Project Background
Measure R Project
$170.1 million identified in the Long Range
Transportation Plan
Environmental Analysis underway
Process initiated in 2011
Initial Study Alternatives identified in 2013"
Refined Alternatives throughout 2014
"
"
Study Partners
Federal Transit Administration lead on federal
clearance "
Metro lead on state clearance"
Coordinating with Cities of Los Angeles and San
Fernando "
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
6
Source: Metro and U.S. Census 2010, State & County QuickFacts
5 Phases
2
1
Alternatives
Analysis
"
Completed
Jan. 2013
4
3
Operation
"
Environmental
Studies (EIS/
EIR) &
Conceptual
Engineering
Construction
Engineering
"
"
EIS/EIR
SCOPING
DRAFT EIS/
EIR"
"
SELECT
LOCALLY
PREFERRED
ALTERNATIVE
"
FINAL
EIS/EIR
"
RECORD OF
DECISION/
NOTICE OF
DETERMINATION
Transportation"
Land Use & Development"
Real Estate & Acquisitions"
Communities & Neighborhoods"
Visual & Aesthetics"
Air Quality"
Noise & Vibration"
Ecosystems & Biological
Resources"
Geotechnical/Seismic/Hazardous
Materials"
Water Resources
Energy
Historical, Archaeological &
Paleontological Resources
Parklands & Community
Facilities
Economic & Fiscal Development
Safety & Security
Construction Impacts
Growth Inducing Impacts
Environmental Justice
Climate Change
Cumulative Impacts
8
No Build
Rail
Initial
Studies
2012
2014
2013
AA
Report
Environmental
Process Begins
Refine"
Alternatives
Low-Floor LRT/Tram
is introduced
TSM
29 Alternatives
October
8 Alternatives
April
October
5 Alternatives
March
6 Alternatives
November
May
Scoping Mtgs.
Alt. 1"
Curb-Running
BRT
"
"
"
"
"
"
"
"
"
10
Alt. 2 "
Median-Running
BRT
"
"
"
"
"
"
"
"
"
11
Alt . 3"
Median-Running
Low-Floor LRT/Tram
Similar San Diego, Portland and European
systems"
9.2 miles total length:"
6.7 miles median dedicated guideway"
2.5 miles mixed-flow "
28 enhanced stations:"
Ticket Vending Machines "
Canopies"
"
"
"
"
"
"
"
"
"
"
12
Alt. 4"
Median-Running
LRT
"
"
"
"
"
"
"
"
"
13
"
"
"
"
"
"
"
"
14
15
After
16
17
After
18
19
After
20
21
After
22
23
24
25
After
26
27
28
29
After
30
Railroad Tracks
Truman St.
Railroad Tracks
Truman St.
San Fernando Rd.
31
32
19.2
20
15
15
11.3
13.4
13.1
11.3
10
0
No Build
33
49
TSM
49
41
37
42
29
Alt 4 - LRT
Minutes
20
30
40
50
34
50,000
47400
40,000
35800
30900
31500
30,000
24200
20900
20,000
10,000
0
No Build
35
30500
30500
30,000
19000
20,000
16700
12300
10400
10,000
8600
3800
3900
5300
4600
0
Alt 1 - Curb-Running BRT
Alt 4 - LRT
36
$2,670,000,000
$1,300,000,000
Funds
Reserved
$170,000,000
$294,000,000
$0.0
$0
No Build
$402,000,000
$35,200,000
$35 Million
Alt 1 - Curb-Running BRT
37
www.metro.net/eastSFVtransit"
Facebook: EastSFVtransit
Twitter: @eastSFVtransit
"
E-mail: eastSFVtransit@metro.net
38
Meetings
November 6, 2014 (Thursday) at 6:00 PM!
San Fernando Aquatic Center, 208 Park Ave, San Fernando
"
November 12, 2014 (Wednesday) at 4:30 PM!
Marvin Braude Constituent Center, 6262 Van Nuys Bl, Van Nuys, CA
Webcast http://ustream.tv/channel/eastsfv"
"
November 13, 2014 (Thursday) at 6:00 PM!
Pacoima Neighborhood City Hall, 13520 Van Nuys Blvd, Pacoima
39
Next Steps
Review comments received at these meetings
Continue preparation of the Draft EIS/EIR/Technical Studies
"
"
40
Questions
Q&A