East San Fernando Valley Transit Corridor

Project Information Meetings November 2014

Purpose of Todays Meeting


Provide project update"
Share alternatives being studied"
Answer questions"

"
"
"

Project Background
Measure R Project
$170.1 million identified in the Long Range
Transportation Plan
Environmental Analysis underway
Process initiated in 2011
Initial Study Alternatives identified in 2013"
Refined Alternatives throughout 2014

"

"

Study Partners
Federal Transit Administration lead on federal
clearance "
Metro lead on state clearance"
Coordinating with Cities of Los Angeles and San
Fernando "

"
"
"
"
"
"

Typical Roadway Conditions


"
100 right-of-way"
80 intersections "
Two to three travel lanes in each
direction"
Left turns permitted throughout"
Street parking "
Landscaped median (Pacoima)"

"
"
"

"
"

"
"
"
"

Study Area and Corridor


Characteristics
9.2 Mile Alignment: Metro Orange Line to Sylmar/San
Fernando Metrolink Station"

"

460,000 People reside in the Study Area


Long Beach, CA. 462,000"
Atlanta (City), GA. 420,000"
Miami (City), FL. 399,000"

"

35% Transit Dependent Population


Average bus trip is 4.7 miles
Averages bus speed ~12 mph in PM peak
7th busiest bus corridor in Metro system
2nd highest bus boardings in the SFV

6
Source: Metro and U.S. Census 2010, State & County QuickFacts

Project Development Process


5
We Are
Here

5 Phases
2
1
Alternatives
Analysis

"

Completed
Jan. 2013

4
3

Operation

"
Environmental
Studies (EIS/
EIR) &
Conceptual
Engineering

Construction
Engineering

Environmental Studies Phase

"

"
EIS/EIR
SCOPING

DRAFT EIS/
EIR"

Ongoing Public Participation

"
SELECT
LOCALLY
PREFERRED
ALTERNATIVE

"
FINAL
EIS/EIR

"

RECORD OF
DECISION/
NOTICE OF
DETERMINATION

Environmental Issues to be Studied

Transportation"
Land Use & Development"
Real Estate & Acquisitions"
Communities & Neighborhoods"
Visual & Aesthetics"
Air Quality"
Noise & Vibration"
Ecosystems & Biological
Resources"
Geotechnical/Seismic/Hazardous
Materials"
Water Resources

Energy
Historical, Archaeological &
Paleontological Resources
Parklands & Community
Facilities
Economic & Fiscal Development
Safety & Security
Construction Impacts
Growth Inducing Impacts
Environmental Justice
Climate Change
Cumulative Impacts
8

How did we get here?


2011
Streetcar Bus

No Build

Rail

Initial
Studies

2012

2014

2013
AA
Report

Environmental
Process Begins

Refine"
Alternatives

Low-Floor LRT/Tram
is introduced

TSM

29 Alternatives

October

8 Alternatives

April

October

5 Alternatives

March

6 Alternatives

November

May
Scoping Mtgs.

Alt. 1"

Curb-Running
BRT

"

Similar to Wilshire BRT"


9.2 miles total length:"
6.7 miles curb-running dedicated busway"
2.5 miles mixed-flow "
18 enhanced stations:"
Ticket Vending Machines "
Canopies"
Existing Maintenance Facility :"
Division 15"
Could be implemented soonest and with existing
financial resources"

"
"
"
"
"

"
"
"

10

Alt. 2 "

Median-Running
BRT

"

Similar to Metro Orange Line"


9.2 miles total length:"
6.7 miles median busway and 2.5 miles mixed-flow "
17 enhanced stations:"
Ticket Vending Machines "
Canopies"
Existing Maintenance Facility: "
Division 15"

"
"
"
"
"

"
"

"

11

Alt . 3"

Median-Running
Low-Floor LRT/Tram
Similar San Diego, Portland and European
systems"
9.2 miles total length:"
6.7 miles median dedicated guideway"
2.5 miles mixed-flow "
28 enhanced stations:"
Ticket Vending Machines "
Canopies"

"

"
"
"
"
"

"
"
"

"

12

Alt. 4"

Median-Running
LRT

"

Similar to existing Metro LRT Lines"


