Professional Documents
Culture Documents
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
1
Rev.
MLNG Fire Fighting Training Centre, Bintulu
Job Title:
Subject:
Made by:
CALCULATION SHEET
FJ
Checked by: CCL
Description
Reference
CIA
Q
C
I
A
=
=
=
=
Where:
For main drainage lines, the discharge are determined by the "Modified Rational Formula" as shown below
Q
Cs C I A
Q
Cs
C
I
=
=
=
=
Where:
"Manning Formula" is used to calculate the capacity of the drains and box culvert where the formula
is as follow:
Q
Q
A
R
S
n
=
=
=
=
=
AR
A3
A4
A5
Where:
A2
(Turf) =
2
0m
(paved) =
2
1870 m
(Turf) =
2
708.3 m
(paved) =
2
841 m
(Turf) =
2
650 m
(paved) =
2
554 m
(Turf) =
2
441 m
(paved) =
2
1282.5 m
(Turf) =
2
326.5 m
A6
(paved) =
A7
(paved) =
2
570 m
2
800 m
Date: 30.10.08
Date: 30.10.08
Result
JPA No.
Job Title:
Subject:
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Tudan Housing
Rev.
Date:
11/20/2014
11/20/2014
Client :
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Description
Reference
Result
CsC I A
Qi
C
=
=
=
Where:
Cs
I
A
Q1
=
=
=
=
3
0.829 m /s
1200 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.6 m
1.2 m
147 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.45 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.54
2.1
0.257
1/300
0.013
Qcap
0.970 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
Qcap/A
1.80 m/s
0.829 m3/s
>
<
3 m/s
Freeboard
= 0.15m
D
OK
OK
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
Job Title:
Subject:
JPA/P-063 Sheet
Tudan Housing
Rev.
Date:
11/20/2014
11/20/2014
Client :
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Description
Reference
Result
CsC I A
Qi
C
=
=
=
Where:
Cs
I
A
Q1
=
=
=
=
3
0.142 m /s
600 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.6 m
95 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.18
1.2
0.150
1/500
0.013
Qcap
0.175 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
0.97 m/s
<
0.142 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
Job Title:
Subject:
JPA/P-063 Sheet
Tudan Housing
Rev.
Date:
11/20/2014
11/20/2014
Client :
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Description
Reference
Result
CsC I A
Qi
C
=
=
=
Where:
Cs
I
A
Q1
=
=
=
=
3
0.056 m /s
450 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.45 m
147 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.135
1.05
0.129
1/500
0.013
Qcap
0.118 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
0.88 m/s
<
0.056 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.498 m /s
900 mm
2.15 m
=
=
=
0.6 m
0.9 m
80 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.45 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.405
1.8
0.225
1/500
0.013
Qcap
0.515 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.27 m/s
<
0.498 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
=
=
=
=
Q1
3
0.498 m /s
3
1.205 m /s
Q1+Q3.3+Q3.4 =
900 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.74 m
0.9 m
80 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.59 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.531
2.08
0.255
1/500
0.013
Qcap
0.735 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
<
Qcap/A
1.38 m/s
<
1.205 m3/s
FAILS
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.184 m /s
600 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.47 m
0.6 m
80 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.32 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.192
1.24
0.155
1/500
0.013
Qcap
0.190 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
0.99 m/s
<
0.184 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.184 m /s
600 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.5 m
0.6 m
346 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.35 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.21
1.3
0.162
1/500
0.013
Qcap
0.214 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.02 m/s
<
0.184 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.523 m /s
900 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.61 m
0.9 m
346 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.46 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.414
1.82
0.227
1/500
0.013
Qcap
0.531 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.28 m/s
<
0.523 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.066 m /s
450 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.45 m
195 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.135
1.05
0.129
1/500
0.013
Qcap
0.118 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
0.88 m/s
<
0.066 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.304 m /s
750 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.55 m
0.75 m
195 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.4 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.3
1.55
0.194
1/500
0.013
Qcap
0.345 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.15 m/s
<
0.304 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.723 m /s
1200 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.65 m
1.2 m
203 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.5 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.6
2.2
0.273
1/500
0.013
Qcap
0.868 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.45 m/s
<
0.723 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.867 m /s
1200 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.66 m
1.2 m
67 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.51 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.612
2.22
0.276
1/500
0.013
Qcap
0.892 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.46 m/s
<
0.867 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.209 m /s
600 mm
2.15 m
=
=
=
0.5 m
0.6 m
47 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.35 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.21
1.3
0.162
1/500
0.013
Qcap
0.214 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.02 m/s
<
0.209 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.088 m /s
450 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.45 m
127 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.135
1.05
0.129
1/500
0.013
Qcap
