Chapter 12

VLSI Designs

Testing VLSI
Circuits

Prepared by
Dr. Lim Soo King
02 Dec 2010.

Chapter 12 Testing of VLSI Circuits ........................................... 121


12.0 Introduction ..........................................................................................121
12.1 Design Constraints ...............................................................................121
12.1.1 Design Rule Checking...................................................................................122
12.1.2 Layout versus Schematic..............................................................................122
12.1.3 Latch-Up and Electrostatic Discharge ........................................................123
12.1.4 Electrical Rule Checking..............................................................................125

12.2 Testing Concepts ..................................................................................125


12.3 Automatic Test Equipment, Test Fixture, Test Program, and
Automatic Test Handler ..............................................................................127
12.3.1 Automatic Test Equipment ..........................................................................128
12.3.2 Test Fixture....................................................................................................128
12.3.3 Automatic Test Handler ...............................................................................130

12.4 Testing Logic Circuits..........................................................................131


12.4.1 Test Specifications.........................................................................................131
12.4.2 Test Set-up for Logic Circuit Testing..........................................................132
12.4.3 Open/Short Test ............................................................................................133
12.4.4 Gross Functional Test...................................................................................135
12.4.5 Quiescent Device Current Test ....................................................................136
12.4.6 Output Low Current Test ............................................................................136
12.4.7 Output High Current Test ...........................................................................137
12.4.8 Propagation Delay Test ................................................................................138

12.5 Designs for Testability .........................................................................140


12.5.1 Fault Models ..................................................................................................141
12.5.2 Ad Hoc Testing..............................................................................................144
12.5.3 In-Circuit Testing..........................................................................................145
12.5.3.1 Initialization ............................................................................................................... 146
12.5.3.2 Clock generation ........................................................................................................ 147
12.5.3.3 Grounded inputs ........................................................................................................ 147
12.5.3.4 Bus drivers.................................................................................................................. 147

12.5.4 Scan Testing...................................................................................................148


12.5.5 Built-in Self Test............................................................................................151
12.5.5.1 Pseudo-Random Sequence Generator PRSG .......................................................... 151
12.5.5.2 Signature Analyzer .................................................................................................... 152
12.5.5.3 Setup of Built-in Self Test Circuit ............................................................................ 153

12.6 Failure Analysis....................................................................................155


12.6.1 Method of De-capsulation ............................................................................155
12.6.2 Cause of Failure ............................................................................................157
12.6.3 Failure Correlation .......................................................................................157

Exercises........................................................................................................158
Bibliography .................................................................................................160

-i-

Figure 12.1: The results of DRC for a silicon layout .........................................................122


Figure 12.2: The refilled deep trench isolation between p-well and n-well isolations used to
reduce the occurrence of latch-up ..................................................................123
Figure 12.3: The illustration of n-well and p-substrate bias to prevent occurrence of latchup....................................................................................................................124
Figure 12.4: The flowchart of probe test and grading of the die........................................126
Figure 12.5: A mixed signal automatic test equipment showing its test head and a mounted
load board.......................................................................................................128
Figure 12.6: A top-view of a load board showing the test socket to be mounted on the ATH
at the center of the board................................................................................129
Figure 12.7: The picture shows a PLCC automatic test handler ........................................131
Figure 12.8: The Extract of CD4011 specifications...........................................................132
Figure 12.9: Pin configuration of CD4011 Quad 2-input CMOS NAND gate ..................133
Figure 12.10: The input diode network of CD4011 NAND gate. The number in parenthesis
is the pin number............................................................................................133
Figure 12.11: The set-up for open/short test for input pin 1 of CD4011 quad 2-input NAND
gate.................................................................................................................134
Figure 12.12: The set-up for gross functional test of a NAND gate of CD4011 .................135
Figure 12.13: The set-up for IDD test for a NAND gate of CD4011.....................................136
Figure 12.14: The set-up for output low current IOL test......................................................137
Figure 12.15: The set-up for output high current IOH test ....................................................138
Figure 12.16: The set-up for propagation delay test (a) logic 0 to logic 1 tpLH transition and
(b) logic 1 to logic 0 tpHL transition................................................................139
Figure 12.17: Illustrating meaning of stuck-at-0 and stuck-at-1 ..........................................142
Figure 12.18: Layout of 4-input NAND gate .......................................................................143
Figure 12.19: Truth table of 4-input NAND with stuck-at-fault occurrence .......................143
Figure 12.20: A gray code counter circuit (a) it is not testable (b) it is testable ..................146
Figure 12.21: A clock drive for in-board testing..................................................................147
Figure 12.22: A 3-bit binary counter....................................................................................149
Figure 12.23: The timing diagram of the test for a 3-bit binary counter..............................149
Figure 12.24: A DFT-able 3-bit binary counter ...................................................................150
Figure 12.25: The timing diagram of the scan test for a 3-bit binary counter......................151
Figure 12.26: A 3-bit linear feedback shift register .............................................................152
Figure 12.27: A complete 3-bit linear feedback shift register..............................................152
Figure 12.28: A signature analyzer ......................................................................................153
Figure 12.29: BIST (a) a 3-bit register and (b) PRSG and signature analyzer used for test
circuit .............................................................................................................154
Figure 12.30: A de-capsulated plastic packaged integrated circuit......................................156
Figure 12.31: A SEM picture showing the failure site of a MOS transistor ........................156

- ii -

Chapter 12
Testing of VLSI Circuits
_____________________________________________
12.0 Introduction
In Chapter, student will learn the basic concepts of testing, design constraints,
identifying failure in CMOS integrated circuits, designing the test program, and
test hardware, which consists of mainly the load board the interface circuit
board - connecting between the device under test DUT and the test stimulants
from the automatic test equipment ATE. Student will learn how to test the logic
circuit including learning the modern test technique, which is the design-fortestability DFT aimed to identify the failure site and reduce the number of
tedious and complex test vectors with the ease of controllability and
observability. Lastly, the student learns how to perform failure analysis of the
failed integrated circuit, which can be caused by processes that it has gone
through, to identify the root cause of the failure so that correction action can be
implemented to prevent re-occurrence of the failure and of course improve
profitability.

12.1 Design Constraints


In the VLSI integrated circuit IC design, a design constraint refers to the
limitations on the conditions under which the IC is developed or on the
requirements of the IC such as its intended application. The design constraint
mainly can come from the functional issue or from the limitation of technology
being used, materials properties, time taken to develop, overall costing, and etc.
A design constraint is normally imposed externally either by the organization or
by external regulatory body. During IC design, it is important to identify each
design constraint as it is the requirement since the design constraints place an
overall boundary around the design process. Lets discuss some of technological
limitations and device properties constraints when designing an integrated
circuit chip. We will also discuss the tools used to help in the development of
the IC design in respect to these constraints and the methods to overcome these
constraints.

- 121 -

12 Testing of VLSI Circuits

12.1.1 Design Rule Checking


Every IC design technology has its own design rules. It consists of
interpretation about the possible geometrical implementation of the integrated
circuit to be fabricated. These rules are given by foundry of IC fabrication,
which often described in a document with polygon representing the layers
available in the technology. It indicates the sizes, distance, and geometrical
constraints allowed in mentioned technology. Designer needs to execute a
program called design rule check DRC to check if the design violates the rules
defined by the foundry for that particular technology. This step of verification is
as important as the simulation of the functionality of the design. If the design
rules are followed, the fabricated integrated circuit chip may have short
physically or may affect the electrical characteristic of the IC chip. Figure 12.1
illustrates the result of DRC applied to a layout. The check finds that the poly
layer fails the design rule r(301), which is the spacing between poly silicon lines
too closed.

