TECHNICAL SPECIFICATION
FOR
CHIEF ENGINEER/MM ,
HVPNL, SHAKTI BHAWAN,
SECTOR-6, PANCHKULA
JULY-2012
-0-
TECHNICAL SPECIFICATION FOR 245 kV, 145 kV & 72.5 kV SF6 GAS CIRCUIT BREAKERS
1.0
SCOPE:
1.1
This specification provides for design, engineering, manufacture, stage testing, inspection and
testing before supply, packing, forwarding and delivery at site FOR destination of 245 kV, 145
kV and 72.5 kV, 3 pole SF6 gas filled outdoor circuit breakers alongwith terminal connectors,
structures, all the accessories and auxiliary equipment and mandatory spares and
maintenance equipment for the satisfactory operation in various substations of the state as
specified here in.
1.2
It is not the intent to specify completely all the details of design and construction of the circuit
breakers. However, the breakers shall conform in all respects to the high standard of
engineering design and workmanship and shall be capable of performing in continuous
commercial operation up to the Bidders guarantee in a manner acceptable to the Purchaser.
The circuit breakers equipment shall conform in all respects to high standards of engineering
design and workmanship and shall be capable of performing in continuous commercial
operation up to the bidders guarantee acceptable to the purchaser. The equipment offered
shall be complete in all respect necessary for its effective and trouble free operation. Such
components shall be deemed to be within the scope of supply irrespective of whether those
are specially brought out in this specification and or the commercial order or not. All similar
parts particularly movable ones shall be interchangeable.
2.0
STANDARDS:
2.1
The circuit breakers shall conform to the latest revisions with amendments available at the
time of testing of relevant standards, rules and codes, some of which are listed herein for
ready reference.
Sl. No.
Standard No.
Title
1.
IEC-56
2.
IEC-376
3.
IS-5578& 11353
4.
IS-2147
IS-325
6.
IS-13118
7.
IS-2629
Recommended practice
of iron and steel.
8.
IEC-137
9.
IS-2099
10.
IS-4379
11.
IS-7285
12.
IS-802
-1-
for
hot
dip
galvanising
(PART-1)
2.2
Equipment meeting with the requirement of other authoritative Standards, which ensure equal
or better performance than the standards mentioned above, shall also be considered. When
the equipment offered by the supplier conforms to other standards salient points of difference
between standards adopted and the standards specified in this specification shall be clearly
brought out in the relevant schedule. Four copies of such standards with authentic translation
in English shall be furnished along with the offer.
3.0
SERVICE CONDITIONS:
The breakers and accessories to be supplied against this specification shall be suitable for
satisfactory continuous operation under the following tropical conditions.
i)
3.1
Location
ii)
50
iii)
-2.5
iv)
100
v)
vi)
900
195
1000
ix)
45
(%)
26
Power Devices
Protective Device
c.
Lighting
Each of the foregoing supplies shall be made available by the Purchaser at the terminal point
for each circuit breaker for operation of accessories and auxiliary equipment. Bidder's
scope include supply of interconnecting cables, terminal boxes etc., The above supply voltage
may vary as below and all devices shall be suitable for continuous operation over the
entire range of voltages.
4.0
i)
AC supply
ii)
D.C. Supply
10%.
PRINCIPAL PARAMETERS:
The SF-6 gas Circuit Breakers covered in this specification shall meet the technical
requirements listed hereunder.
PRINCIPAL TECHNICAL PARAMETERS:
---------------------------------------------------------------------------------------------------------------------------Sl. Item
Specification
No.
72.5 kV
145 kV
245 kV
----------------------------------------------------------------------------------------------------------------------------
-2-
1.
2.
72.5
145
245
frequency (Hz.)
50
50
50
Continuous current
1250
1000
1250
rating (A rms)
3.
Type
4.
Mounting
5.
Number of Poles
6.
Type of Operation
3 pole gang
3 pole gang
Individually
Operated
operated
operated
single poles
7.
1400
1700
4000
3000
4000
5000
1300
2400
150
150
150
2550
2550
2550
Required ground
clearance from the lowest
live terminal if both the
terminals are not in
Phase to earth
800
clearance (mm)
10.
11.
12.
Operating mechanism
13
Three
Three
Single and
phase
phase
three phase
14.
15.
As per IS-13118
(Trip free)
-3-
16.
17.
18.
1.2/50 microsecond
325
650
1050
impulse withstand
voltage (kV peak)
19.
1 minute power
170
275
460
frequency withstand
voltage (kV rms)
20.
10
50
125
125
160
250
31.5
40
31.5
1 sec
78.75
1 sec
1 sec
78.75
100
(kA)
(kA)
(kA)
Permissible limit of
temperature rise
24.
25.
10
10
10
1813
3625
6125
31.5
31.5
40
(kA)
(kA)
(kA)
-4-
27.
i) Rating of auxiliary
contacts
ii) No. of auxiliary
contacts
28.
29 .
Breaking capacity of
auxiliary contacts
Seismic acceleration
Min. Corona extinction
voltage kv (rms)
----------------------------------------------------------------------------------------------------------------------------------5.0
5.1
5.2
Any part of the breakers, especially the removable ones, shall be freely interchangeable
without the necessity of any modification at site.
