CONCEPTO
PRELIMINARES
ALINEADO DE ESCUADRA Y MARCACION DE EXCAVACION
EXCAVACIN A MAQUINA EN CAJA, MATERIAL TIPO "C", EN SECO;
INCLUYE: ACARREO A 20 MTS, VOLUMEN MEDIDO SUELTO, CORTE,
ACAMELLONADO DE MATERIAL, HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION.
ACARREOS EN CAMIN CON CARGA MECANICA DE TIERRA Y MATERIAL
MIXTO, PRODUCTO DE LAS EXCAVACIONES QUE NO SEAN ROCA, MEDIDO
SUELTO.INC. TIRO DENTRO DE LA OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.
LIMPIEZA TRAZO Y NIVELACIN EN REA DE DESPLANTE DE
EDIFICACIONES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.
EXCAVACIN EN TERRENO TIPO "C" EN SECO DE 0.00 A 2.00 METROS DE
PROFUNDIDAD, CON AUXILIO DE RETROEXCAVADORA;
INCLUYE:
ACARREO A 20 METROS, AFINES DE TALUDES, TRASPALEOS, AFINES DE
FONDO, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO
PARA SU
MURO DE CONTENCION
MURO DE PIEDRA BRAZA DE 20 CM DE ESPESOR ASENTADO CON
MORTERO CEMENTO-ARENA1:5 APARENTE DOS CARAS JUN TAS
REMETIDAS Y GUSANEADAS; INCLUYE: BOQUILLAS, HERRAMIENTA
MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.
CONFORMACION DE PLATAFORMA CON MATERIAL PRODUCTO DE LA
EXCAVACION MEDIDO COMPACTADO CON MAQUINA INC. BANDEO CON
MAQUINA, TENDIDO, MOVIMIENTOS Y MANO DE OBRA.
SUMINISTRO Y COLOCACIN DE MATERIAL DE BANCO MEDIDO
COMPACTO; EN CAPAS DE 20 CMS DE ESPESOR, COMPACTADOS CON
RODILLO VIBRATORIO MANUAL O EQUIPO SIMILAR, AL 90% , SEGN
PRUEBA PROCTOR, PREVIA LA INCORPORACIN DEL AGUA NECESARIA;
INCLUYE: ACARREOS,
MEDIDO COMPACTO. CON MATERIAL MEJORADO, EXTENDIDO DEL
MATERIAL, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

CIMENTACION

PLANTILLA DE CONCRETO F'c=100 KG/CM2 HECHO EN OBRA CON UN


ESPESOR DE 6 CM, INCLUYE: PREPARACIN DEL REA DE DESPLANTE Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION.
ACERO PARA REFUERZO EN CIMENTACIN CON VARILLA NO. 4 , INCLUYE:
SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO, COLOCACIN,
AMARRE, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES EN
CUALQUIER ELEMENTO ESTRUCTURAL, HERRAMIENTA MENOR, MANO
DEOBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.
CIMBRA PARA CIMENTACIN , MEDIDA POR SUPERFICIE DE CONTACTO,
INCLUYE: MATERIA LES, MANO DE OBRA EN HABILITADO, CIMBRADO,
DESCIMBRADO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.
CONCRETO F'c=200 KG/CM2 EN CIMENTACIN CON CEMENTO NORMAL, EL
TAMAO MXIMO DEL AGREGADO SER DE 3/4" Y SU CALIDAD Y BANCO
DE PROCEDENCIA, DEBERN SER APROBADOS POR LA SECRETARIA,
ELABORADO EN OBRA CON MAQUINA REVOLVEDORA, COLOCADO,
VIBRADO, CURADO Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.
RELLENO COMPACTADO INCLUYE ACARREOS CON MAQUINARIA PARA EL
RELLENO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION
CIMBRA PARA FIRME DE CONCRETO, INCLUYE: MANO DE ONRA,
HERRAMIENTA MENOR, Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION
FIRME DE CONCRETO ARMADO INCLUYE ACARREOS, MANO DE OBRA,
COLADO, HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
MUROS, CADENAS Y CASTILLOS
MURO DE 15cm. ESP. DE BLOCK COMUN 15X20X40 CON MORTERO CEMCAL 1:5 . ACABADO APARENTE 1 CARA. HASTA UNA ALTURA DE 0 A 3M.
INCLUYE: ACARREOS A 20 MTS. DESPERDICIOS, LIMPIEZA, MATERIALES,
ANDAMIOS, MANO DE OBRA EQUIPO, HERRAMIENTA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.
ACERO PARA CASTILLOSARMADO CON 4 VARILLAS No 3. ESTRIBOS No.2 A
CADA CMS. SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO,
COLOCACIN,
AMARRE,
GANCHOS,
TRASLAPES,
DESPERDICIOS,
DOBLECES EN CUALQUIER ELEMENTO ESTRUCTURAL, HERRAMIENTA
MENOR, MANO DEOBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.
CIMBRA PARA CASTILLOS , INCLUYE: MATERIA LES, MANO DE OBRA EN
HABILITADO, CIMBRADO, DESCIMBRADO Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
COLADO DE CASTILLO DE CONCRETO F'C=150KG/CM2 DE 15 X 15 CMS. ;
INCLUYE:
HABILITADO,
CIMBRADO, DESCIMBRADO, HERRAMIENTA
MENOR, MANO DE OBRA Y TODO LO NECESARIO
ACERO PARA CERRAMIENTO ARMADO CON 4 VARILLAS No 3. ESTRIBOS
No.2 A CADA 15 CMS. SUMINISTRO EN OBRA, ACARREOS INTERNOS,
HABILITADO,
COLOCACIN,
AMARRE,
GANCHOS,
TRASLAPES,
DESPERDICIOS, DOBLECES EN CUALQUIER ELEMENTO ESTRUCTURAL,
HERRAMIENTA MENOR, MANO DEOBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
CIMBRA PARA CERRAMIENTO , INCLUYE: MATERIA LES, MANO DE OBRA
EN HABILITADO, CIMBRADO, DESCIMBRADO Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.
COLADO DE CERRAMIENTO DE CONCRETO F'C=150KG/CM2 DE 15 X 25
CMS. INCLUYE: HABILITADO, , HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO
ACABADOS DE CUBIERTA

APLANADO DE MURO CON MORTERO CEMENTO-CAL-ARENA 1:2:6 A PLOMO


Y REGLA, ACABADO ESPONJEADO; INCLUYE: REMATES, BOQUILLAS,
PREPARACIN DE LA SUPERFICIE, PLOMEADO, ANDAMIOS, MANO DE
OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.(0.00 A
3.00 M DE
SUMINISTRO Y COLOCACION DE LOSETA TIPO 1 30X30 CM, ASENTADO
CON MORTERO CEMENTO-ARENA 1:4 Y LECHADEADO CON CEMENTO
BLANCO; INCLUYE: CORTES, AJUSTES, DESPERDICIOS, NIVELACIN,
MANO DE OBRA, LIMPIEZA Y TODO LO NECESARIO PARA SU CORRECTA
SUMINISTRO Y COLOCACION DE LOSETA TIPO 2 30X30 CM, INCLUYE:
CORTES, AJUSTES, DESPERDICIOS, NIVELACIN, MANO DE OBRA,
LIMPIEZA Y TODO LO NECESARIO PARA SU CORRECTA
SUMINISTRO Y APLICACIN DE PINTURA PARA INTERIOR DE CONCRETO
APARENTE, INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE,
MATERIALES, MANO DE OBRA, HERRAMIENTA, ANDAMIOS Y
SUMINISTRO Y APLICACIN DE PINTURA PARA EXTERIOR DE CONCRETO
APARENTE, INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE,
MATERIALES, MANO DE OBRA, HERRAMIENTA, ANDAMIOS Y
SUMINISTRO Y COLOCACION DE VISTAS EN ESQUINAS SUPERIORES DE LA
HABITACION PRINCIPAL Y PASILLOS., INCLUYE, PREPARACION DE
SUPERFICIE, MANO DE OBRA, HERRAMIENTA MENOR Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.
PUERTA Y VENTANAS.
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA PRINCIPAL
CON MARCO DE MADERA DE PINO ENTABLERADA INCLUYE: CERRADURA
DE PERILLA MOD A 52PD
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA HABITACIONES
CON MARCO DE MADERA DE PINO ENTABLERADA INCLUYE: CERRADURA
DE PERILLA MOD A
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA MOSQUITERA
CON MARCO DE MADERA DE PINO ENTABLERADA INCLUYE: CERRADURA
DE PERILLA
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA CLOSET
HABITACION PRINCIPAL CON MARCO DE MADERA DE PINO ENTABLERADA
INCLUYE: CERRADURA DE PERILLA MOD A
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA CLOSET CON
MARCO DE MADERA DE PINO ENTABLERADA INCLUYE: CERRADURA DE
PERILLA MOD A
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA CUADROS
VIDRIO CON MARCO DE MADERA DE PINO ENTABLERADA INCLUYE:
CERRADURA DE PERILLA MOD
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA CORREDIZA DE
VIDRIO CON MARCO DE METAL INCLUYE: CERRADURA DE PERILLA MOD
SUMINISTRO Y COLOCACIN DE VENTANA 150X120 (ARMADA CON
PERFILES DE ALUMINIO LINEA DE 5CM, INCLUYE MATERIALES,
ACARREOS,
SUMINISTROCORTES,
Y COLOCACIN DE VENTANA 200X130ARMADA CON
PERFILES DE ALUMINIO LINEA DE 5CM, INCLUYE MATERIALES,
ACARREOS, CORTES,
SUMINISTRO Y COLOCACIN DE VENTANA 60X90 ARMADA CON PERFILES
DE ALUMINIO LINEA DE 5CM, INCLUYE MATERIALES, ACARREOS,
CORTES,
SUMINISTRO Y COLOCACIN DE VENTANA 60X40 ARMADA CON PERFILES
DE ALUMINIO LINEA DE 5CM, INCLUYE MATERIALES, ACARREOS,
CORTES,
SUMINISTRO Y COLOCACIN DE VENTANA
PERFILES DE ALUMINIO LINEA DE 5CM,
ACARREOS, CORTES,

