You are on page 1of 80

Structural Engineering Report MUST-98-1

Strengthening Existing Reinforced Concrete


Beams for Flexure Using Bolted External
Structural Steel Channels
by
Christopher M. Foley and Evan R. Buckhouse
January 1998

Marquette University
College of Engineering
Department of Civil & Environmental Engineering
Research Report

MUST-97-1: i

Table of Contents
1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1 Research Significance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2 Review of Existing Literature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.3 Evaluation of Previous Research . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1
2
3
9

2.0 Design Procedure for Concrete Control Specimens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11


3.0 Design Procedure for Strengthened Members . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
4.0 Construction of Test Specimens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
5.0 Experimental Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.1 Strain Gage Instrumentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2 Loading Test Frame and Data Acquisition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.3 Testing of Control Beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.4 Testing of Wedge Expansion Anchor Beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.5 Testing of Epoxy-Anchor Beams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.6 Load Deformation Behavior of Specimens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.7 Strain Distribution Within the External Channel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

25
25
27
27
29
32
33
35

6.0 Evaluation of Proposed Design Methodology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37


7.0 Conclusions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
8.0 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Appendix - A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72

MUST-97-1: ii

Acknowledgments
This research report is based on the MS Thesis of Evan R. Buckhouse entitled: External Flexural
Reinforcement of Existing Reinforced Concrete Beams Using Bolted Steel Channels. The authors would
like to thank the Graduate School at Marquette University for the financial support during the duration of
this project. The support of the Department of Civil and Environmental Engineering of Marquette
Universitys College of Engineering is gratefully acknowledged.
The authors would also like to acknowledge the support of the Society of Iron and Steel
Fabricators of Wisconsin for the generous donation of the structural steel channels used in the research;
Ace Iron and Steel Corp. (Mr. David Mathews) for fabrication of the channels; Zignego Redi-Mix, Inc. for
the concrete donated to the research effort; Powers Fastening, Inc. for the generous donation of fastening
materials, without which, this research project could not be undertaken.

MUST-97-1: 1

1.0

Introduction

Many existing buildings and bridges are in need of repair or upgrade. A crumbling infrastructure is a
reality that all communities are dealing with. Existing beam members that are deficient with respect to
flexural capacity are costly to demolish and reconstruct. An efficient, cost-effective means of
strengthening existing concrete beams is needed so an unsafe or unuseable structure can once again be
utilized.
The method of epoxy-bonding steel plates and fiberglass reinforced plastics to the tensile face of
reinforced concrete beams has been studied extensively as a method to strengthen existing reinforced
concrete structures. Experimental results have proven that these techniques can be an effective means of
increasing a beams flexural capacity and stiffness. However, a problem that has been encountered
during the testing of reinforced beams with epoxy-bonded plates is separation of the plate from the beam
at the plate termination prior to concrete compression failure. Furthermore, there is some question as to
the loss of the ductile failure mode usually associated with reinforced concrete failure when carbon fiber
sheets and plates are used for external reinforcement. The use of expansion anchors has been examined
as a method of eliminating epoxy-bonded plate tear off at termination.
Bonding of steel and fiber-reinforced plastics is the most popular means of reinforcing existing
concrete beams. However, applying epoxy can be a delicate process requiring near perfect working
conditions. The beam must be properly prepared for epoxy application (smooth, flat, sandblasted, dustfree, clean surface), and the thickness of the epoxy layer must be uniform. Perfect conditions are not the
norm when one is working in the field. This procedure can be successful, but the quality control
measures can be extreme. A solution to this problem is to take advantage of the fact that bolts have been
successful in stopping plate tear-off, and go one step further and use anchor bolts as the main system of
anchoring supplemental external steel reinforcement to the beam. This method can be used under
frequently encountered field conditions since the work environment need not be ideal and prep work for
mounting the reinforcement is minimal (aside from drilling holes into the flexural member).

MUST-97-1: 2

The objective of the research outlined in this report was to investigate and evaluate the use of
bolted steel channels to existing R.C. beams as the primary means of additional flexural reinforcement.
First of all, a literature review was conducted to evaluate previous experimental and analytical
procedures, including similar research results. A design procedure is developed for the flexural
reinforcement of existing R.C. beams using structural steel channel shapes. An experimental program
involving nine concrete beams, 10"(w) x 18"(h) x 15'-6"(l), was conducted to test the design procedure
developed. Three beams served as control beams with no external reinforcement. The remaining beams
consisted of three utilizing Rawl-Stud wedge style expansion anchors and three using threaded anchor rod
with Rawl Foil-Fast epoxy-adhesive for attachment of structural steel channel reinforcement. The beams
were designed for shear failure of the mounting anchors for reasons to be highlighted and discussed in the
report.
Testing was done to investigate the increase in flexural strength and stiffness of the externally
reinforced R.C. beams. Each of the nine beams were tested to failure using four point loading. During
testing, the applied load, vertical deflection of the beam centerline, strain in the internal reinforcing steel,
and strain in the web and flanges of the structural steel channel were recorded. The measured ultimate
loading was also recorded.
An analytical technique is developed for predicting the ultimate load; load deformation response;
and strains in the internal and external reinforcement. The theoretical values obtained using the design
procedure and analytical method are compared to the experimental results. Conclusions are drawn and
suggestions for further research are made.

1.1

Research Significance

This research report presents the experimental and analytical results of a practical method of
strengthening existing reinforced concrete beams using structural steel channel shapes bolted to the
exterior soffit. Common construction techniques and materials (structural steel channels, expansion
anchors and epoxy adhesive anchors) are used in the reinforcement scheme developed. Experimental

MUST-97-1: 3

testing is used to evaluate a design procedure developed based on first principles of reinforced concrete
design. The design procedure and experimental results are intended to form the basis for procedures
externally reinforce existing (or damaged) concrete members.

1.2

Review of Existing Literature

A very popular method for reinforcing existing concrete beams is to epoxy-bond steel plates or fiberglass
reinforced plastics (GFRP) to the tension face. Much testing and research has been done involving these
reinforcing schemes. The following is a literature review of relevant articles discussing the utilization of
various reinforcing techniques for increasing the flexural strength of reinforced concrete beams. All of
the experimental results discussed pertain to non-high strength concrete and common reinforcement
configurations and strengths.
Sharif, et al (1994)studied glass-fiber reinforced plastic (GFRP) plates bonded with epoxyadhesive to the beam soffit and sides as means of repairing structurally deteriorated reinforced concrete
beams. A total of ten beams 150 x 150 x 1250 mm (5.9 x 5.9 x 49.2 in) were used, with internal steel
designed to insure an under-reinforced section. Concrete was used with an average compressive strength
of 37.7 N/mm2 (5500 psi). The yield stress of the reinforcement was 450 MPa (65 ksi). Strain gages
were mounted to the tension steel and to the fiberglass plate at midspan. Deflection was measured at the
beam centerline. The beams were simply supported over a span of 1180 mm (46.4 in). The techniques
for repair included bonding of three different thicknesses of GFRP plates to the beam soffit. Anchoring
of the plate ends with steel bolts and the addition of 3 mm FRP plates bonded to the sides of the beam in
the shear zone were evaluated. Lastly, a special I-shaped jacket plate of 3 mm thickness was bonded to
the beam soffit and sides. Each beam was preloaded to a centerline deflection of 10 mm (.3/8 in);
unloaded; repaired using one of four techniques; and then reloaded to failure.
The test results reported show that as the plate thickness increased, premature failure by plate
separation began to occur. The use of steel bolts to anchor the plate to the beam eliminated plate
separation, but introduced a failure due to a diagonal tension crack between the support and the end of the

MUST-97-1: 4

plate. It was concluded that the development of flexural cracks in this region produced high localized
bond stress concentrations at the tension steel which magnified the shear stress causing steep diagonal
cracks. Stirrups in this region failed to bridge these cracks. The use of the added side plates in the region
where the diagonal flexural cracking occurred, resulted in fully developed flexural strength with failure
by crushing of the concrete in the constant moment region. Horizontal flexure cracking formed below the
side plates and developed into a vertical crack up the beam at the end of the side plate. The I-jacketed
beams also reached full flexural capacity.
Jones, et al (1988) attempted to quantify and measure the stresses formed at the plate ends in
simply supported reinforced concrete beams with epoxy-bonded plates on the tensile face. Seven
reinforced concrete beams, 155 x 255 x 2500 mm (6.1 x 10 x 98.4 in.), were tested simply supported over
a span of 2300 mm (90.5 in) with loading at third points. The strain in the plates and the centerline
deflection of the beam was measured. Three beams were reinforced with the varying plate arrangements.
Two used straight plates with the addition of epoxy-anchor bolts at the plate curtailment. The last two
beams had a plate bonded to the bottom and then had different size L-shaped anchor plates epoxy bonded
to the bottom plate which extended up the side of the beam.
The first three beams failed by tearing off of the plate at the end. The two beams with epoxyanchors experienced partial separation of the plates, with the beams eventually failing by crushing of the
concrete in the constant moment region. The L-shaped anchor plates were the most effective reinforcing
system, with each beam reinforced in this manner reaching full flexural capacity. All the anchorage
systems had similar stiffness, about 60% greater than a beam with no plating. The three beams with only
anchor plates had a sudden failure, but the addition of the anchor bolts resulted in a ductile failure for the
two beams reinforced this way.
Hussain et al (1995) repaired pre-loaded beams by bonding steel plates of varying thickness to the
tension face. Eight test beams 150 x 150 x 1250 mm (5.9 x 5.9 x 49.2 in) were discussed. The steel
reinforcing plates were 1100 mm (43.3 in) long, 100 mm (3.9 in) wide, and varied in thickness from 1 to
3 mm (. 1/32 to 1/8 in). The yield stress of the steel plate was 269 MPa (39 ksi). Strain gages were

MUST-97-1: 5

mounted to the main reinforcement, the concrete upper surface at midspan, and to the plate at 50 mm (2
in) intervals to monitor distribution along the plate. Deflection was monitored at midspan of the beam
and at the load points. The beams were supported over a span of 1200 mm (47.2 in) with loading applied
at third points. The beams were all preloaded to 85% of their ultimate load capacity, equivalent to a
centerline deflection of 10 mm (.3/8 in). They were then unloaded allowing the different reinforcing
methods to be applied. The repaired members were then reloaded to failure. The deflection rate during
loading, unloading, and reloading was 1 mm per min. The method of strengthening the beams included
epoxy-bonding steel plates of different thickness to the bottom of the beam. For each reinforcing scheme,
two identical beams were made with one of the beams having anchor bolts installed at the end of the plate
arrangement. Preparation for application of the epoxy was extensive including sandblasting the beam
soffits and then washing them to remove dust. Also, the steel plates were sandblasted to remove the oxide
layer and roughen the surface.
Experimental results showed that as the reinforcing plate thickens, the failures became brittle
(shear-type). This implies that the beams did not have adequate shear strength prior to application of
external reinforcement. The inclusion of end anchorage increased the ductility of the beams with the
thicker plates, but the percentage increase in ductility decreased as the plates got thicker. The prediction
of ultimate load strength for the beams with thin plates ( 1 mm, 1.5 mm) was successful. The beams with
thicker plates (2 mm, 3 mm) failed prematurely due to plate separation, never reaching ultimate capacity.
The addition of anchor bolts did not have any effect in improving ultimate load capacity, with these
beams also failing prematurely.
Swamy, et al (1989) studied strengthening previously damaged structural members with 1.5 mm
plates under sustained loading. Nine reinforced concrete beams 155 x 255 x 2500 mm (6.1 x 10 x 98.4
in) were tested. The beams were simply supported over 2300 mm (90.6 in) with loading applied at third
points. Performance was monitored via measurement of deflections, rotations, concrete strains, and strain
in the reinforcing bars and the plates. Two beams served as control beams with no external plating. The
control beams were tested to failure. One beam was tested to failure with a 1.5 mm plate bonded to the

