Uninterruptible Power System Test Report

Usage purpose

NO.1 UNIT TURBINE UPS GROUP

Installation location

CCB DC&UPS ROOM

1. Nameplate
Manufacturer

Date

Name

Type

Voltage

Frequency

2. Test Device
Name

Type

Function

Name

Digital multi-meter

To measure voltage

Meg-ohmmeter

Phase Sequence
indicator

To measure phase sequence

3. Test procedure

Type

Function
To measure
insulation

Ambient Temp

3.1 UPS operation method changeover test


3.1.1 Changeover from main AC to DC
Check if DC voltage is normal or not, DC switch is at close status, shut off main AC power, check indication lamp for rectification
and charger on control panel is on or not. Inverter performance is normal, measure and record UPS single electric output:
Output Voltage (V)

Output Frequency(Hz)

3.1.2 Changeover from DC to AC by-pass


Check if by-pass AC voltage & frequency is normal or not, by-pass switch is at working position, shut off DC power, inverter
lamp is off, static by-pass lamp is on, at that time UPS power is supplied by DC by-pass. measure and record UPS single
electric output
Output Voltage (V)

Output Frequency(Hz)

3.1.3 Changeover from by-pass AC to maintenance by-pass


Check if maintenance by-pass AC voltage & frequency is normal or not, open by-pass switch on control panel, close
maintenance by-pass power switch, close system and static switch, at that time UPS power is supplied by manual by-pass.
measure and record UPS single electric output:
Output Voltage (V)

Output Frequency(Hz)

3.1.4 Changeover from maintenance by-pass to by-pass AC


Check if maintenance by-pass AC voltage & frequency is normal or not, by-pass AC is at working position, static by-pass
Indication lamp is on measure and record UPS single electric output:
Output Voltage (V)

Output Frequency(Hz)

3.1.5 Changeover from by-pass AC to main AC


Check if main AC voltage & DC is normal or not, turn on main AC, UPS self-diagnostics procedure, start up rectifier/ charger,
corresponding lamp is on. Close DC switch, start up inverter, corresponding lamp is on. measure and record UPS single electric
output:

Uninterruptible Power System Test Report


Usage purpose

NO.1 UNIT TURBINE UPS GROUP

Installation location

Output Voltage(V)

CCB DC&UPS ROOM

Output Frequency(Hz)

3.1.6 Changeover from main AC to by-pass AC


Check if by-pass AC voltage & frequency is normal or not, shut off DC switch firstly, then shut off main AC power, UPS change
to by-pass AC automatically; static by-pass indication lamp is on. Measure and record UPS single electric output.
Output voltage(V)

Output frequency(Hz)

3.2 UPS Normal Shut Down Test


Press shut down button for a long time, inverter will shut down, shut off DC input switch, shut off rectifier input switch, after
about 5 minutes, the voltage of DC main bus decreases to below 20V, shut off by-pass input switch, charger/ rectifier lamp is
off, rectifier / charger shut down.
3.3 UPS Signal Delivery Test
Signal

Test result

Signal

Output current

Output voltage

Output frequency

Rectifier fail

Maintenance by-pass switch on

Static by-pass switch on

AC input fault

DC power fail

COM

Overload

Rest result

4. Test Conclusion

Date:
Tested By:

PT.TRUBA JAYA ENGINEERING

Date:
Approved By:

CNTIC

Date:
Witnessed By:

PLN / JMK