90X120 ARMADA CON


INCLUYE MATERIALES,

INSTALACION HIDROSANITARIA
SALIDA MUEBLE SANITARIO CON TUBO HIDRULICO TUBOPLUS Y
SANITARIO P.V.C. CAMPANA ANGER LISO INCLUYE: VALVULA DE PASO Y
VLVULA DE CONTROL GENERAL, RAMALEO CON TUBO DE COBRE DE PVC
DE 13 A 100 MM DE DIMETRO, CONEXIONES, ALIMENTACIN Y DESCARGA
DE
SUMINISTRO Y COLOCACIN DE W.C. TANQUE BAJO MARCA LAMOSA;
INCLUYE: ACARREO, MATERIALES PARA SU FIJACION, JUNTA PROHEL,
CONEXIN A LA ALIMENTACIN Y AL DESAG E, VLVULA DE CONTROL,
PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO
PARA SU
SUMINISTRO Y COLOCACIN DE LAVABO MARCA LAMOSA MOD AUSTRAL
BLANCO CHICO SOBRE BASE DE CONCRETO DE 8 CM DE ESP.CON LLAVE
INDIV P/LAVABO RUGO 16Q, CONTRA REJILLA Y CESPOL CROMADO,
LIMPIEZA CON AGUA Y JABON, CONEXIN A LA ALIMENTACIN Y AL
DESAG E; INCLUYE: ACARREO, MATERIALES PARA SU
SUMINISTRO Y COLOCACIN DE GANCHO PARA MULETAS DE ACERO
INOXIDABLE; INCLUYE: ACARREO, APERTURA DEL HUECO EN MURO,
COLOCACIN, LIMPIEZA, HERRAMIENTA MENOR Y MANO DE OBRA.
INCLUYE TODO LO
SUMINISTRO Y COLOCACIN DE TARJA DE ACERO INOXIDABLE DE 45 X 45
CM. TIPO FREGADERO PARA EMPOTRAR A MESA DE LAVABO; INCLUYE:
ACARREOS, MATERIALES PARA SU FIJACION, CONEXIONES, PRUEBAS,
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA
INSTALACION ELECTRICA
SUMINISTRO Y COLOCACION DE CENTRO DE CARGA QO-116-M100 CON
INTERRUPTOR PRINCIPAL, MARCA SQUARE'D; INCLUYE: ACARREO,
CONEXION, PRUEBA, MATERIALES PARA SU FIJACION, HERRAMIENTA
MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.
SUMINISTRO Y TENDIDO DE TUBO CONDUIT DE P.V.C. PESADO DE 32 MM
DIAMETRO; INCLUYE: ACARREO, MATERIALES PARA SU FIJACION Y
SOPORTERIA, ANDAMIOS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO
LO NECESARIO PARA SU CORRECTA EJECUCION.
SALIDA DE CONTACTO POR PISO MONOFASICO DUPLEX POLARIZADO
CAT-M-5650-M, CON PLACA DE ALUMINIO ANODIZADO CAT-95101, 2F-3H, 15
AMPS-220 VOLTS, EN CAJA DE LAMINA GALVANIZADA CON TUBO CONDUIT
PVC PESADO, MCA. ARROW-HART; INCLUYE: ACARREO, PRUEBAS,
CONEXIONES, CONECTORES, COPLES, CHALUPA GALVANIZADA, CHASIS,
CABLE THW-LS/THHW-LS CAL.10, PEGAMENTO P.V.C., HERRAMIENTA
MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.
SALIDA DE CENTRO Y/O CONTACTO EN CAJA DE LAMINA GALVANIZADA
CON TUBO POLIDUCTO DE 19 MM. (3/4") DE DIAMETRO; INCLUYE:
ACARREOS,
PRUEBAS,
CONEXIONES,
CONECTORES,
CHALUPA
GALVANIZADA, CABLES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO
LO NECESARIO PARA SU
OBRA EXTERIOR

SUMINISTRO Y COLOCACION DE PISO DE CONCRETO F'c=150 KG/CM2 DE 8


CMS. DE ESPESOR CON ADICIO DE COLOR ACABADO PULIDO O RAYADO
CON BROCHA DE PELO, LOSAS 3.06 X 2.00 METROS, JUNTAS FRIAS
ACABADOS CON VOLTEADOR Y REVOLVEDORA; INCLUYE: ACARREO,
COLADO, CIMBRADO, DESCIMBRADO
SUMINISTRO Y COLOCACION DE MALLA DELIMITADORA DE TERRENO.
INCLUYE: ACARREO HERRAMIENTA MENOR Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION

OMA DE BAJA CALIFORNIA

ERIA, ARQUITECTURA Y DISEO

PUS ENSENADA
DURACION:

INICIO OBRA
FIN OBRA

GO DE CONCEPTOS
UNIDAD

CANTIDAD

UNIVERSIDAD AUTONOMA DE

FACULTAD DE INGENIERIA, ARQUITE

CAMPUS ENSENADA
DEPENDENCIA

UABC

CONCURSO
OBRA:
LUGAR
FECHA

ANALISIS DE PRECIOS UNITA


PRELIMINARES
MARCACION DE EXCAVACION (M)
CONCEPTO
MATERIALES

UNIDAD

CAL

KG

MANO DE OBRA
CABO
PEON
EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

1 JORNADA
1 JORNADA

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

ACARREOS (M3)
CONCEPTO

UNIDAD
EQUIPO Y HERRAMIENTA
HORA
CAMION 7M3
HORA
CARGADOR Cat 966
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)
COMPACTACION DE EXCAVACION (M2)
CONCEPTO
MANO DE OBRA
CABO
PEON

UNIDAD
1 Jornada
1 Jornada

MATERIAL
AGUA

m3

EQUIPO Y HERRAMIENTO
Motoniveladora 16-H
Compactador CP 563D
Herramienta Menor

HORA
HORA
%

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

EXCAVACION PARA CIMENTACION (M3)


CONCEPTO
MANO DE OBRA
CABO
PEON

UNIDAD
1 Jornada
1 Jornada

EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

ACARREOS (M3)
CONCEPTO

UNIDAD

EQUIPO Y HERRAMIENTA
HORA
CAMION 7M3
HORA
CARGADOR Cat 966
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

ALINEADO DE ESCUADRA Y MARCACION PARA CIMENTACION (PIE


CONCEPTO
MATERIALES

TABLA 1*10*12
CLAVO
BARROTE
CAL
MANO DE OBRA
CABO
PEON
EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

NIVEL AUTOMATICO CON TRIPIE

UNIDAD

PIEZA
PIEZA
PIEZA
KG

1 JORNADA
1 JORNADA

hora

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

EXCAVACION PARA CIMENTACION (M3)


CONCEPTO
MANO DE OBRA
CABO

UNIDAD
1 Jornada

EQUIPO Y HERRAMIENTA

RETROEXCAVADORA cat 320

hora
%

HERRAMIENTA MENOR
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

CIMENTACION
PLANTILLA DE CONCRETO F'c=100 KG/CM2 (m3)
CONCEPTO
MATERIALES

UNIDAD

CEMENTO
ARENA
GRAVA
AGUA

SACO
m3
m3
m3

MANO DE OBRA
OF. ALBAIL
PEON
EQUIPO Y HERRAMIENTO
REVOLVEDORA POR HORA
HERRAMIENTA MENOR

1 jornada
1 jornada

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

SUMINISTRO Y HABILITADO DE ACERO DE ACERO PARA ZAPATA (T


CONCEPTO
MATERIALES
VARILLA 1/2"
ALAMBRE RECOCIDO

UNIDAD
TON
TON

TO
MANO DE OBRA
OF.FIERRERO
PEON

1 jornada
1 jornada

TOTAL

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

%
TOTAL DE MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA

CIMBRA PARA LA ZAPATA ( METRO LINEAL)


