FOR
THE PROCUREMENT OF WORKS
(MAJOR CONTRACTS)
[Insert Reference]
[Insert Date]
Accra, Ghana
This invitation for Pre-Qualification follows the General Procurement Notice that
appeared in [insert media used] and was posted on the Public Procurement Authority
(PPA) website www.ppaghana. gov.gh.
2.
[insert full name of Employer] now invites Applications for Pre-qualification for [insert
project name].
3.
5.
[insert name of Employer] will issue Tender Documents to those Pre-Qualified tenderers
that demonstrate sufficient capacity to implement the Works. It is expected that
Invitations for Tenders for [insert project name] will be issued in [insert date].
6.
7.
8.
9.
Each Application must be clearly marked Pre-Qualification Application for [insert project
title].
Contents
PART 1 Pre-qualification Procedures ....................................................................... 1
Section I.
Section II.
Section III.
Section IV.
Section I.
Instructions to Applicants
Table of Clauses
A.
General ................................................................................................................. 3
1.
2.
B.
C.
D.
E.
4.
5.
Sections of
7.
8.
10.
Language of Application...................................................................................... 7
11.
12.
13.
14.
15.
17.
18.
19.
Confidentiality ....................................................................................................... 8
21.
Clarification of Applications................................................................................. 8
22.
23.
24.
Subcontractors...................................................................................................... 8
F.
27.
28.
29.
30.
31.
32.
33.
General
1. Scope of
Application
1.1
2. Source of Funds
2.1
3. Corrupt and
Fraudulent
Practice
3.1
b)
c)
4. Eligible
Applicants
4.1
defines, for the purposes of this provision, the terms set forth
below as follows:
i)
ii)
4.2
4.3
4.4
Applicants and all parties constituting the Applicant shall not have a
conflict of interest. All Applicants found to have a conflict of
interest shall be disqualified. Applicants shall be considered to
have a conflict of interest with one or more parties in this prequalification process, if:
(d) they participate in more than one Application in this prequalification process; participation by an Applicant in more
than one Application will result in the disqualification of all
Applications in which the party is involved; however, this
provision does not limit the inclusion of the same
subcontractor in more than one Application; or
(e) they are, or have been associated in the past, with a firm
which has been engaged to provide consulting services for the
preparation of the design, specifications, or other documents
to be used for the performance of the works that are the
subject of this pre-qualification; or
(f) they or any of their affiliates have been hired (or are proposed
to be hired) by the Employer as Engineer for the works in
question; or
4.5
4.6
4.7
5. Eligible Materials,
Equipment, and
Services
4.8
Applicants and all parties constituting the Applicant shall provide such
evidence of their continued eligibility in a manner satisfactory to
Employer, as it shall reasonably request.
5.1
5.2
For purposes of ITA 5.1 above, origin means the place where the
materials and equipment are mined, grown, produced,
manufactured or processed, and from which the services are
provided. Materials and equipment are produced when, through
manufacturing, processing, or substantial or major assembling of
components, a commercially recognized product results that
differs substantially in its basic characteristics or in purpose or
B.
6. Sections of
Pre-qualification
Document
6.1
Section I.
Section II.
Section III
Section IV.
Application Forms
Section V.
Scope of Works
6.3
7. Clarification of
Pre-qualification
Document
7.1
A prospective Applicant requiring any clarification of the Prequalification Document shall contact Employer in writing at the
Employers address indicated in the PDS. Employer shall respond
in writing to any request for clarification, provided that such request
is received no later than the number of days indicated in the PDS prior
to the deadline for submission of Applications. Employer shall
respond within the time period specified in the PDS. Copies of the
Employers response shall be forwarded to all prospective
Applicants, without identifying its source. The response shall be
posted on the Employers website, including a description of the
inquiry, but without identifying its source. Should Employer deem it
necessary to amend the Pre-qualification Document as a result of a
clarification, it shall do so following the procedure under ITA 8 and
in accordance with the provisions of ITA 17.2.
8. Amendment of
Pre-qualification
Document
8.1
8.2
8.3
C.
Preparation of Applications
9. Cost of
Applications
9.1
The Applicant shall bear all costs associated with the preparation and
submission of its Application. Employer will, in no case, be
responsible or liable for those costs, regardless of the conduct or
outcome of the pre-qualification process.
10. Language of
Application
10.1
11. Documents
Comprising the
Application
11.1
(b)
(c)
Applicants
12. Application
Submission Form
12.1
13. Documents
Establishing the
Eligibility of the
Applicant
13.1
14. Documents
Establishing
Qualifications of
the Applicant
14.1
15.1
15.2
D.
