SINOHYDRO GROUP LIMITED

Doha ExpresswayPackage 6
East Industrial Road Interchanges at Intersection with Street 10 and Street 23
Contact No. C2011/085

Submittal Information
1. Document Number
EXW-P006-0000-MQ-SHC-MS-00010
2. Description
Vendor and Material Submittal for Ready Mix Concrete
3. Pages
155
4. Revision
Rev.1
5. Reference Number
EXW-P006-0000-MQ-KBR-CR-00383
6. Material Type
Ready Mix Design SRC20 & SRC 25 & SRC 30 & OPC 20 & OPC 25 &
OPC 30 & OPC 40 & OPC 50
7. Country of Origin
Qatar
8. Manufacturer
Hamad Bin Khalid Ready-Mix Co. W.L.L.
Add: P.O.Box 1362, Street 47, Industrial Area, Doha, Qatar / Tel: +974
44433644 / Fax: +974 44438729
9. Local Agent
Hamad Bin Khalid Ready-Mix Co. W.L.L.
Add: P.O.Box 1362, Street 47, Industrial Area, Doha, Qatar / Tel: +974
44433644 / Fax: +974 44438729
10. BOQ Ref.
Bill No.05/29A/35A/35B etc.
11. Specification Ref.
QCS 2007 Edition 3rd, Section 5 & Project Specification Section 5 &
Section 32
12. Drawing Ref.
SG-01-07 etc.

Doha Qatar Mob: +974 33832587 Tel: +974-44126471 Fax: +974-44126471 E-mail: dohap6@126.com www.sinohydro.com


SINOHYDRO GROUP LIMITED
Doha ExpresswayPackage 6
East Industrial Road Interchanges at Intersection with Street 10 and Street 23
Contact No. C2011/085

Index
1. Relevant Comments
2. Relevant BOQ
3. Relevant Specification
4. Company Profile
5. Specification Comparison Table
6. Manufacturers Data Sheet
7. Test Report
8. Previous Approval

Doha Qatar Mob: +974 33832587 Tel: +974-44126471 Fax: +974-44126471 E-mail: dohap6@126.com www.sinohydro.com

SECTION 1
RELEVANT COMMENTS

01 Dfg

/
ASHGHAL , 2nd floor , AJ Fabal Towor 2 , Wcst 8 :1 V,
PO Box 26666 , Doh" , Q"t"r.
Tel: + 974 4495 00'J8

KB

Ftl)(: + 97-1
C"n n h'.rd~"

.'", 034791

Rp <<j ls1r.l 'on .s. 17t6

External Document Transmittal


Project:
Project # :
Contract #:

To:

(
Attn:

Transmittal # :

Expressway

Issue Date :
Reason for
Issue:
Format:

P006 - East Industrial Road


P20101050

EXW-P006-0000-PM-KBR-TN-O 1736
18 January 2012
Issued for Action
Paper Original

Sinohydro Group Li mited


P.O Box: 207041
Doha Qatar
Issued By:
Issue Method :

Sun Jinhui
project Manager.

Document N

Rev

Status

EXW-P006-0000-PM-KBRCR-00383

RO

EXW-P006-0000-MQ-SHCMS- 00008
001 ,-002 &003

Robert Poulos
By hand

Document Title

Qty

Contractors Vender and Material


Submittals

Original

RO

Vendor and Material Submittal for


Of Temporary Concrete Barrier

4
Original

EXW-P006-0000-MQ-SHCMS-00010

RO

Vendor and Material Submittal for


Ready Mix Concrete

4
Original

EXW-P006-0000-MQ-SHCMS-00011

RO

Vendor and Material Submittal


Of Reinforcement Steel Bar

4
Original

EXW-P006-0000-MQ-SHCMS-00016

RO

Vendor and Material Submittal for


Of T emporary Concrete Barrier

4
Original

EXW-P006-0000-MQ-SHCMS-00019

RO

Submission of Proposed Subcontractor


for Permanent and T empora Street
Li ghting

4
Original

EXW-P006-0000-MQ-SHCMS-00020

RO

Submission of Proposed Subcontractor


for Permanent and Temporary Street
Li ghting

4
Original

Item

Comments
Mike Doran - KBR (Transmittal Only)
cc:
RECEIVED BY:

