-S2-SCAMEP-0059/R1

BBVN-FIVE-S2-SCAMEP-060
BBVN-FIVE-S2-SCAMEP-060/R1

BBVN-FIVE-S2-SCAMEP-061

BBVN-FIVE-S2-SCAMEP-061/R1

BBVN-FIVE-S2-SCAMEP-065
BBVN-FIVE-S2-SCAMEP-065/R1

BBVN-FIVE-S2-SCAMEP-066

BBVN-FIVE-S2-SCAMEP-066/R1

Title

Approval for Mechanical, Electrical Plumbing


Attachment

Date
Required
Reply
14/05/17

BBVN-FIVE-S2-SCAMEP-0057

Date Delivered

Tabulation, Technical Detail


Description & Catalogue

Author/Delivered to

Quang

Status

Date Delivered to
Author

Quang/Ujiie

SUPERSEEDED
booster pump Grund
Fos Hydro Multi B/E 2CME 25-41

B/B/A

B/B+C

B
B

(SUPERSEDED)

OUTGOIING

Rev.

Date
Required
Reply

INCOMING
Date Received

BBVN-FIVE-S2-SCAMEP-070

14/05/19

14/06/02

14/05/28

Bare Copper Wire - 70mm2

BBVN-FIVE-S2-SCAMEP-071

14/05/19

14/05/30

14/05/29

Tabulation, Technical Data,


Drawing, catalogue

Randy, Ujiie, Quang

14/06/11

14/06/18

14/06/27

(A) LV Panel & LCP: (1,2,3) DB-1A-1, 2,3; (4) DB-CDU2, (5,6) DBMCC2,3; (7) DB-SCHWP; (8,9) DB-M/C-1,2; (10) DB-IT2; (11) LCPTK-01-04-TC, LCP-TK-04-04-MC, LCP-ASS-03&04, LCP-MD-05-22;
(12) LCP-ASS-01,02,05,06,07; (13) LCP-P2-F-1&2; (14) LCP-P2-F3&4; (15) LCP-P2-F-MD-1,2,3,4,5,6; (16,17,18) LCP-P2-G-1&2,3,4;
(19) LCP-P2-G-MD-1; (20) PCHWP; (21) DB-CH-03; (22) VSD-RF;
(23) 02 New MCCB in MSB-A Bus-2 (for DB-MCC3-1); (24) DB-CW;
(25,26,27) DB-1C,1D,1E Modification; (28) DB-CDA Modification;
(29) DB-GC-Modification; (30) ATS Panel; (31) DB-M/C-3
Modification; (32) CLP-EXT-03
LV Panel: (1,2,3) DB-1A-1, 2,3; (4) DB-CDU2, (5,6) DB-MCC2,3; (7)
DB-SCHWP; (8,9) DB-M/C-1,2; (10) DB-IT2; (11) Local Panel LCP:
LCP-TK-01~04-TC, LCP-TK-01~04-MC, LCP-ASS-03&04, LCP-MD05~22; (12) Local Panel: LCP-ASS-01,02,05,06,07; (13) Local Panel
LCP: LCP-P2-F-1&2 (new); (14) Local Panel LCP: LCP-P2-F-3&4
(new); (15) Local Panel LCP: LCP-P2-F-MD-1,2,3,4,5,6; (16,17,18)
Local Panel LCP: LCP-P2-G-1&2,3,4; (19) Local Panel LCP: LCP-P2G-MD-1; (20) PCHWP; (21) DB-CH-03; (22) 02 New MCCB in MSBA Bus-No.2; MSB-ABUS 2 for DB-MCC3-1&2; (23, 24, 25) DB1C,1D,1E Modification; (26) DB-CDA Modification; (27) DB-GCModification; (28) ATS Panel; (29) DB-M/C-3 Modification; (30) CLPEXT-03 New; (31) DB-CW

Tabulation, Technical Data,


Drawing, catalogue

Ujiie, Quang, Diem

BBVN-FIVE-S2-SCAMEP-072

14/05/23

14/06/05

14/06/27

HVAC_Volume Control Damper (Rectangular Type), Volume Control


Damper (Round Type), Access Door for Duct

Tabulation, Technical Detail


description, Catalogue

Quang/Ujiie

B/B+C

BBVN-FIVE-S2-SCAMEP-073

14/05/23

14/06/05

14/06/02

Cable Ladder & Trunking for Power, Data & BMS - E.Nhat

Tabulation, Technical Detail


Description, Catalogue

Quang/ Ujiie

14/05/23

14/05/30

14/06/02

Compressor Valve System

14/08/30

14/09/02

Compressor Valve System (SUS Ball Valve _ Flange Type) TOYO,


Model: 3011L

Ball Valve, Check Valve, Auto Trung/Quang


drain, Relief Valve
Data sheet
Trung / Quang

14/08/28

BBVN-FIVE-S2-SCAMEP-075

14/05/24

14/06/06

14/06/27

HVAC_Exhaust and Return Air Grille, Air Grille for Production


Cleanroom Plenum

Tabulation, Technical Detail


Description, Catalogue

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-076

14/05/24

14/05/28

14/06/27

Damper for Air Duct

Tabulation, Volume Control


Damper, Motorized Damper,
Smoke Fire Damper, NonReturn Damper Model BDDA-R & BDD-A3-R

Quang/Ujiie

B/B/A

BBVN-FIVE-S2-SCAMEP-077

14/05/29

14/06/05

14/06/27

HVAC_BACnet Interface for VRV III

Quang/Ujiie

B/B/A

BBVN-FIVE-S2-SCAMEP-078

14/05/31

14/06/13

14/06/10

HVAC_Wafer Check Valve, Butterfly Valve size up to DN200 lever,


Technical Detail Description,
Butterfly Valve Gear Type, Y Strainer for DN65 and Above (Flange end Catalogue
type), Y strainer for CDA chilled water supply piping, Thermometer,
Pressure Guage, Ball valve for Pressure gauge and temperature gauge,
Flow switch for chiller return pipe

Quang/Randy/Ujiie

B/A+B+C

14/06/25

14/06/30

14/07/04

HVAC_Butterfly Valve Gear Type, Butterfly valve Lener Type, Lug


Type, Wafer Cheeck valve, Y Strainer, Ball balce for Y-Strainer Drain

Technical Detail Description

Quang/Randy/Ujiie

B/A+B+C

BBVN-FIVE-S2-SCAMEP-079

14/05/30

14/06/11

14/06/02

HVAC_VRV Refrigerant Piping (REFNET PIPING)

Technical Detail Description,


Catalogue

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-0080

14/05/31

14/06/13

14/06/27

Production Exhaust, Production exhaust filter and Housing

Catalogue

Quang/Ujiie

B/B/A

BBVN-FIVE-S2-SCAMEP-0081

14/06/03

14/06/09

14/06/10

Catalogue, Tabulation

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-0081 (A)
BBVN-FIVE-S2-SCAMEP-0081 (B)
BBVN-FIVE-S2-SCAMEP-0081 ( C )
BBVN-FIVE-S2-SCAMEP-0081/R1 ( C )

14/06/16

14/06/20

14/06/20

Drainage and Water Supply Valve (PPR Shut Off Valve, Check valve
Flange Type, Check Valve Swing Brass Type, Ball Valve Flange Type,
Ball Valve Screw Type, Gate Valve Flange Type)
Water Supply System_Gate Valve PPR

Technical Detail Description

Quang/Ujiie

B/A+C

14/06/16

14/06/20

14/06/20

Drainage System_Ball Valve (SUS), Check Valve (SUS)

Technical Detail Description

Quang/Ujiie

B/B

14/07/05

14/07/11

14/07/08

Technical Detail Description

Quang/Ujiie

B/A+C

14/08/07

14/08/13

14/08/18

Gate Valve (Flange Type)_(For Water Supply Pipe in Pump Room),


Gate Valve PPR, Gate Valve
Brass Gate Valve for Hot Water Supply_Rev.1 Revised based on
comments in AMEP-81 (C ) dated 8-July-2014) Refer to RFC-85

Catalogue

Quang/Ujiie

B/A

BBVN-FIVE-S2-SCAMEP-0081 (D)

14/08/01

14/08/07

14/08/26

Technical Detail Description

Quang/Ujiie/Khoa

BBVN-FIVE-S2-SCAMEP-0081 (E)

14/08/01

14/08/07

14/08/26

Technical Detail Description

Quang/Ujiie/Khoa

BBVN-FIVE-S2-SCAMEP-0081 (F)

14/08/01

14/08/07

14/08/26

PVC Ball Check Valve (Manufacturer: FIP)_Model: SXENV


(Superseded AMEP-81 (B) refer to RFC-71 subjected "Submersible
Pump Pit 1 & 2" dated 17-July -2014 Rejected)
PVC Ball Check Valve (Manufacturer: FIP)_Model: VEENV
(Superseded AMEP-81 (B) refer to RFC-71 subjected "Submersible
Pump Pit 1 & 2" dated 17-July -2014 Rejected)
PVC Ball Check Valve (Manufacturer: FIP)_Model: VXENV
(Superseded AMEP-81 (B) refer to RFC-71 subjected "Submersible
Pump Pit 1 & 2" dated 17-July -2014 Rejected)

Technical Detail Description

Quang/Ujiie/Khoa

14/06/05

14/06/09

14/06/10

Lighting Switch (1way, 2way, 4way) & Plate (1gang-1divice,


1gang-2divices, 1gang-3divices)

Tabulation, Catalogue

Quang/Ujiie

14/08/23

14/08/27

14/08/28

Lighting Switch 1way & 2way (Superseded the lighting swich 1 way & 2 Catalog, Manufacturers Letter
way in approved AMEP_082 dated 10 June 2014)

BBVN-FIVE-S2-SCAMEP-071/R1

BBVN-FIVE-S2-SCAMEP-074
BBVN-FIVE-S2-SCAMEP-074 (FINAL)

BBVN-FIVE-S2-SCAMEP-078 (A)

BBVN-FIVE-S2-SCAMEP-0082
BBVN-FIVE-S2-SCAMEP-0082(A)

Title

Approval for Mechanical, Electrical Plumbing


Attachment

Date Delivered

Author/Delivered to

Quang/Ujiie

Status

B/A

Date Delivered to
Author

OUTGOIING

Rev.

Approval for Mechanical, Electrical Plumbing


Attachment

10

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

14/06/05

14/06/09

14/06/10

Tabulation, Catalogue

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-0083 (A)

14/07/17

14/07/22

14/07/21

Technical Detail Description

Quang/Ujiie/Diem

BBVN-FIVE-S2-SCAMEP-0083 (B)

14/08/23

14/08/27

14/08/28

BBVN-FIVE-S2-SCAMEP-0083 (C )

14/10/31

14/11/06

14/11/03

Socket Outlet_Single Socket, Double Socket, Divice Plate, Weatherproof


Socket, Industrial Socket & Plug, 1gang 16A 1Pole/N/E Switch Socket
Outlet, Floor Box 2x16A Double Socket Outlet w/ 2 Data, Isolators for
VRV, Camera, Heater
Weatherproof Socket - MK Masterseal Compact 86893 GRY IP66, 15A
3Pin (Superseded the weatherproof socket in AMEP-83 dated 10-June2014)
Socket Outlet_Single Outlet, Double Socket & Plates (Superseded the
single socket, double docket & plate in approved AMEP_083 dated 10
June 2014)
Raised Floor Box w/ 2x16A Double Socket Outlet & 2 data Revised
based on comments in AMEP-83 dated 10-June-2014

BBVN-FIVE-S2-SCAMEP-0084

14/06/06

14/06/09

14/06/27

BBVN-FIVE-S2-SCAMEP-0085

14/06/06

14/06/09

14/06/06
14/06/14

BBVN-FIVE-S2-SCAMEP-0087

BBVN-FIVE-S2-SCAMEP-0083

Author/Delivered to

Status

B/A+B+C

Catalog, Manufacturers Letter Quang/Ujiie

Sample Material Picture, MK


Catalogue

Quang/Ujiie

Fire fighting System_Vane Type Waterflow Alarm Switch with Retard

Catalogue

Quang/Ujiie

A/B/A

14/06/27

Fire fighting System_Pressure relief Valve

Catalogue

Quang/Ujiie

A/B/A

14/06/09

14/06/10

Fire fighting System_Denso Tape for Underground

Catalogue

Quang/Ujiie

14/06/18

14/06/20

Fire fighting System_Denso Tape for Underground_Rev.1 Revised based Catalogue


on comments in AMEP-0086 dated 10-June-2014

Quang/Ujiie

14/06/06

14/06/10

14/06/18

Fire Stop Mortar

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-0088

14/06/06

14/06/10

14/06/18

Fire Stop Sealant

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-0089

14/06/07

14/06/16

14/06/27

Fire Fighting System_Flexible Hose for Sprinkler Head (K5.6 & K14.0)

Tabulation, Catalogue

Quang/Ujiie

B/B/A

BBVN-FIVE-S2-SCAMEP-0090

14/06/12

14/06/16

14/06/12

Safety Valve

Catalogue

Quang/Ujiie/Khoa

14/06/12

14/06/16

14/06/12

Welding Rod

Catalogue

Quang/Ujiie/Trung

14/06/18

14/06/24

14/06/23

Quang/Ujiie/Trung

14/06/26

14/06/30

14/07/04

Welding Rod_Rev.1 Revised based on comments in AMEP-91 dated 12- Product Data Sheet
June-2014
Welding Rod_Rev.2 Revised based on comments in AMEP-91/R1 dated Catalogue
23-June-2014

Quang/Ujiie/Trung

14/06/12

14/06/16

14/06/12

Sub Welding Rod

Quang/Ujiie/Trung

14/06/18

14/06/24

14/06/25

Quang/Ujiie / ung

14/06/26

14/06/30

14/07/04

SUS Welding Rod_Rev.1 Revised based on comments in AMEP-0092


Product Data Sheet
dated 12-June-2014
GAS Metal Arc Welding (KIM TIN)_Rev.2 Revised based on comments Catalogue, Techinical Detail
in AMEP-92/R1 dated 25-June-2014
Description
GAS Metal Arc Welding (KIM TIN)_Rev.3 Revised based on comments
in AMEP-92/R2 dated 4-July-2014

Quang/Ujiie / ung

BBVN-FIVE-S2-SCAMEP-0086
BBVN-FIVE-S2-SCAMEP-0086/R1

BBVN-FIVE-S2-SCAMEP-0091
BBVN-FIVE-S2-SCAMEP-0091/R1
BBVN-FIVE-S2-SCAMEP-0091/R2

BBVN-FIVE-S2-SCAMEP-0092
BBVN-FIVE-S2-SCAMEP-0092/R1
BBVN-FIVE-S2-SCAMEP-0092/R2
BBVN-FIVE-S2-SCAMEP-0092/R3

14/07/08

Catalogue

BBVN-FIVE-S2-SCAMEP-0093

14/06/12

14/06/16

14/06/12

Hot Water Pipe Insulation

Catalogue

Quang/Ujiie/Khoa

BBVN-FIVE-S2-SCAMEP-0094

14/06/12

14/06/16

14/06/12

Copper Pipe for Hot Water

Catalogue

Quang/Ujiie/Khoa

B/A

BBVN-FIVE-S2-SCAMEP-0095

14/06/12

14/06/16

14/06/12

Copper Pipe Fittings for Hot Water Piping

Catalogue

Quang/Ujiie/Khoa

BBVN-FIVE-S2-SCAMEP-0096

14/06/16

14/06/20

14/06/20

Pipe Fittings_Flange Slip on Type (For Valve Flange Connection)_Refer Technical Detail Description,
to comments in AMEP-0078 dated 10-June-2014
Catalogue

Quang/ Ujiie

A/B

BBVN-FIVE-S2-SCAMEP-0097

14/06/17

14/06/21

14/06/20

Copper Pipe for AHU connection (Use for AHU coil connection) &
Technical Detail Description,
Copper Pipe Fittings for AHU connection (Use for AHU coil connection) Catalogue

Quang/ Ujiie

14/06/17

14/06/21

14/06/20

Exposed Chiller Pipe Insulation Cladding

Quang/ Ujiie

14/06/25

14/07/01

14/06/27

Exposed Chiller Pipe Insulation Cladding_Rev.1 Revised based on


comments in AMEP-98 dated 20-June-2014

BBVN-FIVE-S2-SCAMEP-0099

14/06/18

14/06/25

14/06/23

Anchor Bolt (SANKO) for Pipe Support on Trench Pit and Underground Catalogue
Toilet

Quang./Ujiie

BBVN-FIVE-S2-SCAMEP-100

14/06/18

14/06/24

14/06/23

Support Materials (Tisco)

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-0098
BBVN-FIVE-S2-SCAMEP-0098/R1

Technical detail description,


Catalogue
Technical detail description

Catalogue

Date Delivered to
Author

OUTGOIING

Rev.

11

Date
Required
Reply

INCOMING
Date Received

14/06/18

14/06/25

14/06/23

Treaded Rod, Bolt, Nuts, Washer, Pipe Clamp (Tanco/Zhapu)

Certificate/Test of Quality and Quang/Ujiie


Quantity, Product Data Sheet

14/07/09

14/07/14

14/07/11

Treaded Rod, Bolt, Nuts, Washer, Pipe Clamp (Tanco/Zhapu)_Rev.1


Revised based on comments in AMEP-101 dated 23-June-2014

Technical Detail Description

BBVN-FIVE-S2-SCAMEP-101 (A)

14/08/06

14/08/13

14/08/18

BBVN-FIVE-S2-SCAMEP-102

14/06/18

14/06/25

BBVN-FIVE-S2-SCAMEP-103

14/06/21

BBVN-FIVE-S2-SCAMEP-104

BBVN-FIVE-S2-SCAMEP-105

BBVN-FIVE-S2-SCAMEP-101
BBVN-FIVE-S2-SCAMEP-101/R1

BBVN-FIVE-S2-SCAMEP-106
BBVN-FIVE-S2-SCAMEP-106/R1
BBVN-FIVE-S2-SCAMEP-106/R2

Title

Approval for Mechanical, Electrical Plumbing


Attachment

Date Delivered

Author/Delivered to

Status

Quang/Ujiie

B/A+B+C

Treaded Rod for Indoor Support - TANCO Class 4.8 DIN975 Submitted Catalogue
based on comments in AMEP-101/R1 dated 11-July-2014

Quang/Ujiie

B/A+B+C

14/06/23

Buffer Tank (NAM AN)

1A3size drawing

Quang/Ujiie

14/06/25

14/06/25

Galvanized Anchor Bolt (HILTI)

Technical Detail Description

Quang/Ujiie

14/06/21

14/06/25

14/06/25

U Bolt (For Support above ground)

Technical Detail Description

Quang/Ujiie

14/06/21

14/06/25

14/06/25

SUS Anchor Bolt (HILTI)

Technical Detail Description

Quang/Ujiie

14/06/21

14/06/25

14/06/25

Spring Isolator

For 7 items, Technical Detail


Description

Quang/Ujiie

B/A+C

14/07/21

SPRING ISOLATOR_Rev.1
Spring Isolator (Floor Mounted)_Manufacturer: MASON_Model"
SLFH_Rev.2 Revised based on comments in AMEP-106/R1 dated 21July-2014
Spring Isolator (Floor Mounted) for Primary & Secondary Pump MASON SLFH1350 & SLFH1750 (Revised based on comment in
AMEP-106/R2 dated 25-August-2014)
Spring Isolator (Floor Mounted) for Primary & Secondary Pump MASON SLFH1350 & SLFH1750 (Revised based on comment in
AMEP-106(A) dated 18-Oct-2014)
Spring Isolator (Floor Mounted) for Primary & Secondary Pump MASON SLFH1350 & SLFH1750_Rev.2 (Revised based on comment
in AMEP-106(A) dated 18-Oct-2014)

Technical Detail Description


(for 8 items)

Quang/Ujiie

B/A+C

Catalogue

Quang/Ujiie

Catalogue

Quang/Ujiie

Catalogue, Shop Drawing

Quang/Ujiie

14/08/04

14/08/09

14/08/25

14/10/07

14/10/14

14/10/18

BBVN-FIVE-S2-SCAMEP-106 (A)/R1

14/10/31

14/11/06

14/11/08

BBVN-FIVE-S2-SCAMEP-106 (A)/R2

14/11/06

14/11/13

14/11/08

BBVN-FIVE-S2-SCAMEP-107

14/06/23

14/06/28

14/06/26

VAV for Circulation Corridor Communication Controller - DVC-V304

Catalogue

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-108

14/06/25

14/07/01

14/06/27

Galvanized Repair Compound

Technical Detail Description

Quang/Ujiie

B/A

14/06/25

14/07/01

14/06/27

Fire Fighting Paint (Vinilex Primer)

14/07/09

14/07/14

14/06/25

14/07/01

14/07/05

14/07/11

14/06/25

14/07/01

14/07/09

14/07/14

BBVN-FIVE-S2-SCAMEP-112

14/06/26

14/07/03

BBVN-FIVE-S2-SCAMEP-113

14/06/26

BBVN-FIVE-S2-SCAMEP-113 (A)

BBVN-FIVE-S2-SCAMEP-106 (A)

BBVN-FIVE-S2-SCAMEP-109

Technical Detail Description

Quang/Ujiie

Fire Fighting Paint (Vinilex Primer)_Nippon Paint (Model: VINILEX


Technical Detail Description
120 ACTIVE Primier)_rev.1 Revised based on comments in AMEP-109
dated 27-June-2014

Quang/Ujiie

14/06/27

Fire Fighting Paint (Primer for Welded Location)

Technical Detail Description

Quang/Ujiie

14/07/08

Fire Fighting Paint (Primer for Welded Location)_Rev.1 (Revised based


on comments in AMEP_110 dated 27-June-2014

Technical Detail Description

Quang/Ujiie

14/06/27

Fire Fighting Paint (Sprinkler, Hydrant and Hose Reel top Coat paint)

Technical Detail Description

Quang/Ujiie

Fire Fighting Paint (Sprinkler, Hydrant and Hose Reel top Coat
paint)_Nippon Paint (Model: Bilac B9004 Vermillion)_Rev.1 Revised
based on comments in AMEP-111 dated 27-June-2014

Technical Detail Description

Quang/Ujiie

14/07/29

Access Control System_Passive Infrared Sensor

Tabulation, Catalogue

Quang/Ujiie

14/07/02

14/07/09

DDC for Compressor Chiller Water Valve, Motorized Valve for


Tabulation, Catalogue
compressor chilled water pipe, temperature sensor for compressor chilled
water pipe, Solenoid valve for compressor

Quang/ Ujiie

14/08/27

14/09/01

14/09/04

Solenoid valve for compressor (ASCA) for Compressor Chilled Water


Pipe_Model: SCXE238A005-24017 (Supperseded Solenoid valve for
compressor in AMEP-113 dated 26-June-2014) Based on comments in
AMEP-113

Technical Description and


Catalogue

Quang/Ujiie/Khoa

14/07/01

14/07/05

14/07/07

Process Chilled Water Valve

Tabulation, Catalogue

Quang/Ujiie

14/07/15

14/07/21

14/07/25

14/08/28

14/08/30

14/09/06

Process Chilled Water Valve_Rev.1 Revised based on comments in


AMEP-114 dated 7-July-2014
Process Chilled Water Valve_Rev.1 (Additional Document)

Tabulation, Technical detailed Quang/Ujiie/Trung


description
Gate Valve (TOYO)_DN80
Quang/Ujiie/Trung
for water supply Tie-in works;
Ball valve (TOYO) for
Compressor room Tie-in

BBVN-FIVE-S2-SCAMEP-115

14/07/04

14/07/09

14/07/08

Aluminum Insulation Pin (Al Pin)

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-116

14/07/05

14/07/11

14/07/08

Gavanized Black Carbon steel Pipe Medium Grade Schedule 40 (Use for Technical Detail Description
Water Supply on Pump Room)

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-117

14/07/05

14/07/11

14/07/08

Gavanized Black Carbon steel Pipe BS-M (Use for Water Supply DN
100mm and Below)

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-109/R1

BBVN-FIVE-S2-SCAMEP-110
BBVN-FIVE-S2-SCAMEP-110/R1

BBVN-FIVE-S2-SCAMEP-111
BBVN-FIVE-S2-SCAMEP-111/R1

BBVN-FIVE-S2-SCAMEP-114
BBVN-FIVE-S2-SCAMEP-114 (A)
BBVN-FIVE-S2-SCAMEP-114 (A) (FINAL)

Technical Detail Description

B/A+B+C
B/A
C

Date Delivered to
Author

OUTGOIING

Rev.

Title

Approval for Mechanical, Electrical Plumbing


Attachment

12

BBVN-FIVE-S2-SCAMEP-118

14/07/05

Date
Required
Reply
14/07/11

BBVN-FIVE-S2-SCAMEP-119

14/07/07

14/07/12

14/07/10

Auto Drain (for Compressor Auto Drain in Compressor Room)


(ADCA)_Model FA20

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-120

14/07/07

14/07/12

14/07/10

Y Strainer (for compressor Chilled Water Supply Piping)


(ARITA)_Model Brass-Y-Strainer-Screwed End BSPT

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-121

14/07/09

14/07/14

14/07/11

HVAC System_ Aluminum Insulation Tape (Bond Tape)

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-122

14/07/09

14/07/14

14/07/21

Duct Silencer for AO Fan Duct (Tan Hung)

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-123

14/07/09

14/07/14

14/07/21

Duct Silencer for AHU Supply Duct (Tan Hung)


W4200xH2000mmxL3100mm

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-124

14/07/09

14/07/14

14/07/21

Duct Silencer for AHU Supply Duct (Tan Hung)


W4300xH2000mmxL2800mm

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-125

14/07/09

14/07/14

14/07/11

Technical Detail Description


Fire Fighting Paint
Fire Fighting Paint (Vinilex Primer)_Nippon Paint (Model: VINILEX
120 ACTIVE Primier)_rev.1 Revised based on comments in AMEP-109
dated 27-June-2014
Fire Fighting Paint (Primer for Welded Location)_Rev.1 (Revised based
on comments in AMEP_110 dated 27-June-2014)
Fire Fighting Paint (Sprinkler, Hydrant and Hose Reel top Coat
paint)_Nippon Paint (Model: Bilac B9004 Vermillion)_Rev.1 Revised
based on comments in AMEP-111 dated 27-June-2014

Quang/Ujiie

B/A+B+C

BBVN-FIVE-S2-SCAMEP-126

14/07/09

14/07/14

14/07/11

HVAC_Aluminum Insulation Pin Adhesive (TITEBOND)_Model:


Titebond Heavy Duty Construction Adhesive

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-127

14/07/14

14/07/19

14/07/18

Ybsguekded 2-Core AWG18 Cable

Technical Detail Description

Quang/Randy

B/A

BBVN-FIVE-S2-SCAMEP-128

14/07/14

14/07/19

14/07/18

Cable Terminal for LV Cable (Big type & Small Type)

Tabulation, Catalogue

Quang/Randy

B/A

Technical Detail Description

BBVN-FIVE-S2-SCAMEP-129

Date Delivered

INCOMING
Date Received

Author/Delivered to

Status

14/07/08

Gavanized Black Carbon steel Pipe Fittings (Use for Water Supply in
Pump Room)

Technical Detail Description

Quang/Ujiie

14/07/15

14/07/21

14/07/17

Floor Clean Out (1st Floor Toilet)_Model: COB

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-129/R1

14/08/01

14/08/06

14/08/12

Quang/Ujiie/Khoa

BBVN-FIVE-S2-SCAMEP-129/R2

14/10/27

14/11/01

14/11/04

Floor Clean Out (1st Floor Toilet)_Model: COB


Technical Detail Description
(Ground Floor Toilet)_Model: COA_Rev.1 (Revised based on comments
in AMEP_129 dated 17-July-2014)
Cleanout for First Floor Office - K Product CO 810W Type: CW-43 and Catalogue
CW-25_rev.2 Revised based on comment in AMEP-129/R1 dated 12August-2014

Quang/Ujiie/Khoa

14/07/15

14/07/21

14/07/17

Floor Clean Out (Ground Floor)_Model: COA

Technical Detail Description

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-130

BBVN-FIVE-S2-SCAMEP-131

14/07/18

14/07/23

14/07/21

Bitumen For Pipe Protection (Shell Bitumen)_Model: Shell Flintkote 3

Technical Detail Desciption

Quang/Ujiie/Trung

BBVN-FIVE-S2-SCAMEP-131/R1

14/08/01

14/08/08

14/08/15

Bitumen For Pipe Protection (Shell Bitumen)_Model: Shell Flintkote


3_Rev.1 Revised based on comments in AMEP-131 dated 21-July-2014

Catalogue

Quang/Ujiie/Trung

BBVN-FIVE-S2-SCAMEP-131 (ADD.01)

14/08/01

14/08/08

14/08/15

Bitumen For Pipe Protection (Shell Bitumen)_Model: Shell Flintkote PF- Catalogue
4_ADD (Additional Document based on EMEP-131 dated 21--July-2014

Quang/Ujiie/Trung

14/07/18

14/07/23

14/07/21

Copper Pipe Welding Rod (Brazing)_Harris [Model: AWS A5.8, BCuP


2]
Copper Pipe Welding Rod (Brazing)_Harris [Model: AWS A5.8, BCuP
2]_Rev.1

Technical Detail Desciption

Quang/Ujiie/Trung

GTAW Welding Rod for Pipe 50mm and Below (Huyndai)_Model: ST50G
GTAW Welding Rod for Pipe 50mm and Below (Huyndai)_Model: ST50G_Rev.1

Technical Detail Desciption

BBVN-FIVE-S2-SCAMEP-132
BBVN-FIVE-S2-SCAMEP-132/R1

BBVN-FIVE-S2-SCAMEP-133

14/07/25

14/07/18

14/07/23

BBVN-FIVE-S2-SCAMEP-133/R1

14/07/21
14/07/25

C
B/A

Quang/Ujiie/Trung

C
B

BBVN-FIVE-S2-SCAMEP-134

14/07/21

14/07/25

14/07/24

SMAW Welding Rod for Pipe (Chosun Welding Co.,Ltd)_Model: LC300

Technical Detail Desciption

BBVN-FIVE-S2-SCAMEP-135

14/07/22

14/04/24

14/07/28

Master Tie-in List, Method Statement List, Material and Tool List,
Organization Chart for Stage 1

5A3size pages Master Tie-in


Quang/Ujiie
List, Method Statement List of
Tie-in 1A3size page, 8A3size
pages Material and Tool List +
26A3size drawings, 2A3size
pages Organization Chart for
Stage 1 + 2A3pages contact
details

14/08/08

14/08/13

Master Tie-in List, Method Statement List, Material and Tool List,
Organization Chart for Stage 1_Rev.1 Revised based on comments in
AMEP_135 dated 28-Jul-2014

Tie-in Comments List


Quang/Ujiie
(2A3sizepages), Master Tie-in
List for Stage 1 (9S3size pages
+ 1 A0size colored page),
Method Statement List of Tiein (1A3size page),
Organizational Chart,
Manpower list (2A3size pages)

BBVN-FIVE-S2-SCAMEP-135/R1

Date Delivered to
Author

Quang/Ujiie/Trung

Superseed (Replaced
by APD-69)

OUTGOIING

Rev.

13

Date
Required
Reply

INCOMING
Date Received

14/07/25

14/07/31

14/08/04

Bolt, Nuts, Washer for Flange DIN 931, Class 8.8

Technical Detail Desciption

Quang/Ujiie

14/08/06

14/08/13

14/08/18

Bolt, Nuts, Washer for Flange -TANCO DIN931 Class 8.8 _Rev.1
Revised based on comments in AMEP-136 dated 4-Aug-2014

catalogue

Quang

14/07/30

14/08/06

14/08/18

Hose Rack Assembly (Manufacturer: Croker)

Technical Detail Desciption

Quang/Ujiie

14/09/03

14/09/05

14/10/20

14/11/06

Manufacturer Letter,
Catalogue
Manufacturer Letter,
Catalogue

Quang/Ujiie

14/10/31

Hose Rack Assembly (Manufacturer: Croker)_Rev.1 Revised based on


comments in AMEP-137 dated 18-August-2014
Hose Rack Assembly (Manufacturer: Croker)_Rev.2 Revised based on
comments in AMEP-137/R1 dated 20-October-2014

BBVN-FIVE-S2-SCAMEP-138

14/07/30

14/08/06

PVC Ball Valve (Manufacturer: FIP)_Model: VXEAV

Technical Detail Desciption

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-139

14/08/06

14/08/13

14/08/11

Fire Resistance Cable for Fire Alarm Stage 1 Tie-in Connection - Wilson Catalogue
FR-100

Quang/ujiie

14/08/09

14/08/14

Quang/ujiie

BBVN-FIVE-S2-SCAMEP-136
BBVN-FIVE-S2-SCAMEP-136/R1

BBVN-FIVE-S2-SCAMEP-137
BBVN-FIVE-S2-SCAMEP-137/R1
BBVN-FIVE-S2-SCAMEP-137/R2

BBVN-FIVE-S2-SCAMEP-140

Title

Approval for Mechanical, Electrical Plumbing


Attachment

Date Delivered

Status

Quang/Ujiie

14/08/29

Flexible Canvas for Mechanical Equipment_Prodetech

BBVN-FIVE-S2-SCAMEP-140/R1

14/09/22

Flexible Canvas for Mechanical Equipment_Prodetech _Rev.1 Revised


based on comments in AMEP-140 dated 29-August-2014

BBVN-FIVE-S2-SCAMEP-140/R2

14/10/16

flexible Canvas for Mechanical Equipment_Prodetech _Rev.2 Revised


based on comments in AMEP-140/R1 dated 22-September-2014

BBVN-FIVE-S2-SCAMEP-141

Tabulation, Catalogue

Author/Delivered to

14/08/14

14/08/19

14/10/06

Sikagrout GP (Sika)_Model: Sikagrout GP& SikaFlex-Construction


(AP)_Model: SikaFlex-Construction (AP) for Toilet Sleeve Sealing

Technical Detail Description

Quang/Ujiie

14/08/18

14/08/23

14/08/22

Access Control Panel Enclosure W560xH700xD250 &


W540xH560xD250

Drawing, Picture of Existing


Panel for Panel Color

Quang/Ujiie

14/08/25

14/08/29

14/08/28

Access Control Panel Enclosure W560xH700xD250 &


W540xH560xD250_Rev.1 Revised based on comments in AMEP-142
dated 22-August-2014

Drawing

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-143

14/08/20

14/08/25

BBVN-FIVE-S2-SCAMEP-144

14/08/21

14/08/25

14/08/29

Copper Busbar for Modification of LV Panel & Earth Copper BarOriental Copper

Catalogue

Quang/Ujiie

B/A

BBVN-FIVE-S2-SCAMEP-145

14/08/21

14/08/25

14/08/28

Nickel Coated Brass Cable Gland & Nylon Cable Gland (w/Locknut)

Tabulation, 1A4size photo,


data sheet

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-146

14/08/21

14/08/25

14/08/28

PV Control Panel for Pre-Action Valve & Schematic Diagram for


Operation (Additional Document for AMEP-37A Pre-Action Valve for
Fire fighting system double interlock)

Drawings

Quang/Ujiie/Randy

BBVN-FIVE-S2-SCAMEP-147

14/08/23

14/08/27

Hermeseal S-2 for fire fighitng pipe to fittings thear connection (pipe size Catalog, Method Application,
DN25, DN32, DN40, DN50)
Shop drawing Location

BBVN-FIVE-S2-SCAMEP-148

14/08/28

14/09/02

Sprinkler Pipe Support and Process Exhaust Duct DN250 and Below

BBVN-FIVE-S2-SCAMEP-149

14/08/30

14/09/05

14/09/06

Drop in Anchor (SANKO)_Model: CT-1040; CT1250 Use for Concrete Product Data Sheet
Slab Anchoring

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-150

14/08/30

14/09/01

14/09/04

Drawing & Photos

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-150/R1

14/09/30

14/10/07

14/10/08

Duct Silencer for AHU Supply Duct (W4200xH2000xL3540 &


W4300xH2000xL3540) & Duct Silencer for OA Fan Duct
(W800xH600xL1200)_TAN HUNG
Duct Silencer for AHU Supply Duct (W4200xH2000xL3540 &
W4300xH2000xL3540) & Duct Silencer for OA Fan Duct
(W800xH600xL1200)_TAN HUNG_Rev.1
Revised based on comments in AMEP_150 dated 04-September-2014

Technical Data

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-150/R2

14/10/10

14/10/16

14/10/13

Duct Silencer for AHU 3 & 4 Supply Duct & OA Duct _ Rev.2 Revised Catalogue, Noise Analysis
based on comments in AMEP-150/R1 dated 8-Oct-2014
calculation, Drawing

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-151

14/09/01

14/09/04

SUS Ball valve Flange type (for process chilled water piping Tie-in 6
worker, Insolation to Stage 2)

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-152

14/09/02

14/09/05

14/09/15

HILTI Plastic Anchor for Brick- HRD 10x70mm (Use for anchoring on
Brick only)

Technical Data

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-153

14/09/03

14/09/05

14/09/17

Fire Hydrant Hose & Fire Hydrant Nozzle (Supplier: PCCC Hanoi)

Manufacturer Letter,
Catalogue

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-154

14/09/05

14/09/10

14/09/18

Chiller Water and PCW Pipe Insulation Support (AEROFLEX) for


supply and return_Model: AEROFIT

Technical detail description


(Product Data Sheet)

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-155

14/09/09

14/09/11

14/09/22

Pressure Reducing Valve for Fire Hydrant System - Malgorani


EUROBRASS 143

Catalogue

Quang/Ujiie/Trung

BBVN-FIVE-S2-SCAMEP-142
BBVN-FIVE-S2-SCAMEP-142/R1

MS-24.1: HV Connection for Transformer TX-2

Quang/Ujiie/Diem

Sample

Date Delivered to
Author

OUTGOIING

Rev.

14/10/13

Date
Required
Reply
14/10/18

BBVN-FIVE-S2-SCAMEP-156

14/09/10

14/09/17

BBVN-FIVE-S2-SCAMEP-157

14/09/10

14/09/17

BBVN-FIVE-S2-SCAMEP-158

14/09/11

BBVN-FIVE-S2-SCAMEP-159

BBVN-FIVE-S2-SCAMEP-155/R1

Date Delivered

INCOMING
Date Received
14/10/20

Title

Approval for Mechanical, Electrical Plumbing


Attachment

Pressure Reducing Valve for Fire Hydrant System_Rev.1 GOETZE


Series 681 (revised based on comment in AMEP-155 dated 22September-2014)

Catalogue, Technical Data

14
Author/Delivered to

Quang/Ujiie/Trung

Status

B/A

Gate Valve DN80 - TOYO 420E (For Water Supply Tie-in Works only) Teechnical Data, Drawing for
(Superseded the gate valve DN80 in approved ANEP-81C dated 8-July- Reference
2014) Tie-in No.20

Quang/Ujiie

14/09/27

Ball Valve DN25 - TOYO 5026 (for Compressor Tie-in Works only) Tie- Teechnical Data, Drawing for
in No.8
Reference

Quang/Ujiie

14/09/13

14/09/18

Denso Primer D for Underground Firefighting

Technical Data Sheet

Quang/Ujiie

14/09/11

14/09/13

14/09/18

Densoclad 40 HT tape for Underground Firefighting Protection Cover

Technical Data Sheet

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-160

14/09/12

14/09/17

14/09/18

Floor Drain for Clean Room Area - FUKUNISHI T-5SBGS-50

Technical Data Sheet

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-161

14/09/18

14/09/23

14/09/22

Flexible Canvas for Mechanical Equipment - YEEDAH (Superseded the


approved Flexible canvas in AMEP-140 dated 29-August-2014)

Tabulation, Catalogue, Test


report

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-162

14/09/19

14/09/26

14/09/22

Female Anchor for Suspended Slab, Office and Clean Room Area HILTI HKV

Catalogue

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-163

14/09/22

14/09/25

14/09/27

Quick Response Pendent Sprinkler for Component Production - VIKING Technical data
VK352 L=8.0 (Additional material for approval in approved AMEP25/R1 dated 3-July-2014)

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-164

14/09/22

14/09/25

14/09/27

Flexible Hose for Sprinkler Head - TRONFLEX TCR25BR for


Technical data sheet
Component Production Sprinkler Head K=8.0 (Superseded the approved
flexible hose for component production sprinkler head K=14 3/4''
commection in AMEP-89 dated 27-June-2014)

Quang/Ujiie

14/09/26

14/10/03

14/10/01

Electromagnetic Lock_ ALGATECH UL275- SMC

Catalogue

Quang/ Ujiie

14/10/18

14/10/22

14/10/24

Electromagnetic Lock_ ALGATECH UL275- SMC_Rev.1


Revised based on comments in AMEP_165 dated 01-Oct-2014

Catalogue

Quang/Ujiie

B/A

14/10/06

Isolators

Technical detail description/


Catalogue
Isolators- Schneider Clipdsal WHT35: 3P 35A for RF-P2-01, 02 &
Catalog
Legrand 0 226 27: 4P 100A for SCHWP-01, 02, 03 (Revised and
superseded the approval isolator for SCWP in AMEP-166 dated 06-Oct2014)

Quang/Ujiie

Isolators for VRV Outdoor Unit- Schneider/ Clipsal WHT35 3P


35A&WHT20 3P 20A

Catalogue

Quang/Ujiie

14/10/06

OS&Y Gate Valve for Fire Fighting System (Double Interlock PreAction)- FIREKING OF200F-400F (Superseded the approved butterfly
valve DN100 in AMEP_0035/R1 based on RFC_0024 & RFI_159)

Catalog

Quang/Ujiie

14/10/09

OS&Y Gate Valve for Fire Fighting System (Double Interlock PreAction)OS&Y Gate Valve for Fire Fighting System (Double Interlock PreAction)_Rev.2

BBVN-FIVE-S2-SCAMEP-165
BBVN-FIVE-S2-SCAMEP-165/R1

BBVN-FIVE-S2-SCAMEP-166

14/09/26

14/10/03

BBVN-FIVE-S2-SCAMEP-166/R1

14/10/31

14/11/06

BBVN-FIVE-S2-SCAMEP-166(A)

14/10/31

14/11/07

14/09/29

14/10/04

BBVN-FIVE-S2-SCAMEP-167

BBVN-FIVE-S2-SCAMEP-167/R1
BBVN-FIVE-S2-SCAMEP-167/R2

BBVN-FIVE-S2-SCAMEP-168

14/10/28

Quang/Ujiie

C
B

14/09/30

14/10/07

14/10/08

Fire Stop Foam- HILTI CP660

Technical Data

Quang/Ujiie

14/10/20

14/10/27

14/10/24

Fire Stop Foam- HILTI CP660_Rev.1 Revised based on comments in


AMEP-168 dated 8-October-2014

Catalogue, Test report

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-169

14/09/30

14/10/07

14/10/08

Fire Stop Pipe Wrap- HILTI CP648-E

Technical Data

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-170

14/09/30

14/10/07

14/10/08

Fire Stop Collar- HILTI CP643N

Technical Data

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-171

14/10/02

14/10/04

AHU Sealant - SIKAFLEX 221

Technical Data Sheet

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-172

14/10/06

14/10/13

14/10/16

Pipe and Duct Labelling (Brady) for chilled water and process chilled
water pipe (Supply and Return)_Model: B6606 digitally printed plastic

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-173

14/10/07

14/10/14

14/10/09

Highbay Lighting Emergency Lamp for Warehouse (OSRAM Halostar


Catalogue; Technical Data
50W 12V GY6.35); Lamp for Downlight in Office & Canopy (OSRAM sheet
Deluxe D/E); Lamp for Flood Light (Exterior) (OSRAM Powerstar HQITS Excellence 150W/NDL); Lamp for Highbay Light (Warehouse)
(OSRAM Powerstar HQI-E 150W/NDL/Clear); 14W Flourescent Lamp
for Office - Phillips TL5 Essential 14W/840; 28W Flourescent Lamp for
Buffer Areas VRV - Phillips TL5 Essential 28W/840; 36W Flourescent
Lamp for Cleanroom - Phillips TL-D 36W/840; Ballast 36W for Clean
Room-TRIDONIC PC T8 Pro IP; Ballast 28W for Buffer Areas & VRV THorn Electronic Ballast for Linear T5 FL Lamp; Ballast 14W for Office
- TRIDONIC PC T5 Top IP 3x14W

Quang/Ujiie

14/10/17

14/10/20

14/10/23

Highbay Lighting Emergency Lamp for Warehouse (OSRAM Halostar


Catalogue, Techinical Data
50W 12V GY6.35); Lamp for Downlight in Office & Canopy (OSRAM Sheet
Deluxe D/E); Lamp for Flood Light (Exterior) (OSRAM Powerstar HQITS Excellence 150W/NDL); Lamp for Highbay Light (Warehouse)
(OSRA

Quang/Ujiie

B+C/B+C

14/10/07

14/10/14

14/10/09

FS-ONE Fire Stop Sealant for Busduct Penetration - HILTI

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-168/R1

BBVN-FIVE-S2-SCAMEP-173/R1

BBVN-FIVE-S2-SCAMEP-174

Catalogue, Technical Data

Date Delivered to
Author

(refer to
140/R1)

OUTGOIING

Rev.