16. Sealing and
Identification of
Applications
16.1
Submission of Applications
The Applicant shall enclose the original and the copies of the
Application in a sealed envelope that shall:
(a)
(b)
(c)
17.1
17.2
The Employer may, at its discretion, extend the deadline for the
submission of Applications by amending the Pre-qualification
Document in accordance with ITA 8, in which case all rights and
obligations of Employer and the Applicants subject to the previous
deadline shall thereafter be subject to the deadline as extended.
18.1
19. Opening of
Applications
19.1
E.
20. Confidentiality
20.1
20.2
21.1
21.2
22. Responsiveness
of Applications
22.1
23. Margin of
Preference
23.1
24. Subcontractors
24.1
21. Clarification of
Applications
F.
25. Evaluation of
Applications
25.1
25.2
25.3
26.1
27. Pre-qualification
of Applicants
27.1
28. Notification of
Pre-qualification
28.1
29. Invitation to
Tender
29.1
Employer shall invite tenders from all of the Applicants that have
been pre-qualified.
29.2
30.1
30. Changes in
Qualifications of
Applicants
10
31.1
32. Pre-qualification
Inquiries
32.1
33. Pre-qualification
Challenge
33.1
Section II.
11
ITA 1.1
ITA 1.1
ITA 4.1
(i) JV/Consortium: Entities forming the JV shall include not more than [insert
number] construction firms.
B. Contents of the Pre-qualification Document
ITA 7.1
ITA 7.1
Requests for Clarification shall be received by the Employer not later than
[insert date] and the Employer shall respond no later than [insert date and
time].
C. Preparation of Applications
ITA 10.1
ITA 15.2
ITA 16.1(c)
ITA 17.1
ITA 17.1
ITA 18.1
Late Applications shall be declared late, rejected and returned unopened to the
Applicants.
E. Procedures for Evaluation of Applications
ITA 24.2
At this time, the Employer may select Nominated Sub-Contractors for such
works as:
[specify]
ITA 25.3
ITA 31.1
Pre-Qualification through this process shall be valid for tenders related to [insert
name of project].
This Pre-Qualification is valid until [insert date].
ITA 32.1
12
13
Contents
1.
Eligibility ........................................................................................................... 14
2.
3.
Financial Situation............................................................................................ 17
5.
6.
14
Compliance Requirements
Documentation
Joint Venture/Consortium
No.
1.
Subject
Requirement
Single Entity
All Parties
Combined
Each Partner
One Partner
Submission
Requirements
Eligibility
1.1
Nationality
Nationality in accordance
with ITA Sub-Clause 4.3
Must meet
requirement
Existing or
intended
JV/Consortium
must meet
requirement
Must meet
requirement
N/A
Forms ELI1.1
and 1.2, with
attachments
1.2
Conflict of
Interest
Must meet
requirement
Existing or
intended
JV/Consortium
must meet
requirement
Must meet
requirement
N/A
Application
Submission Form
1.3
Ineligibility
Must meet
requirement
Existing
JV/Consortium
must meet
requirement
Must meet
requirement
N/A
Application
Submission Form
1.4
Government
Owned Entity
Must meet
requirement
Must meet
requirement
Must meet
requirement
N/A
Forms ELI1.1
and 1.2, with
attachments
15
Compliance Requirements
Documentation
Joint Venture/Consortium
No.
1.5
Subject
United Nations
resolution or
local
government
law
Requirement
Single Entity
Must meet
requirement
All Parties
Combined
Must meet
requirement
Each Partner
Must meet
requirement
One Partner
N/A
Submission
Requirements
Forms ELI1.1
and 1.2, with
attachments
16
Compliance Requirements
Documentation
Joint Venture/Consortium
No.
2.
Subject
Requirement
Single Entity
All Parties
Combined
Each Partner
One Partner
Submission
Requirements
2.1
History of
NonPerforming
Contracts
Non-performance of a
contract did not occur within
the last five years (5) prior
to the deadline for
Application submission
based on all information on
fully settled disputes or
litigation. A fully settled
dispute or litigation is one
that has been resolved in
accordance with the
Dispute Resolution
Mechanism under the
respective contract and
where all appeal instances
available to the applicant
have been exhausted.
Must meet
requirement by
itself, including
as partner to
past or existing
JV/Consortium
N/A
Must meet
requirement by
itself or as
partner to past
or existing
JV/Consortium
N/A
Form CON-2
2.2
Pending
Litigation
Must meet
requirement by
itself or as a
partner to past
or existing
JV/Consortium
N/A
Must meet
requirement by
itself or as a
partner to past
or existing
JV/Consortium
N/A
Form CON2
17
Compliance Requirements
Documentation
Joint Venture/Consortium
No.
