You are on page 1of 26

QUALITY CONTROL REGISTER (Plant Site)

NAME OF WORK:- IMPROVEMENT AND STRENGTHENING OF BADDI SAI RAMSHEHAR ROAD KM


0/0 TO 20/0 (SH:- C/O ROAD SIDE U-SHAPE DRAIN & P/L GSB, G-II AND TARRING
IN PATCHES IN KM 4/0 TO 8/0)

AGENCY:-

SH. RAVINDER GUPTA CONTRACTOR

AGGREEMENT NO. :-

OF 2011-12

DATE OF START :-

DATE OF COMPLETION:-

..

TIME:-

ESTIMATED COST:-

Rs.

AWARDED AMOUNT:-

Rs. .

Certified that this register contains

leaves.

VOLUME-II
PLANT SITE

AGENCY: SH. RAVINDER GUPTA


BADDI SAI RAMSHEHAR ROAD KM. 4/0 TO 8/0

INDEX

1.
2.
3.
4.
5.
6.
7.
8.
9.

..
.
..

.
..
.

FLAKINESS INDEX OF AGGREGATE


(G-II)
SIZE OF AGGREGATE

Passing through IS
Sieve (mm)

Retained on IS Sieve
(mm)

63

50

Weight of fraction
consisting of at least
200 pieces (g)

W1=

Thickness of gauge
size, (0.6 times the
mean sieve) (mm)

33.90

Weight of aggregate
in each fraction
passing thickness
gauge (g)

M1=

50
40
31.5
25
20
16
12.5
10
Total

40
31.5
25
20
16
12.5
10
6.3

W2=
W3=
W4=
W5=
W6=
W7=
W8=
W9=
W=

27.00
21.50
16.25
13.50
10.80
8.55
6.75
4.89

M2=
M3=
M4=
M5=
M6=
M7=
M8=
M9=
M=

Flakiness Index (F.I.) = ----------------- x 100 = (%)


W

Permissible Limit ..

Max. 30% in sub base, 25% in Base and 20 in surface


course

Aggregate Impact Value of Aggregates

Range of Sieve:
15

10.0 mm to 12.5 mm

No. of Blows:

Height of Fall:
Crushing: Sudden

380 mm

Method of

Date

Location

Weight of aggregate
filled in the cylinder
(Sample passing through
12.50mm IS sieve
and retained on10 mm. sieve)
(gm.)
(W1)

Weight of aggregate
passing 2.36 mm
sieve after test

A.I.V.
W2/W1x100%

(gm.)
(W2)

Sieve analysis of aggregate 13.2 mm to 5.6 mm nominal size (PC)


Date &
location

Wt. of
sample
In gm.
(Ww)

I.S.sieve
Designation

Wt of
sample
retained

(mm)

%age of wt.
retained

Cumulative %
of wt. retained

(%)
(gm.)

%age of wt.
passing
(%)

Required
%age of wt.
passing
(%)

(%)

13.2

100

11.2

88-100

5.6

31-52

2.8

5-25

0.090

0-5

Qualified / not
Qualified

Tested by.

13.2

100

11.2

88-100

5.6

31-52

2.8

5-25

0.090

0-5

13.2

100

11.2

88-100

5.6

31-52

2.8

5-25

0.090

0-5

13.2

100

11.2

88-100

5.6

31-52

2.8

5-25

0.090

0-5

QUALITY CONTROL REGISTER VOLUME-I

NAME OF WORK:- IMPROVEMENT AND STRENGTHENING OF BADDI SAI RAMSHEHAR ROAD KM


0/0 TO 20/0 (SH:- C/O ROAD SIDE U-SHAPE DRAIN & P/L GSB, G-II AND TARRING
IN PATCHES IN KM 4/0 TO 8/0)

AGENCY:-

SH. RAVINDER GUPTA CONTRACTOR

AGGREEMENT NO. :-

DATE OF START :-

OF 2011-12

DATE OF COMPLETION:-

..

TIME:-

ESTIMATED COST:-

Rs.

AWARDED AMOUNT:-

Rs. .

Certified that this register contains


.

PMGSY
CONCRETE WORK

leaves.

AGENCY: M/S H.S. ENGINEERS & ASSOCIATES


SITALPUR NANOWAL ROAD KM. 0/0 TO 18/400

INDEX
1.
2. ..
3. .
4. ..
5.
6.
7. .
8. ..
9. .
10.
11. ..
12. .
13. ..
14.
15.

