You are on page 1of 7

43 14

2013 7


Building Structure

Vol 43 No 14
Jul 2013


215021
214. 8m

PERFORM-3D
3

1002-848X 2013 14-0007-07

CA
ww ME
w. O
ca
me C
o. AE
or
g.
cn

+
TU973 14

Structure design and analysis of Suzhou Modern Media Square Office

Zhang JinTan LihuaLu JianglongYang LleiFu GenzhouYang Weixing


Suzhou Industrial Park Design Research Institute CoLtdSuzhou 215021China

Abstract The height of Suzhou Modern Media Square Office is 214. 8m Tower and podium are combined together with
multi layers space truss Structure system is complexand many indexes exceed the limitso it belongs to super high-rise
building The structure system and design contents of each part were introduced Dynamic elastic-plastic time history
analysis was done by PERFORM-3D in order to analyze the performance of the structure under rare earthquake Based on
the resultsspecial treatments were taken to the vertical componentsvertical curtain type atrium and large-span space
truss At the same timein order to accurately calculate the effective length of bottom three layer columnsthe whole
buckling stability analysis was done

Keywords structure system super high rise structure performance-based design large-span space truss buckling
stability analysis

35 m
1
1 9
47

6m 4. 2m 214. 8m
196. 8m 7
42m

3 10 m2

2
2

2. 1
+

1 000 500mm 9

Q345B

400mm 900 500mm


80 35mm
7
H
3

MIStructECEng Email zhangjin@ sipdri com

2013

CA
ww ME
w. O
ca
me C
o. AE
or
g.
cn

2. 2

42m 45m
12 65m 8
19 20
4

19
20
5
12

H800
400 16 25 400

1. 0m 150

19
20

20

800 400 400 400

110mm
45mm 0. 88

43 14

1 3

7 000kN

2
2. 6m 85
700mm

4 4

21m

CA
ww ME
w. O
ca
me C
o. AE
or
g.
cn

2. 3
8


SRC

8 4
8 250mm

3. 1

1
2

196. 8m A B

X 1. 14Y
1. 40Y 1. 2
B 1. 4

15%

4 7
1 3

2. 4
0. 000 85 3. 600m
3 15. 0m

3. 5m 1. 3m 900mm
65m

3. 2
1
GB 500112010

10

2013

1 /700

1 /350

1 /200

max
Tg / s

10% 50

2% 50

0. 09

0. 12

0. 28

0. 45

0. 45

0. 50

0. 90

0. 90

0. 90

4. 5

0. 04
0. 05
4. 6 RC

50
50

1. 0

RC
0. 5
RC 1. 0

4. 1

63% 50

CA
ww ME
w. O
ca
me C
o. AE
or
g.
cn

5. 1
SATWE ETABS

5

RC

RC


0. 5


RC

0. 75

SRC

0. 5

/ s

SATWE

ETABS

T1

4. 44

4. 40

T2

3. 75

3. 70

T3

2. 48

2. 54

T t / T1

0. 559

0. 577

D xmax / D x

1 /1 584

1 /1 388

D ymax / D y

1 /1 016

1 /974

Qx / Ge

0. 02

0. 02

Qy / Ge

0. 017

0. 017

4. 2
200m

/ %

/ kN

Qx

3. 51 10 4

3. 39 10 4

Qy

2. 91 10

2. 98 10 4

/ kNm

Mx

3. 24 10

3. 16 10 6

2. 87 10
98. 45

2. 86 10 6
98. 12

98. 37

GB 500092001 100

4. 3
GB 500092001


0. 40 kN / m2 50
4. 4
GB 50010
2010 1 6

/ %

My

97. 01

9
10
100

SATWE ETABS

43 14

11

2
11

8s

12s

10

CA
ww ME
w. O
ca
me C
o. AE
or
g.
cn

21%


1
0. 09

5. 2 3

PERFORM-3D

S01S02
S03 XYZ
25s

1 0. 85 0. 65 125gal
0. 05
0. 05

11

4
6

3 12
900mm
900mm 80 50mm

1
IO

LS IO

12

1 3

12

2013

CA
ww ME
w. O
ca
me C
o. AE
or
g.
cn

14. 9

3
= 29. 8


48

P-

13

13. 86


6 14

/ kN

14 594

21 267

26 909

29. 8

30. 2

38. 7

/ kN

434 901

642 263

1 041 378

/ kN

202 400

295 106

470 697

/ kNm2

5 460 383

7 014 951

10 761 608

/ m

18. 2

18. 2

18. 2

0. 897

0. 841

0. 825

13

14

0. 8 1. 0
7

A
B

25%

1
0. 8%

0. 4% 1. 2%

0. 5
2

250mm
0. 25%
3 3
1. 15

43 14

13

3 1


SATWE ETABS


PERFORM-3D

5
150mm

0. 25%


SRC

8
1. 0
8

CA
ww ME
w. O
ca
me C
o. AE
or
g.
cn

28
5

1 /20
40% 50%

1 GB 500112010 S
2010

2 JGJ 32010 S
2011

3
2012
42 S2 72-77
J

4
J 201242

S2 91-95

1
2006
M

2
J

2012
42 1 49-54

3
C/ /
2006 241-246


2
35kg / m

5 J

2008
38 S1 535-538
J

2012
42 S1 669-670

C/ /
2005 599-601

You might also like