5.3
Circuit breaker shall comprise of three identical single pole units. 245 kV circuit breakers are
meant for single pole re-closure. In this case pole discrepancy special features including
relays, timers etc., provided to minimise pole discrepancy and to avoid single phasing shall be
highlighted in the bid. The 72.5 kV and 145 kV circuit breakers are not meant for single pole
re-closure. The units for these breakers shall be linked together mechanically. Complete
circuit breaker with all the items necessary for successful operation shall be supplied,
including but not limited to the following:
5.3.1
Breaker assemblies with bases, support structure for circuit breaker as well as for control
cabinet, central control cabinet and foundation bolts for main structure as well as control
cabinet and central control cabinet (except concrete foundations), terminals and operating
mechanisms are included in the scope of supply.
5.3.2
Compressed SF6 gas, pneumatic systems complete including compressors, tanks, piping,
fittings, valves and controls and necessary supports for interpole piping for pneumatic
systems.
5.3.3
In case of 245 kV circuit breakers one central control cabinet for each breaker, and one
control box for each pole shall be provided with all the required electrical devices mounted
therein and the necessary terminal blocks for termination of interpole wiring. The necessary
interpole cabling at site shall be done by the Purchaser based on the schematic, wiring
diagram and termination schedule to be supplied by the successful Bidder. Terminals shall be
of stud type with two nuts.
5.3.4
5.3.5
All necessary parts to provide a complete and operable circuit breaker installation such as
main equipment, terminal, control parts, connectors and other devices, whether specifically
called for herein or not.
5.4
The 245 KV circuit breaker shall be designed for high speed single and three pole reclosing
with and operating sequence and timing as specified in clause 4.0 "Principal Parameters".
-5-
5.5
The support structure of circuit breaker as well as that of control cabinet shall be hot dip
galvanised. All other parts can be grey colour painted as per shade 631 of IS-5.
5.6
5.7
5.8
The current density adopted for the design of the terminal pads shall in no case exceed the
following values. For copper pads - 1.6 A/sq.mm. and others - 1.0 A/sq.mm.
5.9
CONTACTS:
5.9.1
All making and breaking contacts shall be sealed free from atmospheric effects. Contacts
shall be designed to have adequate thermal and current carrying capacity for the duty
specified and to have a life expectancy so that frequent replacements due to excessive
burning will not be necessary. Provision shall be made for rapid dissipation of heat generated
by the arc on opening.
5.9.2
Main contacts shall be the first to open and the last to close so that there will be little contact
burning and wear.
5.9.3
If arcing contacts are used they shall be the first to close and the last to open. These shall be
easily accessible for inspection and replacement. If there are no separately mounted arcing
contacts the main contacts shall be easily accessible for inspection and replacements. Tips
of arcing contacts and main contacts shall be silver plated or have tungsten alloy tipping.
5.9.4 Any device provided for voltage grading to damp oscillations or to prevent restrike prior to
the complete interruption of the circuit or to limit over-voltages on closing shall have a life
expectancy comparable to that of the breaker as a whole.
5.9.5 Breakers shall be so designed that when operated within their specified rating, the
temperature of each part will be limited to values consistent with a long life of the material
used. The temperature shall not exceed that indicated in IEC-56 under specified ambient
conditions.
5.9.6 Contacts shall be kept permanently under pressure of SF6 gas. The poles shall be partially
filled with SF6 gas at the time of despatch and only topping upto required pressure shall be
permitted at site. The gap between the open contacts shall be such that it can withstand
atleast the rated phase to ground voltage continuously at zero gauge pressure of SF6 gas due
to its leakage.
5.10
PORCELAIN HOUSING:
5.10.1 The porcelain housing shall be of single piece construction without any joint or coupling. It
shall be made of homogeneous, vitreous porcelain of high mechanical and dielectric
strength. Glazing of porcelain shall be uniform brown or dark brown colour with a smooth
surface arranged to shed away rain water or condensed water particles (fog), free from
blisters, burns and similar other defects.
5.11
ADDITIONAL REQUIREMENTS:
a)
The circuit breakers shall be single pressure type and single break, the design and
construction of the circuit breaker shall be such that there is minimum possibility of gas
leakage and entry of moisture. There should not be any condensation of SF6 gas on the
internal insulating surface of the circuit breaker.
b)
All gasketed surfaces shall be smooth, straight and reinforced, if necessary to minimise
distortion and to make a tight seal. Where the operating rod of the operating mechanism
connected to the arc chamber (SF6 media) adequate suitable Oring seals shall be provided.
The test holes for leakage test of the internal seals shall also be provided.
-6-
c)
In the interrupter assembly there shall be a absorbing product box to eliminate SF6
decomposition products and moisture. The material used in the construction of the circuit
breakers shall be fully compatible with SF6 gas.
d)
Each pole shall form an enclosure filled with SF6 gas independent of the other two poles. The
SF6 gas density of each pole shall be monitored and regulated by individual pressure
switches
e)
The SF6 gas density monitor shall be adequately temp. compensated. The density monitor
shall meet the following requirements:
i)
It shall be possible to dismantle the density monitor for checking/ replacement without
draining the SF6 gas by using suitable interlocked non-return couplings.
ii)
It shall damp the pressure pulsation while filling the gas in service so that the flickering
of the pressure switch contacts does not take place.
iii)
iv)
a)
Advance warning can be given for the low pressure below an unacceptable level.
b)
After alarm, the breaker shall open if the pressure falls below pre- determined value.
f)
Means for pressure relief shall be provided in the gas chamber of circuit breaker to avoid
damages or distortion during occurrence of abnormal pressure increase or shock waves
generated by internal electric faults. The position of vents, diaphragms and pressure relief
devices shall be so arranged as to minimise danger to the operators in the event of gas or
vapour escaping under pressure.
g)
Facility shall also be provided to reduce the gas pressure within the breaker to a value not
exceeding 8 millibar for 245 kV and 6 millibar for 145 kV & 72.5 kV within 4 hours or less.