MUST-97-1: 6

bottom. A set of three beams were preloaded to varying percentages of ultimate strength, unloaded, and
then 1.5 mm plates were epoxy-bonded to the beam soffits. After curing two weeks, they were tested to
failure. Another set of three beams were preloaded to varying percentages of ultimate strength. The
applied load was held constant while the 1.5 mm plates were bonded to the beams. The epoxy was
allowed to cure for a period of two weeks, whereupon the beams were loaded to failure. Preparation for
epoxy bonding of the plates was again extensive with sandblasting occurring prior to application of the
epoxy layer.
All the beams reached full flexural capacity with failure by crushing of the concrete in the constant
moment region and yielding of the reinforcing bars and the plate. The predicted values of ultimate
strength, centerline deflection, and beam rotation were close to the experimental values. Both sets of
beams that had plates applied after initial loading exhibited an increase in stiffness during the second
loading stage. All beams showed similar ductility to the control beams. The strain results show that the
plate strains are almost identical for the loaded/unloaded set of beams and the control plated beam,
showing the effectiveness of using epoxy-bonded plates on heavily cracked beams. The strain over the
depth of the beam showed linear distribution, proving that fully composite action occurred between the
beam and the plate. The conclusion of this testing is that plating severely damaged beams is structurally
efficient and can restore a member to stiffness and strength conditions better than the original undamaged
beam.
Chajes, et al (1994) tested reinforced concrete beams to determine the ability of externally bonded
composite fabrics to improve flexural capacity. Fourteen R.C. beams 76.2 x 127 x 1180 mm (3 x 5 x 46.5
in) were tested. The internal reinforcing steel was varied for the different reinforcing techniques so all
members remained under-reinforced. The beams were simply supported over a span of 1120 mm (44 in)
with loading applied at third points. During testing, deflection was measured at the end points, at the load
points, and at mid-span. Strain gages were mounted on the concrete through the depth of the beam and on
the external reinforcement at mid-span. Three test beams served as control beams with only internal
reinforcement. Three sets of three beams were made with the same reinforcement as the control beams

MUST-97-1: 7

plus externally applied Aramid, E-glass, and graphite fiber fabric reinforcement attached to the beam
soffit. In addition, two beams were made with twice as much internal reinforcement as the control beams.
The beams were designed so the tensile capacity of the external composite fabric reinforcement was close
to that of the yield strength of the additional internal reinforcement. This resulted in the use of one layer
of Aramid fabric, two layers of graphite fabric, and three layers of E-glass. Preparation of the specimens
was extensive including vacuum curing.
The general flexural behavior to failure of all the fabric reinforced beams was similar, with the
stiffness and failure mode varying depending on the fabric used. The E-glass and graphite fabrics did not
display as much ductility as the control beams, but some measure of ductility still existed prior to failure.
These beams failed by tensile failure of the fabric first followed by crushing of the concrete. The first
aramid-reinforced beam failed by tearing off of the fabric from the beam. After this occurred, the last two
beams had fabric wrapped around the beam along its sides at the end to prevent tear-off. This worked as
anticipated, with the last two beams failing by crushing of the concrete before reaching the tensile
strength of the fabric. The ductility behavior of these beams is similar to the other two reinforcing
methods. The fabric reinforced beams increased the flexural capacity by approximately 43%, while the
beams with additional internal reinforcement added 62.8% to the ultimate strength. The difference can be
attributed to the steel being approximately 20% higher strength than the fabric reinforcement, as tests
showed. The increase in stiffness of fabric-reinforced beams and the beams with additional internal
reinforcement were similar.
Ziraba, et al (1994) analyzed previous research to develop guidelines for the design of reinforced
concrete beams with external plates bonded with epoxy adhesive. Three steps were outlined as the main
design procedure. The first step is to design the beam and plate assembly for flexure assuming failure
will occur with the plate yielding and the concrete crushing using concepts of basic reinforced concrete
beam design. The second step is to check interface stresses to make sure they are within limits so plate
debonding does not occur. A maximum cutoff distance from the beam support based on an allowable
value coefficient of cohesion of the steel-glue-concrete interface is computed at this stage. Lastly, the

MUST-97-1: 8

shear capacity of the beam is checked using first principles of R.C. beam design. Several excursions into
finite element and experimental regression analysis are made to determine characteristic constants used in
the design procedure. Fifty beams 100 x 150 x 2250 mm (3.9 x 5.9 x 88.6 in) were designed using the
proposed procedure and were then tested to failure using four point loading. Experimental results show
that the design procedure accurately predicts ultimate capacity for beams where failure is governed by
yielding of the steel. Premature failure was found to occur as the thickness of the plates increased.
In addition to the flexural reinforcement of existing and damaged concrete beams using epoxy
bonded steel plates and GFRP, existing concrete columns have been retrofitted using externally bolted
structural steel shapes. Oey and Aldrete (1996) strengthened existing stocky and slender reinforced
concrete columns using epoxy anchored bolts to attach steel angles at the column corners. These
reinforced columns were part of a building that was being upgraded with the addition of three new floors.
The bolts were designed as shear connectors for a force assumed equal to 2% of the total compressive
force in the column. First principles of mechanics of materials was used to govern the design.
Arduini, et al(1997a) performed analytical and experimental studies to quantify the behavior of RC
beams strengthened and stiffened with FRP plates and sheets. A variety of failure mechanisms including
brittle and ductile failures were simulated and verified experimentally. The experimental results indicated
failure mechanisms very much in line with those found in the previous research discussed. The failure
mechanisms found were; FRP rupture, concrete shear at the end of the FRP reinforcement, and FRP
debonding. All of these failure mechanism can be classified as brittle. Arduini, et al(1997b) continued
the study in FRP reinforced RC beams to include a parametric study. The results of the parametric study
show that brittle failure mechanisms can develop at loads much lower than expected when considering
only flexural performance controlled by concrete crushing and FRP tensile rupture; Arduini, et
al(1997b). The results of the research indicate that FRP reinforced RC beams can achieve significant
increase in both strength and stiffness.

MUST-97-1: 9

1.3

Evaluation of Previous Research


The use of epoxy-bonded plates to strengthen existing or damaged reinforced concrete beams has

been extensively researched. It has been proven to be a useful and reliable method of increasing the
ultimate flexural capacity of both damaged and undamaged members. As long as the thickness of the
reinforcing plate is kept thin, the beams will fail in flexure as expected. Ziraba, et al (1994) recommend a
maximum thickness of plate to insure flexural failure. Furthermore, testing that has been done to date has
been on relatively small beams. The cross sections have ranged in size from 76.2 x 127 mm (3 x 5 in) to
155 x 255 mm (6.1 x 10 in), while the lengths have ranged from 1180 mm (46.5 in) to 2500 mm (98.4 in).
As the experimental motivation moves toward determining if a method of reinforcement can be applied
to upgrading and repairing existing structures, full-scale testing should be employed for real-life results.
The only way to truly know if a reinforcement technique is adequate structurally, efficient, and capable of
being implemented for bridge girders is to test the technique on a bridge girder.
Furthermore, the use of epoxy to bond steel plates and composite fabric to beams is a method that
requires much preparation prior to application of the adhesive. The contact surfaces must be sand
blasted, clean, and dry to insure good bonding. Some research discussed in the literature review has even
gone as far as to cure the epoxy in a vacuum to meet these conditions. When working in the field,
conditions like these are often difficult if not impossible to achieve and control. Also, the thickness of the
epoxy layer must be uniform and the plate needs to be clamped in place while curing. All these
drawbacks in the application procedure will result in an increase in final cost, which could in the worst
case scenario eliminate a method as an economical solution.
A common problem that occurred in the testing of the bonded plates was the sudden tearing off
(delaminating) of the plate near the support. It was discovered that high localized stresses develop at the
end of the plate. As the plate thickness increased so did the probability that premature failure would
occur. In some tests, the use of anchor bolts at the plate ends proved a successful means of eliminating
the plate separation. Lastly, the basic underlying philosophy of reinforced concrete design has been to
ensure a ductile failure of reinforced concrete members. Many of the previous (fabric reinforcement)

MUST-97-1: 10

techniques exhibited loss in ductile behavior at the reinforced ultimate load. This is counter to the basic
code philosophy. Providing economical mild-steel shapes as reinforcement is a step in preserving
ductility in the reinforced member.
Taking into consideration all that has been stated above, it was decided to test a method of
retrofitting existing reinforced concrete beams (bridge, floor, etc.) to increase their flexural capacity. The
members could be bridge beams that are deficient and the only other option would be to tear down the
structure; or floor beams that need to carry additional load because of a change in use for a building. It
was decided to test 10"(w) x 18"(h) x 15'-6"(l) [254 mm x 457 mm x 4.724 m] reinforced concrete beams,
smaller than a typical bridge girder but large enough to use as a real-world comparison. Because of the
ability of anchor bolts to stop the occurrence of plate tear-off and the preparation conditions that are
needed for epoxy, it was decided to use anchor bolts as the means of mounting a steel member to the
tension face of the beam. For this analysis, structural steel channels were used as the reinforcing member
rather than a plate.

2.0

Design Procedure for Concrete Flexural Members

This section describes the design procedure used for the RC (control) beams tested. The flexure and shear
design of the control beams using first principles of reinforced concrete design is discussed. The different
reinforcing schemes that were studied are schematically outlined and discussed. Finally, a preliminary
design procedure for externally reinforcing a concrete beam by mounting a structural steel channel to the
bottom is presented. This includes the flexural design, the shear design and the design of the anchoring
bolts used for mounting the steel member.
Three control beams (no external reinforcement) are used for comparing the ultimate load of the
externally reinforced beams. The width and height of the beams were chosen as 10" x 18" [254 mm x
457 mm], respectively, while the length of the beam was set at 15'-6" [4.724 m]. These beam dimensions
were used to simulate an actual structural member and also because of physical limitations in laboratory
space and moving equipment. The control beams were analyzed and designed using first principles for

MUST-97-1: 11

under-reinforced concrete beam sections. The design procedure is highlighted in this section to illustrate
the basic concepts carried over to the procedure used in the design of a retrofitted beam.
Internal equilibrium for a typical singly reinforced member is shown in Figure 2-1. Preliminary
calculations were done using an assumed 28-day concrete strength of 4000 psi [27.6 MPa] and a yield
strength of reinforcing steel of 60,000 psi [413.4 MPa]. The amount of reinforcing steel was chosen so
that ductile failure would occur. This was done by limiting the reinforcement ratio of the section, D, to,

D '

As
bd

# 0.75Dbal

(1)

The following assumptions are made in the design of the RC members:


1.)

Plane sections before bending remain plane after bending (the variation in strain is
linear throughout the member).

2.)

Concrete does not contribute any tensile strength.

3.)

No slip exists between the steel bars and the surrounding concrete during the
development of tensile force in the bars.

4.)

The Whitney equivalent rectangular stress block is used for concrete compressive
stress.

The first step in the design is to select an area of steel less than 0.75Dbal where,

Dbal '

0.85 fc' $1
fy

87000
87000 % fy

(2)

in which:
fc! = compressive strength of concrete, (psi)
fy = yield strength of reinforcing steel, (psi)
$1 = 0.85 - 0.05(fc! - 4000) / 1000 # 0.85 ;

$1 $ 0.65

Dbal is the reinforcement ratio when the concrete reaches its assumed ultimate strain just as the steel
reaches its yield strength. A value of D equal to one half of 0.75Dbal, or 0.375Dbal, is used to compute an
area of reinforcing steel using,

MUST-97-1: 12

As ' Dbd

(3)

where:
As = area of reinforcing steel, (in.2)
b

= width of compression face of beam, (in.)