15

Date
Required
Reply

INCOMING
Date Received

BBVN-FIVE-S2-SCAMEP-175

14/10/07

14/10/14

14/10/13

Fire Smoke Supply Air Fan FSFS0PII-01,02 - Drugger TDA-V90014AA-7-7/22 (Additional Fan - Refer to RFC26)

Technical Data Sheet

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-176

14/10/07

14/10/14

14/10/20

PVC Butterfly Valve for Drain Office Pit - FIP FEOV/LM

Catalogue

Quang/Ujiie

B/A

14/10/07

14/10/14

14/10/09

Badge Printer - Fargo HDP5000 & Accessories

Catalogue, Installation Guide

Quang/Ujiie

14/11/04

14/11/11

14/11/07

Quang/Ujiie

14/11/08

14/11/13

Badge Printer - Fargo HDP5000 & Accessories_Rev.1 Revised based on Technical Detail Description;
comments in AMEP-177 dated 9-October-2014
Catalogue
Badge Printer - Fargo HDP5000 & Accessories_Rev.2 Revised based on Catalog
comments in AMEP-177/R1 dated 07-Nov-2014

BBVN-FIVE-S2-SCAMEP-178

14/10/07

14/10/14

14/10/09

Software for Access Control - Lenel S00090

Picture

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-179

14/10/10

14/10/17

14/10/20

Water Pump Tank - GRUNDFOS GT-H-100 PN10 G1V (Superseded


the approved water pump tank in AMEP-66/R1 dated 20-June-2014)

Catalogue, Letter, Certificate

Quang/Ujiie

14/11/05

14/11/12

Water Pump Tank - GRUNDFOS GT-H-100 PN10 G1V _Rev.1


Revised based on comments in AMEP-179 dated 20-October-2014

Catalogue, Letter

Quang/Ujiie

14/10/14

14/10/21

Quang/Ujiie

14/11/10

BTU Meter - ONICON System-10-BAC BTU Meter (Refer to RFC


Additional BTU Meter for Chilled Water)
BTU Meter - ONICON System-10-BAC BTU Meter_Rev.1 Revised
based on comments in AMEP-180 dated 17-October-2014

Catalogue

14/11/07

Catalogue, Technical Data

Quang/Ujiie

14/10/17

14/10/20

14/10/21

FM 200 Low Pressure Swich and Discharge Pressure Swich- FIKE

Catalogue, Data Sheet

Quang/ Ujiie

14/10/18

14/10/22

14/10/24

Control cable for Mechanical Equipment- LS Vina CVV-A

Catalogue, Test Report

Quang/ Ujiie

14/10/31

14/11/06

14/11/03

Control cable for Mechanical Equipment- LS Vina CVV-A_Rev.1

Catalogue, Test Report

Quang/ Ujiie

14/10/22

14/10/27

14/10/28

ACP Battery Back-up - Phoenix TS1272 (12V-7.2Ah)

Picture

Quang/Ujiie

14/10/31

14/11/06

14/11/03

Technical Data

Quang/Ujiie

14/11/08

14/11/14

ACP Battery Back-up - Phoenix TS1272 (12V-7.2Ah)_Rev.1


Revised based on comments in AMEP_182 dated 28-Oct-2014
ACP Battery Back-up - Phoenix TS1272 (12V-7.2Ah)_Rev.2
Revised based on comments in AMEP_182/R1 dated 03-Nov-2014

Technical detail description,


Catalogue

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-184

14/10/22

14/10/27

14/11/03

EPDM Gasket - Tan Thai Binh G-ST-Flange Gasket

Catalogue

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-185

14/10/25

14/11/01

14/10/30

MCCB 630AF/630AT 4P 50kA (by Schneider)_Model: NSX630N

Product Data Sheet,


Quang/Ujiie
IN_AMEP-15/R2 dated 9-June2014; IN_AMEP-128 dated 18July-2014; IN_AMEP-144
dated 29-August-2014

14/10/31

14/11/01

14/11/03

MCCB 630AF/630AT 4P 50kA- Schneider NSX630N_Rev.1

Catalog

Quang/Ujiie

14/10/25

14/11/01

14/10/31

Variable Speed Drive (VSD)_by Hai Nam (Recycling Fan RF-PII-01,


02) & New DB by Hai Nam Sub-Panel in AHU Room for Smoke Fan

Drawings; Catalogue/Product
Data Sheet

Quang/Ujiie

14/10/27

14/11/01

14/11/04

Quang/Ujiie

14/11/10

PVC Fume Exhaust Fan for Production Tool IMM2-5 and IMM2-6Krugger CCD-9-7 245W 3SY
PVC Fume Exhaust Fan for Production Tool IMM2-5 and IMM2-6Krugger CAC 200-4_ Rev.1
Revised based on comment in AMEP_187 dated 04-Nov-2014

Catalogue, Performance Data

14/11/08

Catalog, Technical Data

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-188

14/10/31

14/11/06

14/11/03

Office Power Supply Battery-Altronix OLS120

Technical Data

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-189

14/10/31

14/11/07

14/11/03

Pilot Light Unibody Type- IDEC YW1P- 1BUQ3(2)

Catalog

Quang/Ujiie

BBVN-FIVE-S2-SCAMEP-190

14/11/07

14/11/14

BBVN-FIVE-S2-SCAMEP-177
BBVN-FIVE-S2-SCAMEP-177/R1
BBVN-FIVE-S2-SCAMEP-177/R2

BBVN-FIVE-S2-SCAMEP-179/R1

BBVN-FIVE-S2-SCAMEP-180
BBVN-FIVE-S2-SCAMEP-180/r1

BBVN-FIVE-S2-SCAMEP-181

BBVN-FIVE-S2-SCAMEP-182
BBVN-FIVE-S2-SCAMEP-182/R1

BBVN-FIVE-S2-SCAMEP-183
BBVN-FIVE-S2-SCAMEP-183/R1
BBVN-FIVE-S2-SCAMEP-183/R2

BBVN-FIVE-S2-SCAMEP-185/R1

BBVN-FIVE-S2-SCAMEP-186

BBVN-FIVE-S2-SCAMEP-187
BBVN-FIVE-S2-SCAMEP-187/R1

BBVN-FIVE-S2-SCAMEP-191

BBVN-FIVE-S2-SCAMEP-192

BBVN-FIVE-S2-SCAMEP-193

BBVN-FIVE-S2-SCAMEP-194

BBVN-FIVE-S2-SCAMEP-195

BBVN-FIVE-S2-SCAMEP-196

BBVN-FIVE-S2-SCAMEP-197

14/10/17

Title

Approval for Mechanical, Electrical Plumbing


Attachment

Date Delivered

Trunking, Data, Powepoint for Toolshop 2; for IPQC Lab and for White Technical Detail Description;
Office
Catalogue

Author/Delivered to

Status

Quang/Ujiie

Quang/Ujiie/Diem

B+C/B+C

Date Delivered to
Author

OUTGOIING

BBVN-FIVE-S2-SCAMEP-198

BBVN-FIVE-S2-SCAMEP-199

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

16
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

17
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

18
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

19
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

20
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

21
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

22
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

23
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

24
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

25
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

26
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

27
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

28
Author/Delivered to

Status

Date Delivered to
Author

45.00

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

29
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

30
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

31
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

32
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

33
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

34
Author/Delivered to

Status

Date Delivered to
Author

OUTGOIING

Rev.

Date Delivered

Date
Required
Reply

INCOMING
Date Received

Title

Approval for Mechanical, Electrical Plumbing


Attachment

35
Author/Delivered to

Status

Date Delivered to
Author

Approval for Method Statement

OUTGOING

Rev.

Date
Issued

BBVN-FIVE-S2-SC-AMS-0001-14

BBVN-FIVE-S2-SC-AMS0001-14/R1

Date
Required
Reply

INCOMING Date
Received

14/03/05

BBVN-FIVE-S2-SC-AMS-0002-14
14/02/28
BBVN-FIVE-S2-SC-AMS0002-14/R1

14/03/03

14/03/03
14/03/05

BBVN-FIVE-S2-SC-AMS0002-14/R2

14/03/06

14/03/06

14/03/04

14/03/04

14/03/14

BBVN-FIVE-S2-SC-AMS0003/R2

14/03/18

14/03/21

14/03/04

14/03/04

14/03/21

14/03/28

14/03/24
BBVN-FIVE-S2-SC-AMS0004/R2

BBVN-FIVE-S2-SC-AMS-0005-14

Nguyen

Temporary site office method statement (Rev.1)

Cuong/Toan

Temporary site office method statement (Rev.1)

14/03/27

14/04/03

14/03/03

14/03/04

Nguyen

Temporary site office method statement (Rev.2)

C
Nguyen

Temporary site office method statement (Rev.3)

Risk Assessment (2 A4 pages), 4 A3 size


drawings: E-01, E-02, E-03, E-04

Dam Minh
Quang

Temporary Electric Method Statement

9 A3 drawings

Trung

Temporary Electric Method Statement (Rev.1)

C
7 A3size drawings

Diem

Temporary Electric Method Statement (Rev.2)

C
1 A3 size schedule, 9 A3 size drawings

Diem

Temporary Electric Method Statement (Rev.3)

A
Risk Assessment (2 A4 pages), 1 A3 size
drawings: MF-02

Dam Minh
Quang

Relocation Fire fighting Method Statement


MS-21. Fire Fighting System_Remove and Modification Existing
Hydrant Pipe Rev.1

MS-21. Fire Fighting System_Remove and Modification Existing


Hydrant Pipe Rev.1
MS-21. Fire Fighting System_Remove and Modification Existing
Hydrant Pipe Rev.2

Temporary Water Supply Method Statement

Status

Temporary site office method statement


Temporary site office method statement

Relocation Fire fighting Method Statement


14/03/05

BBVN-FIVE-S2-SC-AMS0004/R1

Nguyen

Temporary Electric Method Statement (Rev.3)


14/03/21

BBVN-FIVE-S2-SC-AMS-0004-14

Pre-condition survey method

Temporary Electric Method Statement (Rev.2)


14/03/20

BBVN-FIVE-S2-SC-AMS0003/R3

Phuc

Temporary Electric Method Statement (Rev.1)


14/03/17

Prepared by

Pre-condition survey method


Pre-condition survey method

Temporary Electric Method Statement

14/03/06

BBVN-FIVE-S2-SC-AMS0003-14/R1

Attachment

Temporary site office method statement (Rev.3)


14/03/06

BBVN-FIVE-S2-SC-AMS-0003-14

Title

Temporary site office method statement (Rev.2)


14/03/06

BBVN-FIVE-S2-SC-AMS0002-14/R3

36

C
Remove and Modification Existing Hydrant Pipe, Ujiie/D.T . Trung
Details schedule for the remove & modification
existing hydrant pipe, JSA form1 A3 size drawing
C
Remove and Modification Existing Hydrant Pipe,
Details schedule for the remove & modification
existing hydrant pipe

Mr. Trung

Risk Assessment (2 A4 pages), A3 size drawings:


Option 1: 3 pages, Option 2: 2 pages

Dam Minh
Quang

Approval for Method Statement

OUTGOING

Rev.

BBVN-FIVE-S2-SC-AMS0005-14/R1

Date
Issued

Date
Required
Reply

INCOMING Date
Title
Received
14/03/06
Temporary Water Supply Method Statement

14/03/12

Water Supply Temporary System Rev.1


14/03/14

BBVN-FIVE-S2-SC-AMS-0006-14

14/03/03

14/03/04

BBVN-FIVE-S2-SC-AMS0006-14/R1

14/03/14

Attachment

Prepared by

1 A3 size schedule, 2 A3 size drawings

Trung
B

Risk Assessment (2 A4 pages), 5 A3 size


drawings: Option 1 (M-03, M-04, underground
Combined), Option 2 (M-03, M-04)

Dam Minh
Quang

Temporary Sewage water Method Statement

Water Drain Temporary System Rev.1

Status
C

Water Supply Temporary System Rev.2

Temporary Sewage water Method Statement

14/03/06

37

1 A3 size schedule, 2 A3 size drawings

Trung

Existing pile rectification


Existing pile rectification

17 A3 size drawings, JSA form

Cuong

Existing pile rectification Rev.1

Work Monitoring, HILTI Specification, QPTLD6:1978, 17 A3 size drawings, JSA form

Water Drain Temporary System Rev1


BBVN-FIVE-S2-SC-AMS-0007-14

14/03/11
14/03/14
BBVN-FIVE-S2-SC-AMS0007/R1

BBVN-FIVE-S2-SC-AMS-0008-14

14/03/18

Existing pile rectification Rev.1

List of Method Statement


List of Method Statement

Thanh

14/03/12

List of Method Statement Rev.1

Tu

14/03/18
14/03/21

BBVN-FIVE-S2-SC-AMS-0009

14/03/18

14/03/29

14/04/02

BBVN-FIVE-S2-SC-AMS0009/R1 (ADD)

14/04/05

14/04/08

C/A

Schedule of Elevation, Site organization Chart,


Location & Access, Schedule & Manpower, JSA
form

MS-BLD.04 Earthwork
MS-BLD.04 Earthwork Rev.1

14/04/03

List of Method Statement Rev.1

MS-BLD.04 Earthwork

14/03/25
BBVN-FIVE-S2-SC-AMS0009/R1

Cuong

14/03/26

14/03/11

BBVN-FIVE-S2-SC-AMS0008/R1

MS-BLD.04 Earthwork Rev.1

Nguyen/Tu

C/B
Schedule of Elevation, Site organization Chart,
Location & Access, Schedule & Manpower,
Existing Ground Level, JSA form
B

Report & Proposal on consulting for soil treatment method (Based on


comment SL.16 in General Note Sheet 2 - For Construciton Drawings
(Structural Drawings) Nov 2013)
12-Apr-14

Approval for Method Statement

OUTGOING

Rev.

BBVN-FIVE-S2-SC-AMS-0010

Date
Issued
14/03/18

Date
Required
Reply
14/03/19

INCOMING Date
Received

MS-11 Subcon Temporary Site Office

14/03/20
BBVN-FIVE-S2-SC-AMS0010/R1

14/03/21

14/03/22

14/03/24

14/03/28

BBVN-FIVE-S2-SC-AMS0011/R1

14/04/03

14/04/05

12-Apr-14

BBVN-FIVE-S2-SC-AMS-0012

14/03/27

14/03/31

14/04/19
14/04/23

BBVN-FIVE-S2-SC-AMS-0013

14/04/04

14/04/09

BBVN-FIVE-S2-SC-AMS0013/R1

BBVN-FIVE-S2-SC-AMS-0014

14/04/28

14/05/05

14/04/14

14/04/21

Toan

Schedule of elevation, Site Organisation Chart,


JSA form, 6 A3size drawings

Thanh

Equipment List, Schedule & Manpower, JSA

Tuan Anh
C

Method Statement for Concrete work, Equipment


list, JSA

Tuan Anh
Tuan Anh

Details Schedule/Main Power Requirement,


Mr. Quang/Mr.
Survey Method, Installation Underground pipe,
Diem
Method installation earth rod in earth pit, Detail of
grounding rod in earth pit, detail of earth pit,
connection from test link box to earth rod, details
of HDPE conduit installation

MS-29: Earthing System and Underground System Work Cabling and


Piping

MS-19: Air Conditioning & Mechanical Ventilation System


[C] Condensation Drain Pipe Underground System Work

RC Work_Rev.1

MS-19 [C]: Air Conditioning & Mechanical Ventilation System


[C] Condensation Drain Pipe Underground System Work

14/04/18

Toan

R.C Work

MS-29: Earthing System and Underground System Work Cabling and


Piping

08-Apr-14

Site Organisation Chart, Schedule of Works Vinaconex 2 & North Star, 1 A3 size Drawings
Master Plan of site office building, 4 A3 size
drawings of Vinaconex 2 & 13 pages North Star,
JSA form

MS.BLD-01/Anti-Termite Work Rev.1 based on comments AMS-0011 Schedule of elevation, Site Organisation Chart,
Tuan Anh
dated 26-Mar-2014
JSA form, 5 A3size drawings, Material Safety Data
Sheet
MS.BLD-01/Anti-Termite Work Rev.1 based on comments AMS-0011
dated 26-Mar-2014

R.C Work Rev.1

Status

MS.BLD-01/Anti-Termite Work

R.C Work
08-Apr-14

BBVN-FIVE-S2-SC-AMS- 14/04/16
0012/R1

Prepared by

Schedule of Elevation, Site Organisation Chart, A3 Toan


size Drawings Vinaconex 2 4 pages&North Star 17
pages, JSA form

MS-11 Sub-con Temporary Site Office _ Rev.1

MS.BLD-01/Anti-Termite Work
14/03/26

Attachment

MS-11 Subcon Temporary Site Office


MS-11 Subcon Temporary Site Office Rev.1

14/03/28

BBVN-FIVE-S2-SC-AMS-0011

Title

38

Excavation Work, Installaiton pipe work, testing


commissioning, Sleeve, Location of the activity,
Details Schedule/Manpower requirement

Mr. Quang/Mr.
Trung

Approval for Method Statement

OUTGOING

Rev.
BBVN-FIVE-S2-SC-AMS0014/R1

BBVN-FIVE-S2-SC-AMS0014/R2

BBVN-FIVE-S2-SC-AMS-0015

BBVN-FIVE-S2-SC-AMS0015/R1

BBVN-FIVE-S2-SC-AMS-0016

BBVN-FIVE-S2-SC-AMS0016/R1

BBVN-FIVE-S2-SC-AMS-0017

Date
Issued
14/04/26

Date
Required
Reply
14/04/29

14/05/27

14/05/29

14/04/14

14/04/21

14/04/26

14/04/29

14/04/14

14/04/21

14/04/26

14/04/29

14/04/22

14/04/24

INCOMING Date
Title
Received
14/05/19
MS-19: Air Conditioning & Mechanical Ventilation System [C]
Condensation Drain Pipe Underground System Work_Rev.1 Revised
based on comments in AMS_0014 dated 18-Apr-2014

14/06/02

BBVN-FIVE-S2-SC-AMS0017

14/04/24

14/04/18

MS-20: Water Supply and Drainage Underground System Work

14/05/09

MS-20: Water Supply and Drainage Underground System Work_Rev.1


Revised based on comments in AMS_0015 dated 18-Apr-2014

MS-21: Fire Fighting Underground System Work

14/04/18

MS-21: Fire Fighting Underground System Work

14/05/09

MS-21: Fire Fighting Underground System Work_Rev.1 Revised


based on comments in AMS_0016 dated 18-Apr-2014

MS-44 Protection Method for Door & Window at Grid Line 12

14/04/25

14/04/28

Excavation Work, Installaiton pipe work, testing


commissioning, Sleeve, Location of the activity,
Details Schedule/Manpower requirement

Prepared by

Status

Quang/Trung

Quang/Trung

Mr. Quang/Mr.
Trung

C
Mr. Quang/Trung

Excavation Work, Installaiton pipe work, testing


commissioning, Sleeve, Location of the activity,
Details Schedule/Manpower requirement

Mr. Quang/Mr.
Trung

C
Quang/Trung

Method Statement, JSA/Risk Analysis, Schedule

Tuan Anh

MS-44 Protection Method for Door & Window at Grid Line 12

B/C

MS-44 Protection Method for Door & Window at Grid Line 12_Rev1 Method Statement, JSA/Risk Analysis, Schedule
(Revised based on comment in AMS_0017 dated 23-Apr-2014)
14/04/25

BBVN-FIVE-S2-SC-AMS-0018

Attachment

MS-19: Air Conditioning & Mechanical Ventilation System [C]


Condensation Drain Pipe Underground System Work_Rev.1 Revised
based on comments in AMS_0014 dated 18-Apr-2014

MS-20: Water Supply and Drainage Underground System Work

14/04/23

39

14/05/05

14/05/07

MS-44 Protectin Method for Door & Window at Grid Line 12_Rev.1

Tuan Anh

A/B

MS-28: External Lighting-Underground Work for Foundation Cabling Survey Method, Installation underground pipe,
Quang/Diem
& Piping
installation underground crossing road, concrete
foundation method, JSA, schedule, plan of activity

MS-28: External Lighting-Underground Work for Foundation Cabling


& Piping

Approval for Method Statement

OUTGOING

Rev.

Date
Issued
14/05/12

Date
Required
Reply
14/05/16

14/04/29

14/05/05

14/05/09

MS-25: Underground Piping & Cabling for Pumpit

BBVN-FIVE-S2-SC-AMS0019/R1

14/05/28

14/05/28

14/06/04

MS-25: Underground Piping & Cabling for Pumpit_Rev.1 Revised


based on comments in AMS-19 dated 9-May-2014

BBVN-FIVE-S2-SC-AMS0019/R2

14/11/08

14/11/12

14/04/29

14/05/05

14/05/09

MS-35: CCTV system-Underground system work cabling and piping

14/05/24

14/05/28

14/05/28

MS-35: CCTV system-Underground system work cabling and


piping_Rev.1 Revised based on comments in AMS-20 dated 9-May2014

14/04/29

14/05/3

14/05/07

MS-BLD.05 Method Statement for Temporary Steel Stage

BBVN-FIVE-S2-SC-AMS0018/R1

BBVN-FIVE-S2-SC-AMS-0019

BBVN-FIVE-S2-SC-AMS-0020

BBVN-FIVE-S2-SC-AMS0020/R1

BBVN-FIVE-S2-SC-AMS-0021

BBVN-FIVE-S2-SC-AMS-0022

14/04/29

14/05/05

40

INCOMING Date
Title
Attachment
Received
14/05/19
MS-28: External Lighting-Underground Work for Foundation Cabling Details schedule/Menpower Requirements,
& Piping_Rev.1 Revised based on comments in AMS-0018 dated 7MSE.1: Survey Method, MSE.2: Installation
May-14
underground pipe, MSE.3: Details of HDPE
conduit installation, MSE.4: Method Installation
underground pipe across rain water pipe at
crossroad, MSE.5: Fabrication of pipe cast
foundation, MSE.6: Make concrete foundation
method

MS-25: Underground Piping & Cabling for Pumpit_Rev.2 Revised


based on comments in AMS-19/R1 dated 4-June-2014

MS-30 Lightning System - Underground Work Cabling and Piping

Prepared by

Status

Quang/Diem

Survey Method, Installation underground pipe,


Quang/Diem
detail of installation of HDPE conduit, Connect to
panel, sleeve for pum pit, JSA, schedule, plan of
activity
Detailed schedule/Manpower Requirement,
Quang/Diem
MSE.1: Survey Method; MSE.2: Installation
Underground Pipe (HDPE); MSE.3: Details of
HDPE conduit installationl; MSE.4: Connect to
electric panel
Detailed schedule/Manpower Requirement,
Quang/Diem
MSE.1: Survey Method; MSE.2: Installation
Underground Pipe (HDPE); MSE.3: Details of
HDPE conduit installationl; MSE.4: Connect to
electric panel

Survey Method, Installation underground pipe,


Quang/Diem
detail of installation of HDPE conduit, JSA,
schedule, plan of activity
Detailed schedule/Manpower Requirement,
Quang/Diem
MSE.1: Survey Method; MSE.2: Installation
Underground Pipe (FEP); MSE.3: Details of HDPE
conduit installation; MSE.4: Method installation
underground pipe across rain water pipe at
crossroad

1.Working Procedure, 2.Material Spec., 3.Platform Tuan Anh


Installation, 4.Schedule & Manpower, 5.Drawing,
6.JSA/Risk Analysis, 7.Crane Spec., 8.Calculation
Sheet

Quang/Diem

Approval for Method Statement

OUTGOING

Rev.

BBVN-FIVE-S2-SC-AMS0022/R1

BBVN-FIVE-S2-SC-AMS-0023

BBVN-FIVE-S2-SC-AMS0023/R1

BBVN-FIVE-S2-SC-AMS-0024
BBVN-FIVE-S2-SC-AMS0024/R1

BBVN-FIVE-S2-SC-AMS-0025

BBVN-FIVE-S2-SC-AMS-0026
BBVN-FIVE-S2-SC-AMS0026/R1

Date
Issued

Date
Required
Reply

INCOMING Date
Title
Received
14/05/09
MS-30 Lightning System - Underground Work Cabing and Piping

41

Attachment

Prepared by
Mr. Quang

14/05/12

14/05/15

14/05/19

MS-30 Lightning System - Underground Work Cabing and Piping


_Rev.1 Revised based on comments in AMS_0022 dated 05-May2014

Details schedule/Manpower requirements, MSE.1: Quang/Diem


Survey Method, MSE.2: Installation underground
pipe, MSE.3: details of HDPE conduit installation,
MSE.4.1&4.2: Method installation earth rod in
earth pit, MSE.5: Detail of grounding rod in earth
pit, MSE.6: detail of earth pit, MSE.7&7.1:
Connection from test link box to earth rod,
MSE.8&8.1&8.2&8.3: Sleeve for lightning cable,
MSE.7: Connection from test link box to earth rod

14/05/2

14/05/06

14/05/07

MS-BLD.18 Method Statement for Road & Stormwater works

1.General, 2.Reference standards & documents 3. Tuan Anh


Equipment list, 4.Preparation works,
5.Construction for road work, 6.Construction for
storm works, 7.Quality managemant., 8.Safety
management
Drawings for road construction, Drawings for
Tuan Anh
storm water construction, Schedule & Manpower,
JSA/Risk Assessment

14/05/21

14/05/24

MS-BLD.18 Method Statement for Road & Stormwater works_Rev.1


Revised based on comments in AMS-0023 dated 7-May-2014

14/05/05

14/05/07

14/05/07

MS-45: Staircase Demolition at Gridline 12

14/05/21

14/05/24

14/06/03

MS-45: Staircase Demolition at Gridline 12_Rev.1 Revised based on


comments in AMEP-24 dated 7-May-2014

14/06/05

14/06/10

14/06/11

MS-BLD.03 - Scaffolding Installation & Dismantling Works

14/05/07

14/05/10

14/05/13

MS-BLD.06-A: Reinforcement Concrete - Trench Pit

14/05/14

14/05/16

14/05/16

MS-BLD.06-A: Reinforcement Concrete - Trench Pit_Rev.1 Revised


based on comments in AMS-0026 dated 13-May-2014

Method Statement, JSA/Risk Assessment,


Schedule

Tuan Anh

Status
C
B

B
B

Scaffolding Layout, Section&Details; Schedule;


Tuan Anh
Data Sheet/Catalogue; JSA/RA; Calculation Sheet

Method Statement,
JSA/Risk Assessment
Method Statement, Equipment List,
Schedule&Manpower, JSK/Risk Assessment

Tuan Anh

Tuan Anh

B/A

Approval for Method Statement

OUTGOING

Rev.

Date
Required
Reply
14/06/16

INCOMING Date
Received

BBVN-FIVE-S2-SC-AMS-0027

Date
Issued
14/06/11

BBVN-FIVE-S2-SC-AMS-0028

14/05/09

14/05/13

BBVN-FIVE-S2-SC-AMS-0029 (A)

Title

42

Attachment

Prepared by

Status

MS-BLD.10-Roofing & Waterproofing for Roof

Waterproofing Guarantee; RA & JSA;


Tuan Anh
Introduction Letter from SIKA Ltd Vietnam;
Worker Certification/License; SIKA Products Data
Sheet; Machinery Catalogue; Drawings for
Waterproofing Works; Material Safety Data Sheet MSDS; Report for Mock-up Application REP-MU01

14/05/15

MS-BLD.09_XYPEX Waterproofing for Under Slab

Drawings, Specification/Data Sheet, Material


Safety Data Sheet, JSA/Risk Assessment

14/05/28

MS-34 [A]: Fire Detection and Alarm System for Stage 1

Details Schedule/Manpower Requirement, MSE.1: Quang/Diem


Scaffolding setup for existing generator and
MVSG room, MSE.2: Scaffolding setup for AHU
area, MSE.3: Method of installation detector
exposed, MSE.4: Installation for BMS room

Tuan Anh

BBVN-FIVE-S2-SC-AMS0029 (A)/R1

14/07/31

14/08/07

14/08/11

MS-34 [A]: Fire Detection and Alarm System for Stage 1_Rev.1
Revised based on comments in AMS-29 (A) dated 28-May-2014

Details Schedule/Manpower Requirement,


Quang/Diem
Appendix 1: Location of Activity, Appendix 2:
Detail of installation - MV Switchgear room,
Appendix 3: Detail of installation - Generator
room, Appendix 4: AHU room, Appendix 5: Detail
of installation-BMS room, Appendix 6: Detail of
installation - SFACP panels, JSA, Risk Assessment
and management for change system, RCR services
pre-work/task observation sheet, Pre-task planning
worksheet

BBVN-FIVE-S2-SC-AMS0029 (A)/R2

14/08/22

14/08/25

14/08/28

MS-34 [A]: Fire Detection and Alarm System for Stage 1_Rev.2
Comments response table; Details
Quang/Diem
Revised based on comments in AMS-29 (A)/R1 dated 11-August-2014 Schedule/Manpower Requirement, Works detail
(Tie-in No. 31)
table; Appendix 1: Location of Activity, Appendix
2: Detail of installation - MV Switchgear room,
Appendix 3: Detail of installation - Generator
room, Appendix 4: AHU room, Appendix 5: Detail
of installation-BMS room, Appendix 6:
Connection for BB262B-IFC-320-Z04&BB262IFC-320-Z05 panel;Appendix 7: Detail of new
modules connection to FA system, JSA, Risk
Assessment and management for change system,
RCR services pre-work/task observation sheet, Pretask planning worksheet

Approval for Method Statement

OUTGOING

Rev.

Date
Issued

BBVN-FIVE-S2-SC-AMS-0029 (B)

BBVN-FIVE-S2-SC-AMS0029 (B)/R1

14/08/22

14/08/25

BBVN-FIVE-S2-SC-AMS0029 (B)/R2

14/10/29

14/11/03

14/05/15

BBVN-FIVE-S2-SC-AMS-0030
BBVN-FIVE-S2-SC-AMS0030/R1
BBVN-FIVE-S2-SC-AMS0030/R1 (ADD.01)

BBVN-FIVE-S2-SC-AMS-0031

Date
Required
Reply

INCOMING Date
Title
Received
14/05/28
MS-34 [B]: Fire Detection and Alarm System for Stage 2

43

Attachment

Prepared by

Details Schedule/Manpower Requirement, MSE.1: Quang/Diem


Scaffolding setup for existing generator and
MVSG room, MSE.2: Scaffolding setup for AHU
area, MSE.3: Method of installation detector
exposed, MSE.4: Installation for BMS room

MS-34 [B]: Fire Detection and Alarm System for Stage 2_Rev.1
Revised based on comments in AMS-29 (B) dated 25-May-2014

Comments response table; Details


Quang/Diem
Schedule/Manpower Requirement, Work Detail
table; Location of activity; Detail of Installation MV Switchgear room/Generator room/AHU
room/BMS Room; Connection for BB262B-IFC320-Z04&BB262-IFC-320-Z05 panel; Detail of
new modules connection to FA system; JSA; Risk
assessment and management for change system;
RCR servicers Pre-work/Task observation sheet;
Pre-task planning worksheet

14/11/07

MS-34 [B]: Fire Detection and Alarm System for Stage 2_Rev.2
Revised based on comments in AMS-29 (B) /R1

Details Schedule/Manpower Requirement,


Quang/Diem
MSE.1: Method Installation Concealed EMC
conduit on the wall; MSE.2: Method of Installation
for expose conduit; MSE.3: Method of Installation
conduit under sub-beam; MSE.4: Method of
Installation detector on ceiling; MSE.5: Method of
Installation detector for office, corridor and
changing room; MSE.6: Method of Installation
equipment for office, corridor and changing room;
MSE.7: Method of Installation detector for
cleaning room; MSE.8: Method of Installation
equipment for cleaning room; MSE.9: Method of
Installation beam detector for warehouse; MSE.10:
Method of Installation beam detector for
warehouse; MSE.11: Cable test form

14/05/17

14/05/22

MS-46: Fence Relocation

14/05/29

14/06/04

14/06/02

14/06/12

14/06/13

14/06/13

Method Statement, JSK/Risk Assessment,


Schedule
MS-46: Fence Relocation_Rev.1 Revised based on comments in AMS- Method Statement, JSK/Risk Assessment,
0030 dated 22-May -2014
Schedule
MS-46: Fence Relocation_Rev.1 (Additional Document)

14/05/16

14/05/20

14/05/23

MS-21 [A]: Fire Fighting System_Stage 1

Status
B

Tuan Anh

Tuan Anh/Ba
Hoa
Ba Hoa/Nguyen

Methodology, Location, Site Orgnization Chart,


Quang/Trung
Tool&Equipment List, Detail
Schedule/Manpower, Safety Management, Quality
Control, Appendices

Approval for Method Statement

OUTGOING

Rev.

Date
Issued

Date
Required
Reply

INCOMING Date
Received

14/05/16

14/05/20

14/05/23

MS-21 [B]: Fire Fighting System_Stage 2

BBVN-FIVE-S2-SC-AMS0032/R1

14/07/16

14/07/21

14/07/25

MS-21 [B]: Fire Fighting System_Stage 2_Rev.1 Revised based on


comments in AMS-32 dated 23-May-2014

BBVN-FIVE-S2-SC-AMS0032/R2

14/08/01

14/08/07

14/08/16

BBVN-FIVE-S2-SC-AMS0032/R3

14/08/22

14/08/27

14/05/19
BBVN-FIVE-S2-SC-AMS0033/R1

BBVN-FIVE-S2-SC-AMS-0032

Title

44

Attachment

Prepared by

Status

Methodology, Location, Site Orgnization Chart,


Tool&Equipment List, Detail
Schedule/Manpower, Safety Management, Quality
Control, Appendices
Installation Equipment, Installation FM200,
Quang/Trung
Installation support & pipe, Inspection Document,
Procedure firestop, location of the activity, details
schedule/Manpower requirement, JSA

MS-21 [B]: Fire Fighting System_Stage 2_Rev.2 Revised based on


comments in AMS-32/R1 dated 25-July-2014

Installation Equipment, Installation FM200,


Quang/Trung
Installation support & pipe, Inspection Document,
Procedure firestop, location of the activity, details
schedule/Manpower requirement, JSA

14/09/04

MS-21 [B]: Fire Fighting System_Stage 2_Rev.3 Revised based on


comments in AMS-32/R2 dated 16-August-2014

Comments response table; Installation Equipment, Quang/Trung


Installation support & pipe, Inspection Document,
Procedure firestop, location of the activity, details
schedule/Manpower requirement, JSA

14/05/24

14/05/28

MS-20 [A]: Water Supply and Drainage System for Stage 1

Quang/Khoa

14/06/26

14/07/03

14/07/01

MS-20 [A]: Water Supply and Drainage System for Stage 1_Rev.1
Revised based on comments in AMS-33 dated 28-May-2014

Pump &Pipe install works, location of the activity, Quang/Khoa


Procedure fire stop, Details schedule/Manpower
requirement, RCR servicer pre-work/task
observation sheet, Pre-task planning work sheet,
hot work permit, document reference, risk
assessment & management for change system

BBVN-FIVE-S2-SC-AMS0033/R2

14/07/09

14/07/16

14/07/11

MS-20 [A]: Water Supply and Drainage System for Stage 1_Rev.2
Revised based on comments in AMS-33 dated 1-July-2014

Pump &Pipe install works, location of the activity, Quang/Khoa


Procedure fire stop, Welding Procedure, Details
schedule/Manpower requirement, RCR servicer
pre-work/task observation sheet, Pre-task planning
work sheet, hot work permit, document reference,
risk assessment & management for change system

BBVN-FIVE-S2-SC-AMS0033/R3 (A)

14/07/30

14/08/06

14/08/12

MS-20-A-1: Water Supply System for Stage 1_Rev.3 Revised based on Pump &Pipe install works, location of the activity, Quang/Khoa
comments in AMS-33/R2 dated 11-July-2014
Procedure fire stop, Welding Procedure, Details
schedule/Manpower requirement & Tie-in List,
RCR servicer pre-work/task observation sheet, Pretask planning work sheet, hot work permit,
document referenced, risk assessment &
management for change system

BBVN-FIVE-S2-SC-AMS0033/R4 (A)

14/08/15

14/08/22

14/08/26

MS-20-A-1: Water Supply System for Stage 1_Rev.4 Revised based on Pump &Pipe install works, Location of the
Quang/Khoa
comments in AMS-33/R3 (A) dated 12-August-2014
activity, Procedure fire stop, Welding Procedure,
Details schedule/Manpower requirement & Tie-in
List, RCR servicer pre-work/task observation
sheet, Pre-task planning work sheet, hot work
permit, document referenced, risk assessment &
management for change system

BBVN-FIVE-S2-SC-AMS-0033

Approval for Method Statement

OUTGOING

Rev.
BBVN-FIVE-S2-SC-AMS0033/R3 (B)

BBVN-FIVE-S2-SC-AMS0033/R4 (B)

BBVN-FIVE-S2-SC-AMS-0034
BBVN-FIVE-S2-SC-AMS0034/R1

BBVN-FIVE-S2-SC-AMS-0035

BBVN-FIVE-S2-SC-AMS0035/R1

BBVN-FIVE-S2-SC-AMS-0036

BBVN-FIVE-S2-SC-AMS0036/R1

Date
Issued
14/07/30

Date
Required
Reply
14/08/06

INCOMING Date
Title
Received
14/08/12
MS-20-A-1: Drainage System for Stage 1_Rev.3 Revised based on
comments in AMS-33/R2 dated 11-July-2014

14/08/15

14/08/22

14/08/27

MS-20-A-2: Drainage System for Stage 1_Rev.4 Revised based on


comments in AMS-33/R3 (B) dated 12-August-2014

14/05/19

14/05/24

14/05/28

MS-20 [B]: Water Supply and Drainage System for Stage 2

14/06/26

14/07/03

14/07/04

MS-20 [B]: Water Supply and Drainage System for Stage 2_Rev.1
Revised based on comments in AMS-34 dated 28-May-2014

14/05/21

14/05/26

14/05/28

14/08/09

14/08/14

14/06/16

14/07/23

45

Attachment

Prepared by

Status

Installation works, location of the activity, Details Quang/Khoa


schedule/Manpower requirement, RCR servicer
pre-work/task observation sheet, Pre-task planning
work sheet, document referenced, JSA

Installation works, location of the activity, Details Quang/Khoa


schedule/Manpower requirement, RCR servicer
pre-work/task observation sheet, Pre-task planning
work sheet, document referenced, JSA

Quang/Khoa

Installation Pipe, Procedure firestop, Location of


the activity, Document referenced

Quang/Khoa

B/B+C

MS-23: Equipment for Stage 1

Detailed Schedule/Manpower Requirement,


MSE.1: Method Take out louver of transformer,
MSE.2: Method make temporary unloading area,
MSE.3: Method unloading transformer and fix
transformer, MSE.4: Method reinstallation of
louvers for transformer

Quang/Diem

14/08/15

MS-23: Equipment for Stage 1_Rev.1 Revised based on comments in


AMS_0035 dated 28-May-2014

Details schedule/Manpower Requirements,


MSE.1: Take out louver menthod, MSE.2: Make
temporary uploading area, MSE.3: Uploading
transformer and fix transformer, MSE.4: Move
transformer to foundation, MSE.5: Fix
Transformer to concrete base, MSE.6: Re-install
louver and finish work

Quang/Diem

14/06/20

14/06/23

MS-24 [A]: Main Feeder, Cable Rack, Busway and Panel System for
Stage 1

Detailed Schedule/Manpower Requirements,


MSE.1: Method of unloading busway and cable
rack, MSE.2: Method of installation support for
cable rack/busway under sub-beam; MSE.3:
Method of installation cable rack

Quang/Diem

14/07/26

14/08/01

MS-24 [A]: Main Feeder, Cable Rack, Busway and Panel System for Detailed Schedule/Manpower Requirements,
Quang/Diem
Stage 1_Rev.1 Revised based on comments in AMS-36 dated 23-June- MSE.1: Method of unloading cable rack and
2014
panels, MSE.2: Method of Making wall opening
holes; MSE.3: Method of making floor opening
holes, MSE.4: Method of installation cable rack at
AHU room, MSE.5: Method of installing cable
rack above walkable ceilingl MSE.6L Method of
installing cable rack at utility area, MSE.7: Method
of installing LV panels; JSA, RA and Management
for change system

Approval for Method Statement

OUTGOING

Rev.

46

Date
Issued
14/08/07

Date
Required
Reply
14/08/12

INCOMING Date
Title
Received
14/08/15
MS-24 [A]: Main Feeder, Cable Rack, Busway and Panel System for
Stage 1_Rev.2 Revised based on comments in AMS-36/R1 dated 01August-2014

BBVN-FIVE-S2-SC-AMS-0037

14/05/22

14/05/29

MS-24 [B]: Main Feeder, Cable Rack, Busway and Panel System for
Stage 2

Detailed Schedule/Manpower Requirements,


Quang/Diem
MSE.1: Method of unloading busway and cable
rack, MSE.2: Method of installation support for
cable rack/busway under concrete ceiling; MSE.3:
Method of installation support for cable
rack/busway under sub-beam; MSE.4: Method of
installation cable rack; MSE.5: Method of
installation LV Busway for production machine;
MSE.6: Method of installation panel

BBVN-FIVE-S2-SC-AMS-0038

14/05/22

14/05/29

14/05/28

MS-25 [A]: Cable and Trunking for Stage 1

BBVN-FIVE-S2-SC-AMS0038/R1

14/07/28

14/08/04

14/08/07

MS-25 [A]: Cable and Trunking for Stage 1_Rev.1 Revised based on
comments in AMS-38 dated 28-May-2014

BBVN-FIVE-S2-SC-AMS0038/R2

14/08/19

14/08/22

14/08/23

MS-25 [A]: Cable and Trunking for Stage 1_Rev.2 Revised based on
comments in AMS-38/R1 dated 7-August-2014

Detailed Schedule/Manpower Requirements,


Quang/Diem
MSE.1: Method of unloading cable drum to AHU
room; MSE.2: Mehtod of installation pulling cable;
MSE.3: Mehtod of installation for termination
connection
Detailed Schedule/Manpower Requirements,
MSE.1: Method of unloading cable drum to AHU
room; MSE.2: Mehtod of installation pulling cable;
MSE.3: Mehtod of installation for termination
connection
MSE.1: Method of unloading cables; MSE.2:
Quang/Diem/Ujii
Mehtod of unloading trunkings; MSE.3: Method of e
installation trunkings above walkable ceiling;
MSE.4: Mehtod of installing trunking at AHU
room; MSE.5: Method of cabling works; JSA; Risk
Assessment and Managerment for Change system

BBVN-FIVE-S2-SC-AMS0036/R2

Attachment
Detailed Schedule/Manpower Requirements,
MSE.1: Method of unloading cable rack,
scaffoldings; MSE.2: Method of Making wall
opening holes; MSE.3: Method of making floor
opening holes, MSE.4: Method of installation
cable rack at AHU room, MSE.5: Method of
installing cable rack above walkable ceiling;
MSE.6: Method of installing cable racks at utility
area; RCR services pre-work/task observation
sheet; Pre-task planning sheet; Hot work permit;
JSA and Management for change system

Prepared by
Quang/Diem

Status
B

Approval for Method Statement

OUTGOING

Rev.

Date
Issued
14/05/22

Date
Required
Reply
14/05/29

14/07/28

14/08/04

BBVN-FIVE-S2-SC-AMS-0039 ( C )

14/07/12

14/07/14

14/07/18

MS-39 ( C ): Electrical System Work for Stage 1 Remove Lighting and


Trunking

BBVN-FIVE-S2-SC-AMS-0040

14/05/22

14/05/29

14/05/28

MS-26: Lighting System

Detailed Schedule/Manpower Requirements,


Quang/Diem
MSE.1: Method installation concealed EMC
conduit on the wall; MSE.2: Method of installation
for expose conduit: MSE.3: Method of installation
conduit under sub-beam; MSE.4: Method of
installation lighting fixture on ceiling: MSE.5:
Method of installation for cleaning room area:
MSE.6: Method of installation lighting fixture for
warehouse: MSE.7: Method of installation
lighting fixture for common area: MSE.8: Method
of installation lighting fixture for walkway and
outdoor area

BBVN-FIVE-S2-SC-AMS-0041

14/05/23

14/05/28

14/06/02

MS-BLD.07 - Structure Steel Erection Works

Tuan Anh

14/08/04

14/08/05

14/08/11

MS-BLD.07 - Structure Steel Erection Works_Additional Drawing

Sequence for Steel Structure Erection;


Organization Chart; Equipment List; JSA/Risk
Assessment
1A3size drawing

Tuan
Anh/Ngueyn/Phu
c

BBVN-FIVE-S2-SC-AMS-0039

BBVN-FIVE-S2-SC-AMS0039/R1

BBVN-FIVE-S2-SC-AMS0041 (ADD.01)

INCOMING Date
Title
Received
14/05/28
MS-25 [B]: Cable and Trunking for Stage 2

47

MS-25 [B]: Cable and Trunking for Stage 1_Rev. 1 Revised based on
comments in AMS-39 dated 28-May-2014

Attachment

Prepared by

Detailed Schedule/Manpower Requirements,


Quang/Diem
MSE.1: Method of unloading cable and trunking;
MSE.2: Method of installation trunking under subbeam for walkway area; MSE.3: Method of
installation trunking under concrete ceiling for
office area; MSE.4: Method of installation
trunking under purlin for office area: MSE.5:
Method of installation cable pulling: MSE.6:
Method of installation cable pulling for warehouse
and common walkway area: MSE.7: Method of
installation for termination connection

Status
C

Detailed Schedule/Manpower Requirements,


Quang/Diem
MSE.1: Method of unloading cable; MSE.2:
Method of installation trunkings ; MSE.3: Method
of installation trunkings above walkable ceiling;
MSE.4: Method of installation trunkings at AHU
Room; MSE.5: Method of cabling works; MSE.6:
Method of termination works; JSA; Risk
Assessment and Management for change system

Quang/Ujiie/Die
m

Approval for Method Statement

OUTGOING

Rev.

INCOMING Date
Received

Date
Issued

Date
Required
Reply

BBVN-FIVE-S2-SC-AMS-0042

14/06/16

14/06/20

MS-27: Emergency and Exit Lighting System

Details schedule/Man Power Requirements;


Diem/Quang
MSE.1 : Method installation concealed EMC
conduit on the wall; MSE.2 : Method of
installation for expose conduit; MSE.3 : Method of
installation conduit under sub-beam; MSE.4 :
Method of installation emergency lighting fixture
on ceiling; MSE.5 : Method of installation
emergency lighting fixture for cleaning room area;
MSE.6 : Method of installation emergency
lighting fixture for ware house; MSE.7 : Method
of installation emergency lighting fixture for
common area; MSE.8 : Method of installation
emergency lighting fixture for walkway and
outdoor area; MSE.9 : Method of installation exit
lighting for common area; JSA for emergency and
exit lighting system stage 2

BBVN-FIVE-S2-SC-AMS-0043

14/05/24

14/05/30

MS-30: Lightning System

Details Schedule/Manpower requirement; MSE.1: Quang/Diem


connection from testing link box to lightning bar
on roof; MSE.2: connection from testing link box
to lightning bar on roof; MSE.3: connection from
testing link box to lightning bar on roof; MSE.4:
installation detail of air terminal; MSE.5:
installation detail of connection earthing cable to
tape; JSA analysis for lightning system

BBVN-FIVE-S2-SC-AMS-0044

14/06/16

14/06/20

MS-31: Socket Outlet System

Details schedule/Man Power Requirements;


MSE.1: Method installation concealed EMC
conduit on the wall; MSE.2: Method of installation
trunking under sub-beam; MSE.3: Method of
installation cable and outlet for walkway area;
MSE.4 : M Method of installation socket outlet on
the floor; MSE.5: Method of installation socket
outlet on the wall for cleaning room and office
area; MSE.6 : Method of installation isolator at
walkway area; MSE.7 : Installation socket and
isolator on the wall; MSE.8 : Installation socket
and isolator on the wall; Job safety analysis for
socket outlet

14/06/23

Title

48

Attachment

Prepared by

Status

Approval for Method Statement

OUTGOING

Rev.

Date
Issued

Date
Required
Reply

BBVN-FIVE-S2-SC-AMS-0045

14/05/24

14/05/30

BBVN-FIVE-S2-SC-AMS-0046

14/06/16

14/06/20

BBVN-FIVE-S2-SC-AMS0046/R1

14/09/08

BBVN-FIVE-S2-SC-AMS0046/R2

14/09/23

INCOMING Date
Received

Title

49

Attachment

Prepared by

Status

MS-28: External Lighting System

Details schedule/ManPower Requirements; MSE.1 Quang/Diem


: Method installation plate fix the lighting fixture
on the wall; MSE.2 : Method of installation
bracket the lighting fixture on the wall; MSE.3:
Method of installation support for flood lighting
fixture on the wall; MSE.4: Method of installation
flood lighting fixture on the wall; MSE.5: Method
of installation fix the lighting pole to precast
foundation; MSE.6: Method of installation lighting
fixture to pole and connection; Job safety analysis
for external lighting

14/06/23

MS-32 [A]: BMS System

Details schedule/ManPower Requirements; MSE.1 Quang/Diem


: Method installation water temperature sensor;
MSE.2: Method of installation air temperature
sensor; MSE.3: method of installation modulating
dumper; MSE.4: method of installation level
switch for tank and temperature humidity sensor;
JSA for building management system stage 1

14/09/13

14/09/15

MS-32 [A]: BMS System_Rev.1 Revised based on comments in AMS- Details schedule/ManPower Requirements;
46 dated 23-June-2014
Appendix 1: Move in path & location of activity
plan; Appendix 2: Installation cable; Appendix 3:
Installation of devices and panels; Appendix 4:
Cable Termination; JSA for BMS stage 1; Risk
assessment and Management for change system,
RCR services Pre-work/Task observation sheet,
Pre-task planning worksheet

Quang/Diem

14/09/30

14/10/01

MS-32 [A]: BMS System_Rev.2 Revised based on comments in AMS- Comments response table; Details
46/R1 dated 15-September-2014
schedule/ManPower Requirements; Appendix 1:
Move in path & location of activity plan;
Appendix 2: Installation cable; Appendix 3:
Installation of devices and panels; Appendix 4:
Cable Termination; JSA for BMS stage 1; Risk
assessment and Management for change system,
RCR services Pre-work/Task observation sheet,
Pre-task planning worksheet

Quang/Diem

Approval for Method Statement

OUTGOING

Rev.