3.
3.1
Subject
Requirement
Single Entity
All Parties
Combined
Each Partner
One Partner
Submission
Requirements
Financial Situation
Financial
Performance
Submission of audited
financial statements,
including balance sheets
and income statements or,
if not required by the laws
of Applicants country, other
financial statements
acceptable to Employer, for
the last five (5) years to
demonstrate the current
soundness of Applicants
financial position and its
prospective long term
profitability.
a.1 Average coefficient of
Current ratio (Current
Assets / Current Liabilities)
1. 2.
a.2 Average coefficient of
Debt ratio (Total Debt /
Total Assets) 0. 75.
Must meet
requirement
N/A
Must meet
requirement
N/A
Form FIN3.1
with attachments
18
Compliance Requirements
Documentation
Joint Venture/Consortium
No.
3.2
Subject
Financial
Resources
Requirement
Single Entity
All Parties
Combined
Each Partner
One Partner
Submission
Requirements
Must meet
requirement
Must meet
requirement
N/A
N/A
Form FIN3.2
Must meet
requirement
Must meet
requirement
N/A
N/A
Average
Annual
Construction
Turnover
19
Compliance Requirements
Documentation
Joint Venture/Consortium
No.
Subject
Requirement
Single Entity
All Parties
Combined
Each Partner
One Partner
Submission
Requirements
In order to be awarded the contract for [insert Lot number, if applicable], in addition to the previously awarded contract for [insert Lot number, if applicable], an Applicant
would have to demonstrate that it can meet a turnover requirement double the amount called for in 3.3(a) above.
20
Compliance Requirements
Documentation
Joint Venture/Consortium
No.
Subject
Requirement
Single Entity
All Parties
Combined
Each Partner
One Partner
Submission
Requirements
General
Construction
Experience
Must meet
requirement
N/A
Must meet
requirement
N/A
Form EXP4.1
21
Compliance Requirements
Documentation
Joint Venture/Consortium
No.
Subject
Requirement
Similar
4.2 Must
meet requirement
Participation as Contractor,
Construction
(a)
Management Contractor or
Experience
Sub-Contractor, in at least
two (2) contracts of similar
nature within the last five
(5) years, each with a value
of at least:
Single Entity
Must meet
requirement
All Parties
Combined
Each Partner
N/A
One Partner
N/A
Submission
Requirements
Form EXP--4.2(a)
In order to be awarded the contract for [insert Lot number, if applicable], in addition to the previously awarded contract for [insert Lot number, if applicable], an Applicant
would have to demonstrate that it can meet the requirement for similar construction experience double the amount called for in 4.2(a) above.
22
Compliance Requirements
Documentation
Joint Venture/Consortium
No.
4.2
(b)
Subject
Specific
Construction
Experience for
Interchanges
Requirement
Participation as Contractor,
Management Contractor or
Sub-Contractor, in at least
two (2) contracts of similar
nature within the last five
(5) years, each with a value
of at least:
Single Entity
Must meet
requirement
All Parties
Combined
Must meet
requirement
Each Partner
N/A
One Partner
N/A
Submission
Requirements
Form EXP-4.2(b)
In order to be awarded the contract for [insert Lot number, if applicable], in addition to the previously awarded contract for [insert Lot number, if applicable], an Applicant
would have to demonstrate that it can meet the requirement for specific construction experience for interchanges double the amount called for in 4.2(b) above.
5.
24
Position
Total Work/Business
Experience (Years)
Experience in Similar
Position (Years)
6.
25
Minimum No
Required
[insert threshold]
26
27
We, the undersigned, apply to be Pre-Qualified for the Referenced Project, as follows:
[insert project name].
