HYDROELECTRIC POWER PLANTS

AUTOMATION USING IEC 61850:


EXPERIENCES AND IMPROVEMENTS FOR
THE USER

SHF - Enhancing hydropower plants Grenoble, April 9-11, 2014


Erik San Telmo, Esther Alonso (Ingeteam Power Technology S.A.)

INDEX

IEC 61850

ADVANTAGES

INTRODUCTION

NAMING

MOTIVATION
TO USE

INTEGRATION

ENGINEERING
PROCESS

TIMESTAMPS

CONCLUSIONS

Page n

SEQ. OF
EVENTS

WIRING

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

1. IEC 61850 principles

IEC 61850 Principles and evolution

IEC
61850

EVOLUTION

Distributed Energy
Resources

Hydro Wind

Common
information
model

IEC 61850
Devices
Protective
relays

SCADA
HMI

Standard
communication
mechanisms

Substations

Logic
Controllers
Page n

Remote
Terminal
Units

Meters

Inverters
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

IEC 61850 Motivation to use IEC 61850 in Hydro automation

User
requirements

Timestamps

Event list on
comms failures

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

Technology
available

INGESYS IC3
PLC

Page n

INGESYS IT
SCADA HMI
INGEPAC
Protective relay
5

IEC 61850 architecture

MONITORING AND TELECONTROL


SCADA HMI
(RTU)
RTU
IEC 61850 network

Generator
Protective
relay

Transformer
Protective
relay

PROTECTION

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

IC3
Group
controller

IC3
Auxiliar services
and general setpoints Page n

CONTROL + REGULATION

IEC 61850 engineering process

Engineering
process
1.
IEC 61850
Modeling

2.
Protection
integration
3.
System
configuration
4.
SCADA
configuration
Page n

5.
Logic controller
programming
6.
Validation
and testing

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

Step 1 Logic controllers IEC 61850 modeling

Identify
information
exchanged

IEC 61850 defines


a virtual
information model
of the hydro
power plant
components using
Logical Nodes.

Select IEC
61850
information
objects

IEC
61850-7-4

IEC 61850-7-410
Hydro specific

SPRS
Pressure
supervision

KPMP
Pump

XCBR
Circuit breaker

KVLV
Valve

MMXU
Measurements

HSEQ
Sequencer

Create IEC
61850
configuration
file

Group
controller ICD
file
(XML standard
format)
Page n

Plant
controller ICD
file
(XML standard
format)

* ICD: IED(Intelligent Device) Capability Description


SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

Step 2 Integration of protective relays

Engineered
according
to utility
requirements

Group
controller
ICD file

Plant
controller
ICD file

Generator
Protection
ICD file
Provided by

Hydro power
plant complete
virtual
information
model
SCD file

manufacturer
Page n

Transformer
Protection
ICD file

* SCD: System Configuration Description


SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

Step 3 System configuration Data interchanges

Gen.
Prot.

Transf.
Prot.

Group
Controller

Group
Controller 1

Plant
Controller

Group
Controller 2

Page n

SCADA HMI

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

10

Step 4 SCADA Configuration

Each IEC 61850 logical node defines a set of standard


data points for status information, commands or/and
settings.

KPMP
Logical node for
Pump information

SCADA manufacturers can define component libraries


with predefined objects that use the standard IEC
61850 data information.

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

SCADA
Page n
Configuration

11

Step 5 Programmable Logic Controller programming

IEC 61850
Server

KVLV
SPRS
DI/DO

AI/AO

IEC 61131
POUs

IEC 61850

XCBR

WRAPPER

KPMP
Page n

HSEQ
IEC 61850 model
binding to 61131
information

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

12

2. Advantages for the user

Advantages of using IEC 61850

1. Standard naming and format

2. Integration of protective relays

3. Sequence of events

4. Time stamping of data


Page n

5. Wiring reduction

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

14

1. Standard naming and format

Utility A

MMXU

Puissance

Means Measurements

FLOAT32 (W)

Utility B

ActivePower

Utility C

Pot Activa

TotW

Means Total active power

FLOAT32 (MW)

MV structure
INT16 (kW)

Each utility or system


integrator defines the
information name and
format.
Conversions are needed.

name

type

mag.f

FLOAT32

Quality

Timestamp

units.SIUnit

Enumeration

units.multiplier

Enumeration

The standard defines the


rangeformat of each
Enumeration
name and the
data point
Page n

Time reduction.

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

15

2. Integration of protection devices

All protection function


logical nodes start with
P

FROM THE IEC 61850


INTERFACE ALL RELAYS
LOOK EQUAL.

IED xxx
The Trip is always Op
LDXXX
PIOC
Op
PTOC
Op

Connect the trip


information with the
PLC and done
INTEGRATED !!!

Page n

PXXX
Op

Time reduction.

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

16

3. Sequence of events
MODBUS Basic polling:
If communication link is broken, sequence of events is lost.
MODBUS special register for events
MODBUS current values

Cyclic transmission of current values and


registers for events

IEC 61850 includes a native Buffered Reporting mechanism.


The server stores events in case of communication lost. All IEC servers behave the same way.

BRCB: buffered report control block


Page n

Spontaneous transmission

Better functionality.

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

17

4. Time-stamping
More detailed
sequence of events.
Events not related to
scan cycle period
name

type

stVal

BOOLEAN

Quality

Timestamp

Digital inputs with


1ms resolution

Digital inputs with


1ms resolution

IEC 61131 data


change with TASK
cycle resolution

Trips with 1ms


resolution
Page n

Better functionality.

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

18

5. Wiring reduction GOOSE Generic Object Oriented System Event


Wire and communication failure detection.
Event !!

GOOSE lost
detection

few ms

Fast repetition
mechanism

GOOSE
repetition
should arrive
here

Page n

Aggregation: an Ethernet cable transports several digital signals in 1 GOOSE message.

More security and cost reduction.

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

19

3. Conclusions

CONCLUSIONS

Our experience in engineering time

Modbus
Modbus MULTIVENDOR
FIRST IEC 61850
IEC 61850
Page n

IEC 61850 MULTIVENDOR

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

21

CONCLUSIONS

IEC 61850 is a valid solution for hydro power plant automation.


- First 2 IEC 61850 projects required big effort.

- Better in functionality.
- More efficient in multivendor projects.
- We use it depending on the user requirement and the devices to integrate.
- More than 10 IEC 61850 hydro projects mainly in Spain.
Page n

SHF Enhancing hydroelectric power plants , 9-11 April Grenoble

22

Thank You