INCOMING Date
Received
14/06/23
MS-32 [B]: BMS System

Title

50

BBVN-FIVE-S2-SC-AMS-0047

Date
Issued
14/06/16

Date
Required
Reply
14/06/20

Attachment

Prepared by

BBVN-FIVE-S2-SC-AMS-0048

14/05/31

14/06/05

14/06/05

MS-19 [A]: Air Conditioning & Mechanical Ventilation System Stage General , Methodology, Location, Site
1
Organization Chart, Tools & Equipments list,
Detail schedule/manpower, safety management,
quality control, appendices, JSA, Schedule

BBVN-FIVE-S2-SC-AMS0048/R1 (A)

14/06/27

14/07/03

14/07/04

MS-19 [A]: Air Conditioning & Mechanical Ventilation System


Unload Chiller, Location of the activity, details
Quang
_Rev.1
schedule/Manpower requirement, RCR service preMS-19-A-1: Chiller Area Works_ Revised based on comments in AMS- work/task observation sheet, Pre-task planning
48 dated 5-June-2014
work sheet (requirement form RCR), Hot work
permit, RA and management for change system

BBVN-FIVE-S2-SC-AMS0048/R2 (A)

14/08/04

14/08/09

14/09/06

MS-19-A-1: Chiller Area Works_Rev.2 Revised based on comments in Comments response table, Unload Chiller,
Quang
AMS-48/R1 dated 4-July-2014
Location of the activity, details
schedule/Manpower requirement, RCR service prework/task observation sheet, Pre-task planning
work sheet (requirement form RCR), Hot work
permit, RA and management for change system

BBVN-FIVE-S2-SC-AMS0048/R3 (A)

14/09/23

14/09/30

14/10/03

MS-19-A-1: Chiller Area Works_Rev.3 Revised based on omments in Comments response table, Unload Chiller,
Quang/Vuong
AMS-48/R2 dated 6-September-2014
Location of the activity, details
schedule/Manpower requirement, RCR service prework/task observation sheet, Pre-task planning
work sheet (requirement form RCR), Hot work
permit, RA and management for change system

BBVN-FIVE-S2-SC-AMS0048/R1 (B)
BBVN-FIVE-S2-SC-AMS0048/R2 (B)

14/06/05

14/07/04

Duct

14/07/14

14/07/19

14/07/21

MS-19 [A]-2: Duct Stage 1 Work on the Ceiling Clean Room


Preparation works, installation platform/Duct,
Quang/Ujiie/Vuo
Area_Rev.2 Revised based on comments in AMS-0048/R1 (B) dated 4- Locaiton of the activity, Details
ng
July-2014
schedule/manpower requirement, RCR servicer prework/task observation shet, Pre-task planning
work sheet (requirement from RCR), Document
reference, RA and management for change system

BBVN-FIVE-S2-SC-AMS0048/R3 (B)

14/09/09

14/09/16

14/09/19

MS-19 [A]-2: Duct Stage 1 Work on the Ceiling Clean Room


Area_Rev.3 Revised based on comments in AMS-0048/R2 (B) dated
21-July-2014

Details schedule/ManPower Requirements; MSE.1 Quang/Diem


: Method installation of trunking for walkway
ceiling area; MSE.2: Installation of trunking for
office area; MSE.3: installation sensor for panel
and control FCU; MSE.4: installation temperature,
pressure and humidity sensor; MSE.5: installation
damper, humidity and pressure sensor; JSA

Quang/Ujiie,
Randy

Vuong

Comments response table; Preparation works,


Quang/Ujiie/Vuo
installation Duct, Locaiton of the activity, Details ng
schedule/manpower requirement &Tie-in list, RCR
servicer pre-work/task observation shet, Pre-task
planning work sheet (requirement from RCR),
Document referenced, RA and management for
change system

Status
B

B+C/B+C

Approval for Method Statement

OUTGOING

Rev.

Date
Issued
14/07/02

Date
Required
Reply
14/07/07

INCOMING Date
Received

BBVN-FIVE-S2-SC-AMS0048/R2 (C )

14/09/15

14/09/20

BBVN-FIVE-S2-SC-AMS0048/R2 (C ) (ADD.01)

14/09/18

BBVN-FIVE-S2-SC-AMS0048 (D)

BBVN-FIVE-S2-SC-AMS0048/R1 (C )

Title

Attachment

Prepared by

Status

Unload AHU, PUMP, BUFFER Tank, details


schedule/Manpower requirement, Location of the
activity, Procedure Firestop, RCR servicer prework/task observation sheet, Pre-task planning
work sheet (requirement form RCR), Hot work
permit, Document Referenced, RA and
management for change system

Quang/Ujiie/Vuo
ng

14/09/19

MS-19 [A]: Air Conditioning & Mechanical Ventilation System


Comments response table; Unload AHU, Details
MS-19-A-3: AHU Work Area_Rev.2 _ Revised based on comments in schedule/Manpower requirement, Location of the
AMS-48/R1 (C ) dated 4-June-2014
activity, RCR servicer pre-work/task observation
sheet, Pre-task planning work sheet (requirement
form RCR), RA and management for change
system

Quang/Ujiie/Vuo
ng

14/09/20

14/09/19

MS-19-A-3: AHU Work Area_Rev.2 _ Revised based on comments in Guidance the transportation and installation AHU Quang/Ujiie/Vuo
AMS-48/R1 (C ) dated 4-June-2014_Additional Document
(13A4pages_VNese), sketch/drawings (10A4size) ng

14/09/24

14/10/01

14/10/07

MS-19-A-3.1: Assembly AHU Work

Drawing AHU assebly work; AHU assembly


Quang/Vuong
instruction manual; List part by part assembly
AHU; Factory issue final QC check; Unload AHU;
Detail crane AVC 1 ton; Location of the activity;
Detail schedule/Manpower requirement; RCR
servicer pre-work/task observation sheet; Pre-task
planning work sheet (requirement from RCR);
Risk assessment and management for change
system

BBVN-FIVE-S2-SC-AMS-0049

14/06/24

14/06/28

14/06/26

MS-48: Temporary Concrete Road

Method Statement; JSA/RS, Schedule

Tuan Anh/Ba
Hoa

BBVN-FIVE-S2-SC-AMS-0050

14/06/26

14/07/02

MS-49: Aluminum Panel Removal at Gridline 12

Method Statement, JSA/RA, Schedule

Tuan Anh

BBVN-FIVE-S2-SC-AMS-0051

14/06/26

14/07/03

14/07/01

MS-22-A-1: Air Compressor System

Installation Works, Procedure Fire Stop, Location Quang/Ujiie/Tru


of the activity, Details shcedule/Manpower
ng
Requirement, RCR servicer pre-work/task
observation sheet, Pre-task planning work sheet,
document referenced, RA and maangement for
change system

14/07/14

14/07/17

14/07/21

MS-22-A-1: Air Compressor System_Rev.1 Revised based on


comments in AMS-51 dated 1-July-2014

Installation Works, Procedure Fire Stop, Welding


Procedure G.I Pipe, Location of the activity,
Details shcedule/Manpower Requirement, RCR
servicer pre-work/task observation sheet, Pre-task
planning work sheet, document referenced, RA
and maangement for change system

BBVN-FIVE-S2-SC-AMS0051/R1

MS-19 [A]: Air Conditioning & Mechanical Ventilation System


_Rev.1
MS-19-A-3: AHU Area Works

51

Approval for Method Statement

OUTGOING

Rev.

Date
Issued
14/07/30

Date
Required
Reply
14/08/06

BBVN-FIVE-S2-SC-AMS-0052

14/06/27

14/07/03

14/07/03

BBVN-FIVE-S2-SC-AMS-0053

14/06/30

14/07/04

BBVN-FIVE-S2-SC-AMS-0054

14/06/30

BBVN-FIVE-S2-SC-AMS0054/R1 [A]
BBVN-FIVE-S2-SC-AMS0054/R2 [A]_1

BBVN-FIVE-S2-SC-AMS0051/R2

INCOMING Date
Title
Received
14/08/12
MS-22-A-1: Air Compressor System_Rev.2Revised based on
comments in AMS-51/R1 dated 21-July-2014

52

Attachment

Prepared by

Status

CommentIns table, Installation Works, Procedure Quang


FireStop, Function test of Air Compressor,
Welding Procedure G.I Pipe & Copper pipe,
Location of the activity, Details
shcedule/Manpower Requirement, RCR servicer
pre-work/task observation sheet, Pre-task planning
work sheet, document referenced, RA and
maangement for change system

MS-23: Installation Assembly Area

Install Assembly Area, Location of the activity,


Quang/Ujiie
details schedule/manpower requirement, RCR prework/task observation sheet, Pre-task planning
work sheet (requirement from RCR)

14/07/03

MS-19-A-5: Installation Platform

Install Platform, Install temporary floor, lovation of Quang/Ujiie


the activit, Detail schedule/manpower requirement,
RCR servicer pre-work/task observation sheet, Pretask planning work sheet (Requirement from RCR)
& JSA

14/07/04

14/07/02

MS-22-A-2: Installation of RO, Process Cooling Water Pipe above


Ceiling Clean Room

Detail installaiton works, Welding procedure PP-H Quang/Ujiie/Kho


pipe, Welding procedure SUS pipe, Procedure
a
Firestop, Location of the activity, Details
scheudle/Manpower reuirement, RCR servicer prework/task observation sheet, Pretask planning
work sheet, JSA

14/07/07

14/07/18

14/07/10

MS-22-A-2: Installation of Process Cooling water pipe above ceiling


clean room _ Rev.1

Quang/Ujiie/Kho
a

14/08/07

14/08/11

14/08/18

MS-22-A-2.1: Installation of Process Cooling water pipe above ceiling Comments response table, Detail installaiton
Quang/Ujiie/Kho
clean room _ Rev.2_STAGE 1 Revised based on comments in AMS- works, Welding procedure SUS pipe, Procedure
a
54/R1 [A] dated 10-July-2014
Firestop, Location of the activity, Details
schedule/Manpower reuirement, RCR servicer prework/task observation sheet, Pre-task planning
work sheet, Risk Assessment and Management for
change system

Approval for Method Statement

OUTGOING

Rev.

53

Date
Issued
14/09/25

Date
Required
Reply
14/10/02

BBVN-FIVE-S2-SC-AMS0054/R2 [A]_2

14/08/07

14/08/11

14/08/18

MS-22-A-2.2: Installation of Process Cooling water (Open Loop)


pipe above ceiling clean room _ Rev.2_STAGE 1 Revised based on
comments in AMS-57/R1 [A] dated 10-July-2014

Comments response table, Detail installaiton


Quang/Ujiie/Kho
works, Welding procedure SUS pipe, Procedure
a
Firestop, Location of the activity, Details
schedule/Manpower reuirement, RCR servicer prework/task observation sheet, Pre-task planning
work sheet, Hot work permit, Document
Referenced, Risk Assessment and Management for
change system

BBVN-FIVE-S2-SC-AMS0054/R3 [A]_2

14/09/25

14/10/02

14/10/03

MS-22-A-2.2: Installation of Process Cooling water (Open Loop)


pipe above ceiling clean room _ Rev.3_STAGE 1 Revised based on
comments in AMS-57/R2 [A] dated 18-August-2014

Comments response table, Detail installaiton


Quang/Ujiie/Kho
works, Welding procedure SUS pipe, Procedure
a
Firestop, Location of the activity, Details
schedule/Manpower reuirement, RCR servicer prework/task observation sheet, Pre-task planning
work sheet, Hot work permit, Document
Referenced, Risk Assessment and Management for
change system

BBVN-FIVE-S2-SC-AMS0054/R1 [B]
BBVN-FIVE-S2-SC-AMS0054/R2 [B]

14/07/07

14/07/18

14/07/14

14/07/30

14/08/06

MS-22-A-3: Installation of RO Water Pipe above ceiling Clean Room


_ Rev.1
MS-22-A-3: Installation of RO Water Pipe above ceiling Clean Room Detail installaiton works, Welding procedure PP-H
_ Rev.2 Revised based on comments in AMS-54/R1 (B) dated 14-July- pipe, Procedure Firestop, Location of the activity,
2014 (STAGE 1)
Details scheudle/Manpower reuirement, RCR
servicer pre-work/task observation sheet, Pretask
planning work sheet, Hot work permit, Document
reference, JSA

BBVN-FIVE-S2-SC-AMS-0055

14/07/01

14/07/05

14/07/08

MS-BLD.06-B: Reinforcement Concrete Septic Tank

Method Statement for Septic tank, Equipment List, Tuan Anh


Schedule, JSA/Risk Assessent

BBVN-FIVE-S2-SC-AMS-0056

14/07/07

14/07/12

14/07/09

MS-39: Electrical System - Temporary Work for Stage 1

14/07/10

14/07/12

14/07/15

MS-39: Electrical System - Temporary Work for Stage 1_Rev.1


Revised based on comments in AMS-56 dated 9-July-2014

Electrical Method, Equipment list, RCR services Quang/Ujiie/Die


pre-work/task observation sheet, Pre-task planning m
worksheet
Electrical Method, Equipment list, Details
schedule/Manpower requirement, JSA for
electrical system temporary for stage 1, RCR
services pre-work/task observation sheet, Pre-task
planning worksheet, Drawings for installation

BBVN-FIVE-S2-SC-AMS0054/R3 [A]_1

BBVN-FIVE-S2-SC-AMS0056/R1

INCOMING Date
Title
Attachment
Prepared by
Received
14/10/03
MS-22-A-2.1: Installation of Process Cooling water pipe above ceiling Detail installaiton works, Welding procedure SUS Quang/Ujiie/Kho
clean room _ Rev.3_STAGE 1 (Close Loop) Revised based on
pipe, Procedure Firestop, Location of the activity, a
comments in AMS-54/R2 [A] _1 dated 18-August-2014
Details schedule/Manpower reuirement, RCR
servicer pre-work/task observation sheet, Pre-task
planning work sheet, Document referenced; Risk
Assessment and Management for change system

Quang/Ujiie/Kho
a
Quang/Ujiie/Kho
a

Status
B

Approval for Method Statement

OUTGOING

Rev.

Date
Issued
14/07/25

Date
Required
Reply
14/07/30

14/07/09

14/07/14

14/07/22

MS-BLD.02 - Demolition Works at Grid Line 12

BBVN-FIVE-S2-SC-AMS0057/R1

14/08/04

14/08/06

14/08/15

BBVN-FIVE-S2-SC-AMS0057/R1 (ADD.01)

14/08/11

14/08/15

14/07/10

14/07/17

14/07/15

14/07/25

14/07/30

14/07/31

14/07/10
14/07/22

14/07/15
14/07/24

14/07/19
14/07/24

14/07/25

14/07/30

14/07/28

14/08/06

14/08/09

14/08/18

14/07/15

14/07/21

14/08/07

14/07/16

BBVN-FIVE-S2-SC-AMS0056/R1 (ADD)

BBVN-FIVE-S2-SC-AMS-0057

BBVN-FIVE-S2-SC-AMS-0058

BBVN-FIVE-S2-SC-AMS0058 (ADD)

BBVN-FIVE-S2-SC-AMS-0059
BBVN-FIVE-S2-SC-AMS0059/R1
BBVN-FIVE-S2-SC-AMS0059/R2
BBVN-FIVE-S2-SC-AMS0059/R2 (ADD.01)

BBVN-FIVE-S2-SC-AMS-0060

BBVN-FIVE-S2-SC-AMS0060/R1

BBVN-FIVE-S2-SC-AMS-0061

INCOMING Date
Title
Received
14/07/31
MS-39: Electrical System - Temporary Work for Stage 1_Rev.1
(Supplimental Shop Drawing) Based on comments in AMS-56 dated
15-July-2014

54

Prepared by

Status

6A3size drawings

Quang/Diem/Ujii
e

B/A

Method Statement, RA/JSA, Internal, External


Scaffolding Calculation & Drawings, Clean Panel
Protection, Wall & Column Demolition

Tuan Anh

MS-BLD.02 - Demolition Works at Grid Line 12_Rev.1 Revised based Comments response table, Method Statement,
Tuan Anh
on commnets in AMS-57 dated 22-July-2014
RA/JSA, Internal/ External Scaffolding Calculation
& Drawings, Clean Panel Protection, Wall &
Column Demolition

MS-BLD.02 - Demolition Works at Grid Line 12_Rev.1 (Additional


document) Revised based on commnets in AMS-57 dated 22-July2014

Attachment

Hanging Cable Data Sheet & Method for Column


Hanging

MS-39B: Lighting System Temporary Work for Stage 1

Tuan Anh

Lighting System Method, MSE-01:Terminal wire


connection, MSE-02: Insulation testing,
Equipment List, JSA
MS-39B: Lighting System Temporary Work for Stage 1 (Supplimental 3A3size drawings
Shop Drawing) Based on comments in AMS-58 dated 15-July-2014

Quang/Diem

B/B+C

Quang/Diem

MS-BLD.11 - Masonry & Plastering Works


MS-BLD.11 - Masonry & Plastering Works_Rev.1 Revised based on
comments in AMS-59 dated 19-July-2014
MS-BLD.11 - Masonry & Plastering Works_Rev.2 Revised based on
comments in AMS-59/R1 dated 24-July-2014
MS-BLD.11 - Masonry & Plastering Works_Rev.2 (Additional
Drawing) Revised based on comments in AMS-59/R1 dated 24-July2014

Method Statement, RA/JSA, Schedule


Method Statement, RA/JSA, Schedule

Phuc
Phuc

C
C/B

Method Statement, RA/JSA, Schedule

Phuc

1A3size drawing (Execution Method for Brick


Wall)

Phuc/Nguyen

14/07/21

Method Statement for Welding Procedure Plan

Welding Procedure Specification (WPS), Welder


list & Certificates, Welding Report, JSA

Quang/Ujiie

14/08/12

14/08/18

Method Statement for Welding Procedure Plan_Rev.1 Revised based


on comments in AMS-60 dated 21-July-2014

Welding Procedure Specification (WPS), Welder


list & Certificates, Welding Report, JSA

Quang/Ujiie

14/07/21

14/07/25

MS-22-B-1: Air Compressor System

Installation works, Welding Procedure G.I pipe,


Location of the activity, Details
schedule/Manpower requirement, Document
referenced, JSA

Quang/Ujiie/Tru
ng

Approval for Method Statement

OUTGOING

Rev.

Date
Issued
14/08/22

Date
Required
Reply
14/08/25

Prepared by

Status

Quang/Ujiie/Tru
ng

14/07/17

14/07/21

MS-22-B-2: Installation of Process Cooling Water Pipe above Ceiling Detail installation works, welding procedure SUS
Clean Room (Stage 2)
pipe, Location of the activity, details
schedule/Manpower requirement, document
reference, JSA
MS-22-B-2: Installation of Process Cooling Water Pipe above Ceiling Comments response table; Detail installation
Clean Room (Stage 2)_Rev.1 Revised based on comments in AMS-62 works, welding procedure SUS pipe (GTAW),
dated 25-July-2014
ITP, Location of the activity, details
schedule/Manpower requirement, document
reference, JSA

quang/ujiie

14/08/27

14/09/01

14/07/17

14/07/21

14/07/28

MS-22-B-3: Installation of R.O Water Pipe above Ceiling Clean


Room_Stage 2

Quang/Ujiie/Kho
a

14/09/21

14/09/22

MS-22-B-3: Installation of R.O Water Pipe above Ceiling Clean


Room_Stage 2_Rev.1 Revised based on comments in AMS_0063
dated 28-Jul-2014

Detail installation works, welding procedure PP-H


pipe, Location of the activity, details
schedule/Manpower requirement, document
reference, JSA
Detail installation works, welding procedure PP-H
pipe, Location of the activity, details
schedule/Manpower requirement, document
reference, JSA

14/09/15

Quang/Ujiie/Kho
a

BBVN-FIVE-S2-SC-AMS-0064

14/07/18

14/07/23

14/08/18

MS-50: Honeycomb Treatment

Product Datasheet

Tuan Anh

BBVN-FIVE-S2-SC-AMS-0065

14/07/25

14/07/30

14/08/07

MS-BLD.51- Demolition Work for Office Area & Column A12

BBVN-FIVE-S2-SC-AMS0065/R1

14/09/09

14/09/15

14/09/19

Method Statement for Demolition Works; Method Tuan Anh


Statement for Temporary Panel; Risk Assessment
and JSA, , Drawings
MS-BLD.51- Demolition Work for Office Area & Column A12_Rev.1 Method Statement for Demolition Works; Method T. Anh
Revised based on comments in AMS-65 dated 7-August-2014
Statement for Temporary Panel; Risk Assessment
and JSA, Organizational Chart, Schedule

BBVN-FIVE-S2-SC-AMS0065/R2

14/09/25

14/10/02

14/10/09

MS-BLD.51- Demolition Work for Office Area & Column A12_Rev.2 Appendix 1: Method Statement for Demolition
Revised based on comments in AMS-65/R1 dated 19-September-2014 Works; Appendix 2: Method Statement for
Temporary Panel; Appendix 3: Risk Assessment
and JSA; Appendix 4: Organization Chart,
Appendix 5: Schedule

14/07/30

14/08/06

14/08/04

MS-19-C: Remove Equipment No Used inside AHU Room

BBVN-FIVE-S2-SC-AMS0061/R1

BBVN-FIVE-S2-SC-AMS-0062

BBVN-FIVE-S2-SC-AMS0062/R1

BBVN-FIVE-S2-SC-AMS-0063

BBVN-FIVE-S2-SC-AMS0063/R1

BBVN-FIVE-S2-SC-AMS-0066

INCOMING Date
Title
Received
14/08/27
MS-22-B-1: Air Compressor System_Rev.1 Revised based on
comments in AMS-61 dated 25-July-2014

55

14/07/25

Attachment
Comments response table; Installation works,
Welding Procedure, Location of the activity,
Details schedule/Manpower requirement,
Document referenced, JSA

quang/ujiie

T. Anh

Remove Works, Location of the Activity, Details Ujiie, Quang


schedule/Manpower requirement, RCR servicer
pre-work/task observation sheet, Pre-task planning
work sheet (requirement from RCR), Hot work
permit

Approval for Method Statement

OUTGOING

Rev.

Date
Issued

Date
Required
Reply

INCOMING Date
Received

14/07/30

14/08/06

14/07/31

MS-19-A-6: Method Statement for Tie-in No.: 2.1, 2.2, 2.3

Schedule Material List, Tie-in List, Drawing, RCR Quang


servicer pre-work/ task observation sheet, pre-task
planning work sheet (requirement from RCR),
Document referenced, Risk assessment and
management for change system

BBVN-FIVE-S2-SC-AMS0067/R1

14/08/05

14/08/09

14/08/07

MS-19-A-6: Method Statement for Tie-in No.: 2.1, 2.2, 2.3_Rev.1


Revised based on comments in AMS-67 dated 31-July-2014

Comments response table, Schedule Material List, Quang


Tie-in List, Drawing, RCR servicer pre-work/ task
observation sheet, pre-task planning work sheet
(requirement from RCR), Document referenced,
Risk assessment and management for change
system

BBVN-FIVE-S2-SC-AMS0067/R1 (ADD01)

14/08/09

BBVN-FIVE-S2-SC-AMS-0067

BBVN-FIVE-S2-SC-AMS-0068

Title

56

Attachment

Prepared by

Status

Additional document (refer to TS 179 dated 12-Aug-2014)

14/07/30

14/08/06

14/08/06

MS-19-A-7: Method Statement for Tie-in No.: 3.1, 3.2, 3.3

Schedule Material List, Tie-in List, Drawing, RCR Quang


servicer pre-work/ task observation sheet, pre-task
planning work sheet (requirement from RCR),
Document referenced, Risk assessment and
management for change system

14/08/08

14/08/13

14/08/11

MS-19-A-7: Method Statement for Tie-in No.: 3.1, 3.2, 3.3_Rev.1


Revised based on comments in AMS-68 dated 6-Aug-2014

Comments response table, Schedule Material List, Quang


Tie-in List, Drawing, RCR servicer pre-work/ task
observation sheet, Pre-task planning work sheet
(requirement from RCR), Document Referenced,
Risk assessment and management for change
system

BBVN-FIVE-S2-SC-AMS-0069

14/08/06

14/08/09

14/08/14

MS-BLD.53_Wall Penetration on Grid 3

MS for Scaffolding; MS for Wall Penetration on


Grid 3; Risk Assessment and JSA

BBVN-FIVE-S2-SC-AMS-0070

14/08/08

14/08/13

14/08/14

MS-21-A-2: Method Statement for Tie-in No.: 15.1, 15.2, 15.3, 15.4,
15.5

Schedule Material List, Tie-in List, Drawing,


Quang
Installation Work, Fire Stop mortar, RCR servicer
pre-work/ task observation sheet, Pre-task
planning work sheet (requirement from RCR), Hot
work permit, Red tag permit, Risk assessment and
management for change system

BBVN-FIVE-S2-SC-AMS0068/R1

Nguyen/Tuan
Anh

Approval for Method Statement

OUTGOING

Rev.

BBVN-FIVE-S2-SC-AMS-0071

Date
Issued
14/08/07

Date
Required
Reply
14/08/13

INCOMING Date
Title
Received
14/08/18
MS-19-D: Relocation Duct Inside Electric Room (Tie-In 22)

BBVN-FIVE-S2-SC-AMS-0072

14/08/07

14/08/13

14/08/12

BBVN-FIVE-S2-SC-AMS-0073

14/08/08

14/08/13

BBVN-FIVE-S2-SC-AMS-0074

14/08/09

14/08/14

BBVN-FIVE-S2-SC-AMS-0075

14/08/09

14/08/14

BBVN-FIVE-S2-SC-AMS-0076

14/08/09

14/08/14

57

Attachment

Prepared by

Status

Relocation Works; Location of the activity; Details Quang/Diem


schedule/Manpower requirement; RCR servicer
pre-work/task observation sheet; Pre-task planning
work sheet (requirement from RCR), JSA

MS-19-A-8: Method Statement for Tie-in No.: 1.1, 1.2

Schedule Material List, Tie-in List, Drawing, RCR Quang/Trung


servicer pre-work/ task observation sheet, Pre-task
planning work sheet (requirement from RCR),
Document Referenced, Risk assessment and
management for change system

14/08/14

MS-19-A-9: Method Statement for Tie-in No.: 9.1, 9.2, 9.3

Schedule Material List, Tie-in List, Drawing, RCR Quang/Ujiie


servicer pre-work/ task observation sheet, Pre-task
planning work sheet (requirement from RCR),
Document Referenced, Risk assessment and
management for change system

14/08/14

MS-19-A-11: Method Statement for Tie-in No: 11.1, 11.2

Schedule Material List, Tie-in List, Drawing, RCR Quang/Ujiie


servicer pre-work/ task observation sheet, Pre-task
planning work sheet (requirement from RCR),
Document Referenced, Risk assessment and
management for change system

MS-24.1 HV Connection for transformer TX-2

Detail schedule/ Main Power Requirements,


MSE.1: Marking location at site, MSE.2: Method
of cutting-off the main power, MSE.3: Method of
re-opening the existing holes, MSE.4: Method of
cabling works, MSE.5: Method of cable and
termination works, Job safety analysis, Risk
Assessment and Management for Change System

Quang/Ujiie

MS-21-A-3: Method Statement for Tie-in No: 16.1, 16.2

Schedule Material List, Tie-in List, Drawing,


Installation work, RCR servicer pre-work/task
observation sheet, Pre-task planning work sheet
(Requirement from RCR), Hot work permit, Red
tag permit, Risk assessment and management for
change system

Quang/Ujiie

14/08/14

Approval for Method Statement

OUTGOING

Rev.

Date
Issued

Date
Required
Reply

INCOMING Date
Received

14/08/11

14/08/16

14/08/23

MS-19-B-2: Duct Works_Stage 2

Method Duct Works; Installation Works; Location Quang/Vuong


of the activity; Details schedule/Manpower
requirement; Document referencedl JSA

14/08/29

14/09/05

14/09/16

MS-19-B-2: Duct Works_Stage 2_Rev.1 Revised based on comments


in AMS-77 dated 23-August-2014

Comments response table; Method Duct Works;


Installation Works; Location of the activity;
Details schedule/Manpower requirement;
Document referenced; JSA

Quang/Vuong

14/08/12

14/08/16

14/08/20

MS-21-A-4: Method Statement for Tie-in No.: 17.1, 17.2

Schedule Material List, Tie-in List, Drawing,


Installation work, RCR servicer pre-work/task
observation sheet, Pre-task planning work sheet
(Requirement from RCR), Risk assessment and
management for change system

Quang/Tuan/Tru
ng

14/08/21

14/08/23

14/08/21

MS-21-A-4: Method Statement for Tie-in No.: 17.1, 17.2_Rev.1


Revised based on comments in AMS-78 dated 20-August-2014

Appendix4. Plug Sprinkler Head for roof above


clean room, JSA

Quang/Tuan/Tru
ng

B/A

BBVN-FIVE-S2-SC-AMS-0079

14/08/12

14/08/16

14/08/19

MS-31: Tie-in List of Fire Detection and Alarm System

Details Schedule/Manpower Requirements; Tie-in Quang/Ujiie


works detail table; Plan of Tie-in List; Detail of
installation for tie-in list; detail of cable
termination; JSA; Risk assessment and
management for change system; RCR services prework/task observation sheet; pre-task planning
worksheet; Red tag permit

BBVN-FIVE-S2-SC-AMS-0080

14/08/14

14/08/16

14/08/21

MS-BLD.54: Plinth Construction

MS for Temporary Canvas protection; MS for


Installing rebar and formwork; MS for casting
concrete; JSA and Risk Assessment

BBVN-FIVE-S2-SC-AMS-0081

14/08/15

14/08/22

14/08/28

MS-19-A-10: Method Statement for Tie-in No.: 4.1, 4.2, 4.3

Schedule Material List, Tie-in List, Drawing, RCR Quang/Khoa


servicer pre-work/task observation sheet, Pre-task
planning work sheet (Requirement from RCR),
Document Referenced, Risk assessment and
management for change system

BBVN-FIVE-S2-SC-AMS-0077

BBVN-FIVE-S2-SC-AMS0077/R1

BBVN-FIVE-S2-SC-AMS-0078

BBVN-FIVE-S2-SC-AMS0078/R1

Title

58

Attachment

Prepared by

Nguyen

Status

Approval for Method Statement

OUTGOING

Rev.

BBVN-FIVE-S2-SC-AMS-0082

Date
Issued
14/08/18

Date
Required
Reply
14/08/22

BBVN-FIVE-S2-SC-AMS-0083

14/08/18

14/08/19

14/08/26

BBVN-FIVE-S2-SC-AMS-0084

14/08/18

14/08/19

14/09/02

BBVN-FIVE-S2-SC-AMS-0085

14/08/18

14/08/23

BBVN-FIVE-S2-SC-AMS-0086

14/08/18

14/08/20

14/08/21

14/08/23

BBVN-FIVE-S2-SC-AMS0086 (FINAL)

INCOMING Date
Title
Received
14/08/26
MS-20-A-3: Method Statement for Tie-in No. 20.1, 20.2, 20.3

14/08/19

59

Attachment

Prepared by

Status

Schedule Material List, Tie-in List, Drawing, RCR Quang/Ujiie


servicer pre-work/task observation sheet, Pre-task
planning work sheet (Requirement from RCR), Hot
work permit, Document Referenced, Risk
assessment and management for change system

MS-19-A-13:Method Statement for Tie-in No.: 5.1, 5.2, 5.3, 5.4, 5.5,
5.6

Schedule Material List, Tie-in List/Details


schedule, Drawing, RCR servicer pre-work/task
observation sheet, Pre-task planning work sheet
(Requirement from RCR), Document Referenced,
Risk assessment and management for change
system, Hot Work Permit, Red Tag permit

Quang/Ujiie

MS-19-A-13: Method Statement for Tie-in No.: 21.1 (R.O Water


System)

Tie-in List/Detaila Schedule; Schedule Material


List, Drawing, RCR servicer pre-work/task
observation sheet, Pre-task planning work sheet,
Hot work permit, Document Referenced, Risk
assessment and management for change system

Quang/Ujiie

N/A

MS-22-A-4: Method Statement for Tie-in No.: 7.1, 7.2

Tie-in List/Details Schedule; Schedule Material


List, Drawing, RCR servicer pre-work/task
observation sheet, Pre-task planning work sheet,
Document Referenced, Risk assessment and
management for change system

Quang/Ujiie

MS-21-A-5: Method Statement for Tie-in No.: 18.1, 18.2

Schedule Material List, Tie-in List, Drawing,


Quang/Ujiie
Installation work; RCR servicer pre-work/task
observation sheet, Pre-task planning work sheet
(Requirement from RCR), Hot Work Permit, Red
Tag permit; Risk assessment and management for
change system

MS-21-A-5: Method Statement for Tie-in No.: 18.1, 18.2 (FINAL


Document)

Comments Response table; Schedule Material List, Quang/Ujiie


Tie-in List, Drawing, Installation work; RCR
servicer pre-work/task observation sheet, Pre-task
planning work sheet (Requirement from RCR), Hot
Work Permit, Red Tag permit; Risk assessment
and management for change system

Approval for Method Statement

OUTGOING

Rev.

Date
Issued

Date
Required
Reply

INCOMING Date
Received

BBVN-FIVE-S2-SC-AMS-0087

14/08/18

14/08/20

14/08/29

MS-22-A-5: Method Statement for Tie-in No.: 6.1, 6.2

Tie-in List/Details Schedule; Schedule Material


Quang/Ujiie
List, Welding Procedure SUS Pipe; Drawing, RCR
servicer pre-work/task observation sheet, Pre-task
planning work sheet, Hot work permit; Document
Referenced, Risk assessment and management for
change system

BBVN-FIVE-S2-SC-AMS-0088

14/08/19

14/08/22

14/08/22

MS-36-2: LV Busway 3200A Installation

MSE.1: Method of unloading LV Busway; MSE.2: Quang/Diem/Ujii


Mehtod of making wall opening hole; MSE.3:
e
Method of busway installation; JSA; Risk
Assessment and management for change system

BBVN-FIVE-S2-SC-AMS-0089

14/08/19

14/08/22

14/08/23

MS-24.2: LV Busway 3200A Connection from Transformer TX-2 to


MSB-A/BUS_2

Site organization chart; Detailed


Quang/Ujiie/Die
schedule/Manpower requirement; Material list;
m
MSE.1: Location plan of work; MSE.2: Method of
cutting-off the main power; MSE.3: Method of
installing the flanged-end units; MSE.4: Detail of
busway connection; JSA; Risk Assessment and
Management for Change system

14/08/26

14/08/30

14/08/28

MS-24.2: LV Busway 3200A Connection from Transformer TX-2 to


Comments response table; Site organization chart; Quang/Ujiie/Die
MSB-A/BUS_2_Rev.1 Revised based on comments in AMS-89 dated Detailed schedule/Manpower requirement;
m
23-August-2014
Material list; MSE.1: Location plan of work;
MSE.2: Method of cutting-off the main power;
MSE.3: Method of installing the flanged-end units;
MSE.4: Detail of busway connection; JSA; Risk
Assessment and Management for Change system

14/08/20

14/08/27

14/09/04

MS-BLD.20: Clean Room - Finishing Works Ceiling & Partition Wall Drawing for ceiling & Partition Wall; Products
Data sheet; Risk Assessment and JSA

Tuan Anh

14/09/11

14/09/17

14/09/26

MS-BLD.20: Clean Room - Finishing Works Ceiling & Partition


Wall_Rev.1 Revised based on comments in AMS-90 dated 4September-2014

Appendix 1: Drawing for Ceiling & Partition Wall; Tuan Anh


Appendix 2: Products Data Sheet; Appendix 3:
Risk Assessment and JSA

BBVN-FIVE-S2-SC-AMS0089/R1

BBVN-FIVE-S2-SC-AMS-0090

BBVN-FIVE-S2-SC-AMS0090/R1

Title

60

Attachment

Prepared by

Status

Approval for Method Statement

OUTGOING

Rev.

BBVN-FIVE-S2-SC-AMS-0091

Date
Issued
14/08/20

Date
Required
Reply
14/08/25

INCOMING Date
Title
Received
14/08/26
MS-19-A-12: Method Statement for Tie-in No.: 8.1,8.2,8.3

BBVN-FIVE-S2-SC-AMS-0092

14/08/20

14/08/25

14/08/26

BBVN-FIVE-S2-SC-AMS-0093

14/08/20

14/08/25

14/08/26

BBVN-FIVE-S2-SC-AMS-0094

14/08/21

14/08/25

BBVN-FIVE-S2-SC-AMS-0095

14/08/22

14/08/25

14/08/29

61

Attachment

Prepared by

Status

Quang/Ujiie/Kho
a

MS-24.1: HV Connection for Transformer TX-2 (Tie-in 24.1)

Site organization chart; Detailed


Quang/Ujiie/Die
schedule/Manpower requirement; Material list;
m
MSE.1: Working Location at site; MSE.2: Method
of cutting-off the main power; MSE.3: Method of
re-opening the existing holes; MSE.4: Method of
cabling works; MSE.5: Method of cable and
termination works; JSA; Risk Assessment and
Management for Change system

MS-21-B-2: Welding Procedure Plan (GTAW)

Welding Procedure Specification (WPS); Welder


list & Certificates; Welding Report

Quang/Ujiie/Kho
a

MS-21-A-6: Method Statement for Tie-in No.: 19.1, 19.2

Schedule Material List, Tie-in List, Drawing,


Installation work, RCR servicer pre-work/task
observation sheet, Pre-task planning work
sheet,Hot work permit, Red tag permit, Risk
assessment and management for change system

Quang/Ujiie/khoa

MS-BLD.52: Warehouse Wall Demolition for Roller Shutter

Drawing for Demolition works, Organization


Chart, Risk Assessment and JSA; FRI No.183

T.Anh

Tie-in List/Details Schedule; Schedule Material


List, Drawing, RCR servicer pre-work/task
observation sheet, Pre-task planning work sheet,
Document Referenced, Hot work permit, Risk
assessment and management for change system

Approval for Project Document


OUTGOING

Rev.

BBVN-FIVE-S2-SC-APD-0013

Date Issued Date Required


Reply

INCOMING
Date Issued

14/03/18

BBVN-FIVE-S2-SC-APD-0014

BBVN-FIVE-S2-SC-APD-0015

Attachments

List of Mock-up
14/03/20

BBVN-FIVE-S2-SC-APD- 14/03/26
0013/R1

62

Title

14/04/01

Author/Delivered
to

List of Mock-up

List of Mock-up_rev.1
14/04/02

List of Mock-up_rev.1

BBVN-FIVE-S2-SC-APD0013/R1 (Revised)

14/09/19

14/09/26

14/10/04

List of Mock-up_Rev.1 Updated based on actual condition

3A4size pages

Tung

BBVN-FIVE-S2-SC-APD0013/R2 (Revised)

14/10/11

14/10/18

14/10/28

List of Mock-up_Rev.2 Revised based on comments in APD-13/R1 (Revised) dated 4October-2014

4A4size pages

Tung

14/03/20

Procurement Plan
14/03/25

Procurement Plan

Mr. Mark
C

BBVN-FIVE-S2-SC-APD- 14/05/02
0014/R1
BBVN-FIVE-S2-SC-APD- 14/05/15
0014/R2

14/05/06

14/05/07

Procurement Plan_Rev.1 Revised based on comments in APD-0014 dated 25-Mar-2014

Tung

14/05/19

14/05/21

Procurement Plan_Rev.2 Revised based on comments in APD-0014/R1 dated 07-May2014

Tung

14/03/24

14/03/26

Signature Flowchart

Ms. Hau

14/03/19

14/03/24

BBVN-FIVE-S2-SC-APD-0018

14/03/25

14/03/25

14/03/31
BBVN-FIVE-S2-SC-APD- 14/04/02
0018/R1

14/04/07

14/04/07

14/04/25

14/03/27

Road & Drainage System Level based on Pre-condition Survey Result

4A3 drawings for road, 4A3 drawings for drainage


system

Mr. Le/Mr. Thanh (Superseded


)

QCP for Steel Strutural Work (QCP-3)

Quality Control Documents of Seico (Steel Structural


Manufacture)

Mrs. Lan

QCP for Steel Strutural Work (QCP-3)

Profile of Authority Unit for NDT inspector for steel structural works_Rev.1 (based on
Welding Procedure Specification, Welder List &
Certificatess

12-Apr-14

12-Apr-14

Mrs. Lan

QCP for Fabrication Structural Steel in SEICO Factory


QCP-3(1): Quality Control Plan for Fabrication structural steel in Seico factory_Rev.2
QCP-3(2): Quality Control Plan for Assembly and Erection Structural steel on
site_Rev.1
NDT Laboratory: THT Technology and Services Engineering JSC (English Version)

14/04/28

BBVN-FIVE-S2-SC-APD-0019

Company profile for Space Frame and Paint (TOA)

QCP for Fabrication Structural Steel in SEICO Factory


11-Apr-14

BBVN-FIVE-S2-SC-APD- 14/04/19
0018/R2

Mr. Tung

Profile of Authority Unit for NDT inspector for steel structural works_Rev.1 (based on
11-Apr-14

BBVN-FIVE-S2-SC-APD- 14/04/03
0018/R1 (II)

Company profile for Space Frame and Paint (TOA)


14/03/25

BBVN-FIVE-S2-SC-APD-0017

Date Delivered
to Author

Mr. Tung

Signature Flowchart

BBVN-FIVE-S2-SC-APD-0016

Status

QCP-3 (full)

New Gridline based on Survey Existing Factory

Mrs. Lan

1 A4 photo, 1 A3 drawing, 1A3 page benchmark layout, Mr. Nguyen/Mr.


2 A3 size pages of cordinates, 6 A3size drawings
Chien

Approval for Project Document


OUTGOING

Rev.

Date Issued Date Required


Reply

INCOMING
Date Issued
14/03/29

BBVN-FIVE-S2-SC-APD- 14/03/31
0019/R1

14/04/01

BBVN-FIVE-S2-SC-APD-0020

BBVN-FIVE-S2-SC-APD-0021

14/03/27

14/03/31

BBVN-FIVE-S2-SC-APD- 14/04/29
0020/R1
BBVN-FIVE-S2-SC-APD- 14/05/12
0020/R2

14/05/02
14/05/15

14/05/15

14/03/31

14/04/01

14/04/04

11A3size pages
Mr. Tu/Cuong

Mr. Tu/Cuong

Cash Flow

1A3 size page

Tung/Mr. Nguyen

Cash Flow

1A3 size page

Additional Documents required in APD-0011 dated 14/03/24

dated 24-Mar-2014: 2 business certificates(Luong Thanh Tung


Dong & Kinh Viet), 2 companies profiles (Vinh Hiep
Hung & Doan Thanh)

BBVN-FIVE-S2-SC-APD-0025

14/04/08

14/04/18
11-Apr-14

BBVN-FIVE-S2-SC-APD-0026

BBVN-FIVE-S2-SC-APD- 14/04/29
0025/R1

14/05/05

14/04/08

14/04/10

14/05/09

14/04/14

BBVN-FIVE-S2-SC-APD- 14/04/25
0026 (ADD)

14/05/02

14/04/26

25 A4 pages

Mr. Tung

List of Materials

Package List of the Project

14/05/07

Mr. Tu

Additional Documents required in APD-0011 dated 14/03/24

List of Materials

11-Apr-14
14/05/05

Master Schedule & Manpower_Rev.1 Revised based on comments in APD_0021 dated 11A3size pages
15-APR-2014
Master Schedule & Manpower_Rev.2 Revised based on comments in APD_0020/R1
11A3size pages
dated 8-May-2014

14/04/08

BBVN-FIVE-S2-SC-APD- 14/04/28
0024/R1

New Gridline

Master Schedule & Manpower

14/04/25

BBVN-FIVE-S2-SC-APD-0024

Mr. Nguyen

14/05/08

14/04/04

Date Delivered
to Author

C
7 A3 size drawings

14/04/15

14/03/31

14/04/01

Status

12 A3 size pages

14/04/03

BBVN-FIVE-S2-SC-APD-0023

Author/Delivered
to

Master Schedule & Manpower

14/04/03

BBVN-FIVE-S2-SC-APD-0022

Attachments

New Gridline based on Survey Existing Factory


New Gridline

14/04/02

63

Title

1A3 size pages

Mr. Tung

Package List of the Project

Package List of the Project_Rev.1 Reivsed based on comments in APD-0024 dated 11- 1A3 size pages
Apr-2014

Tung

Clean Construction Protocol for Clean Room

Mrs. Lan

1A3size page

Clean Construction Protocol for Clean Room

A/B

Clean Construction Protocol for Clean Room_Rev.1 Revised based on comments in


APD-0025 dated 14-Apr-2014

Access Layout 4A3size drawings

Mrs. Lan

Work permit forms:


Forms including (i) Parent Work Permit, (ii) Hot Work Permit, (iii) Work At Height
Permit, (iv) Confined Space Permit, (v) Lifting Permit, (vi) Excavation Permit, (vii)
Demolition Permit
Work permit forms:
Forms including (i) Parent Work Permit, (ii) Hot Work Permit, (iii) Work At Height
Permit, (iv) Confined Space Permit, (v) Lifting Permit, (vi) Excavation Permit, (vii)
Demolition Permit
Work permit forms: Additional 2 Forms (Based on comments in APD-0026 dated 14Apr-2014)

(2 + 2 + 4 + 2 + 2 + 2 + 2) A4size Pages

Hoang safety

B/C

B
Chemical Registration, Checmical Use Declaration &
Work at Height Permit

Hoang safety

12-Apr-14

B/A

12-Apr-14

Approval for Project Document


OUTGOING

BBVN-FIVE-S2-SC-APD-0027

Rev.

Date Issued Date Required


Reply
08-Apr-14

INCOMING
Date Issued

11-Apr-14
11-Apr-14

BBVN-FIVE-S2-SC-APD- 14/04/15
0027 (ADD)

BBVN-FIVE-S2-SC-APD-0028

BBVN-FIVE-S2-SC-APD-0029

11-Apr-14

12-Apr-14

BBVN-FIVE-S2-SC-APD- 14/04/28
0028/R1

14/05/02

14/04/15

14/04/17

Roofing System for FM Global Approval. Roof Nav Assembly No. 237498-0-0

Mr. Tung

Hard rock 80 for roof insulation, Sika Membrance,


Fastener (Catalogue & Datasheet), V125 Decking +
11A3size drawings

Mr. Tung

Inspection Form for Earthwork & RC Work (7 forms)

Pre-Concrete Inspection, RC Inspection, Formwork


Inspection, Puring Concrete on Site, Inspection, Final
Concrete Inspection, Backfill Inpection Record,
Excavation Inspection Record

Mr. Hoang

14/04/26

Inspection Form for Earthwork & RC Work (9 forms)_Additional & Revised based on
comments in APD_0029 dated 24-Apr-2014

14/04/15

14/04/17

Clashing Point Check

BBVN-FIVE-S2-SC-APD- 14/04/29
0030/R1

14/05/06

Clashing Point Check_Rev.1 Revised based on comments in APD-0030 dated 14-Apr2014

14/04/18

14/04/22

LAS298 profile for Geotextile Test

14/04/18

14/04/22

14/04/21

14/04/23

BBVN-FIVE-S2-SC-APD- 14/04/24
0033/R1

14/05/02
14/04/25

Pre-Concrete Inspection, RC Inspection, Formwork


Tuan Anh
Inspection, Puring Concrete on Site, Inspection, Final
Concrete Inspection, Backfill Inpection Record,
Excavation Inspection Record, Lean Concrete Inspection,
Minutes for Material/Equipment Inspection &
Acceptance Reports
Tuan Anh

C
Mr. Giang/An

LAS 298 Profile

Mrs. Lan/Hoang

LAS 201 Profile

Mrs. Lan/Hoang

LAS201 profile for Testing thickness of zinc coat for purlin

A3 size drawing

Mr. Ba Hoa

Temporary Road for Construction Work


Temporary Road for Construction Work_Rev.1 (Revised based on comments in APD0033 dated 23/04/2014
Temporary Road for Construction Work_Rev.1 (Revised based on comments in APD0033 dated 23/04/2014

12-Apr-14

Duct vs Steel Structure (11 items), Duct vs Fire Fighting Mr. Giang/Mr.
(10 items), Cable Ladder/tray vs Structure (8 items)
Thanh

LAS298 profile for Geotextile Test

Temporary Road for Construction Work


14/04/23

Clashing Point Check

LAS201 profile for Testing thickness of zinc coat for purlin

Date Delivered
to Author

Inspection Form for Earthwork & RC Work (7 forms)


Inspection Form for Earthwork & RC Work (9 forms)_Additional & Revised based on
comments in APD_0029 dated 24-Apr-2014

Status

Mr. Tu

Roofing System for FM Global Approval. Roof Nav Assembly No. 237498-0-0_Rev1
revised based on comments in APD-0028 dated 15-APR-2014

14/04/25

BBVN-FIVE-S2-SC-APD-0033

Mr. Tu

14/05/14

14/04/25

BBVN-FIVE-S2-SC-APD-0032

Report of Taking Photograph and Surveying actual quality of B. Braun Five AP


Construction Site Stage No.2
Report of Taking Photograph and Surveying actual quality of B. Braun Five AP
Construction Site Stage No.2
Report of Taking Photograph and Surveying actual quality of B. Braun Five AP
Construction Site Stage No.2

19A3 size drawings

14/04/17

BBVN-FIVE-S2-SC-APD-0031

Author/Delivered
to

Roofing System for FM Global Approval. Roof Nav Assembly No. 237498-0-0

14/04/29

BBVN-FIVE-S2-SC-APD-0030

Attachments

14/04/15

14/04/21
BBVN-FIVE-S2-SC-APD- 14/04/23
0029 (ADD)

64

Title

C/B
Mr. Ba Hoa
B

Approval for Project Document


OUTGOING

BBVN-FIVE-S2-SC-APD-0034

BBVN-FIVE-S2-SC-APD-0035

Rev.