CONCEPTO
MATERIALES
BARROTE 2"X4"X8'
CLAVO

UNIDAD

m
m
m
Lt

TABLA 1"X8"X12'
DESMOLDANTE ACEITE QUEMADO
MANO DE OBRA
OF. CARPINTERO
PEON

1 Jornada
1 Jornada

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

MEZCLA Y COLADO DE CONCRETO PARA ZAPATA F'C=200 KG/M2


CONCEPTO
MATERIALES
CEMENTO
ARENA
GRAVA
AGUA

UNIDAD

SACO
m3
m3
m3

MANO DE OBRA
OF.ALBAIL
PEON

1 Jornada
1 Jornada

EQUIPO Y HERRAMIENTO
REVOLVEDORA
HERRAMIENTA MENOR

HORA
%

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

COMPACTACION DE EXCAVACION CON PISON (M2)


CONCEPTO
MATERIAL

UNIDAD
AGUA

m3

MANO DE OBRA
CABO
PEON

1 Jornada
1 Jornada

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

ACERO FIRME DE CONCRETO (m2)


CONCEPTO
MATERIALES
VARILLA 3/8"
ALAMBRE RECOCIDO

UNIDAD

TON
TON

MANO DE OBRA
OF.FIERRERO
PEON

1 jornada
1 jornada

TOTAL
EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

%
TOTAL DE MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA

CIMBRA PARA FIRME DE CONCRETO ( METRO LINEAL)


CONCEPTO
MATERIALES
BARROTE 2"X4"X8'
CLAVO

UNIDAD

m
m
m
Lt

TABLA 1"X8"X12'
DESMOLDANTE ACEITE QUEMADO
MANO DE OBRA
OF. CARPINTERO
PEON
EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

1 Jornada
1 Jornada

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

FIRME DE CONCRETO 200KG/M2


CONCEPTO

UNIDAD

MATERIALES
CEMENTO
ARENA
GRAVA
AGUA

SACO
m3
m3
m3

MANO DE OBRA
OF.ALBAIL
PEON

1 Jornada
1 Jornada

EQUIPO Y HERRAMIENTO
REVOLVEDORA POR HORA
HERRAMIENTA MENOR

MUROS, CADENAS Y CASTILLOS

SUMINISTRO Y HABILITADO DE ACERO DE ACERO PARA CASTILLOS (


CONCEPTO
MATERIALES
VARILLA 1/2"
ALAMBRE RECOCIDO

UNIDAD
TON
TON

MANO DE OBRA
OF.FIERRERO
PEON
TOTAL POR UNA TONELADA
EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

1 jornada
1 jornada

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

MURO BLOCK COMUN MORTERO fc'=100 (m2)


CONCEPTO
MATERIALES

UNIDAD

CEMENTO
ARENA
GRAVA
AGUA

SACO
M3
M3
M3

BLOCK 20X20X40

PIEZA

MANO DE OBRA
OF.ALBAIL
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
VIBRADOR
REVOLVEDORA
HERRAMIENTA MENOR

HORA
HORA
%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

ARMADO DE LA CIMBRA CASTILLOS (PIEZA)


CONCEPTO
MATERIALES
BARROTE 2"X4"X8'
CLAVO

UNIDAD

M
PIEZA
M
Lt

TABLA 1"X12"X12'
DESMOLDANTE ACEITE QUEMADO
MANO DE OBRA
OF. CARPINTERO
PEON
EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

1 Jornada
1 Jornada

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

MEZCLA Y COLADO DE CONCRETO PARA CASTILLOS F'C=150 KG/M


CONCEPTO
MATERIALES
CEMENTO
ARENA
GRAVA
AGUA
MANO DE OBRA
OF.ALBAIL
PEON
EQUIPO Y HERRAMIENTO
REVOLVEDORA
HERRAMIENTA MENOR
VIBRADOR

UNIDAD

SACO
m3
m3
m3

JORNADA
JORNADA

JORNADA
%

HORA
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

SUMINISTRO Y HABILITADO DE ACERO DE ACERO PARA CERRAMIE


CONCEPTO
MATERIALES
VARILLA N4
ALAMBRE RECOCIDO

UNIDAD
TON
TON

MANO DE OBRA
OF.FIERRERO
PEON
TOTAL POR UNA TONELADA
EQUIPO Y HERRAMIENTO
Herramienta Menor

JORNADA
JORNADA

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

ARMADO DE LA CIMBRA PARA CERRAMIENTOS (METRO LINEAL


CONCEPTO
MATERIALES
BARROTE 2"X4"X8'
CLAVO

UNIDAD

m
m
m
Lt

TABLA 1"X10"X12'
DESMOLDANTE ACEITE QUEMADO
MANO DE OBRA
OF. CARPINTERO
PEON
EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

1 Jornada
1 Jornada

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

MEZCLA Y COLADO DE CONCRETO PARA CASTILLOS F'C=150 KG/M


CONCEPTO
MATERIALES
CEMENTO
ARENA
GRAVA
AGUA
MANO DE OBRA
OF.ALBAIL
PEON
EQUIPO Y HERRAMIENTO

UNIDAD

SACO
m3
m3
m3

1 Jornada
1 Jornada

REVOLVEDORA
HERRAMIENTA MENOR
VIBRADOR

HORA
%

HORA
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

ACABADOS DE CUBIERTA
APLANADO DE MURO CON MORTERO CEMENTO-CAL-ARENA 1:2:6
CONCEPTO
MATERIALES

UNIDAD

CEMENTO
ARENA
GRAVA
AGUA

SACO
M3
M3
M3

MANO DE OBRA
OF.ALBAIL
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
VIBRADOR
REVOLVEDORA
HERRAMIENTA MENOR

HORA
HORA
%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

LOSETA TIPO 1 (M2)


CONCEPTO
MATERIALES

UNIDAD

BOQUILLA
CEMENTO
ARENA
AGUA
LOSETA 30X30

M3
SACO
M3
M3
M2

ESPACIADORES

PIEZA

MANO DE OBRA
OF.ALBAIL
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

LOSETA TIPO 2 (M2)


CONCEPTO
MATERIALES

UNIDAD

BOQUILLA
CEMENTO
ARENA
AGUA
LOSETA 30X30

M3
SACO
M3
M3
M2

ESPACIADORES

PIEZA

MANO DE OBRA
OF.ALBAIL
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

PINTURA INTERIOR (M2)


CONCEPTO
MATERIALES

UNIDAD

PINTURA
MANO DE OBRA
OF.PINTOR
PEON

CUBETA

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

PINTURA EXTERIOR (M2)


CONCEPTO
MATERIALES

PINTURA
MANO DE OBRA
OF.PINTOR
PEON

UNIDAD

CUBETA

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

VISTAS EN ESQUINAS SUPERIORES


CONCEPTO
MATERIALES

UNIDAD

PEGAMENTO PEGA MOLDURA 10 KG


MOLDURA

MANO DE OBRA

EQUIPO Y HERRAMIENTO

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

CANCELES, PUERTA Y VENTANAS.