= distance from the extreme compression fiber to centroid of reinforcing steel,

(in.)
Based on this area of steel, the number and size of the bars is chosen and Dact is calculated. This must be
greater than Dmin = 200 / fy.
The next step is to calculate the depth of the approximate Whitney rectangular stress block, a,
using equation (4),

a '

As fy

(4)

0.85 fc' b

As a result of theoretical strength capacities being computed, the nominal moment capacity of the beam,
Mn, dead load moment due to the beam self-weight and superimposed live load are computed in
unreduced, non-factored forms. The nominal moment capacity of the beam can be found using,

Mn ' Mult ' As fy d &

a
2

(5)

The moment due to the dead weight of the beam is subtracted from Mult to give the moment capacity of
the beam due to superimposed live load. Assuming the simply supported beam loaded at third points, the
nominal load the beam can theoretically support is calculated as,

P '

3ML

(6)

where:
ML

= moment due to superimposed live load, (kip-ft)

= simply supported length of beam, (ft)

= each load for a two-point loading, (kips)

MUST-97-1: 13

Shear reinforcement is designed so the beam will not fail in diagonal tension. This is done in
accordance with ACI(1995). The nominal shear strength of the concrete, Vc , is found first, using,

Vc ' 2 fc! bd

(7)

If this value is greater than P, only minimum stirrup steel need be provided at a spacing,

s '

d
2

Av fy

(8)

50b

where:
Av

= area of both legs of stirrup, (in.2)

= minimum spacing of stirrups, (in.)

If P > Vc , the spacing of the stirrups is,

s '

Av fy d
P & Vc

Av fy
50b

(9)

which must be less than, d/4.


The procedure for design of the control beams resulted in a typical unreinforced (control) member
shown in Figure 2-2. It should be noted that the overall cross-sectional dimensions, internal
reinforcement, and material properties were kept constant for all control members. However, one
exception to the constant material properties was the 28-day compressive strength which varied for each
of the control beams.

3.0

Design Procedure for Strengthened Beams


Many different external reinforcing schemes were analyzed for applicability. The first was to

mount two structural steel channels to the sides of the beam at the bottom. This seemed the most practical
since in many cases height clearances are important and mounting structural steel shapes to the underside
of a beam may not be an option in an existing building that plans to use this retrofit technique. This also
would be a relatively simple method for attaching the reinforcement since holes could be drilled directly
into the sides of the beams and would have an excellent chance of not violating the integrity of the main

MUST-97-1: 14

flexural reinforcement. A problem with this method is that two steel sections add a large additional area
of steel to the beam. Using the smallest available steel channels would still result in a section that may be
slightly over-reinforced. An option would be to redesign the beams to get a larger cross-section, but
working with a member larger than the one already designed in the laboratory environment was not an
attractive solution.
A second method that was studied was to use steel angles or plates mounted to the sides of the
beam at the bottom. It would clearly be easier to achieve an under-reinforced section because smaller
members would result in a smaller additional area of steel. As with channels, it would be relatively easy
to drill directly into the sides of the member to mount either of these sections. Steel plates were not
considered as an option because they are more expensive than rolled structural steel shapes for the size
and lengths considered in this research.
A third method that was examined was to mount one structural steel channel to the bottom of the
beam. The main motivation behind this method is the obvious fact that this would require the purchase of
half as many steel sections as the previously mentioned methods. This method would also require drilling
half as many holes as the previously considered options. It would be easier to get an under-reinforced
section since half as much steel is being used to contribute to the reinforcement ratio. Care in placement
of holes so as to minimally disturb the main flexural reinforcement has to be taken in this scheme. This
retrofit technique would require more labor to drill the holes for the anchors since the beams would have
to be rolled over to safely get at the bottom, but this was an acceptable trade-off. In the field, overhead
drilling could be performed and therefore, the retrofit technique proposed is still feasible and economical
in field applications.
It was decided to use wedge style expansion anchors and threaded rod bonded into pre-drilled holes
with epoxy-adhesive as the mechanical connection between the the external channel and the existing
reinforced concrete beam. All anchors (and necessary equipment for installation) was generously donated
by the Rawl Plug Company of New Rochelle, New York. Three beams utilizing each of the two
mounting methods were tested and the two methods compared.

MUST-97-1: 15

All of the methods studied require the same basic design procedure for externally reinforcing an
existing concrete member. Ziraba, et al (1994) stated that strain compatibility and a rectangular
compression stress block similar to the ACI method for RC beams in flexure can be utilized for epoxybonded steel plates as long as the thickness of the plates does not exceed a maximum value. The
externally reinforced beams were designed as regular reinforced concrete beams with additional steel area
which results in a second tensile force at the centroid of the attached steel section.
The design procedure is the same for both the epoxy-adhesive anchor beams and the wedge style
expansion anchor beams. The RC beams have the same internal reinforcing steel for flexure and shear.
The six retrofit beams are the same as the three control beams designed in Section 2.0 (10" x 18" x 15'6"). Concrete strength was initially assumed to be 4 ksi, rebar yield strength 60 ksi, and the yield strength
of the steel channels to be 36 ksi. As with the control beams, the retrofitted beams were designed to be
under-reinforced with the additional external reinforcement.
Internal equilibrium for a flexural member containing internal (rebar) and external reinforcement
can be schematically represented as shown in Figure 3-1. The internal tension force that usually consists
of a single component provided by the internal reinforcement, now has two components with
supplemental tension provided by the external reinforcement.
A structural steel channel section was chosen for the external reinforcement, which requires that a
modified reinforcement ratio be defined. The sum of the reinforcement ratios from the rebar and the
channel less than 0.75Dbal should insure ductile failure; with the implication that the steel channel would
yield as well as the internal reinforcing steel. The value of Dbal is calculated using a modification of
equation (1). The combined reinforcement ratio is now calculated using,

D ' Drebar % Dchannel '

As , rebar
bd

As , channel
bd

where:
As,rebar = area of reinforcing steel, (in.2)
As,channel = area of channel, (in.2)

(10)

MUST-97-1: 16

The depth of the Whitney rectangular stress block is calculated with the following addition to equation
(4),

a '

(As fy )

rebar

% (As fy )

channel

(11)

0.85 fc' b

The nominal moment capacity of the reinforced beam is then calculated as,

Mn ' Mult ' { As fy }

rebar

d1 &

a
2

% { As fy }

channel

d2 &

a
2

(12)

where:
d1 = distance from extreme compression fiber to centroid of internal reinforcing steel,
(in.); see Figure 3-1.
d2 = distance from extreme compression fiber to centroid of channel section, (in.).
If one assumes that sufficient bolt strength is available such that the external channel yields at the
ultimate condition, the computation of the depth of the rectangular stress block is a simple procedure
involving direct application of equation (11). However, special procedures (iteration) must be employed
if the full yield strength of the channel cannot be developed through shear of the anchoring bolts. This
situation will tend to be the norm in practice, and the iteration is discussed in subsequent sections.
The design procedure for the externally reinforced beam using equations (10) through (12) results
in a beam the same size as a control beam with a C5 x 6.7 structural steel channel mounted to the bottom
as shown in Figure 3-2. The calculated ultimate capacity of the externally reinforced beam assuming full
channel yielding was a total of 62.2 kips (2 - 31.1 kip loads at third points on a simple span). Concern
was raised about applying a load of this magnitude in the testing laboratory. Properly constructed beams
using commercial materials, would most likely exceed this capacity. Another issue of concern was the
number of anchors that would be required to mount the channel and transfer a load large enough to insure
channel yielding. Practically speaking, with spacing and edge distance requirements, the number of
anchors required for channel yielding will probably not physically fit in the space available on the beam
members soffit.

MUST-97-1: 17

As a result, it was decided to design the beams to fail by shearing of the anchor bolts rather than
channel yielding. In this manner, a comfortable failure load for the reinforced beams could be set and
the number of anchor bolts designed to achieve this strength. The design of the beam up to this point is
still utilized; but now instead of designing the anchor bolts for the full strength of the retrofitted beam, the
number of anchors is designed for a certain acceptable ultimate load (less than full capacity of the beam
based on channel yielding). This will translate very smoothly into a design procedure where a defined
ultimate load for the retrofitted beam is needed. Thus, the number of anchors can be tailored to match the
design load.
It was (rather arbitrarily) decided to use an applied failure load of twice the capacity of the control
beam, which is P =2(12.4)=24.8 kips. Rounding up, a target load of 25 kips was used to design the
anchors.

The first step was to calculate the shear force in the anchors at the desired load of 25 kips.

The shear force in the anchors is the tensile force carried by the external reinforcement, Tanchor, shown in
Figure 3-1. It should be noted that Tanchor is assumed to be developed in the region outside the constant
moment region (central 1/3 portion). This is computed by solving equation (6) for the ultimate
superimposed live load moment that results from the two loads of 25 kips each applied at third points of
the beam. The moment due to the dead load of the beam is added to ML to get the nominal/ultimate
moment applied to the beam.
The next step involves an iterative solution of equation (12) for the tension force required to be
carried by the anchor. An iteration procedure is necessary because the depth of the compression area, a,
is unknown as well as the value of Tanchor. Equation (13) is equation (12) with Tanchor replacing (Asfy)channel,

Mult ' { As fy }

rebar

d1 &

a
2

% Tanchor

d2 &

a
2

(13)

The value of d2 is now assumed to be at the shear interface of the beam and channel. The depth of the
Whitney rectangular compression block, a, is assumed and equation (13) is then solved for the resulting
value of Tanchor . This value of Tanchor is substituted into equation (11) for a revised value of a,

MUST-97-1: 18

arevised '

{ As fy }

rebar

% Tanchor

0.85 fc' b

(14)

Equation (13) is resolved with arevised for a new value of Tanchor. The above procedure is continued until
arevised converges for a value of Tanchor. This value of Tanchor becomes the shear force that the anchors must
be designed for. Equations (13) and (14) assume the internal reinforcing steel is at ultimate strength even
though for this procedure the design is for shear failure of the anchors with the channel reinforcement not
reaching yield.
The design procedure for the anchor bolts is the same for both Rawl-Stud wedge style expansion
anchors and the Rawl Foil-Fast epoxy-adhesive anchors. The tables from Rawlplug(1994) are
referenced to obtain shear design values, minimum spacing and edge distance requirements of both types
of anchors. The anchors are designed so the required channel force is achieved within the end five feet of
the beam. These outer thirds of the reinforced beams were chosen as regions for development of the
channel forces required. Due to the location of the loads, there is constant shear and linearly decreasing
moment in these regions which makes them ideal for this purpose.
The first step in the anchor design procedure is to determine a size and length of anchor from the
shear load tables based on concrete strength and depth of embedment. The appropriate reductions are
then applied to the ultimate shear capacity based on spacing and edge distance requirements. The result is
a modified shear capacity, Vult!, for the anchor. The tension force at the location of the anchors, Tanchor
calculated from equation (13), divided by the modified shear capacity results in the number of anchors
needed, N,

N '

Tanchor
Vult'

(15)

The anchors are laid out within the end five foot section and the shear capacity must then be modified
again based on the spacing and edge distances that result from the anchor pattern layout. This cycle is
continued until the modified shear capacity converges for the number and layout of anchors used.