Date Issued Date Required


Reply

INCOMING
Date Issued

65

Title

14/04/21

14/04/26
14/04/23

General JSA & Risk Assessment Shimizu

BBVN-FIVE-S2-SC-APD- 14/05/14
0034/R1
BBVN-FIVE-S2-SC-APD- 14/05/28
0034/R2

14/05/16

14/05/19

14/06/02.

14/06/02

General JSA & Risk Assessment Shimizu_Rev.1 Revised based on comments in APD- 61 Activities
0034 dated 23-Apr-2014
General JSA & Risk Assessment Shimizu_Rev.2 Revised based on comments in APD- Additional Document required (9 activities + Fire
0034 dated 19-May-2014
extinguisher point location on site - 4A3size drawings)

14/04/24

General JSA & Risk Assessment Shimizu

Attachments

14/04/25

Proportion Mix Concrete for Construction (M20 102, M30 102, M30 142, M40
102, M40 142)

14/04/28

Proportion Mix Concrete for Construction (M20 102, M30 102, M30 142, M40
102, M40 142)

31 items of work

Author/Delivered
to

Status

Mr. Hoang Safety


C
Hoang Safety

Hoang Safety

Concrete Testing report, Cement testing report, Fine


Hoang
aggregate testing report, Coarse aggregate testing report,
Water aggregate testing, Admixture specification for trial
mix
A

Date Delivered
to Author

OUTGOING

Rev.

Approval for Shop Drawing


Date Issued
Required INCOMING
Title
Replied Date Issued Date

BBVN-FIVE-S2-SC-ASD-173(ADD.01)

14/10/14

14/10/15

14/10/20

BBVN-FIVE-S2-SC-ASD-173(ADD.02)

14/10/18

14/10/21

14/10/20

BBVN-FIVE-S2-SC-ASD-174

14/10/07

14/10/14

BBVN-FIVE-S2-SC-ASD-175

14/10/08

14/10/15

BBVN-FIVE-S2-SC-ASD-175/R1

14/11/07

14/11/10

BBVN-FIVE-S2-SC-ASD-177/R1

14/10/08
14/10/28

14/10/15
14/11/03

Attachment

Author/Delivered to

Status

5A3size drawings

Thanh

6A3 size drawings

Thanh

14/10/22

PentHouse Drawings (Additional Drawings No.01)


Revised based on comments in ASD -173
PentHouse Drawings .Revised base on BBVN on
ASD.173. Replace the relative details and drawings in
ASD-13R1:ASD-124R1:ASD-173(ADD.01)
Piping Schedule & Underground Schedule

Drawing List, 10A1size drawings

Quang/Trung/Ujiie

14/10/17

AC Control System Plan

Drawing list, 4A1size drawings (Office


Ground Floor; Clean Room; First Floor;
Outdoor Area)
Drawing list, 5A1size drawings

Quang/Ujiie/Diem

1A3size drawing
1A3size drawing

Cuong
Cuong

AC Control System Plan_Rev.1


Revised based on comments in ASD_175 dated 17-Oct2014

Quang/Ujiie/Diem

BBVN-FIVE-S2-SC-ASD-176

BBVN-FIVE-S2-SC-ASD-177

14/10/20

Pass Tray Details


Pass Tray Details_Rev.1 Revised based on comments in
ASD-177 dated 20-October-2014

66
Date Delivered
to Author

RCR

Approval for Shop Drawing


REFERENCE
(ASD_FOR APPROVAL)

Ref. Date
Issued

BBVN-FIVE-S2-SC-ASD- 14/07/01
102
14/07/07

14/07/10

14/07/18

14/07/21

Previous Title

Drawing NAME

67
Drawing CODE

Size

Author/Delivered to

Bar Bending for Ground Slab Zone 2, Zone 3

Phuc/Nguyen

Bar Bending for Ground Slab Zone 2, Zone


3_Rev.1 Revised based on comments in ASD-102
dated 7-July-2014
Bar Bending for Ground Slab Zone 2, Zone
3_Rev.2 Revised based on comments in ASD102/R1 dated 9-July-2014
Bar Bending for Ground Slab Zone 2, Zone
3_Rev.3_Part 1 (Zone 2) Revised based on
comments in ASD-102/R2 dated 14-July-2014

Phuc/Nguyen

Bar Bending for Ground Slab Zone 2, Zone


3_Rev.3_Part 2 (Zone 3) Revised based on
comments in ASD-102/R2 dated 14-July-2014

Phuc/Nguyen

Phuc/Nguyen

Phuc/Nguyen

To/Receivers

Drawing NAME

Approval for Shop Drawing


Drawing CODE

68
Size

Author/Delivered to

Phuc/Nguyen
Phuc/Nguyen

Phuc/Nguyen

Phuc/Nguyen

Phuc/Nguyen

To/Receivers

OUT-GOING

Rev

BBVN-FIVE-S2-SCRFI-0001-14

Date Issued

14/02/29

Date
Required
Reply
14/03/07

INCOMING

BV-137206/6011/SMZ140228/D001
BBVN-FIVE-S2-SCRFI-0002-14

14/02/28

14/02/28

14/03/04

Author/Delivered
to

Architectual/Roof Insulation

2 As-built
drawings:BB/SEC/G1/00/AARC
H/006,
BB/SEC/G1/00/AARCH/007 (A3
size)

Tung

Structural/Steel structural Comment

8 items of drawings (12 pages A3


size drawings)

Cuong

5 pages A3 size drawings

Cuong

1 A3 size drawing No.141-HBP-ACD-MB-001b, 4 A4 sized photos

Cuong

2 A4 size pages Starter bar survey


level, 9 A3 size drawings

Cuong

14/03/03

Steel Structure Comment

14/03/07

Steel Structure Comment. Designer Reply

14/03/03

Steel Structure Comment

14/03/07

Steel Structure Comment. Designer Reply.

14/03/05

Architectual/ Grid Line Survey

14/03/010 Gridline Survey


14/03/12

BBVN-FIVE-S2-SCRFI-0005-14

Gridline Survey

Structural/ Pile Location & Pile Top Level Survey

BV-137206/6011/SMZ140308/D008
BV-137206/6011/SMZ140312/D012
BBVN-FIVE-S2-SCRFI-0006-14

14/03/04

BBVN-FIVES2-SC-RFI0006/R1

14/03/28

14/03/04

14/03/10

Pile Location & Pile Top Level Survey

14/03/12

Pile Location & Pile Top Level Survey

14/03/07
BV-137206/6011/SMZ140308/D009
BV-137206/6011/SMZ140312/D014

14/03/10

BV-137206/6011/SMZ140402/D037

14/04/02

14/02/13

14/03/

14/03/07
BV-137206/6011/SMZ140310/D010

BBVN-FIVE-S2-SCRFI-0008-14

Attachment

Structural/Ground Beam level confirm

BV-137206/6011/SMZ140308/D007
BV-137206/6011/SMZ140312/D013

BBVN-FIVE-S2-SCRFI-0007-14

Title

14/03/03

14/02/28
BV-137206/6011/SMZ140303/D003
BV-137206/6011/SMZ140306/D005

BBVN-FIVE-S2-SCRFI-0004-14

Request
Date
Issuedfor Information

14/02/28
BV-137206/6011/SMZ140303/D002
BV-137206/6011/SMZ140306/D004

BBVN-FIVE-S2-SCRFI-0003-14

Rev

14/03/10

14/03/07

Structure, Ardhitecture / Design Queries (maintenance/Floor


finishing/drain pipe/cadding/pile shaft)
Design Queries: Maintenance/Floor Finishing/Drain
Pipes/Cladding/Pipe Shaft
Design Queries: Maintenance/Floor Finishing/Drain
Pipes/Cladding/Pipe Shaft
2 Additional Drawings for Structure/Architecture/Drain Pipe/

14/03/10
14/03/13

Thanh/Cuong

Design Queries: Maintenance/Floor Finishing/Drain


Pipes/Cladding/Pipe Shaft
Struture, Architecture/ Design Queries (require 1 hard copy A1 size
with stamp)
Design Queries: hard Copy - Issued for Construction documents

M&E/ Bracing steel structure Clashings points


BV-137206/6011/SMZ140310/D011
BV-137206/6011/SMZ140313/D015

7 drawing pages A4 size

Bracing Steel Structure Clashing Points


Bracing Steel Structure Clashing Points

Mr. Giang/Thanh

5 A3 size drawings

Mr. An/Mr.Giang

OUT-GOING

BBVN-FIVE-S2-SCRFI-0009-14

Rev

Date Issued

Date
Required
Reply

14/03/12

14/03/12

INCOMING

14/03/13

14/03/28

BBVN-FIVE-S2-SCRFI-0012

14/03/17

14/03/24

14/03/24

Pile Test Result

All pipe test result report

Rain Water Pipe (RWP) grid line A

1 A3 size drawing.

Rain Water Pipe - Gridline A

14/03/26

Rain Water Pipe - Gridline A

14/04/02

Rain Water Pipe - Gridline A

14/03/21

Backfill Material & Compaction

14/03/26

Backfill Material & Compaction

14/03/25

Road & Drainage System Level

14/04/02

14/03/26

Mr. Cuong/Giang

14/04/02

14/03/27

Mr. Hoang

4 A3 size drawings (road), 4A3


size drawings (drainage system)

Mr. Le/Mr. Thanh

1 A3 drawing

Mr. Le/Mr. Thanh

RFI-013 Road & Drainage System Level

Survey Report with Different level between design and existing of


interfacing ground floor
(RFI_014) Interfacing Ground Floor Level

Brick for Masonry


BV-137206/6011/SMZ140329/D029

BBVN-FIVE-S2-SCRFI-0016

Mr. Giang/An

Mr. Tu/Nguyen

Backfill Layer Material & Compaction

BV-137206/6011/SMZ140402/D035
BBVN-FIVE-S2-SCRFI-0015

5 A4 size drawings

Author/Delivered
to

Toilet Drain and Structure Beam

14/03/21

14/03/18

00/01/26
BV-137206/6011/SMZ140403/D033

14/03/24

Attachment

Rain Water Pipe - Gridline A

BV-137206/6011/SMZ140318/D022
BV-137206/6011/SMZ140326/D024

BBVN-FIVE-S2-SCRFI-0014

14/03/17

14/03/17

BBVN-FIVE-S2-SCRFI-0011/R1

Title

Pile testing result (Intergrity test, Bearing test)

BV-137206/6011/SMZ140318/D021
BV-137206/6011/SMZ140326/D023
BV-137206/6011/SMZ140402/D038

BBVN-FIVE-S2-SCRFI-0013

14/03/13

14/03/14
BV-137206/6011/SMZ140317/D019

BBVN-FIVE-S2-SCRFI-0011

Request
Date
Issuedfor Information

Structure/Architecture/M&E_Design Queries_Toilet
BV-137206/6011/SMZ140313/D016

BBVN-FIVE-S2-SCRFI-0010-14

Rev

14/03/29

Hoang

Brick for Masonry

14/04/04

14/04/09

Brick for Masonry Rev.1

14/03/26

14/03/26

RFI_0016_toilet & Structure Beam

6 A3 size drawings

Thanh

Conflict between beeam and Sewage Pipe

4 A3 size drawings

Mr. Giang/Mr.
Thanh, Mr.
Le/Quang

BV-137206/6011/SMZ-14
BBVN-FIVE-S2-SCRFI-0017

14/03/27

14/03/31

OUT-GOING

Rev

Date Issued

Date
Required
Reply

INCOMING

BV-137206/6011/SMZ140402/D036

BBVN-FIVE-S2-SCRFI-0018

14/03/27

14/03/29

14/04/01

14/04/04

14/04/14

14/04/21

14/04/21

Specification, 2A3 size drawings

Mr. Quang

Design/Internal - Location of floor drain at ground and first floor

12 A3size drawings

Mr. Quang

14/04/03

Design/Internal - Location of floor drain at ground and first floor

12 A3size drawings

14/04/08

Design/Internal - Location of floor drain at ground and first floor


(Designer Comments)

14/03/29

RFI-18 Ground Compaction

14/04/02

RFI-018 Ground Compaction

14/04/01

Electrical/ Lighting cable specification

14/04/04

Electrical/ Lighting cable specification

14/04/07

Purlin Connection Details


14/04/04

Purlin Connection Details

14/04/07

(RFI-021) Purlin Connection Details (reply by Designer)

14/04/17

Paint for Steel Structure


14/04/17

14/04/24
14/04/23

14/04/24

14/05/06

Mr. Giang/Mr.
Thanh

Mr. Giang/Mr.
Thanh

Mr. Giang/Hoang

Mr. Ujiie/Mr.
Quang

Dehumidifier Specification

Lightning Protection System

BV-137206/6011/SMZ140506/D046

4 A3size drawings

Paint for Steel Structure

Dehumidifier in Granulation Room's Specification


BV-137206/6011/SMZ140423/D045

BBVN-FIVE-S2-SCRFI-0024

Mr. Nguyen/Tu

14/04/04

BV-137206/6011/SMZ140417/D044

BBVN-FIVE-S2-SCRFI-0023

Photos of Soil Trial Test, Testing


Resultfor compacting at the
construction site

(RFI_017)_Toilet & Structure Beam

Electrical/ Lighting cable specification

BV-137206/6011/SMZ140404/D040
BV-137206/6011/SMZ140404/D042

BBVN-FIVE-S2-SCRFI-0022

Author/Delivered
to

14/04/02

BV-137206/6011/SMZ140403/D039
BV-137206/6011/SMZ140408/D043
BBVN-FIVE-S2-SCRFI-0021

Attachment

14/04/02

Title

Civil / Ground Compaction

BV-137206/6011/SMZ140401/D032
BV-137206/6011/SMZ140404/D041
BBVN-FIVE-S2-SCRFI-0020

Request
Date
Issuedfor Information

14/04/02

BV-137206/6011/SMZ140329/D031
BV-137206/6011/SMZ140402/D034
BBVN-FIVE-S2-SCRFI-0019

Rev

Lightning Protection System

Mr. Ujiie/Mr.
Quang, Mr. Trung

OUT-GOING

BBVN-FIVE-S2-SCRFI-0025

Rev

Date Issued

14/04/22

Date
Required
Reply
14/04/25

INCOMING

14/04/22

14/04/22

14/04/25

14/04/25

14/04/25

14/04/29

14/04/25

14/06/06

14/04/29
14/06/03

14/05/02

Mr. Ujiie

Mr. Ujiie

Production Panel Relocation

Mr. Ujiie

Production Panel Relocation

Ujiie/Quang

14/05/22

Door Hardware

14/06/03

Door Hardware

14/04/29

Mr. Tuan Anh/Mr.


Mike-Hoa

UPS at Panel DB-IT2

Chair at Laboratory Room


BV-137206/6011/SMZ140429/D058

Mr. Ujiie/Mr.
Quang, Mr. Trung

RFI-027_ M&E Outlet Location

Door Hardware

14/05/02

Author/Delivered
to

RFI-026_ Specification Clarification. Foundation Notes.

UPS at Panel DB-IT2

BV-137206/6011/SMZ140522/D113
BV-137206/6011/SMZ140603/D122

BBVN-FIVE-S2-SCRFI-0031

14/04/25

Attachment

Vent Pipe for Sanaitation Facilities

M&E Outlet Location

BV-137206/6011/SMZ140602/D126

BBVN-FIVE-S2-SCRFI-0030

14/04/25

14/04/25

BV-137206/6011/SMZ140606/D145

BBVN-FIVE-S2-SCRFI-0029

Title

Specification Clarification (Pile Cap)

BV-137206/6011/SMZ140424/D055

BBVN-FIVE-S2-SCRFI-0028

14/04/23

14/04/25

BV-137206/6011/SMZ140424/D056

BBVN-FIVE-S2-SCRFI-0027

Request
Date
Issuedfor Information

Vent Pipe for Sanaitation Facilities

BV-137206/6011/SMZ140423/D047

BBVN-FIVE-S2-SCRFI-0026

Rev

RFI-031_Chair at White Area

Tung

Tung

OUT-GOING

BBVN-FIVE-S2-SCRFI-0032

Rev

Date Issued

Date
Required
Reply

14/04/25

14/04/26

INCOMING

BV-137206/6011/SMZ140506/D062

BBVN-FIVE-S2-SCRFI-0033

14/04/28

14/04/29

14/04/28

14/04/28

14/04/28

14/05/16

14/05/16

14/05/03
BV-137206/6011/SMZ140506/D060

BBVN-FIVE-S2-SCRFI-0037

14/05/06

14/05/03
BV-137206/6011/SMZ140516/D073

BBVN-FIVE-S2-SCRFI-0036

14/05/06

14/05/02
BV-137206/6011/SMZ140516/D072

BBVN-FIVE-S2-SCRFI-0035

Request
Date
Issuedfor Information

14/05/03
BV-137206/6011/SMZ140506/D061

BBVN-FIVE-S2-SCRFI-0034

Rev

14/05/06

14/05/03
BV-137206/6011/SMZ140516/D074

14/05/16

Title

Attachment

Author/Delivered
to

Lightning Protection

Quang

Lightning Protection

Quang/Diem

Smoke Exhaust Fan

Randy

Smoke Exhaust Fan

Randy

Moterrise Damper

Randy

Moterrise Damper

Randy

Process Exhaust Fan

Randy

Process Exhaust Fan

2A3size drawings

Exhaust Fan Capacity

Randy

Exhaust Fan Capacity

Randy

Ele. Room Sprinkler

Randy

Ele. Room Sprinkler

1A3size drawing

OUT-GOING

BBVN-FIVE-S2-SCRFI-0038

Rev

Date Issued

Date
Required
Reply

14/04/28

14/05/03

INCOMING

14/04/28

14/04/28

14/04/29

14/05/02

14/05/02

14/05/20

14/05/16

14/05/02
14/05/16

14/05/03

Switch Box Level

Randy

RFI-039_Warehouse Lighting

Sprinkler inside Air Shaft

Randy
2A3size drawings

Spinkler Head under Duct

Randy
1A3size drawing + 1A4size photo

Conductor for Lightning System


14/05/16

14/05/03

Conductor for Lightning System

Randy
1A3size drawing

Urinal Sensor Socket


14/05/16

14/05/23

Urinal Sensor Socket

Water Chiller Valve


BV-137206/6011/SMZ140605/D140

14/06/05

Author/Delivered
to

Randy

Spinkler Head under Duct

BV-137206/6011/SMZ140516/D078

BBVN-FIVE-S2-SCRFI-0044

Attachment

Sprinkler inside Air Shaft

BV-137206/6011/SMZ140516/D077

BBVN-FIVE-S2-SCRFI-0043

14/04/29

14/05/02

BV-137206/6011/SMZ140516/D076

BBVN-FIVE-S2-SCRFI-0042

Title

Warehouse Lighting

BV-137206/6011/SMZ140516/D075

BBVN-FIVE-S2-SCRFI-0041

14/05/07

14/05/02
BV-137206/6011/SMZ140429/D059

BBVN-FIVE-S2-SCRFI-0040

Request
Date
Issuedfor Information

Switch Box Level


BV-137206/6011/SMZ140507/D063

BBVN-FIVE-S2-SCRFI-0039

Rev

Water Chiller Valve

Randy
2A3size drawings

Randy

OUT-GOING

BBVN-FIVE-S2-SCRFI-0045

Rev

Date Issued

Date
Required
Reply

14/05/02

14/05/03

INCOMING

BV-137206/6011/SMZ140507/D064

BBVN-FIVE-S2-SCRFI-0046

14/05/02

14/05/02

14/05/02

14/05/02

14/05/02

14/05/02

Attachment

14/05/16

14/05/03

Randy

RO Gasket & O ring Type

Randy

Existing Panel Modification

Randy

Existing Panel Modification

1A3size drawing & 1A4size


Photo

Manhole for AC Drain & Compressor Drain

Randy
3A3size drawings

Randy

Cable ladder & trinking color code

Earthing System
14/05/16

14/05/03

Earthing System

Randy
2A3size drawings

Earth Pit Dimension


14/05/16

14/05/03
BV-137206/6011/SMZ140516/D084

14/05/19

Author/Delivered
to

RO Gasket & O ring Type

Cable ladder & trinking color code

BV-137206/6011/SMZ140516/D083

BBVN-FIVE-S2-SCRFI-0051

14/05/16

14/05/03

BV-137206/6011/SMZ140516/D082

BBVN-FIVE-S2-SCRFI-0050

14/05/16

Title

Manhole for AC Drain & Compressor Drain

BV-137206/6011/SMZ140516/D081

BBVN-FIVE-S2-SCRFI-0049

14/05/07

14/05/03
BV-137206/6011/SMZ140516/D080

BBVN-FIVE-S2-SCRFI-0048

Request
Date
Issuedfor Information

14/05/03
BV-137206/6011/SMZ140516/D079

BBVN-FIVE-S2-SCRFI-0047

Rev

Earth Pit Dimension

Randy
1A3size drawing

Earth Ring Conductor

Randy

Earth Ring Conductor

Randy

OUT-GOING

BBVN-FIVE-S2-SCRFI-0052

Rev

Date Issued

14/05/02

Date
Required
Reply
14/05/03

INCOMING

14/05/14

14/05/02

14/05/02

14/05/02

14/05/02

14/05/02

14/05/02

Single line diagram

14/05/16

14/05/05

2A3zise drawings

Randy

Chiller Control

Warehouse Exhaust Air Fan and Smoke Exhaust Damper

Randy
1A3size drawing

Water Supply System Route

Randy
2A3size drawings

Louver Air Velocity


14/05/16

14/05/06

Louver Air Velocity

Randy
1A3size drawing

Exhaust fan RF-PII-01 & 02 Operation Control


14/05/16

14/05/06
14/05/16

14/05/06

Exhaust fan RF-PII-01 & 02 Operation Control

Humidity and Temperature Control on Component Production &


Storage
Humidity and Temperature Control on Component Production &
Storage

Randy
1A3size drawing

Randy
1A3size drawing

CCTV Monitor at Guard House and BMS Room


BV-137206/6011/SMZ140516/D090

14/05/16

Author/Delivered
to
Randy

Water Supply System Route

BV-137206/6011/SMZ1405/16/D089

BBVN-FIVE-S2-SCRFI-0059

14/05/16

14/05/06

BV-137206/6011/SMZ140516/D088

BBVN-FIVE-S2-SCRFI-0058

Attachment

Warehouse Exhaust Air Fan and Smoke Exhaust Damper

BV-137206/6011/SMZ140516/D087

BBVN-FIVE-S2-SCRFI-0057

14/06/05

14/05/06

BV-137206/6011/SMZ140516/D086

BBVN-FIVE-S2-SCRFI-0056

Title

Chiller Control

BV-137206/6011/SMZ140516/D085

BBVN-FIVE-S2-SCRFI-0055

14/05/16

14/05/16
BV-137206/6011/SMZ140605/D139

BBVN-FIVE-S2-SCRFI-0054

Request
Date
Issuedfor Information

Single line diagram


BV-137206/6011/SMZ140516/D101

BBVN-FIVE-S2-SCRFI-0053

Rev

CCTV Monitor at Guard House and BMS Room

Randy
1A3size drawing

OUT-GOING

BBVN-FIVE-S2-SCRFI-0060

Rev

Date Issued

Date
Required
Reply

14/05/02

14/05/06

INCOMING

14/05/02

14/05/16

14/05/08

14/05/11

BBVN-FIVE-S2-SCRFI-0064

14/05/02

14/05/06

14/05/05

14/05/05

Randy
2A3size drwings

14/05/16

AHU Plenum

Randy
2A3zise drawings

Randy

14/06/05

MV&LV Cable Color Code

BV-137206/6011/SMZ140509/D069

14/05/12

Push Putton Switch

Randy

AHU Supply Air Duct Silencer

Randy

14/05/16

14/05/08

AHU Supply Air Duct Silencer

1A3zise drawing

Fire Hose Cabinet


14/05/16

14/05/08

Fire Hose Cabinet

Randy
1A3zise drawing

Pre Filter for Ventillation System


BV-137206/6011/SMZ140516/D095

BBVN-FIVE-S2-SCRFI-0067

Access Control System

Author/Delivered
to

BV-137206/6011/SMZ140605/D138

BV-137206/6011/SMZ140516/D094

BBVN-FIVE-S2-SCRFI-0066

Attachment

MV&LV Cable Color Code

BV-137206/6011/SMZ140516/D093

14/05/05

Title

AHU Plenum

14/05/19

BBVN-FIVE-S2-SCRFI-0063

BBVN-FIVE-S2-SCRFI-0065

14/05/16

14/05/05
BV-137206/6011/SMZ140516/D092

BBVN-FIVE-S2-SCRFI-0062

Request
Date
Issuedfor Information

Access Control System


BV-137206/6011/SMZ140516/D091

BBVN-FIVE-S2-SCRFI-0061

Rev

14/05/16

14/05/08

Pre Filter for Ventillation System

Randy
3A3zise drawings

VentillationSystem for Toilet: Air Grill W/O Duct


BV-137206/6011/SMZ140516/D096

14/05/16

VentillationSystem for Toilet: Air Grill W/O Duct

Randy
1A3zise drawing

OUT-GOING

Rev

BBVN-FIVE-S2-SCRFI-0068

Date Issued

Date
Required
Reply

14/05/05

14/05/08

INCOMING

14/05/05

14/05/05

14/05/05

14/05/06

BBVN-FIVE-S2-SCRFI-0073

14/06/03

14/05/08
14/05/16

14/05/09

Provisional Sum Items Information

Stage 1 Clean Room Plenum

Drain Pipe in IPQC Lab

Randy

Randy
1A3zise drawing

Thanh/Duong-An

Beam & Stair Confliction

1A3zise drawings
1A3size drawing

14/05/16

Beam & Stair Confliction

14/05/07

14/05/09

CR4-Wall Type

14/05/16

2A3zise drawings

Stage 1 Busbar BB4 400A Relocation

14/05/14

14/05/13

Randy

Beam & Stair Confliction


14/05/16

Author/Delivered
to

Randy

Drain Pipe in IPQC Lab

BV-137206/6011/SMZ-140
BBVN-FIVES2-SC-RFI0073/R1

Attachment

Stage 1 Busbar BB4 400A Relocation

BV-137206/6011/SMZ140516/D103
BBVN-FIVES2-SC-RFI0072 (ADD.01)

14/05/16

14/05/08

BV-137206/6011/SMZ140516/D098

BBVN-FIVE-S2-SCRFI-0072

Title

Stage 1 Clean Room Plenum

BV-137206/6011/SMZ140602/D125

BBVN-FIVE-S2-SCRFI-0071

14/05/09

14/05/08
BV-137206/6011/SMZ140516/D097

BBVN-FIVE-S2-SCRFI-0070

Request
Date
Issuedfor Information

Provisional Sum Items Information


BV-137206/6011/SMZ140507/D065

BBVN-FIVE-S2-SCRFI-0069

Rev

Thanh

Thanh

CR4-Wall Type
CR4-Wall Type

Thanh

OUT-GOING

BBVN-FIVE-S2-SCRFI-0074

Rev

Date Issued

14/05/07

Date
Required
Reply
14/05/10

INCOMING

14/05/07

14/05/08

14/05/08

14/05/11

BBVN-FIVE-S2-SCRFI-0078

14/05/09

14/05/12

14/05/12

Balancing Valve for Chiller

14/05/22

Author/Delivered
to
Randy

2A3zise drawings

Randy

AHU Chiller Pipe Connection

Thanh

BV-137206/6011/SMZ140516/D099

14/05/16

C5-1 & Anchor Steel Plate

BV-137206/6011/SMZ140509
BV-137206/6011/SMZ-140

14/05/12

Accesss Control Module

Randy

SB1 Steel Beam Connection

Thanh

14/05/16

14/05/15
BV-137206/6011/SMZ140522/D114

BBVN-FIVE-S2-SCRFI-0080

Attachment

C5-1 & Anchor Steel Plate

BV-137206/6011/SMZ140516/D100

14/05/12

Title

AHU Chiller Pipe Connection

14/05/10

BBVN-FIVE-S2-SCRFI-0077

BBVN-FIVE-S2-SCRFI-0079

14/05/16

14/05/10
BV-137206/6011/SMZ140522/D116

BBVN-FIVE-S2-SCRFI-0076

Request
Date
Issuedfor Information

Balancing Valve for Chiller


BV-137206/6011/SMZ140516/D102

BBVN-FIVE-S2-SCRFI-0075

Rev

14/05/22

14/05/15

SB1 Steel Beam Connection

1A3zise drawing

Smoke Exhaust Static Pressure Calculation

D61, 2A3size drawings,


tabulation

Quang

1A4size photo & 2A3size


drawings

Randy

Smoke Exhaust Static Pressure Calculation

Water Tank Outlet and Gate Valve


BV-137206/6011/SMZ140606/D143

14/06/06

3A3zise drawings

Water Tank Outlet and Gate Valve

OUT-GOING

BBVN-FIVE-S2-SCRFI-0081

Rev

Date Issued

Date
Required
Reply

14/05/13

14/05/16

INCOMING

14/05/13

14/05/13

14/05/13

14/05/13

14/05/13

14/05/13

14/05/15

14/05/16

Title

Attachment

14/05/15

14/05/16
BV-137206/6011/SMZ140515/D071

14/05/15

Author/Delivered
to

Load Power Schedule& 2A3size


drawings
Load Power Schedule& 4A3size
drawings

Randy

LV Panel DB-1A-3 Modification

Load Power Schedule + Drawings

Randy

LV Panel DB-1A-3 Modification

Load Power Schedule

LV Panel DB-MCC2 Modification

Schedule + Drawings

LV Panel DB-MCC2 Modification

Schedule + 2A3size Drawings

LV Panel DB-SCHWP-02, 03 Modification

Schedule, 2A3size drawings

LV Panel DB-SCHWP-02, 03 Modification

Schedule, 2A3size drawings

LV Panel DB-MCC3-1&DB-MCC3-2 Modification

Schedule & 2A3size drawings

Lv Panel DB-MCC3-1&DB-MCC3-2 Modification

Schedule & 2A3size drawings

M&E Proposed Change

LV Panel Modification: Analog Type Meter to Digital Multimeter


BV-137206/6011/SMZ140515/D071

BBVN-FIVE-S2-SCRFI-0087

14/05/15

14/05/16
BV-137206/6011/SMZ140515/D071

BBVN-FIVE-S2-SCRFI-0086

14/05/15

14/05/16
BV-137206/6011/SMZ140515/D071

BBVN-FIVE-S2-SCRFI-0085

14/05/15

14/05/16
BV-137206/6011/SMZ140515/D071

BBVN-FIVE-S2-SCRFI-0084

14/05/15

14/05/16
BV-137206/6011/SMZ140515/D071

BBVN-FIVE-S2-SCRFI-0083

Request
Date
Issuedfor Information

LV Panel DB-1A-2 Modification


BV-137206/6011/SMZ140515/D071

BBVN-FIVE-S2-SCRFI-0082

Rev

Randy

Randy

Randy

Randy

LV Panel Modification: Analog Type Meter to Digital Multimeter

Main Switchboard A&B Modification

2A3size drawings

Main Switchboard A&B Modification

2A3size drawings

Randy

OUT-GOING

BBVN-FIVE-S2-SCRFI-0088

Rev

Date Issued

Date
Required
Reply

14/05/13

14/05/16

INCOMING

BV-137206/6011/SMZ140515/D071

BBVN-FIVE-S2-SCRFI-0089

14/05/22

15/05/13

14/05/15

14/05/16

14/05/17

14/05/17

14/06/06

14/06/03

14/05/19

14/0521
14/05/22

Author/Delivered
to

LV Panel DB-M/C-1&2, DB-CH-03 Modification

5A3size drawings

MSB-A New MCCB for AHU-04 Supply & Return Fans

2A4size photos&data sheet,


1A3size drawing

Randy

Randy

Beam B12 size

2A3size drawings

Thanh

Beam B12 size

2A3size drawings

Duct Pressure (Low & Medium)

Schedule

Randy

1A3size drawing

Randy

2A3size drawings

Randy

Technical Specification &


1A3size drawing

Randy

MSB-A New MCCB for AHU-04 Supply & Return Fans

Duct Pressure (Low & Medium)

Generator Delivery

AHU Opening

CCTV Connection Module


BV-137206/6011/SMZ140522/D115

Attachment

5A3size drawings

AHU Opening
14/06/10

Title

LV Panel DB-M/C-1&2, DB-CH-03 Modification

Generator Delivery

BV-137206/6011/SMZ140610/D161

BBVN-FIVE-S2-SCRFI-0094

14/05/16

14/05/21
BV-137206/6011/SMZ140602/D127

BBVN-FIVE-S2-SCRFI-0093

14/07/04

14/05/16
BV-137206/6011/SMZ140606/D144

BBVN-FIVE-S2-SCRFI-0092

14/05/15

14/05/17
BV-137206/6011/SMZ140515/D104

BBVN-FIVE-S2-SCRFI-0091

Request
Date
Issuedfor Information

14/05/24
BV-137206/6011/SMZ140704/D233

BBVN-FIVE-S2-SCRFI-0090

Rev

CCTV Connection Module

OUT-GOING

BBVN-FIVE-S2-SCRFI-0095

Rev

Date Issued

Date
Required
Reply

14/05/22

14/05/24

INCOMING

14/05/22

14/05/22

14/05/22

14/05/22

14/05/22

14/05/23

Fusible Link Temperature Requirement for Smoke Duct Fire Damper

1A3size drawing

Randy

The Brick Jamb at Door Locations

1A4Aize photo & 13A3size


drawings

Thanh

4A3size drawings

Thanh

6A3size drawings

Thanh / Duong

Water Chiller Valve Size

14/07/09

Water Chiller Valve Size

Motorized Valve for Chiller - 03

14/05/23

14/05/25
14/06/16

14/05/26

The Brick Jamb at Door Locations

Septic Tank
BV-137206/6011/SMZ140709/D244

BBVN-FIVE-S2-SCRFI-0101

Randy

14/06/25

14/05/24

BV-137206/6011/SMZ140616/D176

BBVN-FIVE-S2-SCRFI-0100

Data sheet + Specification

Return Air Grille

Motorized Valve for Chiller - 03

BV-137206/6011/SMZ140523/D117

BBVN-FIVE-S2-SCRFI-0099

Randy

14/07/09

14/07/04

14/07/09

14/05/25

Septic Tank

Ceiling Frame Connection Detail


BV-137206/6011/SMZ140604/D129

Author/Delivered
to

2A3 size drawings

Return Air Grille

14/05/25

Attachment

Randy

Water Chiller Valve Size

BV-137206/6011/SMZ140704/D234

BBVN-FIVE-S2-SCRFI-0098

Title

1A3sze drawing

14/06/11

14/0525
BV-137206/6011/SMZ140624/D195
BV-137206/6011/SMZ140709/D243

BBVN-FIVE-S2-SCRFI-0097

Request
Date
Issuedfor Information

Return Air Grille


BV-137206/6011/SMZ140610/D168
BV-137206/6011/SMZ140709/D242

BBVN-FIVE-S2-SCRFI-0096

Rev

14/06/05

Ceiling Frame Connection Detail

OUT-GOING

BBVN-FIVE-S2-SCRFI-0102

Rev

Date Issued

Date
Required
Reply

14/05/23

14/05/24

INCOMING

BV-137206/6011/SMZ140523/D118

Rev

Request
Date
Issuedfor Information

BBVN-FIVE-S2-SCRFI-0104

14/05/27

BBVN-FIVE-S2-SCRFI-0105

14/05/28

14/05/28

BBVN-FIVE-S2-SCRFI-0107

14/05/30

14/05/30

Sanitary Fixture

Randy

Sanitary Fixture

New Production Machine Layout

14/06/10

New Production Machine Layout

1A3size drawing

Master Key Schedule


14/06/25

14/05/31
14/06/07

14/06/03

14/06/05
14/06/05

1A3size drawing

Duong

1A3size drawing

Randy

2A3size drawings

Randy

LCP-P2-G-1 Relocation to Stage 1 Staircase

Relocation of utilities from under to above of secondary support


BV-137206/6011/SMZ140604/D130

Mr. Thanh

Structure & Finishing 1Fl Toilet

LCP-P2-G-1 Relocation to Stage 1 Staircase


14/06/03

Randy

Master Key Schedule

Structure & Finishing 1Fl Toilet

BV-137206/6011/SMZ140602/D123

BBVN-FIVE-S2-SCRFI-0108

Tung

14/06/06

14/05/31

BV-137206/6011/SMZ140607/D148

Author/Delivered
to

Fastener Securement Deck Lap

New Production Machine Layout

BV-137206/6011/SMZ140625/D198

BBVN-FIVE-S2-SCRFI-0106

14/06/03

14/05/30
BV-137206/6011/SMZ140606/D146
BV-137206/6011/SMZ140610/D162

Attachment

14/05/23

BBVN-FIVE-S2-SCRFI-0103
BV-137206/6011/SMZ140602/D128

Title

Relocation of utilities from under to above of secondary support

OUT-GOING

Rev

BBVN-FIVE-S2-SCRFI-0109

Date Issued

Date
Required
Reply

14/05/30

14/06/04

INCOMING

14/05/31

14/06/2

14/06/19

14/06/02

14/06/02

BBVN-FIVE-S2-SCRFI-0114

Title

14/06/07

Attachment

Author/Delivered
to

4A3size drawings

Thanh

Relocation of Existing Pole Light, CCTV, Fire Hydrant Pillar &


Cabinet
Relocation of Existing Pole Light, CCTV, Fire Hydrant Pillar &
Cabinet

2A3size drawings

Randy

Aluminum Cover Details @ GL A&Z

6A3size drawings & 1 A3size


drawing for REFERENCE

Thanh

Aluminum Cover Details @ GL A&Z_Rev.1

SMZ_140605/D137(RFI_111)
7A3size drawings

Thanh

Aluminum Cover Details @ GL A&Z_Rev.1

SMZ_140605/D137(RFI_111)
7A3size drawings

Thanh

Steel Lintel for Alu door & window

1A3size drawing

Thanh

6A3size drawings

Thanh

C8 Column along GL-E size

Aluminum Cover Details @ GL A&Z

Steel Lintel for Alu door & window

Top Beam @ Gridline 21


Top Beam @ Gridline 21

14/06/09

14/06/14

Top Beam @ Gridline 21

11A3size drawings included in


IN_ASD-0020 dated28-May-2014

Thanh

14/06/02

14/06/05

Wall Type 1b Detail

6A3size drawings

Thanh

1A3size drawing

Thanh

BV-137206/6011/SMZ140607/D150

BBVN-FIVE-S2-SCRFI-0115

14/06/07

14/06/05
BV-137206/6011/SMZ140607/D152

BBVN-FIVES2-SC-RFI0113/R1

14/06/26

14/06/07
BV-137206/6011/SMZ140607/D149

BBVN-FIVE-S2-SCRFI-0113

14/06/05

14/06/24

BV-137206/6011/SMZ140626/D207

BBVN-FIVE-S2-SCRFI-0112

14/06/25

14/06/05
BV-137206/6011/SMZ140605/D137

BBVN-FIVES2-SC-RFI0111/R1

14/06/07

14/06/07
BV-137206/6011/SMZ140625/D199

BBVN-FIVE-S2-SCRFI-0111

Request
Date
Issuedfor Information

C8 Column along GL-E size


BV-137206/6011/SMZ140607/S153

BBVN-FIVE-S2-SCRFI-0110

Rev

14/06/02

14/06/07

14/06/07

Wall Type 1b Detail

Double Glass Specification

OUT-GOING

Rev

Date Issued

Date
Required
Reply

INCOMING

BV-137206/6011/SMZ140607/D151
BBVN-FIVES2-SC-RFI0115/R1

14/06/09

14/06/05

Request
Date
Issuedfor Information

14/06/07

14/06/14

BV-137206/6011/SMZ140614/D175

BBVN-FIVE-S2-SCRFI-0116

Rev

14/06/12

14/06/14

Title

Attachment

Author/Delivered
to

Double Glass Specification


Double Glass Specification

Description of Work

Thanh

Double Glass Specification

Description of Work

Thanh

Concrete Apron to the Curb for Asphalt Road

1A4size photo, 2A3size drawings

Le, Thanh

OUT-GOING

CODE

Date Issued

BBVN-FIVE-S2-RFC001

BBVN-FIVE-S2-RFC002

BBVN-FIVE-S2-RFC003

14/04/12
BBVN-FIVES2-RFC-003

INCOMING

Request for Information


Title

BV-137206/6011/SMZ-140314/D017

14/03/14

Bus duct from Aluminum to Copper

BV-137206/6011/SMZ-140327/D025

14/03/27

Bus duct from Aluminum to Copper. Approval

BV-137206/6011/SMZ-140318/D020

14/03/18

Trench and Backfilling under Ground Slab

BV-137206/6011/SMZ-140522/D109

14/05/22

Trench and Backfilling under Ground Slab_Approval

BV-137206/6011/SMZ-140314/D018

14/03/14

Fire Fighting Pipe Location

14/06/03

Fire Fighting Pipe


BV-137206/6011/SMZ-140627/D217

BBVN-FIVE-S2-RFC004

Date Issued

14/06/27

14/04/12
BV-137206/6011/SMZ-140423/D053

Attachment

Author/Delivered to

RFC form BBVN -FIVE-S2-RFC0001


RFC form BBVN -FIVE-S2-RFC0001 and Estimsation (VO)

Mr. Ujiie

BBVN-FIVE-S2-RFC-0002, 2
drawings A3
BBVN-FIVE-S2-RFC-0002, 4
drawings A3

Mr. Hoa

BBVN-FIVE-S2-RFC-0003,2
A3size drawings, 1 sketch
Cost Estimation

Tung

Fire Fighting Pipe_Approval

Design Change: (M&E) Addition Floor drain (FD) at ground and first
floor
Design Change: (M&E) Addition Floor drain (FD) at ground and first
floor. Rejected.

