Professional Documents
Culture Documents
OCE
NT
ER
Blum PRO-CENTER
Please keep a copy of the instruction leaflet.
The instruction leaflet contains the EC Declaration of Conformity, which must be produced for authorities upon request.
EN
BA-077/0EN M6X.20XX
A- Orientation diagram
&
%
&
%
%
%
;
130$&/5&
3
;
%
;
Fixing screws
(4pcs M8x80)
Handles
Crane eye
Controller
Hexagonal Allen key screws
(4pcs M8x20)
E29
E30
Stop screw
for drilling depth revolver
(M8x30, M8x40, M8x50)
Adjustable depth stop rod (3psc)
Z1
Z2
Z3
Z4
Allen key 4
with cross handle
Allen key 6
Allen key 4
Spanner SW10/13 (2psc)
%
;
&
&
%
&
%
&
&
%
D1
D2
D3
D6
D11
D5 Work table
D6 Controller
D10 Clipboard
E7 Locking device for drilling head
E8 Ruler clamping screws
E10 Work table lock
E11 Work table depth stop
E12 Cover
E16 Drill head depth stop
E18 Drill brake set screw
E19 Mode switch (vertical drilling
and/or drilling and insertion)
&
130
$&
/5&
3
&
&
&
&
BA-077/0EN M6X.20XX
A- Orientation diagram
&
&
%
&
&
%
D5
D6
D7
D8
Work table
Controller
Extraction port
Air filter unit
E16
E17
E18
E19
D5
D6
D7
D8
Work top
Controller
Extraction port
Air filter unit
E16
E17
E18
E19
E23
E24
E25
E26
E27
%
%
&
&
%
&
%
&
%
&
%
&
&
&
&
BA-077/0EN M6X.20XX
B - Table of contents
A- Orientation diagram
B - Table of contents
C - Reading guide
C.1 - How to use this instruction leaflet
D - Safety information
D.1- Remaining risks according to ISO EN 12100-2
D.2 - Safety decals
D.3 - Intended use
D.4 - Safety information
D.5 - Noise emission
D.6 - Dust emission
E - EC Declaration of Conformity
E.1 - EC Declaration of Conformity
E.2 - Technical data
2 - Setting up PRO-CENTER
2.1 - Unpacking and assembly
2.2 - Connecting to compressed air system
2.3 - Electrical connection
2.4 - Dust extraction
3 - How to operate the machine
3.1 - Description of operator panels
3.2 - Vertical drilling unit
3.3 - Vertical drilling and fittings insertion
3.4 - Vertical drilling only
3.5 - Pre-setting revolver for drilling depth
3.6 - Pre-setting revolver for work top setting
3.7 - Horizontal drilling unit
3.8 - Horizontal drilling
4 - Working with PRO-CENTER
4.1 - Creating a setup plan
4.2 - Overview (assembly - drilling heads - rulers)
4.3 - Drilling heads overview
4.4 - Rulers overview
5 - Maintenance and service
5.1 - Maintenance
6 - Troubleshooting
6.1 - What do the individual flashing signals mean?
6.2 - Error during vertical drilling
6.3 - Error during horizontal drilling
7 - Diagrams
7.1 - Electrical diagram 3x400 V 50 Hz
7.2 - Pneumatic diagram
2
4
5
5
6
6
6
6
6
7
7
8
8
8
9
9
11
11
12
13
13
14
17
18
19
20
21
25
27
27
29
31
35
37
37
38
38
39
41
42
42
43
BA-077/0EN M6X.20XX
C - Reading guide
Safety information:
This exclamation mark indicates important safety information that must be followed.
Note:
This exclamation mark indicates a note. If this comment is not followed, then assembly machine components as
well as the work piece itself may be damaged or the assembly machine may be rendered inoperable and/or the
work piece unusable.
(3.1)Component description codes correspond to the section where the component and its function is described. For example, (3.1) is
described in section 3.
