You are on page 1of 10

Organization

Seattle City Council


Date
Dec. 15, 2014

Settlement (in.)

Surface, Building and Benchmark Settlement Since Nov. 24, 2014


0
-0.125
-0.25

Survey Accuracy

-0.375
-0.05
-0.625
-0.75
-0.875
-1
-1.125

-0.636

-0.636

-0.672
-0.696

-0.672

-0.756

-1.25

24 - Nov

29 - Nov

4 - Dec

Deep Benchmark 1
Occidental Ave S and Railroad Way S

9 - Dec

14 - Dec

Dec 12

Settlement (in.)

Surface, Building and Benchmark Settlement Since Nov. 24, 2014


0
-0.125
-0.25
-0.375
-0.05
-0.625
-0.75
-0.875
-1
-1.125

-0.24

-0.24

-0.24

-0.252

-0.288

-0.24

Survey Accuracy

-1.25

24 - Nov

29 - Nov

4 - Dec

Deep Benchmark 2
Second Ave and Marion St

9 - Dec

14 - Dec

Dec 12

Settlement (in.)

Surface, Building and Benchmark Settlement Since Nov. 24, 2014


0
-0.125
-0.25
-0.375
-0.05
-0.625
-0.75
-0.875
-1
-1.125

Survey Accuracy
-1.164

-1.25

24 - Nov

-1.176
-1.164

29 - Nov

-1.236
4 - Dec

S Jackson St and First Ave S


(Survey Control Point - JACK)

-1.176

-1.152
-1.14

9 - Dec

14 - Dec

Dec 12

Settlement (in.)

Surface, Building and Benchmark Settlement Since Nov. 24, 2014


0
-0.125
-0.25
-0.375
-0.05
-0.625
-0.75
-0.875
-1
-1.125

Survey Accuracy
-1.044

-1.25

24 - Nov

-1.08

29 - Nov

-1.032

-1.116

-1.152
4 - Dec

S Main St and First Ave S


(Survey Control Point - MAIN)

-1.152
9 - Dec

-1.056
14 - Dec

Dec 12

Ground Surface Settlement,


as of December 12

Bergman

-0.1

Pike

-0.1

Target
-0.2

SMP 409
-0.1

Alaskan Way
Viaduct
DBM3

X32
SMP 408

X52

Spring

X51

-0.3
-0.2

X50
-0.1

COS 5020
2
-0.

X34

X49

DBM2
United

-0.3

GP-319

SMP 405
X47

Tidal G
-0.4

4
-0.

MYST
X07

-0.5

-0.5

-0.7
-1
.4

Main

-0.9
.8
-0 GP-232

Jack

-1
.4

-1.3

-0.8

-0.7

-1.2

500

Survey Control Point

-1.0

Feet

King

(
!

Near Surface Settlement Point


!
(
SETTLEMENT

-1.1

Inches

Fire

-1.47 to -1.4
-1.39 to -1.3
-1.29 to -1.2
-1.19 to -1.1

-0.89 to -0.8
-0.79 to -0.7

Tunnel
Alignment

Event

-0.6

-0.7

-0.99 to -0.9

-0.8

-1.09 to -1

-0
.9

MTC019

-0.9

Access Shaft

-0.6

X06

DBM1

-0.69 to -0.6
-0.59 to -0.5

-0.7

-0.49 to -0.4
-0.39 to -0.3

-0.6

-0.29 to -0.2
-0.19 to -0.1
-0.09 to 0

.5
-0

GP-276

12 DEC 14

SPRING ST

MADISON ST

MARION ST

COLUMBIA ST

YESLER WAY

S WASHINGTON ST

40

S MAIN ST

S KING ST

S JACKSON ST

80

SENECA ST

NOTE: Vertical Exaggeration = 5X

Groundwater Drawdown from Lower Aquifer Depressurization

40

Preconstruction Groundwater Head


(Lower Aquifer)

Recent Fill

Access
Shaft

-40

80

-40

Till
-80

-80

Current Groundwater Head


(Lower Aquifer)
20

12/1/2014

12/6/2014

12/6/2014

11

7
12/1/2014

12/6/2014

12/6/2014

12/5/2014

Outwash Sand

1. This plot is intended to present information regarding the effect


of dewatering of TBM Access Shaft on groundwater levels in the
project area.
2. Observations are based on data obtained by STP and
downloaded from Geoscope on 12-1-2014.

208+00
I

3. ESUs were estimated by WSDOT based on boring logs, where


available, or from comparison of the measurement point depth
with the Geotechnical Baseline Report centerline profile.
4. Drawdown was calculated by subtracting the initial reading of
the measurement point (prior to 9-21-2014) from the average of the readings
observed between 11-17-2014 and 12-01-2014.

210+00
I

Drawdown
Level
(ft)

212+00
I

!
(0-2
!
( 3 - 10
!
( 11 - 20
! 21 - 30
(
!
( 31 - 50
! Over 50
(

214+00
I

12/5/2014

206+00

216+00

Original Observed
Groundwater Level
Drawdown Observed
Groundwater Level

218+00

220+00
I

Horizontal Scale:
Vertical Scale:

0
0

222+00
I

200

Feet
40

Feet
Vertical Datum: NAVD 88

12 DEC 14

224+00

NOTES:

204+00

202+00

12

-160

-200

14

11/26/2014

200+00

15
12/6/2014

14

-120

14

12

12/6/2014

14

12/5/2014

19

89

198+00
-240

16

21

12/5/2014

12/5/2014

19
12/5/2014

-200

12/5/2014

20

20
12/5/2014

50
12/1/2014

91

10
12/5/2014

140

Clay
w/ Silt Interbeds

12/1/2014

89
104

11/20/2014

11/29/2014

-160

12/1/2014

84

83 104
12/1/2014

11/29/2014

71

98

11/29/2014

63 102 107

12/1/2014

-120

21-1-21400-053

226+00
I

228+00
I

AWV Central Waterfront Bored Tunnel


TBM Access Shaft

-240

GROUNDWATER DRAWDOWN FROM


LOWER AQUIFER DEPRESSURIZATION

FIG. 1

Generalized Aquifer Profile with Groundwater Wells

#
*

#
*

Ground Surface

Confined Groundwater Level


Unconfined Groudwater Level
Screened Observation Well
In Upper Aquifer

Upper Aquifer
(Recent Soil & Fill)
Aquitard
(Clay w/ Silt Interbeds)

Screened Observation Well


In Lower Aquifer

Lower Aquifer
(Outwash Sand)

12 DEC 14

Schematic of Pressure changes due to Dewatering

100 lbs.
100 lbs.

Coil Spring

Coil Spring

12 DEC 14

Alaskan Way Viaduct


R E P L AC E M E
NT
PROGRAM

Alaskan Way Viaduct Survey Results


S Washington Street

100

101

S Main Street

102

103

104

105

106

S Jackson Street

107

108

109

110

111

S King Street

112

113

114

115

116

117

Settlement in inches

-1

-2
2010

2014 (Oct. 18)

2014 (Dec 7)
prepared on Dec. 12, 2014
10