GENERAL
Casework
B.
C.
Fire-retardant Treatment
PART 2
MATERIALS
2.1 PRODUCTS
A
Manufacturer:
Auxiliary Materials
1 Screws:
2 Nails:
3 Anchors:
Page 1 / 3
Date 11/06/2009
Rev. Date //
DIVISION
SECTION
3
6
06402
EXECUTION
Lumber shall be of approved quality of the respective kinds required for the
various parts of the work, well-seasoned, thoroughly dry and free from large,
loose or unsound knots, saps, shakes or other imperfections impairing its
strength durability or appearance.
All exposed woodwork shall be smoothly dressed and well sand- papered.
Guijo (kiln-dried)
1
For all door jambs and other wall openings with wood frames.
All frame work for double plywood partitions vertical and horizontal
studs 50 mm x 76 mm, etc, where required.
Tanguile/Narra (Kiln-Dried)
1
All interior frame work for counters, cabinets, closets, and shelvings.
Page 2 / 3
Date 11/06/2009
Rev. Date //
DIVISION
SECTION
6
06402
Surface in contact with masonry and concrete shall be coated with creosote.
3.4 PLYWOOD
A
Plywood Materials
1 All plywood shall be free from knots, splits and other open defects, with
smooth surface suitable to receive finish.
3.5 WORKMANSHIP
A. Rough carpentry shall be executed in best, substantial, workmanlike
manner. Framing shall be erected true to line, levels and dimensions,
squared, aligned, plumbed, well spiked and nailed, adequately braced and
fitted, using mortise and tendon joints where practical.
B. Millwork shall be accurately milled to details as approved in manner to
allow free play of panels, avoid swelling, shrinkage, insure work remaining
in place without warping, splitting, or opening of joints. Millwork shall not be
installed until concrete and masonry work have been cured and will not
release moisture harmful to woodwork.