MUST-97-1: 19

A larger size bolt may need to be used if the section becomes too congested. The above process is
redone using the new value of ultimate shear capacity for the larger diameter bolt. Once the iterations
converge to a final number of anchors, the design of the externally reinforced beam is complete. The
appropriate design checks must be made for the block shear strength of the steel channel and the yield of
the bolt holes. An example calculation for the design of a beam using the Rawl-Stud wedge style
expansion anchors is included in an example design for an externally reinforced beam in Appendix-A.
The design of the shear reinforcement in the form of stirrups for the 25 k load at third points is
accomplished using the same procedure as was discussed in Section 2.0.
The result of the retrofit design procedure is the specimen given in Figure 3-2. All reinforcement
(rebars) were Grade 60. The stirrups were placed as shown in the figure. Cover to all steel (flexural and
stirrup) was 2 inches. The layout of the anchor bolts for the wedge type expansion anchors and epoxy
adhesive anchors are shown in Figure 3-3. It should be noted that the anchor layout is determined largely
based on edge distance and spacing requirements obtained from RawlPlug (1994). Also, the anchors
were intended to enter the space between the main internal reinforcing steel (3-bars)..

4.0

Construction of Test Specimens

Nine concrete beams were tested to failure for this research. Three were control beams to be used as a
comparison for the remaining six. The remaining beams were externally reinforced with structural steel
channels mounted to the bottom. Three beams used Rawl-Stud wedge style expansion anchors to attach
the channel to the beam. The last three beams to be tested used threaded anchor rods with Rawl FoilFast epoxy-adhesive to mount the channel. This section discusses the materials used to make the
specimens, as well as the procedures used for externally reinforcing the beams. The experimental testing
method is then described in detail.
Form-work was built of construction grade lumber in the Structural Testing laboratory of the
Haggerty Engineering building. Due to space restrictions and budget considerations, form-work for only

MUST-97-1: 20

three beams was built. As a result, three beams were poured at a time at the loading dock of the
laboratory.
Commercially obtained redi-mix concrete was used for construction of the beams. A basic, nonair-entrained footing mix of 3000 psi strength was used. The concrete was poured into one end of the
form and then shoveled down the length until the forms were full. A concrete vibrator was used to
eliminate air pockets and insure the concrete flowed into all corners of the form-work and around all
reinforcing bars. Concrete finishing tools were used to smooth the top surface of the beam. The beams
were allowed to cure undisturbed for a period of one week, and then moved into the main lab.
The RC beam specimens were designated as follows. The C, W, and E indicate Control beam,
beam using Wedge style expansion anchors to mount the external channel, and beams using Epoxyadhesive anchors to mount the external channel, respectively. The numbers after the C, W, and E
designations correspond to the date of concrete pour for the beam. One, two, and three stand for the first,
second, and third concrete pours, respectively.
Three standard testing cylinders, with 6" diameter and 12" height, were made for each set of beams
to obtain an average 28-day compressive strength for the concrete. The cylinders were cured in the same
environment as the beams. Each cylinder was compression tested using a Forney QC-410-D/TA-0103
digital readout compression loading apparatus. The maximum values for the three cylinders were
averaged together to obtain an average concrete compressive strength for the three sets of beams. The
values of fc! for the three sets of beams are included in Table 4-1.
The internal flexural reinforcement for each beam consisted of 3-#5 bars. The shear reinforcement
for the beams was #3 bars bent in a U-shape and spaced at 7". The cover to reinforcement was 2", with
plastic rebar chairs used to insure this was met. Grade 60 steel was purchased for both the main and
stirrup steel. Three representative samples were cut from the stock of bars for tension testing to obtain
estimates for the actual yield stress and modulus of elasticity of the steel. The material property results of
the tension testing of the rebar samples are included in Table 4-2.

MUST-97-1: 21

The preliminary design of the beams has been discussed in previous sections. Table 4-3 shows the
actual dimensions of the test beams that were measured at quarter points along the length. The
measurements were averaged for each beam and are included in the table. Grade 36 structural steel
channels were obtained. Shop drawings of the channels were provided to a local fabricator, who
performed the fabrication. The final layout of the channels, as a result of the preliminary design
procedure is shown in Figure 3-3 and the measured material properties for the channels is shown in Table
4-4. Two methods, as discussed previously were used to mount the structural steel channels to the RC
beams. The first method discussed is Rawl-Stud wedge style expansion anchors. Threaded anchor rod
utilizing Foil-Fast epoxy-adhesive was the second attachment method used. Both are examined in the
following discussion.
Rawl-Stud wedge style expansion anchors made of carbon steel were used as one technique for
mounting the structural steel channels to the bottom of the R.C. beam. The anchors are designed with a
tapered expansion section on the working end. Interlocking wedges at this end are held on by tabs which
grip the anchor firmly to prevent spinning of the anchor during tightening. As the anchor is tightened, the
shaft is pulled upwards causing the tapered expansion section to compress the wedges outwards against
the wall of the anchor hole. Rawlplug(1994), was referenced for the performance data, installation
specifications, and the installation procedures for the anchors used. A " by 7" Carbon Steel Rawl-Stud
wedge style expansion anchor was used. The design values were based on an embedment into the
existing concrete beam of 4".
Rawl Foil-Fast epoxy injection gel with threaded steel anchor rod was the second method used for
mounting the structural steel channels to the bottom of the R.C. beam. The gel is a two component
structural epoxy that comes in a dual-tube cartridge. One tube of the cartridge contains the base resin and
the other a hardener. A special injection gun is used to dispense an equal amount of epoxy into a static
mixing nozzle. The mixing nozzle contains a series of mixing elements that progressively divide and
recombine the components, automatically mixing them as they are pumped through. Rawlplug(1994),
was referenced for the performance data, installation specifications, and the installation procedures of the

MUST-97-1: 22

anchors used. A " by 6 " Grade B7 carbon steel threaded anchor rod was used for this mounting
technique. The design values used were based on an embedment into the concrete of 2". A fast set gel
was used since the laboratory setting consists of ideal conditions.
Attaching the structural steel channels to the bottom of the beam created a problem as to the safest
way to drill the holes and mount the channel. It was decided to roll the beams 180E so the bottom was
facing upward. Once the beam was in the correct position, the anchor pattern was laid out using the
channel as a template. The holes were drilled using the appropriate size Rawl SDS-Plus Carbide drill bit
and a Black & Decker rotary hammer drill. A " diameter bit was used for the epoxy-adhesive anchor
holes, while a 9/16" diameter bit was used for the holes of the wedge style expansion anchor system, as
recommended in RawlPlug(1994).
While drilling some of the holes, pieces of steel were seen with the concrete dust. It was assumed
this was from the reinforcing steel, whether stirrup or flexural steel is unknown. The fact that this
occurred was noted, but nothing was changed in the analysis due to this decrease in the area of the bar
since it is not known how much material was removed or what bar it came from. This is an acceptable
risk when one blindly drills into a RC beam (a procedure conceivably done in field situations).
The drill had a depth gage mounted to it which could be set to the appropriate depth for the
different anchors. The actual embedment depths of the anchors were measured, and the average
calculated on a per beam basis. The results are summarized in Table 4-3. The wedge-anchors were
designed for an embedment of 4", while the epoxy-adhesive anchors were designed for an embedment of
2". The actual embedment of the wedge-anchors all came close to the required embedment, with those
for beam W2 exceeding 4". The reason that the actual embedment of the epoxy-adhesive anchor was 3"
larger than the required embedment was because the threaded anchor rod delivered was longer that what
was ordered. The maximum design value for the epoxy-adhesive anchor based on shear only is for a 2"
embedment of the anchor into the concrete. A greater embedment depth may be used, but this has no
effect (increase or decrease) on the shear strength of the connection. Therefore, these anchors were used
with an embedment of 51/2" and no change was made to the design shear value.

MUST-97-1: 23

Installation of the wedge type expansion anchors followed the procedures established in
Rawlplug(1994). The anchors were first set loosely into the holes. The channel was then placed onto the
beam with the anchors directed through the appropriate holes. A 3 lb. hammer was used to drive the
anchors. Pounding was continued until the anchors felt like they were all the way into the hole. This
was decided by a solid feeling in the hammer as the anchor was hit indicating it was against the bottom of
the hole. Once all the anchors were driven to their full embedment depth, they were tightened by hand
using a ratchet and socket. The wedge-anchors were first finger tightened and then tightened an
additional 3 to 4 turns of the nut as directed in RawlPlug(1994).
The installation of the epoxy adhesive anchors followed the procedures contained in
Rawlplug(1994). The initial step was to fill the holes approximately half way with epoxy. After a few
holes it was discovered that three and one-half pumps of the injection gun trigger would fill the hole with
enough epoxy. Upon insertion of the threaded rod to the appropriate embedment depth, epoxy would be
forced out of the hole indicating it was full. After insertion of the epoxy, the threaded rod was
immediately pushed into the hole turning it slightly (like one turns a screw) to insure positive distribution
of the epoxy. Once the anchor rods were in place, the channel was placed on the beam. This was not a
good method, because the anchors did not all line up exactly with the holes in the channel. Some
manipulation of the anchors was done to get them through the channel holes. This caused the anchor rods
to be pushed deeper into the holes, which caused excess epoxy to be emitted from the holes. Once all the
anchors were through, there was epoxy between the channel and the beam that could not be removed. It
was not anticipated that this would cause a problem in the testing, but this did cause an unsightly gap
between the channel and the beam. This method was only used for beam E1, with the following revised
procedure used for beams E2 and E3.
The first step of the second procedure was to place the channel onto the beam, lining up the holes.
The channels were then mechanically strapped to the beam eliminating a possible gap between the
channel and the beam that epoxy could seep into. The epoxy was inserted into the holes in the same
manner as used for beam E1. The threaded rod was then pushed into the holes to the appropriate depth,

MUST-97-1: 24

allowing the epoxy to flow out onto the channel where it could be wiped off. The epoxy was then
allowed to cure. This method worked much better. A guide torque was not provided for the epoxyanchors, so the nuts were turned as much as could be done by hand with a ratchet and socket. The
tightening of the epoxy-anchors was done after a 24 hour cure period.

5.0

Experimental Program

An experimental program was undertaken to verify the proposed design procedure and to calibrate future
analytical studies. The nine full-scale specimens described in the previous section were instrumented for
deflection, strain, and load measurements. Each specimen was tested to failure in the Marquette
University Structural Testing Laboratory. This section gives an overview of the experimental program
including details of the instrumentation and data acquisition.

5.1

Strain Gage Instrumentation

General purpose strain gages were used to measure strain on the channel and internal reinforcing steel.
The gages had a fully encapsulated grid and exposed copper solder tabs. The preparation and application
of the gages was completed as directed in the instruction bulletins supplied by Measurements Group, Inc.
A bondable terminal was used to insure that tension in the wiring was not applied directly to the strain
gage. A small length of wire was connected between the gage and the bondable terminal. Each main
wire from the data acquisition system was then soldered into the same solder joint on the bondable
terminal as the wire from the gage to complete the circuit. This is illustrated in Figure 5-1.
Before the concrete was poured for the six channel-mounted beams, a strain gage was mounted to
the center reinforcing bar of the group. This was done by grinding and sanding a 4 inch smooth section
over one-half the diameter of the bar at approximately the center. The surface was then cleaned with the
necessary solutions and the gage applied to the bar using epoxy-adhesive. Pressure was applied to the
gage during curing to insure proper bond. After curing 24 hours, wires were soldered to the gage and a

MUST-97-1: 25

protective gel was put over it. This gel covered the entire gage, and once set up, would protect it from the
concrete and the moisture.
The concrete was placed in the formwork taking care not to vibrate in the area of the strain gage.
The wires were allowed to move freely in the concrete, trying not to introduce tension into them which
may pull on the gage. The wires were brought up through the top of the beam to the data acquisition
computer. After the beams were poured, the strain gages were checked with a digital multi-meter to
verify the installed gage resistance. Several of the strain gages mounted to the internal reinforcing steel
were damaged during concrete placement. Ramifications of this will be discussed in later sections.
While the beams were rolled over for mounting of the channels, strain gages were also mounted to
the channels. Two gages were located on the channel flanges (near mid-flange height), while a single
gage was located on the channel web (refer to Figure 5-1). This was done by first grinding and sanding a
4 inch smooth section of the channel. These areas were cleaned with the necessary solutions. Gages were
then mounted to the web of the channel and to each flange at approximately mid-span. Pressure was
applied to the gages during curing to insure proper bond. No special procedure was employed to ensure
the flange gages were located at nearly the same distance from the flange tips.
The mounting of the gages was performed with the intent to determine the distribution of strain
within the external reinforcing channel. A uniform (average) distribution of strain and stress in the
external channel is assumed in the design procedure proposed. Experimental results will shed additional
light on the validity of this assumption. Furthermore, the mounting of strain gages on the internal
reinforcing steel will allow the determination as to whether or not the internal steel has yielded prior to
any yielding of the external channel. This is an additional assumption made in the design procedure
proposed. Lastly, a check of the composite action of the member (fully- or partially-) can be made with
information pertaining to the strain in the internal reinforcing steel and the external channel..