BBVN - FIVE-S2-RFC-0004,
1A3 size drawing
BBVN - FIVE-S2-RFC-0004,
1A3 size drawing

Mr. Ujiie

14/04/29

Conduit from PVC to GI

BBVN - FIVE-S2-RFC-0005,
1A4size page, Comparison Sheet

Mr. Ujiie

14/05/19

Conduit from PVC to GI

14/04/23

Galvanized Fire Fighting Pipe

BBVN - FIVE-S2-RFC-0006

Mr. Mike

Galvanized Fire Fighting Pipe_V.O

2 options

Mr. Quang

Mr. Mike

14/04/23

BV-137206/6011/SMZBBVN-FIVE-S2-RFC005

14/04/29

BV-137206/6011/SMZ-140519/D105
BV-137206/6011/SMZBBVN-FIVE-S2-RFC0006

BV-137206/6011/SMZ-140423/D048
BBVN-FIVES2-RFC-0006

14/06/03
BV-137206/6011/SMZ-140627/D218

14/06/27

Galvanized Fire Fighting Pipe_Approval

14/04/23

Lighting Poles

BBVN - FIVE-S2-RFC-07

Lighting Poles

BBVN - FIVE-S2-RFC-07

BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0007

BV-137206/6011/SMZ-140423/D049
BBVN-FIVES2-RFC-0007

14/05/25
BV-137206/6011/SMZ-140619/D185

BBVN-FIVES2-RFC-0007

14/06/30

BBVN-FIVE-S2-RFC0008
BBVN-FIVES2-RFC-0008

BBVN-FIVE-S2-RFC0009

14/06/19

Lighting Poles
Lighting Poles Arrangment_V.O

BV-137206/6011/SMZ-140423/D050

14/04/23

BV-137206/6011/SMZ-140715/D259

14/07/15

BV-137206/6011/SMZ-140423/D051

14/04/23

14/05/25

Lighting System at Warehouse


Lighting System at Warehouse

BV-137206/6011/SMZ-140

Estimation

BBVN - FIVE-S2-RFC-0008,
1A4size drawing
Estimation, Variation

Mr. Mike

BBVN - FIVE-S2-RFC-0009

Mike, Tung

Lighting System at Warehouse_Approval

Roof Insulation Material

Status

Date
Deliverd to
Author

OUT-GOING

CODE

Date Issued

INCOMING

Date Issued

Request for Information


Title

Attachment

Author/Delivered to

BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0010

BV-137206/6011/SMZ-140423/D052

14/04/23

Clean Room Floor Material

BV-137206/6011/SMZ-140428/D057

14/04/28
14/05/19

RFC-10_ Clean Room Floor Material. Additional Details for Static


Conductive Vinyl
Static Conductive Vinyl Floor

14/05/28

Static Conductive Vinyl Floor

BBVN-FIVES2-RFC-0010
BV-137206/6011/SMZ-140528/D121

BBVN-FIVE-S2-RFC0011

Ladder inside Septic Tank & Pump Pit No.1 & No.2
BV-137206/6011/SMZ-140627/D214

14/06/27

BBVN - FIVE-S2-RFC-0010, ACD-SC-01 Finishing & Material


Schedule
2A3size drawings
Form RFC-010 by SMZ;
Estimation & 1A3size drawing

Mike, Tung

Tung

Tung

BBVN - FIVE-S2-RFC-010

Mr. Le

BBVN - FIVE-S2-RFC-012

Mr. Ba Hoa

Ladder inside Septic Tank & Pump Pit No.1 & No.2

BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140
BBVN-FIVE-S2-RFC0012

14/05/13

Road, Ground slab & Natural Soil


BV-137206/6011/SMZ-140605/D131

14/06/05

Road, Ground slab & Natural Soil_Approval

BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0013

BV-137206/6011/SMZ-140

BV-137206/6011/SMZ-140627/D216

Biometric Access Control

14/06/27

BBVN - FIVE-S2-RFC-

a Thanh/Mike

Biometric Access Control

BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0014

14/05/13

Moisture barrier at clean room


BV-137206/6011/SMZ-140521/D110

BBVN-FIVE-S2-RFC0015

14/05/21

14/05/16

14/06/27

Mr. Tung

Moisture barrier at clean room_Rejected

Lighting Control Swich

BV-137206/6011/SMZ-140627/D219

BBVN - FIVE-S2-RFC-014,
Product Data Sheet

BBVN - FIVE-S2-AC-RFI-73,
BV-137206/6011/SMZ140509/D069, 2A3size drawings

Randy/Ujiie

BBVN - FIVE-S2-SC-RFI-77, BV137206/6011/SMZ-140509/D070


dated 9May2014, 1A3soze
drawing

Randy/Ujiie

Lighting Control Swich_Approval

BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0016

'14/05/16

Control Module for Access System

BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140

Status

Date
Deliverd to
Author

OUT-GOING

CODE

Date Issued

INCOMING

Date Issued

Request for Information


Title

Attachment

Author/Delivered to

BV-137206/6011/SMZ-

BBVN-FIVE-S2-RFC0017

14/05/15

Fire Hose Reel Supply Connection


BV-137206/6011/SMZ-140619/D180

BBVN - FIVE-S2-RFC-

Randy

BV

14/06/19

Fire Hose Reel Supply Connection_Approval

14/05/20

Archive door relocation

BBVN - FIVE-S2-RFC-

Archive door relocation

1A3size drawing
BBVN - FIVE-S2-RFC-018;
2A3size drawings

BV

BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-

BBVN-FIVE-S2-RFC0018

BV-137206/6011/SMZ-140520/D106

BBVN-FIVES2-RFC-0018

14/05/25

BBVN-FIVE-S2-RFC0019
BBVN-FIVES2-RFC-0019

BV-137206/6011/SMZ-140603/D124

14/06/04

Archive Door Relocation_Approval

BV-137206/6011/SMZ-140620/D193

14/06/20

Ante-chamber to toilet-Carpet Tiles_Approval

BV-137206/6011/SMZ-140520/D107

14/05/20

IT Shop and server room - Floor Vinyl tiles

BBVN - FIVE-S2-RFC-19

BV

IT Shop and server room - Floor Vinyl tiles

BBVN - FIVE-S2-RFC-19,
2A4size drawing

SMZ

14/05/25
BV-137206/6011/SMZ-140605/D132

14/06/05

IT Shop and server room - Floor Vinyl tiles_Approval

14/05/20

Ante Chamber to toilet - Carpet Tiles

BV-137206/6011/SMZBV-137206/6011/SMZ-

BBVN-FIVE-S2-RFC0020

BV-137206/6011/SMZ-140520/D108
BBVN-FIVES2-RFC-0020

14/05/25

Ante Chamber to toilet - Carpet Tiles


BV-137206/6011/SMZ-140605/D136

BBVN-FIVES2-RFC-0020

14/06/05

14/06/10

BBVN - FIVE-S2-RFC-20;
1A3size drawing
Estimation, 2A3size drawings

BV
SMZ

Ante Chamber to toilet - Carpet Tiles


RFC-020 form (signature)

BV-137206/6011/SMZ-

BBVN-FIVE-S2-RFC0021

BV-137206/6011/SMZ-140522/D111

14/05/22

Temporary Backfilling of Stage 2 area_Approval

BBVN - FIVE-S2-RFC-

BV

14/05/22

3D Model_Approval

BBVN - FIVE-S2-RFC-22

BV

BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0022

BV-137206/6011/SMZ-140522/D112
BV-137206/6011/SMZ-140
BV-137206/6011/SMZ-140

Status

Date
Deliverd to
Author

OUT-GOING

CODE

Date Issued

INCOMING

Date Issued

BBVN-FIVE-S2-RFC0023

BV-137206/6011/SMZ-140606/D147

14/06/06

Request for Information


Title

Attachment

Author/Delivered to

BBVN - FIVE-S2-RFCWater Supply System _ Change the Pipe size & Pipe route, chang pump Form RFC-023, SMZUjiie/Randy/Quang
capacity
140516/D086 dated 26-May-2014
(for RFI-055), data
sheet&4A3size drawings
Water Supply System _ Approval
Form RFC-023; SMZ140516/S086 dated 16-May-2014;
Water Supply Calculation;
4A3size drawings; 1A3size
drawings list

BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0024

14/05/21

Fire Fighting System _ Change model & physical data of OS&Y valve
from OF200 to OF200F & from cast iron to ductile iron
BV-137206/6011/SMZ-140609/D156

14/06/09

BBVN - FIVE-S2-RFC-0024,
Viking letter, catalogue, data sheet

Fire Fighting System _ Change model & physical data of OS&Y valve
from OF200 to OF200F & from cast iron to ductile iron_Approved

Ujiie

Ujiie

BV-137206/6011/SMZ-140

BBVN - FIVE-S2-RFCBV-137206/6011/SMZ-140
BBVN-FIVE-S2-RFC0025

14/05/21

Socket and Data Location at Clean Room


BV-137206/6011/SMZ-140627/D215

BBVN-FIVE-S2-RFC0026

14/06/27

BV-137206/6011/SMZ-14070//D123
BBVN-FIVES2-RFC-0026

Ujiie

Socket and Data Location at Clean Room

Fire Smoke Supply Air Fans

BBVN - FIVE-S2-RFC-

Fire Smoke Supply Air Fans

Cost estimation, D223 (RFC-26),


3A3size drawings

Ujiie

14/10/01

Fire Smoke Supply Air Fans

Cost estimation, 1A3size drawing

Ujiie

14/10/06

Fire Smoke Supply Air Fans

Cost estimation

Tung

14/08/02

BB

BV-137206/6011/SMZ-140
BBVN-FIVES2-RFC-0026
BBVN-FIVES2-RFC-0026
BBVN-FIVES2-RFC-0026

BV-137206/6011/SMZ-141010//D391

14/10/10

BBVN-FIVE-S2-RFC0027

Fire Smoke Supply Air Fans_APPROVED

Septic Tank Ladder Casting into Concrete


BV-137206/6011/SMZ-140605/D133
BV-137206/6011/SMZ-140

14/06/05

Septic Tank Ladder Casting into Concrete_Rejected

BBVN - FIVE-S2-RFC-

Status

Date
Deliverd to
Author

OUT-GOING

CODE

BBVN-FIVE-S2-RFC0028

Date Issued

INCOMING

Date Issued

14/05/25

Request for Information


Title

Grafting Filter for rubish


BV-137206/6011/SMZ-140619/D189

14/06/19

Attachment

Author/Delivered to

BBVN - FIVE-S2-RFC-028;
Estimation, 2A3size drawings

Grafting Filter for rubish

BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0029

14/05/29

BBVN-FIVE-S2-RFC0030

Change of Ground Beam Profile_Warehouse GL Z and 21


BV-137206/6011/SMZ-140605/D134

14/06/05

Change of Ground Beam Profile_Warehouse GL Z and 21

BV-137206/6011/SMZ-140626/D203

14/06/26

Change of Ground Beam Profile_Warehouse GL Z and 21_Approval

BV-137206/6011/SMZ-140529/D120

14/05/29

Pharmaceutical Pipe & Sleeve

BV-137206/6011/SMZ-140530/D122

14/05/31

Pharmaceutical Pipe & Sleeve_Approval

14/06/02

Additional Drain for IPQC Room

14/06/07

Additional Drain for IPQC Room_Rejected

BBVN-FIVE-S2-RFC0031
BV-137206/6011/SMZ-140607/D154

BBVN - FIVE-S2-RFC-

Thanh

BBVN - FIVE-S2-RFC-

BBVN - FIVE-S2-RFC-

BV-137206/6011/SMZ-140
BBVN-FIVE-S2-RFC0032

14/05/31

BBVN-FIVES2-RFC-0032

BBVN-FIVE-S2-RFC0033

Compressor Pipe Fittings Brand Name


BV-137206/6011/SMZ-140605/D135

14/06/05

Compressor Pipe Fittings Brand Name

BV-137206/6011/SMZ-140605/D141

14/06/06

Compressor Pipe Fittings Brand Name_Approved

BBVN - FIVE-S2-RFC-32

Ujiie

14/06/09

Compressor Pipe Fittings Brand Name

14/06/02

Ventilation Fan Brand (From Fantech replaced by Krugger)

BBVN - FIVE-S2-RFC-

Ujiie

Ventilation Fan Brand (From Fantech replaced by Krugger)_Approval

Form RFC-33, Main Equipment


List, Technical Specification

Ujiie

Painting on Brick Wall at Air Shaft

BBVN - FIVE-S2-RFC-

Tung

BV-137206/6011/SMZ-140605/D142

14/06/06

BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0034

BBVN-FIVE-S2-RFC0035

14/06/03

14/06/09

BV-137206/6011/SMZ-140607/D155

14/06/07

Painting on Brick Wall at Air Shaft

BV-137206/6011/SMZ-140627/D220

14/06/27

Painting on Brick Wall at Air Shaft_Approval

AC Drain and Compressor Drain

4A43sizedrawings

Ujiie/Randy

Status

Date
Deliverd to
Author

OUT-GOING

CODE

Date Issued

INCOMING

BV-137206/6011/SMZ-140612/D171

Date Issued

14/06/12

Request for Information


Title

Attachment

Author/Delivered to

AC Drain and Compressor Drain_Approved

BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0036

14/06/09

BBVN-FIVE-S2-RFC0037

BBVN-FIVE-S2-RFC0038

Ball Valve for Handspray

BV-137206/6011/SMZ-140619/D181

14/06/19

Ball Valve for Handspray_Approval

BV-137206/6011/SMZ-140609/D158

14/06/09

Copper Pipe for Water Heater

BV-137206/6011/SMZ-140620/D194

14/06/20

Copper Pipe for Water Heater_Approval

BV-137206/6011/SMZ-140609/D159

14/06/09

Steel Structure Color

BV-137206/6011/SMZ-140619/D184

14/06/19

Steel Structure Color_Rejected

BBVN-FIVE-S2-RFC0039

BBVN-FIVES2-RFC-0040

BV-137206/6011/SMZ-140609/D160

14/06/09

Flood Lights

BV-137206/6011/SMZ-140619/D186

14/06/19

Flood Lights

BV-137206/6011/SMZ-140609/D157

14/06/09

Chilled water system bypass

14/06/27

Chilled water system bypass_V.O


BV-137206/6011/SMZ-140702/D226

14/07/02

14/06/10

BV

14/06/26

BV

BV
Estimation, drawing

Chilled water system bypass

High Speed Door 2.G.D.42 & 2.G.D.46 change from Horman Door to
Dynaco Door
BV-137206/6011/SMZ-140626/D205

Randy

BV

Flood Lights

BBVN-FIVE-S2-RFC0040

BBVN-FIVE-S2-RFC0041

BBVN - FIVE-S2-RFC-0034;
Cost Estimation; SMZ140602/D128 dated 2nd June
2014; RFI-103_Sanitary Fixtures
dated 23-May -2014; IN_AMEP0046 cover page dated 15-May2014

High Speed Door 2.G.D.42 & 2.G.D.46 change from Horman Door to
Dynaco Door_Approval

Horman Confirmation Letter,


Dynaco Catalogue, Reference
Projects

Tung

Status

Date
Deliverd to
Author

OUT-GOING

CODE

BBVN-FIVE-S2-RFC0042

Date Issued

INCOMING

Date Issued

14/06/10

Waterproofing between brick wall and concrete column


BV-137206/6011/SMZ-140612/D172

14/06/12

BBVN-FIVE-S2-RFC0043
14/06/26

BBVN-FIVE-S2-RFC0044

Attachment

Estimation, 4A3size drawings

Tung

Sikafloor 81 Epocem 3mmthick to


Flowcem 2mm thick

Tung

Moisture Barrier at Clean Room_Approval

Earth Pit Dimension


BV-137206/6011/SMZ-140804/D294

14/08/04

BBVN-FIVE-S2-RFC0045

Duong

Earth Pit Dimension_Approval

Raised Floor Outlet Box


BV-137206/6011/SMZ-140619/D187

14/06/19

BBVN-FIVE-S2-RFC0046

Ujiie/Quang

Raised Floor Outlet Box

Drainage System Submersible Pump


BV-137206/6011/SMZ-140619/D182

BBVN-FIVE-S2-RFC0047

14/06/19

14/06/13

BBVN-FIVES2-RFC0047/R1

14/06/19

14/07/10

BBVN-FIVE-S2-RFC0048
BBVN-FIVES2-RFC0048/R1

14/06/17

Ujiie/Quang

Drainage System Submersible Pump_Approval

Chiller CH-03 Additional Valve

BV-137206/6011/SMZ-140619/D188

Author/Delivered to

Waterproofing between brick wall and concrete column_Rejected

Moisture Barrier at Clean Room

BV-137206/6011/SMZ-140626/D204

BBVN-FIVE-S2-RFC0049

Request for Information


Title

Estimation; SMZ-140602/D127
dated 3-Jun-2014; Product Data
Sheet

Ujiie/ Quang

Chiller CH-03 Additional Valve


Chiller CH-03 Additional Valve_Rev.1

BV-137206/6011/SMZ-140804/D295

14/08/04

Chiller CH-03 Additional Valve_Rev.1 _Approval

BV-137206/6011/SMZ-140731/D286

14/07/31

IT Adjustment

BB

BV-137206/6011/SMZ-140822/D331

14/08/22

IT Adjustment

SMZ

BV-137206/6011/SMZ-140917/D371

14/09/18

IT Adjustment_APPROVAL

Construction Joint on Ground Floor Slab

1A3size drawings, 1 A3 drawing


141-HBPE-S-CD-MB-214

Le/Thanh/nguyen

Status

Date
Deliverd to
Author

OUT-GOING

CODE

Date Issued

INCOMING

BV-137206/6011/SMZ-140626/D202
BBVN-FIVES2-RFC0049/R1

BBVN-FIVES2-RFC-0051
(ADD.01)

BBVN-FIVES2-RFC0051/R1

Form, 3A3size drawings

Phuc. Thanh

4A3size drawings

Ujiie/Quang

Giang

Construction Joint on Ground Floor Slab _Approved

Water Heater Safety Walve Drain Pipe_Approved

VRV Room Steel Work Member

3A3size drawings

14/06/25

VRV Room Steel Work Member_Additional Document

Comparison for geometric


properties of sections, 3A3size
drawings

Giang/Duong

Geometric Properties, 1A3size


drawing

Tung/Giang

14/07/01

14/07/02

VRV Room Steel Work Member


VRV Room Steel work member_Rev.1

14/07/23

14/06/20

VRV Room Steel work member_Rev.1 _ Approval

Priority Power Supply for DB-SP Connection Point


BV-137206/6011/SMZ-140627/D221

14/06/27

14/06/24
BV-137206/6011/SMZ-140711/D251

14/07/11

14/07/10
BV-137206/6011/SMZ-140804/D297

BBVN-FIVE-S2-RFC0055

Author/Delivered to

14/06/17

BV-137206/6011/SMZ-140723/D282

BBVN-FIVE-S2-RFC0054

14/06/19

Attachment

Construction Joint on Ground Floor Slab_Approval

Water Heater Safety Walve Drain Pipe

BV-137206/6011/SMZ-140630/D122

BBVN-FIVE-S2-RFC0053

14/07/22

14/06/17

BBVN-FIVE-S2-RFC0051

Request for Information


Title

Construction Joint on Ground Floor Slab

BV-137206/6011/SMZ-140619/D183

BBVN-FIVE-S2-RFC0052

14/06/26

14/07/17

BV-137206/6011/SMZ-140722/D280

BBVN-FIVE-S2-RFC0050

Date Issued

14/08/04

14/07/10

3A3size drawings

Quang/Ujiie

Pit Support Meterial Change from GI to SUS304

4A3size drawings

Quang/Ujiie

Pit Support Meterial Change from GI to SUS304_Rejected

Estimation, 4A3size drawings

Concrete Apron to the kerbt for the asphalt road

3A3size drawings

Thanh

3A3size drawings

Thanh

Priority Power Supply for DB-SP Connection Point

Concrete Apron to the kerbt for the asphalt road_Approval

Asphalt road extension


BV-137206/6011/SMZ-140731/D290

14/07/31

Tung/Giang/Thanh/
Quang

Asphalt road extension_Approved

Thanh

Status

Date
Deliverd to
Author

OUT-GOING

CODE

BBVN-FIVE-S2-RFC0056

Date Issued

INCOMING

14/06/24

BBVN-FIVE-S2-RFC0057

14/06/26

14/06/24

BBVN-FIVE-S2-RFC0058
BV-137206/6011/SMZ-140731/D287

Estimation, SMZ-140515/D71
dated 15-May-2014, RFI-86 dated
13-May-2014, Panel List for
Multimeter, Technical
Specification

Quang/Ujiie

Product Data Sheet, AMEP 17


dated 24-Apr-2014, VAV
Terminal Unit Catalogue

Quang/Ujiie

VAV Communication Control_Approval

14/07/15

Ramp Adjustments

14/07/31

Ramp Adjustments

4A3size drawings

Ramp Adjustments

Estimation, 4A3size drawings,


2A3size photos, 1A3size sketch

14/08/29

14/06/30
14/09/19

BB
BV
SMZ/Tung

Ramp Adjustments_Approval

Raised Floor Outlet Box (From 4 nos. to 2 nos.)


BV-137206/6011/SMZ-140918/D375

Author/Delivered to

14/08/06

14/08/22

BV-137206/6011/SMZ-140829/D349

Attachment

LV Panel Load Technical Data Meter (from analog to digital)_Rejected

VAV Communication Control

BV-137206/6011/SMZ-140805/D299

BBVN-FIVES2-RFC-0058

Request for Information


Title

LV Panel Load Technical Data Meter (from analog to digital)

BV-137206/6011/SMZ-140626/D206

BBVN-FIVE-S2-RFC0059

Date Issued

form + ASD 60, ASD-60/R1 dated


30-June-2014

Raised Floor Outlet Box (From 4 nos. to 2 nos.)

Ujiie

BBVN-FIVE-S2-RFC0059

14/10/04

Clinic House Terrace Renovation

Cost estimation, 2A3size drawings

SMZ (BB)

BBVN-FIVE-S2-RFC0060

14/07/01

LV Panel Modification - DB-SCHWP-02,03

Estimation, 6A3size drawings

Ujiie

Dike Wall and Water Proofing at the Wet Area

9A3size drawings

Thanh

BV-137206/6011/SMZ-140

BBVN-FIVE-S2-RFC0061

14/07/04
BV-137206/6011/SMZ-140710/D247

14/07/10

Dike Wall and Water Proofing at the Wet Area

Status

Date
Deliverd to
Author

OUT-GOING

BBVN-FIVE-S2-RFC0062

CODE

Date Issued

INCOMING

14/07/04
BV-137206/6011/SMZ-140722/D278

BBVN-FIVE-S2-RFC0063

Date Issued

14/07/22

14/07/07
14/07/31

BBVN-FIVE-S2-RFC0064

14/07/10

14/07/10

14/07/18

diagram, photo A4size

Ujiie
Ujiie

Estimation, D176 (RFI-099),


14A4size drawings, 4A3size
drawings

RC for brickwalls at door/window/louver/opening locations_Approved

Reinforced Concrete post for intersecting brick wall


BV-137206/6011/SMZ-140718/D271

BBVN-FIVE-S2-RFC0066

14/07/31

Author/Delivered to

Hoang QC

Pressure gauge on the chilled water pipe for compressor_Approved

RC for brickwalls at door/window/louver/opening locations

BV-137206/6011/SMZ-140731/D291

Attachment

Waterproofing for Construction Joint (Casting Concrete for Ground


Slab)
Waterproofing for Construction Joint (Casting Concrete for Ground
Slab)_Approved

Pressure gauge on the chilled water pipe for compressor


BV-137206/6011/SMZ-140730/D288

BBVN-FIVE-S2-RFC0065

Request for Information


Title

Thanh

Thanh

14A3size drawings

Thanh

3A3size drawings

Thanh

Reinforced Concrete post for intersecting brick wall _ Rejected

Water Proofing for Septic Tank

Status

Date
Deliverd to
Author

Correspondence submission to PCI

Title

96

No.

To

CC:

Issued

Attachment

BBVN-FIVE-S2-SC-LTRENG-0030
BBVN-FIVE-S2-SC-LTRENG-0031
BBVN-FIVE-S2-SC-LTRENG-0032
BBVN-FIVE-S2-SC-LTRENG-0033
BBVN-FIVE-S2-SC-LTRENG-0034
BBVN-FIVE-S2-SC-LTRENG-0035

BV

BB

14/08/08

Confirmation of Pre-Action System Control Panel

BV

BB

08/11/08

ASD-0076/R2 - Fire Sprinkler FM Approvals

Mr. Ujiie

BV

BB

14/08/08

Shop Drawing Approvals

Mr. Ujiie

BV

BB

14/08/08

EVN Confirmation for Shutdown Schedule

Ujiie

BV

BB

14/08/08

MOM Item 8.5.46 Pipe Connection to Buffer Tank

2A3size drawings

Ujiie

BV

BB

14/08/09

BV-137206/609/140804/SI044 Pharma Proposed Floor Drain


Provision at Warehouse

Ujiie

BBVN-FIVE-S2-SC-LTRENG-0036
BBVN-FIVE-S2-SC-LTRENG-0037
BBVN-FIVE-S2-SC-LTRENG-0038

BV

BB

14/08/11

Support Fabrication

2A4size drawings, BV137206/609/140804/SI-44


dated 5-August-2014
Supporting Finishing table

BV

BB

14/08/08

Factory Visit/Inspection (Hainam Factory)

BV

BB

14/08/12

MOM-26 Item 9.42 FM-200 Refilling

BBVN-FIVE-S2-SC-LTRENG-0039
BBVN-FIVE-S2-SC-LTRENG-0040
BBVN-FIVE-S2-SC-LTRENG-0041
BBVN-FIVE-S2-SC-LTRENG-0042

BV

BB

14/08/12

BV-137206/6011/SMZ-140811/D308 RFC-088 Comment

BV

BB

14/08/12

ASD-130 Timber door and glass partition

BV

BB

14/08/14

BBVN-FIVE-S2-SC-AMEP-005A Comment

BV

BB

14/08/14

AMEP Comment Clarification BBVN-FIVE-S2-SC-AMEP-002/R2


Air Handing Unit 3&4

BBVN-FIVE-S2-SC-AMEP- Ujiie
005A
BBVN-FIVE-S2-SC-AMEP- Ujiie
002/R2 Air Handing Unit 3&4

BBVN-FIVE-S2-SC-LTRENG-0043
BBVN-FIVE-S2-SC-LTRENG-0044
BBVN-FIVE-S2-SC-LTRENG-0045

BV

BB

14/08/14

BV

BB

14/08/14

BV

BB

14/08/14

AMEP Comment Clarification BBVN-FIVE-S2-SC-AMEP-0045 Air


Compressor
AMEP Comment Clarification BBVN-FIVE-S2-SC-AMEP-001/R1
Air Cooled Chiller
AMEP Comment Clarification BBVN-FIVE-S2-SC-AMEP-0015/R2
LV Cable

BBVN-FIVE-S2-SC-AMEP0045 Air Compressor


BBVN-FIVE-S2-SC-AMEP001/R1 Air Cooled Chiller
BBVN-FIVE-S2-SC-AMEP0015/R2 LV Cable

2A3size drawings

Authored by
Mr. Ujiie

Ujiie
Ujiie

E-mail from FIKE Aisa Pacific Ujiie


(Clean Agent FM-200
Refilling for Fike's
System)&MOM-26 page 9 of
22
D308
Ujiie
Mike

Ujiie
Ujiie
Ujiie

Correspondence submission to PCI

No.

To

CC:

Issued

BBVN-FIVE-S2-SC-LTRENG-0046

BV

BB

14/08/14

MOM Item 11.12.11 AHU Coil

BBVN-FIVE-S2-SC-LTRENG-0047
BBVN-FIVE-S2-SC-LTRENG-0048
BBVN-FIVE-S2-SC-LTRENG-0049
BBVN-FIVE-S2-SC-LTRENG-0050

BV

BB

14/08/15

BV

BB

14/08/15

BB-FIVE AP-S2 Ref: BV-137206/609/140805/SI049 Zone 2


M&E Installation Works
Inspection Schedule for Transformer Delivery & Power On

BBVN-FIVE-S2-SC-LTRNS
ENG-0051
BBVN-FIVE-S2-SC-LTRBB
ENG-0052
BBVN-FIVE-S2-SC-LTRBB
ENG-0053
BBVN-FIVE-S2-SC-LTRNS
ENG-0054
BBVN-FIVE-S2-SC-LTRBV
ENG-0055
BBVN-FIVE-S2-SC-LTR- Nhat Hoa
ENG-0056
BBVN-FIVE-S2-SC-LTR- Dai Vu
ENG-0057

BBVN-FIVE-S2-SC-LTRENG-0058
BBVN-FIVE-S2-SC-LTRENG-0059
BBVN-FIVE-S2-SC-LTRENG-0060

Attachment

Authored by

MOM-26 page 11/22l Alko


Ujiie
letter (Capacity of Cooling
Coil in AHU of Bbraun Phase
2 Project), sketch, 2A3size
draiwng
Tu
Quang

14/08/19

BB-FIVE AP-S2 Ref: Non Compliance with Approved


Documentation
Transformer Factory Test Schedule

14/08/21

BB-FIVE-AP-S2-Ref: Re-Organization of Site Staff

BV

14/08/21

Smoke Exhaust Duct

BV

14/08/21

Transformer Inspection

Ujiie

14/08/22

Working Time

Ujiie

14/08/23

Remaining Works at Substation Area

Ujiie

14/08/23

Clean Room Vinyl Flooring Installation

1A3szie schedule

Tung QS

14/08/23

Clean Room Moisture Resistant Membrane Contract Award

1A3szie schedule

Tung QS

Contractors Scope of Work & Responsibilities prior to Transformer


Installation
EVN Checking

1A3size drawing

Tu

2A4size photos

Ujiie

BBVN - FIVE-AP-S2-RFI 180 Response - BV-137206/6011/SMZ140821/D324

3A4size colored photos

Tuan Anh /
Mike

NS
BV

Title

97

14/08/15
BB

BB

BV

14/08/29

BB

BV

14/08/29

BB

BV

14/08/30

Quang
Factory Acceptance Test
procedure for Transformer;
Test report of Transformer

Quang/Ujiie

Sasaki Toru
Duct & Fitting Schedule;
1A3size drawing

Ujiie

Correspondence submission to PCI

No.

To

CC:

Issued

BBVN-FIVE-S2-SC-LTRENG-0061

BB

BV

14/09/02

HILTI Female Type Anchor (Drop in Anchor)

Ujiie

BBVN-FIVE-S2-SC-LTRENG-0062
BBVN-FIVE-S2-SC-LTRENG-0063
BBVN-FIVE-S2-SC-LTRENG-0064
BBVN-FIVE-S2-SC-LTRENG-0065
BBVN-FIVE-S2-SC-LTRENG-0066
BBVN-FIVE-S2-SC-LTRENG-0067
BBVN-FIVE-S2-SC-LTRENG-0068
BBVN-FIVE-S2-SC-LTRENG-0069

VNC2

14/09/05

Site works progress and Outstanding Schedule of Works

Tu

14/09/08

Stage 1 Remaining Works (Interlocking Function Test)

14/09/08

Site Works Progress and Outstanding Schedule of Works

Tu

14/09/10

Provisional Sum Item 10.114 Installation of Loose Furniture Fixtures

Hoa

14/09/10

Stage 1 Underground Firefighting Works

Hoa

14/09/10

Chiller Equipment Delivery Schedule

Ujiie

14/09/11

Quality of Welding Work

NCR-06 dated 12-June-2014

Ujiie

BB

BV

14/09/12

Stage 1 Remaining Works (Interlocking Function Test) (ADD.01)

Ujiie/Tu

BBVN-FIVE-S2-SC-LTRENG-0070

BB

BV

14/09/13

MOM Item 11.20.18 Cable Spacer

MSB Panel Module Control


for Operation 1A3size
drawing
MOM No.30 page 21 of 31,
Product data sheet, 2A3size
drawings

LTR/VIE-001

BB

14/09/16

muon 02 khoa (1 khoa co, 1 khoa dien)

Toan

BBVN-FIVE-S2-SC-LTRENG-0071

BB

14/09/18

MOM Item 11.17.6 Pre-Action System

Confirmation letter from Ban Ujiie


Mai System JSC, Certificates,
1A3size drawings

BB

BV

VNC2
LS

BB, BV

NS
BB, BV
NS

BV

Title

98

Attachment

ETF-01 sheet (LV Room test


items_2 sheets)

Authored by

Ujiie

Ujiie/Tu

Correspondence submission to PCI

No.

To

CC:

Issued

BBVN-FIVE-S2-SC-LTRENG-0072
BBVN-FIVE-S2-SC-LTRENG-0073
BBVN-FIVE-S2-SC-LTRENG-0074

BB

BV

14/09/19

Material & Installation Flow Chart

BB

BV

14/09/19

Update Existing DB-1C, DB-1S; DB-1E

1A3size drawing

14/09/20

Air Compressor Delivery

BBVN-FIVE-S2-SC-LTRENG-0075
BBVN-FIVE-S2-SC-LTRENG-0076

BB

BV

14/09/26

Site Management

Internal Minutes for


Ujiie
material/Equipment Inspection
& Acceptance, AMEP-45,
C/O&C/Q
Ujiie

BB

BV

14/10/06

AHU Sealant - Sikaflex 221

BBVN-FIVE-S2-SC-LTRENG-0077

BB

BV

14/10/09

FM 200 Re-Filling

BBVN-FIVE-S2-SC-LTRENG-0078

BB

BV

14/10/09

Electrical Cable Color

BBVN-FIVE-S2-SC-LTRENG-0079

BB

BV

14/10/13

Grundfos Pump Certificate of Origin

14/10/02
14/10/13

muon 02 khoa (1 khoa co, 1 khoa dien)_3/10 den 17/10


Issue for Construction Drawing

BV

14/10/13

Stage 1 Clean Room

BV

14/10/16

AMEP-173 Ballast & Lamp for Lighting

NS

LTR/VIE-002
BB
BBVN-FIVE-S2-SC-LTR- NORTH
ENG-0080
STAR
BBVN-FIVE-S2-SC-LTRBB
ENG-0081
BBVN-FIVE-S2-SC-LTRBB
ENG-0082

Title

99

Attachment

Authored by
Ujiie
Ujiie

Confirmation letter from


Ujiie
manufacturer (AL-KO),
Product Data sheet for Onecomponent adhesive sealant;
Certificate Hygiene conformity
test
Letter FM 200 Filling time;
Tu
FIKE FIRE Suppression
System Distribution IN
VIETNAM
Tu

Confirmation letter from


Tu
Grundfos; Certificate of
Origin/Processing; Certificate
of Quality & Quantity; INAMEP-66/R1 dated 20-Jun2014
Toan
Tu
Thanh
Confirmation letter by
THORN, IN_AMEP-173
dated 9-October-2014

Ujiie

Correspondence submission to PCI

No.

To

CC:

Issued

BBVN-FIVE-S2-SC-LTRENG-0082/R1

BB

BV

14/10/17

AMEP-173 Ballast & Lamp for Lighting

BBVN-FIVE-S2-SC-LTRENG-0083
BBVN-FIVE-S2-SC-LTRENG-0084
BBVN-FIVE-S2-SC-LTRENG-0085
BBVN-FIVE-S2-SC-LTRENG-0086

BB

BV

14/10/17

AMEP-173 Ballast & Lamp for Lighting

BB

BV

14/10/20

Badge Printer & Card Sample

Ujiie

BB

BV

14/10/20

RFC-105 Response - AMS-140910/D361

Hoa

BB

BV

14/10/20

AMEP-179 Water Pump Tank

Confirmation letter from


Ujiie
A&M technical equipment;
Certificate authorised
distributorship, IN_AMEP 179
dated 20-October-2014,

BBVN-FIVE-S2-SC-LTRENG-0087

BB

BV

14/10/22

Motorized Valve for AHU

BBVN-FIVE-S2-SC-LTRENG-0088
BBVN-FIVE-S2-SC-LTRENG-0089
BBVN-FIVE-S2-SC-LTRENG-0090
BBVN-FIVE-S2-SC-LTRENG-0091
BBVN-FIVE-S2-SC-LTRENG-0092
BBVN-FIVE-S2-SC-LTRENG-0093

BB

BV

14/10/28

Door Fan Test

IN-AMEP-0036(A) dated 18- Ujiie


Oct-2014, AMEP-0036 dated
03-Jun-2014
Ujiie

14/10/27

Clean Room Ceiling Installation

Ujiie/Tu
Mr. Hoa

BBVN-FIVE-S2-SC-LTRENG-0093A

NS

Title

100

BB

BV

14/10/30

BB

BV

14/10/30

BV-137206/6011/SMZ-141027/D417 (RFC-123) Change of


Location for Louver Opening
FM 200 Refilling

BB

BV

14/10/31

Viet Kim Company - VRV Air Conditioning

BB

BV

14/11/04

MOM Item 8.5.71 RFC-26 Fire Smoke Supply Air Fans

BB

BV

14/11/04

MOM Item 8.5.71 RFC-26 Fire Smoke Supply Air Fans

Attachment
Confirmation letter by
THORN, IN_AMEP-173
dated 9-October-2014,
Comparison table Lighting
Specification, Technical
Specification, Product Data
Sheet

Confirmation Letter from


European Tech., JSC

Authored by
Ujiie

Tu
Tu

RFC-26 Additional OA
Tu
Supply Fan for Smoke
Exhaust,2A3size drawings;
List of Pending documents for
Resubmission
Tu

Correspondence submission to PCI

No.

To

CC:

Issued

BBVN-FIVE-S2-SC-LTRENG-0094
BBVN-FIVE-S2-SC-LTRENG-0095
BBVN-FIVE-S2-SC-LTRENG-0096
BBVN-FIVE-S2-SC-LTRENG-0097

BB

BV

14/11/10

Title

101

Attachment

BBVN-FIVE-S2-SC-AMEP_157: Ball Valve for Compressor Tie-in IN-AMEP-157


Work

Authored by

Ujiie

Correspondence submission to PCI

No.

To

CC:

Issued

Title

102

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

103

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

104

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

105

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

106

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

107

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

108

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

109

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

110

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

111

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

112

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

113

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

114

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

115

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

116

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

117

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

118

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

119

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

120

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

121

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

122

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

123

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

124

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

125

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

126

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

127

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

128

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

129

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

130

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

131

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

132

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

133

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

134

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

135

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

136

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

137

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

138

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

139

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

140

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

141

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

142

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

143

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

144

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

145

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

146

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

147

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

148

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

149

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

150

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

151

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

152

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

153

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

154

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

155

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

156

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

157

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

158

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

159

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

160

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

161

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

162

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

163

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

164

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

165

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

166

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

167

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

168

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

169

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

170

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

171

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

172

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

173

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

174

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

175

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

176

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

177

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

178

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

179

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

180

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

181

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

182

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

183

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

184

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

185

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

186

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

187

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

188

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

189

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

190

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

191

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

192

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

193

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

194

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

195

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

196

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

197

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

198

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

199

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

200

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

201

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

202

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

203

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

204

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

205

Attachment

Authored by

Correspondence submission to PCI

No.

To

CC:

Issued

Title

206

Attachment

Authored by

No.

Issued

Title

BV-140218-01
BV-140219-01

14/02/18
14/02/19

Standards form for reference


Benchmark Handover (Minutes of handover btw TONE, ACC &
BBVN)

BBVN-FIVE-S2-SC-TS-0001-14

14/02/26

BBVN-FIVE-S2-SC-TS-0002-14
BBVN-FIVE-S2-SC-TS-0003-14

14/02/27
14/02/28

CVs & Project Organizational Chart; Quality Management Plan ;


Project Execution Plan
Pile Survey Report (by Shimizu)

BBVN-FIVE-S2-SC-TS-0004-14
BBVN-FIVE-S2-SC-TS-0005-14

14/03/03
14/03/03

BBVN-FIVE-S2-SC-TS-0006-14
BBVN-FIVE-S2-SC-TS-0007-14
BBVN-FIVE-S2-SC-TS-0008-14

14/04/03
14/03/04
14/03/05

BBVN-FIVE-S2-SC-TS-0009-14
BBVN-FIVE-S2-SC-TS-00010-14

14/03/06
14/03/07

BBVN-FIVE-S2-SC-TS-00011-14
BBVN-FIVE-S2-SC-TS-00012-14
BBVN-FIVE-S2-SC-TS-00013-14

14/03/10
14/03/11
14/03/12

BBVN-FIVE-S2-SC-TS-00014-14

14/03/14

BBVN-FIVE-S2-SC-TS-00015-14
BBVN-FIVE-S2-SC-TS-00016
BBVN-FIVE-S2-SC-TS-00017

14/03/28
14/03/26
14/04/01

1.
BBVN-FIVE-S2-SC-AMS-0002-14 Method statement for temporary office, 2.
BBVN-FIVE-S2-SC-LET-ENG-0001-14 Pile survey report, 3.
BBVN-FIVE-S2-SC4.
BBVN-FIVE-S2-SC-ASD-0003-14 Approval for temporary site office shop
drawingASD-0003-14 Approval for signboard shop drawing, RFI_0002, RFI_0003,
Project Safety Plan, AME_001, AME_0002

Return borrowed documents


4 Method statements AMS-003-006 (water supply, sewage water,
temporary electricity, relocation of fire fighting) ,AMS-0001
(Pesticide), ADP-0006 (QCP-1), APD-0007 (QCP-2), RFI-0004 (Grid
line survey)
2 RFI 0005 & 0006, APD-0008 (ITPs)
Return borrowed documents
AMASA_0002 (geotextile), AMS-0001/R1 Pre-condition survey
method, RFI_0007 (hard copy of drawing with stamp)
ASD Site office _0.002/R3
AMASA_0003 (Concrete grade & Slump), APD_0009 Prj
Environmental Plan; RFI_0008_Brace steel structure
APD-0001/R1_Project Management Plan (Rev.1)
AMS_0007 (Pile rectification), AMS_0008 (AMS list)
AMASA_0003/R1 (concrete grade&slump), RFI_0009 (Design
Queries_M&E/Toilet), ASD_0002/R1 (Signboard Rev.1),
Geotextile additional document (Company profile) + 8 contracts for
reference of experience from TEINCO
Giay Chung nhan kiem dinh Dong ho nuoc Zenner- Comma/
Verification Certificate for Water Meter
Official Electric Meter Number showing dated 19 Feb 2014
Cerfiticate basic scaffolding course (Tubular)_Vu Viet Anh

Quatity
(Copies)

BV/SMZ FOR
CON Chop
Thu
Thu

Lan

BBVN-FIVE-S2-SC-TS-00018

14/04/02

Certificate for Pesticide Registration, Material Safety Data Sheet (for


AMASA_0002_R1)
Giay chung nhan dang ky thue (Certificate of tax registration)
(Notarized copy)
19 A3 size drawings REFERENCE for Space Management (Steel
structure, M&E combine)
RFC-0003 (M&E) Addition FD at ground and first floor
Document, Drawing regarding ceiling, wall (Soft file)
IN (ASD: 0008_00, AMEP: 0001/R1, 0002/R2, 0003/R1, 0004-00,
0005-00, 0006-00, 0007-00, 0008-00; AMS: 0003//R3, 0004/R1,
0005/R1, 0006/R1, 0007/R1, 0008/R1, 0009/R1, 0013-00); OUT
(AMS: 0014, 0015, 0016)_ CD (Soft Files)
CD_AMEP (full)
RFI Progress status
IN_AMEP (0013, 0013/R1, 0014, 0014/R1, 0016, 0019)
IR FORMS for Earth Work & RC Works (9 Forms in total)
ASD_0005/R3 copy Pile cap Rev.3 (Revised based on comments in
ASD-0005/R2 dated 03-Apr-2014) dated 12-Apr-2014

BBVN-FIVE-S2-SC-TS-00019

14/04/04

BBVN-FIVE-S2-SC-TS-00020

14/04/05

BBVN-FIVE-S2-SC-TS-00021
BBVN-FIVE-S2-SC-TS/M&E-00022
BBVN-FIVE-S2-SC-TS/M&E-00023

14/04/14
14/04/15
14/04/18

BBVN-FIVE-S2-SC-TS/M&E-00024
BBVN-FIVE-S2-SC-TS-00025
BBVN-FIVE-S2-SC-TS-00026
BBVN-FIVE-S2-SC-TS-00027
BBVN-FIVE-S2-SC-TS-00028

14/04/18
14/04/22
14/04/23
14/04/24
14/04/26

BBVN-FIVE-S2-SC-TS-00029

14/04/28

IN _ ASD_0006/R1 dated 15-Apr-2014 titled: Steel Structure_Rev.1


revised based on ASD_0006 dated 31-Mar-2014

BBVN-FIVE-S2-SC-TS-00030

14/04/29

BBVN-FIVE-S2-SC-TS-00031

14/04/29

BBVN-FIVE-S2-SC-TS-00032
BBVN-FIVE-S2-SC-TS-00033

14/05/05
14/05/05

BBVN-FIVE-S2-SC-TS-00034

14/05/05

Report of Taking Photograph and Surveying Actual Quality of


B.Braun FIVE AP Construction Site Stage No.2
Report of Taking Photograph and Surveying Actual Quality of
B.Braun FIVE AP Construction Site Stage No.2 (4 copies)
MOM_12
M&E Sample Board No.1 _ PPR for Cold Water System, GI Pipe for
FF and Air Compressor, BS pipe for Chiller system
M&E Sample Board No. 2 _ u. PVC pipe&fittings for Condensate
drain plumbing & Sanitary system, HDPE flexible for electric system,
HDPE pipe for drainage system (compacted area)

BBVN-FIVE-S2-SC-TS-00035
BBVN-FIVE-S2-SC-TS-00036
BBVN-FIVE-S2-SC-TS-00037

14/05/05
14/05/05
14/05/05

BBVN-FIVE-S2-SC-TS-00038

14/05/05

M&E Sample Board No. 3 _ HVAC System


M&E Sample Board No. 4 _ Lightning System
M&E Sample Board No. 5 _ Steel Pipe & Fittings and Support of
M&E Systems
M&E Sample _ Sleeve

BBVN-FIVE-S2-SC-TS-00039
BBVN-FIVE-S2-SC-TS-00040

14/05/05
14/05/12

BBVN-FIVE-S2-SC-TS-00041
BBVN-FIVE-S2-SC-TS-00042
BBVN-FIVE-S2-SC-TS-00043
BBVN-FIVE-S2-SC-TS-00044
BBVN-FIVE-S2-SC-TS-00045
BBVN-FIVE-S2-SC-TS-00046
BBVN-FIVE-S2-SC-TS-00047
BBVN-FIVE-S2-SC-TS-00048
BBVN-FIVE-S2-SC-TS-00049
BBVN-FIVE-S2-SC-TS-00050
BBVN-FIVE-S2-SC-TS-00051
BBVN-FIVE-S2-SC-TS-00052

14/05/12
14/05/12
14/05/12
14/05/12
14/05/14
14/05/15
14/05/20
14/05/19
14/05/20
14/05/21
14/05/21
14/05/22

BBVN-FIVE-S2-SC-TS-00053
BBVN-FIVE-S2-SC-TS-00054
BBVN-FIVE-S2-SC-TS-00055
BBVN-FIVE-S2-SC-TS-00056
BBVN-FIVE-S2-SC-TS-00057

14/05/22
14/05/22
14/05/22
14/05/23
14/05/24

BBVN-FIVE-S2-SC-TS-00058
BBVN-FIVE-S2-SC-TS-00059

14/05/26

BBVN-FIVE-S2-SC-TS-00060
BBVN-FIVE-S2-SC-TS-00061

14/05/27
14/05/28

BBVN-FIVE-S2-SC-TS-00062

14/05/29

BBVN-FIVE-S2-SC-TS-00063

14/05/29

BBVN-FIVE-S2-SC-TS-00064
BBVN-FIVE-S2-SC-TS-00065

14/05/29
14/05/29

RFC-0009
APD-0006/R2, APD-0007/R1, APD-00008/R3 (Tuan Anh to
Vinaconex2)
XYPEX sample
MOM_13 to North Star
IN_ASD_0014/R1 Ground Floor Slab, Beam_Rev.1
IN_ASD_0005/R5_ Trench Pit (For Con. Chopped) 2A3pages
M&E
Sample Board_Duct Equipments for HVAC System
Official Contract Documents
MOM_13 & 14
Sample Board_Air Grille for HVAC system
Sample Board_GI Conduit & Supports
Sample Board_MV & LV Cable
IN_ASD-0015/R2 dated 19-May-2014 & ASD-0026/R1 dated 19-May2014, IN_ASD-0038 dated 19-May-2014
IN_BBVN-FIVE-S2-SC-ASD-0014/R1
IN_ASD-22/R1 & IN - ASD-23/R1 dated 22-May-2014
IN_ASD-22/R1 & IN - ASD-23/R1 dated 22-May-2015
MOM_15
IN_ASD-0008/R2 (A) M&E Underground Drawings_Rev.2 Sleeve for
pipe underground Revised based on comments in ASD-0008/R1 dated
13-May-2013
IN_ SI_05 Schedule Recovery Plan
Tuan Anh
IN - ASD-0033 Ground Floor Wall Type Layout
IN_ASD-0035 Crane Beam Layout Plan & Section; IN - ASD-0020
CBP for Mezzanine Floor
IN- ASD-0021/R3 (A) _ M&E Ground Floor Ceiling Combination for
Clean Room Detail Section _ Rev. 3 (A)
IN_ ASD-0028 M&E Ground Floor Combination Look down(Clean
room) & 1st Floor Ceiling Combination (office) & IN - ASD-0029
M&E Ground Floor Combination Look up(Clean room)
Interim Payment No.2 (Draft)
IN_ ASD-0025/R2 Ground Beam for Zone 2_Rev.2 dated 28-May2014

BBVN-FIVE-S2-SC-TS-00066

14/05/30

IN_ASD-0013/R1 Roof & Gutter water proofing _Rev.1 dated 29-May2014 (For Con chop)
IN_Transmittal Sheet (BV)_List of Items to be Dismantled at Vacuum
Pump & AHU area
IN_ASD-0020 dated 28-May-2014 CBP for Mezzanine Floor &
IN_ASD-0026/R1 dated 19-May-2014 Concrete Body Plan for First
Floor_Rev.1
IN_ASD-0051 dated 29-May-2014 Gridline A Downspout (Sifon) &
VRV Room & Gridline Z Downspout (Sifon)
IN - AMS-0030/R1 _ Fence Relocation _ Rev.1 dated 2-June -2014

BBVN-FIVE-S2-SC-TS-00067

14/05/30

BBVN-FIVE-S2-SC-TS-00068

14/05/31

BBVN-FIVE-S2-SC-TS-00069

14/06/02

BBVN-FIVE-S2-SC-TS-00070

14/06/02

BBVN-FIVE-S2-SC-TS-00071

14/06/03

BBVN-FIVE-S2-SC-TS-00072
BBVN-FIVE-S2-SC-TS-00073

14/06/04
14/06/04

BBVN-FIVE-S2-SC-TS-00074
BBVN-FIVE-S2-SC-TS-00075

14/06/05
14/06/05

BBVN-FIVE-S2-SC-TS-00076

14/06/06

Additional Document for AMASA-11 (Based on comments in


AMASA-0011/R3 dated 31-May-2014)_Specification_Interlac 645

BBVN-FIVE-S2-SC-TS-00077

14/06/06

BBVN-FIVE-S2-SC-TS-00078
BBVN-FIVE-S2-SC-TS-00079
BBVN-FIVE-S2-SC-TS-00080

14/06/07
14/06/10
14/06/10

BBVN-FIVE-S2-SC-TS-00081

14/06/10

Foundation Pit & Concrete Body Plan (CBP).Rev2( Revised based on


RFI-072)
Drawing Ground Floor Beam Layout Plan (1 of 6)
IN_MOM_017
Main Contract
Tender Submission documents for B. Braun Project from QS Hanoi to
Tng QS filing in construction site (Commercial Part_Original, Rev.1
& Rev.2)
Refer to AMASA-0025 dated 28-May-2014 regarding: Wire Mesh
Sl52, SL82_Supplemental documents: (1) Song Hop Luc Weldmesh
Co., Ltd - HLC Catalogue; (2) Song Hop Luc Weldmesh Co., Ltd Certification & (3) Song Hop Luc Weldmesh Co., Ltd - List of
Reference Projects

IN_AMS-0041 dated 2-June-2014 MS-BLD.07 - Structure Steel


Erection Works dated 2-June-2014
CCTV Sytem
IN_AMS-0024/R1 dated 3-June-2014 MS-BLD.18 Method Statement
for Road & Stormwater works_Rev.1
IN_ASD-0036 dated 3-June-2014 Dock Level Plan & Section
IN_AMEP (50,20/R1,57/R1, 73,51/R1,19/R1, 74,52/R1, 79, 44,
60/R1, 65/R1, 13/R1, 13/R2, 32/R1, 33/R1, 70, 34/R1, 23/R1_B, 49,
48, 47, 18, 42, 27, 40, 43, 71, 39, 38/R1) , AMS (14/R2, 40, 29,
20/R1, 29_A, 35, 39, 38, 34, 33), ASD (50, 58, 62, 21/R3_A, 28, 29)

BV/SMZ For Con


Chop
For con Chop
For Con Chop

For con Chop


CD

BBVN-FIVE-S2-SC-TS-00082

14/06/10

IN_AMEP (10, 54, 62, 63, 64, 66, 67, 68, 69, 15/R2, 16/R1, 47/R1,
49/R1); IN_AMS (39, 48); IN_ASD (60, 63, 64)
IN_ASD-0043/R1 & ASD-0044/R1
List of FM Approved Materials (M&E and Building)
Loose Furniture Quotation (PC sum) [2A3size pages]
IN_ASD_0054/R1 dated 11-Jun-2014 Internal Staircase_Rev.1

BBVN-FIVE-S2-SC-TS-00083
BBVN-FIVE-S2-SC-TS-00084
BBVN-FIVE-S2-SC-TS-00085
BBVN-FIVE-S2-SC-TS-00086

14/06/11
14/06/11
14/06/11
14/06/12

BBVN-FIVE-S2-SC-TS-00087

14/06/12

BBVN-FIVE-S2-SC-TS-00088

14/06/12

IN_ASD-0062/R1 dated 11-Jun-2014 HVAC-Water Chiller Pipe


Layout 1st Floor _ Stage 1_Rev.1
Shop Drawing for Steel Door Installation (90A3size drawings)

BBVN-FIVE-S2-SC-TS-00089

14/06/12

IN_AMEP (35, 46, 78, 81,82,83,86); IN_ASD (49, 62/R1, 69, 76)_CD

BBVN-FIVE-S2-SC-TS-00090

14/06/13

BBVN-FIVE-S2-SC-TS-00091
BBVN-FIVE-S2-SC-TS-00092

14/06/13
14/06/13

BBVN-FIVE-S2-SC-TS-00093

14/06/13

SANITEC System - Product Data Sheet (Refer to RFC-0034: Painting


on Brick Wall at Air Shaft)
FM Approval Materials (Building Material)_R1
IN_APD-44/R1 dated 28-May-2014: Quality Control Plan for Masonry
& Plastering Works (QCP-6)_Rev.1 ; IN_AMS-30/R1 dated 2-Jun2014; IN_AMS-30/R1 (ADD.01) dated MS-46: Fence
Relocation_Rev.1 (Additional Document) dated 13-Jun-2014;
IN_AMS-0025 dated 11-Jun-2014: MS-BLD.03 - Scaffolding
Installation & Dismantling Works
IN_ASD_0047/R1 dated 12-Jun-2014: Office Toilet Drawings_Rev.1;
IN_ASD-0030/R2 dated 12-Jun-2014: Ground Floor and First Floor
Ceiling_Rev.2; IN_ASD-0053/R1 dated 12-Jun-2014: External
Staircases_Rev.1; IN_ASD-0031/R1 dated 12-Jun-2014:
Male&Female ground floor toilet&changing room_rev.1