Figure 12.1: The results of DRC for a silicon layout

12.1.2 Layout versus Schematic


Layout versus schematic LVS is a tool to be used especially if the design started
with a schematic entry tool. The aim of LVS tool is to check if the design at the
layout level correspond to or consistent with the schematic drawing. Usually,
the designers start with a schematic drawing and then do simulation. If the
simulation works fine and complies with specifications then only begin to
design the layout. However, in the case like full-custom or semi-custom
integrated circuit designs, the layout implementation of the integrated circuit
can differ from the schematic because of wrong simulation results or because of
design errors that simulation can not detect. LVS tool can then be used to check
- 122 -

12 Testing of VLSI Circuits

that if the designer designs the layout according to schematic drawing. To


secure better results, a simulation of the layout using the same stimuli used for
the schematic is preferred.

12.1.3 Latch-Up and Electrostatic Discharge


Latch-up occurred in CMOS device has caused the delay of releasing the
CMOS version product to the market in the electronic industry. Latch-up is also
called silicon control rectifier SCR effect and it can cause the destruction of the
integrated circuit or a part of the integrated circuit. In the severe case, it causes
melting of bond wire. There is no real solution to solve this phenomena but a set
of design techniques do exist to avoid the occurrence of latch-up such as the
design with MOS transistor sitting in its own isolated well and separately
isolated the wells with refilled deep trench isolation between the wells as shown
in Fig. 12.2.

Figure 12.2: The refilled deep trench isolation between p-well and n-well isolations used to
reduce the occurrence of latch-up

The structure of n-MOS and p-MOS transistor has two parasitic diodes form
between drain/source and the substrate. An either npn or pnp parasitic bipolar
junction transistor formed between drain substrate and source depending on
whether it is an n-MOS or p-MOS transistor. In the case of wrong application of
stimulant to the device such the input voltage is 0.7V (forward voltage of a
diode) greater than the supply voltage VDD. The voltage difference is sufficient
to switch-on the emitter-base junction of the parasitic npn bipolar junction
transistor. The consequence is the SCR effect result a large current flowing from
power supply VDD via a small resistance of collector-emitters of pnpn thyristor
structure. This high current will destroy the surrounding p-MOS and n-MOS
transistors and can melt the bond wire due high current density.
Beside the isolation technique mentioned earlier to prevent the occurrence
of latch-up, other most common technique is to in-activate parasitic bipolar
transistor by setting the emitter-base junction of the transistor in reverse bias
- 123 -

12 Testing of VLSI Circuits

mode. This is done by setting the n-well to power supply VDD voltage and
setting p-well and p-substrate to VSS rail. These techniques cannot totally
eliminate the latch-up problem but it helps reducing its effect. The illustration of
these techniques used in the layout is shown in Fig. 12.3.

Figure 12.3: The illustration of n-well and p-substrate bias to prevent occurrence of latch-up

Another electrical constraint of the design is the problem of electrostatic


discharge ESD. Owing to very small dimension of the MOS transistor, its ESD
susceptibility level is very low. Thus, handling CMOS integrated circuit chip
improperly can cause damage to due electrostatic charge generated by human
being. One good way is to ground the human being with a ground cord before
handling the ESD sensitive CMOS integrated circuit. Besides handling
procedure, the designer designs in the ESD protection circuit connecting the
input and the inner core circuit. A simple scheme is to connect two diodes at
each input one connecting supply voltage VDD and one connecting to VSS rail.
These two diodes protect the inner CMOS transistor from ESD damage by
discharging the excessive charge to either VSS or VDD. There are many other
protection schemes for integrated circuit against ESD. Methods such as design
in current limiting resistor, gate-grounded p-MOS and n-MOS transistors, thick
oxide MOS device, low voltage triggering silicon control rectifier etc., at the
input pad of the device.

- 124 -

12 Testing of VLSI Circuits

12.1.4 Electrical Rule Checking


Electrical rule check ERC helps the designer to consider all the minimum
necessary implementations for a fee electrical free fault design. This tool
verifies that the designer has used a sufficient number of well biases, design in
appropriate ESD protection, used VDD and VSS at the right places etc.

12.2 Testing Concepts


Testing is a process at the back-end after fabrication of integrated circuit wafer;
the integrated circuit chip has been assembled into package form. It is a process
whereby the IC device is tested according to the intended application following
the device specifications. The intended application can be space/military,
industrial, and commercial applications. Thus, the test strategy is to test the
device and grade them into four categories that are space/military grade A,
industrial grade B, commercial grade C, and failed/reject grade F.
After the integrated circuit has been fabricated, the wafer probe test would
screen the die (integrated circuit in chip form) into space/military grade,
industrial grade, commercial grade, and of course the non-functional die. The
screen test is like picking the best grade students for doctor/engineer
professional job, the second best for teacher/lawyer job, and the third best for
technician job. The flowchart of the screening test at probe is shown in Fig. 12.4.
The test strategy is to test the die with the space/military grade first. If the die
fails any of the tests, it is proceeded to test with the industrial test limits. If the
die fails any of the industrial limit test, it is then tested with commercial grade
test. If the die fails any of the commercial grade tests, it is then yielded as reject.
The inking strategy to identify the die grade can be varied. Normally no ink on
the surface of the die indicates the die is a space/military grade die. Green is
used to identify the industrial grade die. Double inking red and green, is used
to identify the commercial grade die, and red ink is used to identify nonfunctional - failed to make any specification die. The inking strategy is
necessary because the optical system of the die sorting process will pick the die
according to the color and categorized them into space/military, industrial, and
commercial grade. In the modern approach, inking can be ignored provided
there is a grade mapping data of the wafer for each wafer that can be fed to
sorter to pick the right grade die.

- 125 -

12 Testing of VLSI Circuits

Figure 12.4: The flowchart of probe test and grading of the die

- 126 -

12 Testing of VLSI Circuits

In the test operation, the process step after assembly, the test strategy follows
the same grading systems as it has been described for die probe test. The
military grade, industrial grade, and commercial grade device are binned
separately by the sorter of automatic test handler ATH. Sorted devices are then
branded with the device part number and special digit to signify grading.
Commercial grade device is normally guaranteed to operate for
temperature range between 00C to 700C. In order to reduce the cost of testing,
the commercial grade device is normally tested with ambient temperature,
which is taken as 250C. Since the 00C and 750C temperature tests are not done.
The test strategy is to test the device with guard banding for 00C and 750C tests.
Commercial product is normally used in the consumer product. The average
selling price ASP of the product is low and there are not in critical operation
such as a car and commercial plane. Therefore, one ambient with proper guard
banding for 00C and 750C tests is sufficient.
Industrial grade device is normally guaranteed to operate for temperature
range between -400C to 850C. This grade of product is used in industrial
application such as the control system of the car fuel injector etc. Therefore, the
test strategy is to test at least two temperatures i.e. ambient and -400C cold
temperature. Depending on the criticality of the industrial operation, the product
may have to be subjected to an accelerated burn-in to wipe out the infant
mortality failure.
Military/space grade device is normally guaranteed to operate for
temperature range between -550C to 1250C. This grade of device is used in
space/military application such as the control system of weaponry system. The
device normally has to undergo four tests i.e. one ambient before burn-in and
three temperature tests after burn-in, which are ambient, +1250C, and -550C
tests.