Each circuit breaker shall be capable of withstanding this degree of vacuum without distortion
or failure of any part.
h)
Sufficient SF6 gas shall be provided to fill all the circuit breakers installed. In addition to this
20% of the total gas requirement shall be supplied in separate cylinders as spare requirement.
The pressure loss in the breaker shall not be more than 1% per year under normal operating
conditions.
i)
Provisions shall be made for attaching an operation analyzer after installation at site to record
contact travel, speed and making measurement of operation timings and synchronization of
contacts in one pole.
5.12
a)
The SF6 gas shall comply with IEC-376, 376A and 376B and be suitable in all respects for
use in the switchgear under the worst operating conditions.
b)
The high pressure cylinders in which the SF6 gas is shipped and stored at site shall comply
with requirements of the following standards and regulations:
IS:4379
IS:7285
Seamless high carbon steel cylinders for permanent and high pressure
liquefiable gases.
Test: SF6 gas shall be tested for purity, dew point, breakdown voltage, water contents as per
IEC-376, 376A and 376B and test certificates shall be furnished to Purchaser indicating all the
tests as per IEC-376 for each lot of SF6 gas.
-7-
5.13
DUTY REQUIREMENTS:
5.13.1 The circuit breakers shall be totally re-strike free under all duty conditions
capable of performing specified duties without opening resistors.
and shall be
5.13.2 The circuit breakers shall meet the duty requirements for any type of fault or fault location,
for line charging and roping when used on an effectively grounded system and perform
make and break operations as per stipulated duty cycles satisfactorily.
5.13.3 The Circuit Breakers shall be capable of:
i)
Clearing short line faults (Kilo metric faults) with source impedance behind the bus
equivalent to symmetrical fault current specified.
ii)
Breaking inductive currents of 0.5 to 10A without switching over-voltage exceeding 2.3
p.u.
iii)
Breaking 25% of the rated fault current at twice rated voltage under phase opposition
condition.
5.13.4
The critical current which gives the longest arc duration at lockout pressure of
extinguishing medium and the arc duration shall be indicated.
5.13.5
The breakers shall satisfactorily withstand the high stresses imposed on them during
fault clearing, load rejection and re-energisation of lines with trapped charges. The
breakers shall also withstand the voltage specified in clause 4.0 Principal Parameters"
of this specification.
5.14
5.14.1
Parameters" of this
The Bidder may please note that there is only one specified break time of the breaker
which shall not be exceeded under any duty conditions specified such as with
the combined variation of the trip coil voltage, (85-110%) pneumatic pressure and
arc extinguishing medium pressure etc., While furnishing the proof for the total
break time of complete circuit breaker, the Bidder may specifically bring out the
effect of non-simultaneity between contacts within a pole or between poles and show
how it is covered in the guaranteed total break time.
5.14.3
The values guaranteed shall be supported with the type test reports.
5.15
5.15.1
The circuit breakers shall be designed for electrical local as well as remote control
5.15.2 (i)
5.15.2 (ii)
The operating mechanism shall be spring closing and spring tripping through electric
motor for 145 kV & 72.5kV SF-6 Circuit Breakers. The mechanism shall be adequately
designed for specified tripping and re-closing duty. The entire operating mechanism
control circuitry as required shall be housed in an out-door type,CRCA steel enclosure.
-8-
All working parts in the mechanism shall be of corrosion resistant material. All bearings
which require greasing, shall be equipped with pressure grease fittings.
5.15.4
The design of the operating mechanism shall be such that it shall be practically
maintenance free. The guaranteed years of maintenance- free operation, the number
of full load and full rated short circuit current breaking/operation without enquiring any
maintenance or overhauling, shall be clearly stated in the bid. As far as possible the
need for lubricating the operating mechanism shall be kept to the minimum and
eliminated altogether if possible.
5.15.5
5.15.6
A mechanical indicator shall be provided to show open and close position of the
breaker. It shall be located in a position where it will be visible to a man standing on
the ground level with the mechanism housing closed. An operation counter shall also
be provided in the central control cabinet.
5.15.7
The Bidder shall furnish detailed operation and maintenance manual of the mechanism
along with the operation manual for the circuit breakers.
CONTROL:
The close and trip circuits shall be designed to permit use of momentary contact
switches and push buttons.
Each breaker pole shall be provided with two (2) independent tripping circuits, valves
and coils each connected to a different set of protective relays.
The breaker shall normally be operated by remote electrical control. Electrical tripping
shall be performed by shunt trip coils. However, provisions shall be made for local
electrical control. For this purpose a local/remote selector switch and close and trip
push buttons shall be provided in the breaker central control cabinet. Remote located
push buttons and indicating lamps shall be provided by the Purchaser.
5.16
5.16.1
5.16.2
5.16.3
5.16.4
The trip coils shall be suitable for trip circuit supervision. The trip circuit supervision
relay would be provided by the Purchaser. Necessary terminals shall be provided in
the central control cabinet of the circuit breaker by the Bidder.
