ELISSA 2012-13
Hull & Deck Restoration
Renewed frame.
Constant
inspection.
After 135 years under concrete, the rivet heads are still as
perfect as the day they were driven.
Plate bolted up ~ rivets are put in empty holes and then the
bolts are removed and rivets passed.
A shinny new rivet~ the rivet gun polishes the rivet point as it
works the rivet in the chamfered hole.
1,900 square feet of steel plate renewals about 1/3 of her hull plating.
Purple area is actual plate renewal; red outline area is original USCG anticipated renewals.
Quarterdeck demolition
begins. It was a challenge
keeping the ship open to the
public during this job.
Hand-cut dovetails in 3
thick teak with exquisite
detailing.
The new skylight being glued up and awaiting the new glass
panels with an exact replication of original etched design.
Craftsmanship