APPROVAL SHEET
Engr. M.Omair
Supervisor
DEPARTMENT OF TECHNOLOGY
SARHADUNIVERSITY OF SCIENCE AND INFORMATION
TECHNOLOGY,
PESHAWAR-PAKISTAN
Problem Statement:
The problem statement is that in our country Pakistan. Here we doesn't prefer the
estimator.The role of Estimator is very important in our Civil Engineering field. If
we constructing a building and we doesn't estimate that how much the material
use in the building, so this is an un economical building, and a lot of material and
resourses we can loss.
Objectives:
The following objective of our project is given bellow
Material use according to Specification.
To find accurate figure of Quantity of material to be used and to save the
owner of building from the loss of Raw material.
In mega project to know that the owner provide how much Resources,
Either it is human,Machinary, or Money.
To know the Total cost of the project.
1.Design:
First of all select the drawing and then design it.In the design we find out what
kind of foundation,structure, etc we design for the building.
2.Estimating:
After design we find out the estimate of the building Either it (Earth work,Substructure,Superstructure,And Finishing).
3.Construction:
After the estimation we start the construction works.
Methodology:
1.Detailed Drawing preparation
2.Getting diamension from drawing
3.Study specification both general and detailed
4.Selection of rates schedule (CSR Market rates )
5. Preparing BOQ from rates (CSR or Market rates)
Project Components:
Block Diagram:
3
Estimating
of Super
Structure
2
Estimating
of Sub
Sturecture
Selection of
Drawing
1
Estimation
of Earth
work
4
Finishing
Working Description
7th Semester
1. Proposal Presentation
2.Estimate of the
Residential building
"Phase I"
3.Presentation of
"Phase I"
Final Term
4.Theises
&
Presentation
1)
8th Semester
References
1.
www.Google.com
2.
www.wikipedia.com
3.
www.civilengineeringblog.com
4.
Note:Headings Font Size should be 14 (New Times Roman) while the remaining Font size
should be 12(New Times Roman).Line spacing should be 1.5