BA-077/0EN M6X.20XX
D - Safety information
BA-077/0EN M6X.20XX
D - Safety information
BA-077/0EN M6X.20XX
E - EC Declaration of Conformity
2006/42/EC
2004/108/EC
The following harmonised European standards have been used to ensure proper
implementation of the requirements specified in the EU Directives:
EN ISO 12100-1, EN ISO 12100-2, EN 13849-1, EN 349, EN 983
In addition, the following standards have also been applied:
EN ISO 11202, EN ISO 11204, DIN 33893-2
Registered location:
Hchst, 06.07.09
Fachausschu Holz
Prf- und Zertifizierungsstelle im BG - PRFZERT
Postfach 800480
70504 Stuttgart
GS-Prfbescheinigungsnr: 091015
BG-Prfbescheinigungsnr: 091016
Power input:
Vertical motor:
Horizontal motor:
RPM:
see serial tag
Compressed air: 5 - 7 bar
Air consumption: 2 litres per cycle
Important
Provide a 16 A mains backup
fuse.
m=
H=
W=
D=
75 kg
890 mm
1000 mm
900 mm
m=
Dimensions:
H=
W=
D=
95 kg
890 mm
1000 mm
1300 mm
Processing dimensions:
a) Vertical drilling head
max. workpiece thickness: 40 mm
Drilling distance
centre spindle: 5 - 124 mm
Max.
drill diameter: 35 mm
b) Horizontal drilling head
max. workpiece thickness: 30 mm
Drilling height: 5 - 16 mm
Drilling depth: max. 50 mm
Max. drill diameter 10 mm
BA-077/0EN M6X.20XX
2 - Setting up PRO-CENTER
2.1 - Unpacking and assembly
2.1.1) PRO-CENTER space requirement
PRO-CENTER without horizontal drilling unit
130$
&/5&3
Height
H = 890
B = 1000
D = 900
mm
mm
mm
H = 890
B = 1000
D = 900
mm
mm
mm
H1
H2
B
D
=
=
=
=
613
600
1282
350
mm
mm
mm
mm
ATTENTION
A machine with a horizontal gearbox weighs approx. 95 kg.
A machine without a horizontal gearbox weighs approx. 75 kg.
%
%
BA-077/0EN M6X.20XX
2 - Setting up PRO-CENTER
b) If using a crane, the crane hooks (D3) should be used to lift the machine.
Secure the machine to the work top using the fixing screws (D1)
Important
A horizontal drilling machine should not rest on the table so that the
wood chips can fall downward
10
BA-077/0EN M6X.20XX
2 - Setting up PRO-CENTER
2.1.8) Attaching (D5) work table
Place work table (D5) on the machine foot
Secure work table (D5) using the included hexagonal Allen key screws (D11)
2.2.1) Connecting the air supply to the air filter unit (D8) ( 6 mm)
Connect machine to air pressure system
Air pressure is preset to 6 bar
Important
A rapid hose coupling must be inserted a max. 3m from the machine in
the air pressure supply line.
Important
The machine is designed for the voltage printed on the label of the connection cable.
Important
Along with the motor, the transformer controller must also be reconnected to the corresponding voltage. (See electrical diagram)
11
BA-077/0EN M6X.20XX
2 - Setting up PRO-CENTER
2.3.3) Checking motor rotation
ATTENTION
During the following procedure, keep your hands away from the work
area (A) of the machine.
Main switch (E1) at Pos. I
Set mode switch (E2) to Pos. I (operation)
If the control light for vertical drilling (E6) is flashing, tighten the spindle clamp screw
(E7)
Briefly press the start button (E3)
The motor fan must turn in the direction of the arrow (D9)
2.3.4) Correcting motor rotation
If the motor rotation is wrong:
Main switch (E1) at Pos. 0
Interchange two phases for connection cable
(only by an authorised electrician)
Recheck the motor rotation.
Important
The extraction hose must be laid so that the extraction port (D7) is not
encumbered
12
BA-077/0EN M6X.20XX
13
BA-077/0EN M6X.20XX
Remove drilling head from the guide and place in the storage rack holder
Insert the desired drilling head into the guide until the stop
14
BA-077/0EN M6X.20XX
Insert desired ruler (E9) into the specified elongated hole with the indexing pegs and
slide all the way back.
Retighten clamping screws (E8)
Important
Make sure that the ruler is inserted and clamped cleanly and is not
askew.
The gap in the standard ruler must point to the front.
Note
The Pre-setting revolver for work top section, describes how to pre-set
the revolver stop.
15
BA-077/0EN M6X.20XX
(loosen)
Note
How to set other dimensions is described in Pre-setting revolver for
drilling depth.
16
BA-077/0EN M6X.20XX
Important
Particular care must be taken when working on sections that jut out
over the work table. Use extensions.