5.16.5
Closing coil shall operate correctly at all values of voltage between 85% and 110% of
the rated voltage. Shunt trip shall operate correctly under all operating conditions of
the circuit breaker upto the rated breaking capacity of the circuit breaker and at all
values of supply voltage between 85% and 110% of rated voltage. If additional
elements are introduced in the trip coil circuit their successful operation and reliability
for similar applications on outdoor circuit breakers shall be clearly brought out in
the additional information schedules. In the absence of adequate details the offer is
likely to be rejected.
5.16.6
Suitable relay for monitoring of DC supply voltage to the control cabinet shall be
provided. The pressure switches used for interlock purposes shall have adequate
contact ratings to be directly used in the closing and tripping circuits. In case the
contacts are not adequately rated and multiplying relays are used then the interlock
for closing/opening operation of breaker shall be with No logic of the relay i.e. if the
DC supply to the interlock circuit fails then it is essential that breaker trips in
-9-
order to protect the switchgear and connected equipment like transformers etc., for
any possible faults at that time. Provision for automatic tripping of the breaker shall
be made alongwith the flag indication for non-availability of DC supply. The connection
must be such that capacitor provided for this purpose gets charged from the DC
source provided by the Board only and the capacitor supply is released for the tripping
circuit as soon as DC supply fails. It must be possible to close the breaker only after
restoration of DC supply. The entire arrangement of CTD must be accommodated in
a separate box and it shall be mounted to control cubicle
5.16.7
For pneumatically and spring operated mechanisms a local manual closing device
which can be easily operated by one man standing on the ground shall also be
provided for maintenance purposes and direction of motion of handle shall be clearly
marked.
5.16.8
The auxiliary switch of the breaker shall be preferably positively driven by the breaker
operating rod and where due to construction features, same is not possible a plug-in
device shall be provided to simulate the opening and closing operations of circuit
breaker for the purpose of testing control circuits.
5.17
5.18
b)
The ICU shall be complete with air piping and accessories, all stop valves,
tees, pressure reducers etc., required for normal operation of the breaker.
c)
The breaker local receivers shall comply with the requirements in clause 5.29
and shall have sufficient capacity for two CO operations of the breakers at the
lowest pressure for auto reclosing duty without refilling. The Bidder shall ensure
that rated pressure. is available at all the breaker locations.
d)
- 10 -
pressure dip has been damped and a reliable pressure measurement can be
made. Such facilities shall be provided for following conditions:
i) Close lockout pressure.
ii) Auto reclose lockout pressure.
iii) Extreme low pressure.
5.19
e)
f)
The compressed air piping shall comply to requirements given in clause 5.28.8.
5.20
INTERLOCKS:
It is proposed to electrically interlock the circuit breaker with Purchaser's associated air
break isolating switches in accordance with switchyard safety interlocking scheme.
The details of the scheme will be furnished to the successful Bidder. All accessories
required on breaker side for satisfactory operation of the scheme shall be deemed to
be included in the scope of supply of this specification.
5.21
SUPPORTING STRUCTURE:
The Bidder shall indicate the price of support structure along with the foundation
bolts required separately in the bid proposal sheets and these shall be considered in
evaluation. However, in case the equipment offered have integral support structure or
the specialities of the breaker are such that support structures have to be provided by
the successful Bidder, the prices of these support structures shall be included in the
price of the equipment and same shall be indicated clearly in the bid proposal sheet.
The support structure shall meet the following requirements:
1)
The minimum vertical clearance from any energised metal part to the bottom of
the circuit breaker (structure) base, where it rests on the foundation pad,
shall be 2.85meters for 72.5kV,3.85meters for 145kV and 4.85 meters for245
kV..
2)
The minimum vertical distance from the bottom of the lowest porcelain part of
the bushings, porcelain enclosures or supporting insulators to the bottom of the
circuit breaker base, (from the ground level) shall be 2.55 meters for all
voltages.
3)
The minimum clearance between the live parts and earth shall be 0.8 meters
for 72.5kV, 1.3 meters for 145kV and 2.4 meters for 245kV.
5.22
5.22.1
Following is a partial list of some of the major fittings and accessories to be furnished
by Bidder in the central control cabinet. Number and exact location of these parts shall
be indicated in the bid.
a)
Central control cabinet in accordance with clause no. 5.30 complete with
i)
Cable glands for control cables off sizes will be intimated to the successful
bidders .
- 11 -
ii)
iii)
iv)
v)
vi)
vii)
The number of terminals provided shall be adequate enough to wire out all
contacts and control circuits plus 24 terminals spare for Purchaser's use.
viii)
ix)
x)
xi)
xii)
xiii)
b)
Anti-pumping relay.
c)
Note :-
5.22.2
No.5.28.
b)
c)
d)
e)
Stop, non-return and other control valves, piping and all accessories
upto breaker mechanism housing.
5.23
SURFACE FINISH:
5.23.1
All interiors and exteriors of tanks and other metal parts shall be thoroughly cleaned
to remove all rust, scales, corrosion, greases or other adhering foreign matter. All
steel surfaces in contact with insulating oil, as far as accessible, shall be painted
with not less than two coats of heat resistant, oil insoluble, insulating paint.