BBVN-FIVE-S2-SC-TS-00094

14/06/13

BBVN-FIVE-S2-SC-TS-00095
BBVN-FIVE-S2-SC-TS-00096
BBVN-FIVE-S2-SC-TS-00097

14/06/14
14/06/14
14/06/14

BBVN-FIVE-S2-SC-TS-00098

14/06/16

BBVN-FIVE-S2-SC-TS-00099

14/06/16

IN_ASD-0032/R2 dated 11-Jun-2014: General Floor Finish


Layout_Rev3; IN_ASD-0056/R1 dated 11-Jun-2014: General First
Floor Finish Floor Layou_Rev.1
FM Approval Materials (M&E Materials)_Rev.1
IN_MOM_18
IN_ASD (76, 10/R1, 75, 28); IN_AMEP (93,94,95,90,91,92,48/R1)
IN_ASD-0070/R1 dated 14-Jun-2014 1st Floor Beam Rebar
Arrangement_Part 2_Rev.1
Interim Payment No.2

For con red chop


For con red chop

For con red chop

For con red chop

For con red chop

BBVN-FIVE-S2-SC-TS-00100

14/06/17

BBVN-FIVE-S2-SC-TS-00101
BBVN-FIVE-S2-SC-TS-00102

14/06/17
14/06/18

BBVN-FIVE-S2-SC-TS-00103

14/06/18

BBVN-FIVE-S2-SC-TS-00104

14/06/19

BBVN-FIVE-S2-SC-TS-00105

14/06/19

BBVN-FIVE-S2-SC-TS-00106

14/06/20

BBVN-FIVE-S2-SC-TS-00107
BBVN-FIVE-S2-SC-TS-00108

14/06/21
14/06/23

BBVN-FIVE-S2-SC-TS-00109

14/06/24

BBVN-FIVE-S2-SC-TS-00110

14/06/25

BBVN-FIVE-S2-SC-TS-00111

14/06/25

BBVN-FIVE-S2-SC-TS-00112

14/06/26

BBVN-FIVE-S2-SC-TS-00113

14/06/30

BBVN-FIVE-S2-SC-TS-00114
BBVN-FIVE-S2-SC-TS-00115
BBVN-FIVE-S2-SC-TS-00116

14/06/30
14/07/01
14/07/02

BBVN-FIVE-S2-SC-TS-00117

14/07/02

BBVN-FIVE-S2-SC-TS-00118
BBVN-FIVE-S2-SC-TS-00119

14/07/02
14/07/03

IN_ASD-0035 Crane Beam Layout Plan & Section dated 28-May2014


Monthly Statement No.2_Interim Payment
IN_ASD-0077/R1 dated 17-June-2014 1st floor slab rebar
arrangement Rev.1
IN_ASD-0068/R1 dated 16-Jun-2014 1st floor beam rebar
arrangement
Additional Document for TS_91 dated 13/June/2014 regarding FM
Approval Materials for Building (refer to Item No. 13 - Fire Resistant
Door _ 120 minutes)_ English translation
IN_ASD-0059/R2 dated 19-June-2014 regarding Ground Beam for
Zone 3 _ Rev.2
IN_ASD-57/R2 dated 20-June-2014 First Floor Wall Type_Rev.2
MOM_19
IN_ASD-20 (Replaced 1 drawing, A3size) MEZZ Floor Beam Layour
Plan (4 of 6)
IN_ASD-15/R2 dated 19-May-2014 Ground Floor Column
layout_rev.2
IN_ASD-15/R2 dated 19-May-2014 Ground Floor Column
layout_Rev.2 (2A3size drawings)
IN_ASD-83 dated 25-Jun-2014 Rebar Arrangement for Stormwater
System (A, B, D), IN_ASD-85 dated 25-Jun-2014 Rebar Arrangement
for Stormwater System ( C )
2 Minutes of Hand-over Material of Owner (Pole Lighting, Lighting
Fixture, Pole Camera, Dome Camera)_6 items
IN_ASD-26/R1 dated 19-May-2014 revised 2 A3size drawings
following comments
IN_MOM_20
Monthly Statement Interim No.3 -Interim Payment
Refer to AMASA-46 dated 12-June-2014; Clean Room Window Tempered Glass Cerfiticate _ Purchase Order (Stage 1) from Channel
Systems
Refer to MOM 20 (item 11.18.2)_ Factory Acceptance for Compress
Air
RFC-0026 Fire Smoke Supply Air Fans
Vinaconex 2 Group Accident Insurance Contract _ Copy

For con red chop

For con red chop


For con red chop

For con red chop


For con red chop

For con red chop


For con red chop
For con red chop
For con red chop

For con red chop

BBVN-FIVE-S2-SC-TS-00120

14/07/03

BBVN-FIVE-S2-SC-TS-00121

14/07/03

BBVN-FIVE-S2-SC-TS-00122

14/07/04

BBVN-FIVE-S2-SC-TS-00123

14/07/05

BBVN-FIVE-S2-SC-TS-00124

14/07/05

BBVN-FIVE-S2-SC-TS-00125

14/07/05

BBVN-FIVE-S2-SC-TS-00126
BBVN-FIVE-S2-SC-TS-00127
BBVN-FIVE-S2-SC-TS-00128

14/07/07
14/07/07
14/07/08

BBVN-FIVE-S2-SC-TS-00129

14/07/08

BBVN-FIVE-S2-SC-TS-00130
BBVN-FIVE-S2-SC-TS-00131

14/07/08
14/07/09

BV-137206/6011/SMZ-140702/D226 dated 02-7-2014


Chilled water system bypass
IN_ASD-81/R1 dated 03-July -2014 Mezzanine Floor Beam Rebar
Arrangement _Rev.1 & IN_ASD-82 (A) dated 3-July -2014 Entrance
Mat & Louver
Welding Procedure Specification (WPS) and Welding Certificate 6G
Refer to AMS-54 dated 2-July -2014
IN- ASD-0026R1
FIRST FLOOR BEAM LAYOUT PLAN (1 OF 6) -(R.3)
HBPE-S-CD-MB-261-1/6
FIRST FLOOR BEAM LAYOUT PLAN (1 OF 6) -(R.3)
HBPE-S-CD-MB-261-1/6
IN-ASD-0077
1FL SLAB TOP X REINFORCEMENT (R.2)
HBPE-S-CD-MB-217 - TOP X
1FL SLAB TOP Y REINFORCEMENT (R.2)
HBPE-S-CD-MB-217 - TOP Y
1FL SLAB TOP X REINFORCEMENT(R.2)
HBPE-S-CD-MB-218 - BOT X
1FL SLAB TOP Y REINFORCEMENT(R.2)
HBPE-S-CD-MB-218 - BOT Y
1FL SLAB SECTION AND DETAIL (R.2)
141-HBPE-S-CD-MB-217-Detail

SD-Beam -1FL-141SD-Beam -1FL-141-

SD-BBS-1FL-141SD-BBS-1FL-141SD-BBS-1FL-141SD-BBS-1FL-141SD-BBS-1FL-

Brick wall Typical detail


Brick wall ground floor plan
Brick wall layout 1st floor & mezzanine
Refer to Letter BBVN-FIVE-S2-SC-LTR-0016 FM Approval
Materials_Rev.2 based on Letter BB-137206/6011/SMZ-140703/D228
List of EM Approved Materials_Rev.2; Catalogue: Automatic air vent
c/w gate valve for Pre-action, Heat Detector, Smoke sampling
detection system fire alarm; Flow switch, Pressure switch
IN_MOM_21
Quotation and Furniture Layout
IN_AMS-28 MS.BLD-09_dated 15-May-2014: XYPEX
Waterproofing for Under Slab
IN-APD-37 dated 7-july-2014 Quality Control Plan for Road &
Stormwater Works (QCP-9)
2CVs (Randy & Quyen)
JSA (Refer to AMS-34/R1 dated 4-July-2014)

For con chop

BBVN-FIVE-S2-SC-TS-00132

14/07/14

BBVN-FIVE-S2-SC-TS-00133
BBVN-FIVE-S2-SC-TS-00134
BBVN-FIVE-S2-SC-TS-00135

14/07/12
14/07/12
14/07/12

BBVN-FIVE-S2-SC-TS-00136

14/07/14

BBVN-FIVE-S2-SC-TS-00137

14/07/14

BBVN-FIVE-S2-SC-TS-00138

14/07/14

BBVN-FIVE-S2-SC-TS-00139

14/07/15

BBVN-FIVE-S2-SC-TS-00140
BBVN-FIVE-S2-SC-TS-00141

14/07/16
14/07/16

BBVN-FIVE-S2-SC-TS-00142

14/07/16

BBVN-FIVE-S2-SC-TS-00143

14/07/16

BBVN-FIVE-S2-SC-TS-00144
BBVN-FIVE-S2-SC-TS-00145

14/07/17
14/07/17

BBVN-FIVE-S2-SC-TS-00146

14/07/18

BBVN-FIVE-S2-SC-TS-00147

14/07/18

BBVN-FIVE-S2-SC-TS-00148
BBVN-FIVE-S2-SC-TS-00149

14/07/21
14/07/21

Red bill (VAT) for completed amount No.2 for BB Project dated 22May-2014
IN_MOM No.22
IN_AMS-55 dated 8-July-2014 MS-BLD 06-B: RC Septic Tank
IN_NCR-05, 06 dated 11-July-2014: GI Piping Procedure & Welding
Procedure
IN_D258 dated 14-July-2014: (RFC-069) Relocation of By-pass valve
from Walkable ceiling to inside Toolshop room and additional ball
valve (Process Chilled water system)
IN-APD-0008/R3 dated 22-Apr-2014 Inspection and Testing Plan
(ITP)_Rev.3
AS 4100-1998 & Amendment No.1 to AS 4100-1998: Steel Structure
Embeded Plate (PL8, PL12 Q345B) Test Result & Steel Bar (D12,
D16) Test Result
Ground Floor Column Layout (2A4size drawings)
Letter to Ministry of Industry & Trade (Goods and products to be
imported), Ist of goods and products to be imported, Investment
lisence of B. B dated 31-Aug-2011
BBVN-FIVE-S2-RFC-0073
Modification of Data and Voice System Schematic Diagram
IN-APD-25/R1 dated 9-May-2014 Clean Construction Protocol for
Clean Room& IN-APD-53 dated 19-June-2014 Access Control Layout
for Clean Room Revised based on comments in APD-0025/R1 dated 9May-2014
Monthly Statement No.3_Interim Payment
IN_ASD-96/R2 dated 17-July-2014 Rebar arrangement for Septic tank
rev.2 and IN_ASD-117/R1 dated 17-July-2014 Rebar arrangement for
Pump Pit No.1
IN_D253 dated 11-July-2014 (RFC-67) IT System Wifi Relocation &
IN_D254 dated 11-July-2014 (RFC-68) Process Exhaust System for
Toolshop Room
IN_SMZ-140716/D265 dated 16-July-2014 (RFI-159) Pre-action
System
IN_MOM 23
IN_AMS-27 dated 20-June-2014 MS-BLD-10 Roofing &
Waterproofing for roof

For con red chop

BBVN-FIVE-S2-SC-TS-00150

14/07/21

IN_SI-34 dated 21-July-2014 Submission of Holiday Tester for FF


System (Underground Pipe)
IN_ASD-109 dated 21-July-2014 Main Building Phase 2.1 Elevation

BBVN-FIVE-S2-SC-TS-00151

14/07/21

BBVN-FIVE-S2-SC-TS-00152

14/07/22

IN_BV-137206/6011/SMZ-140722/D276 dated 22-July-2014 Minutes


Project walkthrough Stage 1 on 18th & 21st July 2014

BBVN-FIVE-S2-SC-TS-00153

14/07/23

IN_ASD-107/R1 dated 22-July-2014 Crane _ Rev.1

BBVN-FIVE-S2-SC-TS-00154
BBVN-FIVE-S2-SC-TS-00155
BBVN-FIVE-S2-SC-TS-00156
BBVN-FIVE-S2-SC-TS-00157

14/07/23
14/07/24
14/07/24
14/07/25

BBVN-FIVE-S2-SC-TS-00158
BBVN-FIVE-S2-SC-TS-00159
BBVN-FIVE-S2-SC-TS-00160

14/07/28
14/07/30
14/07/31

HSE_Incident_Report (EHS F14 4.13)


Architecture Drawings Pending List
Incident Investigation Report No.1
Test Result of Purlin Strength, Decking Strength, Anchor Bolts (M20,
M24) Strength
IN_MOM_24
CD_EVN Document (Soft files)
IN_ASD-102/R3_ 1& 2 dated 30-July-2014 Bar Bending for Ground
Slab Zone 2, Zone 3_Rev.3_Part 1 &@ (Zone 2 & Zone 3) Revised
based on comments in ASD-102/R2 dated 14-July-2014

BBVN-FIVE-S2-SC-TS-00161

14/07/31

IN_AMS-59/R2 dated 25-Jul-2014 MS-BLD.11 Masonry & Plastering


Works_Rev.2

BBVN-FIVE-S2-SC-TS-00162

14/07/31

IN_ASD-110/R1 dated 31-Jul-2014 Ground Floor & 1st Floor Brick


Wall Plans and Typical Details (Refer to ASD-90)_Rev.1

BBVN-FIVE-S2-SC-TS-00163
BBVN-FIVE-S2-SC-TS-00164
BBVN-FIVE-S2-SC-TS-00165
BBVN-FIVE-S2-SC-TS-00166
BBVN-FIVE-S2-SC-TS-00167

14/07/31
14/08/01
14/08/01
14/08/02
14/08/02

Incident Investigation Report No.1


IN_MOM 25
Pending/Remaining Material for Approval
Purlin Test Result (Zinc coating, Tension strength)
BV-137206/609/140802/SC/SI-43 dated 2-Aug-2014 "Submission of
Holiday Tester for FF System (Underground Pipe)"

BBVN-FIVE-S2-SC-TS-00168
BBVN-FIVE-S2-SC-TS-00169

14/08/04
14/08/04

BBVN-FIVE-S2-SC-TS-00170

14/08/04

Cash Flow (end of July) (1A3page)


Surface water test result (1A4page) & Location of sample (1A3 photo
drawing)
IN_SI-42 dated 2-Aug-2014 Protection and Proper Covering of Sewer
and rian manhole and stormline and sealing of HDPE pipe sleeve

Red For Conchop

For con red chop

For con red chop

For con red chop

BBVN-FIVE-S2-SC-TS-00171

14/08/05

BBVN-FIVE-S2-SC-TS-00172
BBVN-FIVE-S2-SC-TS-00173

14/08/05
14/08/07

BBVN-FIVE-S2-SC-TS-00174
BBVN-FIVE-S2-SC-TS-00175
BBVN-FIVE-S2-SC-TS-00176

14/08/08
14/08/11
14/08/12

BBVN-FIVE-S2-SC-TS-00177

14/08/12

BBVN-FIVE-S2-SC-TS-00178
BBVN-FIVE-S2-SC-TS-00179
BBVN-FIVE-S2-SC-TS-00180
BBVN-FIVE-S2-SC-TS-00181
BBVN-FIVE-S2-SC-TS-00182
BBVN-FIVE-S2-SC-TS-00183
BBVN-FIVE-S2-SC-TS-00184

14/08/12
14/08/12
14/08/12
14/08/13
14/08/14
14/08/14
14/08/14

BBVN-FIVE-S2-SC-TS-00185

14/08/14

BBVN-FIVE-S2-SC-TS-00186

14/08/15

BBVN-FIVE-S2-SC-TS-00187
BBVN-FIVE-S2-SC-TS-00188
BBVN-FIVE-S2-SC-TS-00189

14/08/15
14/08/15
14/08/15

BBVN-FIVE-S2-SC-TS-00190

14/08/16

BBVN-FIVE-S2-SC-TS-00191

14/08/18

BBVN-FIVE-S2-SC-TS-00192

14/08/18

BBVN-FIVE-S2-SC-TS-00193
BBVN-FIVE-S2-SC-TS-00194
BBVN-FIVE-S2-SC-TS-00195

14/08/18
14/08/18
14/08/18

IN_SI-46 dated 5-Aug-2014 Pharma Proposed Floor Drain Provision


at Warehouse (2A4size photos)
Monthly Statement No.4_Interim Payment
IN_ASD-14 (Replaced 4 drawing, A3size) Ground floor beam layout
layout (3&6), 3D model, layout section
Official (red chop) Payment Certificates No.2 (4A4 pages)
PV Control Panel for Pre-Action Valve
IN_SMZ-140811/D308 dated 11-Aug-2014 (RFC-88) Duct
Reinforcement Angle Bar_Approval
OUT_RFC-76 dated 19-July-2014 Change in Roof connection detail
GL-12_Additional Drawing (1A3size drawing)
Tie-in
OUT-AMS-67/R1 (ADD.01) dated 09-Aug-2014
Tie-in Permit
BBVN - FIVE-S2-SC/IR/M&E-0246 (3 copies)
Tie-in Permit
Tie-in Permit 1
Confirmation Letter from INOCHI Technology SDN BHD (2 HEPA
BOX samples on 1st August 2014 finished imder Powder Coated
Painting) dated 13 Aug 2014
IN_ASD-109 dated 21-July-2014 Main Building Phase 2.1 Elevation
& IN_ASD-110/R1 Brick wall
OUT_ASD-052 (ADD.01) GL Z Downspout Combine w/MEZZ CBP
dated 14-August-2014 (1A3size drawing)
IN-ASD-110/R1 (39A3size drawings)

For con red chop

OUT - AMS-64 Dated 18 July 2014 MS-50: Honeycomb treatment


Dang ky vao thi cong (MS-23: Equipment for stage 1; MS-24A-1:
Main Feeder, Cable rack for stage 1; MS-24-A-1: Air Compressor
system)
Acceptance Order & Acceptance Board Establishment Decision
IN_ASD-20 MEZZ Floor Beam Layout Plan & IN_ASD-26/R1 First
Floor Beam
IN_MOM-26&27
FM Approval Materials (Additional item for FM Approval)
QC Site Check (16 & 18 August 2014)_9pages

2 copies/each

BBVN-FIVE-S2-SC-TS-00196
BBVN-FIVE-S2-SC-TS-00197

14/08/18
14/08/18

QC Site Check (18 August 2014)_32pages


HAND-OVER Sample (Magnetic Holder)_Model: YD602_Full set in
1 box (including door contact)
Tie-in Work No.17 & Tie-in Work No. 18
Tie-in Work No.22 & Extending the Temporary storage for the
assembly AHU
IN_ASD-127 dated 16-AUG-2014 Pantry Details; IN_ASD-16A dated
16-AUG-2014 Drainage System; IN_ASD-119/R3 dated 14-AUG2014 Ramp Enlarge CBP&Finishing Details_Rev.3; .IN_ASD-124/R1
dated 18-AUG-2014 Aluminum Composite Cladding SD_Rev.1

BBVN-FIVE-S2-SC-TS-00198
BBVN-FIVE-S2-SC-TS-00199

14/08/18
14/08/19

BBVN-FIVE-S2-SC-TS-00200

14/08/19

BBVN-FIVE-S2-SC-TS-00201

14/08/19

IN_ASD-132/R1 dated 19-AUG-2014 Chiller Plinth; IN_ASD-128/R1


dated 19-AUG-2014 AHU CBP Extension_Stage 1_Rev.1

BBVN-FIVE-S2-SC-TS-00202

14/08/19

BBVN-FIVE-S2-SC-TS-00203

14/08/19

Application for Work Permit (MS-36-2) LV Busway 3200A


Installation
Cable Gland Material Sample (Tabulation for Cable Gland Sample)

BBVN-FIVE-S2-SC-TS-00204

14/08/19

BBVN-FIVE-S2-SC-TS-00205

14/08/20

BBVN-FIVE-S2-SC-TS-00206

14/08/20

BBVN-FIVE-S2-SC-TS-00207
BBVN-FIVE-S2-SC-TS-00208

14/08/21
14/08/21

BBVN-FIVE-S2-SC-TS-00209

14/08/21

BBVN-FIVE-S2-SC-TS-00210

14/08/21

BBVN-FIVE-S2-SC-TS-00211
BBVN-FIVE-S2-SC-TS-00212
BBVN-FIVE-S2-SC-TS-00213
BBVN-FIVE-S2-SC-TS-00214

14/08/22
14/08/22
14/08/22
14/08/23

For con red chop

For con red chop

2 sets
1

copy

AMEP-37A _ Shop drawing of PV Control panel for Pre-action valve,


Pre-action system operation & instruciton manual

copy

BBVN-FIVE-S2-SC-AMEP-0039 Designers' Comment (Attachment:


Tabulation of UPS for Building Managerment System; IN_AMEP-39
dated 29-May-2014)
Honeycomb Treatment (IN_BBVN - FIVE-S2-SC-AMS-64 dated 18Aug-2014)
IN_ASD-119 dated
IN_ASD-140 dated 21-Aug-2014 Framing Elevation; IN_ASD006/R2(ADD.02) dated 21-Aug-2014 Steel Structure rev.2
IN_SMZ-140820/D321 dated 20-Aug-2014 (RFI-173) Fire pump room
and clinic drawing
IR-275, 276, 277

copy

copy

For con red chop

copy + CD

INOCHI Technology SDN BHD Confirmation letter


Mock-up inspection report
QC Site Check on 22nd August 2014 (21 pages photos)
AMEP-147 Hermeseal Material Submission (Clear Soft Copy) for FM
Approval

1
1
1
1

Copies (signed+
Stamped)
copy
copy
copy
copy

BBVN-FIVE-S2-SC-TS-00215

14/08/25

Contract on Compensation Insurance for Labor (HUNG TRANG); (ii)


Certificate for Construction Machines and Equipment Insurance &
Certificate for Personal Accident Insurance (HUNG TRANG); (iii)
Construction Machines and Equipment Insurance (SEICO); (iv)
Certificate for Personal Accident 24/24 Insurance (VIEN DONG); (v)
Contract on Compensation Insurance for Labor (North Star)

copy (Vnese)

BBVN-FIVE-S2-SC-TS-00216

14/08/25

Official Original
(Red chop)

BBVN-FIVE-S2-SC-TS-00217

14/08/25

Copy

BBVN-FIVE-S2-SC-TS-00218

14/08/25

Copy

BBVN-FIVE-S2-SC-TS-00219

14/08/25

Bien ban nghiem thu giai doan hoan thanh (Minutes of Inspection &
Acceptance of Stage Completion: Preliminary inspection for substation
& MV)
Package of Main Contractor (Monthly Statement No.4)_Interim
payment
Loose Furniture Quotation (PC sum) [2A3size pages] (Refer to
AMASA_0028); Labor Insurance for Dang Minh (SEICO)
QC Site Patrol dated 25-August-2014 by Mr. Duong (07 pages)

Copy

BBVN-FIVE-S2-SC-TS-00220

14/08/26

IR-268, 279, 291 & 292

Copy (with
signature)

BBVN-FIVE-S2-SC-TS-00221

14/08/26

BBVN-FIVE-S2-SC-TS-00222

14/08/26

BBVN-FIVE-S2-SC-TS-00223
BBVN-FIVE-S2-SC-TS-00224

14/08/27
14/08/27

BBVN-FIVE-S2-SC-TS-00225

14/08/27

FM Approval Materials (Additional item for FM Approval)_FM plan


review No. 191722
IN_ASD-129/R1 dated 26-August-2014 AHU Plenum
Extension_Stage 1_Rev.1 (1A3size drawing)
IR-250 & 287 with signature
IN_ASD-127 dated 16-AUG-2014 Pantry Details revised (1A3size
drawing)
IN_Minutes of Inspection & Acceptance of Tie-in Works: Sub-station
& MV Inspection record (cable 35kV)
Transformer 2000kVA 35(22)/0.4 kV
Panel, cable LV, out going (dated 25/08/2014); Minutes of Inspection
& Acceptance of Completion and Put into Use (dated 27/08/2014):
Correspondence No.01/140826 pertaining Signing of Electrical
Contract (dated 25/08/2014); EVN Contract (14/190002)

BBVN-FIVE-S2-SC-TS-00226

14/08/28

BBVN-FIVE-S2-SC-TS-00227

14/08/28

IN_ASD-144/R1 dated 28-August-2014 Brick Wall Details - Rebar


Details_Rev.1 (1A3size drawing)
IN-ASD-128 AHU Concrete Body Plan Extension _ Stage 1_Rev.1
Revised based on comments in ASD-128 dated 7-Aug-2014

For con red chop

2
1

with signature
For con red chop

06; 06; 02; 02 Original (red chop)

1
1

copy (for con red


chop)
COPPY

BBVN-FIVE-S2-SC-TS-00228

14/08/29

Comments on Site Instructions (28-August-2014)_2A1size photos

Color copy

BBVN-FIVE-S2-SC-TS-00229
BBVN-FIVE-S2-SC-TS-00230

14/08/30
14/09/01

Result of Checking Slab Level (2A3size pages)


Bo lnh thc hin hp ng s 709BG01400357

1
1

Copy
Original (red chop)

BBVN-FIVE-S2-SC-TS-00231

14/09/02

IN_SMZ-140829/D343 dated 29-AUG (RFC-72) IT Adjustments Additional Data Points; IN_SMZ-140829/D344 dated 29-AUG (RFC75) New DB Panel for Smoke Extraction Fan; IN_SMZ-140829/D346
dated 29-AUG (RFC-99) C-Channel Support for Duct 2401 and
above_Approval; IN_SMZ-14829 dated 29-AUG (RFC-100) DB-1D
Panel Modification_Approval; IN_SMZ-140829/D348 dated 29-AUG
(RFC-103) DB-1E Panel Modification_Approval

Copy

BBVN-FIVE-S2-SC-TS-00232

14/09/03

Monthly Statement No.4_Interim Payment (OFFICIAL)

Original Copy (red


chop)

BBVN-FIVE-S2-SC-TS-00233

14/09/03

BBVN-FIVE-S2-SC-TS-00234

14/09/03

IN_AMS-100 dated 2-SEP-2014 MS-BLD.12-A: Aluminum Door &


Window
Minutes of Acceptance and Hand-Over after 72 hours electricity
connection (6 Original copies); 2 Electricity Contract (14/190002)

BBVN-FIVE-S2-SC-TS-00235

14/09/04

copy

BBVN-FIVE-S2-SC-TS-00236

14/09/04

copy (for con red


chop)

BBVN-FIVE-S2-SC-TS-00237

14/09/05

IN_AMS90 dated 4-September-2014 MS-BLD.20: Clean Room Finishing Works Ceiling & Partition Wall
IN_ASD-110/R1 (ADD) dated 4-September-2014 Brick wall elevation
axis U (3A3size drawings)
Contract Implementation Bank Guarantee (Deutsche Bank for
Electricity Sale/Consumption), 2 copies of Electricity
Sale/Consumption Contract & 2 original official copies; Minutes of
Meeting Checking the electricity sale rate determination

BBVN-FIVE-S2-SC-TS-00238

14/09/05

copy

BBVN-FIVE-S2-SC-TS-00239

14/09/05

copy

BBVN-FIVE-S2-SC-TS-00240

14/09/05

copy

BBVN-FIVE-S2-SC-TS-00241

14/09/08

IN_SMZ-140905/D352 dated 5-September-2014 (TS-221)


Clarification Required
IN_SI-59 dated 5-September-2014 M&E Items at Stage 1 area /
Preparation for Saturday 6th power off
IN_SMZ-140905/D353 dated 5-September-2014 (RFI-190) Weight
Capacity Suspended on Purlin
6 Original Minutes of handover after 72hour Power on dated 3-Sep/2014; 2 original EVN Contract (14/190002) dated 5-Sep-2014; 2
original of Electrical Selling Rate (dated 5-Sep-2014)

ORG (set)

BBVN-FIVE-S2-SC-TS-00242

14/09/09

BBVN-FIVE-S2-SC-TS-00243
BBVN-FIVE-S2-SC-TS-00244

14/09/09
14/09/09

BBVN-FIVE-S2-SC-TS-00245

14/09/09

BBVN-FIVE-S2-SC-TS-00246
BBVN-FIVE-S2-SC-TS-00247
BBVN-FIVE-S2-SC-TS-00248

14/09/09
14/09/10
14/09/10

BBVN-FIVE-S2-SC-TS-00249

14/09/11

BBVN-FIVE-S2-SC-TS-00250
BBVN-FIVE-S2-SC-TS-00251
BBVN-FIVE-S2-SC-TS-00252

14/09/11
14/09/11
14/09/13

BBVN-FIVE-S2-SC-TS-00253

14/09/13

BBVN-FIVE-S2-SC-TS-00254

14/09/13

BBVN-FIVE-S2-SC-TS-00255

14/09/15

BBVN-FIVE-S2-SC-TS-00256

14/09/16

BBVN-FIVE-S2-SC-TS-00257
BBVN-FIVE-S2-SC-TS-00258

14/09/16
14/09/16

BBVN-FIVE-S2-SC-TS-00259

14/09/16

BBVN-FIVE-S2-SC-TS-00260

14/09/16

IN_ASD_0030 dated 19-August-2014 Ground floor and 1st floor


ceiling_Rev.3
As-Built Roof Decking Level (1A4page)
IN_AMS-95 dated 29-August -2014 MS-BLD.52: Warehouse Wall
Demolition for Roller Shutter ; IN_APD-58/R1 dated 9-September2014 Quality Control Plan for Waterproofing Work (QCP-5)_Rev.1

copy

1
1

copy
copy

IN_AMS-104 dated 9-September-2014 MS-BLD.06-C:


Reinforcement Concrete Ramp Extension;
Incident Investigation Report No.2a, 2b & 2c
Monthly Statement No.5 (Interim Payment)
25A3size As-Built Drawings (prepared by Hoang Ky CTCP TV Xay
lap dien luc), checked by North Star
Red bill (VAT) for completed amount No.3 for BB Project dated 19August-2014
Monthly Statement No.4 (Interim Payment)
Cable Arrangement (1A3size drawing)
IN_ASD-160 dated 13-September-2014 Clean room ceiling shop
drawings
MOM Item No. 11.32.4
Flushing method for Ro, PCW Open loop & Close Loop Tie-in Work

copy

1
1
1

copy
copy
copy

Original

4
1
1

Original
copy
copy

Brick wall elevation axis U (opening locations_design)_1A3size


drawing
Integrity Report BBVN-FIVE-S2-SC-New Building Project.
Warehouse Area- Water Leakage 20140813- Occurrence, Suspected
cause of occurrence, Rectification Procedure, Integrity Checking,
Appendix
MOM No.31 Item No.11.30.8 (Production Area
Illumination_Calculation)
Quality Control Document (Buffer/Chiller Tank)
Monthly Statement No.4 (Interim Payment)

copy

copy

copy

1
4

copy
ORG (set)

HEPA Box confirmation letter from INOCHI Technology SDN BHD;


Document hand-over for construction finalization
HAFELE lock document (23A4 pages); OUT_ASD-80/R4 dated 6September-2014 Shop Drawing for Steel Door Installation with Mr.
Hoa's signature

copy

copy

BBVN-FIVE-S2-SC-TS-00261

14/09/16

IN_ASD-110/R1 dated 31-Jul-2014 Ground Floor & 1st Floor Brick


Wall Plans and Typical Details (Refer to ASD-90)_Rev.1; IN_ASD145 dated 11-September-2014 Brick Wall Elevation Axis 21

copy

BBVN-FIVE-S2-SC-TS-00262

14/09/16

colored copy

BBVN-FIVE-S2-SC-TS-00263

14/09/18

copy

BBVN-FIVE-S2-SC-TS-00264

14/09/22

QC Patrol_Site Inspection Comments (16-September-2014)-4A3size


pages with 22 items
OUT_ASD-110/R1 (revised) Brick wall ground floor plan 1, 2 & 3
(3A3size drawings)
CSA- Internal Quality Issues (18-September-2014)_3A3size pages

color copy

BBVN-FIVE-S2-SC-TS-00265
BBVN-FIVE-S2-SC-TS-00266

14/09/22
14/09/22

1
1

copy
copy

BBVN-FIVE-S2-SC-TS-00267

14/09/23

As-built drawing list (Steel structure; As-built list; sub-con)


SMZ-140919/D377 dated 22-SEP-2014 (RFC-111) Fume Exhaust Fan
(RFC-111 form, 1A3size drawing)
IN_ASD-162 dated 23-September-2014 Racking for Warehouse

copy red chop

BBVN-FIVE-S2-SC-TS-00268
BBVN-FIVE-S2-SC-TS-00269

14/09/25
14/09/25

1
1

copy
copy

BBVN-FIVE-S2-SC-TS-00270

14/09/25

(MOM Item 16.32)_HILTI load test report


IN_ASD-74/R3 dated 22-September-2014 Dock leveller, dock
shelter_Rev.3
Brick Wall Detail at Axis 19 from E to G Axis (1A3size drawing)

copy

BBVN-FIVE-S2-SC-TS-00271

14/09/25

Brick Wall Detail at Axis 19 from E to G Axis (1A3size drawing)

copy

BBVN-FIVE-S2-SC-TS-00272
BBVN-FIVE-S2-SC-TS-00273
BBVN-FIVE-S2-SC-TS-00274

14/09/25
14/09/26
14/09/26

IR/M&E-383 & IR/M&E-385 (signature)_2 copies


As- built lever for decking
Clean Room -Finishing Works Ceiling & Parition Wall

2
1
1

copy
copy
copy

BBVN-FIVE-S2-SC-TS-00275
BBVN-FIVE-S2-SC-TS-00276
BBVN-FIVE-S2-SC-TS-00277

14/09/27
14/09/29
14/09/29

1
1
1

ORG (set)
copy
copy

BBVN-FIVE-S2-SC-TS-00278
BBVN-FIVE-S2-SC-TS-00279
BBVN-FIVE-S2-SC-TS-00280
BBVN-FIVE-S2-SC-TS-00281
BBVN-FIVE-S2-SC-TS-00282

14/09/29
14/09/29
14/09/30
14/09/30
14/10/01

Red Invoice For IPC NO.4


As-built drawing for DB-1E, 1C, ID, GC
IN_ASD_0058/R1 dated 05-September-2014 Quality control Plan for
Waterproofing Work (QCP-5)_Rev.1 (Approval)
Brick wall elevation axis Z
Clean Room Doors
FM-200 System (for FM submission)
Magnetic Lock
Monthly Statement No.6 Interim Payment (Summary & Building)
M&E 1St Interim Payment (M&E IPC No.6)

1
1
1
1
1
1

copy
copy
copy
sample
Book File c

BBVN-FIVE-S2-SC-TS-00283
BBVN-FIVE-S2-SC-TS-00284
BBVN-FIVE-S2-SC-TS-00285

14/10/01
14/10/01
14/10/01

Monthly Statemant No.5 Interim Payment


Underground Fire Fighting Plan Schedule
Clean Room Sprinklers

1
1
1

Original
copy
copy

BBVN-FIVE-S2-SC-TS-00286
BBVN-FIVE-S2-SC-TS-00287

14/10/01
14/10/01

1
1

copy
copy

BBVN-FIVE-S2-SC-TS-00288

14/10/02

Atlas Copco Letter ragarding Air Compressor


FIKE Design Information - Ckean Agent System W/Impulse
Technology HFC-227EA Agent
Ho so hoan cong: Nang cong suat tram bien ap (As-Built document:
Improve the transformer capacity) 2000kVA-35(22)/0.4kV

copy (Vietnamese)

BBVN-FIVE-S2-SC-TS-00289

14/10/03

Monthly Statement No.5 (Interim Payment)

Original copy

BBVN-FIVE-S2-SC-TS-00290

14/10/03

copy

BBVN-FIVE-S2-SC-TS-00291

14/10/06

NCR-23 dated 1-October-2014 Unsatisfactory welding quality on


sarnafil layer gridline (L-N&20-21) and CSA3-OCT-2014
IN_APD-0008/R3 dated 22-April-2014 ITP rev.3 and IN_APD-68/R1
dated 22-September-2014 Quality Control Plan for Floor Finishing
Works_QCP-8 (1)_Rev.1

copy

BBVN-FIVE-S2-SC-TS-00292
BBVN-FIVE-S2-SC-TS-00293

14/10/07
14/10/09

4
1

Original
Copy

BBVN-FIVE-S2-SC-TS-00294
BBVN-FIVE-S2-SC-TS-00295

14/10/09
14/10/09

Monthly Payment No.5


DKE comments on drawings for PCCC Resubmission (7A3size
drawings) (refer to DT119 dated 8-Oct-2014 from BB); DIA Lux
Thorn 96 535 724 DUOPRF 3x36W T26 HF IP65 L840 [STD]
Luminaire Data Sheet
Monthly Payment No.5
IN-AMS-65/R1 dated 19-September-2014: MS-BLD.51- Demolition
Work for Office Area & Column A12_Rev.1 Revised based on
comments in AMS-65 dated 7-August-2014

Original
Copy

BBVN-FIVE-S2-SC-TS-00296

14/10/09

IN-AMS-110(A)/R1 datd 9-Oct-2014 MS-BLD.14-C-1: Finishing


Works- (Flooring Epoxy Floor)
Revised based on comments in AMS_110 dated 18- Sep- 2014 and INAMS-110 (C )/R1 dated 9-Oct-2014 MS-BLD.14-C-3: Finishing
Works- (Moisture Barrier)
Revised based on comments in AMS_110 dated 18- Sep- 2014

Copy

BBVN-FIVE-S2-SC-TS-00297

14/10/10

Drawings:
Clean Room Key Plan

Copy

14/10/10

BBVN-FIVE-S2-SC-TS-00298

14/10/10

BBVN-FIVE-S2-SC-TS-00299
BBVN-FIVE-S2-SC-TS-00300

14/10/13
14/10/13

BBVN-FIVE-S2-SC-TS-00301
BBVN-FIVE-S2-SC-TS-00302
BBVN-FIVE-S2-SC-TS-00303

14/10/14
14/10/14

BBVN-FIVE-S2-SC-TS-00304

14/10/14

BBVN-FIVE-S2-SC-TS-00305

14/10/15

CLEAN ROOM SECTION DETAIL - SHEET 1


CLEAN ROOM SECTION DETAIL - SHEET 2
CLEAN ROOM SECTION DETAIL - SHEET 3
CLEAN ROOM TYPICAL DETAILS - SHEET 1
CLEAN ROOM TYPICAL DETAILS - SHEET 2
HANGER WITH OFFSET 65MM
CEILING LAYOUT H=4000MM
HANGER POINT PLAN
WALL LAYOUT
WALL ELEVATION (1 OF 3)
WALL ELEVATION (2 OF 3)
WALL ELEVATION (3 OF 3)
Calculation and Report for PCCC re-submission: Fire services report PCCC; Report-Heating, ventilation & cooling system; Report-Fire
fighting system; Hydraulic calculation (Production) CD

copy

Toilet Perspective (8A3size drawings)


CLEAN ROOM SECTION KEY PLAN
CLEAN ROOM SECTION DETAIL - SHEET 1
CLEAN ROOM SECTION DETAIL - SHEET 2
CLEAN ROOM SECTION DETAIL - SHEET 3
CLEAN ROOM SECTION DETAIL - SHEET 4

1
1

copy
copy

IN-ASD-159 date 13-Oct-2014


IN-ASD_0031/R1 dated 12-June-2014 Male & Female Ground Floor
Toilet & Changing Room.
IN-ASD_0047/R1 dated 12-June-2014 Office Toilet Drawings
IN-AASD-124/R1 dated 18-Aug-2014 Aluminum Composite Cladding
Shop Drawings
IN_AMS-120 dated 14-October-2014 MS-55 Waterproofing for
bathrooms & Others Wet Areas

1
1

copy
copy

copy

copy

BBVN-FIVE-S2-SC-TS-00306

14/10/15

IN_AMS-120 dated 14-October-2014 MS-55 Waterproofing for


bathrooms & Others Wet Areas; IN_APD-77/R1 dated 14-October2014 Quality Control Plan for Finishing Work_Painting for Wall &
Ceiling (QCP-8 (2))_Rev.1; IN_APD-83 dated 14-October-2014
Quality Control Plan for Ceiling Work (QCP-8 (3))

copy

BBVN-FIVE-S2-SC-TS-00307

14/10/15

IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for


Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1

copy

BBVN-FIVE-S2-SC-TS-00308

14/10/15

IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for


Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1

copy

BBVN-FIVE-S2-SC-TS-00309

14/10/15

copy

BBVN-FIVE-S2-SC-TS-00310

14/10/15

copy

BBVN-FIVE-S2-SC-TS-00311

14/10/17

copy

BBVN-FIVE-S2-SC-TS-00312

14/10/17

copy

BBVN-FIVE-S2-SC-TS-00313

14/10/20

copy

BBVN-FIVE-S2-SC-TS-00314
BBVN-FIVE-S2-SC-TS-00315
BBVN-FIVE-S2-SC-TS-00316
BBVN-FIVE-S2-SC-TS-00317
BBVN-FIVE-S2-SC-TS-00318
BBVN-FIVE-S2-SC-TS-00319
BBVN-FIVE-S2-SC-TS-00320

14/10/21
14/10/21
14/10/21
14/10/21
14/10/21
14/10/21
14/10/22

IN_APD-77/R1 dated 14-October-2014 Quality Control Plan for


Finishing Work_Painting for Wall & Ceiling (QCP-8 (2))_Rev.1;
IN_APD-83 dated 14-October-2014 Quality Control Plan for Ceiling
Work (QCP-8 (3))
IN_APD-83 dated 14-October-2014 Quality Control Plan for Ceiling
Work (QCP-8 (3))
Updated List of Mock-up, Remaining Material List, Main Equipment
List (M&E)
IN_APD-85 dated 17-October-2014 Quality Control Plan for Partition
Work (QCP-8 (4))
BV-137206/6011/SMZ-141016/D397 (RFC-128 dated 17-OCT-2014)
Power Distribution System Modification
Clean Room Ceiling Mock-up List
Equipment Delivery Schedule for RFC-26
Production Exhaust Filter c/w Housing
Panel Status
NDT Test Report
As-built Roof Level/Elevation (1A3size drawing)
(MOM Item 9.42) FM 200 Refilling Station at Hochiminh city,
Vietnam

1
1
1
1
1
1
1

copy
copy
copy
copy
copy
copy
copy

BBVN-FIVE-S2-SC-TS-00321
BBVN-FIVE-S2-SC-TS-00322
BBVN-FIVE-S2-SC-TS-00323
BBVN-FIVE-S2-SC-TS-00324
BBVN-FIVE-S2-SC-TS-00325

14/10/22
14/10/23
14/10/25
14/10/25
14/10/25

1
1

copy
copy

1
1

copy
copy

IN-ASD-150 -Ground Floor and 1st Floor Ceiling Details


NDT Test Schedule
Sprinkler Head Inspection (3A3size photos, checklist/check sheet,
1A3size drawing)

BBVN-FIVE-S2-SC-TS-00326
BBVN-FIVE-S2-SC-TS-00327
BBVN-FIVE-S2-SC-TS-00328

14/10/27
14/10/27
14/10/29

IN_AMS-100 (B)/R2 dated 25-October-2014


Lighting calculation for cleanroom
M&E Interim Payment (M&E IPC No.7) [A4size bookfile] and
Monthly Statement No.7 Interim Payment [A3size bookfile]

1
1
1

copy
copy
copy

BBVN-FIVE-S2-SC-TS-00329
BBVN-FIVE-S2-SC-TS-00330

14/10/31
14/11/04

4
1

ORIGINAL
Copy

BBVN-FIVE-S2-SC-TS-00331

14/11/04

Original

BBVN-FIVE-S2-SC-TS-00332

14/11/05

Copy

BBVN-FIVE-S2-SC-TS-00333
BBVN-FIVE-S2-SC-TS-00334
BBVN-FIVE-S2-SC-TS-00335
BBVN-FIVE-S2-SC-TS-00336
BBVN-FIVE-S2-SC-TS-00337
BBVN-FIVE-S2-SC-TS-00338
BBVN-FIVE-S2-SC-TS-00339
BBVN-FIVE-S2-SC-TS-00340
BBVN-FIVE-S2-SC-TS-00341
BBVN-FIVE-S2-SC-TS-00342
BBVN-FIVE-S2-SC-TS-00343
BBVN-FIVE-S2-SC-TS-00344
BBVN-FIVE-S2-SC-TS-00345
BBVN-FIVE-S2-SC-TS-00346
BBVN-FIVE-S2-SC-TS-00347
BBVN-FIVE-S2-SC-TS-00348
BBVN-FIVE-S2-SC-TS-00349
BBVN-FIVE-S2-SC-TS-00350
BBVN-FIVE-S2-SC-TS-00351
BBVN-FIVE-S2-SC-TS-00352
BBVN-FIVE-S2-SC-TS-00353
BBVN-FIVE-S2-SC-TS-00354
BBVN-FIVE-S2-SC-TS-00355
BBVN-FIVE-S2-SC-TS-00356
BBVN-FIVE-S2-SC-TS-00357

14/11/07
14/11/07

Monthly Statement No.6_Interim Payment


V/O No.30 Asphalt Road Increase Area IN_D290 (RFC-55) dated 31July-2014; V/O No. 45 Ramp Adjustment IN_D349dated 29-August2014
As-built Foundation, CBP for First Floor and Trench Pit (26A3size
drawings)
Slab Level before Moisture Barrier Application (3A3size page)_1st
Time
VAT Red Bill For IPC No.06
Monitoring Panel Table for Power On Schedule

1
1

Original
copy

BBVN-FIVE-S2-SC-TS-00358
BBVN-FIVE-S2-SC-TS-00359
BBVN-FIVE-S2-SC-TS-00360
BBVN-FIVE-S2-SC-TS-00361
BBVN-FIVE-S2-SC-TS-00362
BBVN-FIVE-S2-SC-TS-00363
BBVN-FIVE-S2-SC-TS-00364
BBVN-FIVE-S2-SC-TS-00365
BBVN-FIVE-S2-SC-TS-00366
BBVN-FIVE-S2-SC-TS-00367
BBVN-FIVE-S2-SC-TS-00368
BBVN-FIVE-S2-SC-TS-00369
BBVN-FIVE-S2-SC-TS-00370
BBVN-FIVE-S2-SC-TS-00371
BBVN-FIVE-S2-SC-TS-00372
BBVN-FIVE-S2-SC-TS-00373
BBVN-FIVE-S2-SC-TS-00374
BBVN-FIVE-S2-SC-TS-00375
BBVN-FIVE-S2-SC-TS-00376
BBVN-FIVE-S2-SC-TS-00377
BBVN-FIVE-S2-SC-TS-00378
BBVN-FIVE-S2-SC-TS-00379
BBVN-FIVE-S2-SC-TS-00380
BBVN-FIVE-S2-SC-TS-00381
BBVN-FIVE-S2-SC-TS-00382
BBVN-FIVE-S2-SC-TS-00383
BBVN-FIVE-S2-SC-TS-00384
BBVN-FIVE-S2-SC-TS-00385
BBVN-FIVE-S2-SC-TS-00386
BBVN-FIVE-S2-SC-TS-00387
BBVN-FIVE-S2-SC-TS-00388
BBVN-FIVE-S2-SC-TS-00389
BBVN-FIVE-S2-SC-TS-00390
BBVN-FIVE-S2-SC-TS-00391
BBVN-FIVE-S2-SC-TS-00392
BBVN-FIVE-S2-SC-TS-00393
BBVN-FIVE-S2-SC-TS-00394
BBVN-FIVE-S2-SC-TS-00395

