Professional Documents
Culture Documents
)
FOR STRUCTURAL GLAZING
NON PLANT BUILDINGS WORKS
NEW VIZAG REFINERY PROJECT, HPCL
DOCUMENT NO.
6807-00-16-48-JS-56 Rev. 0
Page 1 of 5
JOB SPECIFICATIONS
(ARCHITECTURAL)
FOR
PROJECT :
OWNER
JOB NO.
6807
04.07.07
Rev. No
Date
G.B.
Purpose
Prepared by
GEETA
J.K.B.
Checked by
Approved by
1.0
DOCUMENT NO.
6807-00-16-48-JS-56 Rev. 0
Page 2 of 5
General:
The structural glazing shall form uninterrupted fully water, air and weather tight glazed
surface in accordance with the architectural elevation and layout drawings. The contractor
shall design, engineer, provide and fix the entire system as per these specifications.
Framing system, which shall be of structurally and mechanically designed technology for
fabrication and erection with grid sizes as approved, shall form the glazed surface. The
horizontal members shall span in length between vertical members. The perimeter of the
frames shall be structurally integrated to form air and water proof movement joint on all four
sides of each panel with pressure equalization chambers formed internally. Design and
sealing of such joints shall ensure that there is no penetration of rainwater through these
joints under heavy wind pressures.
The contractor shall comply with all relevant Indian Standards, Code of Practice and
technical literature relating to best practice pertaining to structural glazing. The equivalent
International Standards may be used where these are not lower. Nothing in these clauses
shall relieve the contractor of his obligation to provide a higher standard where required
and directed.
The contractor shall engage a specialized agency/ sub-contractor with proven track record
to execute this job. The sub-contractor should have executed similar jobs for large projects/
PSU buildings.
2.0
Framing System:
The framing system shall consist of mullions, transoms etc.; shall be of heavy gauge
aluminium extruded sections of approved make and shall be extruded from aluminium alloy
HE9WP of IS: 733 of commercial quality and free from all defects impairing appearance,
strength and durability and shall be specially selected to fulfill the requirements of design
criteria stipulated in these specifications. The aluminium framing sections shall be powder
coated (min. 30 microns) in approved shade. The coating shall be conform to IS: 1868 and
IS: 660/2 and the density shall be 32 MG/sq.m.
Fixing bolts, anchors screws and nuts shall be manufactured from stainless steel grade
316. Rivets and pins shall be aluminium alloy of appropriate grade as required. All bolts,
anchors and other fastening devices shall be self-locking and shall be torque tightened to
achieve maximum torque tension where required. Brackets shall be aluminium of adequate
size to meet design parameters. The bracket joint shall be flexible to allow for all
movements, deflections and expansion/ contraction. Tough high impact and both side
smooth membrane of Teflon of minimum 1.0 mm thickness shall separate all metal-to-metal
joints.
3.0
DOCUMENT NO.
6807-00-16-48-JS-56 Rev. 0
Page 3 of 5
14%
22%
19%
69%
12%
28%
32%
5.2%
14%
22%
20%
71%
10%
19%
22%
2.8%
Sealant:
Silicon adhesive structural sealant having excellent properties of adhesion, elasticity, long
life (more than 10 years) and of approved make. Two part silicon shall be used.
5.0
Openable Shutters:
Top/ side hung shutters shall be provided with operating hardware and as per details and
requirements of location to facilitate ventilation, cleaning/ maintenance of the glass.
6.0
Workmanship:
The framing system and fixing arrangements to the RCC framed structure shall be with
Aluminium brackets. All the joints in aluminium framing system and factory glazed panels
(also between metal sections and between glass and metal sections and between glass
and metal sections) as well as joints between aluminium frame with concrete and/ or
masonry meeting surrounds shall be fully sealed and made air, water and weather tight
preventing seepage of rain water under heavy wind pressures with provision of adhesive
silicon sealant and superior quality approved make EDPM gaskets. The EDPM gasket shall
be free from any contract or migration strain and shall be compatible with all substrates.
Sealant and finishes, which are likely to come in contact shall comply with provision of IS
code. The EPDM gasket shall be purpose made by approved manufacturer.
Space at each floor level between the external face of the building frame and the internal
face of the structural glazed spandrel panel shall be sealed air tight by horizontal barrier to
prevent passage of smoke/ fire, conditioned air from one floor level to another. There shall
be continuous seal for stopping fire and smoke between the structural glazing and the
building face in cavities formed in spandrel panels between the sill wall level at external
edge of one floor and RCC/ false ceiling of the lower floor, The fire rating of the stoppers
between floors to be minimum 2 hours.
7.0
Design Criteria:
The fixing arrangement of factory formed infill glazed grid unitized framing system shall be
designed by the Structural glazing contractor to withstand all external forces due to worst
condition of wind loads as per IS code applicable for the region of the proposed buildings,
earthquake forces occurring in the Zone as per the IS code, building frame movement
forces due to wind and earth-quake, outside temperature experienced during last 10 years.
DOCUMENT NO.
6807-00-16-48-JS-56 Rev. 0
Page 4 of 5
The structural bite or contact dimensions of silicon adhesive structural sealant to the glass
required, that is the amount of silicon adhesive structural sealant (contact width and
thickness) required to support the glass externally and internally in the panel against action
of the worst condition of the external forces such as wind earthquake forces, building
movement forces, temperature forces including their combinations etc. as well as to
prevent penetration of rain water under heavy wind conditions experienced during the last
10 years in the region. It shall be designed in accordance with the requirement of the silicon
adhesive structural sealant manufacturer and supplier, mentioning the factor of safety
obtainable as per the design. In any case the factor of safety shall not be less than 1.5.
Framing system shall fulfill the design criteria/ specifications as under:
Vertical Mullions:
19 Kg/mm2
8.0
Alloy:
Fixing Bolts:
All exposed bolts, nuts, screws shall be of stainless steel 304 or 306
grade.
Gaskets:
Glazing tape:
Design Data:
Temperature range: 60 degree C Ambient, 100 degree C for Materials.
Wind Load:
150 kg/sq.m
(Entire system and each component including glass in edge zones
on each side of building corners shall be designed for heavier wind
suction as required by design code)
Seismic Load:
As per IS codes
Deflections:
Mullions:
Max. L/240 04 or 15mm whichever is less
Transoms:
Max. L/300
Permanent deflection in Mullions:
Max. L/3000 at 300 Kg/ sq.m
wind pressure
Permanent deflection in transoms: Nil at 1.5 times dead load
Permanent deflection in cladding frame members: Nil at 300 Kg/
sq.m wind pressure
Max. 15mm or as recommended by glass by glass manufacturer
whichever is less (for each typical panel)
Glass panels:
R.C.C. Grade:
9.0
DOCUMENT NO.
6807-00-16-48-JS-56 Rev. 0
Page 5 of 5
Movement:
The system shall be capable of accommodating all stress and movements that are
likely to occur during normal life of 20 years of Structural Glazing members and not
less than 10 years for the structural silicon sealant.
(b)
(c)
Deflection:
Deflection shall not be more than 1/175 of the span of the members
(d)
10.0
Performance Guarantee:
The contractor shall offer a Warranty for the entire installation carried out and for structural
silicon sealant proposed to be used vis--vis similar guarantee from the manufacturer of the
silicon sealant to fulfill the quality standards stipulated above. The performance guarantee
shall cover for replacement of any or all members and components by the contractor at his
own cost in case of any deficiency or failure in performance of the Structural glazing
component as per the design requirement during the Warranty period.
11.0
12.0