5.23.2
All metal surfaces exposed to atmosphere shall be given two primer coats of zinc
chromate and two coats of epoxy paint with epoxy base thinner. All metal parts not
accessible for painting shall be made of corrosion resisting material. All machine
finished or bright surfaces shall be coated with a suitable preventive compound and
suitably wrapped or otherwise protected. All paints shall be carefully selected to
withstand tropical heat and extremes of weather within the limits specified. The
paint shall not scale off or wrinkle or be removed by abrasion due to normal handling.
All external paintings shall be as per shade no. 631 of IS:5.
- 12 -
5.23.3
5.24
5.25
EARTHING:
The operating mechanism housing, control cabinets, dead tanks, support structure
etc., shall be provided with two separate Earthing terminals suitable for bolted
connection to 50x8mm MS flat to be provided by the Purchaser for connection to
station earth mat.
5.26
b)
Serial number or type designation making it possible to get all the relevant
information from the manufacturer.
c)
Year of manufacture.
d)
Rated voltage.
e)
f)
Rated frequency.
g)
h)
i)
j)
k)
l)
m)
n)
o)
p)
The coils of operating devices shall have a reference mark permitting the data to be
obtained from the manufacturer.
The rating plate shall be visible in position of normal service and installation. The
rating plate shall be weather proof and corrosion proof.
5.27
- 13 -
----------------------------------------------------------------------------------------------------------------Sl.
No.
of the liquid
Maximum value of
--------------------------------------------------------------Temp. at a
max air temp
1.
105
55
75
25
copper, copper alloy or aluminium alloy {see notes (i) & (ii)}
Bare copper or tinned aluminium alloy.
2.
Contacts in oil:
i)
90
40
80
30
105
55
3.
Terminals to be connected to
external conductors by screws
or bolts silver faced
(see note iii)
4.
5.
: (for non-impreg-
90
40
100
50
in air
120
70
in oil
100
50
nated materials)
Class A
(for materials
immersed in oil
or impregnated)
Class E
Class B
:
in oil
in air
130
100
80
50
Class F
:
in oil
in air
155
100
105
50
- 14 -
Enamel
6.
oil base
100
50
synthetic
in air
120
70
synthetic
in oil
100
50
100
50
90
40
7.
Oil
-------------------------------------------------------------------------------------------------------------------------------------Notes:
i)
ii)
The quality of the silver facing shall be such that a layer of silver remains at the
points of contact after the mechanical endurance tests. Otherwise, the contacts
shall be regarded as "bare".
iii)
The values of temperature and temperature rise are valid whether or not the
conductor connected to the terminals is silver-faced.
iv)
The temperature shall not reach a value where the elasticity of the material is
impaired. For pure copper, this implies a temperature limit of 75 C.
5.28
5.28.1
Each circuit breaker shall be supplied with individual compressor unit. Each ICU shall
be provided with compressor, piping, piping accessories, local air receivers, control
valves, filters, coolers of adequate capacity, reducing valves, isolating valves, drain
ports etc.,
5.28.2
The capacity of local air receivers shall be sufficient for two operations of the
circuit breaker, at the lowest pressure for auto reclosing duty without refilling.
5.28.3
Air Compressor:
a)
The air compressor shall be oil-less and of air cooled type complete with
cylinder, lubrication, drive motor and slide rails. Each compressor shall be
rated for the following duty:
i)
Not exceeding
20 minutes.
ii)
Not exceeding
15 minutes.
iii)
Not exceeding
60 minutes.
b)
c)
- 15 -
d)
5.28.4.1
5.28.5
5.28.6
Air Receivers:
a)
Air receiver shall be designed in accordance with the latest edition of the
ASME Code for Pressure Vessel-Section VIII of BS:5197. A corrosion
allowance of 3.0 mm shall be provided for shell and dished ends in case the air
receiver are not hot dip galvanised . Receivers shall be coated on the inside
face with anti-rust medium.
b)
Air receivers shall have a manhole with cover for inspection and cleaning.
Connections for air inlet and outlet, drain and relief valves shall be flanged
type. Pressure gauge and pressure switch connections shall be of screwed
type.
c)
d)
The receiver shall be rated such that the compressor will not start within
less than hour hours for supplying the leakage of air from the compressed air
system. This condition shall be met with only one compressor in operation at a
time.
Quality of Air:
Compressed air used shall be dry and free of dust particles. Arrangement for
conditioning the compressed air shall be provided as an integral part of air compressor
system. Air shall not condensate at working pressure at a temperature of minus 10 C.
Measures of achieving this shall be brought out clearly in the bid. All instruments
required for checking the quality of air shall be furnished as special tools alongwith the
breakers.
5.28.7
b)
c)
- 16 -
5.28.8
5.28.9
The flow capacity of all valves shall be at least 20% greater than the total
compressor capacity.
b)
The high pressure pipe and air system shall be such that after one O-0.3
sec -CO- operation
the breaker shall be capable of performing one
CO-operation within 3 minutes.
c)
d)
Compressor air piping in the switchyard trenches shall be laid with a slope of
1 in 1000. All necessary fittings required for this purpose including the drain
valves at all the low points shall be included in the proposal. The piping shall
be laid horizontally on steel supports in RCC trenches having a slope of 1 in
500.
e)
All joints and connections in the piping system shall be brazed or flared as
necessary.
f)
All compressed air piping shall be carried out in accordance with BS:162.
g)
5.28.10.