(clamp on)
17
BA-077/0EN M6X.20XX
Important
Particular care must be taken when working on sections that jut out
over the work table. Use extensions.
18
BA-077/0EN M6X.20XX
(clamp on)
Drilling
Attention
Make sure that only the work piece is in the working area of the machine.
Keep your hands out of the working area (A) of the machine during drilling and insertion.
Press the start button (E3) until the drilling depth is reached
- The hold down clamps secure the work piece
- The vertical drilling unit moves downward
- The drill bits rotate
Release the start button (E3)
-
-
-
The vertical drilling unit does not return completely to the starting position
(the work stroke is shorter)
The hold down clamps are released
The drill holes are blown out
Note
The revolver can also be removed for setting.
To do so, lift the revolving handle (E16).
19
BA-077/0EN M6X.20XX
=
=
12,7
X
>Z=X
=
=
Y
X
b) Drilling depth
Work piece thickness
mm
mm
mm
mm
> Z = X + 12,7 - Y
3.6.3) Screwing the re-sized stop rod (E30) into the revolver
Loosen the clamping lever (E10)
Pull out work table completely
Remove the cover (E12) in the work table
Now fully screw the stop rod into a free drill hole in the revolver
20
BA-077/0EN M6X.20XX
Insert horizontal ruler (E9) into the specified elongated hole with the indexing pegs
and slide all the way back.
Retighten clamping screw (E8)
Important
Make sure that the ruler is inserted and clamped cleanly and is not
askew.
21
BA-077/0EN M6X.20XX
Note
Both control lights flash.
3.7.3) Setting the horizontal hold down clamp (E21) to the down position
Press in locking mechanism (E22)
Use both hands to press down on the horizontal hold down clamp (E21) until it locks
in this position
Note
The control light for horizontal drilling must light up.
(loosen)
22
BA-077/0EN M6X.20XX
Make vertical drilling (8 mm) in the sample board (approx.10 cm x 20 cm) using the
desired drilling distance (z).
23
BA-077/0EN M6X.20XX
Note
Both control lights flash.
24
BA-077/0EN M6X.20XX
Important
Particular care must be taken when working on sections that jut out
over the work table. Use extensions.
Set the horizontal hold down clamp (E21) to the down position
Set hold down clamp (E14)
Note
Horizontal drilling is only possible with a closed horizontal drilling cover
25
(clamp on)
BA-077/0EN M6X.20XX
26
BA-077/0EN M6X.20XX
Note
To better understand the following description and procedures, take a
look at the included sample setup plan.
In the overview on pages 38 and 39, select the required gearbox and ruler for the
desired assembly application.
4.1.2) Template set-up plan
Fill out header data
Explanation of symbols
.. Enter partial description
--- Enter work procedure
... Enter creation date
... Enter comments
... Enter page no.
... Enter number of pages
... Vertical drilling
... Horizontal drilling
4.1.3) Creating work piece drawings on the set-up plan
Make hand drawings on set-up plan
or
Coping drawing to set-up plan
27
BA-077/0EN M6X.20XX
4.1.8) Put the completed set-up plan into the clear plastic folder and store on the
clipboard on the machine
28
BA-077/0EN M6X.20XX
29
BA-077/0EN M6X.20XX
Ruler
hinge
Dowel mounting
plates
Cruciform
mounting plate
cabinet profile
System drilling
Drilling head
Ruler
dowel
cabinet connector
cabinet connector
cabinet connector
METABOX front
fixing bracket
30
BA-077/0EN M6X.20XX
Important
The total length of the drill bits (from bit-tip to adjustment screw) must
be
- Vertical gearbox
X=57 mm
- Horizontal gearbox
X=77 mm
Adjustment
Set length by turning the drill bit adjustment screw using a screwdriver.
c) Inserting drill bits into the chuck
Attention
Before changing drill bits, remove the drilling head from the machine.
Loosen the fixing screw using a hex wrench
Insert drill bits into the chuck
(The flat surface of the drill shaft must be placed in the direction of the fixing screw)
Retighten fixing screw
Important
Insert cover caps into the unused chucks. This will keep the bits clean
and prevent the fixing screws from coming out on their own.
