You are on page 1of 2

26th December 2009 Page 1

CHECKLIST of FEATURES
South City Gardens
Tower 5 (Tulip) Flats 5 I and 5 L
If in a position to be
checked,
whether this is as per
# Features Provided/Completed specification Comments1
"Luxury within easy reach" letter sent on 28th November 2006 (At an additional cost of Rs 100 per square feet)
1 Main door to be fitted with extra strong steel door with Teak Finish
Yes Yes
2 Video Door Phone Not yet
3 Vitrified Tiles for Flooring - Except in Toilets Yes Yes
4 Shower Panel in Master Bathroom Yes Yes
5 Wall Hanging WC in Toilets Yes NO WC is of Pedestal type
6 AirConditioning Points in Living / Dining Area <to be checked> <to be checked> Will need to do an explicit check
7 Electric Chimney Not yet
8 Microwave Oven Not yet
9 Gas Burner Not yet
Allotment Letter dated 17th March 2007
Extras and Deposits
10 Car Parks (Open Car Park for 5L and Covered Car Park for 5 I) Not yet
11 Costs and charges for CESC power connection Rs 33 per square feet
12 Electricity from Generator for 1 KVA
13 Documentation Charges
14 Gas Connection Yes
15 Club Membership Fees
16 Sinking Fund
Internal Specifications
17 Entrance door - Teak Veneer finished flush door on external side Yes
18 Internal Door - painted flush door Yes
19 Ceramic Tiles - unit Flooring ???? Why is there a reference to Ceramic Tiles
20 Kitchen - Anti-skid ceramic tiles <to be checked>
21 Kitchen Walls - Ceramic Tiles in DADO <to be checked>
22 Kitchen Counter - Granite Counter Top with Stainless steel sinkYes
23 Modular Kitchen Cabinets Yes
24 Hot and Cold Lines in Shower and Basin Yes
25 White Sanitary ware of Reputed Brand Yes
26 Chrome - plated fittings of Reputed Brand <to be checked>
27 Bathroom - Anti-skid ceramic tiles <to be checked>
28 Bathroom walls - designer ceramic tiles up to door height <to be checked>
Page 2
If in a position to be
checked,
whether this is as per
# Features Provided/Completed specification Comments1
Upgradation Option Offered (Letter dated 8th March 2008)
29 Main Door to be fitted with Extra Strong Steel Door with Teak finish An extra Rs 40 per sq. feet. This should
30 Vitrified Tiles for Flooring have been covered by the Rs 100/sq feet
Gas Pipeline in the Kitchen (Letter dated 10th December 2008)
31 Installation of Gas Pipeline Yes Rs 15000
Rs 10,100 paid for Flat 5 I;
32 Grills for Bedroom Not yet Grill option not taken for Flat 5 L;
Completed the Construction of the Residential Complex (Letter dated 20th December 2009)
33 CESC Individual Meter Not yet Rs 12000

Requests made by Mr. P.B.Ghosh Dastidar (Purchaser of Flat 5 I) and Mr. Arup Ghosh Dastidar (Purchaser of Flat 5 L)
If in a position to be
checked,
whether this is as per
# Features Provided/Completed specification Comments1
Letters provided on 9th September 2006;
1 Remove the Kitchen Wall to make the 2 kitchens into one No No 26th February 2007; 21st December
2 Remove the Living Room Wall to make One Living Area No No 2007

You might also like