Isolating Switches:
------ VOID --------
5.28.11
Fuses:
All fuses shall be of the HRC cartridge type, conforming to IS:2208 and suitable for
mounting on plug-in type of fuse bases. Fuses shall be provided with visible operation
indicators to show that they have operated. All accessible live connections shall be
adequately shrouded, and it shall be possible to change fuses with the circuit live,
without danger of contact with live conductor. Insulated fuses pulling handle shall be
supplied with each control cabinet.
5.29
TERMINAL CONNECTORS:
5.29.1
All the circuit breakers shall be provided with terminal connectors suitable for 0.4
Sq.inch ACSR Zebra Conductor.
The terminal connectors shall meet the following requirements:
a)
b)
All castings shall be free from blow holes, surface blisters, cracks and activities.
All sharp edges & corners shall be blurred and rounded off.
- 17 -
5.30
c)
d)
e)
f)
g)
All current carrying parts shall be designed and manufactured to have minimum
contact resistance.
h)
Control cabinets shall be of the free standing floor mounting type in case of 245
kV SF6 Circuit Breaker.
2.
Control cabinets shall be sheet steel enclosed and shall be dust, weather and
vermin proof. Sheet steel shall be at least 2.6mm thick (2 mm if CRCA) sheet
used. Control cabinets shall be provided with a hinged door and padlocking
arrangement. The door hinges shall be of union joint type to facilitate easy
removal. Door shall be properly braced to prevent wobbling. There shall be
provision in the bottom sheet for entrance of cables from below.
3.
Equipment and devices shall be suitable for operation on a 415 V, 3 phase 3/4
wire 50 Hz AC system. The wiring shall be of stranded copper with minimum
cross section of 2.5 Sq.mm with 1100 V PVC insulation.
4.
5.
Motors rated 1 KW and above being controlled from the control cabinet shall
be suitable for operation on a 415 V, 3 phase 50 Hz system. Fractional KW
motors shall be suitable for operation on a 240 V, 1-phase, 50 Hz supply
system.
6.
Isolating switches shall be group operated units 3-pole for use on 3-phase
supply systems and 2 pole for single phase supply systems) quick make
quick break type, capable of breaking safely and without deterioration, the
rated current of the associated circuit. Control cabinet door shall be
interlocked with the operating handle of the switch so as to prevent opening of
the door when the switch is closed. A device for bypassing the door interlock
shall also be provided. Switch handle shall have provision for locking in both
fully open and fully closed positions.
7.
8.
Fuses shall be HRC cartridge link type having prospective current rating of not
less than 46 kA (rms). They shall be provided with visible operation indicators
to show when they have operated. One fuse pulling handle shall be supplied
for every ten fuses or a part thereof.
Push button shall be rated for not less than 6 Amps, 415 V AC or 2 Amps,
220V DC and shall be flush mounted on the cabinet door and provided with
appropriate name plates. Red, Green and Amber indicating lamps shall be
flush mounted and provided with series resistors to eliminate the possibility of
short circuiting of control supply in the event of fusing of lamps.
- 18 -
9.
For motors upto 5 KW, contactors shall be direct-on-line, air break, single throw
type and shall be suitable for making and breaking the starting current of
the associated motor which shall be assumed equal to 6.5 times the full load
current of the motor at 0.2 p.f. For motors above 5 KW, automatic star delta
type starters shall be provided. 3 pole contactors shall be furnished for 3 phase
motors and 2-pole contactors for single phase motors. Reversing contactors
shall be provided with electrical interlocks between forward and reverse
contactors. If possible, mechanical interlocks shall also be provided.
Contactors shall be suitable for uninterrupted duty and shall be of duty
category class AC4 as defined in IS:2959. The main contacts of the
contactors shall be silver plated and the insulation class for the coils shall be
class E or better. The dropout voltage of the contactors shall not exceed 70%
of the rated voltage.
10.
11.
Single phasing preventer relay shall be provided for 3 phase motors to provide
positive protection against single phasing.
12.
13.
14.
Wiring for all control circuits shall be carried out with 1100/650 volts grade PVC
insulated tinned copper stranded conductors of sizes not smaller than 2.5 sq.
mm atleast 10% spare terminal blocks for control wire terminations shall be
provided on each panel. The terminal blocks shall be ELMEK type or
equivalent. All terminals shall be provided with ferrules Visibly marked or
numbered and these identifications shall correspond to the designations on the
relevant wiring diagrams. The terminals shall be rated for adequate capacity
which shall not be less than 10 Amps.
15.
16.
Space heaters shall be provided inside each cabinet complete with thermostat
(preferably differential type) to prevent moisture condensation. Heaters shall
be controlled by suitably rated double-pole miniature Circuit Breakers.
17.
Signal lamps provided shall be of neon screw type with series resistors,
enclosed in bakelite body. Each signal lamp shall be provided with a fuse
integrally mounted in the lamp body.
18.
19.
Items inside the cabinet made of organic material shall be coated with a fungus
resistant varnish.
20.
All doors, panels, removable covers and breaker openings shall be gasketed all
around. All louvers shall have screens and filters. Cabinets shall be dust,
moisture and vermin proof.
- 19 -
5.31
MOTORS:
5.31.1
Motors shall be "Squirrel Cage" three phase induction motors of sufficient size
capable of satisfactory operation for the application and duty as required for the driven
equipment.