ACCOUNT OF BITUMEN

DATE

REFERECE TO RECEIPT/ISSUE

RECEIPT

ISSUE

C.B.

REMARKS

Sieve analysis of G.S.B. (closed graded) G-I

Date &

Wt. of

I.S.sieve

location

sample

Designation

Wt of
sample
retained

(mm)

(gm.)

%age of wt.
retained

Cumulative % of
wt. retained

%age of wt.
passing

(%)

(%)

(%)

Required
%age of wt.
passing

Qualified / not
Qualified

Tested by.

In gm.
(Ww)

Contr. or representative
Tested by

(%)

E.E.

A.E

A.A.E

Tests for field Density and Moisture content of Granular sub grade
Bulk density of sand = (Ys)
density :Weight of sand filling the cone =
moisture contents:%

gm/cc
gm./cc.
(W2) gms

Max. dry
.

Optimum

Date &

Wt. of

Wt. of

Wt. of

location

sample

sand +
cylinder

sand +
cyl.

In gm.
(Ww)

in gm.
(W1)

After
pouring
In hole
In gm.

Wt of
sand
filling the
hole
In gm

Bulk

Moisture

Moisture

density

Wt. of
dry
Soil

Contents

Contents

of sub

In gm.

(gm)

(%)

grade

(Wd)

(W1-W2W3)

Yb=

(W4)

Ww/W4xYs

Dry
density
Yd=
Wd/WxYb

(Yb)

(W3)

Checked by
Tested by

PRIME COAT
Rate of Spread of Binder
Tray size: 20x20x3 mm
0.040 sqm
Permissible limit:

Area of tray:
/ sqm. ( +10% of specified rate)

Date /
location

Weight of
bitumen and
tray

Weight
of tray

Net weight of
bitumen

Rate of spread

Signature

20MM PREMIX CARPET


Binder Content
Type of wearing course: 20 MM PC

Required binder contents: 3.50%

Date

Weight of mix

Weight of

weight of

Weight of

/ location

taken before

filter paper

mix after

filter paper

extraction

before

extraction

after
extraction

extraction
(A)

(B)

(C)

(D)

Weight of
filler
collected
from
extract
after
allowing
for setting

Weight of
filler
collected
In filter
paper

Wt. of
aggregate
+filler
collected
after
extraction

(B-D)=F

(C+E+F)=G

%age of
bitumen in
the mix

(A-G)x100
A

(E)

Temperature record of 20 mm Premix carpet


Permissible limit: (a) At the time of laying =
(b) At the time of rolling =
Date/
Location

Time

Vehicle No.

Temp.
at
Time of
laying

Temp.
at
the time
of
rolling

Teste
d
by

Sig. of
contr./
repres
entati
ve

GRANULAR
CONSTRUCTION

WATER BOUND MACADAM


G-II

GRANULAR
CONSTRUCTION

GRANULAR SUB BASE

Sieve Analysis of G-II


Date &
location

Wt. of
sample
In gm.
(Ww)

I.S.sieve
Designation
(mm)

Wt of
sample
retained
(gm.)

%age of wt.
retained

Cumulative % of
wt. retained

%age of wt.
passing

(%)

(%)

(%)

Required
%age of wt.
passing
(%)

90

100

63

90100

53

25-75

45

0-15

22.4

0-5

90

100

Qualified / not
Qualified

Tested by.

63

90100

53

25-75

45

0-15

22.4

0-5

90

100

63

90100

53

25-75

45

0-15

22.4

0-5

Contr. or representative
Tested

E.E.

A.E

A.A.E

FLAKINESS INDEX OF AGGREGATE


(G-II)
SIZE OF AGGREGATE

Weight of
fraction
consisting of
at least 200
pieces (g)

Thickness of
gauge size,
(0.6 times the
mean sieve)
(mm)

Weight of
aggregate in
each fraction
passing
thickness
gauge (g)

Passing
through IS
Sieve (mm)

Retained on
IS Sieve (mm)

63

50

W1=

33.90

M1=

50

40

W2=

27.00

M2=

40

31.5

W3=

21.50

M3=

31.5

25

W4=

16.25

M4=

25

20

W5=

13.50

M5=

20

16

W6=

10.80

M6=

16

12.5

W7=

8.55

M7=

12.5

10

W8=

6.75

M8=

10

6.3

W9=

4.89

M9=

Total

W=

M=

Flakiness Index (F.I.) = ----------------- x 100 = (%)


W

Permissible Limit ..