9.2 miles total length:"
6.7 miles median dedicated guideway "
2.5 miles underground"
2.5 miles on railroad right-of-way"
Adjacent to San Fernando Road"
14 enhanced stations (3 underground):"
Ticket Vending Machines "
Canopies"

"
"
"
"
"

"
"
"

13

Maintenance Storage Facility


"
Requires new Maintenance Storage
Facility !
25-30 acre site "
Within mile of route"
Three candidate areas identified"

"
"
"
"
"

"
"

"

14

Van Nuys at Metro Orange Line


Before

15

Median-Running BRT at Van Nuys/MOL"


Conceptual

After

16

Van Nuys Civic Center


Before

17

Low-Floor LRT/Tram at Van Nuys Civic


Center"
Conceptual

After

18

Van Nuys at Victory


Before

19

LRT at Van Nuys/Victory"


Conceptual

After

20

Van Nuys at Roscoe


Add Median running Tram
Before
rendering at Marvin
Braude or Panorama High

21

Curb-Running BRT at Van Nuys/Roscoe"


Conceptual

After

22

Van Nuys at Laurel Canyon


Before

23

Median-Running BRT at Van Nuys/Laurel


Canyon - Conceptual
After

24

Rail Road Tracks at Paxton


Before

25

LRT at Rail Road Tracks/Paxton


Conceptual

After

26

San Fernando at Maclay


Before

27

Low-Floor LRT/Tram at San Fernando/


Maclay
Conceptual
After

28

Rail Road Tracks at Maclay


Before

29

LRT at Rail Road Tracks/Maclay


Conceptual

After

30

Three Route Options

Railroad Tracks

Truman St.

Railroad Tracks

Truman St.
San Fernando Rd.

San Fernando Rd.

31

Considerations for Comparison

32

Projected 2040 Average Speed (MPH)


25

19.2

20

15

15

11.3

13.4

13.1

Alt 1 - Curb-Running BRT

Alt 3 - Low-Floor LRT/Tram

11.3

10

0
No Build

33

Projected 2040 Travel Time (Minutes)


No Build

49

TSM

49

41

Alt 1 - Curb-Running BRT

37

Alt 2 - Median-Running BRT

42

Alt 3 - Low-Floor LRT/Tram

29

Alt 4 - LRT

Minutes

20

30

40

50

34

Projected 2040 Corridor Boardings


60,000

50,000

47400

40,000

35800
30900

31500

30,000

24200
20900
20,000

10,000

0
No Build

Alt 1 - Curb-Running BRT

Alt 3 - Low-Floor LRT/Tram

35

Projected 2040 Corridor Boardings


40,000
Premium Service Boardings
Metro Local Line 233 (or 233X in Alt1)
Non-project Transit Boardings

30500

30500

30,000

19000

20,000

16700
12300
10400
10,000

8600
3800

3900

5300

4600

0
Alt 1 - Curb-Running BRT

Alt 2 - Median-Running BRT

Alt 3 - Low-Floor LRT/Tram

Alt 4 - LRT

36

Capital Costs: 2014 Dollars


$3,000,000,000.0

$2,670,000,000

$1,300,000,000

Funds
Reserved
$170,000,000

$294,000,000

$0.0

$0
No Build

$402,000,000

$35,200,000
$35 Million
Alt 1 - Curb-Running BRT

Alt 3 - Low-Floor LRT/Tram

37

We Want to Hear from You


US Mail:!
Walt Davis, Project Manager
One Gateway Plaza - MS 99-22-5
Los Angeles, CA 90012
Phone: (818) 276-3233 "

www.metro.net/eastSFVtransit"
Facebook: EastSFVtransit
Twitter: @eastSFVtransit
"

E-mail: eastSFVtransit@metro.net

38

Meetings
November 6, 2014 (Thursday) at 6:00 PM!
San Fernando Aquatic Center, 208 Park Ave, San Fernando

"
November 12, 2014 (Wednesday) at 4:30 PM!
Marvin Braude Constituent Center, 6262 Van Nuys Bl, Van Nuys, CA

Webcast http://ustream.tv/channel/eastsfv"

"
November 13, 2014 (Thursday) at 6:00 PM!
Pacoima Neighborhood City Hall, 13520 Van Nuys Blvd, Pacoima

39

Next Steps
Review comments received at these meetings
Continue preparation of the Draft EIS/EIR/Technical Studies

"
"

40

Questions

Q&A

41