NAME

SIGNATURE

Page 1 of 1

DATE

EXPRESSWAY PROGRAMME
Operations - Review Comments Sheet
Project No:

P006

Document:

Contractors Vendor and Material Submittals

Project:
Project Code:
Date:

East Industrial Street


P2010/050
15/01.2012

Document Number:
Document No.: EXW-P006-0000-PM-KBR-CR-00383
Document Name

Item

Doc / Dwg. Reference

Review Comment

Date

Status

15/01/2012

Approved with
Comment

EXW-P006-0000MQ-SHC-MS-00010

Vendor and Material Submittal for


Ready Mix Concrete

EXW-P006-0000MQ-SHC-MS-00011

Vendor and Material Submittal


Of Reinforcement Steel Bar

N/A

15/01/2012

Approved

EXW-P006-0000MQ-SHC-MS-00019

Submission of Proposed Subcontractor for


Permanent and Temporary Street Lighting

Note: This contractor is does traffic


signalization, please submit vendor for traffic
signals also.

15/01/2012

Approved

EXW-P006-0000MQ-SHC-MS-00020

Submission of Proposed Subcontractor for


Permanent and Temporary Street Lighting

N/A

15/01/2012

Approved

EXW-P006-0000MQ-SHC-MS- 00008
001,-002 & 003

Vendor and Material Submittal for


Of Temporary Concrete Barrier

N/A

15/01/2012

Approved

EXW-P006-0000MQ-SHC-MS-00016

Vendor and Material Submittal for


Of Temporary Concrete Barrier

Provide submittal according to requirements of


section 6 part 9.1.3

15/01/2012

Rejected

Subject to SC Approval for mix design

Reviewer: Robert E. Poulos


Package Coordinator

The Engineers comments are given to ensure the reviewed submission conforms to the Contract provisions and shall not be construed as limiting or relieving the Contractors liability in any way
or constituting an instruction, direction or notice to change or vary the Works.
Legends- Approved=A, Approved as noted=AAN, Revise and Re-submit=RAR, Rejected=REJ, Noted=N
Page 1 of 1

SECTION 2
RELEVANT BOQ

FINANCIAL SUBMISSION
SECTION G
BILL OF QUANTITIES
Item

BILL NO. 5
DRAINAGE AND
SERVICE DUCTS
Description

Unit Qty

Rate

Amount (Q.R.)

BILL NO. 5 - DRAINAGE AND SERVICE DUCTS


Sewers, Drains, Piped Culverts and Ducts
Surface Water Drainage
uPVC Gully connection pipes with flexible spigots and
socket joints, in trenches including excavation in any
materials, backfilling, compaction, removal of surplus
materials to approved locations, SRC 20 concrete bed and
surrounds and all other related works complete as detailed
on drawings and specifications.
5.01 150mm dia pipe, depth to invert n.e 1.5m

6,550

5.02 300mm dia pipe, depth to invert n.e. 1.5m

1,871

5.03 300mm dia pipe, depth to invert 1.5 - 2.0m

1,128

5.04 300mm dia pipe, depth to invert 2.0 - 2.5m

258

5.05 400mm dia pipe, depth to invert 1.5 - 2.0m

605

5.06 400mm dia pipe, depth to invert 2.0 - 2.5m

532

5.07 400mm dia pipe, depth to invert 2.5 - 3.0m

48

5.08 400mm dia pipe, depth to invert 3.0 - 3.5m

52

5.09 500mm dia pipe, depth to invert 1.5 - 2.0m

151

5.10 500mm dia pipe, depth to invert 2.0 - 2.5m

415

5.11 500mm dia pipe, depth to invert 2.5 - 3.0m

145

5.12 500mm dia pipe, depth to invert 3.0 - 3.5m

64

5.13 600mm dia pipe, depth to invert 1.5 - 2.0m

126

5.14 600mm dia pipe, depth to invert 2.0 - 2.5m

105

5.15 600mm dia pipe, depth to invert 3.0 - 3.5m

140

Vitrified Clay drainage pipes with flexible spigots and socket


joints, in trenches including excavation in any materials,
backfilling, compaction, granular bed and surrounds,
removal of surplus materials to approved locations etc as
detailed on drawings and specifications.