and declare the following:
(a)
(b)
we, including any Sub-Contractors or Suppliers for any part of the Contract resulting from
this pre-qualification process, have nationalities from eligible countries, in accordance
with ITA Sub-Clause 4.3: [insert the nationality of the Applicant, including that of all
partners in case of a Joint Venture/Consortium, and the nationality of each already
identified subcontractor and supplier of related services, if applicable];
(c)
we, including any Sub-Contractors or Suppliers for any part of the Contract resulting from
this Pre-Qualification, do not have any conflict of interest, in accordance with ITA SubClause 4.4;
(d)
we, including any subcontractors or suppliers for any part of the contract resulting from this prequalification, have not been declared ineligible by the Government of Ghana Laws, Official
Regulations, or by an Act of Compliance with a decision of the United Nations Security Council,
in accordance with ITA Sub-Clauses 4.6 and 4.7;
(e)
[insert either "we are not a Government owned entity" or "we are a Government
entity, and we meet the requirements of ITA Sub-Clause 4.5];
(f)
we, in accordance with ITA Sub-Clause 24.1, plan to subcontract the following key
activities and/or parts of the works:
[insert any of the key activities identified in Section III- 4.2 (b) which the Applicant
intends to subcontract]
(g)
we declare that the following commissions, gratuities, or fees have been paid or are to be
paid with respect to the Pre-Qualification process, or the corresponding tendering
process or the execution of the contract:
Name of Recipient
[insert full name for
each occurrence]
Address
[insert street/
number/city/country]
Reason
[indicate reason]
Amount
[specify amount in
GHS equivalent]
(h)
28
We understand that you may cancel the Pre-Qualification process at any time and that
you are neither bound to accept any Application that you may receive nor to invite the
Pre-Qualified Applicants to bid for the Contract, subject of this pre-qualification, without
incurring any liability to the Applicants, in accordance with ITA Clause 26.
29
Form ELI-1.1
Applicant Information Form
Date: [insert day, month, year]
Page [insert page number] of [insert total number] pages
In case of Government owned entity, documents establishing legal and financial autonomy
and compliance with commercial law, in accordance with ITA 4.5.
30
In case of a Government owned entity, documents establishing legal and financial autonomy
and compliance with commercial law, in accordance with ITA 4.5.
31
Form CON2
Historical Contract Non-Performance
[The following table shall be filled in for the Applicant and for each partner of a Joint
Venture/Consortium.]
Applicants Legal Name: [insert full name]
Date: [insert day, month, year]
Joint Venture/Consortium Party Legal Name: [insert full name]
Page [insert page number] of [insert total number] pages
Non-Performing Contracts in accordance with Section III, Qualification Criteria and Requirements
Contract non-performance did not occur during the [number] years specified in Section III,
Qualification Criteria and Requirements, Sub-Factor 2.1.
Contract(s) not performed during the [number] years specified in Section III, Qualification Criteria
and Requirements, Sub-Factor 2.1.
Year
[insert
year]
Non
performed
portion of
contract
[insert amount
and
percentage]
Contract Identification
Total Contract
Amount
(current value,
GHS
equivalent)
Pending Litigation, in accordance with Section III, Qualification Criteria and Requirements
No pending litigation in accordance with Section III, Qualification Criteria and Requirements, SubFactor 2.2.
Pending litigation in accordance with Section III, Qualification Criteria and Requirements, SubFactor 2.2 as indicated below.
Year
[insert
year]
Outcome as
Percentage
of Total
Assets
[insert
percentage]
32
Contract Identification
Total Contract
Amount
(current value,
GHS
equivalent)
[insert amount]
33
Form FIN3.1
Financial Performance
[The following table shall be filled in for the Applicant and for each partner of a Joint
Venture/Consortium.]
Year 1
Year 2
Year 3
Year 4
Year 5
34
2. Financial Documents
The Applicant and its parties shall provide copies in English or translated to English, of the Balance
Sheets and Income Statements for five years pursuant Section III, Qualifications Criteria and
Requirements, Sub-Factor 3.1. The Financial Statements shall:
(a)
(b)
(c)
(d)
Attached are copies of financial statements (balance sheets, including all related notes, and
income statements) for the five years required above; and complying with the requirements.
35
Form FIN3.2
Financial Resources
[The following tables shall be filled in for each Applicant and for each member of a joint venture
or other consortium that is a party to the Applicant.]
Financial Resources
Each Applicant and each member of a joint venture or other consortium must fill in this form,
specifying proposed sources of financing, such as cash on hand, cash in bank, and assured lines
of credit, and other financial means, net of current commitments, available to meet the total
construction cash flow demands of the contracts as indicated in Section III, Qualification Criteria
and Requirements.
No.
Source of Financing
Average monthly
invoicing over
last six months
(GHS/month)
1.
The Employer reserves the right to contact this person or any other person for a reference check, as well as
checking in accordance with Employers Guidance on Reporting and Considering Past Performance by
Contractors in Employers Entity Program Procurements. It is in the best interest of the Applicant to ensure that
the contact person provided in this form responds within a maximum of 7 days when contacted by Employer. A
non response from the reference could be treated as a poor performance.
2.
3.
4.
etc.
36
37
Form FIN-3.3
Average Annual Construction Turnover
[The following table shall be filled in for the Applicant and for each partner of a Joint
Venture/Consortium.]
Applicant's/Joint Venture Partner's Legal Name: [insert full name]
Date: [insert day, month, year]
Applicant's Party Legal Name: [insert full name]
Page [insert page number] of [insert total number] pages
Annual turnover data (construction only)
Year
[indicate year]
GHS equivalent
[insert amount in GHS equiv.]