12.3 Automatic Test Equipment, Test Fixture, Test


Program, and Automatic Test Handler
To test an integrated circuit die - after fabrication before package and
packaged integrated circuit called device requires at least an automatic test
equipment ATE, a test fixture, and a test programs. In the case of automatic
testing, an automatic test handler ATE is needed for automatic feeding the
device to the test fixture and upon testing automatic categorizes the device into
graded type.
- 127 -

12 Testing of VLSI Circuits

12.3.1 Automatic Test Equipment


An ATE is used to apply a sequence of stimuli to the die under probe DUP or
device under test DUT, monitor and/or record the results of the response from
the device, and make decision on pass/fail status according specifications of the
die/device. An ATE may have a single or dual test heads depending on the cost
and purpose. A test head contains mainly the driver/receiver cards (pin cards),
timing measurement units, power supply cards, current/voltage meter, control
bits etc.
The ATE can be classified according to its intended purpose and product
family. It can be a VLSI tester, an analogue tester, a mixed signal tester, a
wireless/communication tester, microprocessor tester etc. Figure 12.5 shows a
photograph of a mixed signal ATE.

Figure 12.5: A mixed signal automatic test equipment showing its test head and a mounted
load board

12.3.2 Test Fixture


A test fixture is an interface board that contains interface circuitry connecting
the assigned driver/receiver I/O card, power supply cards, timing cards, control
bits and etc of the ATE with the pin layout configuration of the chip/device
under test. The test fixture may contain relays that can be controlled by the
control bits of the ATE for switching-in different stimulant to the input/output
pin, load to the die/device under test.

- 128 -

12 Testing of VLSI Circuits

A probe card is a test fixture. It is used to probe the integrated circuit die. A
mounted prober containing the probe pins arranged in bond pad layout pattern is
used to make contact with the bond pads (bond pad is the input/output, clock
input etc. that are to be connect via bond wire to the external world) of the die
during probe test. The other end of the prober contains a bundle of wire
connecting the prober and the probe card. The wafer is mounted on the x-y table
that its x-y position is controlled by the ATE.
A load board is a test fixture used for packaged device testing. For VLSI
digital testing, a load board may contain simple configuration wiring between
the input/output pins, clock pin, power supply pin etc. with the assigned pin
card of the ATE. For VLSI analogue device testing, a more complicated device
test fixture is required. The bottom end of the load board contains contact pads
when in use they are connected to the assigned pin cards etc of the ATE via
spring loaded pins. The top part contains a socket that can be mounted on the
automatic test hander ATH for automatic feeding testing or temperature testing.
A picture of a load board is shown in Fig. 12.6.

Figure 12.6: A top-view of a load board showing the test socket to be mounted on the ATH
at the center of the board

Automatic test equipment requires a test program. The program is normally


written in a high-level language for instance the IMAGE language used by
Teradyne test system. The test program specifies a set of input test vector
patterns and a set of output assertions. If an output does not match the asserted
value at the corresponding time, the error logic of the ATE will report an error.
Before the test vector patterns and assertions are applied, the test program has to
set-up the various attributes of an ATE as the following:
- 129 -

12 Testing of VLSI Circuits

Set the supply voltage.


Assign mapping between stimulus file signal names and physical ATE
pin cards.
Set the pin cards on the ATE to inputs or outputs their VIL/VOH and
VOL/VOH levels.
Set the clock on the ATE.
Set the input pattern and output assertions timing.
and on a device basis

Apply supply voltages.


Apply digital stimulus and record responses.
Check responses against assertions
Report and log error.

12.3.3 Automatic Test Handler


An IC automatic test handler ATH is responsible for feeding the device to a test
fixture mounted to an ATE. Chutes or trays containing packaged device can be
used to gravity-feed the device to the handler, which uses a variety of
mechanical means to pick the device and place it in the test socket on the load
board. The ATE stimulus is then applied to the device and device is binned
depending on the grade that it has passed or reject if it fails functional test or
device specifications. A photograph of an automatic handler is shown in Fig. 5.7.
The pilot light at the top left corner of the handler indicates the operating status
of the handler. Green light means the handler is in operation. Yellow light
indicates there is fault with the handler such as jamming. Red light indicates the
handler stop operation. This is necessary to attract attention of the maintenance
crew when assistant is needed.

- 130 -

12 Testing of VLSI Circuits

Figure 12.7: The picture shows a PLCC automatic test handler

12.4 Testing Logic Circuits


In this section learner will learn the concepts how to test a logic circuit. Before a
logic circuits such as a NAND gate or a combinational circuit such an adder are
tested. Learner has to know what are the tests expected to be performed. Thus, it
is necessary for the learner to know how to read the device specifications of the
logic gate circuit. In this sub-section, learner also learns how to set-up and test
some selected dc and ac parameters of a quad 2-input NAND gate CD4011
device.

12.4.1 Test Specifications


Product specifications of integrated circuit device can be a NAND gate or an
adder list down the limits and typical values of dc and ac parameters of the
device and the maximum rating of the device. The specifications also specify
the test conditions on how those parameters are tested. Thus, as a test engineer,
you have to write the test program so that it issues test command to set-up the
test hardware in the test head of ATE according to the specified test condition,
apply them to the DUT, measures the value of the said parameter, compare it
with the device specifications, and determine the pass/fail status of the
parameters. This procedure is repeated until all the specified dc and ac
parameters are tested. The extract of part of the specifications of CD4011 Quad
2-input CMOS NAND gate is shown in Fig. 12.8.
Static Electrical Characteristics
- 131 -

12 Testing of VLSI Circuits


Limit at Indicated Temperature (0C)
+25

Conditions
Characteristics

VO
(V)

Quiescent
Device Current
IDD Max.

0.4
Output Low
(Sink) Current
IOL min.

0.5
1.5

Output High
(Source)
Current
IOH min.

4.6
9.5
13.5

VIN
(V)
0,
5
0,
10
0,
15
0,
20
0,
5
0,
10
0,
15
0,
5
0,
10
0,
15

VDD
(V)

-55

-40

+85

+125

Min

Typ.

Max.

0.25

0.25

7.5

7.5

0.01

0.25

10

0.5

0.5

15

15

0.01

0.50

15

30

30

0.01

20

150

150

0.02

0.64

0.61

0.42

0.36

0.51

10

0.5

0.5

15

15

1.3

2.6

15

30

30

3.4

6.8

Units

mA

-0.64 -0.61

-0.42 -0.36

0.51

10

-1.6

-1.5

-1.1

-0.9

-1.3

-2.6

15

-4.2

-4

-2.8

-2.4

-3.4

-6.8

-1

Dynamics Electrical Characteristics at TA = 250C Input tr,tf = 20ns, CLoad =


50pF, RL = 200k

Characteristics
Propagation Delay
Time TpHL, TpLH

Test Conditions
VDD (V)
5
10
15

Limits
Typ.
125
60
45

Units
Max.
250
150
90

ns

Figure 12.8: The Extract of CD4011 specifications

12.4.2 Test Set-up for Logic Circuit Testing


Based on the extracted specifications, they state the test conditions, test limits
by temperature for quiescent device current IDD, output low current IOL, output
high current (IOH), and propagation delay parameters. We would like to see how
these parameters are tested. Before these parameters are tested, we would also
like to test the wire bond connectivity from the integrated circuit bond pad to
the lead of the package and gross functionality of the device.
The pin configuration of a dual in line DIP package quad 2-input CMOS
NAND gate is shown in Fig. 12.9. The device has a power supply VDD pin (14),
- 132 -

12 Testing of VLSI Circuits

ground rail (VSS) pin (7), input pin (1), (2), (5), (6), (8), (9), (12), and (13), and
output pin (3), (4), (10), and (11).
The test set-ups described here assumed that the dc and ac parametric tests
are done at ambient temperature, which is taken as 250C.