Carried to Collection Page G5/7


IA 10/11 C 114 G - Doha Expressway (Package 6)
East Industrial Road Interchanges at
Intersections with Street 10 and Street 23

QR

G5 /1

January 2011

FINANCIAL SUBMISSION
SECTION G
BILL OF QUANTITIES
Item

BILL NO. 5
DRAINAGE AND
SERVICE DUCTS
Description

Unit Qty

Rate

Amount (Q.R.)

BILL NO. 5 - DRAINAGE AND SERVICE DUCTS, Cont'd


Surface Water Drainage, Cont'd
Manholes, Catch Pits, Soakaways and Gullies
Manholes
Insitu concrete unlined manholes including excavation in any
materials, backfilling and compaction, disposal of surplus
materials to approved tip, concrete, formworks, r/f, water
proofing, GRP liner to cover slab, cover and frame, benching
and haunching etc as detailed on drawings and
specifications.
5.26 Internal Size 900x900mm, depth n.e 1.5m

nr

34

5.27 Internal dia 1200mm, depth n.e 2.0m

nr

14

5.28 Internal dia 1200mm, depth to invert 2.0 - 3.0m

nr

5.29 Internal dia 1500mm, depth n.e 2.0m

nr

14

5.30 Internal dia 1500mm, depth to invert 2.0 - 3.0m

nr

31

5.31 Internal dia 1500mm, depth to invert 3.0 - 4.0m

nr

5.32 Internal dia 1800mm, depth n.e 2.0m

nr

5.33 Internal dia 1800mm, depth to invert 2.0 - 3.0m

nr

28

5.34 Internal dia 1800mm, depth to invert 3.0 - 4.0m

nr

5.35 Internal size 2200x1500mm, depth to invert 2.0 - 3.0m

nr

5.36 Internal size 2200x1500mm, depth to invert 3.0 - 4.0m

nr

11

5.37 Internal size 2200x2000mm, depth to invert 2.0 - 3.0m

nr

5.38 Internal size 2200x2200mm, depth to invert 3.0 - 4.0m

nr

5.39 Internal size 2600x2200mm, depth to invert 5.0 - 6.0m

nr

nr

401

Rate Only

Gullies
5.40 Polypropylene concrete surround gullies including removable
basket, concrete surrounds, gully frame and cover, pipe
fittings, excavation in any materials and backfilling,
compaction, complete as detailed on drawings and
specifications.

Carried to Collection Page G5/7


IA 10/11 C 114 G - Doha Expressway (Package 6)
East Industrial Road Interchanges at
Intersections with Street 10 and Street 23

QR

G5 /3

January 2011

FINANCIAL SUBMISSION
SECTION G
BILL OF QUANTITIES
Item

BILL NO. 5
DRAINAGE AND
SERVICE DUCTS
Description

Unit Qty

Rate

Amount (Q.R.)

BILL NO. 5 - DRAINAGE AND SERVICE DUCTS, Cont'd


FOUL SEWER, Cont'd
Manholes
Insitu concrete lined manholes including excavation in any
materials, backfilling, compaction, disposal of surplus
materials to approved tip, dewatering, concrete, formworks,
steel reinforcement, water proofing, cover and frame, GRP
sealing plate, GRP ladder, benching and haunching and all
other related works complete as detailed on drawings and
specifications.
Shallow Manhole
5.53 Internal dia. 1200mm, depth to invert 2.0 - 3.0m

nr

5.54 Internal dia. 1200mm, depth to invert 3.0 - 4.0m

nr

5.55 Internal dia. 1500mm, depth to invert 5.0 - 6.0m

nr

5.56 Internal dia. 1500mm, depth to invert 5.0 - 6.0m with ramp
backdrop.

nr

nr

11

5.58 200mm dia VC Pipes

415

5.59 300mm dia VC Pipes

135

5.60 Demolish existing chambers /manholes to approved location


including excavation, backfill and compaction, reinstatement
etc. Salvaged pipes, fittings and valves to be returned to
operation and maintenance stores as directed by the
Engineer.

