Professional Documents
Culture Documents
Tech Sheet
Product Description:
Part Number:
Number:
080-2047-120 MFH Hydrostatic Set Retrievable Packer, 6 5/8" 24#, 7" 38# 080-2047-120
Features/Description
Operationally simple.
The Model MFH Hydrostatic Packers is a retrievable, double-grip packer set by either the
Hydrostatic head of the well, tubing pressure, or both and will hold pressure from above or
below. It can be run as a single packer or as a lower packer in multiple packer hookups using
dual or triple string packers. It also can be run as an upper packer in selective single string. For
applications to: Production, injection and zonal isolation; Single string selective completions or
dual string completions with multiple packers; Deviated wells or other applications where no
rotation for installation or removal is desired; Applications where displacing and setting is
desirable after the well is flanged up is desirable; Applications where prohibit mechanically-set
packers; Test tubing string before packer setting or to independently set and test individual
packers in multiple packer completions.
Operating Instructions
OPERATION INSTRUCTIONS:
The model "MFH" Packer is actuated by pressuring the tubing to obtain a differential at the
packer. To accomplish this a means of temporarily plugging the tubing below the packer must
be provided. Such as Pump Out Plug at some point below the packer. If more than one "MFH"
Packer is to be run,one of the top temporary tubing plugging devices must be run below the
lowermost packer. When the tubing is pressured in this case, all of the Hydrostatic Packers will
be set simultaneously. (If it is desirable to individually set and test each packer,a
recommended practice is included below.)
Running:
1. For applications where the hydrostatic pressure is 1,500 psi or above
Run packer to setting depth, flange up the well and displace tubing. Place a ball in the tubing
string and pump down to the seat in the Pump Out Plug below the Model "MFH" Packer.
Increase the tubing pressure to approximately 1,000 psi over the annulus pressure at the
packer. (At hydrostatic pressure over 7,500 psi the actuating pressure will increase with
increasing hydrostatic pressure due to load on Segment Retainer.) This will shear the Shear
Screws in the Segment Retainer, allowing it to move up, and release the Ring Segments and
unlock the Connector Mandrel from the Mandrel. The hydrostatic pressure of the well fluid then
forces the Connector Mandrel down into the Atmospheric Chamber. This action moves the
Receptacle down toward the Slip Ring, setting the Slips and packing off the tool. The
downward movement of the Receptacle, Packing Element Mandrel, and Connector Mandrel,
etc., is held by the Body Lock Ring engaging the Mandrel. If after the packer is set, the tubing
contracts, the Mandrel can move up until the Shear Ring Retainer contacts the Shock
Absorber at bottom of the Setting sleeve. This movement will be retained in the Body Lock
Ring. If the Tubing elongates, the downward force of the Mandrel is transmitted through the
Body Lock Ring, Packing Element Mandrel, Receptacle, Packing Elements, and Cone, adding
to the setting force.
After the Packing Elements are sealed off, any differential pressure from below the tool will
actuate the hydraulic hold-down Pistons and engage them in the casting. The tubing pressure
differential is then increased across the Hydro-Trip Pressure Sub Ball Seat to pump the Ball
through the finger-type Ball Seat and allow it to gravitate to bottom. The Ball Seat fingers will
expand into the recess provided and leave the tubing full opening.
2. For applications where the hydrostatic pressure is less than 1,500 psi
The Model "MFH" Hydrostatic Packer is designed to allow the packer to be set hydraulically at
shallow depths where the hydrostatic pressure is not sufficient to effectively set the packer. For
this application, the packer is dressed with an additional number of Shear Screw to increase
the actuating pressure to 2,000 psi. The actuating pressure is increased from 1,000 psi to
2,000 psi under this condition in order to provide additional stretch in the tubing at the time the
packer is set so that there is a great likelihood that the rebound will shoulder the Mandrel
against the Shear Ring when the Hydro-Trip Pressure Sub is sheared out. In order to allow
adequate safety factor, the Hydro-Trip Pressure Sub must be dressed to require 3,500 psi
differential to blow the Ball through the Sub.
Note:
In order for the packer to be set, the Hydro-Trip Pressure Sub must allow the tubing pressure
to be increased over the annulus pressure to a level sufficient to release the Ring Segments. It
is important to note that in wells that take fluid under hydrostatic pressure alone, it is possible
to obtain a differential across the Ball without pressuring the tubing. If the tubing, below the
Ball, is isolated from the annulus (as with a permanent packer below the Hydrostatic Packer),
the Ball could shear the Hydro-Trip Sub without setting the packer. Under these conditions,
provisions should be made for running a seating nipple and landing a plug on wireline.
Releasing Procedure:
The standard Model "MFH" Packer is equipped with a 30,000 lb. Shear Ring for a straight
upstrain release. Other values of Shear Rings available are shown in the table below.
Shear Ring Availability Chart
Shear Ring (lbs.)
Packer Size
20,000
30,000
40,000
50,000
43
45
46
47
48
49
51
Determination of Shear Release Values (Prefer to Mandrel and Tubing area table)
As the Shear Ring limits the upward travel of the Mandrel when the packer is set, thereby
preventing the packer from unsetting, it is imperative that due consideration is given to the
selection of a shear-out value. Four general sets of conditions are described below.
(Remember that the following calculations include only piston effect due to pressure. Other
factors, specifically ballooning and temperature effects, can contribute significantly to the force
on the Shear Ring. If the packer is to be used for treating of stimulation, these factors must be
considered.)
