GENERAL KNOWLEDEGE QUESTIONS IN NTDC TEST

1: What is GDP, (Gross Domestic Product Pakistan gdp is 236.6 billion USD)
2: NEPRA, (National Electric Power Regulatory Authority)
3: OGDCL, (Oil And Gas Development Company Limited)
4:President of Turkey's name. (Recep Tayyip Erdogan)
5:Iran's President name, (Hassan Rouhani)
6:UK ruling party (Conservative Party, Liberals Democrats)
7:Obama's Party. (Democratic Party)
8:Pakistan's Electricity Shortfall. (between 4000 to 5000 MW)
9: Name three Biggest production capacity sources of Pakistan's Electricity,and their production.
Terbela
Mangla
Ghazi-Brotha

3478 MW
1000 MW
1450 MW

Thermal Power Station, Muzaffargarh


Thermal Power Station, Guddu

1350 MW
1655 MW

IPP independent power project:


1

Hub Power Project

1292

Uch Power Limited

586

AES Pak Gen. (Pvt) Limited

365

AES Lalpir Limited

362

Tapal Energy Limited

126

Southern Electric Power Company Limited

115.2

Saba Power Company Limited

114

Rousch (Pakistan) Power Limited

412

Liberty Power Project

235

10

Kohinoor Energy Limited

131.44

11

Japan Power Generation (Pvt) Limited

120

12

Habibullah Coastal Power (Pvt) Co.

140

13

Gul Ahmed Energy Ltd. (GAEL)

136.17

14

Fauji Kabirwala Power Company

NPCC (national power construction corporation) : National Power Construction

Corporation (NPCC) was established in 1974 by the Government of Pakistan with a


special objective of executing Power Engineering Projects speedily and economically
not only at home but also in other friendly countries.
CPPA (Canada Pakistan Professional Association)
MD ntdc engr tahir mahmood