0.118 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
0.88 m/s
<
0.088 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.211 m /s
750 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.75 m
127 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.225
1.35
0.167
1/500
0.013
Qcap
0.234 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.04 m/s
<
0.211 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
1.142 m /s
1200 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.77 m
1.2 m
132 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.62 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.744
2.44
0.305
1/500
0.013
Qcap
1.159 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.56 m/s
<
1.142 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.157 m /s
600 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.6 m
42 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.18
1.2
0.150
1/500
0.013
Qcap
0.175 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
0.97 m/s
<
0.157 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.352 m /s
750 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.57 m
0.75 m
42 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.42 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.315
1.59
0.198
1/500
0.013
Qcap
0.368 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.17 m/s
<
0.352 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.145 m /s
600 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.6 m
95 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.18
1.2
0.150
1/500
0.013
Qcap
0.175 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
0.97 m/s
<
0.145 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.107 m /s
750 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.75 m
95 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.225
1.35
0.167
1/500
0.013
Qcap
0.234 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.04 m/s
<
0.107 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.303 m /s
900 mm
2.15 m
=
=
=
0.5 m
0.9 m
22 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.35 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.315
1.6
0.197
1/500
0.013
Qcap
0.367 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.16 m/s
<
0.303 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.070 m /s
900 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.65 m
0.9 m
200 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.5 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.45
1.9
0.237
1/500
0.013
Qcap
0.593 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.32 m/s
<
0.070 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.089 m /s
750 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.75 m
106 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.225
1.35
0.167
1/500
0.013
Qcap
0.234 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.04 m/s
<
0.089 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.057 m /s
750 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.75 m
22 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.225
1.35
0.167
1/500
0.013
Qcap
0.234 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.04 m/s
<
0.057 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.631 m /s
900 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.7 m
0.9 m
156 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.55 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.495
2
0.248
1/500
0.013
Qcap
0.671 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.36 m/s
<
0.631 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.041 m /s
750 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.45 m
0.75 m
125 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.3 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.225
1.35
0.167
1/500
0.013
Qcap
0.234 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.04 m/s
<
0.041 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.401 m /s
900 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.55 m
0.9 m
140 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.4 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.36
1.7
0.212
1/500
0.013
Qcap
0.440 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.22 m/s
<
0.401 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.338 m /s
900 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.55 m
0.9 m
190 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.4 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.36
1.7
0.212
1/500
0.013
Qcap
0.440 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.22 m/s
<
0.338 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
0.206 m /s
900 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
0.5 m
0.9 m
125 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
0.35 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
0.315
1.6
0.197
1/500
0.013
Qcap
0.367 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.16 m/s
<
0.206 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
2.207 m /s
1200 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
1.18 m
1.2 m
125 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
1.03 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
1.236
3.26
0.379
1/500
0.013
Qcap
2.227 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
1.80 m/s
<
2.207 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
4.330 m /s
1500 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
1.52 m
1.5 m
125 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
1.37 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
2.055
4.24
0.485
1/500
0.013
Qcap
4.362 m3/s
Velocity, v
=
=
Where:
n
m2
m
m
(For R.C. Drain)
>
Qcap/A
2.12 m/s
<
4.330 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
Where:
Q1
=
=
=
=
3
6.170 m /s
1800 mm
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
1.63 m
1.8 m
125 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
1.48 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
2.664
4.76
0.560
1/500
0.013
Qcap
6.224 m3/s
Velocity, v
=
=
Where:
m2
m
m
(For R.C. Drain)
>
Qcap/A
2.34 m/s
<
6.170 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
Rev.