Average
Annual
Turnover*
*
Average annual turnover as obtained from the audited financial statements (income
statements), Qualification Criteria and Requirements, Sub-Factor 3.2.
38
Form EXP-4.1
General Construction Experience
[The following table shall be filled in for the Applicant and for each partner of a Joint
Venture/Consortium.]
Applicant's/Joint Venture/Consortium Partner's Legal Name: [insert full name]
Date: [insert day, month, year]
Applicant JV/Consortium Party Legal Name: [insert full name]
Page [insert page number] of [insert total number] pages
[Identify contracts that demonstrate continuous construction work over the past five years
pursuant to Section III, Qualification Criteria and Requirements, Sub-Factor 4.1. List contracts
chronologically, according to their commencement (starting) dates.
Starting
Month /
Year
[indicate
month/
year]
Ending
Month /
Year
[indicate
month/
year]
Contract Identification
Role of
Applicant
[insert "Contractor
or "Subcontractor
or "Contract
Manager]
[insert "Contractor
or "Subcontractor
or "Contract
Manager]
The Employer reserves the right to contact this person or any other person for a reference check, as well as
checking in accordance with Employers Guidance on Reporting and Considering Past Performance by
Contractors in Employers Entity Program Procurements. It is in the best interest of the Applicant to ensure that
the contact person provided in this form responds within a maximum of 7 days when contacted by Employer. A
non response from the reference could be treated as a poor reference.
Starting
Month /
Year
Ending
Month /
Year
39
Contract Identification
Role of
Applicant
[insert "Contractor
or "Subcontractor
or "Contract
Manager]
40
Form EXP-4.2(a)
Similar Construction Experience
[The following table shall be filled in for contracts performed by the Applicant, each partner of a
Joint Venture/Consortium, and specialist sub contractors. A copy of the certificate of substantial
completion should be attached for each contract in order for such contract to be considered.]
Applicant's/Joint Venture/Consortium Partner's Legal Name: [insert full name]
Date: [insert day, month, year]
JV/Consortium Party Name: [insert full name]
Page [insert page number] of [insert total number] pages
Information
Award date
Start date
Completion date
Role in Contract
Contractor
Management
Contractor
Subcontractor
[insert a
If partner in a JV/Consortium, or percentage
subcontractor, specify participation amount]
in total contract amount
Employer's Name6:
The Employer reserves the right to contact this person or any other person for a reference check, as well as
checking in accordance with Employers Guidance on Reporting and Considering Past Performance by
Contractors in Employers Entity Program Procurements. It is in the best interest of the Applicant to ensure that
the contact person provided in this form responds within a maximum of 7 days when contacted by Employer. A
non response from the reference could be treated as a poor reference.
41
Information
Telephone/fax number
E-mail:
2. Physical size
3. Complexity
4. Methods/Technology
5. Other Characteristics
42
Form EXP-4.2(b)
Specific Construction Experience
[The following table shall be filled in for contracts performed by the Applicant, each partner of a
Joint Venture/Consortium, and specialist sub contractors. A copy of the certificate of substantial
completion should be attached for each contract in order for such contract to be considered.]
Applicant's/Joint Venture/Consortium Partner's Legal Name: [insert full name]
Date: [insert day, month, year]
JV/Consortium Party Name: [insert full name]
Page [insert page number] of [insert total number] pages
Similar Contract No.
Information
Award date
Start date
Completion date
Role in Contract
Contractor
Management
Contractor
Subcontractor
[insert a
If partner in a JV/Consortium, or percentage
subcontractor, specify participation amount]
in total contract amount
Employer's Name7:
The Employer reserves the right to contact this person or any other person for a reference check, as well as
checking in accordance with Employers Guidance on Reporting and Considering Past Performance by
Contractors in Employers Entity Program Procurements. It is in the best interest of the Applicant to ensure that
the contact person provided in this form responds within a maximum of 7 days when contacted by Employer. A
non response from the reference could be treated as a poor reference.
43
Telephone/fax number
E-mail:
2. Physical size
3. Complexity
4. Methods/Technology
5. Other Characteristics
44
45
Section V.
Scope of Works
2.
Construction Period
State expected construction period and time in weeks or months; if alternative time schedules
are permitted, give the range of acceptable construction periods. The period allowed should be
reasonable and flexible.
3.
Provide general information on the climate, hydrology, topography, geology, access to site,
transportation and communications facilities, medical facilities, project layout, facilities, services
provided by the Employer, and other relevant data.