Am=Area of Mandrel OD
Ai=Area of Tubing ID
Ao=Area of Tubing OD
*Pt=Change in Tubing Pressure (psi)
*Pa=Change in Casing Pressure (psi)
Since it would be almost impossible to foresee and calculate all of these factors, a 30,000 lb.
shear value will usually suffice unless it is known in advance that any of the above forces will
be unusually large. For instance, if the installation is such that the zone above the lower packer
in a selective completion can be drawn down considerably, the upward force described in Step
4 should be calculated to verify that the 30,000 lb. shear force is sufficient: likewise, if the well
is to be treated from the surface at high rates, thereby cooling the tubing considerably,
temperature effects could become significant and should be calculated or estimated.
Packer Size
Tubing Size
Am (sq. in.)
43
2-3/8
1.15
0.2*
4.2
45
2-3/8
1.8
0.5
4.9
2-3/8
4.0
2.7
7.1
2-7/8
2.4
0.6
7.1
2-3/8
2.8
1.5
5.9
2-7/8
3.6
1.8
8.3
3-1/2
3.4
1.0
10.5
46 & 47
49 & 51
* On this packer the annulus hydrostatic exerts a force up on the Mandrel equal to 0.2 sq. in.
resulting in a load on the shear ring. This effect is small, but should be taken into account when
selecting a shear ring for the packer.
Area
Shear Screws
Tubing pressure
to set
available
packer &
for
pack-off w/ shearing
Hydrostatic Hydraulic
zero
Number to
Size
shear
Brass
Hydrostatic screws
Annealed
steel
(psi) required to
shear each
shear screw
Brass
Annealed
steel
43
3.2
1.8
4,050 psi
3.0
#10-32
350
410
45
4.5
2.7
2,750 psi
4.3
5/16-18
550
750
46
6.2
3.8
2,560 psi
6.6
5/16-18
360
490
2 Brass
47
6.2
3.8
2,560 psi
6.6
5/16-18
360
490
49
8.6
4.1
4,000 psi
7.9
3/8-16
450
610
51
8.6
4.1
4,000 psi
7.9
3/8-16
450
610
Classification
F)
End
Middle
End
Standard Tool
0-275
90
70
90
Low Temperature
0-200
80
60
80
Moderate Temp.
250-350
95
80
95
Specifications
Casing
OD
WT
(T&C)
6 5/8"
24
7"
38
Setting Range
Min. ID Max. ID
5.830
5.937
Min. OD.
Max. OD
5.562
6.139
Packer
Packer
max. O.D
Bore
5.656
2.416
Thread
Box Up
Pin Down
2 7/8 -8 EUE
Assembly Instructions
NOTES: Lubricate O-ring and O-ring grooves and all mating threads before assembly. Apply
the grease to the Slip Ring slots, Cone slots and Slip areas that contact these two parts. Pack
the space between Slip Ring and Segment Retainer with the grease. This will help prevent
buildup of the well fluids in this critical area.
1. Install all O-ring.
2. Assemble pistons (item 8), piston springs (item 6), restraining pins (item 7), and piston
retainers (item 52) in receptacle (item 4).
3. Assemble slips (item 21) in cone (item 18) and slip ring (item 26).
4. Install segment retainer (item 30) into the segment retainer housing (item 28) and
install the proper number of shear screws (item 29).
5. Install pickup ring (item 35) in segment retainer housing.
6. Place segment retaining ring (item 34) on connector mandrel (item 27) and install
connector mandrel in segment retainer.
7. Place mandrel (item 50) in vise and clamp just above wicker threads
8. Move connector mandrel assembly up from the bottom of the mandrel. Caution: O-ring
friction will require the use of some driving force. Care must be taken not to damage
the seal diameters of the mandrel. A wooden block struck with a rubber mallet will
drive assembly onto mandrel.
9. Line segment slots up with groove on mandrel.
10. Place segment retainer housing (item 28) in the vise.
11. Install ring segments (item 36) and segment retaining ring (item 34).
12. Install segment retainer housing (item 28) over ring segments (item 36). Pickup ring
(item 35) will be shouldered against piston end of connector mandrel (item 27).
13. Install snap ring (item 41).
14. Install setting sleeve (item 40). LEFT-HAND THREAD.
15. Install lower seal ring (item 45).
16. Install lower seal ring retainer (item 43).
17. Install shock absorber (item 46).
18. Install shear ring retainer (item 47).
19. Install shear ring (item 48) and move shear ring retainer back over shear ring.
20. Install cap screws (item 49).
21. Install bottom sub (item 51).
22. Install connector mandrel ring (item 25).
23. Install ring carrier (item 24) and lock ring (item 23).
24. Install lock ring retainer (item 22) into packing element mandrel (item 19).
25. Make up packing element mandrel onto connector mandrel. LEFT-HAND THREAD.
26. Make up slip (item 21), slip ring (item 26), and cone assembly onto segment retainer
housing. LEFT-HAND THREAD.
27. Install torque pins (item 20).
28. Install lower gage ring (item 17) and packing element system (item 12, 14, 16).
29. Install upper gage ring (item 11) on receptacle (item 4) and install receptacle on
packing element mandrel (item 19).
30. Make up top sub (item 2).
Checking correct assembly of packers all size: It is important the ring segments of the model
"MFH" packers be positioned and retained correctly Therefore each packer must be checked
at assembly in the following manner:
1. Strike lower end of mandrel with a rubber mallet.
2. Repeat on upper end.
3. Repeat above steps, checking mandrel movement each time. Packer is assembled
correctly if mandrel does not move more than 3/8 inch in either direction.