LIFT TRAFFIC ANALYSIS

A) Estimation of quality of services


1. Estimated population
P=
Area (m)
Estimated Population (m/person)

* Number of floors

2. Recommended Arrival Rates & Recommended Interval

Calculating Handling Capacity


HC = (P * 0.8 daily occupancy factor) * (Arrival rates / 100)
Estimation example
The lift system should sized to able to handle 100 person with a 30s interval. i.e: a satisfactory
system performance.

B) Calculation Up Peak Performance


1.

Round Trip Time

2.

Up Peak Interval

3.

Up Peak Handling Capacity

4.

i.

Single Lift Car

ii.

Multiple Lift Car, (L)

Percentage Of Population

Parameters in RTT Equation

The Average Number Of Passenger, P


P = 0.8 * CC

Average Highest Call Reversal Floor, H


N 1

i
H N
i 1 N

Average Number Of Stops, S


P

S N 1 1

N

CIBSE published table (2.13) showing H and S for different values of N and P in Guide D.
Values of H and S are shown overleaf.
CC

10

12

16

18

20

24

28

30

4.0

4.8

6.4

8.0

9.6

12.8

14.4

16.0

19.2

22.4

24.0

3.6 2.7 3.7 3.0 3.8 3.4 3.9 3.6 3.9 3.7 4.0 3.9 4.0 3.9 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

4.4 3.0 4.6 3.3 4.7 3.8 4.8 4.2 4.9 4.4 4.9 4.7 5.0 4.8 5.0 4.9 5.0 4.9 5.0 5.0 5.0 5.0

5.2 3.1 5.4 3.5 5.6 4.1 5.7 4.6 5.8 5.0 5.9 5.4 5.9 5.6 5.9 5.7 6.0 5.8 6.0 5.9 6.0 5.9

6.1 3.2 6.2 3.7 6.5 4.4 6.6 5.0 6.7 5.4 6.8 6.0 6.9 6.2 6.9 6.4 6.9 6.6 7.0 6.8 7.0 6.8

6.9 3.3 7.1 3.8 7.4 4.6 7.5 5.3 7.6 5.8 7.8 6.6 7.8 6.8 7.9 7.1 7.9 7.4 7.9 7.6 8.0 7.7

7.7 3.4 7.9 3.9 8.2 4.8 8.4 5.5 8.6 6.1 8.7 7.0 8.8 7.3 8.8 7.6 8.9 8.1 8.9 8.4 8.9 8.5

10

8.5 3.4 8.7 4.0 9.1 4.9 9.3 5.7 9.5 6.4 9.7 7.4 9.7 7.8 9.8 8.1 9.9 8.7 9.9 9.1 9.9 9.2

11

9.3 3.5 9.6 4.0 10.0 5.0 10.2 5.9 10.4 6.6 10.6 7.8 10.7 8.2 10.7 8.6 10.8 9.2 10.9 9.7 10.9 9.9

12

10.1 3.5 10.4 4.1 10.8 5.1 11.1 6.0 11.3 6.8 11.5 8.1 11.6 8.6 11.7 9.0 11.8 9.7 11.8 10.3 11.9 10.5

13

10.9 3.6 11.2 4.1 11.7 5.2 12.0 6.1 12.2 7.0 12.5 8.3 12.6 8.9 12.6 9.4 12.7 10.2 12.8 10.8 12.8 11.1

14

11.7 3.6 12.1 4.2 12.6 5.3 12.9 6.3 13.1 7.1 13.4 8.6 13.5 9.2 13.6 9.7 13.7 10.6 13.8 11.3 13.8 11.6

15

12.5 3.6 12.9 4.2 13.4 5.4 13.8 6.4 14.0 7.3 14.3 8.8 14.4 9.4 14.5 10.0 14.7 11.0 14.7 11.8 14.8 12.1

16

13.3 3.6 13.7 4.3 14.3 5.4 14.7 6.5 14.9 7.4 15.3 9.0 15.4 9.7 15.5 10.3 15.6 11.4 15.7 12.2 15.7 12.6

17

14.1 3.7 14.5 4.3 15.2 5.5 15.6 6.5 15.8 7.5 16.2 9.2 16.3 9.9 16.4 10.6 16.6 11.7 16.7 12.6 16.7 13.0

18

14.9 3.7 15.4 4.3 16.0 5.5 16.5 6.6 16.8 7.6 17.1 9.3 17.3 10.1 17.4 10.8 17.5 12.0 17.6 13.0 17.7 13.4

19

15.7 3.7 16.2 4.3 16.9 5.6 17.4 6.7 17.7 7.7 18.1 9.5 18.2 10.3 18.3 11.0 18.5 12.3 18.6 13.3 18.6 13.8

20

16.5 3.7 17.0 4.4 17.8 5.6 18.2 6.7 18.6 7.8 19.0 9.6 19.1 10.4 19.3 11.2 19.4 12.5 19.6 13.7 19.6 14.2

21

17.3 3.7 17.9 4.4 18.6 5.6 19.1 6.8 19.5 7.9 19.9 9.8 20.1 10.6 20.2 11.4 20.4 12.8 20.5 14.0 20.6 14.5

22

18.1 3.7 18.7 4.4 19.5 5.7 20.0 6.8 20.4 7.9 20.9 9.9 21.0 10.7 21.1 11.5 21.3 13.0 21.5 14.2 21.5 14.8

