Professional Documents
Culture Documents
Following is to be ensured
• Noise problem
• Separate Exit for vehicles
• Only outer walls should be constructed for 3rd & 4th Floors
• Centralized AC
• At least 8 trees to be planted
• The corridors in the building needs to be air-conditioned as there is no provision
of ventilation and daylight for them
Best Scenario is Tariff from MOR patients @ market rates and 7.5% Revenue
Share with MOR
Operation and Maintenance Plan