BBVN-FIVE-S2-SC-TS-00396
BBVN-FIVE-S2-SC-TS-00397
BBVN-FIVE-S2-SC-TS-00398
BBVN-FIVE-S2-SC-TS-00399
BBVN-FIVE-S2-SC-TS-00400
BBVN-FIVE-S2-SC-TS-00401
BBVN-FIVE-S2-SC-TS-00402
BBVN-FIVE-S2-SC-TS-00403
BBVN-FIVE-S2-SC-TS-00404
BBVN-FIVE-S2-SC-TS-00405
BBVN-FIVE-S2-SC-TS-00406
BBVN-FIVE-S2-SC-TS-00407
BBVN-FIVE-S2-SC-TS-00408
BBVN-FIVE-S2-SC-TS-00409
BBVN-FIVE-S2-SC-TS-00410
BBVN-FIVE-S2-SC-TS-00411
BBVN-FIVE-S2-SC-TS-00412
BBVN-FIVE-S2-SC-TS-00413
BBVN-FIVE-S2-SC-TS-00414
BBVN-FIVE-S2-SC-TS-00415
BBVN-FIVE-S2-SC-TS-00416
BBVN-FIVE-S2-SC-TS-00417
BBVN-FIVE-S2-SC-TS-00418

14/10/09

Send to/Receiver

Author/Remarks

File Code

Volume
Vol 01
Vol 01

Hard & Soft


Hard
Soft

Mrs. Nguyet BB
Ms. Thu

Mr. Oscar

Thu
Thu

BB, BV

Ngo Duy Ngoc (North Star)


Tam (North Star)

Tam (North Star)


Ms. Hiep, Ms. Thu
Tam (North Star)
a Kien Northstar
a Quang VINACONEX2

a Giang/a Lam Seico

Mr. Ho Tuong Long LS


Ms. Hiep
Ms. Tam
Ms. Hiep
Ms. Hiep

Ms. Hiep
Ms. Hiep
Ms. Hiep
Ms. Hiep

Ms. Hiep
Mr. Binh
Ms. Hiep
Ms. Tam
Mr. Nham
Mr. Nguyen/Mr. Nham
Mr Quang/Ms. Tam
Ms. Hiep
Ms. Thu
Ms. Tam
Ms. Hiep
Ms. Hiep
MS. Hiep
Ms. Tam
Ms. Tam
Ms. Tam
Mr. Bnh
Ms. Tam
Ms. Tam

Ms. Tam
Vinaconex_2 (Mr. Bach Quoc
Binh)
North Star
Ms. Tam
Ms. Tam
Ms. Tam

BB, BV, LS
Ms. Tam

Ms. Tam
Ms. Tam
Mr. Binh

Mr. Binh & Ms. Tam


Mr. Nham
Mr. Lam SEICO
BB, BV
Mr. Binh VINACONEX2
Ms. Tam
Ms. Tam

BB, BV

Vinaconex_2 (Mr. Bach Quoc


Binh)
Ms. Tam
Mr. Long_LS
Tung QS

BB, BV

Ms. Tam
Ms. Tam, Mr. Binh
BB, BV
BB, BV
Mr. Binh
Mr. Lam SEICO
Ms. Tam
Ms. Tam
BB, BV
BB
Mr. Binh

NS, Vinaconex2

NS, Vinaconex3

BB, BV
NS
NS
NS, VNC2
LS

HACXO - SEICO
BV
NS, VNC2
NS, VNC2
BB, BV

Vinaconex2, North Star


Vinaconex2, North Star
NS
Vinaconex2, North Star
Vinaconex2, North Star
Vinaconex2, North Star
Vinaconex2

BB, BV
BB, BV, NS, VNC2
NS
LS, BB, BV
BB, BV

BV
NS
BB, BV

NS
NS, VNC2

BB, BV
BV

Vinaconex2

BV

NS
BB, BV
Vinaconex2, Vinh Hiep Hung
VNC2, NS
BB, BV
BB, BV

BB
NS
NS, VNC2
NS
NS

NS
SEICO
BB, BV
BV
BB

NS
NS, VNC2, Hung Trang, Vien
Dong, Nhat Hoa ICT, Dai Vu

Langdon Seah
NS, VNC2

NS

NS
NS
SEICO

NS
NS, VNC2
NS

NS, VNC2
BB, BV
BB, BV
BB, BV
BB (red stamp), BV
NS
NS
VNC2

VNC2
NS, VNC2

BB, BV
NS
BB., BV
BB., BV
NS

BB, BV
BB, BV
NS

NS
BB, BV, LS
NS, VNC2
BV
BB, BV
NS
BB, BV
RCR
BB, BV
RCR (Mr. Thang)
BV
RCR (Mr. Thang)
NS
BB, BV

NS, VNC2
BB, BV, NS, VNC2
BB
NS
VNC2
RCR (Mr. Thang)

BB. BV
VNC2, NS
NS
BB, BV
SEICO

VNC2
VINASANWA (mr. Hung)
RCR
RCR (full set)
NS+ VNC2

NS+ VNC2

RCR

(Diem)

BB, BV
BB, BV

BB, BV

VNC2

VNC2, NS
NS
BV
BB, BV
NS
VNC2
BB

Tuan Anh

BB, BV, LS

NS

Incoming from BB 23/08/2014

Langdon Seah (MR. Long Associate)


BB, BV, LS

Tung QS

VNC2

Tuan Anh

BV

Trung ME

BB, BV
NS, VNC2
BV
BB, Bv, VNC2, NS
NS

NS, VNC2
NS

Trung ME
Cuong

VNC2, NS
BB, BV
NS
NS

BB
Viet Chau
BB

Nhat Hoa ITC


VNC2, NS
BB

NS
NS
NS
NS

NS
BB, BV
VNC2, NS

VNC2
BB, BV
BB, BV, LS
BB
BB
BV
BB (Mr. Thanhf)
C-Chanel (Mr. Yoong)
BB

Vinaconex2, NS
BB/BV

BB/BV
BB/BV
Langdon Seah (MR. Long Associate)
BB/BV
BB (Mr. Thanhf)

NS, VNC2

SEICO, VNC2
VNC2, NS
VNC2, SEICO
BB, BV
NS
C-Chanel (Mr. Yoong)
BB, BV
NS
BB, BV
VNC2
BV
BV, BB
C-Chanel (Mr. Yoong)
Nhat Hoa ITC
BB(Bernd Plocher)
BB
Hung Trang
Vinaconex(Mr.Phuc)
C-Chanel (Mr. Yoong)
BV
VINASANWA( Mr.Hung)
BB,BV,Langdon Seah(Mr.Long)

As-built drawing

BV,Langdon Seah
BV, BB
BV, BB , Langdon Seah(Mr.Long)
BV, BB
BV,BB
BV,BB

Langdon Seah (MR. Long Associate)


Hung Trang (Le Xuan Muoi)
1. i V ITC
2. Nht Hoa ITC
3. Vien Dong
4. Vinaconex 2
BB
North Star

BB(Bernd Plocher)
VNC2, Vien Dong

Dai Vu

Chanel System (Yong)


SD-BBVN2-SUB-CHA-CLN-CLG-LAY-01A

A3

Chanel System (Yong)


SD-BBVN2-SUB-CHA-CLN-CLG-SEC-01
SD-BBVN2-SUB-CHA-CLN-CLG-SEC-02
SD-BBVN2-SUB-CHA-CLN-CLG-SEC-03
SD-BBVN2-SUB-CHA-CLN-CLG-TYP-01A
SD-BBVN2-SUB-CHA-CLN-CLG-TYP-01B
SD-BBVN2-SUB-CHA-CLN-CLG-TYP-32
SD-BBVN2-SUB-CHA-CLN-CLG-LAY-01A
SD-BBVN2-SUB-CHA-CLN-CLG-LAY-02
SD-BBVN2-SUB-CHA-CLN-PRT-LAY-01
SD-BBVN2-SUB-CHA-CLN-PRT-ELE-01
SD-BBVN2-SUB-CHA-CLN-PRT-ELE-02
SD-BBVN2-SUB-CHA-CLN-PRT-ELE-03

North Star

North Star
VINACONEX2, VIEN DONG

North
14/10/25
Star
return
docume
nt & CD

SD-BBVN2-SUB-CHA-CLN-CLG-LAY-01A
SD-BBVN2-SUB-CHA-CLN-CLG-LAY-SEC-01
SD-BBVN2-SUB-CHA-CLN-CLG-LAY-SEC-02
SD-BBVN2-SUB-CHA-CLN-CLG-LAY-SEC-03
SD-BBVN2-SUB-CHA-CLN-CLG-LAY-SEC-04

Vinaconex2
North Star

North Star
Hung Trang

A3
A3
A3
A3
A3
A3
A1
A1
A1
A1
A1
A1

Vinaconex2

Dai Vu

Doan Thanh

Vien Dong, Nhat Hoa ITC

Channel System
BB, BV
Vien Dong (mr. Long)
North Star
BB, BV
BB, BV
BB, BV
BB, BV
BB, BV
BB, BV
BB, BV
BB, BV
Vien Dong(Mr.Long)
BB, BV
BB, BV

APD

Dai Vu
BB, BV
BB, BV, Langdon Seah

BV
BB, BV, Langdon Seah

BV, BB
BB, BV
BB
BB, BV

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

BV-137206-1009-140312/HSI01

14/03/12

BV-137206-1009-140313/HSI02

14/03/13

BV-137206-1009-140321/HSI03

14/03/21

BV-137206-1009-140418/HSI04

14/04/18

BV-137206-1009-140428/HSI05
BV-137206-1009-140428/HSI06
BV-137206-1009-140505/HSI07

14/04/28
14/04/28
14/05/05

Request for Installation electric cabinet and warning sign at live


10A4 photos
cable, stop pumping water at site
Request for installation hard barricade for deep hole, provide rubbish 1A4size photo
bin and toilet temporary at site
Request for installation drainage system and cover electric wire at
washing bay
Request for checking during night time at project area and bilingual
permit to work
Water Discharge on adjacent Properties
Installation for Lightning system (SMZ & Vinaconex Office)
Request for Cleaning Up Public road and Drain Stagnant water
4A4size photos

BV-137206-1009-140514/HSI08
BV-137206-1009-140519/HSI09
BV-137206-1009-140521/HSI10
BV-137206-1009-142305/HSI11
BV-137206-1009-142405/HSI12
BV-137206-1009-143005/HSI13
BV-137206-1009-140623/HSI14
BV-137206-1009-140623/HSI15
BV-137206-1009-140630/HSI16
BV-137206-1009-140702/HSI17
BV-137206-1009-140701/HSI18
BV-137206-1009-140708/HSI19
BV-137206-1009-140711/HSI20
BV-137206-1009-140711/HSI21
BV-137206-1009-140717/HSI22
BV-137206-1009-140718/HSI23
BV-137206-1009-140723/HSI24
BV-137206-1009-140723/HSI25
BV-137206-1009-140731/HSI26
BV-137206-1009-140805/HSI27
BV-137206-1009-140805/HSI28
BV-137206-1009-140811/HSI29
BV-137206-1009-140806/HSI30
BV-137206-1009-140812/HSI31
BV-137206-1009-140822/HSI32
BV-137206-1009-140909/HSI33
BV-137206-1009-140910/HSI34
BV-137206-1009-140910/HSI35
BV-137206-1009-140918/HSI36
BV-137206-1009-140918/HSI37
BV-137206-1009-140918/HSI38
BV-137206-1009-140922/HSI39
BV-137206-1009-140922/HSI40
BV-137206-1009-140922/HSI41
BV-137206-1009-140930/HSI42
BV-137206-1009-141003/HSI43
BV-137206-1009-141009/HSI44
BV-137206-1009-141011/HSI45
BV-137206-1009-141011/HSI46
BV-137206-1009-141003/HSI47
BV-137206-1009-141103/HSI48
BV-137206-1009-141103/HSI49
BV-137206-1009-141103/HSI50
BV-137206-1009-141105/HSI51
BV-137206-1009-141106/HSI52
BV-137206-1009-141003/HSI53

14/05/14
14/05/19
14/05/22
14/05/23
14/05/24
14/05/30
14/06/23
14/06/23
14/06/30
14/07/02
14/07/03
14/07/08
14/07/11
14/07/11
14/07/17
14/07/18
14/07/23
14/07/23
14/07/31
14/08/05
14/08/05
14/08/11
14/08/06
14/08/12
14/08/22
14/09/09
14/09/10
14/09/11
14/09/18
14/09/18
14/09/18
14/09/22
14/09/22

Sadety Improvement
Request Safety Issue
Incompliance of minimum HSE Equipments
Improvement of Security entrance post
Cable isolation and arrangement
Control Speed of Heavy Trucks on Site
Unsafe Access of Ramp
Wearing Safety Glass on Site
Set up life line system for working at height
Set up Stable Access for Heavy Crane
Working platform for rebar and transfering material
Protect web sling
Housekeeping at Stage 1
Set up safety net system
Covering all openings of gridline 12
No Smoking at roof of main building
Pumping Stagant Water
Covering the gap for the cladding of column GL 12-A
Sprinkler pipe system protection
Missing PPE
Housekeeping Materials and tools
Washing Bay Improvements
Protection the Floor at Storage area
HSE Supervisor at night shift
Damage Road at Stage 1
Housekeeping on site
Hard Barricade a visitor balcony area
Working with scissor lift
Concrete beam is impacting the scaffolding
Housekeeping on site
Unsafe Working Conditions
Unsafe Working Condition
Unsafe Working Condition

14/09/30
14/10/03
14/10/09
14/10/11
14/10/11
14/10/20
14/11/03
14/11/03
14/11/03
14/11/05
14/11/06

Unsafe Conditioin at 12 Gridline


Lifeline System
Lighting Condition
Personal Protective Equipment
Housekeeping at AHU area
Working at height
Unsafe Scaffolding at Gridline Z
Concrete on the Top of Column at Gridline 12
Dust on Walkable Ceiling
Unsafe Activities at Stage 1
Training Protocol 1at Clean Stage at Clean Room Area

7A4size photos
1A4size photo
3A4size photos
1A4size photo
1A4size photo
1A4size photo
2A4size photos
3A4size photos
2A4size photos
4A4size photos
1A4size photo
2A4size photos
1A4size photo
2A4size photos
1A4size photo
1A4size photo
2A4size photos
2A4size photos
2A4size photos
2A4size photos
1A4size photo
3A4size photos
2A4size photos
1A4size photo
1A4size photo
2A4size photos
3A4size photos
1A4size photo
6A4size photos

2A4size photos
1A4size photo
3A4size photos
4A4size photos
2A4size photos
5A4size photos
2A4size photos
8A4size photos
10A4 photos
3A4size photos

270
Delivered to

Toan Safety
Toan Safety
Hoang Safety
Hoang Safety
Nguyen, Hoang safety
Nguyen, Hoang safety
Nguyen, Hoang safety
Nguyen, Hoang safety, Quang
Nguyen, Hoang safety
Nguyen, Hoang safety
Nguyen, Hoang safety, Quang M&E
Nguyen, Hoang safety, Quang M&E
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu, Quang
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike
Nguyen, Hoang Safety, Tu, Mike

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

271
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

272
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

273
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

274
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

275
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

276
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

277
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

278
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

279
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

280
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

281
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

282
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

283
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

284
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

285
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

286
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

287
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

288
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

289
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

290
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

291
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

292
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

293
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

294
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

295
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

296
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

297
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

298
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

299
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

300
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

301
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

302
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

303
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

304
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

305
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

306
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

307
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

308
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

309
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

310
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

311
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

312
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

313
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

314
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

315
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

316
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

317
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

318
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

319
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

320
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

321
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

322
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

323
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

324
Delivered to

45.00

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

325
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

326
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

327
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

328
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

329
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

330
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

331
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

332
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

333
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

334
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

335
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

336
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

337
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

338
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

339
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

340
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

341
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

342
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

343
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

344
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

345
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

346
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

347
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

348
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

349
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

350
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

351
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

352
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

353
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

354
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

355
Delivered to

Correspondence submission to PCI

356

Correspondence submission to PCI

357

Correspondence submission to PCI

358

Correspondence submission to PCI

359

Correspondence submission to PCI

360

Correspondence submission to PCI

361

Correspondence submission to PCI

362

Correspondence submission to PCI

363

Correspondence submission to PCI

364

Correspondence submission to PCI

365

Correspondence submission to PCI

366

Correspondence submission to PCI

367

Correspondence submission to PCI

368

Correspondence submission to PCI

369

Correspondence submission to PCI

370

Correspondence submission to PCI

371

Correspondence submission to PCI

372

Correspondence submission to PCI

373

Correspondence submission to PCI

374

Correspondence submission to PCI

375

Correspondence submission to PCI

376

Correspondence submission to PCI

377

Correspondence submission to PCI

378

Correspondence submission to PCI

379

Correspondence submission to PCI

380

Correspondence submission to PCI

381

Correspondence submission to PCI

382

Correspondence submission to PCI

383

Correspondence submission to PCI

384

Correspondence submission to PCI

385

Correspondence submission to PCI

386

Correspondence submission to PCI

387

Correspondence submission to PCI

388

Correspondence submission to PCI

389

Correspondence submission to PCI

390

Correspondence submission to PCI

391

Correspondence submission to PCI

392

Correspondence submission to PCI

393

Correspondence submission to PCI

394

Correspondence submission to PCI

395

Correspondence submission to PCI

396

Correspondence submission to PCI

397

Correspondence submission to PCI

398

Correspondence submission to PCI

399

Correspondence submission to PCI

400

Correspondence submission to PCI

401

Correspondence submission to PCI

402

Correspondence submission to PCI

403

Correspondence submission to PCI

404

Correspondence submission to PCI

405

Correspondence submission to PCI

406

Correspondence submission to PCI

407

Correspondence submission to PCI

408

Correspondence submission to PCI

409

Correspondence submission to PCI

410

Correspondence submission to PCI

411

Correspondence submission to PCI

412

Correspondence submission to PCI

413

Correspondence submission to PCI

414

Correspondence submission to PCI

415

Correspondence submission to PCI

416

Correspondence submission to PCI

417

Correspondence submission to PCI

418

Correspondence submission to PCI

419

Correspondence submission to PCI

420

Correspondence submission to PCI

421

Correspondence submission to PCI

422

Correspondence submission to PCI

1,244,000

423

Correspondence submission to PCI

424

Correspondence submission to PCI

425

Correspondence submission to PCI

426

Correspondence submission to PCI

427

Correspondence submission to PCI

428

Correspondence submission to PCI

429

Correspondence submission to PCI

430

Correspondence submission to PCI

431

Correspondence submission to PCI

432

Correspondence submission to PCI

433

Correspondence submission to PCI

434

Correspondence submission to PCI

435

Correspondence submission to PCI

436

Correspondence submission to PCI

437

Correspondence submission to PCI

438

Correspondence submission to PCI

439

Correspondence submission to PCI

440

Correspondence submission to PCI

441

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

442
Delivered to

BV-137206/609/130826/SC/SI-01

14/03/12

BV-137206/609/130826/SC/SI-01
BV-137206/609/140516/SC/SI-02
BV-137206/609/140521/SC/SI-03
BV-137206/609/140526/SC/SI-04
BV-137206/609/140526/SC/SI-05

14/07/27
14/05/16
14/05/21
14/05/26
14/05/26

Request for Installation electric cabinet and warning sign at live


cable, stop pumping water at site
Earthworks. Backfilling of Stage 2 area
Foundation Works. Improvement for next stages
Foundation Works. Waiting bar for ground slad
Improvement of Concrete Quality
Schedule Recovery Plan

BV-137206/609/140529/SC/SI-06

14/05/29

Report after Inspection at SEICO (Steel Structure Supplier) Factory

BV-137206/609/140530/SC/SI-07
BV-137206/609/140609/SC/SI-08

14/05/31
14/06/09

BV-137206/609/140609/SC/SI-09
BV-137206/609/140610/SC/SI-10
BV-137206/609/140610/SC/SI-11
BV-137206/609/140618/SC/SI-12
BV-137206/609/140618/SC/SI-13
BV-137206/609/140619/SC/SI-14
BV-137206/609/140619/SC/SI-15
BV-137206/609/140627/SC/SI-16

14/06/09
14/06/10
14/06/10
14/06/18
14/06/18
14/06/19
14/06/19
14/06/27

Ground Beam Sleeve


Report after Inspection at SEICO (Steel Structure Supplier) Factory
2nd time
Concrete Curing Progress
Backfilling Method
Backfilling Material
Welding Issue on Factory
Concrete for Footing
Rain Water pipe position
Embeded steel plate
Scratch positions during transportation and unloading steel structure

BV-137206/609/140630/SC/SI-17

14/06/30

BV-137206/609/140702/SC/SI-18

14/07/02

BV-137206/609/140703/SC/SI-19

14/07/03

BV-137206/609/140703/SC/SI-20
BV-137206/609/140711/SC/SI-21

14/07/03
14/07/11

Scratch positions during transportation and unloading steel structure


2nd time)
Steel Structure Schedule
Removal of Underground GI piping works at warehouse area

BV-137206/609/140703/SC/SI-22
BV-137206/609/140717/SC/SI-23
BV-137206/609/140703/SC/SI-24
BV-137206/609/140717/SC/SI-25

14/07/14
14/07/17
14/07/14
14/07/17

Verticalityof concrete column


Honeycomb of Column GL21Y
Surface of concrete column
Shop Drawing for bar bending for ground slab Zone 2, Xone 3

BV-137206/609/140703/SC/SI-26
BV-137206/609/140703/SC/SI-27
BV-137206/609/140703/SC/SI-28
BV-137206/609/140703/SC/SI-29
BV-137206/609/140703/SC/SI-30
BV-137206/609/140703/SC/SI-31
BV-137206/609/140703/SC/SI-32
BV-137206/609/140719/SC/SI-33
BV-137206/609/140721/SC/SI-34

14/07/17
14/07/17
14/07/17
14/07/17
14/07/19
14/07/19
14/07/19
14/07/19
14/07/21

Warning of sub-concrete column along axis 21


Protection for mezzanine floor
Quality of Painting for roof bracing
Lean Concrete surface before applying Xypec
Notice during loading and unloading progress
Aluminum Cladding Material
Testing Results Submission
Technical document of torque wrench
Submission of Holiday Tester for FF System (Underground Pipe)

1A4size photo
1A4size photo
3A4size photos
2A4size photos
1A4size photo

Tu, Nguyen, Tuan Anh


Tu, Nguyen, Tuan Anh
Tu, Nguyen, Tuan Anh
Tu, Nguyen, Tuan Anh
Tu, Nguyen, Tuan Anh
Tu, Nguyen, Tuan Anh
Tu, Nguyen, Tuan Anh
Tu, Nguyen, Tuan Anh
Tu, Nguyen, Quang, (T. Anh), Mike

BV-137206/609/140724/SC/SI-35

14/07/24

5A4 photos

Tu, Nguyen, T. Anh, Mike

BV-137206/609/140724/SC/SI-36
BV-137206/609/140728/SC/SI-37
BV-137206/609/140731/SC/SI-38
BV-137206/609/140731/SC/SI-39
BV-137206/609/140731/SC/SI-40
BV-137206/609/140731/SC/SI-41
BV-137206/609/140802/SC/SI-42

14/07/24
14/07/28
14/07/31
14/07/31
14/07/31
14/07/31
14/08/02

BV-137206/609/140802/SC/SI-43

14/08/02

Protection and Caring of Installed Rain Water Pipe along GL a and


GL Z
Quality Document Control
Brickwork issues
Brickwork issues 2nd time
Heavy Rain during Casting Concrete
Preventive action for Casting Concrete at Ground Slab
Correct Damage Rebar at Ground Beam
Protection and Proper Covering of Sewer and rian manhole and
stormline and sealing of HDPE pipe sleeve
Submission of Holiday Tester for FF System (Underground Pipe)

BV-137206/609/140802/SC/SI-44

14/08/02

Rainwater pipe joining fusion welding Works for underground


rainwater pipe of Stage 2 area
Submittal of Shop Drawing for M&E opening and embeded item

Mr. Tu, Nguyen, Hoang Safety

5A4 photos
1A4size photo
1A3size page

21A4 size page photos (4


photos)

Mr. Tu, Nguyen, Hoang Safety


Mr. Tu, Nguyen, Hoang Safety
Mr. Tu, Nguyen, Hoang Safety
Tu, Nguyen, Tuan Anh/Hoang QC
Tu, Nguyen, Tuan Anh, Quang, Thanh,
Tung QS
All SMZ members (email)

Tu, Nguyen, Tuan Anh

1A4size photo
2A4size photos

Tu. Nguyen, Tuan Anh


Tu. Nguyen, Tuan Anh
Tu. Nguyen, Tuan Anh
Tu, Tuan Anh
Tu, Tuan Anh
Tu. Nguyen, Tuan Anh
Tu. Nguyen, Tuan Anh
Tu. Nguyen, Tuan Anh

4A4size photos

Tu, Nguyen, Quang

1A4size drawing, 1 A4size


schedule
3A4size photos

Tu, Quang, Cuong

1A4size photo
1A4size photo
1A4size photo
1A4size photo

2A4size photos

2A4size photos
3A4size photos

1A4size photo
3A4size photos
3A4size photos
1A4size photo
2A4size photos

Tu. Nguyen, Tuan Anh


Tu, Tuan Anh
Tu, Nguyen, Quang
Tu, Nguyen, Tuan Anh
Tu, Nguyen, Tuan Anh
Tu, Nguyen, Tuan Anh
Tu, Phuc, Nguyen

Tu, Nguyen, T. Anh, Mike


Tu, Nguyen, T. Anh, Mike
Tu, Nguyen, T. Anh, Mike
Tu, Nguyen, T. Anh, Mike
Tu, Nguyen, T. Anh, Mike
Tu, Nguyen, T. Anh, Mike
Tu, Nguyen, Mike, Quang
Tu, Nguyen, Mike, Quang

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

443
Delivered to

BV-137206/609/140802/SC/SI-45
BV-137206/609/140805/SC/SI-46

14/08/02
14/08/05

Road & Stormwater Drainage Issue


Pharma Proposed Floor Drain Provision at Warehouse

2A4size photos
2A4size photos

Tu, Nguyen, Mike


Tu, Nguyen, Mike, Quang

BV-137206/609/140805/SC/SI-47
BV-137206/609/140805/SC/SI-48
BV-137206/609/140805/SC/SI-49
BV-137206/609/140805/SC/SI-50
BV-137206/609/140805/SC/SI-51
BV-137206/609/140807/SC/SI-52
BV-137206/609/140807/SC/SI-53
BV-137206/609/140807/SC/SI-54
BV-137206/609/140809/SC/SI-55

14/08/05
14/08/05
14/08/05
14/08/05
14/08/05
14/08/07
14/08/07
14/08/07
14/08/11

Concrete Beam B3-axis 14A(E-G) bending


Existing roof issues
Zone 2 M&E Installation Works
Backfilling Issue axis G-E
Roof Installation issue
Flatness of ground slab
Delivered and Accepted Rain Water Pipe Material (HDPE)
Prevent Rain Water Coming to Phase 1-Roof Area
Installation of Exposed rain water pipe along GL Z at warehouse area

1A4size photo
4A4size photos

Tu, Nguyen, Mike


Tu, Nguyen, Mike
Tu, Nguyen, Mike, Quang
Tu, Nguyen, Mike
Tu, Nguyen, Mike
Tu, Nguyen, Mike
Tu, Nguyen, Mike, Quang
Tu, Nguyen, Mike, Quang
Tu, Nguyen, Mike, Quang

BV-137206/609/140812/SC/SI-56

14/08/13

Quality Document Preparation Before Inspection From Authority

BV-137206/609/140822/SC/SI-57

14/08/22

Delivered AHU at Material Assembly Area at Stage 1 (Parking Area) 1A4size photo

Tu, Nguyen/Phuc, Mike, Quang, T.Anh

BV-137206/609/140829/SC/SI-58
BV-137206/609/140905/SC/SI-59

14/08/29
14/09/05

Store Material Properly


M&E Items at Stage 1 area / Preparation for Saturday 6th power off

2A4size photos

Tu, Nguyen, T.Anh, Mike


Tu, Nguyen, T.Anh, Mike, Quang

BV-137206/609/140922/SC/SI-60
BV-137206/609/140922/SC/SI-61
BV-137206/609/140923/SC/SI-62
BV-137206/609/140924/SC/SI-63
BV-137206/609/140925/SC/SI-64
BV-137206/609/140926/SC/SI-65
BV-137206/609/140926/SC/SI-66
BV-137206/609/141002/SC/SI-67
BV-137206/609/141003/SC/SI-68
BV-137206/609/141008/SC/SI-69
BV-137206/609/141104/SC/SI-70

14/09/22
14/09/22
14/09/23
14/09/24
14/09/25
14/09/26
14/09/26
14/10/02
14/10/03
14/10/08
14/11/04

Brickwork Defect
Repair water leak on roof before applying insulation layers
Stainless Steel Piping Work
Stage 1 main air duct installation (Handling & moving)
Storage material on Site
Air Particle Counting inside Stage 1 Clean Room
Damage of underground sevices at Ramp Extension area
Underground pipe at technical building stage 1
Unsatisfactory Frame for Dry Wall at gridline E
Inadequate Protection of AHU Parts and Other Material
Welding Process Approved Parameters (External Fire Fighting Pipe)

3A4size photos

BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140

1A4size photo
4A4size photos
1A4size photo
1A4size photo
3A4size photos
2A4size photos

1A4size photo
1A4size page
1A4size photo
6A4size photo
5A4 photos
1A4size photo
1A4size photo
1A4size photo
1A4size photo & 1A3size
Weld Log/Weld Inspection
Report

Tu, Nguyen, T.Anh, Mike


Tu, Nguyen, T.Anh, Mike
Tu, Nguyen, Quang, Mike
Tu, Nguyen, T.Anh, Mike
Tu, Nguyen, T.Anh, Mike

Tu, Nguyen, Quang, Mike


Tu, Nguyen, T.Anh, Mike
Tu, Nguyen, T.Anh, Mike, Quang
Tu, Nguyen, Mike, Quang

NS, Tung, Ujiie (To


raise RFC)

NS

Code/Ref.
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140
BV-137206/609/140

Issued Date

Title

Correspondence submission to PCI


Attachment

444
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

445
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

446
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

447
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

448
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

449
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

450
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

451
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

452
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

453
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

454
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

455
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

456
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

457
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

458
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

459
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

460
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

461
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

462
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

463
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

464
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

465
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

466
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

467
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

468
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

469
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

470
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

471
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

472
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

473
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

474
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

475
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

476
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

477
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

478
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

479
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

480
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

481
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

482
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

483
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

484
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

485
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

486
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

487
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

488
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

489
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

490
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

491
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

492
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

493
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

494
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

495
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

496
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

497
Delivered to

45.00

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

498
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

499
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

500
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

501
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

502
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

503
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

504
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

505
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

506
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

507
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

508
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

509
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

510
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

511
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

512
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

513
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

514
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

515
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

516
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

517
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

518
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

519
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

520
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

521
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

522
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

523
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

524
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

525
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

526
Delivered to

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Attachment

527
Delivered to

Correspondence submission to PCI

528

Correspondence submission to PCI

529

Correspondence submission to PCI

530

Correspondence submission to PCI

531

Correspondence submission to PCI

532

Correspondence submission to PCI

533

Correspondence submission to PCI

534

Correspondence submission to PCI

535

Correspondence submission to PCI

536

Correspondence submission to PCI

537

Correspondence submission to PCI

538

Correspondence submission to PCI

539

Correspondence submission to PCI

540

Correspondence submission to PCI

541

Correspondence submission to PCI

542

Correspondence submission to PCI

543

Correspondence submission to PCI

544

Correspondence submission to PCI

545

Correspondence submission to PCI

546

Correspondence submission to PCI

547

Correspondence submission to PCI

548

Correspondence submission to PCI

549

Correspondence submission to PCI

550

Correspondence submission to PCI

551

Correspondence submission to PCI

552

Correspondence submission to PCI

553

Correspondence submission to PCI

554

Correspondence submission to PCI

555

Correspondence submission to PCI

556

Correspondence submission to PCI

557

Correspondence submission to PCI

558

Correspondence submission to PCI

559

Correspondence submission to PCI

560

Correspondence submission to PCI

561

Correspondence submission to PCI

562

Correspondence submission to PCI

563

Correspondence submission to PCI

564

Correspondence submission to PCI

565

Correspondence submission to PCI

566

Correspondence submission to PCI

567

Correspondence submission to PCI

568

Correspondence submission to PCI

569

Correspondence submission to PCI

570

Correspondence submission to PCI

571

Correspondence submission to PCI

572

Correspondence submission to PCI

573

Correspondence submission to PCI

574

Correspondence submission to PCI

575

Correspondence submission to PCI

576

Correspondence submission to PCI

577

Correspondence submission to PCI

578

Correspondence submission to PCI

579

Correspondence submission to PCI

580

Correspondence submission to PCI

581

Correspondence submission to PCI

582

Correspondence submission to PCI

45.00

583

Correspondence submission to PCI

584

Correspondence submission to PCI

585

Correspondence submission to PCI

586

Correspondence submission to PCI

587

Correspondence submission to PCI

588

Correspondence submission to PCI

589

Correspondence submission to PCI

590

Correspondence submission to PCI

591

Correspondence submission to PCI

592

Correspondence submission to PCI

593

Correspondence submission to PCI

594

Correspondence submission to PCI

1,244,000

595

Correspondence submission to PCI

596

Correspondence submission to PCI

597

Correspondence submission to PCI

598

Correspondence submission to PCI

599

Correspondence submission to PCI

600

Correspondence submission to PCI

601

Correspondence submission to PCI

602

Correspondence submission to PCI

603

Correspondence submission to PCI

604

Correspondence submission to PCI

605

Correspondence submission to PCI

606

Correspondence submission to PCI

607

Correspondence submission to PCI

608

Correspondence submission to PCI

609

Correspondence submission to PCI

610

Correspondence submission to PCI

611

Correspondence submission to PCI

612

Correspondence submission to PCI

613

Code/Ref.

BV-13720/802/140520/NCR-01
Reply
BV-13720/802/140520/NCR-01

Correspondence submission to PCI


Issued Date OUTGOIN
Title
Attachment
GING
(Reply)
(FINAL)
14/05/20
Ground Beam Rebar: Tie Bar Shape
1A4size photo
14/05/21 Ground Beam Rebar: Tie Bar Shape
14/06/03
Ground Beam Rebar: Tie Bar Shape_FINAL_(Confirm Accept for
1A4size photo (2 photos)
Payment)

BV-13720/802/140521/NCR-02
Reply
BV-13720/802/140521/NCR-02

14/05/21

BV-13720/802/140609/NCR-03
Reply
BV-13720/802/140609/NCR-03
BV-13720/802/140621/NCR-04
Reply

14/06/09

BV-13720/802/140621/NCR-04

14/07/14

Column Honeycomb_FINAL

BV-13720/802/140711/NCR-05
Reply

14/07/11

GI Piping Welding Procedure

BV-13720/802/140712/NCR-06
Reply

14/07/12

Welding Procedure

BV-13720/802/140712/NCR-07
Reply

14/07/12

BV-13720/802/140621/NCR-08
Reply

14/07/14

BV-13720/802/140621/SC/NCR-09
Reply

14/07/16

BV-13720/802/140621/SC/NCR-09

14/08/11

BV-13720/802/140721/SC/NCR-10
Reply

14/07/21

BV-13720/802/140721/SC/NCR-11
Reply

14/07/21

BV-13720/802/140728/SC/NCR-12

14/07/28

Reply

14/05/21
14/07/08

14/06/17
14/06/23
14/06/21
14/07/09

614
Delivered to

Tu, Nguyen, Tuan Anh


Tu, Nguyen, Tuan Anh

Ground Beam Rebar: Waiting Tie Bar


Ground Beam Rebar: Waiting Tie Bar
Ground Beam Rebar: Waiting Tie Bar_FINAL (Confirm Accept for
Payment)

1A4size photo
2 photos, 1A3size drawing

Tu, Nguyen, Tuan Anh


Tuan Anh

Column Footing
Column Footing
Column Footing_FINAL
Column Honeycomb
Column Honeycomb

1A4size photo

Tu, Nguyen, Tuan Anh


Tuan Anh

1A4size photo
2A4size photos, Sikagrout 21411 product specification/data
sheet

7A4size photos

14/07/21

Bolts Finishing Length (Steel Structure)


Bolts Finishing Length (Steel Structure)

14/09/26

Main Rebar Deformation


Main Rebar Deformation

2A4size photos
5A4size photos

14/08/08

Column Honeycomb (Axis 21-Y)


Column Honeycomb (Axis 21-Y)_Solution

1A4size photo
Tu, Nguyen, Tuan Anh
1A4size photo, SikaGrout 212- Tu, Nguyen, Tuan Anh
11/214-11 data
sheet/Specification (4A4
pages) 2A4size photos
1A4size photo, SikaGrout 212- Tu, Nguyen, Tuan Anh
11/214-11 data
sheet/Specification (4A4
pages) 2A4size photos

Column Honeycomb (Axis 21-Y)_FINAL

14/10/01

Damaged Main Rebar & Tie Bar (GL-16 &Q-R)


Damaged Main Rebar & Tie Bar (GL-16 &Q-R)

1A4size photo
1A4size photo

Tu, Nguyen, Tuan Anh


Tu, Nguyen, Tuan Anh

1A4size photo

Tu, Nguyen, Tuan Anh

14/07/21

Unapproved Roof Bracing


Unapproved Roof Bracing
Thickness of masonry motar layer

1A4size photo

Tu, Nguyen, Tuan Anh, Mike

Code/Ref.

BV-13720/802/140731/SC/NCR-13

Correspondence submission to PCI


Issued Date OUTGOIN
Title
Attachment
GING
(Reply)
(FINAL)
14/07/31
Wrong Position of Concrete Beam at Mezzanine Floor Axis E (16A- 2A2aize photos
19A)

615
Delivered to

BV-13720/802/140812/SC/NCR-14

14/08/13

Deformed Anchor Bolt at top of Column (A, E-13A, A-E-14A)

2A4size photos

Tu, Nguyen, Tuan Anh, Mike

BV-13720/802/140829/SC/NCR-15

14/08/29

Crack on top of column coordinate E-13A

1A4size photo

Tu, Nguyen, Tuan Anh, Mike

BV-13720/802/140915/SC/NCR-16

14/09/15

Electrical Earth Wire Insulation Color

BV-13720/802/140922/SC/NCR-17

14/09/22

Wrong Technic in brick work

1A4size photo

Tu, Nguyen, Tuan Anh, Mike

BV-13720/802/140922/SC/NCR-17

14/11/07

Wrong Technic in brick work


wrong Technic in brick work_FINAL (APPROVED)

1A4size photo

Tuan Anh
Mrs. Lan QC

BV-13720/802/140922/SC/NCR-17 (/R1)

14/09/24

Wrong Technic in brick work (not acceptable_Resubmit)

BV-13720/802/140924/SC-NCR-18
BV-13720/802/140924/SC-NCR-18
BV-13720/802/140924/SC-NCR-18

14/09/26
14/10/14
14/11/05

Septic tank & Pump pit work


Septic tank & Pump pit work_Repair work
Septic tank & Pump pit work_Repair work_Rejected

1A4size photo
1A4size photo
1A4size photo

BV-13720/802/140929/SC-NCR19

14/09/30

Sealant for AHU Cleanroom Grade

7A4size photo

BV-13720/802/140930/SC-NCR-20

14/09/30

Supply Air Duct Method of Fabrication Stage 1

4A4size photo

BV-13720/802/140930/SC/NCR-21

14/09/30

Air Duct Method of Fabrication Stage 2

4A4size photo

BV-13720/802/140930/SC/NCR-22

14/09/30

Air Duct Hanger Support Method

3A4size photo

14/10/01

Unsatisfactory welding quality on Sarnafil layer gridline (L-N&2021)

3A4size photo

BV-13720/802/141010/SC/NCR-25

14/10/10

Brickwork defect at gridline 15A (E-G)

1A4size photo

Tuan Anh

BV-13720/802/141010/SC/NCR-25
(REPLY)
BV-13720/802/141010/SC/NCR-25

14/11/07

Brickwork defect at gridline 15A (E-G)_REPLY

2A4size photos

Mrs. Lan QC

14/11/07

Brickwork defect at gridline 15A (E-G)_FINAL APPROVED

2A4size photos

Mrs. Lan QC

14/09/22

BV-13720/802/141001/SC/NCR-23

Tu, Nguyen, Tuan Anh, Mike

Tu, Nguyen, Tuan Anh, Mike

Ba Hoa

BV-13720/802/140

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

BV-13720/802/141020/SC/NCR-26
Reply Method

14/10/20
14/10/22

Smoke Extraction Equipment Delivery Inspection


Smoke Extraction Equipment Delivery Inspection

BV-13720/802/141020/SC/NCR-26

14/10/23

Smoke Extraction Equipment Delivery Inspection_Rejected

BV-13720/802/140

BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140

1A4 size photo

616
Delivered to

BV
M&E Team
BV

Code/Ref.

BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140
BV-13720/802/140

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

617
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

618
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

619
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

620
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

621
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

622
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

623
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

624
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

625
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

626
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

627
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

628
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

629
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

630
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

631
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

632
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

633
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

634
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

635
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

636
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

637
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

638
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

639
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

640
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

641
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

642
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

643
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

644
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

645
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

646
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

647
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

648
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

649
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

650
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

651
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

652
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

653
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

654
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

655
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

656
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

657
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

658
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

659
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

660
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

661
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

662
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

663
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

664
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

665
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

666
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

667
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

668
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

669
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

670
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

671
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

672
Delivered to

45.00

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

673
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

674
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

675
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

676
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

677
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

678
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

679
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

680
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

681
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

682
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

683
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

684
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

685
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

686
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

687
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

688
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

689
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

690
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

691
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

692
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

693
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

694
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

695
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

696
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

697
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

698
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

699
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

700
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

701
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

702
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

703
Delivered to

Code/Ref.

Issued Date OUTGOIN


GING
(Reply)
(FINAL)

Title

Correspondence submission to PCI


Attachment

704
Delivered to

Correspondence submission to PCI

705

Correspondence submission to PCI

706

Correspondence submission to PCI

707

Correspondence submission to PCI

708

Correspondence submission to PCI

709

Correspondence submission to PCI

710

Correspondence submission to PCI

711

Correspondence submission to PCI

712

Correspondence submission to PCI

713

Correspondence submission to PCI

714

Correspondence submission to PCI

715

Correspondence submission to PCI

716

Correspondence submission to PCI

717

Correspondence submission to PCI

718

Correspondence submission to PCI

719

Correspondence submission to PCI

720

Correspondence submission to PCI

721

Correspondence submission to PCI

722

Correspondence submission to PCI

723

Correspondence submission to PCI

724

Correspondence submission to PCI

725

Correspondence submission to PCI

726

Correspondence submission to PCI

727

Correspondence submission to PCI

728

Correspondence submission to PCI

729

Correspondence submission to PCI

730

Correspondence submission to PCI

731

Correspondence submission to PCI

732

Correspondence submission to PCI

733

Correspondence submission to PCI

734

Correspondence submission to PCI

735

Correspondence submission to PCI

736

Correspondence submission to PCI

737

Correspondence submission to PCI

738

Correspondence submission to PCI

739

Correspondence submission to PCI

740

Correspondence submission to PCI

741

Correspondence submission to PCI

742

Correspondence submission to PCI

743

Correspondence submission to PCI

744

Correspondence submission to PCI

745

Correspondence submission to PCI

746

Correspondence submission to PCI

747

Correspondence submission to PCI

748

Correspondence submission to PCI

749

Correspondence submission to PCI

750

Correspondence submission to PCI

751

Correspondence submission to PCI

752

Correspondence submission to PCI

753

Correspondence submission to PCI

754

Correspondence submission to PCI

755

Correspondence submission to PCI

756

Correspondence submission to PCI

757

Correspondence submission to PCI

758

Correspondence submission to PCI

759

Correspondence submission to PCI

760

Correspondence submission to PCI

761

Correspondence submission to PCI

762

Correspondence submission to PCI

45.00

763

Correspondence submission to PCI

764

Correspondence submission to PCI

765

Correspondence submission to PCI

766

Correspondence submission to PCI

767

Correspondence submission to PCI

768

Correspondence submission to PCI

769

Correspondence submission to PCI

770

Correspondence submission to PCI

771

Correspondence submission to PCI

772

Correspondence submission to PCI

773

Correspondence submission to PCI

774

Correspondence submission to PCI

775

Correspondence submission to PCI

1,244,000

776

Correspondence submission to PCI

777

Correspondence submission to PCI

778

Correspondence submission to PCI

779

Correspondence submission to PCI

780

Correspondence submission to PCI

781

Correspondence submission to PCI

782

Correspondence submission to PCI

783

Correspondence submission to PCI

784

Correspondence submission to PCI

785

Correspondence submission to PCI

786

Correspondence submission to PCI

787

Correspondence submission to PCI

788

Correspondence submission to PCI

789

Correspondence submission to PCI

790

Correspondence submission to PCI

791

Correspondence submission to PCI

792

Correspondence submission to PCI

793

Correspondence submission to PCI

794

Correspondence submission to PCI

795

CODE

Issued Date
To

BBVN-FIVE-S2-SC-SUB-NCR-001

14/08/20

BBVN-FIVE-S2-SC-SUB-NCR-002

14/08/20

BBVN-FIVE-S2-SC-SUB-NCR-003

14/08/19

BBVN-FIVE-S2-SC-SUB-NCR-004

14/08/29

BBVN-FIVE-S2-SC-SUB-NCR-005

Name
received

VNC2

VNC2

Correspondence submission to PCI


Title/Subject

INCOMIN
G (Reply&
FINAL)

796
Attachment

Author

Concrete Curve after Removing Formwork for Mezzanine Floor

1A4size drawing, 2A4size


photos

Tuan Anh

Wrong Position of Concrete Beam at 1st Floor Offcie Area

1A4size drawing, 3A4size


photos

Tuan Anh

Damaged Anchor Bolts at Office Area

6A4size photos

Tuan Anh

Crack on top of Column Axis E-16A at Office Area

2A4size photos; 1A3size


drawing

Tuan Anh

SEICO

Quan

VNC2

Nham

14/08/29

C-Channel

Yyong

Damaged Clean Room Components

3A4size photos

Tuan Anh

BBVN-FIVE-S2-SC-SUB-NCR-006

14/09/11

SEICO

Quan

Finishing length of bolts-anchor bolts

2A4size photos

Tuan Anh

BBVN-FIVE-S2-SC-SUB-NCR-007

14/09/17

VNC2

Nham

Concrete Curve at Drainage

1A4size drawing, 2A4size


photos

Tuan Anh

BBVN-FIVE-S2-SC-SUB-NCR-008

14/09/17

Honeycomb at Concrete Post Axis Z - Warehous

1A4size drawing, Transmittal Tuan Anh


sheet 206 dated 20-August2014 (Honeycomb treatment),
2A4size ptotos

VNC2

Nham

BBVN-FIVE-S2-SC-SUB-NCR-009

14/09/23

VNC2

Nham

Plaster Cracking at Column 13-U

2A4size photos

Tuan Anh

BBVN-FIVE-S2-SC-SUB-NCR-010

14/10/04

VNC2

Nham

Water Leak & Wrong Installation Sequence of Septic Tank

3A4size photos

Tuan anh

BBVN-FIVE-S2-SC-SUB-NCR-011

14/10/06

Nhat Hoa
ITC

Wrong Method of Handling and Storage ceiling panel for Clean


Room

4A4size photos

Tuan Anh

BBVN-FIVE-S2-SC-SUB-NCR-012

14/10/23

BBVN-FIVE-S2-SC-SUB-NCR-013

14/10/23

BBVN-FIVE-S2-SC-SUB-NCR-014

Vien Dong

Long/Duy

Hung Trang

Le Xuan
Muoi

Wrong Frame Installation for Alu. Composite Cladding at Axis 21/H- 2A4size drawings, 2A4size
Q
photos

Tuan Anh

Water Penetrated Rockwool at Axis 20A-21/D-E

Tuan Anh

3A4size photos

CODE

Issued Date
To

BBVN-FIVE-S2-SC-SUB-NCR-015

BBVN-FIVE-S2-SC-SUB-NCR-016

BBVN-FIVE-S2-SC-SUB-NCR-017

BBVN-FIVE-S2-SC-SUB-NCR-018

BBVN-FIVE-S2-SC-SUB-NCR-019

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

797
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

798
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

799
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

800
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

801
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

802
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

803
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

804
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

805
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

806
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

807
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

808
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

809
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

810
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

811
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

812
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

813
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

814
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

815
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

816
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

817
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

818
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

819
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

820
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

821
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

822
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

823
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

824
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

825
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

826
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

827
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

828
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

829
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

830
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

831
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

832
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

833
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

834
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

835
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

836
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

837
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

838
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

839
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

840
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

841
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

842
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

843
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

844
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

845
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

846
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

847
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

848
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

849
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

850
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

851
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

852
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

853
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

854
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

855
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

856
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

857
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

858
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

859
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

860
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

861
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

862
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

863
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

864
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

865
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

866
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

867
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

868
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

869
Attachment

Author

CODE

Issued Date
To

Name
received

INCOMIN
G (Reply&
FINAL)

Correspondence submission to PCI


Title/Subject

870
Attachment

Author

Correspondence submission to PCI

871

Correspondence submission to PCI

872

Correspondence submission to PCI

873

Correspondence submission to PCI

874

Correspondence submission to PCI

875

Correspondence submission to PCI

876

Correspondence submission to PCI

877

Correspondence submission to PCI

878

Correspondence submission to PCI

879

Correspondence submission to PCI

880

Correspondence submission to PCI

881

Correspondence submission to PCI

882

Correspondence submission to PCI

883

Correspondence submission to PCI

884

Correspondence submission to PCI

885

Correspondence submission to PCI

886

Correspondence submission to PCI

887

Correspondence submission to PCI

888

Correspondence submission to PCI

889

Correspondence submission to PCI

890

Correspondence submission to PCI

891

Correspondence submission to PCI

892

Correspondence submission to PCI

893

Correspondence submission to PCI

894

Correspondence submission to PCI

895

Correspondence submission to PCI

896

Correspondence submission to PCI

897

Correspondence submission to PCI

898

Correspondence submission to PCI

899

Correspondence submission to PCI

900

Correspondence submission to PCI

901

Correspondence submission to PCI

902

Correspondence submission to PCI

903

Correspondence submission to PCI

904

Correspondence submission to PCI

905

Correspondence submission to PCI

906

Correspondence submission to PCI

907

Correspondence submission to PCI

908

Correspondence submission to PCI

909

Correspondence submission to PCI

910

Correspondence submission to PCI

911

Correspondence submission to PCI

912

Correspondence submission to PCI

913

Correspondence submission to PCI

914

Correspondence submission to PCI

915

Correspondence submission to PCI

916

Correspondence submission to PCI

917

Correspondence submission to PCI

918

Correspondence submission to PCI

919

Correspondence submission to PCI

920

Correspondence submission to PCI

921

Correspondence submission to PCI

922

Correspondence submission to PCI

923

Correspondence submission to PCI

924

Correspondence submission to PCI

925

Correspondence submission to PCI

926

Correspondence submission to PCI

927

Correspondence submission to PCI

45.00

928

Correspondence submission to PCI

929

Correspondence submission to PCI

930

Correspondence submission to PCI

931

Correspondence submission to PCI

932

Correspondence submission to PCI

933

Correspondence submission to PCI

934

Correspondence submission to PCI

935

Correspondence submission to PCI

936

Correspondence submission to PCI

937

Correspondence submission to PCI

938

Correspondence submission to PCI

939

Correspondence submission to PCI

1,244,000

940

Correspondence submission to PCI

941

Correspondence submission to PCI

942

Correspondence submission to PCI

943

Correspondence submission to PCI

944

Correspondence submission to PCI

945

Code/Ref.

