You are on page 1of 7

VAL.

FECHA

N FACT.

OCT. 2013

00051

NOV. 2013

00054

TOTAL

MONTO
DIRECTO
139,716.91

IGV 19%
26,546.21

MONTO

C.PAGO

166,263.12

PAGO DE
DETRACCION

149,472.59

0.00

1,380.00

262.20

1,642.20

1,642.20

0.00

141,096.91

26,808.41

167,905.32

151,114.79

0.00

N C.
PAGO

MONTO
ORIGINAL CONT.
167,905.32

49304.88
217,210.20

VAL.
1

FECHA
8/31/2013
TOTAL

N FACT.
00076

MONTO
DIRECTO

IGV 18%

MONTO

C.PAGO

PAGO DE
DETRACCION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

N C.
PAGO
6459

MONTO
ORIGINAL CONT
0.00

49,304.88
106308.26
83123.644

151148.29

MONTO
PAGADO

10% R.F.G
16,790.53

167,905.32

151,114.79

16,790.53

167,905.32

167,905.32

14229.2644
0

167,905.32
MONTO
PAGADO

10% R.F.G
0.00

0.00

0.00

0.00

0 167,905.33

170,938.55

480640.6
567155.908

MONTO TOTAL DE OBRA

RETENCION POR GARANTIA DE FIEL CUMPLIMIENTO


TOTAL

16,790.53

RETENCION POR GARANTIA DE FIEL CUMPLIMIENTO ADICIONAL


TOTAL

0.00

CONTRATO ORIGINAL
MONTO CONTRACTUAL

167,905.32

MONTO PAGADO CONTRACTUAL

151,114.79

REAJUSTES

3,033.23

FONDO DE GARANTIA

16,790.53
SUB TOTAL

16,790.53

ADICIONAL
MONTO CONTRATUAL

0.00

MONTO PAGADO CONTRACTUAL

0.00

DETRACCION

0.00

FONDO DE GARANTIA

0.00
SUBTOTAL

MONTO TOTAL A DEVOLVER AL CONTRATISTA

0.00

16,790.53

CONTRATO ORIGINAL
VAL.

PERIODO DE
VALORIZACION

NOV

DIC

REAJUSTE
CALCULO SIN
IGV
2,364.01
184.92

IGV 19 %
449.16

2,813.16

35.13

220.05

TOTAL A

3,033.23

ADICIONAL
VAL.
1

PERIODO DE
VALORIZACION
SETIEMBRE

REAJUSTE
CALCULO SIN
IGV
0.00

IGV 18 %
0.00

TOTAL B

PARCIAL

TOTAL

PARCIAL
0.00
0.00

2,548.93

484.30

3,033.23

18%
425.52
33.29

23.64
1.85

ITEM

RESUMEN TOTAL

DEVOL. RETENCION DE GARANTIA 10%

REAJUSTE FORM. POLINOMICA

REGULARIZACION IGV DE REAJUSTES


TOTAL A PAGAR AL CONTRATISTA

MONTO
16,790.53
3,033.23
-25.48
19,798.29

167,905.32