STORM WATER RUN OFF CALCULATIONS

Project Name
Calculation of Intensity of rain fall for zone 1:
Peak mean total rainfall in last couple of years is in the month of Aug 2011 = 237.5 mm
Considering 30% of highest intensity of rainfall - 71.25 mm

Source: www.imd.gov.in

PRE DEVELOPMENT CASE - IMPERVIOUS AREA


S.No

Area

Surface Type

Open land

Pre Development
Runoff Coefficient

Storm water
Catchment
(Area in sq m)

Impervious
(Area in sq m)

Intensity of rainfall

Discharge (Q)
cum/day

41910.22

23050.621

0.0271

624.67

Total Area

41910.22

23050.621

0.0271

624.67

Total Imperviousness Area (%)

55%

Total Discharge cum/day

624.67

Silty sand

0.55

POST DEVELOPMENT CASE - IMPERVIOUS AREA


S.No

1
2
3

Area

Surface Type

Roofs
Roads/ parking/walkway
Green Area

Post Development
Runoff Coefficient

Concrete
Concrete/Asphalt
Vegetation flat

Storm water
Catchment
(Area in sq m)

0.95
0.95
0.20

Impervious (Area in
sq m)

16104.60
21328.73
4476.89

15299.37
20262.29
895.38

Total Area

41910.22

36457.04

Total Imperviousness Area (%)

87%

Intensity of rainfall
16.14mm/day = 0.016m/day

0.0712
0.0712
0.0712

Discharge (Q)
cum/day

1089.32
1442.68
63.75
2595.74

Total Discharge cum/day

2595.74

Quantity
Capacity
Total Capacity
(Nos)
(Cum/day)
(Cum/day)
1
1700
1700.00
16
27
432
Total Discharge of storm water to municipal drain - Pre Development Case(Cum/day)

Total Capacity
(Cum/day)
1700.00
432
624.67

Total Discharge of storm water to municipal drain - Post Development Case(Cum/day)


Total capacity including storage and harvesting

2595.74
2132.00

RAIN WATER COLLECTION CAPACITY


S.No
1

Pond Collection Capacity Provided


TANK CAPACITY
Rainwater Harvesting pit capacity

Maximum discharge allowed as per IGBC Requirement for existing imperviousness >50%= 25% reduction in pre-development stormwater discharge
Total discharge from the site after harvesting and storage

469
463.74