PUERTA PRINCIPAL
CONCEPTO
MATERIALES

UNIDAD

PUERTAS
CHAPA

PIEZA
PIEZA

BISAGRA
BARROTE 2"X4"X8'
CLAVO

PIEZA

m
m

MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

PUERTA HABITACION
CONCEPTO
MATERIALES

PUERTAS

UNIDAD

PIEZA

PERILLA

PIEZA

BISAGRA
BARROTE 2"X4"X8'
CLAVO

PIEZA

m
m

MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

PUERTA MOSQUITERA
CONCEPTO
MATERIALES

UNIDAD

PUERTAS
CHAPA

PIEZA
PIEZA

BISAGRA
BARROTE 2"X4"X8'
CLAVO

PIEZA

m
m

MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

PUERTA CLOSET HABITACION PRINCIPAL


CONCEPTO
MATERIALES

UNIDAD

PUERTAS
PERILLA

PIEZA
PIEZA

BISAGRA
BARROTE 2"X4"X8'
CLAVO

PIEZA

MANO DE OBRA
CABO
PEON
EQUIPO Y HERRAMIENTO

m
m

1 JORNADA
1 JORNADA

HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

PUERTA CLOSET
CONCEPTO
MATERIALES

UNIDAD

PUERTAS
PERILLA

PIEZA
PIEZA

BISAGRA
BARROTE 2"X4"X8'
CLAVO

PIEZA

m
m

MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

PUERTA CUADROS VIDRIO


CONCEPTO
MATERIALES

UNIDAD

PUERTAS
PERILLA

PIEZA
PIEZA

BISAGRA
BARROTE 2"X4"X8'
CLAVO

PIEZA

m
m

MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

PUERTA CORREDISA VIDRIO


CONCEPTO
MATERIALES

PUERTAS
SILICON

UNIDAD

PIEZA
PIEZA

MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

VENTANA CUADRO 150X120 (HABITACIONES)


CONCEPTO
MATERIALES

UNIDAD

VENTANA

PIEZA
PIEZA

SILICON
MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

VENTANA 200X130 (SALA)


CONCEPTO
MATERIALES

UNIDAD

VENTANA

PIEZA
PIEZA

SILICON
MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

VENTANA 60X90 (CUARTO DE SERVICIO Y HABITACION PRINCIPAL)


CONCEPTO
MATERIALES

VENTANA
SILICON

UNIDAD

PIEZA
METRO

MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

VENTANA 60X40 (BAO)


CONCEPTO
MATERIALES

UNIDAD

VENTANA

PIEZA
METRO

SILICON
MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

VENTANA 90X 120 (COCINA)


CONCEPTO
MATERIALES

UNIDAD

VENTANA

PIEZA
METRO

SILICON
MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

TECHO LADO IZQUIERDO(M)


CONCEPTO
MATERIALES

UNIDAD

BARROTE 2X8"X12'

PIEZA
PIEZA
PIEZA
PIEZA

CLAVO 2

TRIPLAY 1"X10'X12'
POLIN 4"X4"X12'
MANO DE OBRA
CARPINTERO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

YESO
CONCEPTO
MATERIALES

UNIDAD

YESO

PIEZA
PIEZA

TORNILLO

REDIMIX
MANO DE OBRA
CABO
PEON

1 JORNADA
1 JORNADA

EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

YESO BAO
CONCEPTO
MATERIALES

YESO
TORNILLO

REDIMIX
MANO DE OBRA
CABO
PEON
EQUIPO Y HERRAMIENTO
HERRAMIENTA MENOR

UNIDAD

PIEZA
PIEZA
LB

1 JORNADA
1 JORNADA

%
TOTAL DE MATERIALE MANO DE OBRA + (Eq y Herramienta)

IDAD AUTONOMA DE BAJA CALIFORNIA

CULTAD DE INGENIERIA, ARQUITECTURA Y DISEO


CAMPUS ENSENADA
DURACION:

INICIO OBRA
FIN OBRA

ANALISIS DE PRECIOS UNITARIOS


PRELIMINARES

ON DE EXCAVACION (M)
COSTO

CANTIDAD

$2.34

IMPORTE

0.075

$0.18
$0.18

$215.00
$120.00

$0.42
OBRA + (Eq y Herramienta)

CARREOS (M3)
COSTO

0.0003
0.003

0.03

GASTOS INDIRECTOS

$0.42

FINANCIAMIENTO

$0.01

$0.61

CANTIDAD
$360.00
$680.08

$0.06
$0.36

IMPORTE

0.057084
0.057074

20.55024
38.8149

$59.37

COSTO

CANTIDAD
$350.00
$120.00

0.03125
0.3125

IMPORTE

$10.94
$37.50
$48.44

16.61

0.0102

0.17

0.17
GASTOS INDIRECTOS
$893.76
$417.19

0.0041
0.0040
$48.44

3.629
1.68
0.03

FINANCIAMIENTO
$1.45

$6.76
$55.37

PARA CIMENTACION (M3)


COSTO

CANTIDAD
$350.00
$120.00

IMPORTE

$11.90
$40.80

0.034
0.34

GASTOS INDIRECTOS

$52.70

FINANCIAMIENTO

$2,511.62
0.03

$52.70

$1.58

$1.58
$54.28

GASTOS INDIRECTOS

CARREOS (M3)
COSTO

CANTIDAD

IMPORTE

FINANCIAMIENTO
$360.00
$680.08

0.057084
0.057074

20.55024
38.8149

$59.37

MARCACION PARA CIMENTACION (PIEZA)


COSTO

CANTIDAD

$122.50
$0.03

$53.38
$2.34

0.0833
4
0.5
0.25

IMPORTE
$10.20
$0.14
$26.69

$0.59
$39.50

$350.00
$120.00

0.0016
0.016

$0.56
$1.92
$2.48

GASTOS INDIRECTOS
FINANCIAMIENTO

$2.48

0.03

$0.07

$1.50

0.3

$1.50
$1.57

$43.55

PARA CIMENTACION (M3)


COSTO

CANTIDAD
$350.00

IMPORTE

$3.50

0.01

$538.78

0.105293
0.03

$3.50

$3.50

GASTOS INDIRECTOS

$56.73

FINANCIAMIENTO

$0.11

$56.83
$60.33

CIMENTACION

ONCRETO F'c=100 KG/CM2 (m3)


COSTO

CANTIDAD

$132.76
$259.48
$302.59
$22.50

IMPORTE

5.6
0.47
0.7
0.21

$743.46
$121.96
$211.81
$4.73
$1,136.05

TOTAL

$325.00

0.174
0.8

$120.00

$99.80
$152.55

$56.55
$96.00
$152.55

0.014
0.03

$1.40
$4.58

GASTOS INDIRECTOS
FINANCIAMIENTO

$5.97
$1,294.57

OBRA + (Eq y Herramienta)

DE ACERO DE ACERO PARA ZAPATA (TON)


COSTO

CANTIDAD
$9,564
$12,410.00

$365.00
$120.00

0.01848
0.005544

IMPORTE
$176.75
$68.80

TOTAL MATERIALES

$257.83

0.15
0.15
TOTAL MANO DE OBRA

$54.75
$18.00
$72.75

GASTOS INDIRECTOS

FINANCIAMIENTO
$72.75

0.03

$2.18

TOTAL

$2.18
$332.76

RA, EQUIPO Y HERRAMIENTA

LA ZAPATA ( METRO LINEAL)


COSTO

CANTIDAD

$53.38

1.1

$0.03

27
1.1
0.16

$94.83
$40

IMPORTE
$104.31
$0.92
$104.31

$6.40

TOTAL

$300.00

$226.74

0.084
0.084
TOTAL

$150.00

$25.20
$12.60
$37.80

GASTOS INDIRECTOS
FINANCIAMIENTO

$1.13

$1.13

$1.13
$265.68

OBRA + (Eq y Herramienta)

CRETO PARA ZAPATA F'C=200 KG/M2 (m3)


COSTO

CANTIDAD

$132.76
$259.48
$302.59
$22.50

IMPORTE

7.1
0.47
0.65
0.195

$942.60
$121.96
$196.68
$4.39
$1,328.90

TOTAL

$325.00
$170.00

$99.80
$171.13

0.174
0.674

$56.55
$114.58
$171.13

0.014
$5.13

$1.40
$5.13

$6.53
$1,506.56

E EXCAVACION CON PISON (M2)


COSTO

CANTIDAD

$22.50

0.0102

IMPORTE
0.23

GASTOS INDIRECTOS
FINANCIAMIENTO

0.23
$350.00
$120.00

$4.38
$15.00

0.0125
0.125

GASTOS INDIRECTOS

$19.38

FINANCIAMIENTO
$0.58

0.03

$0.58

$0.58
$20.19

ME DE CONCRETO (m2)
COSTO

CANTIDAD

IMPORTE

$9,426.71

0.0062

$12,410.00

0.00186

$365.00
$120.00

$58.45
$23.08
$85.60

0.15
0.15
TOTAL MANO DE OBRA

$54.75
$18.00
$72.75

GASTOS INDIRECTOS
FINANCIAMIENTO

$2.18

0.03

$2.18

TOTAL

$2.18
$160.54

RA, EQUIPO Y HERRAMIENTA

E DE CONCRETO ( METRO LINEAL)


COSTO

CANTIDAD

$53.38

0.55

$0.03

14
0.55
0.05

$94.83
$40

IMPORTE
$52.16
$0.48
$52.16

$2.00

TOTAL

$300.00

$112.13

0.021
0.021
TOTAL

$150.00

$6.30
$3.15
$9.45

GASTOS INDIRECTOS
FINANCIAMIENTO

$9.45

0.03

$0.28

$0.28
$121.86

OBRA + (Eq y Herramienta)