31
BA-077/0EN M6X.20XX
Drill bits:
(A) ... 1 x 10 mm Counter clockwise
(B) ... 1 x 10 mm Clockwise
or
(B) ... 1 x 25 mm Clockwise
Colour coded bits:
Counter clockwise = red
Clockwise = black
4.3.4) MPV drilling head: MZK.2110 for cruciform mounting plates and furniture
connectors
Drilling head with 2 spindles
Swing arm for ram attachment
Drill bits:
(A) ... 2 x 5 mm Counter clockwise
or
(A) ... 2 x 10 mm Counter clockwise
Colour coded bits:
Counter clockwise = red
Clockwise = black
32
BA-077/0EN M6X.20XX
Drill bits:
(A) ... 2 x
(B) ... 1 x
or
(A) ... 2 x
(B) ... 1 x
8 mm Counter clockwise
8 mm Clockwise
10 mm Counter clockwise
10 mm Clockwise
Drill bits:
(A) ... 4 x 5 mm Counter clockwise
(B) ... 4 x 5 mm Clockwise
Colour coded bits:
Counter clockwise = red
Clockwise = black
4.3.7) SYH drilling head: MZK.2810.01 for hole groups and system drilling
Drilling head with 9 spindles
Drill bits:
(A) ... 4 x 5 mm Counter clockwise
(B) ... 5 x 5 mm Clockwise
Colour coded bits:
Counter clockwise = red
Clockwise = black
33
BA-077/0EN M6X.20XX
Drill bits:
(A) ... 1 x
(B) ... 1 x
(C) ... 1 x
(D) ... 1 x
10
10
20
20
mm
mm
mm
mm
Counter clockwise
Clockwise
Clockwise/
Counter clockwise
Important
For assembly with a gallery fixing, the gallery fixing must be inserted first and
then the front fixing bracket is inserted after the second insertion of the fitting.
4.3.9) H drilling head: M65.26XX horizontal drilling unit for dowel connections,
cabinet connector screws and furniture connectors
Drilling head with 3 spindles
Drilling head cannot be changed
Drill bits:
(A) ... 2 x ...
(B) ... 1 x ...
mm Counter clockwise
mm Clockwise
Important
The drill bit length for 8 and 10 mm is 77 mm.
The 57 mm drill bit must be used for a 5 mm drill bit (precision).
In this case, 20 mm must be calculated for the drilling depth setting (e.g.
set 45 mm for a 25 mm drilling depth).
34
BA-077/0EN M6X.20XX
35
BA-077/0EN M6X.20XX
Note
The MZR.1200 centre stop can only be used for this ruler.
Important
Support the extension ruler using ruler supports.
36
BA-077/0EN M6X.20XX
37
BA-077/0EN M6X.20XX
6 - Troubleshooting
Cause
Solution
Note
See chapter 3
none
none
See chapter 3
See chapter 3
See chapter 3
See chapter 3
See chapter 3
38
BA-077/0EN M6X.20XX
6 - Troubleshooting
Cause
Solution
Note
See chapter 3
See chapter 4
See chapter 4
Work piece thickness does not correspond to the given value (e.g. 15 mm
instead of 16 mm)
none
See chapter 3
Remove object
none
none
none
none
none
See chapter 3
none
none
none
none
none
Bevel drillings
none
none
See chapter 4
See chapter 3
39
BA-077/0EN M6X.20XX
6 - Troubleshooting
Error
Cause
Solution
Note
none
none
none
See chapter 3
none
none
See chapter 3
none
none
Drill blockage in
wood
40
BA-077/0EN M6X.20XX
6 - Troubleshooting
Cause
Solution
Note
See chapter 3