5.31.2
Stator:
a)
Stator Frame:
The stator frame and all external parts of the motors shall be rigid fabricated
steel or of casting. They shall be suitably annealed to eliminate any residual
stresses introduced during the process of fabrication and machining.
b)
Stator Core:
The stator lamination shall be made from suitable grade magnetic sheet steel
varnished on both sides. They shall be pressed and clamped adequately to
reduce the core and teeth vibrations to minimum.
c)
5.31.3
ii)
iii)
For 415 Volt motors, after the coils are placed in slots and all
connections are made, entire motor assembly shall be impregnated by
completely submerging core and winding in suitable insulating
compound or varnish allowed by proper baking. At least two additional
submersions and bakes shall be applied either making a total of at least
three submersions and bake treatment.
Rotor:
a)
b)
c)
Rotors of induction motors shall be of rigid core construction with bars firmly
secured and solidly bonded to the end rings. The end rings assembly shall be
such that it is free to move with expansion of the bars without distortion. The
connection of the bars to the end ring shall be made by brazing or fusion
welding.
d)
Rotors shall be so designed as to keep the combined critical speed with the
driven equipment away from the running speed by at least 20%.
e)
Rotors shall also be designed to withstand 120% of the rated speed for 2
minutes in either direction of rotation.
f)
All high speed rotors shall be constructed with provision of re-balancing the
rotor on its site position without major disassembly.
- 20 -
5.31.4
Bearings:
a)
shall design
b)
Greased ball and roller bearings when used shall be of reputed make subject to
Purchaser's approval. The minimum standard life of the bearings shall not be
less than 30,000 working hours taking all motor and driven loads into
account. These shall be pressure grease gun lubricated type fitted with grease
nipple and shall have grease relief devices.
c)
Bearing shall be so constructed that the loss of grease and its creeping
alongwith shaft into motor housing is prevented. It shall also prevent dirt and
water from getting into the motor.
d)
e)
5.31.5
For oil lubricated bearings, drain plugs shall be provided for draining any
residual oil when required.
Enclosures:
a)
b)
c)
Motors shall have drain plugs so located that they will drain water resulting
from condensation or other causes from all pockets in the motor casing.
d)
Motors weighing more than 25 kg shall be provided with eyebolts, lugs or other
means to facilitate lifting.
5.31.6
Cooling Method:
Motors shall be of self ventilated type having TEFC (totally enclosed fan
cooled) enclosure.
5.31.7
Rating Plate:
The rating plate shall conform to the requirements of IEC incorporating the year of
manufacture.
5.31.8
Operational Features:
a)
Continuous motor rating (name plate rating) shall be at least ten (10) percent
above the maximum load demand of the driven equipment at design duty
point and the motor shall not be overloaded at any operating point of driven
equipment that will arise in service.
b)
Motors shall be capable of giving rated output without reduction in expected life
span when operated continuously in the system having the particulars as
given in Annexure-II.
5.31.9
Starting Requirements:
a)
All induction motors shall be suitable for full voltage direct-on -line starting.
These shall be capable of starting and accelerating to the rated speed
- 21 -
c)
The locked rotor current shall not exceed six (6) times the rated full load
current for all motors, subject to tolerance as given in IS:325.
d)
Motors, when started with the driven equipment imposing full starting torque
under the supply voltage conditions specified under clause 5.32.9(a) above
shall be capable of withstanding at least two successive starts from cold
condition at room temperature and one start from hot condition without
injurious heating of winding. The motors shall also be suitable for three equally
spread starts per hour under the above referred supply condition.
e)
The locked rotor withstand time under hot condition at 110% of rated voltage
shall be more than starting time with the driven equipment at minimum
permissible voltage by at least two seconds or 15% of the accelerating time
whichever is greater. In case it is not possible to meet the above requirement,
the Bidder shall offer centrifugal type speed switch mounted on the motor shaft
which shall remain closed for speeds lower than 20% and open for speeds
above 20% of the rated speed.
The speed switch shall be capable of
withstanding 120% of the rated speed in either direction of rotation.
6.0
TESTS:
6.1
TYPE TESTS:
The equipment should be offered type test. Test reports should not more then seven
years old reckoned from date of bid opening in respect of all the tests carried out in
accredited laboratories (based on ISO/IEC) by a reputed accreditatic body or
witnessed by HVPN or another electric power utility and be submitted by the
successful bidder to HVPNL for approval as schedule given in Bar Chart.
i) Impulse withstand voltage test
ii) Power frequency voltage withstand dry test on main circuit
iii) Short circuit withstand capability test
iv) Mechanical endurance test
v) Temperature rise test
vi) Radio interference voltage (RIV)
vii) Measurement of the resistance of main circuit
viii) Short time withstand current and peak withstand current test
ix) Out of phase making & breaking test
x) Shunt reactor current switching test
xi) Dielectric test
xii) IP-55 test on operating mechanism
xiii) Seismic test
6.2
ROUTINE TESTS:
As per quality assurance program (QAP).
- 22 -
6.3
ACCEPTANCE TESTS:
The following acceptance tests as stipulated in the relevant ISS-13118 shall be carried
out by the Supplier in presence of HVPNL representative, unless dispensed with in
writing by the HVPNL.
i) Power frequency voltage withstand dry test on main circuit
ii) Voltage withstand test on control and auxiliary circuits
iii) Measurement of resistance of the main circuit
iv) Mechanical operating test
v) Design and visual test
vi) Tightness Test
7.0
INSPECTION:
7.1
The Purchaser shall have access at all times to the works and all other all other places
of manufacture, where the circuit breaker are being manufactured and the supplier
shall provide all facilities without extra charges, for unrestricted inspection of the
supplier's works, raw materials, manufacture of the equipment., all the accessories
and for conducting necessary test as detailed herein.