CONCRETO 200KG/M2
COSTO

CANTIDAD

IMPORTE

$132.76
$259.48
$302.59
$22.50

7.1
0.47
0.65
0.195

$942.60
$121.96
$196.68
$4.39
$1,328.90

TOTAL

$325.00

0.174
0.674

$170.00

$99.80
$5.13

$56.55
$114.58
$171.13

0.014
0.03

$1.40
$5.13

GASTOS INDIRECTOS
FINANCIAMIENTO

$6.53
$1,506.56

MUROS, CADENAS Y CASTILLOS

ACERO DE ACERO PARA CASTILLOS (PIEZA)


COSTO

CANTIDAD
$9,564
$12,410.00

$365.00
$120.00

IMPORTE

0.022
0.0066
TOTAL

$210.42
$81.91
$306.94

0.0012
0.0012

$0.44
$0.14
$0.58

GASTOS INDIRECTOS
FINANCIAMIENTO

$0.02

0.03

$0.02
$0.02

$307.54

OBRA + (Eq y Herramienta)

OMUN MORTERO fc'=100 (m2)


COSTO

CANTIDAD

$132.76
$259.48
$302.59
$22.50
$8

0.572
0.055
0.0748
0.02145
18
TOTAL

$325.00
$120.00

0.1
0.1

IMPORTE
$75.94
$14.27
$22.63
$0.48
$135.00
$260.74
$32.50
$12.00

$44.50

GASTOS INDIRECTOS
$2.50
$99.80
$44.50

0.11
0.014
0.03

$0.28
$1.40
$1.34

FINANCIAMIENTO

$3.01
$308.25

OBRA + (Eq y Herramienta)

CIMBRA CASTILLOS (PIEZA)


COSTO

CANTIDAD

$53.38

1.46

$0.03
$40.83

32
1.61
0.159

$40

IMPORTE
$59.62
$1.09
$65.74

$6.36

TOTAL

$300.00

$139.45

0.114
0.114
TOTAL

$150.00

$34.11
$17.05
$51.16

GASTOS INDIRECTOS
FINANCIAMIENTO

$51.16

0.03

$1.53

$1.53
$192.14

RETO PARA CASTILLOS F'C=150 KG/M2 (M3)


COSTO

CANTIDAD

$132.76
$259.48
$302.59
$22.50

6.46
0.48
0.67
0.21
TOTAL

$325.00
$120.00

0.174
0.674

IMPORTE
$857.63
$124.55
$202.74
$4.73
$1,249.12
$56.55
$80.88
$137.43

GASTOS INDIRECTOS
$99.80
$4.12
$2.50

OBRA + (Eq y Herramienta)

0.014
0.03
0.11

$1.40
$4.12
$0.28

$5.80
$1,392.35

FINANCIAMIENTO

E ACERO DE ACERO PARA CERRAMIENTO


COSTO

CANTIDAD
$9,564
$12,410.00

IMPORTE

0.009
0.0027
TOTAL

$86.08
$33.51
$125.57

0.0012
0.0012

$0.44
$0.14
$0.58

$365.00
$120.00

GASTOS INDIRECTOS
FINANCIAMIENTO

$0.58

0.03

$0.02

$0.02
$126.17

ARA CERRAMIENTOS (METRO LINEAL)


COSTO

CANTIDAD

$53.38

0.45

$0.03
$122.50

1.125
1.1
1

$40

IMPORTE
$24.02
$0.04
$134.75

$40.00

TOTAL

$300.00

$208.75

0.024
0.024
TOTAL

$150.00

$7.20
$3.60
$10.80

GASTOS INDIRECTOS
FINANCIAMIENTO

$10.80

0.03

$0.32

$0.32
$219.87

RETO PARA CASTILLOS F'C=150 KG/M2 (M3)


COSTO

CANTIDAD

$132.76
$259.48
$302.59
$22.50

6.46
0.48
0.67
0.21
TOTAL

$325.00
$120.00

0.174
0.674

IMPORTE
$857.63
$124.55
$202.74
$4.73
$1,249.12
$56.55
$80.88
$137.43

GASTOS INDIRECTOS

$99.80
$4.12
$2.50

0.014
0.03
0.11

$1.40
$4.12
$0.28

FINANCIAMIENTO

$5.80
$1,392.35

OBRA + (Eq y Herramienta)

ACABADOS DE CUBIERTA

ORTERO CEMENTO-CAL-ARENA 1:2:6 (M2)


COSTO

CANTIDAD

$93.97
$259.48
$302.59
$22.50

IMPORTE

0.572
0.055
0.0748
0.02145

$53.75
$14.27
$22.63
$0.48
$95.70

TOTAL

$300.00
$120.00

0.09
0.09

$27.00
$10.80
$37.80

GASTOS INDIRECTOS
$2.50
$99.80
$37.80

0.11
0.014
0.03

$0.28
$1.40
$1.13

FINANCIAMIENTO

$2.81
$136.30

OBRA + (Eq y Herramienta)

SETA TIPO 1 (M2)


COSTO

CANTIDAD

$68.52
$132.76
$259.48
$22.50
$89.39
$52.5

0.006
0.01
0.02
0.1
1
0.08
TOTAL

$325.00
$120.00

$44.50

0.1
0.1

0.03

IMPORTE
$0.41

$1.33
$5.19
$2.25

$89.39
$4.20
$101.44
$32.50
$12.00
$44.50

GASTOS INDIRECTOS

$1.34

FINANCIAMIENTO

$1.34
$147.28

$163.48

OBRA + (Eq y Herramienta)

SETA TIPO 2 (M2)


COSTO

CANTIDAD

$68.52
$132.76
$259.48
$22.50
$102.22
$52.5

IMPORTE

0.006
0.01
0.02
0.1
1
0.08

$0.41

$1.33
$5.19
$2.25

$102.22
$4.20
$114.27

TOTAL

$325.00
$120.00

0.1
0.1

$32.50
$12.00
$44.50

$44.50

0.03

$1.34

GASTOS INDIRECTOS
FINANCIAMIENTO

$1.34
$160.11

OBRA + (Eq y Herramienta)

URA INTERIOR (M2)


COSTO

CANTIDAD

IMPORTE

$1,225.75

0.006

$7.35
$7.35

$325.00

0.033
0.033

$10.73
$3.96
$14.69

$120.00

GASTOS INDIRECTOS
FINANCIAMIENTO

$14.69

0.03

$0.44

$0.44
$22.48

OBRA + (Eq y Herramienta)

RA EXTERIOR (M2)
COSTO

CANTIDAD

IMPORTE

$1,723.28

0.006

$10.34
$10.34

$325.00

0.033
0.033

$10.73
$3.96
$14.69

$120.00

GASTOS INDIRECTOS

FINANCIAMIENTO
$14.69

0.03

$0.44

$0.44
$25.47

OBRA + (Eq y Herramienta)

ESQUINAS SUPERIORES
COSTO

CANTIDAD

IMPORTE

$142.24
$107.76

GASTOS INDIRECTOS
FINANCIAMIENTO

OBRA + (Eq y Herramienta)