MUST-97-1: 26

.2

Loading Test Frame and Data Acquisition

A loading frame made of structural steel tube-columns and W-section cross-beams was used to load the
beams. The columns were anchored to the floor, with each having a tensile capacity at the floor
connection of 50 kips. A picture of the loading frame is shown in Figure 5-2. As can be seen in the
figure, there are two hydraulic loading rams attached to the W-section cross-member. These rams are
hooked up to an Enerpac hydraulic pump with the ability of producing a load of 50 kips each. Specimens
C1, W1 and E1 were set up with centerline to centerline support distances equal to 15'-0" with loading at
one-third points. The remaining six specimens were set up on a 14'-6" centerline to centerline support
spacing with 4'-6" separating the two loading rams. An explanation of why this was done will be
discussed later in the report.
The Marquette University Department of Civil and Environmental Engineering Daytronic data
acquisition system was used to record loading, beam deflection at the midpoint, strain in internal
reinforcement, and strain in the web and flanges of the external channel. Two 50 kip capacity load cells
were placed under each loading ram, as shown in Figure 5-3. The load cells were hooked up to the
computer to record the amount of applied load.
Two LVDTs, pictured in Figure 5-4, were used to measure vertical displacement of the beam at
mid-span. The LVDTs were placed on two metal tabs that were epoxied to each side of the beam
approximately 5 inches below the top surface. One tab was 3 inches to the left of centerline and the other
was 3 inches to the right of centerline. This was done in case the concrete compression failure occurred
directly at the center of the span. An average of the two deflections was used in the data analysis.

5.3

Testing of Control Beams

Three control beams were constructed as part of the experimental program. Each control beam was white
washed for better detection of cracks. As cracks formed in the concrete member, they were highlighted
with a heavy black marker to make the cracks more visible to the naked eye. This section will highlight

MUST-97-1: 27

observations made during the testing and also enumerate pertinent data collected during the testing of the
control beams.
Each of the three control beams was tested with monotonic load application. The load was applied
at a rate of approximately 400 lbs/min until 'failure' of the member occurred. Failure was defined in the
context of these experiments to be a compression failure in the concrete within the constant moment
region following sustained increase in vertical deformation after cracking. Beam C1 was tested with a
centerline to centerline support spacing of 15'-0" and a distance between loading rams of 5'-0" (placed
symmetrically about the beam centerline). Beams C2 and C3 had a centerline to centerline span of 14'-6"
with loading rams spaced at 4'-6" (placed symmetrically about the beam centerline).
The experimental results are contained in the description that follows. The monotonic loading was
applied to the member after which hairline cracks began to form in the constant moment region. As the
loading was increased further, the cracks extended vertically up the cross section as shown in Figure 5-5.
Cracks then formed in the constant shear zone (the member length between load and support) as a result
of redistribution of flexural stress. These cracks extended up the member approximately (3/4)h,
whereupon they began to extend diagonally toward the load points exhibiting classic diagonal tension
behavior. The diagonal cracks formed throughout the shear zone, but never encroached upon the final
15" before the support.
All control beams failed in classic flexural mode with significant yielding followed by crushing of
the concrete between the load points. Figure 5-6 illustrates the cracking and crushing of the concrete at
the extreme compression fiber. The two loading rams applying load were not exactly of equal magnitude
for each of the tests, and as a result, the crushing location was slightly off the member centerline. Table
5-1 summarizes important highlights from the testing of the control beams. Full load deformation data
was acquired for the beam testing and this data will be discussed in later sections. Upon examination of
Table 5-1, it can be seen that the average load at first visible crack was approximately 4000-4500 lbs.
First cracking was observed in beam C3 at approximately 3300 lbs. The differences in these results are a
result of experimental error as the cracks were detected and recorded visually and also a result of

MUST-97-1: 28

differences in concrete strengths for the three members. The ultimate loads recorded at failure for all
three members are very close to one another. However, differences are due to the variation in 28 day
ultimate concrete compression strengths for the members. The deformation at the ultimate load condition
typical of the lightly reinforced control beams is shown in Figure 5-7.
It is prudent to discuss several difficulties that were encountered with the experimental setup
during the testing procedure. As can be seen in Table 5-1, the centerline deflection at ultimate is
excessive ( 3.28 '' . L / 57 ). This resulted in the load cell and roller beneath it to be loaded in a severely
eccentric condition. This eccentricity caused the load cell and roller support to slide out from under the
loading ram in the tests of beams C2 and C3. In each of these tests, however, evidence of compression
failure was observed in the top of the concrete (cracks and spalling), so it was assumed that failure for the
member had been achieved.

5.4

Testing of Wedge Expansion Anchor Beams

This section describes the experiments conducted and results obtained for the members externally
reinforced using structural steel channels mounted to the beam soffit using wedge type expansion
anchors. As done previously in the case of the control beams, each of the members were white washed
for crack detection. Furthermore, the structural steel channels were also painted with white-wash
compound to detect yielding within the structural steel channel if and when it occurred. Beam W1 was
placed within the testing frame with support rollers placed at 15'-0" on center and the loading rams placed
symmetrically about the beam centerline at 5'-0" apart. Figure 5-8 illustrates the typical setup for the
wedge anchor beams. Beam W3 were placed within the loading frame with centerline to centerline
support spacing equal to 14'-6" and the loading rams placed symmetrically about the beam centerline with
spacing of 4'-6". This was done as a result of an unexpected failure of beam W2 to be discussed. The
applied moment within the zero shear region of the member remained the same for all three wedge anchor
specimens. The steel channel area surrounding the anchors were white-washed to make signs of yielding
within the channel more visible to the naked eye as shown in Figure 5-9.

MUST-97-1: 29

All beams were subjected to monotonic loading until failure occurred. Failure in the retrofitted
beams was characterized by the members inability to support further increases in loading. Failure was
defined to be the result of shear failure of the bolts, crushing at the extreme compression fiber, or both.
The failure of beams W1 and W3 were characterized by shearing of the anchors followed by a very
subtle (almost imperceptible) compression failure of the concrete in the constant moment region. Prior to
failure of the member there was significant cracking of the concrete throughout the constant moment
region and constant shear zone. The anchors failed in progression beginning with the anchors near the
supports and ending with the several anchors moving inwards toward the loading points. Pertinent
information related to the testing of the wedge anchor specimens can be found in Table 5-1. Furthermore,
Figure 5-10 illustrates the significant reduction in deformation at the ultimate load condition for the
wedge anchor specimens. Overall cracking of the members were very similar to that of the control
beams. The cracking patterns for these beams had a similar pattern as the control members which can be
shown in Figures 5-11, 5-12 and 5-13. The spacing of the cracks corresponded closely with the locations
of the anchors. The channel members did not exhibit any sign of yielding, although a forensic analysis of
the channels after removal from the beam showed that there was very slight deformation (elongation) of
the bolt holes in the channel. The elongation was more pronounced in the anchor holes near the supports
as expected. Creaking of the channels could be heard approximately midway through the test indicating
possible seating action of the anchors within the channel holes. Upon further inspection of the beams at
the conclusion of testing, evidence of a slight compression failure in the concrete was evident. It is
unknown whether this compression failure occurred after failure of the bolts or not as it was not
witnessed.
The failure of the anchors in beams W1 and W3 warrants further discussion as it will enlighten the
reader as to behavior exhibited on the load deformation plots shown later in this section. The anchor near
the support (as mentioned previously) was the first anchor to fail. At this point, the beam(s) unloaded and
began taking slightly decreasing load until four additional anchors failed in the case of beam W1 and a
complete unloading occurred in the case of beam W3. The multiple anchors that failed in specimen W3

MUST-97-1: 30

failed more or less simultaneously and hence the beam unloaded suddenly. Beam W1 exhibited a slight
ability to carry a decreased load in a ductile manner. Both specimens W1 and W3 exhibited channel
delaminating near the support(s). Figures 5-14 and 5-15 depict the typical delaminating that occurred.
It should be noted that this peeling of the channel occurred subsequent to anchor failure and virtually
coincident with the ultimate load achieved for the specimen.
Specimen W2 gave undesirable test results. This member suffered from a sudden and complete
diagonal tension failure near the support. The failure is shown in Figure 5-16. Upon inspection of the
failure, it was determined that the main reason this occurred was poor craftsmanship during casting of the
member. After reviewing the failure and the method used to cast the concrete beam, it was concluded that
the main internal reinforcement had shifted within the formwork during the concrete pour. The stirrups
were tied to the flexural reinforcement to create a cage. As the concrete was cast, it was manually
shoveled down the length of the formwork. During this process, the reinforcing cage shifted to one end.
The diagonal tension failure was then a result of a combination of the main flexural steel not extending
into the support region at all and the lack of stirrup steel at the support. These justifications can be clearly
seen in the failure exhibited in Figures 5-16 and 5-17. The ultimate load and deflection at ultimate
attained by this specimen indicates that the shear failure was nearly identical to the ultimate flexural
failure for the member. Furthermore, upon examination of the load deformation response for the member,
it can be seen that it exhibited very similar behavior as beams W1 and W3 and therefore, the experimental
results can be used in further discussion.
The failure of beam W2 by diagonal tension prompted a re-evaluation of the testing procedure. It
was decided to move the beam supports inward 6" (3" from each end) and add an additional 5/8" steel
plate in between the support roller and beam to distribute reaction force to a larger length at the end of the
beam. The spacing of the two loading cylinders was also reduced by 6 to give the same applied bending
moment to the member as previously applied. This plate can be clearly seen in the subsequent figures
used in the discussion of the epoxy adhesive anchored beams. As evidenced by the testing results of

MUST-97-1: 31

specimens E2, C3, W3 and E3 the modification of the test procedure and setup succeeded in solving the
likely problem of rebar cage shifting.