Figure 12.9: Pin configuration of CD4011 Quad 2-input CMOS NAND gate

12.4.3 Open/Short Test


All the input pins of the NAND gates are protected by a diode network as
shown in Fig. 12.10 against the damage due to electrostatic discharge (ESD).
Thus, we can use this diode network to check part of the connectivity of the
wire from the bond pad of the integrated circuit to the lead of the package and at
the same time the input gate integrity of the NAND gates can be checked. The
test is termed as open/short test mentioned in previous section.

Figure 12.10: The input diode network of CD4011 NAND gate. The number in parenthesis
is the pin number

The open/short test is consisting of two tests lower diode test and upper diode
test. Set-up shown in Fig. 12.11(a) is testing the functionality of the upper
- 133 -

12 Testing of VLSI Circuits

diodes and the wire connecting the bond pads and leads of the package by
forcing 1.0mA of current from ATE to the every input pin and then measure the
voltage across the input pin with respect to VDD pin. The value measured should
be the forward voltage of a diode, which has a value >0.7V. The set-up to test
the functionality of lower diodes and the wire connectivity is shown in Fig.
5.11(b). It is done by sinking 1.0mA of current from ATE to the input pin and
measure the voltage between input pin and VSS pin. The measured value should
be the forward voltage of a diode, which should have a value <- 0.7V. Note that
for both tests, the power supply VDD pin (14) and VSS ground rail pin (7), are set
to 0V.

(a)

(b)
Figure 12.11: The set-up for open/short test for input pin 1 of CD4011 quad 2-input NAND
gate

If there is a shorted diode, the measured voltage will be zero in both tests.
Likewise if there is open circuit such as open diode or no connection between
bond pad and lead, the voltage measurement should be the maximum value of
- 134 -

12 Testing of VLSI Circuits

the voltage range set by the test program, which can be 2.047V for the case of
2.0V range setting. Thus, as a test engineer, you may to set the test limit as <
0.5V and > -0.5V for short circuit and < -1.5V and > 1.5 for open circuit, and
the in between values as good. If there is an open wire connecting VDD or VSS
bond pads and leads, all the tests will show as open failure. If the device fails
any one of the open/short test, the test program will issue command to halt the
test and issue to command to the automatic test handler ATH to yield the device
as reject. If the device passes all open/short test except the for output pins. The
program will execute the command to proceed to next test.

12.4.4 Gross Functional Test


Gross functional test is used to test the functionality of the logic gate before
tedious dc and ac tests are performed because there is no point to test the device
if there is cross failure such as short-at-VDD, broken metal interconnect in the
inner core of the device. For the case of CD4011 NAND gate, the gross
functional test tests the logical NAND output of all the input logic
combinations. The test set-up for a NAND gate is shown in Fig. 12.12. The
remaining 3 NAND can be simultaneously tested if there are sufficient pin cards
in the ATE.

Figure 12.12: The set-up for gross functional test of a NAND gate of CD4011

Before the beginning of the gross functional test, the sequence test vector
patterns and expected output test vector patterns are programmed into the
memory of the ATE. The VSS is set to 0V and VDD is set to 5.0V by the ATE.
The pattern generator of the ATE issues test vector 0011 and 0101 sequentially
to inputs pin (1) and (2) of the NAND gate via the drivers of the pin cards. The
actual output patterns are then compared with the expected output patterns after
a programmed propagation delay and input to error logic of ATE to decide
whether the gate passes or fails gross functional test.
- 135 -

12 Testing of VLSI Circuits

12.4.5 Quiescent Device Current Test


According to the device specifications, the quiescent device current (IDD) test is
to be done for four power supply VDD applications, which are 5V, 10V, 15V,
and 20V. There are altogether eight measurements to be made. Each supply
voltage has two measurements one for all input tie to logic 0 and one all input
tie to logic 1.
The set-up for the IDD test is shown in Fig. 12.13. The setting of the logic 1
follows the setting of the power supply (VDD). If the power supply (VDD) is set
to 15V, then logic 1 shall be 15V. Logic 0 shall mean 0V. The IDD current is
measured by the ampere meter of the power supply. The measured voltage is
then compared with the limits of IDD, which are <0.25A @5V VDD, < 0.5A
@10V VDD, < 1.0A @10V VDD, and < 1.0A @20V VDD respectively.

Figure 12.13: The set-up for IDD test for a NAND gate of CD4011

12.4.6 Output Low Current Test


From the specifications of device, the output low current IOL is output sink
current of the to the n-MOS network of the device when output is at logic 0. For
a 2-input NAND gate, there is only one input logic combination that the output
is logic 0, which is when both inputs of the gate are at logic 1. According to the
specifications of the device, there are three supply voltage applications to be
tested, which are 5.0V, 10, and 15V. For each supply voltage test, the output
- 136 -

12 Testing of VLSI Circuits

force voltage is different, which are 0.4V, 0.5V, and 1.5V respectively for
supply voltage 5V, 10V, and 15V test. Figure 12.14 shows the test set-up of IOL
test for one NAND gate. Normally all NAND gates can be tested
simultaneously.

Figure 12.14: The set-up for output low current IOL test

The measured current by the ATE is then compared with the set limit, which are
>0.51mA @5V VDD supply voltage, >1.3mA @10V VDD supply voltage, and
>6.8mA @15V VDD supply voltage.

12.4.7 Output High Current Test


From the specifications of device, the output high current (IOH) is output source
current of the p-MOS network of the device when output is at logic 1. For a 2input NAND gate, there are three input logic combination that the output is
logic 1, which are when the inputs are at 00, 01, and 10 logic According to the
specifications of the device, there are three supply voltage application are to be
tested, which are 5.0V, 10V, and 15V. For each supply voltage test, the output
force voltage is different, which are 4.6V, 9.5V, 13.5V, and respectively for
power supply voltage 5V, 10V, and 15V tests. Since there are three input logic
combinations that will provide output logic 1 and three supply voltage
applications are needed, a total of 9 tests are to be performed. Figure 12.15
shows the test set-up of IOH test for one NAND gate. Normally all NAND gates
can be test simultaneously.

- 137 -

12 Testing of VLSI Circuits

Figure 12.15: The set-up for output high current IOH test

The measured current by the ATE is then compared with the set limit, which are
<-0.51mA @5V VDD supply voltage, <-1.6mA @10V VDD supply voltage, <1.6mA @10V VDD supply voltage, and <-3.4mA @15V VDD supply voltage.

12.4.8 Propagation Delay Test


Propagation delay test is a dynamic test or at time it is called ac test. The test
requires the timing measurement unit of the ATE. The timing measurement unit
of ATE needs to have the rise/fall time better than what is specified in the
device specification, which is better than 20ns. There are two tests to be done,
which are logic 0 to logic 1tpLH and logic 1 to logic 0 tpHL transitions. According
to the truth table of the NAND gate, there are three input logic combinations for
transition from logic 0 to logic 1, which are 1100, 1101, and 1110
transition; three input logic combinations for logic 1 to logic 0 transition, which
are 0011, 0111, and 1011 transitions. Since there are three power supply
applications i.e. 5V, 10V, and 15V, thus, the total number of test are 18. The
set-up for the test is shown in Fig. 12.16. The timing generator will generator
the required logic state for the input and the timing measurement unit will
measure propagation delay and compared it with the set limit, which are
<200ns @5V VDD, <100ns<10V VDD, and <80ns @15V VDD.

- 138 -

12 Testing of VLSI Circuits

(a)

(b)
Figure 12.16: The set-up for propagation delay test (a) logic 0 to logic 1 tpLH transition and
(b) logic 1 to logic 0 tpHL transition

There are many other dc and ac parameters to be tested for CD4011. Learners
are encouraged to learn them.
You may notice that so far we have not discussed test at temperature. You
may choose temperature test by heating up the chamber of ATH or cold down
the chamber of ATH. For high temperature testing, it is easy by heating up the
chamber of the handler to the desired temperature. To cold the temperature to 400C or -550C required to piped-in the liquid nitrogen, which is costly and at
time can pose the safety hazard due to cold burn. If it is permitted, you may
perform a guard banding study of each and every parameter so that by
- 139 -

12 Testing of VLSI Circuits

tightening the test limits at room temperature can simulate the failure at either
cold or hot temperature.

