You are on page 1of 161
ctel Gas (TPS| Thyna Petroleum onieee Trectebel Engineering SS swez TECHNICAL SPECIFICATION CALCULATION 02-RB-630 REGENERATION (02-RB-630 REBOILER & 02-V-630 SURGE VESSEL) Client: TPS Thyna Petroleum Services, Tunisia Project: Chergui Gas Field Development Order No.: 022839 TGE Project No.: 1562 Specification No.: 1562-SB-1011 Including Spec.No.: 1562-SB-1011.1, 1562-SB-1011.2, 1562-SB-1011.3 1562-SB-1011.4, 1562-SB-1011.5 0 _|24.03,2003| R. Hauser 2.423 Rev.| Date By Date Checked Date ‘Approved ‘yecrniat eaten 5901 Cn Sa CHLCRATON enw ‘SS TE Se EC a ene ye ore ere ee, eas OMERN GMD: XGEPT WhIERE SUCH KEOMUATONUAS SUPPLED BY THE Rene 16 wn mamnrrsccronToNs SUPPLIED INVESTIGATION CASE HPC 0330060A Tractebel GAS ENGINEERING GMBH 02-RB-630 REBOILER & 02-V-630 SURGE VESSEL Drawing no. 1562-H1-1011.1-5 Rev.( 1) Design Code ASME VIII / Div.1 Ed. 2001 Add. 2002 WRC 107 Wind load & Earthquake in acc. to Spec. Finn Name T ate Prepared by Lloyd's Register of Dipl ing. P.M Sirehi_| 14/03/03 Shipping | Monckebergsr.27 | Senigr Surveyor 20095 Hamburg Tel. +49/40/328107215 Fax.-.230) “Approved by Traciebel GAS ENGINEERING | ous | ff Ls D- 53175 Bonn fu S ileed Scheel Table of Contents [System View External load ; fl [Design loads and force _ i/4 Vessel loadings i/s ‘Material aE 6 jee [02-RB-630 REBOILER > Page 2-50] ii/1 FIREBOX ae ~ > Page 2-15 |ii/2 REFLUX CONDENSER STILL COLUMN | GLYCOL REBOILER, > page 2-43 | REBOILER/ Support operating-/test condition __ > page 2- 19 | ii/4 REBOILER / Support Shut down ( Wind- Storm) > page 2-19 | ii/5 02-V-630 SURGE VESSEL Dpage 2-53 [i/1 02-E-630A,B Heat exchanger Ppage 2-19 [iii /2 SURGE VESSEL / Support operating- /test condition page 2-24 | iii/3 SURGE VESSEL /Support Shut down (Wind- Storm) page 2-11 /iii/4 Nozzle loads WRC 107) _ > page 2-18 |iv

You might also like