5.5

Testing of Epoxy-Anchor Beams

As in the previously discussed tests, the epoxy anchor specimens were white-washed for crack detection
as well as the channel reinforcement. Beam E1 was placed within the test frame with 15'-0" centerline to
centerline support spacing with 5'-0" load separation, while beams E2 and E3 were set up with 14'-6"
support spacing with 4'-6" load separation. The reason for this change in setup was discussed in the
previous section. The typical setup for the epoxy-adhesive specimens is shown in Figure 5-18. Also, the
exposed length of threaded rod beyond the channel was much less in the case of epoxy-adhesive anchors.
The differences can be seen in Figure 5-19. This difference had no effects on the results. All specimens
were tested until failure characterized in a similar manner as for the wedge anchor beams using
monotonic loading.
Failure of the epoxy anchor specimens were all characterized by shearing of the anchors followed
by a very subtle compression failure of the concrete in the constant moment region of the member. Prior
to failure, there was significant cracking of the concrete in the constant shear zone and the constant
moment region of the member. Pertinent data related to the tests are given in Table 5-1. As one can see,
the deflections at ultimate are very similar to those measured in the wedge anchor specimens.
Furthermore, the average failure load for the specimens are very similar. The differences in the average
load at first crack are significant, however, resulting from experimental error and/or inaccuracy in visually
detecting cracking from one specimen to another. Cracking patterns and deformations at ultimate for a
typical failure of an epoxy anchored member are given in Figures 5-20 through 5-23. The epoxyadhesive specimens exhibited similar delaminating of the reinforcing channel to that of the wedge
anchor specimens. The delaminating of the channel can be seen in Figure 5-24. This separation of the
channel occurred simultaneously with the failure of the bolts and the ultimate load condition. Figure 5.25

MUST-97-1: 32

is a close up of the underside of the channel in the bolt failure region. As one can see, no distress of the
channel is exhibited.
Table 5-1 illustrates the very encouraging consistency in the results between epoxy-adhesive and
wedge-type expansion anchor specimens. All channel reinforced members (neglecting W2) failed with
very comparable ultimate loads and deflections. This is to be expected since the both anchor types were
capable of supporting nearly the same shear force. There is, however, a rather wide variation in the
average load to first visible crack. This could have been a result of visual error in detecting the cracking
as a result of the small vertical deflection of the beam. That is to say, the beam simply was not deflecting
as much as in the case of the control members, and therefore, cracks were difficult to catch at the instant
of there formation.

5.6

Load Deformation Behavior of Specimens

The load deformation response of the specimens are also useful to an understanding of the externally
reinforced members behavior. Table 5-2 contains information related to the deformations of all tested
specimens at the ultimate load condition. Also, the percentage decrease in deflection at ultimate load is
given. From the data it can certainly be said that the externally reinforced members are much stiffer than
their control counterparts. This is to be expected since the transformed moment of inertia for the new
cross-section in the case of the channel reinforced member has increased.
In addition to single deformation values of deformation at ultimate load, the load-deformation
response of the members throughout the loading history is important. Figures 5-26 through 5-28 illustrate
the load-deformation response of all specimens tested. The externally reinforced members (using both
wedge and epoxy anchors) exhibit very consistent load deformation response. Externally reinforced
specimens, E1 and W1, exhibit some redistribution of force and sustained deformation after the ultimate
load is achieved. However, the load level for this sustained deformation is significantly lower for
specimen E1. Specimens, E2, E3, W2 and W3 do not exhibit any sustained deformation after the ultimate
load condition. Therefore, one can consider the failure of the externally reinforced member as brittle and

MUST-97-1: 33

outside the philosophy of reinforced concrete design. (The general philosophy of design in reinforced
concrete is to provide member ductility at the ultimate load condition.) The externally reinforced
members do not reflect ductility normally associated with reinforced concrete members.
The lack of ductility in the failure mode can be directly attributable to the sudden shear failure of
the anchors. Recalling the design procedure used for the externally reinforced members; the shear
strength of the connector was the governing failure mode in assigning an ultimate superimposed load to
the member. This failure mode was achieved in the specimens, so that although the failure was nonductile, it was expected. If space is available on the existing reinforced concrete member to provide
enough anchors to ensure the failure mode of the externally reinforced member is governed by tensile
failure of the channel, it is believed the ductility requirements can be met. Also, there is the opportunity
for providing fuses at the anchor holes in the external reinforcing member to shift the failure mode into
the channel (from the anchor) to return the ductility to the externally reinforced member.
The increase in stiffness of the externally reinforced members can also be seen in Figures 5-26
through 5-28. A service load level reduction relative to the ultimate load for each member (externally
reinforced and control) can be approximated by,

SLR '

Resistance Factor
Load Factor

N
0.85
'
'
' 0.5
(
1.7

(16)

One can consider a service level of loading to be approximately 7,500 lbs for the control (un-reinforced)
members. At this load level, the increase in stiffness (decrease in deflection) of the externally reinforced
members is apparent. Furthermore, this increase is consistent for all externally reinforced specimens,
without preference for one type of anchor over another.
Overall, the externally reinforced specimens displayed consistent expected behavior relative to
ultimate load and load-deformation response. The load-deformation behavior is consistent for both
wedge type and epoxy adhesive type anchors.

MUST-97-1: 34

5.7

Strain Distribution Within the External Channel

Both the wedge type and epoxy adhesive anchor specimens were fitted with strain gages on the surface of
the external channel reinforcement. It should be noted that specimens W1 and E2 had questionable strain
readings within the web as a result of possibly damaged gages. Therefore, these specimens are not
present in the discussion.
Strain within the channel for the wedge type expansion anchor specimens are contained in Figures
5-29(a) and 5-29(b). The average strain in the flanges of the channel and the strain in the web are
presented in the figures as a function of the average applied load. The average flange strain was used as
the gages were not mounted in the same position (vertically). As one can see from the data, the flange
strain and web strain start out virtually identical for the first 5000 lbs of applied (average) load. At this
point, one could say that the distribution of strain (and therefore, the tensile force) within the channel is
essentially uniform. However, once the load level equal to 5000 lbs. is exceeded, the strain tends to
deviate significantly from one another. This separation widens as loading is increased on the beam
member. There is an obvious gradient of strain through the depth of the channel. The strain in the
internal reinforcing steel is also shown in the figures. Based on the vertical locations of the internal
reinforcement relative to the external channel, the strain in the re-bar is much less than that in both the
average flange and web strain in the channel at load levels below approximately 8000 lbs. At
approximately 8,000 lbs, the strain in the internal reinforcement begins to exhibit significant nonlinear
behavior. Furthermore, the strain in the reinforcing steel increases significantly beyond that in the
channel. If perfectly composite action was occurring within the member, the strain in the channel should
be significantly above that in the re-bar at any given load level. However, as a result of slip at the
interface of the channel and concrete member, linear strain distribution is lost. Therefore, the member
behaves in a partially composite manner beyond about 8,000 pounds of average applied load (and at
ultimate).
Similar strain behavior is exhibited for the epoxy adhesive anchor bolted members. The average
flange strain and the web strain in the external channel reinforcement are given in Figures 5-30(a) and 5-

MUST-97-1: 35

30(b). Unfortunately, the strain gage on the internal reinforcement was non-functional for these
members. However, the overall similarity in strain behavior within the channel between the wedge type
expansion anchor and the epoxy adhesive anchor specimens can be seen. The maximum strain achieved
at the ultimate load for all anchor specimens are comparable. As a result of the data obtained for the
epoxy adhesive anchor, it is believed that similar behavior for the internal reinforcement would have been
obtained with good gages and therefore, the discussion of the wedge type anchor specimen behavior is
applicable in this case.
It is interesting to see how the strains in the web of the external channels vary with the type of
anchor bolt used. The strain at the web is useful, since the vertical distance from beam neutral axis to
extreme channel web face is nearly the same for all specimens. The same can not be said about the gages
mounted on the flanges of the channel. Figure 5-31 illustrates the variation of microstrain in the channel
webs for the various anchor types as the average applied load is increased. It can be seen that all
specimens had virtually identical strain behavior and therefore, the wedge and epoxy anchors performed
in nearly identical fashion. Thus, in this application the anchor types makes essentially no difference to
strain behavior and transfer of force from the channel to the concrete member.

6.0

Evaluation of Proposed Design Methodology

The design procedure outline in Section 3.0 for the design of external reinforcement for existing
reinforced concrete members can now be evaluated and discussed in the light of the experimental results.
Table 6-1 illustrates the theoretical ultimate load predicted using the procedure from Section 3.0 and the
measured ultimate loads obtained via experiment. The load deformation response for the specimen
groups are given in Figures 6-1 through 6-3.
All specimens, with the exception of W1 and W2 attained the theoretical ultimate load. Specimen
W2 suffered the premature diagonal tension (shear-type) member failure discussed in previous sections.
Member W1 is a wedge type expansion anchor specimen. In this case, it is believed that the natural
variability in the construction technique resulted in a slightly inadequate torque being provided to this

MUST-97-1: 36

anchor set. However, the deficiency with respect the theoretical is small. Specimen W3 is consistent
with specimens E1, E2, and E3 with respect to attained theoretical ultimate load levels.
Overall, the design methodology proposed is adequate in predicting the ultimate load behavior of
the externally reinforced concrete members using structural steel channels with wedge and epoxy
adhesive anchors. It is difficult to assess the reliability of the method with the results of only nine
specimens. However, in the case of the epoxy adhesive anchors, the reliability of the technique and
design procedure appears high. The reason for this is that the epoxy anchors are not as sensitive to the
installation torque during construction to set the anchor. The wedge type expansion anchors are more
sensitive to the installation procedure. It should be noted that the procedures outlined in RawlPlug(1994)
were followed rigorously during the installation of the epoxy adhesive anchors. The benefits of this
adherence are apparent in the experimental results. However, in the case of the wedge type expansion
anchors, there was no defined torque recommended by RawlPlug(1994) for installation. A three-to-four
turns after contact is an extremely variable definition of application torque. This variability displayed
itself in the experimental results for the wedge type expansion anchor specimens.

7.0

Conclusions

An experimental investigation to determine the feasibility of using externally attached structural steel
channels to the tension face of reinforced concrete beams as additional external reinforcement has been
presented. The experimental program consisted of fabrication of nine test specimens: three control
beams without external reinforcement, three externally reinforced members with wedge type expansion
anchors, and three specimens with epoxy adhesive anchors. All externally reinforced members utilized a
C5x6.7 structural steel channel as reinforcement.
A design procedure was presented for determining the strength of the externally reinforced
member. The procedure suggested is based on a strength of materials approach and basic mechanics of
reinforced concrete design. Design values pertaining to anchor strength are taken from corporate
literature; RawlPlug(1994). The specimens designed in the present study assumed that anchor shearing is

MUST-97-1: 37

the controlling mode of failure for the member. The reason for this is the space limitations on the tension
face of the RC beam and the edge distance and spacing requirements for the anchors. If a smaller channel
were used in the design, perhaps the controlling mode of failure would be yielding of the external
reinforcement rather than anchor shearing. Ductile failures may then be expected. Furthermore, steel
plates could be bolted to the sides of the existing RC member. Mounting steel elements to the sides of the
member could minimize interference with the main flexural steel in the RC member. Also, these plates
could have small additional cross-sectional areas and therefore, could lead to ductile failures.
The nine test specimens were loaded to failure in four point bending. Variability in ultimate loads
for control specimens was small. The variability in the ultimate loads for the externally reinforced
members was smaller than the control members since the failure was due to anchor shear failure. The
shear failure of the anchors (both epoxy adhesive and wedge) were very reliable and predicted. The six
externally reinforced members all achieved nearly the desired ultimate loading predicted using the design
procedure. It should be noted that no reliability or workmanship factors were employed in the analysis
for strength prediction. Therefore, the ultimate load values should only be used as a schematic reference.
More testing could be done to establish reliability factors for design purposes. The measurements of
strain within the specimens indicate that the internal reinforcement in the control members has undergone
nonlinear behavior and therefore yielding of the internal steel can be assumed for design purposes. The
strain in the external reinforcement, although greater than the internal reinforcement at lower load levels,
is less than that in the internal reinforcement at higher levels indicating partially composite behavior. The
strain measured in the webs of the various externally reinforced specimens indicated that the variability
due to anchor type in providing the partially composite behavior was minimal. Lastly, the strain
measured in the flanges and web of the external reinforcement indicated a gradient of stress through the
channel. Therefore, a uniform distribution of stress could be considered, but this stress would be an
average over the channel depth.
Overall, the design methodology proposed for the external reinforcement of existing RC beams is
adequate. Both strength of the member and stiffness are improved. One deficiency of the reinforced

MUST-97-1: 38

member is the lack of ductility at failure. This non-ductile behavior arises from anchor shear being the
controlling failure mechanism. If yielding of the channel could be guaranteed, this non-ductile failure
could be avoided. Therefore, the proposed external reinforcing method has the opportunity to preserve
the RC design philosophy of ductile failure lacking in proposed methodologies using GRFP and FRP
fabrics.