COSTO

CANTIDAD

$1,146.55
$514.66
$44

1
1
1

$53.38

2.05

$0.03

20

$215.00
$120.00

0.0125
0.125

IMPORTE
$1,146.55
$514.66
$43.97
$109.43
$0.68
$1,815.29

$2.69
$15.00

GASTOS INDIRECTOS

$17.69

FINANCIAMIENTO
$17.69

0.03

$0.53

$0.53
$1,833.51

COSTO

CANTIDAD

$257.76

IMPORTE
$257.76

$279.54
$44

1
1

$53.38

2.05

$0.03

20

$215.00
$120.00

0.0125
0.125

$279.54
$43.97
$109.43
$0.68
$691.38

$2.69
$15.00

GASTOS INDIRECTOS

$17.69

FINANCIAMIENTO
$17.69

0.03

$0.53

$0.53
$709.60

COSTO

CANTIDAD

$1,702.59
$514.66
$44

1
1
1

$53.38

2.05

$0.03

20

$215.00
$120.00

0.0125
0.125

IMPORTE
$1,702.59
$514.66
$43.97
$109.43
$0.68
$2,371.33

$2.69
$15.00

GASTOS INDIRECTOS

$17.69

FINANCIAMIENTO
$17.69

0.03

$0.53

$0.53
$2,389.55

COSTO

CANTIDAD

$658.00
$279.54
$44

1
1
1

$53.38

2.6

$0.03

20

$215.00
$120.00

0.0125
0.125

IMPORTE
$658.00
$279.54
$43.97
$138.79
$0.68
$1,120.98

$2.69
$15.00

GASTOS INDIRECTOS

$17.69

FINANCIAMIENTO

$17.69

0.03

$0.53

$0.53
$1,139.20

COSTO

CANTIDAD

$658.00
$279.54
$44

2
2
2

$53.38

2.62

$0.03

20

$215.00
$120.00

0.0125
0.125

IMPORTE
$1,316.00
$559.08
$87.94
$139.86
$0.68
$2,103.56

$2.69
$15.00

GASTOS INDIRECTOS

$17.69

FINANCIAMIENTO
$17.69

0.03

$0.53

$0.53
$2,121.77

COSTO

CANTIDAD

$1,663.79
$279.54
$44

1
1
1

$53.38

2.05

$0.03

20

$215.00
$120.00

0.0125
0.125

IMPORTE
$1,663.79
$279.54
$43.97
$109.43
$0.68
$2,097.41

$2.69
$15.00

GASTOS INDIRECTOS

$17.69

FINANCIAMIENTO
$17.69

0.03

$0.53

$0.53
$2,115.63

COSTO

CANTIDAD

$3,663.79
78.59

IMPORTE

$3,663.79

0.76

$3,663.79
$215.00
$120.00

$5.38
$30.00

0.025
0.25

GASTOS INDIRECTOS

$35.38

FINANCIAMIENTO
$35.38

0.03

$1.06

$1.06
$3,700.23

COSTO

CANTIDAD

$1,723.28
$78.59

1
0.54

$215.00
$120.00

0.0125
0.125

IMPORTE
$1,723.28
$42.44
$1,765.72

$2.69
$15.00

GASTOS INDIRECTOS

$17.69

FINANCIAMIENTO
$17.69

0.03

$0.53

$0.53
$1,783.94

COSTO

CANTIDAD

$2,443.10
$78.59

1
0.64

$215.00
$120.00

0.0125
0.125

IMPORTE
$2,443.10
$50.30
$2,493.40

$2.69
$15.00

GASTOS INDIRECTOS

$17.69

FINANCIAMIENTO
$17.69

0.03

$0.53

$0.53
$2,511.62

DE SERVICIO Y HABITACION PRINCIPAL)


COSTO

CANTIDAD

$1,723.28
$78.59

1
0.3

IMPORTE
$1,723.28
$23.58

$1,746.86
$215.00
$120.00

$26.88
$1.50

0.0125
0.125

GASTOS INDIRECTOS

$28.38

FINANCIAMIENTO
$28.38

0.03

$0.85

$0.85
$1,776.08

OBRA + (Eq y Herramienta)

ANA 60X40 (BAO)


COSTO

CANTIDAD

$1,723.28
$78.59

1
0.2

$215.00
$120.00

0.0125
0.125

IMPORTE
$1,723.28
$15.72
$1,739.00

$2.69
$15.00

GASTOS INDIRECTOS

$17.69

FINANCIAMIENTO
$17.69

0.03

$0.53

$0.53
$1,757.22

OBRA + (Eq y Herramienta)

NA 90X 120 (COCINA)


COSTO

CANTIDAD

$969.83
$78.59

1
0.42

$215.00
$120.00

0.0125
0.125

IMPORTE
$969.83
$33.01
$1,002.84

$2.69
$15.00

GASTOS INDIRECTOS

$17.69

FINANCIAMIENTO
$17.69

0.03

$0.53

$0.53
$1,021.06

OBRA + (Eq y Herramienta)

LADO IZQUIERDO(M)
COSTO

CANTIDAD

IMPORTE

$215.00
$0.03

3.5
52

$752.50
$1.56
$754.06

$132.50
$187.07

0.54

$101.02
$1,689.59

$300.00
$120.00

0.265
0.125

$79.50
$15.00

0.4

GASTOS INDIRECTOS

$94.50

FINANCIAMIENTO
$94.50

0.03

$2.84

$2.84
$851.40

OBRA + (Eq y Herramienta)

YESO
COSTO

CANTIDAD

$81.90
$0.03

IMPORTE

1
48

$81.90
$1.44
$83.34

$350.00
$120.00

$3.50
$12.00

0.01
0.1

GASTOS INDIRECTOS

$15.50

FINANCIAMIENTO
$15.50

0.03

$0.47

$0.47
$99.31

OBRA + (Eq y Herramienta)

YESO BAO
COSTO

CANTIDAD

$81.90
$0.03

$67.67

1
48
0.05

IMPORTE
$81.90
$1.44

$3.38
$83.34

$350.00
$120.00

0.01
0.1

$3.50
$12.00

GASTOS INDIRECTOS

$15.50

FINANCIAMIENTO
$15.50

OBRA + (Eq y Herramienta)

0.03

$0.47

$0.47
$99.31

MURO DE CONTENCION

INSTALACION HIDROSANITARIA

INSTALACION ELECTRICA

OBRA EXTERIOR

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$5.94
$65.30
$1.31
$66.61
$5.33
$71.94

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$55.37
$0.00
$55.37
$0.00
$55.37

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$54.28
$0.00
$54.28
$0.00
$54.28

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$59.37
$0.00
$59.37
$0.00
$59.37

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD

$0.00
$43.55
$0.00
$43.55
$0.00

PU

$43.55

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$60.33
$0.00
$60.33
$0.00
$60.33

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$1,294.57
$0.00
$1,294.57
$0.00
$1,294.57

GASTOS INDIRECTOS
SUBTOTAL

$0.00
$332.76

FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$332.76
$0.00
$332.76

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$265.68
$0.00
$265.68
$0.00
$265.68

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$1,506.56
$0.00
$1,506.56
$0.00
$1,506.56

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$20.19
$0.00
$20.19
$0.00
$20.19

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$160.54
$0.00
$160.54
$0.00
$160.54

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$121.86
$0.00
$121.86
$0.00
$121.86

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$1,506.56
$0.00
$1,506.56
$0.00
$1,506.56

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$307.54
$0.00
$307.54
$0.00
$307.54

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$308.25
$0.00
$308.25
$0.00
$308.25

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$192.14
$0.00
$192.14
$0.00
$192.14

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$1,392.35
$0.00
$1,392.35
$0.00
$1,392.35

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$126.17
$0.00
$126.17
$0.00
$126.17

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$219.87
$0.00
$219.87
$0.00
$219.87

GASTOS INDIRECTOS

$0.00

SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$1,392.35
$0.00
$1,392.35
$0.00
$1,392.35

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$136.30
$0.00
$136.30
$0.00
$136.30

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD

$0.00
$163.48
$0.00
$163.48
$0.00

PU

$163.48

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$160.11
$0.00
$160.11
$0.00
$160.11

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$22.48
$0.00
$22.48
$0.00
$22.48

GASTOS INDIRECTOS
SUBTOTAL

$0.00
$25.47

FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$25.47
$0.00
$25.47

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$1,833.51
$0.00
$1,833.51
$0.00
$1,833.51

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$709.60
$0.00
$709.60
$0.00
$709.60

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$2,389.55
$0.00
$2,389.55
$0.00
$2,389.55

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO

$0.00
$1,139.20
$0.00

SUBTOTAL
UTILIDAD
PU

$1,139.20
$0.00
$1,139.20

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$2,121.77
$0.00
$2,121.77
$0.00
$2,121.77

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$2,115.63
$0.00
$2,115.63
$0.00
$2,115.63

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$3,700.23
$0.00
$3,700.23
$0.00
$3,700.23

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$1,783.94
$0.00
$1,783.94
$0.00
$1,783.94

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$2,511.62
$0.00
$2,511.62
$0.00
$2,511.62

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$1,776.08
$0.00
$1,776.08
$0.00
$1,776.08

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$1,757.22
$0.00
$1,757.22
$0.00
$1,757.22

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$1,021.06
$0.00
$1,021.06
$0.00
$1,021.06

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$851.40
$0.00
$851.40
$0.00
$851.40

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$99.31
$0.00
$99.31
$0.00
$99.31

GASTOS INDIRECTOS
SUBTOTAL
FINANCIAMIENTO
SUBTOTAL
UTILIDAD
PU

$0.00
$99.31
$0.00
$99.31
$0.00
$99.31

ION

NITARIA

RICA

$21.99
$241.86
$4.84
$246.70
$19.74
$266.43

UNIVERSIDAD AUTNOMA DE

FACULTAD DE INGENIERIA, ARQUITE


DEPENDENCIA

UABC

Concurso
Obra:
LUGAR
FECHA

CATALOGO DE CONCEPT
CLAVE

CONCEPTO
PRELIMINARES

ALINEADO DE ESCUADRA Y MARCACION DE EXCAVACION


EXCAVACIN A MAQUINA EN CAJA, MATERIAL TIPO "C", EN
SECO; INCLUYE: ACARREO A 20 MTS, VOLUMEN MEDIDO
SUELTO,
CORTE,
ACAMELLONADO
DE
MATERIAL,
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

2
ACARREOS EN CAMIN CON CARGA MECANICA DE TIERRA
Y MATERIAL MIXTO, PRODUCTO DE LAS EXCAVACIONES
QUE NO SEAN ROCA, MEDIDO SUELTO.INC.
TIRO
DENTRO DE LA OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

3
LIMPIEZA TRAZO Y NIVELACIN EN REA DE DESPLANTE
DE EDIFICACIONES. INCLUYE TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.