12.5 Designs for Testability


A new piece of equipment, when it is received by the customer, the customer
expects it to work without any failure. However, a modern automated
equipment such as an automatic test equipment that we use to test the integrated
circuit, it is impossible for the an equipment manufacturer to guarantee that
every single equipment produced will be working perfectly as it is intended
when the test company receive it. Some equipment may not be working because
they contain individual components failure or printed circuit board that contain
sub-system such as a nano-ammeter are faulty or it may be due to handling
leading to failure. Most equipment manufacturers prefer to resolve these
problems in the factory, rather than the failure found at customer, which is a bad
reputation to the manufacturer.
In the device process cycle, a fault can be occurred at integrated circuit
level. If the test strategy is considered at the beginning of the design phase, the
fault can be detected rapidly and eliminated at very low cost. When the device is
soldered on PCB, the cost for ratification is escalated to ten folds. This is the
famous saying Rule of Ten. This cost factors continues to apply until the system
has been assembled, packed, and sent to end-user.
The most basic test is testing the functionality of the components,
functionality of sub-system printed circuit board. The diagnostic test can be
performed to test the 100.0% functionality of the equipment as while system
and also be used to identify and locate the particular sub-system failure. If the
equipment passes the test, it can be then shipped to customer; otherwise,
detailed troubleshooting should be done to identify the failure. It is then follow
by either repair or replace the component/board and performance diagnostic test
again to ensure this time the equipment is functioning.
The design for testability DFT is a method designed to test the components,
sub-system, and the equipment thorough and less costly with controllability and
observability, without the needs to apply full test vectors to the logic gate/circuit,
sub-system, and system. This method can identify, detect, and locate failure
easily right at circuit design level to a sub-system/system levels. This method
has many benefits. The functional test is more reliable; the diagnostic tests run
faster and produce more accurate result, and both functional test and diagnostic
test require less test-engineering time to develop. The disadvantage is the
- 140 -

12 Testing of VLSI Circuits

engineering effort taken to add in DFT test circuitry in the integrated circuit die
and the circuitry would take up a portion of real estate of the die. However, this
can be offset by long-term benefit in time taken to identify failure and less
development cost for the equipment.
In this Section, learner will learn methods of design for test (DFT), which
includes the fault models, in-Circuit testing, ad hoc testing, scan test, and builtin self test. There are many advanced DFTs for testing to identify and locate
failure for controllability and observability. Learner is encouraged learn them.

12.5.1 Fault Models


As you already know that logic circuits are tested by applying test vectors which
consist of input combination and expected output combinations. A logic circuit
passes the test if its outputs match whats expected. In the worst case, an n-input
combinational circuit requires 2n test vectors. Take for an example, 2-input
NOR gate requires 22 test vectors applied to the input in order to fully knowing
the output logic. However, if we know the physical layout of the circuit and
make some assumptions about the type of failures that may occur, the number
of vectors required to test the circuit fully can be greatly reduced.
There are many models that can be used to describe the failure of the logic
circuit. Among the models are; the stuck-at-fault model, stuck-open fault model,
bridging fault model, transition delay model, path delay model etc. Stuck-atopen fault model is used to model the behavior of a circuit with transistor are
permanently switch-off or switch-on. A bridging fault model is used to model
the shorting of two or more signal lines in the circuit. The transition delay
model is based on stuck-at fault model. The stuck-at-0 or stuck-at-1 values are
replaced by logic 0-to logic 1 and logic 1-to-logic 0 transitions. The path delay
model is targeted on total path transition delay. We shall emphasize on the
stuck-at-fault model.
The most common model used for testing of the logic circuit is the stuckat-fault model which has assumption that all failures cause nodes to be stuckat either logic 0 or logic 1, i.e. either shorted permanently to power supply
(VDD) or VSS (GND). This shall mean either a single input or an output signal
stuck at logic 0 or logic 1. The assumption made is true and the method work
well in actual practice condition. Figure 12.17 illustrates the meaning of a stuckat-0 and stuck-at-1 with a 2-input NOR gate. The input B shorted to power
supply VDD is termed as stuck-at-1, while the input A shorted to VSS is termed
- 141 -

12 Testing of VLSI Circuits

as stuck-at-0. The suck-at-0 and stuck-at-1 can also be happened at the output of
the device.
Using the stuck-at-fault model, lets analyse to see how many test vector
patterns are necessary to effectively test the functionality of a 4-input NAND
gate. The layout of the 4-input NAND gat is shown in Fig. 12.18. Based on the
layout, stuck-at-0 (SA0) and stuck-at-1 (SA1) faults can be occurred at either
input A, B, C, or D, or all inputs, and output.

Figure 12.17: Illustrating meaning of stuck-at-0 and stuck-at-1

Theoretically, it requires 16 (24) test vector patterns in order to fully test its
functionality. However, if we apply the stuck-at-fault method, the 4-input
NAND can be fully tested with just five test vector patterns, which are 1111,
0111, 1011, 1101, and 1110. Lets find out how we derive to this conclusion.
The truth table of a 4-input NAND gate with stuck-at-fault occurrence is shown
in Fig. 12.19.

- 142 -

12 Testing of VLSI Circuits

Figure 12.18: Layout of 4-input NAND gate


Input
A

0
0
0
0
0
0
0
0
1
1
1
1
1
1
1
1

0
0
0
0
1
1
1
1
0
0
0
0
1
1
1
1

0
0
1
1
0
0
1
1
0
0
1
1
0
0
1
1

0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1

No
Fault
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0

SA0
A
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

SA1
A
1
1
1
1
1
1
1
0
1
1
1
1
1
1
1
0

SA0
B
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Output
SA1 SA0
B
C
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
1
1
1
1
1
1
1
0
1

SA1
C
1
1
1
1
1
1
1
1
1
1
1
1
1
0
1
0

SA0
D
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

SA1
D
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0

Figure 12.19: Truth table of 4-input NAND with stuck-at-fault occurrence

The results show that whenever, there is a stuck-at-0 or stuck-at- 1 at any input
A, B, C, and D, there is a change of output for test vector 0111, 1011, 1101,
1110, and 1111. Thus, test vector pattern 0111, 1011, 1101, 1110, and 1111 are
sufficient to fully test the functionality of a 2-input NAND gate. The rest of test
- 143 -

12 Testing of VLSI Circuits

vectors 0000, 0001, 0010, 0011, 0100, 0101, 0110, 1000, 1001, 1010, and 1100
are redundant.
Under the stuck-at-fault model, its easy to apply test vectors to the input of
an individual logic gate. However, in practice, there is problem to apply the test
vectors to the logic gates that are buried in a circuit and observing the results.
Supposing a circuit has a few combinational and sequential logic gates in
between its primary inputs and the inputs of a 4-input NAND gate that a
designer wants to test, it is not obvious what primary-input test vector, or
sequence of primary-input test vectors must be applied to generate the test
vector pattern 1111 at the NAND-gate inputs. Furthermore, its not obvious
what else is required to propagate the NAND gates output to a primary output
of the circuit.
Sophisticated test-generation program deals with this complexity and
attempt to create a complete test set for a circuit, which is a sequence of test
vector patterns that fully tests each logic gate in the circuit. However, the
computation required can be huge and its quite often just not possible to
generate a complete test vector patterns. With this difficulty, DFT methods
attempt to simplify test-pattern generation by enhancing the controllability and
observability of logic gates in a circuit. A circuit with good controllability and
easy to produce any desired output logic on the internal signals of the circuit by
applying an appropriate test-vector input combination to the primary inputs is
desired. Similarly, a circuit with good observability means that any internal
signal can be easily propagated to a primary output for comparison with an
expected value by the application of an appropriate primary-input combination
is needed. The most common method of improving controllability and
observability is to add test points to tap the additional primary inputs and
outputs during testing.