CALCULATION SHEET
SV
Checked by: HIL
Made by:
Date:
Date:
Description
Reference
a) Surface runoff
Qi
CsC I A
Qi
C
=
=
=
=
=
=
=
Where:
2.15 m
Depth (D)
Width (W)
Length (L)
=
=
=
1.35 m
2m
125 m
Freeboard
=
Allow' water depth =
=
0.15 m
D - Freeboard
1.2 m
A R
Qcap
A
P
R
S
n
=
=
=
=
=
2.4
4.4
0.545
1/500
0.013
Qcap
5.512 m3/s
Velocity, v
=
=
Where:
0.000
m3/s
2000 mm
m2
m
m
(For R.C. Drain)
>
Qcap/A
2.30 m/s
<
0.000 m3/s
OK
3 m/s
OK
Varies
Freeboard
= 0.15m
11/20/2014
11/20/2014
Result
Cs
I
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
9
Rev.
MLNG Fire Fighting Training Centre, Bintulu
Job Title:
Subject:
FJ
Checked by: CCL
CALCULATION SHEET
Date: 30.10.08
Description
Reference
Result
AR
n
1.0 Point A
Q
=
=
0.30
0.3
2.0 Point B
0.30
Q
=
=
0.3
3.0 Point C
0.30
Q
=
=
0.3
4.0 Point D
Q
=
=
0.30
0.4
5.0 Point E
Q
=
=
0.57
0.4
Surface runoff from Drain 1-2-3-4-5
Q
=
=
Q Drain at point E = 0.310 m3/s > Q surface run-off from drain 1-2-3-4-5 = 0.050 m3/s
OK
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
10
Rev.
MLNG Fire Fighting Training Centre, Bintulu
Job Title:
Subject:
FJ
Checked by: CCL
CALCULATION SHEET
Date: 30.10.08
Description
Reference
Result
=
=
(2/3)
0.40 x 0.163
x (1/250)
0.013
3
0.504
m /s
1/2
0.87
0.4
7.0 Point G
Q
=
=
0.87
0.4
8.0 Point H
Q
=
=
0.87
0.4
9.0 Point H1
Q
=
=
0.87
0.4
Surface runoff from Drain 17-18-19-20
(0.90 x 2.97 x 10-5 x 554) + (0.75 x 2.97 x 10-5 x 441)
Q
=
m3/s
=
0.025
Q(21-22-23-25-19) & Q(23-24-20)
Total Q
= 0.104 + 0.098
=
=
0.025 + 0.202
0.227
m3/sec
0.202
m3/sec
Q Drain at point H1 = 0.504 m3/s > Q surface run-off from drain 17-18-19-20 = 0.227 m3/s
OK
10.0 Point H2
Q
=
=
0.87
0.4
Surface runoff from Drain 12-13-14-15-16
(0.90 x 2.97 x 10-5 x 841) + (0.75 x 2.97 x 10-5 x 650)
Q
=
m3/s
=
0.037
Q from Fire Fighting training:
Q (Kerosene-fire training modules)
Total Q
=
=
=
0.037 + 0.083
0.120
300 m3/hr
0.083
m3/sec
m3/sec
Q Drain at point H2 = 0.504 m3/s > Q surface run-off from drain 12-13-14-15-16 = 0.120 m3/s
OK
JPA No.
Lot 1386, Jln Kubu, Miri Centre Point Phase 2, 98000 Miri, Sarawak
Tel : 085-438178 Fax: 085-438196
Email : jpasb@akal-epmc.com..my
JPA/P-063 Sheet
11
Rev.
MLNG Fire Fighting Training Centre, Bintulu
Job Title:
Subject:
FJ
Checked by: CCL
CALCULATION SHEET
Date: 30.10.08
Description
Reference
Result
=
=
0.60 x 0.231
(2/3)
1/2
x (1/350)
0.013
3
0.504
m /s
0.87
0.4
Point J
Q
=
=
0.87
0.4