4
EXCAVACIN EN TERRENO TIPO "C" EN SECO DE 0.00 A
2.00 METROS DE PROFUNDIDAD, CON AUXILIO DE
RETROEXCAVADORA; INCLUYE: ACARREO A 20 METROS,
AFINES DE TALUDES, TRASPALEOS, AFINES DE FONDO,
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO
NECESARIO PARA SU

5
MURO DE CONTENCION
MURO DE PIEDRA BRAZA DE 20 CM DE ESPESOR
ASENTADO
CON
MORTERO
CEMENTO-ARENA1:5
APARENTE DOS CARAS JUN TAS REMETIDAS Y
GUSANEADAS; INCLUYE: BOQUILLAS, HERRAMIENTA
MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

7
CONFORMACION
DE PLATAFORMA CON MATERIAL
PRODUCTO DE LA EXCAVACION MEDIDO COMPACTADO
CON MAQUINA INC. BANDEO CON MAQUINA, TENDIDO,
MOVIMIENTOS Y MANO DE OBRA.

SUMINISTRO Y COLOCACIN DE MATERIAL DE BANCO


MEDIDO COMPACTO; EN CAPAS DE 20 CMS DE ESPESOR,
COMPACTADOS CON RODILLO VIBRATORIO MANUAL O
EQUIPO SIMILAR, AL 90% , SEGN PRUEBA PROCTOR,
PREVIA LA INCORPORACIN DEL AGUA NECESARIA;
INCLUYE: ACARREOS,

9
MEDIDO COMPACTO. CON MATERIAL MEJORADO,
EXTENDIDO DEL MATERIAL, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

10

CIMENTACION
PLANTILLA DE CONCRETO F'c=100 KG/CM2 HECHO EN
OBRA CON UN ESPESOR DE 6 CM, INCLUYE:
PREPARACIN DEL REA DE DESPLANTE Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

11
ACERO PARA REFUERZO EN CIMENTACIN CON VARILLA
NO. 4 , INCLUYE: SUMINISTRO EN OBRA, ACARREOS
INTERNOS,
HABILITADO,
COLOCACIN,
AMARRE,
GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES EN
CUALQUIER ELEMENTO ESTRUCTURAL, HERRAMIENTA
MENOR, MANO DEOBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

12
CIMBRA PARA CIMENTACIN , MEDIDA POR SUPERFICIE
DE CONTACTO, INCLUYE: MATERIA LES, MANO DE OBRA
EN HABILITADO, CIMBRADO, DESCIMBRADO Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

13
CONCRETO F'c=200 KG/CM2 EN CIMENTACIN CON
CEMENTO NORMAL, EL TAMAO MXIMO DEL AGREGADO
SER DE 3/4" Y SU CALIDAD Y BANCO DE PROCEDENCIA,
DEBERN SER APROBADOS POR LA SECRETARIA,
ELABORADO EN OBRA CON MAQUINA REVOLVEDORA,
COLOCADO, VIBRADO, CURADO Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.

14
RELLENO COMPACTADO INCLUYE ACARREOS CON
MAQUINARIA PARA EL RELLENO Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION

15
CIMBRA PARA FIRME DE CONCRETO, INCLUYE: MANO DE
ONRA, HERRAMIENTA MENOR, Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION

16
FIRME DE CONCRETO ARMADO INCLUYE ACARREOS,
MANO DE OBRA, COLADO, HERRAMIENTA MENOR Y TODO
LO NECESARIO PARA SU CORRECTA EJECUCION.

17
MUROS, CADENAS Y CASTILLOS

MURO DE 15cm. ESP. DE BLOCK COMUN 15X20X40 CON


MORTERO CEM-CAL 1:5 . ACABADO APARENTE 1 CARA.
HASTA UNA ALTURA DE 0 A 3M. INCLUYE: ACARREOS A 20
MTS. DESPERDICIOS, LIMPIEZA, MATERIALES, ANDAMIOS,
MANO DE OBRA EQUIPO, HERRAMIENTA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

18
ACERO PARA CASTILLOSARMADO CON 4 VARILLAS No 3.
ESTRIBOS No.2 A CADA CMS. SUMINISTRO EN OBRA,
ACARREOS
INTERNOS,
HABILITADO,
COLOCACIN,
AMARRE,
GANCHOS,
TRASLAPES,
DESPERDICIOS,
DOBLECES EN CUALQUIER ELEMENTO ESTRUCTURAL,
HERRAMIENTA MENOR, MANO DEOBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

19
CIMBRA PARA CASTILLOS , INCLUYE: MATERIA LES, MANO
DE OBRA EN HABILITADO, CIMBRADO, DESCIMBRADO Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

20
COLADO DE CASTILLO DE CONCRETO F'C=150KG/CM2 DE
15 X 15 CMS. ; INCLUYE: HABILITADO, CIMBRADO,
DESCIMBRADO, HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO

21
ACERO PARA CERRAMIENTO ARMADO CON 4 VARILLAS No
3. ESTRIBOS No.2 A CADA 15 CMS. SUMINISTRO EN OBRA,
ACARREOS
INTERNOS,
HABILITADO,
COLOCACIN,
AMARRE,
GANCHOS,
TRASLAPES,
DESPERDICIOS,
DOBLECES EN CUALQUIER ELEMENTO ESTRUCTURAL,
HERRAMIENTA MENOR, MANO DEOBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

22

23

CIMBRA PARA CERRAMIENTO , INCLUYE: MATERIA LES,


MANO
DE
OBRA
EN
HABILITADO,
CIMBRADO,
DESCIMBRADO Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
COLADO
DE
CERRAMIENTO
DE
CONCRETO
F'C=150KG/CM2 DE 15 X 25 CMS. INCLUYE: HABILITADO, ,
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO
NECESARIO

24
ACABADOS DE CUBIERTA
APLANADO DE MURO CON MORTERO CEMENTO-CALARENA 1:2:6 A PLOMO Y REGLA, ACABADO ESPONJEADO;
INCLUYE: REMATES, BOQUILLAS, PREPARACIN DE LA
SUPERFICIE, PLOMEADO, ANDAMIOS, MANO DE OBRA Y
TODO
LO
NECESARIO
PARA
SU
CORRECTA
EJECUCION.(0.00 A 3.00 M DE

25

SUMINISTRO Y COLOCACION DE LOSETA TIPO 1 30X30 CM,


ASENTADO CON MORTERO CEMENTO-ARENA 1:4 Y
LECHADEADO CON CEMENTO BLANCO; INCLUYE: CORTES,
AJUSTES, DESPERDICIOS, NIVELACIN, MANO DE OBRA,
LIMPIEZA Y TODO LO NECESARIO PARA SU CORRECTA

26
SUMINISTRO Y COLOCACION DE LOSETA TIPO 2 30X30 CM,
INCLUYE:
CORTES,
AJUSTES,
DESPERDICIOS,
NIVELACIN, MANO DE OBRA, LIMPIEZA Y TODO LO
NECESARIO PARA SU CORRECTA

27
SUMINISTRO Y APLICACIN DE PINTURA PARA INTERIOR
DE
CONCRETO
APARENTE,
INCLUYE:
LIMPIEZA,
PREPARACION DE LA SUPERFICIE, MATERIALES, MANO DE
OBRA, HERRAMIENTA, ANDAMIOS Y

28
SUMINISTRO Y APLICACIN DE PINTURA PARA EXTERIOR
DE
CONCRETO
APARENTE,
INCLUYE:
LIMPIEZA,
PREPARACION DE LA SUPERFICIE, MATERIALES, MANO DE
OBRA, HERRAMIENTA, ANDAMIOS Y

29
SUMINISTRO Y COLOCACION DE VISTAS EN ESQUINAS
SUPERIORES DE LA HABITACION PRINCIPAL Y PASILLOS.,
INCLUYE, PREPARACION DE SUPERFICIE, MANO DE OBRA,
HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

30
31

PUERTA Y VENTANAS.
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA
PRINCIPAL CON MARCO DE
MADERA DE PINO
ENTABLERADA INCLUYE: CERRADURA DE PERILLA MOD A
52PD

32
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA
HABITACIONES CON MARCO DE
MADERA DE PINO
ENTABLERADA INCLUYE: CERRADURA DE PERILLA MOD A

33
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA
MOSQUITERA CON MARCO DE
MADERA DE PINO
ENTABLERADA INCLUYE: CERRADURA DE PERILLA