12.5.2 Ad Hoc Testing


Ad hoc test techniques are temporary test procedure added on the need basis
aimed at reducing the number of combinational pattern of testing. They are only
useful for small designs where scans, automatic test pattern generator ATPG,
built-in self test BIST are not available. However, a completed scan-based
testing methodology is recommended for all logic circuits. The common
techniques for ad hoc testing are partitioning large sequential test, adding test
point, adding multiplexer, and providing for easy state reset.

- 144 -

12 Testing of VLSI Circuits

A technique classified in this category is the use of the bus in a busoriented system for test purposes. Each register has been made loadable from
the bus and capable of being driven onto the bus. Here, the internal logic values
that exist on a data bus are enabled onto the bus for testing purpose. Frequently,
multiplexer can be used to provide alternative signal path during testing. In
CMOS testing, transmission gate and multiplexers provide alternative paths to
routed external test signals. We can see it in the built-in circuit of the scan test
and built-in self test.
Any design should always have a method of resetting the internal state of
the circuit within single clock cycle or at most a few clock cycles. Apart from
making the testing easier, this also makes simulation faster as a few cycles are
required to initialize the circuit is considered short time.
In general, ad hoc testing techniques represent a number of approaches
developed over the years by designers to avoid the overhead of a systematic
approach to testing. While these general approaches are still valid as of today.

12.5.3 In-Circuit Testing


The logic circuits in terms of IC package are mounted on a single PCB. The
controllability and observability of the circuits ultimately can be obtained by
using every pin of every IC as a test point and route them to the edge connector
of the PCB so that they can be tested. This is then followed by building a
special test fixture that matches the edge connector layout of the PCB. The PCB
is placed on the spring loaded pins of test fixture (load board) and is connected
to automatic test equipment that can monitor each pin as required by a test
program.
In-circuit testing also can achieve the ultimate goal of controllability. This
method not only can monitor the signals at the spring loaded pins for
observability, but also connects loaded pin to a very low impedance driving
circuit in the ATE. In this way, the tester can override whatever circuit on the
PCB normally drives each signal, and directly generate any desired test vector
pattern on the internal signals of the circuit in PCB. Overdriving an opposing
gate output causes excessive current flow in both the tester and the opposing
gate, but the tester can sink the current within a few milli-seconds, which is not
harmful to the circuit.
To test an 4-input NAND gate, an in-circuit tester needs only to provide the
five test vectors mentioned previously and can ignore whatever values that the
- 145 -

12 Testing of VLSI Circuits

rest of the circuit is trying to drive onto the four input pins. The output of 4input NAND-gate can be observed directly on the output pin. With in-circuit
testing, each logic gate can be tested in isolation from the others.
A few key procedures and requirement are needed for performing in-circuit
testing. They are listed in the following sub-sections.
12.5.3.1 Initialization
The initialization is a mandatory to make all logic gates in the circuit to a reset
state. Since the preset and clear input pins of registers and flip-flops are
available in the circuit, one can use ATE to initialize them. However, Fig.
12.20(a) shows an example of a gray-code counter circuit cannot be initialized
because the flip-flops go into an unpredictable state when preset pin (PR) and
clear pin (CLR) are asserted high simultaneously. The right way to handle the
preset and clear inputs is shown in Fig. 12.20(b), which is having separated bias
voltage. The ATE can send logic 0 to clear the counter and then followed by
sending logic 1 to set the counter in ready mode.

(a)

(b)
Figure 12.20: A gray code counter circuit (a) it is not testable (b) it is testable
- 146 -

12 Testing of VLSI Circuits

12.5.3.2 Clock generation


The ATE must be able to provide its own clock signal without depending on the
on-board clock signals. For several reasons, ATE usually must override an onboard clock, which are the speed at which it can apply the test vectors is limited;
it must allow extra time for overdriven signals to settle; and sometimes it must
stop the clock. However, overdriving the clock may oscillate the circuit and
make several transitions between logic 0 and logic 1 before finally settling to
the desire level.
Figure 12.21 shows a recommended clock driver circuit. To inject its own
clock, the tester pulls Clk En to logic 0 and inserts its clock on TestClk_L pin.
Since the ATE is not overdriving any gate outputs, the resulting clock signal is
clean. In general, any normally glitch-free signal used as a clock input or other
asynchronous input must not be overdriven by the tester, and would have to be
treated in a way similar what is shown in Fig. 12.21. This is another reason why
synchronous design with a single clock is desirable.

Figure 12.21: A clock drive for in-board testing

12.5.3.3 Grounded inputs


In general, ground should not be permanently tied to zero volt source. For the
in-circuit testing, ATE must be able change the voltage level of this signal.
Therefore, signals that require a zero volt input during normal operations should
be tied to ground through a resistor, which allows the ATE to set it to logic 1 by
connecting the supply voltage VDD.
12.5.3.4 Bus drivers
In general, it should be possible to disable the drivers for wide buses so that the
ATE can drive the bus without having to overdrive all the signals on the bus.
That is, it should be possible to output-disable all of the tri-state drivers on a bus,
so that the tester drives an open bus. This reduces electrical stress both on the
ATE and output of the devices in the PCB. Otherwise overheat due excessive
- 147 -

12 Testing of VLSI Circuits

current driven the output may damage by having all outputs overdriven
simultaneously.

12.5.4 Scan Testing


In-circuit testing works fine, up to a point. It doesnt do much good for custom
VLSI chips and application specific IC ASIC, because the internal signals
simply are not accessible. Even in board-level circuits, high-density packaging
technologies such as surface mounting greatly increase the difficulty of
providing test points for every signal on a PCB. As a result, an increasing
number of designs are using scan testing to provide controllability and
observability.
A scan testing provides controllability and observability of the internal
signals of a circuit using a small number of test points. A scan-path method
considers any digital circuit to be a collection of flip-flops or other storage
elements interconnected by combinational logic gate. It is a concerned with
controlling and observing the state of the storage elements. It does this by
providing two operating modes, which are a normal mode, and a scan mode in
which all of the storage elements are reorganized into a giant shift register. In
scan mode, the state of the circuits n storage elements can be read out by n
shifts thus, providing observability, and a new state can be loaded at the same
time that shows controllability. Scan-path design is used most often in custom
VLSI and ASIC designs because of the impossibility of providing a large
number of conventional test points.
Lets consider a 3-bit binary counter as shown in Fig. 12.22. The circuit
consists of two parts, which are combinational logic circuit blocks and three D
flip-flops. This circuit has limited observability and controllability. To complete
testing this circuit fully, it requires 22x23 = 32 test vector patterns, which
comprising of enable, reset and 8 clock pulses. The timing of the test is shown
in Fig. 12.23.