8.0

References

1.)

ACI (1995), Building Code Requirements for Structural Concrete (ACI 318-95). American
Concrete Institute. Detroit, MI.

2.)

Arduini, A., Di Tommaso, Nanni, A. (1997a) Brittle Failure in FRP Plate and Sheet Bonded
Beams, ACI Structural Journal, Vol. 94, No. 4, pp. 363-370.

3.)

Arduini, A., Di Tommaso, Nanni, A. (1997b) Parametric Study of Beams with Externally Bonded
FRP Reinforcement, ACI Structural Journal, Vol. 94, No. 5, pp. 493-501.

4.)

Chajes, Michael J.; Thomson, Theodore A. Jr.; Januszka, Ted F.; and Finch, William W. Jr. (1994),
Flexural Strengthening of Concrete Beams Using Externally Bonded Composite Materials,
Construction and Building Materials, V.8, No.3, pp191-201.

5.)

Hussain, M.; Sharif, Alfarabi; Basunbul, I.A.; Baluch, M.H.; and Al-Sulaimani, G.J. (1995),
Flexural Behavior of Precracked Reinforced Concrete Beams Strengthened Externally by Steel
Plates, ACI Structural Journal, V.92, No.1, Jan.-Feb., pp14-22.

6.)

Jones, R.; Swamy, R.N.; and Charif, A. (1988), Plate Separation and Anchorage of Reinforced
Concrete Beams Strengthened by Epoxy-Bonded Steel Plates, Structural Engineer, V.66, No.5,
March, pp85-94.

7.)

Oey, Hong Sioe and Aldrete, Carlos J. (1996), Simple Method for Upgrading an Existing
Reinforced Concrete Structure, Practice Periodical on Structural Design and Construction, V.1,
No.1, Feb., pp47-50.

MUST-97-1: 39

8.)

Rawlplug (1994), The Rawlplug Company Inc., Drilling & Anchoring Systems Design Manual,
New Rochelle, NY.

9.)

Sharif, Alfarabi; Al-Sulaimani, G.J.; Basunbul, I.A.; Baluch, M.H.; and Ghaleb, B.N. (1994),
Strengthening of Initially Loaded Reinforced Concrete Beams Using FRP Plates, ACI Structural
Journal, V.91, No.2, March-April, pp160-168.

10.)

Swamy, R.N.; Jones, R.; and Charif, A. (1989), The Effect of External Plate Reinforcement on the
Strengthening of Structurally Damaged R.C. Beams, Structural Engineer, V.67, No.3, Feb., pp4554.

11.)

Wang, Chu-Kia and Salmon, Charles G., (1992). Reinforced Concrete Design. Harper Collins
Publishers Inc.

12.)

Ziraba, Y.N.; Baluch, M.H.; Basunbul, I.A.; Sharif, A.M.; Azad, A.K.; and Al-Sulaimani, G.J.
(1994), Guidelines Toward the Design of Reinforced Concrete Beams with External Plates, ACI
Structural Journal, V.91, No.6, Nov.-Dec., pp 639-646.

MUST-97-1: 40

- This page intentionally left blank -

MUST-97-1: 41

- This Page Intentionally Left Blank -

MUST-97-1: 42

Table 4-1: 28-Day Compressive Strengths for Concrete Batches Used in Beam Specimen Construction.
Beam
Set

C1
E1
W1

C2
E2
W2

C3
E3
W3

Cylinder No. or
Average

Applied Compressive
Load (lbs.)

28-Day Compressive
Strength (psi)

131248

4645

137123

4850

135916

4807

Average

134796

4767

123000

4350

111177

3932

117446

4154

Average

117208

4145

138349

4893

134453

4755

137637

4868

Average

136813

4839

MUST-97-1: 43

Table 4-2: Sectional and Material Properties for Reinforcing Steel (Re-Bars) for Test Specimens

Bar

#3 Bars
(Batch 1)

#3 Bars
(Batch 2)

#5 Bars

Sample
Number
or Avg.

Yield
Stress
(ksi)

Ultimate
Stress
(ksi)

Elastic
Modulus
(ksi)

77.15

102.7

38576

60.95

103.3

30473

70.50

35250

Average

69.53

103.0

34766

67.57

109.0

33787

70.49

111.1

35244

56.63

106.1

28317

Average

64.90

108.7

32447

66.72

33359

68.99

109.1

34494

70.20

109.2

35103

Average

68.64

109.1

34318

Table 4-3: Average dimensions for concrete beam specimens: h = height (in.), b = width (in.) and
average embedment depths in inches for anchors.
Dimension

C1

C2

C3

W1

W2

W3

E1

E2

E3

18.26

18.21

18.14

18.17

18.21

18.15

18.24

18.18

18.24

10.14

10.03

10.05

10.05

10.05

10.09

10.19

10.03

10.05

Embedment

3.94

4.35

4.02

5.57

5.57

5.43

MUST-97-1: 44

Table 4-4: Section and Material Properties for Structural Steel Channels Used as External Flexural
Reinforcement.
Specimen
Designation

Yield Stress
(psi)

Elastic Modulus
(psi)

#1

48417

28015800

#2

47272

36954500

#3

48300

22105100

Average

47996

29053727

Table 5-1: Pertinent Data Related to the Testing of the Nine Beam Specimens.
Specimen
Designation

Avg. Load at
First Crack
(lbs.)

Avg. Failure
Load (lbs.)

Avg. Centerline
Deflection at
Failure (in.)

Failure Mode

C1

4500

16310

3.65

compression failure
of concrete

C2

4000

17780

3.27

compression failure
of concrete

C3

3300

16280

3.28

compression failure
of concrete

E1

7000

28660

1.21

shear failure
of anchors

E2

6000

28050

1.10

diagonal tension
failure at support

E3

6250

30315

1.08

shear failure
of anchors

W1

9000

29310

1.04

shear failure
of anchors

W2

6000

30400

1.48

shear failure
of anchors

W3

7600

31070

1.44

shear failure
of anchors

MUST-97-1: 45

Table 5-2: Comparison of Average Centerline Deflection at Ultimate Load.


Specimen
Designation

Deflection at Ultimate
Load (in.)

Percentage Decrease in
Deflection Over Control Beam

C1

3.65

n.a.

C2

3.27

n.a.

C3

3.28

n.a.

E1

1.04

351

E2

1.48

221

E3

1.44

228

W1

1.21

300

W2*

1.10

297

W3

1.08

304

* - Indicates specimen that suffered from unexpected shear failure at the support.

Table 6.1: Comparison of Theoretical Versus Measured Ultimate Loads Using Design Procedure.
Specimen
Designation

Theoretical Ultimate
Load (lbs.)

Measured Ultimate
Load (lbs.)

Percentage
Difference

C1

14600

16310

+11.7

C2

14400

17780

+23.5

C3

14500

16280

+12.3

E1

28500

29310

+2.8

E2

27900

30400

+9.0

E3

29600

30320

+2.4

W1

29600

28700

-2.8

W2*

29200

28010

-4.1

W3

29600

30320

+2.4

* - Indicates specimen that suffered from unexpected shear failure at support.

MUST-97-1: 46

Figure 2-1:

Internal equilibrium for the typical control beam.

Figure 2-2:

Typical internal reinforcement layout for the control beams.

Figure 3-1:

Internal equilibrium for externally reinforced member.

MUST-97-1: 47

Figure 3-2:

Figure 3-3:

Reinforcement layout for typical externally reinforced member.

External channel configurations with anchor layout and spacing: (a) wedge-type
expansion anchor specimens, (b) epoxy adhesive anchor specimens.

MUST-97-1: 48

Figure 5-1: Mounting of General Purpose Strain Gages to the Reinforceing Channel on a Typical
Retrofitted Beam.

MUST-97-1: 49

(a)

(b)
Figure 5-2: Structural Testing Setup: (a) Illustration of Testing Frame, Loading Cylinder, Specimen, and
Support Mechanism; (b) LVDT Mounting, Data Acquisition System and Hydraulic Pump.

MUST-97-1: 50

Figure 5-3: Load Cells and Roller Supports Located at Points of Load Application on the Beam
Specimen(s).

MUST-97-1: 51

Figure 5-4: LVDT and LVDT Tab for Measuring Vertical Deformation of the Beam Specimen(s).

MUST-97-1: 52

(a)

(b)

Figure 5-5: Specimen C1 at Failure Load Condition: (a) Central Region of Flexural Cracking, (b) Zone
of Cracking Near Support(s).

MUST-97-1: 53

Figure 5-6: Zone of Crushing Exhibited in All Control Beam Specimens Located Within the Length of
Beam Bounded by Loading Cylinders.

Figure 5-7: Typical Deflected Shape of Control Beam at Failure Prior to Final Load Removal.

MUST-97-1: 54

Figure 5-8: Typical Wedge Type Anchor Specimen (W1 shown here)in Test Apparatus.

Figure 5-9: Close Up Illustrating Position and Orientation of Wedge Type Expansion Anchors
Prior to Testing for Typical Specimen.

MUST-97-1: 55

Figure 5-10:

Figure 5-11:

Permanent Deformation Typical of Wedge Type Expansion Anchor Specimen


Subsequent to Load Removal.

Cracking in Central Region of Member Typical of Wedge Type Expansion Anchor


Specimens.

MUST-97-1: 56

Figure 5-12:

Cracking at Support where Bolt Failure Occurred Typical of Wedge Type Expansion
Anchor Specimens.

Figure 5-13:

Cracking at Opposite Support from Bolt Failure Side Typical of Wedge Type Expansion
Anchor Specimens.

MUST-97-1: 57

Figure 5-14:

Reinforcing Channel Delamination Typcial of Wedge Type Expansion Anchor


Specimens.

Figure 5-15:

Close Up View of Expansion Anchors After Load Removal in Region of Anchor Failure
Typical of Wedge Type Expansion Anchor Specimens.

MUST-97-1: 58

Figure 5-16:

Wedge Type Expansion Anchor Specimen W2 Displaying Unexpected Shear Failure Near the
Support.

Figure 5-17:

Close Up of Shear Failure Near Support Roller for Wedge Type Expansion Anchor Specimen
W2.

MUST-97-1: 59

Figure 5-18:

Typical Epoxy Adhesive Specimen in Testing Appratus.

Figure 5-19:

Epoxy Adhesive Specimen and Wedge Type Specimen in Rolled Over Configuration
Illustrating the Differences in Bolt Shank Extensions.

MUST-97-1: 60

Figure 5-20:
Figure 5-21:

Deformed Shape of Epoxy Adhesive Specimen E2 Typical of all Epoxy Adhesive Specimens
Prior to Load Removal at Failure Condition.
Crack Pattern at Support Opposite Bolt Failure Side Typical of Epoxy Adhesive Specimens.

MUST-97-1: 61

Figure 5-22:

Cracking Pattern in Central Region of Beam (Between Loading Cylinders) Typical of Epoxy
Adhesive Specimens.

Figure 5-23:

Cracking Pattern In Region of Bolt Failure Typical of Epoxy Adhesive Specimens.