34

35

SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA


CLOSET HABITACION PRINCIPAL CON MARCO DE
MADERA DE PINO ENTABLERADA INCLUYE: CERRADURA
DE PERILLA MOD A
SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA
CLOSET
CON
MARCO
DE
MADERA
DE
PINO
ENTABLERADA INCLUYE: CERRADURA DE PERILLA MOD A

36

SUMINISTRO Y COLOCACIN DE 1.00 X2.20 MTRS. PUERTA


CUADROS VIDRIO CON MARCO DE MADERA DE PINO
ENTABLERADA INCLUYE: CERRADURA DE PERILLA MOD

37

38

39

SUMINISTRO Y COLOCACIN DE PUERTA CORREDIZA DE


VIDRIO CON MARCO DE METAL INCLUYE: CERRADURA DE
PERILLA MOD
SUMINISTRO Y COLOCACIN DE VENTANA 150X120
(ARMADA CON PERFILES DE ALUMINIO LINEA DE 5CM,
INCLUYE MATERIALES, ACARREOS, CORTES,
SUMINISTRO
Y
COLOCACIN
DE
VENTANA
200X130ARMADA CON PERFILES DE ALUMINIO LINEA DE
5CM, INCLUYE MATERIALES, ACARREOS, CORTES,

40
41

SUMINISTRO Y COLOCACIN DE VENTANA 60X90


ARMADA CON PERFILES DE ALUMINIO LINEA DE 5CM,
INCLUYE MATERIALES, ACARREOS, CORTES,
SUMINISTRO Y COLOCACIN DE VENTANA 60X40
ARMADA CON PERFILES DE ALUMINIO LINEA DE 5CM,
INCLUYE MATERIALES, ACARREOS, CORTES,

42
SUMINISTRO Y COLOCACIN DE VENTANA 90X120
ARMADA CON PERFILES DE ALUMINIO LINEA DE 5CM,
INCLUYE MATERIALES, ACARREOS, CORTES,

43
TECHO

44

COLOCACION,SUMINISTRO DE TECHO DE MADERA CON


BARROTE 2"X8"X12' TRIPLAY DE 1"X10X12' Y CLAVO
NUMERO 2; INCLUYE : MANO DE OBRA, ACARREOS,
CORTES Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

45

COLOCACION,SUMINISTRO DE TECHO DE MADERA CON


BARROTE 2"X8"X12' TRIPLAY DE 1"X10X12' Y CLAVO
NUMERO 2; INCLUYE : MANO DE OBRA, ACARREOS,
CORTES Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

46

COLOCACION,SUMINISTRO DE PANEL DE YESO STANDAR,


TORNILLOS Y REDIMIX; INCLUYE : MANO DE OBRA,
ACARREOS, CORTES Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

47

COLOCACION,SUMINISTRO DE PANEL DE YESO RH ,


TORNILLOS Y REDIMIX; INCLUYE : MANO DE OBRA,
ACARREOS, CORTES Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
INSTALACION HIDROSANITARIA

48

SALIDA MUEBLE SANITARIO CON TUBO HIDRULICO


TUBOPLUS Y SANITARIO P.V.C. CAMPANA ANGER LISO
INCLUYE: VALVULA DE PASO Y VLVULA DE CONTROL
GENERAL, RAMALEO CON TUBO DE COBRE DE PVC DE 13
A 100 MM DE DIMETRO, CONEXIONES, ALIMENTACIN Y
DESCARGA DE

49

SUMINISTRO Y COLOCACIN DE W.C. TANQUE BAJO


MARCA LAMOSA; INCLUYE: ACARREO, MATERIALES PARA
SU FIJACION, JUNTA PROHEL, CONEXIN A LA
ALIMENTACIN Y AL DESAG E, VLVULA DE CONTROL,
PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO
LO NECESARIO PARA SU

50

SUMINISTRO Y COLOCACIN DE LAVABO MARCA LAMOSA


MOD AUSTRAL BLANCO CHICO SOBRE BASE DE
CONCRETO DE 8 CM DE ESP.CON LLAVE INDIV P/LAVABO
RUGO 16Q, CONTRA REJILLA Y CESPOL CROMADO,
LIMPIEZA CON AGUA Y JABON, CONEXIN A LA
ALIMENTACIN Y AL DESAG E; INCLUYE: ACARREO,
MATERIALES PARA SU

51

SUMINISTRO Y COLOCACIN DE GANCHO PARA MULETAS


DE ACERO INOXIDABLE; INCLUYE: ACARREO, APERTURA
DEL HUECO EN MURO, COLOCACIN,
LIMPIEZA,
HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO
LO

52

SUMINISTRO Y COLOCACIN DE TARJA DE ACERO


INOXIDABLE DE 45 X 45 CM. TIPO FREGADERO PARA
EMPOTRAR A MESA DE LAVABO; INCLUYE: ACARREOS,
MATERIALES PARA SU FIJACION, CONEXIONES, PRUEBAS,
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA
INSTALACION ELECTRICA

53

SUMINISTRO Y COLOCACION DE CENTRO DE CARGA QO116-M100


CON
INTERRUPTOR
PRINCIPAL,
MARCA
SQUARE'D; INCLUYE: ACARREO, CONEXION, PRUEBA,
MATERIALES PARA SU FIJACION, HERRAMIENTA MENOR,
MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

54

SUMINISTRO Y TENDIDO DE TUBO CONDUIT DE P.V.C.


PESADO DE 32 MM DIAMETRO; INCLUYE: ACARREO,
MATERIALES
PARA SU FIJACION Y SOPORTERIA,
ANDAMIOS, HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

55

SALIDA DE CONTACTO POR PISO MONOFASICO DUPLEX


POLARIZADO CAT-M-5650-M, CON PLACA DE ALUMINIO
ANODIZADO CAT-95101, 2F-3H, 15 AMPS-220 VOLTS, EN
CAJA DE LAMINA GALVANIZADA CON TUBO CONDUIT PVC
PESADO, MCA. ARROW-HART; INCLUYE: ACARREO,
PRUEBAS,

56

CONEXIONES,
CONECTORES,
COPLES,
CHALUPA
GALVANIZADA, CHASIS, CABLE THW-LS/THHW-LS CAL.10,
PEGAMENTO P.V.C., HERRAMIENTA MENOR, MANO DE
OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

57

SALIDA DE CENTRO Y/O CONTACTO EN CAJA DE LAMINA


GALVANIZADA CON TUBO POLIDUCTO DE 19 MM. (3/4") DE
DIAMETRO;
INCLUYE:
ACARREOS,
PRUEBAS,
CONEXIONES, CONECTORES, CHALUPA GALVANIZADA,
CABLES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO
LO NECESARIO PARA SU
OBRA EXTERIOR
SUMINISTRO Y COLOCACION DE PISO DE CONCRETO
F'c=150 KG/CM2 DE 8 CMS. DE ESPESOR CON ADICIO DE
COLOR ACABADO PULIDO O RAYADO CON BROCHA DE
PELO, LOSAS 3.06 X 2.00 METROS, JUNTAS FRIAS
ACABADOS CON VOLTEADOR Y REVOLVEDORA; INCLUYE:
ACARREO, COLADO, CIMBRADO, DESCIMBRADO

58
SUMINISTRO Y COLOCACION DE MALLA DELIMITADORA DE
TERRENO. INCLUYE: ACARREO HERRAMIENTA MENOR Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION

59

NIVERSIDAD AUTNOMA DE BAJA CALIFORNIA


FACULTAD DE INGENIERIA, ARQUITECTURA Y DISEO
DURACION:

INICIO OBRA
FIN OBRA

CATALOGO DE CONCEPTOS

CANTIDAD

UNIDAD

COSTO

m2

$71.94

13

m3

$54.28

38.63

m3

$59.37

m2

$43.55

m3

$54.28

$1,294.57

43.53

$332.76

1.44035

$265.68

$1,506.56

$20.19

$121.86

$160.54

13.87

$308.25

$307.54

$192.14

$1,392.35

$126.17

$219.87

$1,392.35

$136.30

$163.48

$160.11

$22.48

$25.47

$0.00

$1,833.51

$709.60

$2,389.55

$1,139.20

$2,121.77

$2,115.63

$11,100.68

$1,783.94

$2,511.62

$1,776.08

$1,757.22

$1,021.06

$851.40

$99.31

$99.31

$99.31

19

IMPORTE
$935.17

$2,096.88

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00
$0.00
$0.00
$0.00

$56,352.67

$479.30

$0.00

$20,896.05

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$1,833.51

$3,547.99

$2,389.55

$1,139.20

$4,243.55

$2,115.63

$11,100.68

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$1,886.80

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00
$109,016.946