none
none
none
See chapter 3
none
Remove chips
none
Drilling position is
incorrect
41
BA-077/0EN M6X.20XX
7 - Diagrams
S100
T1
PE
braun - brown
L1
T1
400V
blau - blue
L2
T2
346V
L3
T3
230V
gelb/grn - yellow/green
200V
PE
0V
16A
F0
1F4
H1
10V
0,5AT
13
A2 ---> 2X1
13
14
Prim.:200/230/346/400V,
50/60Hz
mit Temperaturschalter
Sek.:18V, 10V
S101.1
14
S102.1
S101.2
S102.2
1X3
(5)
1X1
(3)
A1
S103
1
2-0V
3-10V
1K2
1K1
H2
1X4
(20)
1X5
(5)
<--- A2
L1
N
1X2
(64)
Z1
U1
Z2
U2
W2
U2
U1
V1
M2
M1
S100
S101x
S101.1
S101.2
S102x
S102.1
S102.2
S103x
S103
F0
1F5
1F4
T1
A1
H1,H2
M1
M2
W1
C2 - 12F
C1 - 25F
1x230V 50Hz, S6-60% ED
1,1kW, 5,0A, 2830Upm
V2
File:PC AK 1x230V.ai
1312970
1259800
1260130
1260050
1259630
1260050
1260050
1260050
3376930
1788700
3809540
8825380
5263470
2649479
1146941
BA-077/0EN M6X.20XX
7 - Diagrams
L2
L3
N
PE
T1
X0
schwarz - black
L1
T1
braun - brown
L2
T2
grau - grey
L3
T3
gelb/grn - yellow/green
3x400V
400V
346V
3x230V
230V
200V
PE
10A
F0
0V
13
A2 ---> 2X1
1F5
1,6AT 18V
1F4
H1
10V
0,5AT
13
14
Prim.:200/230/346/400V,
50/60Hz
mit Temperaturschalter
Sek.:18V/1,5A, 10V/0,5A
S101.1
14
U1
V1
W1
U2
V2
(3x230V)
U1
V1
W1
W2
U2
V2
M1
3x400V 50Hz,
60%ED, 2,75A, 1,1kW, 2820Upm
3x400V
U1
V1
W1
W2
U2
V2
M2
3x400V
3x400V 50Hz,
60%ED, 1,6A, 0,55kW, 2690Upm
X0
400 V, 50/60 Hz
S100
690 V IEC, 600 V UL/CSA
S101x
S101.1
S101.2
S102x
S102.1
S102.2
S103x
S103
F0
440 V, 6 x 32 mm, 10 A
1F5
250 V, 5 x 20 mm, 1,6 AT
1F4
250 V, 5 x 20 mm, 0,5 AT
T1
200-400V/10/18V
A1
PC-2000.V6S ET
H1,H2
M1
1,1 kW, 3 x 400 V 50/60 Hz
M2
0,55 kW, 3 x 400 V 50/60 Hz
S101.2
1X1
(3)
A1
W2
S102.2
1
2-0V
3-10V
1K2
1K1
H2
S102.1
1X5
(5)
1X2
(64)
S103
1X3
(5)
1X4
(5)
<--- A2
L1
File:PC AK 3x400V.ai
1258740
1312970
1259800
1260130
1260050
1259630
1260050
1260050
1260050
1797370
1788700
3809540
8825380
5263470
2454899
1040281
BA-077/0EN M6X.20XX
7 - Diagrams
--- > A1
1X2
(64)
A2 - PC-2000 V6
1-PE
2-18V
3-0V
+ = rot - red
- = blau - blue
2
+
2X1
(3)
+
-
bn
bl
sw
bn
bl
sw
sw
4
+
-
+
-
8
-
9
14
11
15
gr
bn
bl
bn
bl
sw
sw
12
17
bl
30
18
19
32
20
38
21
22
23
24
25
26
27
34
39
--- > T1
35
bl
bn
bl
bn
S1
S102.2
bn
bn
bn
bn
bn
bn
bn
bl
bl
bl
S2
S3
S8
21
13
22
14
S11
S4
File: PC AK Klemmenplan.ai
16
K2
18
15
A1
A1
A2
A2
Y1.1 Y1.2 Y2
Y3
Y4
Y5
Y6
B1
A2
A1
K2
1K1 1K2
6 sec
K2
A2
S1
S2
S3
S4
S8
S11
1K1,1K2
K2
Y1.1
Y1.2
Y2
Y3
Y4
Y5
Y6
PC2000.V6K ET
M 12 x 1, 2 mm, 30 mm
M 12 x 1, 2 mm, 30 mm
M 12 x 1, 2 mm, 30 mm
M 12 x 1, 2 mm, 30 mm
Z3K 236-11Z
L = 2000 mm
LP1-K0910BD3, UL/CSA
E1Z1R1024-240V
1827009954
1827009954
1827009954
1827009954
1827009954
1827009954
1827009954
8825520
1117250
1117330
1117680
1117500
1117170
1118060
4554590
8492340
4734490
4734490
4734490
4734490
4734490
4734490
4734490
BA-077/0EN M6X.20XX
7 - Diagrams
BA-077/0EN M6X.20XX
Notes
46
BA-077/0EN M6X.20XX
Notes
47
BA-077/0EN M6X.20XX