Max. 30% in sub base, 25% in Base and 20 in


surface course

BITUMINIOUS
CONSTRUCTION

Sieve analysis of aggregate 10 mm nominal size


Date
&
loca
tion

Wt.
of
sam
ple
In
gm.
(Ww
)

I.S.si
eve
Desig
natio
n
(mm)

Wt of
samp
le
retai
ned
(gm.)

%ag
e of
wt.
retai
ned
(%)

Cumula %age
tive %
of wt.
of wt. passin
retaine
g
d
(%)
(%)

Requi
red
%age
of wt.
passi
ng
(%)

12.5

100

10
4.75

85100
0-45

2.36

0-10

Qualifi
ed /
not
Qualifi
ed

Teste
d by.

12.5

100

10
4.75

85100
0-45

2.36

0-10

12.5

100

10
4.75

85100
0-45

2.36

0-10

Sieve analysis of aggregate 20 mm nominal size


Date &
locatio
n

Wt. of
sampl
e
In gm.
(Ww)

I.S.sieve
Designat
ion

Wt of
sample
retained

%age of
wt.
retained

(mm)

(gm.)

(%)

Cumulative
% of wt.
retained

%age of
wt.
passing
(%)

Required
%age of
wt.
passing
(%)

(%)

40

100

20

95-100

10

25-55

4.75

0-10

40

100

Qualified /
not
Qualified

Tested
by.

20

95-100

10

25-55

4.75

0-10

40

100

20

95-100

10

25-55

4.75

0-10

40

100

20

95-100

10

25-55

4.75

0-10

Tests Of Concrete Cubes (Compressive Strength)


Proportion of mix :- C.C. ..
Sl.
No.

Description

Date of
casting

Age 7 days
Due date
of tests

Compres
sive
strength

Age 28 days
Due
date
of tests

Compressi
ve
strength

Tested by

Sig
of
contr
.

Sig.
of
AAE/
AE/
EE

CALIBRATION OF SAND
Sample No.: _____________________________ Calibration Date: _______________
Source: _________________________________ Calibrated by: __________________
S.N
O.

DESCRIPTION

TEST
NO. 1

TEST
NO. 2

TEST
NO. 3

CALIBRATION
1.

Weight of cylinder with full of sand (kg.)

2.

Weight of empty cylinder (kg.)

3.

Net weight of sand in cylinder (1 2) (kg.)

4.

Weight of sand after filling the cone (kg.)

5.

Weight of sand retained in cone (3 4) (kg.)

Average weight of sand in the cone


kg.

+
3

DENSITY OF SAND
1.

Weight of calibrating cylinder with full of


sand (gm.)

2.

Weight of empty cylinder (gm.)

3.

Net weight of sand (gm.) (M)

4.

Volume of calibrating cylinder (V)


Diameter of calibrating cylinder = 10 cm.
Depth

= 15 cm.

V = rx h = 3.14 x 5x 15 = 1178.57 m

Average density of sand =

ATTERBERG LIMITS TEST


DETERMINATION OF LIQUID LIMIT ( L L)
Run Number

Container Number
Weight of
container + wet
soil
Weight of
container + wet
soil
Loss of moisture
Weight of
container
Weight of dry soil
Moisture content
%
Number of blows
LIQUID LIMIT ( L L) = .%
DETERMINATION OF PLASTIC LIMIT (P L)
Run Number

(mc1)

(mc2)

(mc3)

Remarks

Container Number
Weight of container + wet
soil
Weight of container + dry
soil
Loss of moisture
Weight of container
Weight of dry soil
Moisture content %
PLASTIC LIMIT (P L) =

mc1 + mc2 + mc3 = ..percent


3
PLASTIC INDEX (P L)= L L P L = .percent

Contr. or representative
Tested by

E.E.

A.E

A.A.E

PROCTOR DENSITY
Description

of sample

Type of test

Standard proctor

Weight of mould W1 (g)


Volume of mould Vm (cm3)
Percent retained on 20 mm IS Sieve

S.
No.

Weight of
mould +
Compacted
Soil (g)
W1

Weight
of
wet
soil (g)
( W2W1)

Wet
density
(g/cc)
ym

Container
No.

Weight
of
container
(g)

Weight of
container+
wet soil
(g)

Weight of
container+
dry soil
(g)

Weight
of
water
(Ww)
(g)

Weight
of dry
soil
(Ws)
(g)

1
2

3
4

Contr. or representative
Tested by

E.E.

A.E

A.A.E

Moisture
content
%(W)

Dry
density
100 ym
100+W

You might also like