- 148 -

12 Testing of VLSI Circuits

Figure 12.22: A 3-bit binary counter

Figure 12.23: The timing diagram of the test for a 3-bit binary counter

The circuit has three combinational circuit blocks. Every block has its input and
output. The MSB combinational block at the right of the circuit received 3
inputs I0, I1, I2 and has one output CO2. If we have the controllability of node Io
and observability at node CO2 then we can have easily test the functionality of
this circuit block by applying the minimum number of test vectors (based on to
stuck-at-fault model) to it. Thus, the key issue is to make I0, I1, I2 control-able
- 149 -

12 Testing of VLSI Circuits

via the chip boundary and CO2 observable via the chip boundary. We will do
similar kind of arrangements for all inputs and outputs to all the combinational
blocks identified in the design.
For better observability and controllability, we replace all the flip-flops of
this counter, with special flip-flops that has a multiplexer connected to the D
input of each flip flop and two additional input pins called scan enable (SE) and
Scan input (SI) for multiplexer of the flip-flop. As shown in Fig. 12.24, the 3-bit
binary counter is now DFT-able. The multiplexer can be selected by scan enable
pin (SE) to allow scan in data to be clocked into the input D of the flip-flop to
produce Q output and scan out results with the relevant edge of clock.

Figure 12.24: A DFT-able 3-bit binary counter

If there is any stuck-at-fault of the combinational block, the scan out result will
reveal the problem. The timing diagram of the scan test for the 3-bit binary
counter is shown in Fig. 12.25.

- 150 -

12 Testing of VLSI Circuits

Figure 12.25: The timing diagram of the scan test for a 3-bit binary counter

12.5.5 Built-in Self Test


Built-in self test (BIST) is a concept that the integrated circuit can be provided
with capability to test itself. This technique adds some chip area but in return, it
reduces the test time of functional test. There are several ways to accomplish
this objective. One method of testing an integrated circuit is to use signature
analysis or cyclic redundancy checking. This involves using a pseudo-random
sequence generator (PRSG) to produce the input signal for a section of
combinational circuit and a signature analyzer to observe the output signal.
12.5.5.1 Pseudo-Random Sequence Generator PRSG
A PRSG of length n is constructed based on the characteristic polynomial
equation of n-bit linear feedback register i.e. P(x) = anxn + an-1xn-1+ +a2x2 +
a1x1 + a0, whereby ai (i = 1 to n) can be 0 or 1, a0 is equal to 1, and x denotes the
designated flip-flop number. The linear feedback shift register LFSR shown in
Fig. 12.26 is designed based on characteristic polynomial equation P(x) = x3 +x
+1. The output of an exclusive OR gate is feedback to the input of LFSR, while
the input of the exclusive OR gate comes from the outputs of flip-flop FF0 and
flip-flop FF2. An n-bit LFSR will cycle through 2n-1 state before repeating the
sequence. For this design, it has seven sequence states.

- 151 -

12 Testing of VLSI Circuits

Figure 12.26: A 3-bit linear feedback shift register

If the initial data of the flip-flip is 100, the pseudo-random sequence data
generated six other random patterns after the six clock pulses, which are 011,
111, 110, 100, and 010. This random sequence will repeat for every seven clock
pulses.
A complete feedback shift register (CFSR) is shown in Fig. 12.27. This
linear shift register includes zero state that may be required in some test
situation. An n-bit LFSR can be converted to an n-bit CFSR by adding in an n-1
input NOR gate connected to all output except the MSB output.

Figure 12.27: A complete 3-bit linear feedback shift register

12.5.5.2 Signature Analyzer


- 152 -

12 Testing of VLSI Circuits

A signature analyzer is used to compress a sequence of data into a unique code.


It uses the linear feedback shift register LFSR provided with extra input in the
exclusive OR gate to accept sequence of bits to be compressed. After the entire
sequence has been clocked through, the state of shift register is called a
signature. At the end of a test sequence, the LFSR contains the signature to
determine whether the circuit is good or bad. If the signature contains enough
bits, it is improbable that a defective circuit will produce the correct signature.
The circuit of a signature analyzer is shown in Fig. 12.28 with 101110 sequence
of data bit as scan out compressed signature data.

Figure 12.28: A signature analyzer

After resetting, the initial content of the LFSR is 000. The data content of the
flip-flop (FF1, FF1, and FF0) for the seven clock pulses are 000, 011, 110, 100,
000, and 000. Thus, the compressed signature of the analyzer is 001100.
12.5.5.3 Setup of Built-in Self Test Circuit
The combination of signature analysis and the scan test technique shown in
previous sub-section creates a test structure known as built-in self test BIST or
built-in logic block observation BILBO. Fig. 12.29(a) shows the 3-bit BIST
register and how it is inserted in use for logic circuit test. The 3-bit register is a
scanable, resettable register that can serve as a pattern generator and signature
analyzer. The input C[0] and C[1] specify the mode of operation. In the reset
mode (10), all flip-flops are synchronously initialized to logic 0. In normal
mode (11), the flip-flops behave normally with their Q input feeds to D input. In
the scan mode (10), the flip-flops are configured as a 3-bit shift register between
scan-input (SI) and scan-output (S0). In the test mode (01), the register behaves
- 153 -

12 Testing of VLSI Circuits

as a pseudo-random sequence generator or signature analyzer. If all the D inputs


are held at logic 0, the Q outputs loop through a pseudo-random bit sequence,
which can serve as input to the combinational logic. If D inputs are taken from
the output of combinational logic, they are swizzled with the existing state to
produce signature code. In summary BIST is performed by first resetting the
content in the output register. Then both registers are placed in the test mode to
produce pseudo-random inputs and calculate the expected signature code.
Finally, the signature code is shifted out the scan chain. Figure 5.29(b) shows
the block diagram of BIST.

(a)

(b)
Figure 12.29: BIST (a) a 3-bit register and (b) PRSG and signature analyzer used for test
circuit

There are many other BIST techniques such as memory BIST, parallel BIST,
which are not covered in this text. Learner is encouraged to learn them.

- 154 -

12 Testing of VLSI Circuits

12.6 Failure Analysis


Failure analysis is important in semiconductor industry because it helps to
identify the cause of the failure of the circuit. Knowing the cause of the failure,
preventive measure or corrective action can be taken to prevent re-occurrence of
the problem. Solving the root cause of the failure shall mean the loss due to
failure can be minimized and at the same time, the reliability of the circuit can
be ensured in terms of quality assurance.
In the section learner will the method to de-capsulation of the package
VLSI circuit in order we can use optical aid to visually inspect the failure site so
that the cause of failure can be identified. Learner will also learn the common
causes of the failure, which can be fabrication related, assembly related, and
handling issue such as failure due to static electricity discharge, electrical
overstress due supply voltage over the limit of the circuit etc. The last part of
the section, learner will learn how to correlate the test failure data with the
physical failure site.

12.6.1 Method of De-capsulation


The failure VLSI integrated circuits are in package form which can general be
classified as ceramic or plastic package (epoxy package). In order to have visual
inspect the integrated circuit, the device needs to be de-capsulated.
Ceramic package can be easily de-capped by blade to open the lid of the
package. However, to encapsulate the plastic package is not that easy. A small
hole or several holes is to be drilled on the package with a mounted drill and a
holder to hold the device. For a large package type like quad flat pack, grinding
is necessary. Since the thickness of the package is thin, care must be taken to
ensure the surface of die (integrated circuit silicon) is not being damaged by the
drill bit because this will destroy the evidence of the cause of failure. After this
procedure, fuming nitric acid is dripped on the package to dissolve the plastic
material so the die surface can be exposed for optical inspection. Safety
precaution must be taken since the fuming nitric acid is harmful and corrosive.
It is advised to wear a safety goggle and face mask and the procedure to be
performed in a fume hood. After dripping the fuming nitric acid on the plastic
package, the acid would dissolve the package material. The dissolved plastic
material is then cleaned with acetone solution. The procedure of dissolving
plastic material and cleaning with acetone is done repeatedly until the surface of
the die exposed for the ease of optical inspection. Figure 12.30 shows the
- 155 -

12 Testing of VLSI Circuits

picture of a de-capsulated quad flat pack QFP plastic packaged integrated circuit.
It shows that exposed die.