23

18.9 3.7 19.5 4.4 20.4 5.7 20.9 6.9 21.3 8.0 21.8 10.0 22.0 10.9 22.1 11.7 22.3 13.2 22.4 14.5 22.5 15.1

24

19.7 3.8 20.3 4.4 21.2 5.7 21.8 6.9 22.2 8.0 22.7 10.1 22.9 11.0 23.0 11.9 23.2 13.4 23.4 14.7 23.5 15.4

28

22.9 3.8 23.7 4.5 24.7 5.8 25.4 7.1 25.8 8.3 26.4 10.4 26.6 11.4 26.8 12.4 27.1 14.1 27.2 15.6 27.3 16.3

30

24.5 3.8 25.3 4.5 26.4 5.9 27.1 7.1 27.6 8.3 28.3 10.6 28.5 11.6 28.7 12.6 29.0 14.4 29.2 16.0 29.2 16.7

32

26.1 3.8 27.0 4.5 28.2 5.9 28.9 7.2 29.5 8.4 30.1 10.7 30.4 11.7 30.6 12.7 30.9 14.6 31.1 16.3 31.2 17.1

33

26.9 3.8 27.8 4.5 29.0 5.9 29.8 7.2 30.4 8.4 31.1 10.7 31.3 11.8 31.5 12.8 31.8 14.7 32.0 16.4 32.1 17.2

38

30.9 3.8 31.9 4.6 33.4 6.0 34.3 7.3 34.9 8.6 35.7 11.0 36.0 12.1 36.2 13.2 36.6 15.2 36.8 17.1 36.9 18.0

Single Floor Transit Time , tv

df = Interfloor distance ; v = rated speed

Time Consumed When Stopping, ts

tf = single floor flight time(s) ; tc = closing time ; to = opening time

Passenger Transfer Time, tp

PROJECT : JLN IMBI SERVICE APARTMENT


A)

Estimation of quality of services

1. Estimated population
Floor occupancy = 10 units = 22 person
*each bedroom assume 2 person

P = 40 floors * 22 = 880

2. Recommended Arrival Rates & Recommended Interval

Peak Arrival Rate


Arrival Rate = 7%
Arrival Rate = 880 * (7 / 100)
= 62 person

According to table, the lift system proposed should be size to handle 62 persons
with a 40s interval, ie: a satisfactory system performance.

B) Estimate car size to handle 62 persons in five minutes with an UPPINT of 40s
- Number of trip in 5 minutes period: 300 / 40 = 7.5 = 8
- Number of person per trip: 62 / 8 = 7.75 = 8
- Car size will be = 8 * 0.8 = 6.4
A 8 person lift car is the nearest standard size. Then, from Table.3.4 H =33.4 , S
=6.0 , P = 6.4
C) Decide on the lift system

- Total travel is 162m: Table 3.6 indicates minimum rated speed of 6m/s
- Thus transit time is 3.4m / 6 = 0.5s

Door opening, to = 2.0s ; Door closing, tc = 3.0s


Stopping time = 6.0 + 2.0 + 3.0 0.5 = 10.5s
Assume passenger transfer time = 1.2s
Then, from RTT quotation,
RTT = (2 * H * transit time) + [(S+1) * stopping time] + (2 * P * transfer time)
= (2 * 33.4 * 0.5) + [(6.0 + 1) * 10.5] + ( 2* 6.4 * 1.2)
= 33.4 + 73.5 +15.4
= 122.3

To achieve an interval of 40s, 3 cars will be needed.


UPPINT = 122.3 / 3
= 40.7s
Up peak handling capacity
UPPHC = ( 300 * 3 * 8 ) / 122.3
= 58.8 = 60 persons

2nd Scenario ( Break into three zones ( low, mid & high)
Estimation of quality of services
3. Estimated population
Floor occupancy = 10 units = 22 person
*each bedroom assume 2 person

P = 15 floors * 22 = 330

4. Recommended Arrival Rates & Recommended Interval

Peak Arrival Rate


Arrival Rate = 7%
Arrival Rate = 330 * (7 / 100)
= 23 person

According to table, the lift system proposed should be size to handle 23 persons
with a 40s interval, ie: a satisfactory system performance.

B) Estimate car size to handle 23 persons in five minutes with an UPPINT of 40s
- Number of trip in 5 minutes period: 300 / 40 = 7.5 = 8
- Number of person per trip: 23 / 8 = 2.875= 3
- Car size will be = 3 * 0.8 = 2.4
A 5 person lift car is the standard size. Then, from Table.3.4 H =12.5, S =3.6, P =
4.0
C) Decide on the lift system

- Total travel is 54m: Table 3.6 indicates minimum rated speed of 2.5m/s
- Thus transit time is 3.4m / 2.5 = 1.4s

Door opening, to = 2.0s ; Door closing, tc = 2.0s


Stopping time = 2.5 + 2.0 + 2.0 1.4 = 5.1s
Assume passenger transfer time = 1.2s
Then, from RTT quotation,
RTT = (2 * H * transit time) + [(S+1) * stopping time] + (2 * P * transfer time)
= (2 * 12.5 *1.4) + [(3.6 + 1) * 5.1] + ( 2* 4 * 1.2)
= 35 + 8.7 + 9.6
= 45.3

To achieve an interval of 40s, 1 car will be needed.


UPPINT = 45.3 / 1
= 45.3s
Up peak handling capacity
UPPHC = ( 300 * 1 * 5 ) / 45.3
= 33 persons

Lift cars for mid & high zones with same lift car size need to have travel speed of
5m/s or 6 m/s respectively