MUST-97-1: 62

Figure 5-24:

Delamination of External Reinforcing Channel Typical of Epoxy Adhesive Specimens.

Figure 5-25:

Close Up View of Beam Soffit Showing Failed Bolts Near Support Typical of Epoxy Adhesive
Specimens.

MUST-97-1: 63

35000
30000
25000
20000
15000
10000
5000
0

0.0

Figure 5-26:

0.5

1.0

1.5

2.0

2.5

3.0

3.5

Load Deformation Response for Beams Specimens in Group 1.

4.0

MUST-97-1: 64

35000
30000
25000
20000
15000
10000
5000
0
0.0

Figure 5-27:

0.5

1.0

1.5

2.0

2.5

3.0

3.5

Load Deformation Response for Beams Specimens in Group 2.

4.0

MUST-97-1: 65

35000
30000
25000
20000
15000
10000
5000
0
0.0

Figure 5-28:

0.5

1.0

1.5

2.0

2.5

3.0

Load Deformation Response for Beams Specimens in Group 3.

3.5

4.0

MUST-97-1: 66

30000
25000
20000
15000
10000
5000
0

200

400

600

800

1000

1200

1400

(a)
32000
28000
24000
20000
16000
12000
8000
4000
0
0

200

400

600

800

1000

1200

(b)
Figure 5-29:

Load vs. Microstrain in Wedge type Expansion Anchor Specimens: (a) Specimen W2, (b)
Specimen W3.

MUST-97-1: 67

32000
28000
24000
20000
16000
12000
8000
4000
0
0

100

200

300

400

500

600

(a)
35000
30000
25000
20000
15000
10000
5000
0
0

Figure 5-30:

100

200

300

400

500

600

700

(b)
Load vs. Microstrain in Epoxy Adhesive Type Expansion Anchor Specimens: (a) Specimen E1,
(b) Specimen E3.

MUST-97-1: 68

32000
28000
24000
20000
16000
12000
8000
4000
0
0

Figure 5-31:

100

200

300

400

500

Average Load vs. Micro-Strain in External Channel Reinforcement Web as a Function of Anchor
Type.

MUST-97-1: 69

35000
30000
25000
20000
15000
10000
5000
0

0.0

0.5

1.0

1.5

2.0

2.5

3.0

Figure 6-1: Load Deformation Response for Beam Specimens in Group 1.

3.5

4.0

MUST-97-1: 70

35000
30000
25000
20000
15000
10000
5000
0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

Figure 6-2: Load Deformation Response for Beam Specimens in Group 2.

3.5

4.0

MUST-97-1: 71

35000
30000
25000
20000
15000
10000
5000
0
0.0

0.5

1.0

1.5

2.0

2.5

3.0

Figure 6-3: Load Deformation Response for Beam Specimens in Group 3.

3.5

4.0

MUST-97-1: 72
Appendix - A: Design Example for Externally Reinforced Beam
This example illustrates the steps necessary for the preliminary design of an externally reinforced
concrete beam used for testing. The design procedure is the same for both types of anchoring systems
used. The concrete and rebar strengths and beam dimensions were assumed, with corrections made in the
final design for the actual values of these variables to get theoretical ultimate strengths. The beams are
the same as the control beams with the addition of a structural steel channel mounted to the bottom.
Data:
b = 10"

h = 18"

L = 15'-0"

fc! = 4000 psi

fy,rebar = 60000 psi

fy,stirrup = 60000 psi

cover = 2"

d1 = 15.31" (see Figure 3-1)

d2 = 18.48" (see Figure 3-1)

As,rebar = 3-#5 bars


Solution:
Part 1
The following is the design procedure to calculate the capacity of the externally reinforced concrete
beams. The first step is to choose a channel section. Try a C5 x 6.7 structural steel channel. To insure an
under-reinforced section, Dact must be less than 0.75Dbal,

$1 ' 0.85 & 0.05

Dbal '

0.85 fc' $1
fy

fc' & 4000


1000

4000 & 4000


1000

' 0.85

87000
0.85(4000)(0.85)
87000
'
87000 % fy
60000
87000 % 60000

Dact ' Drebar % Dchannel '


'

' 0.85 & 0.05

As,rebar
bd1

' 0.0285

As,channel
bd2

3(0.31 in.2 )
1.97 in.2
%
' 0.0167
10'' (15.31'' )
10'' (18.48'' )

0.75Dbal ' 0.75(.0285) ' 0.0214

>

Dact ' 0.0167 U ok

Calculate the nominal moment capacity and moment due to superimposed live load,

MUST-97-1: 73

(As fy )

a '

rebar

% (As fy )

channel

0.85 fc' b
(0.93 in.2)(60000 psi) % (1.97 in.2)(36000 psi)
' 3.73 in.
0.85(4000 psi)(10'')

'

Mn ' Mult ' (As fy )

rebar

d1 &

a
a
% (As fy )
d2 &
channel
2
2

(0.93 in.2 )(60 ksi ) 15.31'' &


'

3.73''
2

12
(1.97 in.2 )(36 ksi ) 18.48'' &

3.73''
2

12

' 160.7 k ft

The superimposed live load, P, the beam can carry with loads applied at third points is,

P '

3ML
L

'

3(155.4 k ft )
' 31.1 kips
15'

The stirrups are designed by first calculating the shear strength of the concrete section,

Vc ' 2 fc'bd '

2 4000 psi (10'' )(15.31'' )


' 19.4 kips
1000

Since this is less than P, shear reinforcement must be provided. Spacing for #3 stirrups is,

s '

Av fy d
P& Vc

'

2(0.11 in.2 )(60 ksi)(15.31'' )


' 17.3 in.
(31.1 k & 19.4 k)

With,

Vs ' P & Vc ' 31.1 & 19.4 ' 11.7 kips


4 fc' bd ' 2Vc ' 38.8 kips
and Vs < 4 fc' bd , s must be less than,

MUST-97-1: 74

s '

d
15.31''
'
' 7.66 in
2
2

Av fy

<

50b

'

2(0.11 in.2 )(60000 psi)


' 26.4 in. U ok
50(10'')

Thus, a spacing of d/2 controls. Use 7 in. for a distance of 5 ft. from each support, with the first stirrup
at 3 in. from the end. The center 5 ft. of the beam is not experiencing any shear due to superimposed
loading, but it was decided to put stirrups in this area at 12 in. to have vertical steel in this region to resist
shear from the beam self-weight.
Part 2
In this part, shear failure of the anchors is the controlling mode on which the reinforced strength is based.
It was decided to design the beams to fail by shearing of the bolts at a load corresponding to P = 25 kips.
A concrete strength of 4000 psi and steel yield strength of 60000 psi for reinforcement was assumed for
the preliminary calculations and is used in the following design procedure for the anchor bolts. Note that
the value for d2 is now the distance to the shear interface of the anchors and the beam.
The first step is to calculate the superimposed live load moment due to the point loads using the
equation given below,

ML '

1
1
(P)(L) ' (25 kips)(15' ) ' 125.0 kip ft
3
3

The dead weight of the beam is added to this to get the nominal moment capacity of the beam,

Mn ' Mult ' ML % MD


' 125.0 %

(0.150 kcf )(10'')(18'')(15' )2


' 130.3 kip ft
8(144)

Tanchor is computed based on an assumed value of a and the assumption that the internal reinforcing steel
is at yield. Try a = 4",

Mult & (As fy )


Tanchor '

rebar

a
d2&
2

d1&

a
2

12(130.3 k ft) & (0.93 in.2)(60 ksi) 15.31'' &


'

' 51.3 kips


Calculate arevised based on this value of Tanchor using,

18'' &

4''
2

4''
2

MUST-97-1: 75

arevised '

(As fy )

rebar

% Tanchor

0.85 fc' b

'

(0.93 in.2 )(60 ksi) % 51.3 kips


' 3.15 in.
0.85(4 ksi)(10'' )

Calculate a new value of Tanchor and recalculate arevised ,

Mult & (As fy )


Tanchor '

rebar

d2&

d1&

a
2

a
2

12(130.3 k ft ) & (0.93 in.2 )(60 ksi) 15.31'' &


'

arevised '

3.15''
2

3.15''
18'' &
2

(As fy )

rebar

% Tanchor

0.85 fc' b

'

' 48.5 kips

(0.93 in.2 )(60.0 ksi ) % 48.5 kips


' 3.07 in.
0.85(4 ksi)(10'')

Continuing the above iterations, the answer converges at Tanchor = 48.3 kips and arevised = 3.06 in..
The anchors will now be designed for a shear of 48.3 kips. Rawlplug (1994), is used to obtain the
design values and spacing requirements for the anchors. A carbon steel Rawl-Stud wedge style expansion
anchor is used. For a " diameter anchor, a depth of embedment assumed to be 4 inches, and a concrete
strength of 4000 psi; an ultimate (pure) shear load capacity of 7535 lbs. is obtained from Table A-1
below; taken from the Rawlplug (1994).
Table A-1: Ultimate Shear Capacity for Rawl-Stud Anchors
Anchor

Embedment

Guide

2000 psi

4000 psi

6000 psi

Size (in.)

Depth (in.)

Torque (ft.-lbs)

Concrete (lbs)

Concrete (lbs)

Concrete (lbs)

1/2

2 - 1/4

60

7025

7150

7150

1/2

60

7200

7190

7295

1/2

60

7280

7535

7710

1/2

60

7280

7535

7710

Assuming that spacing and edge distance requirements are adequate, the number of anchors needed, N is,

MUST-97-1: 76

N '

Tanchor
Vult

'

48.3 kips
' 6.4 anchors
7.535 kips

The anchors are placed within the end five feet of the beam, or in the constant shear zone. One should
round up to 7 or 8, but for a first iteration try 6 anchors within the end 5 feet of the beam on each side. A
preliminary anchor layout gives the following,

Figure A-1:: Preliminary Layout for Wedge Style Expansion Anchors


To obtain the maximum load in shear, a spacing of 10 anchor diameters (5") between anchors in all
directions should be used. An examination of the layout in Figure A-1 shows that all anchor spacing,
including the diagonal spacing between anchors, is greater than 10d. Therefore no reduction is needed for
spacing requirements.
An edge distance, E, of 12 anchor diameters (6") should also be used to obtain the maximum shear
load. The current layout includes an edge distance of 4" (8.5d), which is greater than the minimum
allowed of 5d. The load reduction factor, Re, for E = 8.5d is interpolated from the following table taken
from Rawlplug (1994).
Table A-2: Edge Distance Reductions for 1/2 diam. Rawl-Stud Anchors (shear only)
Edge Distance /

Edge Distances - shear only

Reduction Factor

12d

11d

10d

9d

8d

7d

6d

5d

Edge Distance

5 - 1/2

4 - 1/2

3 - 1/2

2 - 1/2

Re

1.00

0.93

0.86

0.79

0.71

0.64

0.57

0.50

A reduction of 0.75 is applied to the ultimate shear load capacity of 7535 lbs. to get,

Vult' ' Re Vult ' 0.75(7535 lbs.) ' 5651 lbs.


The number of anchors now needed is,

MUST-97-1: 77

N '

Tanchor
Vult'

'

48.3 kips
' 8.5 anchors
5.651 kips

Round up to ten anchors and try the layout shown in Figure A-2.

Figure A-2: Final Layout for Wedge Style Expansion Anchors

The spacing requirements of 10d is still met in all directions. The edge distance is still 4" which gives a
reduction of 0.75, the same reduction that was used the previous calculation. The answer has converged,
therefore use the layout shown in Figure A-2. The final step in the design is to check the channel strength
for block shear, bolt bearing, and yield of the anchor holes. The channel is okay for all of these checks.