Issued Date

Title

BV-137206-1009-140312/HSI01

14/03/12

BV-137206-1009-140313/HSI02

14/03/13

BV-137206-1009-140321/HSI03

14/03/21

BV-137206-1009-140418/HSI04

14/04/18

BV-137206-1009-140428/HSI05
BV-137206-1009-140428/HSI06
BV-137206-1009-140505/HSI07

14/04/28
14/04/28
14/05/05

Request for Installation electric cabinet and warning sign at live


cable, stop pumping water at site
Request for installation hard barricade for deep hole, provide rubbish
bin and toilet temporary at site
Request for installation drainage system and cover electric wire at
washing bay
Request for checking during night time at project area and bilingual
permit to work
Water Discharge on adjacent Properties
Installation for Lightning system (SMZ & Vinaconex Office)
Request for Cleaning Up Public road and Drain Stagnant water

BV-137206-1009-140514/HSI08
BV-137206-1009-140519/HSI09
BV-137206-1009-140521/HSI10
BV-137206-1009-142305/HSI11
BV-137206-1009-142405/HSI12
BV-137206-1009-143005/HSI13
BV-137206-1009-140623/HSI14
BV-137206-1009-140623/HSI15
INCIDENT INVESTIGATION
REPORT
No.001
No.002
No.003
No.004
No.005
No.006

14/05/14
14/05/19
14/05/22
14/05/23
14/05/24
14/05/30
14/06/23
14/06/23

Sadety Improvement
Request Safety Issue
Incompliance of minimum HSE Equipments
Improvement of Security entrance post
Cable isolation and arrangement
Control Speed of Heavy Trucks on Site
Unsafe Access of Ramp
Wearing Safety Glass on Site

No.007
No.008
No.009
No.010
No.011
No.012
No.013
No.014

Correspondence submission to PCI


Incident Date
Attachment

Dust on walkable ceiling


(Packing Area)_Drop steel pipe from the handrail gap at Stage 1

10A4 photos

Toan Safety

1A4size photo

Toan Safety

Position

Hoang Safety
Hoang Safety

4A4size photos
7A4size photos
1A4size photo
3A4size photos
1A4size photo
1A4size photo

Set up life line system for working at height

14/10/02
14/10/20

946
Prepared by

Nguyen, Hoang safety


Nguyen, Hoang safety
Nguyen, Hoang safety
Nguyen, Hoang safety, Quang
Nguyen, Hoang safety
Nguyen, Hoang safety
Nguyen, Hoang safety, Quang M&E
Nguyen, Hoang safety, Quang M&E
Nguyen, Hoang Safety, Tu
Nguyen, Hoang Safety, Tu

1A4size photo

14/09/15
14/10/18

2A4size photos
2A4size photos

Hoang Tuan Anh


Vuong

Site Engineer

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

947
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

948
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

949
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

950
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

951
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

952
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

953
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

954
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

955
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

956
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

957
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

958
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

959
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

960
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

961
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

962
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

963
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

964
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

965
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

966
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

967
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

968
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

969
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

970
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

971
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

972
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

973
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

974
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

975
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

976
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

977
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

978
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

979
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

980
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

981
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

982
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

983
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

984
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

985
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

986
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

987
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

988
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

989
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

990
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

991
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

992
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

993
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

994
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

995
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

996
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

997
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

998
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

999
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1000
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1001
Prepared by

Position

45.00

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1002
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1003
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1004
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1005
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1006
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1007
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1008
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1009
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1010
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1011
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1012
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1013
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1014
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1015
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1016
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1017
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1018
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1019
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1020
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1021
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1022
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1023
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1024
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1025
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1026
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1027
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1028
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1029
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1030
Prepared by

Position

Code/Ref.

Issued Date

Title

Correspondence submission to PCI


Incident Date
Attachment

1031
Prepared by

Position

Correspondence submission to PCI

1032

Correspondence submission to PCI

1033

Correspondence submission to PCI

1034

Correspondence submission to PCI

1035

Correspondence submission to PCI

1036

Correspondence submission to PCI

1037

Correspondence submission to PCI

1038

Correspondence submission to PCI

1039

Correspondence submission to PCI

1040

Correspondence submission to PCI

1041

Correspondence submission to PCI

1042

Correspondence submission to PCI

1043

Correspondence submission to PCI

1044

Correspondence submission to PCI

1045

Correspondence submission to PCI

1046

Correspondence submission to PCI

1047

Correspondence submission to PCI

1048

Correspondence submission to PCI

1049

Correspondence submission to PCI

1050

Correspondence submission to PCI

1051

Correspondence submission to PCI

1052

Correspondence submission to PCI

1053

Correspondence submission to PCI

1054

Correspondence submission to PCI

1055

Correspondence submission to PCI

1056

Correspondence submission to PCI

1057

Correspondence submission to PCI

1058

Correspondence submission to PCI

1059

Correspondence submission to PCI

1060

Correspondence submission to PCI

1061

Correspondence submission to PCI

1062

Correspondence submission to PCI

1063

Correspondence submission to PCI

1064

Correspondence submission to PCI

1065

Correspondence submission to PCI

1066

Correspondence submission to PCI

1067

Correspondence submission to PCI

1068

Correspondence submission to PCI

1069

Correspondence submission to PCI

1070

Correspondence submission to PCI

1071

Correspondence submission to PCI

1072

Correspondence submission to PCI

1073

Correspondence submission to PCI

1074

Correspondence submission to PCI

1075

Correspondence submission to PCI

1076

Correspondence submission to PCI

1077

Correspondence submission to PCI

1078

Correspondence submission to PCI

1079

Correspondence submission to PCI

1080

Correspondence submission to PCI

1081

Correspondence submission to PCI

1082

Correspondence submission to PCI

1083

Correspondence submission to PCI

1084

Correspondence submission to PCI

1085

Correspondence submission to PCI

1086

Correspondence submission to PCI

45.00

1087

Correspondence submission to PCI

1088

Correspondence submission to PCI

1089

Correspondence submission to PCI

1090

Correspondence submission to PCI

1091

Correspondence submission to PCI

1092

Correspondence submission to PCI

1093

Correspondence submission to PCI

1094

Correspondence submission to PCI

1095

Correspondence submission to PCI

1096

Correspondence submission to PCI

1097

Correspondence submission to PCI

1098

Correspondence submission to PCI

1,244,000

1099

Correspondence submission to PCI

1100

Correspondence submission to PCI

1101

Correspondence submission to PCI

1102

Correspondence submission to PCI

1103

Correspondence submission to PCI

1104

Correspondence submission to PCI

1105

Correspondence submission to PCI

1106

Correspondence submission to PCI

1107

Correspondence submission to PCI

1108

Correspondence submission to PCI

1109

Correspondence submission to PCI

1110

Correspondence submission to PCI

1111

Correspondence submission to PCI

1112

Correspondence submission to PCI

1113

Correspondence submission to PCI

1114

Correspondence submission to PCI

1115

Correspondence submission to PCI

1116

Correspondence submission to PCI

1117

No.

Bao Minh insurance

Rev.

To

Bao
Minh/Mr.
Thang

CC:

Issued

Title

14/03/14 Questionnaire Answer

Correspondence submission to PCI


Attachment
Prepared by

(Contact No. 0977455105) Email address:


khacthangvttc@gmail.com

1118
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1119
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1120
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1121
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1122
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1123
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1124
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1125
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1126
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1127
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1128
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1129
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1130
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1131
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1132
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1133
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1134
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1135
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1136
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1137
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1138
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1139
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1140
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1141
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1142
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1143
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1144
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1145
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1146
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1147
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1148
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1149
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1150
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1151
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1152
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1153
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1154
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1155
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1156
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1157
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1158
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1159
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1160
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1161
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1162
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1163
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1164
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1165
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1166
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1167
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1168
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1169
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1170
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1171
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1172
DateReplied

Delivered to

Date
delivered

Volume

45.00

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1173
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1174
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1175
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1176
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1177
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1178
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1179
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1180
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1181
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1182
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1183
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1184
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1185
DateReplied

Delivered to

Date
delivered

Volume

1,244,000

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1186
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1187
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1188
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1189
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1190
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1191
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1192
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1193
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1194
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1195
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1196
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1197
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1198
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1199
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1200
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1201
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1202
DateReplied

Delivered to

Date
delivered

Volume

No.

Rev.

To

CC:

Issued

Title

Correspondence submission to PCI


Attachment
Prepared by

1203
DateReplied

Delivered to

Date
delivered

Volume

Correspondence submission to PCI

1204

Correspondence submission to PCI

1205

Correspondence submission to PCI

1206

Correspondence submission to PCI

1207

Correspondence submission to PCI

1208

Correspondence submission to PCI

1209

Correspondence submission to PCI

1210

Correspondence submission to PCI

1211

Correspondence submission to PCI

1212

Correspondence submission to PCI

1213

Correspondence submission to PCI

1214

Correspondence submission to PCI

1215

Correspondence submission to PCI

1216

Correspondence submission to PCI

1217

Correspondence submission to PCI

1218

Correspondence submission to PCI

1219

Correspondence submission to PCI

1220

Correspondence submission to PCI

1221

Correspondence submission to PCI

1222

Correspondence submission to PCI

1223

Correspondence submission to PCI

1224

Correspondence submission to PCI

1225

Correspondence submission to PCI

1226

Correspondence submission to PCI

1227

Correspondence submission to PCI

1228

Correspondence submission to PCI

1229

Correspondence submission to PCI

1230

Correspondence submission to PCI

1231

Correspondence submission to PCI

1232

Correspondence submission to PCI

1233

Correspondence submission to PCI

1234

Correspondence submission to PCI

1235

Correspondence submission to PCI

1236

Correspondence submission to PCI

1237

Correspondence submission to PCI

1238

Correspondence submission to PCI

1239

Correspondence submission to PCI

1240

Correspondence submission to PCI

1241

Correspondence submission to PCI

1242

Correspondence submission to PCI

1243

Correspondence submission to PCI

1244

Correspondence submission to PCI

1245

Correspondence submission to PCI

1246

Correspondence submission to PCI

1247

Correspondence submission to PCI

1248

Correspondence submission to PCI

1249

Correspondence submission to PCI

1250

Correspondence submission to PCI

1251

Correspondence submission to PCI

1252

Correspondence submission to PCI

1253

Correspondence submission to PCI

1254

Correspondence submission to PCI

1255

Correspondence submission to PCI

1256

Correspondence submission to PCI

1257

Correspondence submission to PCI

1258

Correspondence submission to PCI

1259

Correspondence submission to PCI

1260

Correspondence submission to PCI

1261

Correspondence submission to PCI

1262

Correspondence submission to PCI

1263

Correspondence submission to PCI

1264

Correspondence submission to PCI

1265

Correspondence submission to PCI

1266

Correspondence submission to PCI

1267

Correspondence submission to PCI

1268

Correspondence submission to PCI

1269

Correspondence submission to PCI

1270

Correspondence submission to PCI

1271

Correspondence submission to PCI

1272

Correspondence submission to PCI

1273

Correspondence submission to PCI

1274

Correspondence submission to PCI

1275

Correspondence submission to PCI

1276

Correspondence submission to PCI

1277

Correspondence submission to PCI

1278

Correspondence submission to PCI

1279

Correspondence submission to PCI

1280

Correspondence submission to PCI

1281

Correspondence submission to PCI

1282

Correspondence submission to PCI

1283

Correspondence submission to PCI

1284

Correspondence submission to PCI

1285

Correspondence submission to PCI

1286

Correspondence submission to PCI

1287

Correspondence submission to PCI

1288

Correspondence submission to PCI

1289

REV.

DT-77

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

BB

14/03/25

PCCC documents (CD)

DT-107

BB

14/08/22
14/09/18

Mock up Inspection Report


Minutes No.1: Completion of
Minutes No.1 (official)_Red
Foundation Work for Main Building signed

DT-109

BB

14/09/22

PCCC, Hydraulic calculation for roof


and warehouse (with sketch); FF
system design report; smoke exhaust
calculation; approved PCCC
documents; drawings, certificate &
technical report, CD

DT-110

BB

14/09/22

DT-116
DT-119

BB
BB

14/10/08
14/10/08

BBVN comments on incident


investigation report No.3 - Clean
room wall
Approved IPC No.05 for SMZ
DKE comments on drawings for
PCCC Resubmission (7A3size
drawings)

PCCC

14/10/10

DT-122

BB

14/10/10

DT-123

BB

14/10/23

List of Imported Products (2nd batch)

DT-124

BB

14/10/24

DT-125

BB

14/10/28

DT-126

BB

14/10/30

Letter to DOC (Request for


Inspection of Foundation
Completion)
Power of Attorney_from BBVN to
3 original
SMZ to work with PCCC
Letter to EVN Thanh Oai pertaining 3 original
Power Shutdown (1st & 2nd NOV)
for S1 Power Supply Modification

DT-128

BB

14/11/06

TS-04

01 ORIGINAL
01 Copy

Minutes of Meeting/Inspection in 9- 01 ORIGINAL


October-2014
Calculation and Report for PCCC Re- 1 copy
submission: (i) Fire service report PCCC; (ii) Report-Heating,
ventilation & cooling system; (iii)
Report-Fire fighting system; (iv)
Hydraulic calculation (Production)

Approved IPC No.06 for SMZ

1 Original

1290
Author/Delivere
d to Author

Status

Date Delivered
to Author

Tung
M&E team
Transmit to NS
in TS-293 dated
9-OCT
a Nguyen
M&E

given to Ms.
Hau
Quyen keeps

Tung/Sent to
Mrs. Hieu

North Star on
10-OCT (TS298)

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1291
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1292
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1293
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1294
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1295
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1296
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1297
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1298
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1299
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1300
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1301
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1302
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1303
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1304
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1305
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1306
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1307
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1308
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1309
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1310
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1311
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1312
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1313
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1314
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1315
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1316
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1317
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1318
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1319
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1320
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1321
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1322
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1323
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1324
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1325
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1326
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1327
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1328
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1329
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1330
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1331
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1332
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1333
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1334
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1335
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1336
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1337
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1338
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1339
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1340
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1341
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1342
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1343
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1344
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1345
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1346
Author/Delivere
d to Author

Status

Date Delivered
to Author

45.00

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1347
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1348
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1349
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1350
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1351
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1352
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1353
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1354
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1355
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1356
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1357
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1358
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1359
Author/Delivere
d to Author

Status

Date Delivered
to Author

1,244,000

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1360
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1361
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1362
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1363
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1364
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1365
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1366
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1367
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1368
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1369
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1370
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1371
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1372
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1373
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1374
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1375
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1376
Author/Delivere
d to Author

Status

Date Delivered
to Author

REV.

Received From

Date Issued

Title

Correspondence submission to PCI


Attachment

1377
Author/Delivere
d to Author

Status

Date Delivered
to Author

Correspondence submission to PCI

1378

Correspondence submission to PCI

1379

Correspondence submission to PCI

1380

Correspondence submission to PCI

1381

Correspondence submission to PCI

1382

Correspondence submission to PCI

1383

Correspondence submission to PCI

1384

Correspondence submission to PCI

1385

Correspondence submission to PCI

1386

Correspondence submission to PCI

1387

Correspondence submission to PCI

1388

Correspondence submission to PCI

1389

Correspondence submission to PCI

1390

Correspondence submission to PCI

1391

Correspondence submission to PCI

1392

Correspondence submission to PCI

1393

Correspondence submission to PCI

1394

Correspondence submission to PCI

1395

Correspondence submission to PCI

1396

Correspondence submission to PCI

1397

Correspondence submission to PCI

1398

Correspondence submission to PCI

1399

Correspondence submission to PCI

1400

Correspondence submission to PCI

1401

Correspondence submission to PCI

1402

Correspondence submission to PCI

1403

Correspondence submission to PCI

1404

Correspondence submission to PCI

1405

Correspondence submission to PCI

1406

Correspondence submission to PCI

1407

Correspondence submission to PCI

1408

Correspondence submission to PCI

1409

Correspondence submission to PCI

1410

Correspondence submission to PCI

1411

Correspondence submission to PCI

1412

Correspondence submission to PCI

1413

Correspondence submission to PCI

1414

Correspondence submission to PCI

1415

Correspondence submission to PCI

1416

Correspondence submission to PCI

1417

Correspondence submission to PCI

1418

Correspondence submission to PCI

1419

Correspondence submission to PCI

1420

Correspondence submission to PCI

1421

Correspondence submission to PCI

1422

Correspondence submission to PCI

1423

Correspondence submission to PCI

1424

Correspondence submission to PCI

1425

Correspondence submission to PCI

1426

Correspondence submission to PCI

1427

Correspondence submission to PCI

1428

Correspondence submission to PCI

1429

Correspondence submission to PCI

1430

Correspondence submission to PCI

1431

Correspondence submission to PCI

1432

Correspondence submission to PCI

1433

Correspondence submission to PCI

1434

Correspondence submission to PCI

1435

Correspondence submission to PCI

1436

Correspondence submission to PCI

1437

Correspondence submission to PCI

1438

Correspondence submission to PCI

1439

Correspondence submission to PCI

1440

Correspondence submission to PCI

1441

Correspondence submission to PCI

1442

Correspondence submission to PCI

1443

Correspondence submission to PCI

1444

Correspondence submission to PCI

1445

Correspondence submission to PCI

1446

Correspondence submission to PCI

1447

Correspondence submission to PCI

1448

Correspondence submission to PCI

1449

Correspondence submission to PCI

1450

Correspondence submission to PCI

1451

Correspondence submission to PCI

1452

Correspondence submission to PCI

1453

Correspondence submission to PCI

1454

Correspondence submission to PCI

1455

Correspondence submission to PCI

1456

Correspondence submission to PCI

1457

Correspondence submission to PCI

1458

Correspondence submission to PCI

1459

Correspondence submission to PCI

1460

Correspondence submission to PCI

1461

Correspondence submission to PCI

1462

Correspondence submission to PCI

1463

Correspondence submission to PCI

1464

Correspondence submission to PCI

1465

Correspondence submission to PCI

OUTGOIING

Section

BBVN-FIVE-S2-SC-IR
BBVN-FIVE-S2-SC-IR0002-14
BBVN-FIVE-S2-SC-IR0003
BBVN-FIVE-S2-SC-IR0004
BBVN-FIVE-S2-SC-IR0005
BBVN-FIVE-S2-SC-IR0006
BBVN-FIVE-S2-SC-IR0007
BBVN-FIVE-S2-SC-IR0008
BBVN-FIVE-S2-SC-IR0009
BBVN-FIVE-S2-SC-IR0010
BBVN-FIVE-S2-SC-IR0011
BBVN-FIVE-S2-SC-IR0012
BBVN-FIVE-S2-SC-IR0013
BBVN-FIVE-S2-SC-IR0014
BBVN-FIVE-S2-SCIR/M&E-Site-0015
BBVN-FIVE-S2-SC-IR/QCMA-0016
BBVN-FIVE-S2-SCIR/CON-0017
BBVN-FIVE-S2-SCIR/CON-0018
BBVN-FIVE-S2-SCIR/CON-0019
BBVN-FIVE-S2-SCIR/CON-0020
BBVN-FIVE-S2-SC-IR/QCMA-0021
BBVN-FIVE-S2-SC-IR/

No.

0001
0002
0003
0004
0005
0006
0007

Section

Date Issued

0010
0011
0012
0013
0014
0015
0016
0017
0018
0019
0020

..

Author/Deliver
ed to

Concrete Mixing trial (7 day - 28 days)_ M30, M40, Slump 14 2

14/03/11

Testing Concrete (7 day)_ M30, M40, Slump 14 2

Hoang QC

14/03/13

Concrete Mixing trial

Hoang QC

14/03/17

Concrete Mixing trial

Hoang QC

14/03/21

Concrete Mixing trial

Hoang QC

14/03/24

Trial Mixing Concrete Test (AQH) (7 days)

Hoang QC

14/03/26

Inspection within the new construction boundary

Chu Binh
Nguyen

Hoang QC

Trial Mixing Concrete Test (MHDI9)


14/04/02

Nguyen

14/04/04

Inspection the existing soil level at construction site (from 9Am10AM) dated 3-Apr-2014
Trial Mixing Concrete Test (AQH) 14 days

14/04/04

Trial Mixing Concrete Test (MHDI9) 14 days

Hoang

14/04/07

Anchor Bolts Testing

Hoang

14/04/07

Rebar Testing for Construction

Hoang

14/04/11

Actual soil level Check

Nguyen

14/04/14

Trung

14/04/15

Inspection of Remove and Modification existing fire hydrant pipe


before & after at construction site
Trial Mixing Concrete Test (AQH) 28 days

14/04/15

Soft Soil Treatment

Ba Hoa

14/04/16

Compact Sand K90-layer1

Ba Hoa

14/04/18

Compact Sand K90_layer 2

Ba Hoa

14/04/18

Concrete Spacer Mixing Grade 30MPa

Hoang

14/04/23

Lean Concrete for Pile Cap (PC 8, PC10, PC11, PC13, PC16,
PC18, PC31, PC33, PC36, PC40, PC41, C48, C50, C53, C56, C58,
C71, C73, C76, C79, C94, C96, C99, C102, C104, )
Sampling Steel Plate for Steel Structure thickness 6mm, 8mm,
10mm, 12mm, 16mm, 20mm& 40mm
Lean Concrete for Foundation PC1C(PC13), PC1C(PC36),
PC1B(C53), PC1B(C76), PC1B(C99), PC1C(PC15), PC1C(PC34),
PC1B(C51), PC1B(C55), PC1B(C74), PC1B(C78), PC1B(C97),
PC2(PC41), PC1C(PC09), PC1C(PC32), PC1(PC08), PC1(PC31),
PC1A(C58), PC1A(C81), PC1A(C104), PC2(PC40), PC1A(C104),
PC1A(PC40), PC1A(C48), PC1A(C71), PC1A(C94) (24Nos.)

Phuc

Lean Concrete for Foundation PC1( PC17 ), PC1A ( C49 ), PC1A (


C72 ), PC1A ( C95 ),PC1 ( PC7 ),PC1 ( PC30 ),PC1A ( C59 ),PC1A
( C82 ),PC1A ( C105 ),PC1 ( PC06 ),PC1 ( PC29 ),PC1A ( C60
),PC1A ( C83 ),PC1A ( C106 ),PC2 ( PC39 )
Formwork, Rebar, Casting concrete for PC1B(C56), PC1B(C79)
,PC1B(C102), PC1A(C73) , PC1A(C96), PC1A(C57),
PC1A(C80), PC1A(C103), PC1A(C72), PC1A(C95)

Toan

Formwork, Rebar, Casting concrete for PC1C(PC11), PC1C(PC10),


PC1C(PC16), PC1B(C56), PC1B(C79), PC1A(C80), PC1B(C97),
PC1A(C96), PC1B(C101), PC1A(C103)

Toan

Hoang

Hoang

0021
CON
0022

BBVN-FIVE-S2-SC-IR/

QC/MA

BBVN-FIVE-S2-SC-IR/

CON

0023

14/04/23
14/04/24

0024

BBVN-FIVE-S2-SC-IR/

14/04/26
0025

BBVN-FIVE-S2-SC-IR/

14/04/26
0026

BBVN-FIVE-S2-SC-IR/

14/04/28
0027

BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/

Attachment

14/03/04

0008
0009

Title

0028
0029
0030
0031
0032
0033
0034

Hoang
Phuc

Toan

1466

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

BBVN-FIVE-S2-SC-IR/

No.
0035
0035 (B)
0036
0037
0038
0039
0040
0041
0042
0043
0044
0045
0046
0047
0048
0049
0050

BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

14/05/04

Inspection Pile Treatment (higti)

Toan

14/05/22

Inspection Installation sleeves on trench pit wall at construction site

Trung

14/05/22

Inspection of Project Sign Board

Nguyen

14/05/28

Rebar, Formwork, Casting Concrete for Ground Beam Axis K - E


& 18 - 21

Phuc

14/05/31

Lean concrete for external drainage system

Toan

0051

BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/

0052
0053
0054
0055
0056
0057
0058
0059
0060

BBVN-FIVE-S2-SC-IR/
BBVN-FIVE-S2-SC-IR/

0062
0063
0064
0065
0066
0067
0068
0069
0070
0071

0061

0072

CON

0073
0074
0075
0076
0077
0078
0079
0080
0081
0082
0083
0084
0085
0086
0087

1467

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1468

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1469

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1470

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1471

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1472

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1473

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1474

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1475

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1476

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1477

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1478

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1479

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1480

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1481

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1482

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1483

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1484

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1485

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1486

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1487

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1488

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1489

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1490

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1491

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1492

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1493

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1494

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1495

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1496

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1497

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1498

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1499

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1500

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1501

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1502

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1503

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1504

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1505

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1506

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1507

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1508

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1509

Status

Date Delivered to
Author

45.00

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1510

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1511

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1512

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1513

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1514

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1515

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1516

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1517

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1518

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1519

Status

Date Delivered to
Author

1,244,000

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1520

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1521

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1522

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

No.

Section

Date Issued

Title

Attachment

Author/Deliver
ed to

1523

Status

Date Delivered to
Author

Correspondence submission to PCI

1524

Correspondence submission to PCI

1525

Correspondence submission to PCI

1526

Correspondence submission to PCI

1527

Correspondence submission to PCI

1528

Correspondence submission to PCI

1529

Correspondence submission to PCI

1530

Correspondence submission to PCI

1531

Correspondence submission to PCI

1532

Correspondence submission to PCI

1533

Correspondence submission to PCI

1534

Correspondence submission to PCI

1535

Correspondence submission to PCI

1536

Correspondence submission to PCI

1537

Correspondence submission to PCI

1538

Correspondence submission to PCI

1539

Correspondence submission to PCI

1540

Correspondence submission to PCI

1541

Correspondence submission to PCI

1542

Correspondence submission to PCI

1543

Correspondence submission to PCI

1544

Correspondence submission to PCI

1545

Correspondence submission to PCI

1546

Correspondence submission to PCI

1547

Correspondence submission to PCI

1548

Correspondence submission to PCI

1549

Correspondence submission to PCI

1550

Correspondence submission to PCI

1551

Correspondence submission to PCI

1552

Correspondence submission to PCI

1553

Correspondence submission to PCI

1554

Correspondence submission to PCI

1555

Correspondence submission to PCI

1556

Correspondence submission to PCI

1557

Correspondence submission to PCI

1558

Correspondence submission to PCI

1559

Correspondence submission to PCI

1560

Correspondence submission to PCI

1561

Correspondence submission to PCI

1562

Correspondence submission to PCI

1563

Correspondence submission to PCI

1564

Correspondence submission to PCI

1565

Correspondence submission to PCI

1566

Correspondence submission to PCI

45.00

1567

Correspondence submission to PCI

1568

Correspondence submission to PCI

1569

Correspondence submission to PCI

1570

Correspondence submission to PCI

1571

Correspondence submission to PCI

1572

Correspondence submission to PCI

1573

Correspondence submission to PCI

1574

Correspondence submission to PCI

1575

Correspondence submission to PCI

1576

Correspondence submission to PCI

1,244,000

1577

Correspondence submission to PCI

1578

Correspondence submission to PCI

1579

Correspondence submission to PCI

1580

Correspondence submission to PCI

1581

Correspondence submission to PCI

OUTGOIING

BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT
BBVN-FIVE-S2-SC-ACPT

Section

0001
0002
0003
0004
0005
0006
0007
0008
0009
0010
0011
0012
0013
0014
0015
0016
0017
0018
0019
0020
0021
0022
0023
0024
0025
0026
0027
0028
0029
0030
0031
0032
0033
0034
0035
0036
0037
0038
0039
0040
0041
0042
0043
0044
0045
0046
0047
0048
0049
0050
0051
0052
0053
0054
0055
0056
0057
0058
0059
0060
0061
0062
0063
0064
0065
0066
0067

QC-MA-Concrete

Date Issued

14/04/23
14/04/23

Title
MINUTES FOR MATERIAL/EQUIPMENT INSPECTION &
ACCEPTANCE
Concrete for Construction

Attachment

Proportions Mix Design


Result

1582

Author/Deliver
ed to

Hoang QC

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1583

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1584

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1585

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1586

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1587

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1588

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1589

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1590

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1591

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1592

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1593

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1594

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1595

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1596

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1597

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1598

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1599

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1600

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1601

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1602

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1603

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1604

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1605

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1606

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1607

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1608

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1609

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1610

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1611

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1612

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1613

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1614

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1615

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1616

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1617

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1618

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1619

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1620

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1621

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1622

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1623

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1624

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1625

Author/Deliver
ed to

Status

Date Delivered to
Author

45.00

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1626

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1627

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1628

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1629

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1630

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1631

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1632

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1633

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1634

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1635

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1636

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1637

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

OUTGOIING

Section

Date Issued

Title

Attachment

1638

Author/Deliver
ed to

Status

Date Delivered to
Author

Correspondence submission to PCI

1639

Correspondence submission to PCI

1640

Correspondence submission to PCI

1641

Correspondence submission to PCI

1642

Correspondence submission to PCI

1643

Correspondence submission to PCI

1644

Correspondence submission to PCI

1645

Correspondence submission to PCI

1646

Correspondence submission to PCI

1647

Correspondence submission to PCI

1648

Correspondence submission to PCI

1649

Correspondence submission to PCI

1650

Correspondence submission to PCI

1651

Correspondence submission to PCI

1652

Correspondence submission to PCI

1653

Correspondence submission to PCI

1654

Correspondence submission to PCI

1655

Correspondence submission to PCI

1656

Correspondence submission to PCI

1657

Correspondence submission to PCI

1658

Correspondence submission to PCI

1659

Correspondence submission to PCI

1660

Correspondence submission to PCI

1661

Correspondence submission to PCI

1662

Correspondence submission to PCI

1663

Correspondence submission to PCI

1664

Correspondence submission to PCI

1665

Correspondence submission to PCI

1666

Correspondence submission to PCI

1667

Correspondence submission to PCI

1668

Correspondence submission to PCI

1669

Correspondence submission to PCI

1670

Correspondence submission to PCI

1671

Correspondence submission to PCI

1672

Correspondence submission to PCI

1673

Correspondence submission to PCI

1674

Correspondence submission to PCI

1675

Correspondence submission to PCI

1676

Correspondence submission to PCI

1677

Correspondence submission to PCI

1678

Correspondence submission to PCI

1679

Correspondence submission to PCI

1680

Correspondence submission to PCI

1681

Correspondence submission to PCI

45.00

1682

Correspondence submission to PCI

1683

Correspondence submission to PCI

1684

Correspondence submission to PCI

1685

Correspondence submission to PCI

1686

Correspondence submission to PCI

1687

Correspondence submission to PCI

1688

Correspondence submission to PCI

1689

Correspondence submission to PCI

1690

Correspondence submission to PCI

1691

Correspondence submission to PCI

1,244,000

1692

Correspondence submission to PCI

1693

Correspondence submission to PCI

1694

Correspondence submission to PCI

1695

No.

Rev.

BBVN-FIVE-S2-SCLMS-0001
BBVN-FIVE-S2-SCLMS-0002
BBVN-FIVE-S2-SCLMS-0002/R1
BBVN-FIVE-S2-SCLMS-0003

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1696
Attachment

Author/Delivere
d to Author

14/03/20

17-23 Mar 2014

14/03/21

24-30 Mar 2014

Toan

14/03/24

24-30 Mar 2014 (Rev.1)

Toan

14/04/04

7-13 Apr 2014

Toan

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1697
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1698
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1699
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1700
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1701
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1702
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1703
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1704
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1705
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1706
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1707
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1708
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1709
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1710
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1711
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1712
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1713
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1714
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1715
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1716
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1717
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1718
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1719
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1720
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1721
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1722
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1723
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1724
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1725
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1726
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1727
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1728
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1729
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1730
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1731
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1732
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1733
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1734
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1735
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1736
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1737
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1738
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1739
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1740
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1741
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1742
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1743
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1744
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1745
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1746
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1747
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1748
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1749
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1750
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1751
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

45.00

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1752
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1753
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1754
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1755
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1756
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1757
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1758
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1759
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1760
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1761
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1762
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1763
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1764
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1765
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1766
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1767
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1768
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1769
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1770
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1771
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1772
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1773
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1774
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1775
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1776
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1777
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1778
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1779
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1780
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1781
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

No.

Rev.

Date Issued

Date
Date
INCOMI
Delivered Required
NG
Reply

Rev

Date
Issued

Correspondence submission to PCI


Date
Title
Received

1782
Attachment

Author/Delivere
d to Author

Status

Date Delivered
to Author

Correspondence submission to PCI

1783

Correspondence submission to PCI

1784

Correspondence submission to PCI

1785

Correspondence submission to PCI

1786

Correspondence submission to PCI

1787

Correspondence submission to PCI

1788

Correspondence submission to PCI

1789

Correspondence submission to PCI

1790

Correspondence submission to PCI

1791

Correspondence submission to PCI

1792

Correspondence submission to PCI

1793

Correspondence submission to PCI

1794

Correspondence submission to PCI

1795

Correspondence submission to PCI

1796

Correspondence submission to PCI

1797

Correspondence submission to PCI

1798

Correspondence submission to PCI

1799

Correspondence submission to PCI

1800

Correspondence submission to PCI

1801

Correspondence submission to PCI

1802

Correspondence submission to PCI

1803

Correspondence submission to PCI

1804

Correspondence submission to PCI

1805

Correspondence submission to PCI

1806

Correspondence submission to PCI

1807

Correspondence submission to PCI

1808

Correspondence submission to PCI

1809

Correspondence submission to PCI

1810

Correspondence submission to PCI

1811

Correspondence submission to PCI

1812

Correspondence submission to PCI

1813

Correspondence submission to PCI

1814

Correspondence submission to PCI

1815

Correspondence submission to PCI

1816

Correspondence submission to PCI

1817

Correspondence submission to PCI

1818

Correspondence submission to PCI

1819

Correspondence submission to PCI

1820

Correspondence submission to PCI

1821

Correspondence submission to PCI

1822

Correspondence submission to PCI

1823

Correspondence submission to PCI

1824

Correspondence submission to PCI

1825

Correspondence submission to PCI

1826

Correspondence submission to PCI

1827

Correspondence submission to PCI

1828

Correspondence submission to PCI

1829

Correspondence submission to PCI

1830

Correspondence submission to PCI

1831

Correspondence submission to PCI

1832

Correspondence submission to PCI

1833

Correspondence submission to PCI

1834

Correspondence submission to PCI

1835

Correspondence submission to PCI

1836

Correspondence submission to PCI

1837

Correspondence submission to PCI

45.00

1838

Correspondence submission to PCI

1839

Correspondence submission to PCI

1840

Correspondence submission to PCI

1841

Correspondence submission to PCI

1842

Correspondence submission to PCI

1843

Correspondence submission to PCI

1844

Correspondence submission to PCI

1845

Correspondence submission to PCI

1846

Correspondence submission to PCI

1847

Correspondence submission to PCI

1848

Correspondence submission to PCI

1849

Correspondence submission to PCI

1850

Correspondence submission to PCI

1,244,000

1851

Correspondence submission to PCI

1852

Correspondence submission to PCI

1853

Correspondence submission to PCI

1854

Correspondence submission to PCI

1855

Correspondence submission to PCI

1856

Correspondence submission to PCI

1857

Correspondence submission to PCI

1858

Correspondence submission to PCI

1859

Correspondence submission to PCI

1860

Correspondence submission to PCI

1861

Correspondence submission to PCI

1862

Correspondence submission to PCI

1863

Correspondence submission to PCI

1864

Correspondence submission to PCI

1865

Correspondence submission to PCI

1866

Correspondence submission to PCI

1867

Correspondence submission to PCI

1868

Correspondence submission to PCI

1869

File
M-01-001
M-01-002
M-01-003
M-01-004
M-01-005
M-01-006
M-01-007
M-01-008
M-01-009
M-01-010
M-01-011
M-01-012
M-01-013
M-01-014
M-01-015
M-01-016
M-01-017
M-01-018
M-01-019
M-01-020
M-01-021
M-01-022
M-01-023
M-01-024
M-01-025
M-01-026
M-01-027
M-01-028
M-01-029
M-01-030
M-01-031
M-01-032
M-01-033
M-01-034
M-01-035
M-01-036
M-01-037
M-01-038
M-01-039
M-01-040
M-01-041
M-01-042
M-01-043
M-01-044
M-01-045
M-01-046
M-01-047
M-01-048

Issued
06/11/23
06/11/30
06/12/07
06/12/15
06/12/21
06/12/29
07/01/04
07/01/15
07/01/20
07/01/25
07/02/01
07/02/08
07/02/14
07/03/01
07/03/09
07/03/15
07/03/22
07/03/30
07/04/05
07/04/12
07/04/19
07/05/02
07/05/10
07/05/17
07/05/24
07/05/31
07/06/07
07/06/21
07/06/28
07/07/05
07/07/12
07/07/19
07/07/28
07/08/02
07/08/08
07/08/16
07/08/23
07/08/30
07/09/06
07/09/13
07/09/20
07/09/28
07/10/04
07/10/11
07/10/18
07/10/25
07/11/01
07/11/08

WEEKLY MEETING
Title
Weekly MOM at PCI office. No1 -23 November-2006
Weekly MOM at PCI office. No1 -30 November-2006
Weekly MOM at PCI office. No3 -7 December-2006
Weekly MOM at PCI office. No4 -15 December-2006
Weekly MOM at PCI office. No 5 -21 December-2006
Weekly MOM at PCI office. No 6 -28 December-2006
Weekly MOM at PCI office. No 7 -04 January-2007
Weekly MOM at PCI office. No 8 -11 January-2007
Weekly MOM at PCI office. No 9 -18 January-2007
Weekly MOM at PCI office. No 10 -25 January-2007
Weekly MOM at PCI office. No 11 -01 February-2007
Weekly MOM at PCI office. No 12 -08 February-2007
Weekly MOM at PCI office. No 13 -14 February-2007
Weekly MOM at PCI office. No 14 -1 March -2007
Weekly MOM at PCI office. No 15 -8 March -2007
Weekly MOM at PCI office. No 16 -15 March -2007
Weekly MOM at PCI office. No 17 -22 March -2007
Weekly MOM at PCI office. No 18 -30 March -2007
Weekly MOM at PCI office. No 19 -05 April -2007
Weekly MOM at PCI office. No 20 -12 April -2007
Weekly MOM at PCI office. No 21 -19 April -2007
Weekly MOM at PCI office. No 22 -03 May-2007
Weekly MOM at PCI office. No 23 -10 May-2007
Weekly MOM at PCI office. No 24 -17 May-2007
Weekly MOM at PCI office. No 25 -24 May-2007
Weekly MOM at PCI office. No 26 -31 May-2007
Weekly MOM at PCI office. No 27 -7 June-2007
Weekly MOM at PCI office. No 28 -21 June-2007
Weekly MOM at PCI office. No 29 -28 June-2007
Weekly MOM at PCI office. No 30 -05 July-2007
Weekly MOM at PCI office. No 31 -12 July-2007
Weekly MOM at PCI office. No 32 -19 July-2007
Weekly MOM at PCI office. No 33 -26 July-2007
Weekly MOM at PCI office. No 34 -02 August-2007
Weekly MOM at PCI office. No 35 -08 August-2007
Weekly MOM at PCI office. No 36 -16 August-2007
Weekly MOM at PCI office. No 37 -23 August-2007
Weekly MOM at PCI office. No 38 -30 August-2007
Weekly MOM at PCI office. No 39 -06 Sep-2007
Weekly MOM at PCI office. No 40 -13 Sep-2007
Weekly MOM at PCI office. No 41 -20 Sep-2007
Weekly MOM at PCI office. No 42 -28 Sep-2007
Weekly MOM at PCI office. No 43 -04 October-2007
Weekly MOM at PCI office. No 44 -11 October-2007
Weekly MOM at PCI office. No 45 -18 October-2007
Weekly MOM at PCI office. No 46 -25 October-2007
Weekly MOM at PCI office. No 47 -01 November-2007
Weekly MOM at PCI office. No 48 -08 November-2007

BI-WEE
File Code
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01

M-01-049
M-01-050
M-01-052
M-01-053
M-01-054
M-01-055
M-01-056
M-01-057
M-01-058
M-01-059
M-01-060
M-01-061
M-01-062
M-01-063
M-01-064
M-01-065
M-01-066
M-01-067
M-01-068
M-01-069
M-01-070
M-01-071
M-01-072
M-01-074
M-01-075
M-01-076
M-01-077
M-01-078
M-01-079
M-01-080
M-01-082
M-01-083

07/11/15
07/11/22
07/12/08
07/12/13
07/12/20
07/12/26
08/01/10
08/01/23
08/01/30
08/02/20
08/02/27
08/03/12
08/03/19
08/03/26
08/04/02
08/04/23
08/05/07
08/05/14
08/05/21
08/06/18
08/06/25
08/07/02
08/07/16
08/08/06
08/08/13
08/08/20
08/09/03
08/09/10
08/09/17
08/09/24
08/10/08
08/10/15

Weekly MOM at PCI office. No 49 -15 November-2007


Weekly MOM at PCI office. No 50 -22 November-2007
Weekly MOM at PCI office. No 52 -06 December-2007
Weekly MOM at PCI office. No 53 -13 December-2007
Weekly MOM at PCI office. No 54 -20 December-2007
Weekly MOM at PCI office. No 55 -26 December-2007
Weekly MOM at PCI office. No 56 -10 January -2008
Weekly MOM at PCI office. No 57 -23 January -2008
Weekly MOM at PCI office. No 58 -30 January -2008
Weekly MOM at PCI office. No 59 -20 February -2008
Weekly MOM at PCI office. No 60 -27 February -2008
Weekly MOM at PCI office. No 61 -12 March -2008
Weekly MOM at PCI office. No 62 -19 March -2008
Weekly MOM at PCI office. No 63 -26 March -2008
Weekly MOM at PCI office. No 64-02 April 2008
Weekly MOM at PCI office. No 65-22 April 2008
Weekly MOM at PCI office. No 66-7 May 2008
Weekly MOM at PCI office. No 67-14 May 2008
Weekly MOM at PCI office. No 68-21May 2008
Weekly MOM at PCI office. No 69-18 June 2008
Weekly MOM at PCI office. No 70-25 June 2008
Weekly MOM at PCI office. No 71-02 July 2008
Weekly MOM at PCI office. No 72-16 July 2008
Weekly MOM at PCI office. No 74-06 August 2008
Weekly MOM at PCI office. No 75-13 August 2008
Weekly MOM at PCI office. No 76-20 August 2008
Weekly MOM at PCI office. No 77-03 Sep 2008
Weekly MOM at PCI office. No 78-10 Sep 2008
Weekly MOM at PCI office. No 79-17 Sep 2008
Weekly MOM at PCI office. No 80-24 Sep 2008
Weekly MOM at PCI office. No 82- 8 Oct 2008
Weekly MOM at PCI office. No 83-15 Oct 2008 ( No meeting)

MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01

M-01-084

08/10/22 Weekly MOM at PCI office. No 84-22 Oct 2008 ( no meeting)

MOM-03-01

M-01-085
M-01-086
M-01-087
M-01-088

08/10/29
08/11/19
09/01/14
09/04/06

MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01

Weekly MOM at PMU office. No 85- 29 Oct 2008


Weekly MOM at PCI office. No 86-19 Nov 2008
Weekly MOM at PMU office. No 87-14 Jan 2009
Weekly MOM at PMU office. No 88-06 Apr 2009

Volume
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02

File
MB-01-001
MB-01-002
MB-01-003
MB-01-004
MB-01-005
MB-01-006
MB-01-007
MB-01-008
MB-01-009
MB-01-010
MB-01-011
MB-01-012
MB-01-013
MB-01-014

Issued
06/12/11
06/12/25
07/01/08
07/01/22
07/03/06
07/03/19
07/04/01
07/04/16
07/05/07
07/06/04
07/07/10
07/07/23
07/08/13
07/09/10

BI-WEEKLY MEETING
Title
Bi-weekly MOM at PMU office on 12/11/06
Bi-weekly MOM at PMU office on 25/12/06
Bi-weekly MOM at PMU office on 8 Jan 2007
Bi-weekly MOM at PMU office on 22 Jan 2007
Bi-weekly MOM at PMU office on 06/03/07
Bi-weekly MOM at PMU office on 19/03/07
Bi-weekly MOM at PMU office on 01/04/07
Bi-weekly MOM at PMU office on 16/04/07
Bi-weekly MOM at PMU office on 07/05/07
Bi-weekly MOM at PMU office on 04 June 2007
Bi-weekly MOM at PMU office on 10/07/07
Bi-weekly MOM at PMU office on 23 July 2007
Bi-weekly MOM at PMU office on 13 August 2007
Bi-weekly MOM at PMU office on 10 September 2007

MB-01-015
MB-01-016
MB-01-016
MB-01-017
MB-01-018
MB-01-019
MB-01-020

07/10/01
07/10/22
07/11/12
07/11/26
07/12/24
08/01/14
08/03/03

Bi-weekly MOM at PMU office on 01 October 2007


Bi-weekly MOM at PMU office on 22 October 2007
Bi-weekly MOM at PMU office on 12 November 2007
Bi-weekly MOM at PMU office on 26 November 2007
Bi-weekly MOM at PMU office on 24 December 2007
Bi-weekly MOM at PMU office on 14 January 2008
Bi-weekly MOM at PMU office on 03 March 2008

Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03
Vol 03

MB-01-021
MB-01-022
MB-01-023
MB-01-024

08/03/31
08/06/02
08/07/07
08/08/25

Bi-weekly MOM at PMU office on 31 March 2008


Bi-weekly MOM at PMU office on 02 June 2008
Bi-weekly MOM at PMU office on 07 July 2008
Bi-weekly MOM at PMU office on 25 August 2008

File Code
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01

Volume
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01
Vol 01

MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01
MOM-03-01

Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02
Vol 02