nr

Deep Manhole

Raise or Lower the Level of Manhole


5.57 Raise or lower the level of manhole cover slab, cover and
frame complete as directed by the Engineer.
Removal of Cancelled Foul Sewer Pipeline
Excavate and remove abandoned foul sewer pipeline. Allow
for dewatering, removal of all pipes & fittings,
granular/concrete surrounding, disposal as directed,
backfilling of trenches, compaction, reinstatement for the
following: Salvaged pipes , fittings and valves to be returned
to operations and maintenance stores as directed by the
Engineer

Carried to Collection Page G5/7


IA 10/11 C 114 G - Doha Expressway (Package 6)
East Industrial Road Interchanges at
Intersections with Street 10 and Street 23

QR

G5 /6

January 2011

FINANCIAL SUBMISSION
SECTION G
BILL OF QUANTITIES
Item

BILL NO. 29A


QGEWC
(WATER WORKS)
Description

Unit

Qty

29A.25 Gate valve for 100mm dia pipe

nr

15

29A.26 Gate valve for 150mm dia pipe

nr

29A.27 Gate valve for 200mm dia pipe

nr

10

29A.28 Gate valve for 300mm dia pipe

nr

22

29A.29 Butterfly valve for 400mm dia pipe

nr

29A.30 Butterfly valve for 900mm dia pipe

nr

29A.31 Washout valve for 900mm dia pipe

nr

29A.32 Air valve for 900mm dia pipe

nr

29A.33 Fire hydrants

nr

13

29A.34 200mm dia. 90 degree double flange bend

nr

29A.35 200mm dia. 45 degree double flange bend

nr

29A.36 300mm dia. 90 degree double flange bend

nr

29A.37 300mm dia. 45 degree double flange bend

nr

29A.38 Extra over item 29A.21 for 200mm double flanged pipe
4000mm with integral puddle flange

nr

12

29A.39 Extra over item 29A.22 for 300mm double flanged pipe
4000mm with integral puddle flange

nr

18

29A.40 200mm, flange adaptor

nr

29A.41 300mm, flange adaptor

nr

Rate

Amount (Q.R.)

BILL NO. 29A - QGEWC (WATER WORKS), Cont'd


Valves & Fire hydrants in Chambers
Supply and install DI valves & fire hydrants including all
fittings & accessories, corrosion protection, concrete
chambers including all civil works complete as detailed on
drawings and specifications

Fittings
Supply and install DI fittings as detailed on drawings and
specifications

Carried to Collection Page G29A/8

IA 10/11 C 114 G - Doha Expressway (Package 6)


East Industrial Road Interchanges at
Intersections with Street 10 and Street 23

QR

G29A/3

January 2011

FINANCIAL SUBMISSION
SECTION G
BILL OF QUANTITIES
Item

BILL NO. 35
STRUCTURES
35A- STREET 10 INTERCHANGE 33
Description

Unit

Qty

Rate

Amount (Q.R.)

BILL NO. 35 - STRUCTURES


35A - STREET 10 INTERCHANGE 33
In Situ Concrete
35A.20 Class 30/20 SRC Blinding concrete 100mm thick

75

m3

1,553

m3

280

m3

3,492

In situ concrete, class 40/20 including mixing,


placing in or against any surface, vibrating, curing,
construction joints, admixtures and additives etc.
complete as detailed on drawings and
specifications
35A.21 Footings, Abutments & Approach Slab
In situ concrete, class 50/20 including mixing,
placing in or against any surface, vibrating, curing,
construction joints, admixtures and additives etc.
complete as detailed on drawings and
specifications
35A.22 Piers
Prestressed Concrete
35A.23 Prestressed post tensioned cast-in-situ class 50/20
concrete for Bridge Slab

Carried to Collection Page G35A /16


IA 10/11 C 114 G - Doha Expressway (Package 6)
East Industrial Road Interchanges at
Intersections with Street 10 and Street 23

QR

G35A/6

January 2011

FINANCIAL SUBMISSION
SECTION G
BILL OF QUANTITIES
Item

BILL NO. 35
STRUCTURES
35B - STREET 23 INTERCHANGE 24
Description

Unit

Qty

Rate

Amount (Q.R.)