7.2
The Supplier shall keep the Purchaser informed in advance, about the manufacturing
program so that arrangement can be made for inspection.
7.3
No material shall be despatched from its point of manufacture unless the material has
been satisfactorily inspected and tested.
7.4
The supplier shall submit their internal inspection report containing manufacturer's test
certificates before offering the material for inspection.
7.5
The acceptance of any quantity of equipment shall in no way relieve the Supplier of his
responsibility for meeting all the requirements of this specification and shall not prevent
subsequent rejection if such equipment are later found to be defective.
8.0
DOCUMENTATION
8.1
All drawings shall conform to International Standards Organisation (ISO) 'A' series of
drawing sheet/Indian Standards Specification.
8.2
b)
c)
d)
Structural drawing, design calculations and loading data for support structures.
e)
f)
Terminal Connector
- 23 -
8.3
The Supplier shall within 2 weeks of placement of order submit four sets of final
version of all the above drawings for Purchaser's approval. The Purchaser shall
communicate his comments/approval on the drawings to the Supplier within two
weeks. The Supplier shall, if necessary, modify the drawings and resubmit four copies
of the modified drawings for Purchaser's approval within one week from the date of
comments. After receipt of Purchaser's approval, the Supplier shall, within three
weeks, submit 20 prints and two good quality reproducible of the approved
drawings for Purchaser's use.
8.4
The Supplier shall also furnish twenty copies of bound manuals covering erection,
commissioning, operation and maintenance instructions and all relevant information
and drawings pertaining to the main equipment as well as auxiliary devices. Marked
erection drawings shall identify the component parts of the equipment as shipped to
enable Purchaser to carryout erection with his own personnel. Each manual shall
also contain one set of all the approved drawings, type test reports as well as
acceptance reports of the corresponding consignment despatched.
8.5
8.6
Approval of drawings by the Purchaser shall not relieve the Supplier of any of his
responsibility and liability for ensuring correctness and correct interpretation of the
drawings for meeting the requirements of the latest revision of the applicable
standards, rules and codes of practices. The equipment shall conform in all respects
to high standards of engineering, design, workmanship and latest revisions of relevant
standards at the time of supply and Purchaser shall have the power to reject any
material which, in his judgement, is not in full accordance therewith.
8.7
Additional data to be furnished within two weeks of the placement of the order.
a)
Drawing showing contacts in close, arc initiation, full arcing, arc extinction
and open position.
b)
The temperature v/s pressure curves for each setting of density monitor,
along with details of density monitor.
c)
d)
e)
f)
g)
Details and type of filters used in interrupter assembly and also the
operating experience with such filters (for SF6 C.B.)
h)
The test methods used in controlling the quality of gas used in the
circuit breakers particularly purity and moisture content.
- 24 -
ii)
iii)
i)
j)
The Bidder shall furnish along with the bid, curves supported by test
data indicating the opening time under close open operation with
combined variation
of trip coil voltage and pneumatic/hydraulic
pressure.
k)
Detailed
literature
and
schematic
diagrams of switching
mechanism for closing resistor showing the duration of insertion
shall also be furnished alongwith the calculations in respect of
thermal rating of resistors for the duties.
l)
All duty requirements shall be proved with the support of adequate test
reports to be furnished alongwith the bid failing which the bid is likely to
be rejected.
m)
8.8
TEST REPORTS:
i)
ii)
iii)
- 25 -
Sr.
No
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
18.
- 26 -
50%
Sr.
No.
19.
20.
21.
22.
23.
28.
29.
30.
31.
32.
33.
34.
Description
Minimum clearance in air.
a) Between phases (mm)
b) Live parts to earth (mm)
Number of poles of circuit breaker
Number of breaks per phase
Total length of break per phase (mm)
Auxiliary contacts
a. Type
b. Material of auxiliary contacts
c. Confirm that contacts silver-plated
d. Minimum thickness of silver plating
e. Contact Pressure
f. Number of auxiliary contacts provided.
i.
Those closed when breaker is closed.
ii.
Those open when breaker is closed.
iii.
Those adjustable with respect to the position of main
contacts.
Type of Operating mechanism
a) Opening
b) Closing
Control Circuit voltage
Power required for trip coil at 220 Volt D.C.
Power required for closing coil at 220 Volt D.C.
i.
Rated pressure of SF-6 gas in breaker (Kg/cm2)
ii.
Rated pressure of SF-6 gas in cylinder (Kg/cm2)
iii.
Weight of empty cylinder (Kg)
iv.
Quantity of SF-6 gas in cylinder (Kg)
v.
Qty. of SF-6 gas in Kg required to maintain the operating
pressure of breaker.
vi.
Total Weight of SF-6 gas to be supplied as 30% extra on
tender quanity.
Total weight of one complete breaker
i.
with SF-6 (gas) (KG)
ii.
without SF-6 (gas) (KG)
iii.
impact of loading for foundation design to include dead
load plus impact loading on opening of rated breaking
capacity.
Chemical composition of absorbent
i. Quantity of absorbent per pole (Kg)
ii. Recommended interval for renewal of absorbent (months)
- 27 -
ANNEXURE B
SCHEDULE OF REQUIREMENT
Sr. No.
Description
Quantity
1.