Figure 12.30: A de-capsulated plastic packaged integrated circuit

Visual inspection can be done to check the integrity of the quality of bond wire
and check the surface to see if there visible defect such as scratch, missing wire,
and chip-off that course the failure of functional test. 200X to 400X optical
inspection can be used to identify the failure due to static electricity defect (due
to handling), micro assembly defect, fabrication defect, and test operation. With
help of circuit layout and the test failure data, learner can identify the location of
failure on the die. If visual inspection and optical inspection can not locate and
identify the failure site, the use scanning electron microscope SEM will help the
reveal the failure site. The picture shown in Fig. 12.31 is a SEM picture
showing failure site of the transistor due to electrostatic discharge ESD.

Figure 12.31: A SEM picture showing the failure site of a MOS transistor

Before subjected to scanning electron microscope (SEM), the integrated circuit


needs to de-layer, which is the process of removing various layers of the
- 156 -

12 Testing of VLSI Circuits

integrated circuit such as the glassivation layer, aluminum metallic interconnect


layout, and oxide isolation layer , nitride isolation layout and polysilicon layer
of integrated circuit. After the removals of these layers, it allows access to the
surface of diffusion layer for SEM revelation.

12.6.2 Cause of Failure


There are many causes of integrated circuit failure. The most common failure
are coming from fabrication, assembly, and handling problem and test
overstress problem at test operations. As you already know, for the fabrication
of a VLSI circuit, it involves multiply repeated process steps. These process
steps can leave multiply problems such as over etch, metal shorting, mask
misalignment, residue of photoresist if some of these process steps are out of
control, which means it does not comply to process specifications. The
mentioned fabrication process problems will cause non-functionality of the
integrated circuit either at probe test, a test before assembly used to grossly
check the functionality of the integrated circuit and a package final test. Usually
the failure will show-up as open and short test failure and gross functional
failure.
There are a number of assembly processes, which can be summarized as
wafer cutting, die attach, wire bond, encapsulation, environmental test, tin
plate/lead soldering, form and trim. All these processes particularly the process
before encapsulation, can cause integrated circuit failure due to scratch, chip-off,
eutectic attached die lift etc. A scratch on the integrated circuit will cause gross
functional failure.
In test operation, the most common causes of the failure are electrostatic
discharge and electric overstress due to improper set-up procedure and sequence
in the test program. Proper grounding of the ATE and automatic test handler
ATH and grounding of working personnel are necessary to prevent failure due
to ESD.

12.6.3 Failure Correlation


Since cause of failure at test operation can be from multiply sources. One of the
primary ways to identify the failure is from the failure test data. Since the test
for an integrated circuit basically consists of open/short test, gross functional
test, dc test, and ac test, we can rely on the failure data to determine the cause of
the failure. If the device failure open/short test, from the test data, we will know
which pin/pins are having either short or open failure. We can then confirm by
- 157 -

12 Testing of VLSI Circuits

de-cap the package for ceramic package or x-ray the plastic package to locate
and confirm the failure site. For the case of open/short test, it can be due to
missing bond wire or bond wire shorted to adjacent bond wire.
In the case of functional failure like the case of memory array failure, test
data will show the address location of failure that can be traced to a particular
row and column of memory matrices on the integrated circuit with aid of the
layout diagram of the integrated circuit. In this manner, we can correlate the
failure data with physical site of failure.
In the case of ac failure, the correlation of failure data cannot be traced to
the physical failure site. This is because the failure is related with the physical
parameters of the transistor in the integrated circuit. As you have learnt in Unit
3 Parasitic Extraction and Performance, they are related to the dimension and
particularly the doping concentration, and threshold of the transistor. If such
failure occurred, we can check back the data of the process parameters used
during fabrication for further understanding of the failure.

Exercises
12.1. State three methods that can be used to minimize of the design constraints
due to latch-up problem.
12.2. As a design engineer you know that there is an npn parasitic bipolar
junction transistor in the n-MOS transistor strcuture. Name the method
used to in-active this transistor.
12.3. State the reason why there is no diode circuit at the output of the logic
gate to protect against ESD damage.
12.4. The output low voltage (VOL) specification of the CD4011 2-input NAND
gate is given as follow. Draw the test set-up diagram to perform this test.
Limit at Indicated Temperature (0C)
+25

Conditions
Characteristics
Output Low
Voltage
VOL max.

VO
(V)

VIN
(V)

VDD
(V)

0, 5
0, 10
0, 15

5
10
15

-55

-40

+85

+125

Min

Typ.

Max.

Units

0.05

0.05

0.05

0.05

0.05
0.05

0.05
0.05

0.05
0.05

0.05
0.05

0
0
0

0.05
0.05
0.05

- 158 -

12 Testing of VLSI Circuits

12.5. A combinational circuit has logic function Y= (A + B + C) (D + E) , what is


the number of test vectors required to fully test the functionally of this
logic circuit.
12.6. Using stuck-at-fault method to find the optimum test vector patterns to
test the functionality of the following combinational logic circuit.

12.7. A linear feedback shift register is shown in below. Draw the timing
diagram of the register.

12.8. The signature analyzer circuit shown below in scan in data sequence
100110. Find the compressed signature out code assuming the initialized
content of the analyzer is 000.

- 159 -

12 Testing of VLSI Circuits

12.9. We notice most of the time, the failure site of a MOS transistor is found
at the drain site of the transistor. Can you explain the reason?
12.10. Do you think defect caused by assembly processes can be minimized or
eliminated?
12.11. Why it is necessary to ground the operator working in test area to prevent
the static electricity damaging the integrated circuit?

Bibliography
1.
2.
3.
4.

Neil HE Weste and David Harris, CMOS VLSI Design: A Circuits and
Systems Perspective, third edition, Pearson Addison Wesley, 2005.
M. Machael Vai, VLSI Design, CRC Press LLC, 2001.
John P. Uyemura, Chip Design for Submicron VLSI: CMOS Layout and
Simulation, Thomson, 2006.
John P. Uyemura, CMOS Logic Circuit Design, Kluwer Academic
Publishers, 2002.

- 160 -

Index
A

Acetone solution ...................................156


Application specific IC .........................149
Automatic test equipment .....................141
Automatic test handler ..........................158
Automatic test pattern generation .........145
Average selling price ............................128

In-circuit testing....................................146
L
Layout versus schematic check ............123
Linear feedback shift register ...............152
Load board ............................................130
N

NAND gate ...........................................145


NOR gate ..............................................142

Bond pad ...............................................130


Built-in logic block observation............154
Built-in self test.............................145, 152

O
Observability.........................................145
Open/short test ......................................134
Output high current...............................138
Output low current................................137

C
CD4011 .................................................132
Ceramic package...................................156
Complete feedback shift register ..........153
Controllability.......................................145

P
Probe test ..............................................126
Propagation delay .................................139
Pseudo-Random Sequence Generator ..152

D
Design rule check..................................122
Device specification..............................132
Device under test...................................129
Dual in line............................................133

Q
Quad flat pack.......................................157
Quiescent device current.......................137

E
Electrical rule check..............................125
Electrostatic discharge ..........................134

Flip-flop ................................................147
Fuming nitric acid .................................156

Scan method..........................................149
Signature analyzer ................................154
Silicon control rectifier .........................123

Rule of Ten ...........................................141

Gray-code counter.................................147
Gross functional test .............................136

Test fixture....................................130, 146


Test program.........................................128
Test vectors...........................................142

- 161 -

Index

- 162 -