BILL NO. 35 - STRUCTURES


35B - STREET 23 INTERCHANGE 34
In Situ Concrete
35B.20 Class 30/20 SRC Blinding concrete 100mm thick

75

m3

1,553

m3

285

m3

3,492

In situ concrete, class 40/20 including mixing,


placing in or against any surface, vibrating, curing,
construction joints, admixtures and additives etc.
complete as detailed on drawings and
specifications
35B.21 Footings, Abutments & Approach Slab
In situ concrete, class 50/20 including mixing,
placing in or against any surface, vibrating, curing,
construction joints, admixtures and additives etc.
complete as detailed on drawings and
specifications
35B.22 Piers
Prestressed Concrete
35B.23 Prestressed post tensioned cast-in-situ class 50/20
concrete for Bridge Slab

Carried to Collection Page G35B /16


IA 10/11 C 114 G - Doha Expressway (Package 6)
East Industrial Road Interchanges at
Intersections with Street 10 and Street 23

QR

G35B/6

January 2011

SECTION 3
RELEVANT
SPECIFICATION

QCS 2007

Section 5

Part 6

Property Requirements

Page 3

6.2

GRADES OF CONCRETE

6.2.1

General

Grades of concrete to be used in the Works shall in general be as shown in Table 6.1.
Where different grades of concrete are required the design of the mix shall follow the
requirements of this specification.

Where adequate workability is difficult to obtain at the maximum water:cement ratio allowed,
the use of plasticisers or water reducing admixtures may be considered. Alternatively an
increase in cement content may be considered at the discretion of the Engineer where this
will not adversely affect the durability of the concrete.

Cement contents in excess of 400 kg/m shall not be used unless special consideration has
been given to reduce thermal stress in the concrete, and approval has been obtained from
the Engineer.

6.2.2

Design of Concrete Mixes

At the start of the construction period, the Contractor shall design a mix for each grade of
concrete listed in Table 6.1 that is required to be built into the Works.

Each mix design shall be such that:

(a)
(b)
(c)
(d)
3

the aggregate shall comprise fine aggregate and coarse aggregate no greater than the
maximum size specified in Table 6.1
the combined aggregate grading shall be continuous
the aggregate quantity shall be calculated by weight
the mixes shall be designed to produce a concrete cube strength at twenty-eight days
after manufacture of not less than the cube strength specified in Table 6.1.

For concrete using other than moderately sulphate resisting Portland cement (ASTM Type II)
or incorporating admixtures, the strengths shall not be less than those specified in Table 6.1,
but the mix designs shall be revised and agreed with the Engineer.
Table 6.1
Grades of Concrete

Concrete
Grade

Max. Size
Aggregate
mm

Min. Cement
3
Content kg/m
Type of
Cement

40
35
30
25
20
15

20
20
20
20
20
20

370/MSRPC
350/MSRPC
330/MSRPC
320/MSRPC
310/MSRPC
280/MSRPC

0.4-0.45
0.4-0.45
0.4-0.45
0.45-0.50
0.55
0.55

40
35
30
25
20
15

20
20
20
20
20
20

370/PC
340/PC
300/PC

0.45
0.5
0.6

Qatar General Organization for Standards and Metrology


QCS 2007, 3rd Edition

Max. Free
Water:Cement
Ratio

Cube Crushing at 28 d
Trial Mix
Works
Test
Test
MPa
MPa
50
45
40
35
30
25

40
35
30
25
20
15

SECTION 4
COMPANY PROFILE

SECTION 5
SPECIFICATION
COMPARISON TABLE

SECTION 6
MANUFACTURERS
DATA SHEET

SECTION 7
TEST REPORT

SECTION 8
PREVIOUS APPROVAL

You might also like