OBJECTIVE
Seeking a career position in an organization where I can fully utilize and enhance my
knowledge and skills to contribute to the growth of the organization.
WORK PREFERENCES
Availability
4-6 weeks
Any
MBA (Finance)
Bachelor of Engineering in Electrical Technology
Relocation
Yes
AREAS OF EXPERTISE
Project Management
Electrical Testing & Inspection
Health & Safety management
IT skills
Technical Plans
Cost Estimation
Oil & Gas Industry
EXPERIENCE SUMMARY
Over sixteen (16) years as a Senior Engineer (Electrical Projects) including 5 years of
Overseas Experience.
PROJECT MANAGEMENT
Providing technical support to the project team and wider regional teams.
Page 1 of 8
Liaising with customers on a regular basis to ensure the successful design and
manufacture of products to agreed budgets and time frames.
Site survey and analysis of technical requirement and coordination with end user to
establish basic design criteria.
Fully conversant with the Oil and Gas industry construction relevant standards.
TECHNICAL EXPERIENCE
Lead and manage a project team & interact with other departments for relevant
inputs/requirements.
Page 2 of 8
Basic and Detailed Engineering, Design Vetting of oil & gas, refinery, transportation
& marketing, process & power industries, expansion & revamping with a focus on
project specifications, budget, quality & schedule.
Prepare technical data sheets for Motorised, Non-Motorised and Lighting equipments.
Coordination with QA/QC department in order to develop inspection and test plans.
Progress monitoring and reporting to the client and resolve technical and commercial
issues.
Monitoring,
Involvement
in
Pre-
EMPLOYMENT HISTORY
Designing of Single Line Diagrams of Switchgears & Power and Lighting Distribution
Boards.
Design Vetting.
PROJECTS HIGHLIGHTS
Currently involved in the construction supervision in M/s. GASCO Saudia Arabia. The
project is upgradation of the LPG filling plants in seven cities of Saudia Arabia viz.,
Dammam, Riyadh, Jeddah, Abha, Taif, Madinah and Qassim. The upgradation works is
mainly done by M/s. KOSAN CRISPLANT and partly done by M/s. SIRAGA.
Also currently involved in design review of M/s K-Electric 10 MW Power Plants for
Korangi & Site Plants each. The scope included the review of design of 132 kV Grid &
11 kV Generation.
Engineering Procurement Management of existing 800 TPD & new 200 TPD Edible Oil
Refinery Expansion Project of M/S IFFCO Pakistan (Pvt.) Ltd. at Port Qasim Karachi.
The expansion includes New 200 TPD Edible Oil Refinery, Margarine Producing Unit,
Hydrogen Generation Unit and Packaging of the Products. The Electrical Works included
the design of Low Voltage Electrical Network which involved Power Transmission on 11
KV Network at both the source end receiving end. The job was mainly based on
producing Construction and Procurement Packages of different electrical items namely,
Transformers, Standby Diesel Generators, Power (LV & MV) and Control Cables, Cable
Trays, Lighting and Earthing accessories.
Electrical Design Works of M/s. Bosicor Pakistan Limited. The project involved the
revamping of the existing facility at Mozakund, Hub.
Page 4 of 8
Designing of Low Voltage Electrical System for M/s. Overseas Oil Trading Company
(OOTC) Machike Terminal. The design works was mainly comprising of Sizing of
Equipments like WAPDA Connection Transformers, Standby Diesel Generators, LV
Motors Output Power required to maintain respective BHP at input of Pumps, Low
Voltage Power and Control Cables and Layouts of Cables, Lighting and Earthing. Also
Preparation of Procurement Packages for different electrical items comprising of relevant
BOQs, Specifications and Data sheets.
Preparation of Construction and Procurement Package of Power (LV & MV) and Control
Cables involving Laying activities for M/s. Bosicor Oil Pakistan Limited (BOPL),
Mozakund, Hub Plant. The procurement package was based on Cable Schedule,
Respective BOQ and Extensive Cable Layout comprising mainly on cable trenches.
Designing of Low Voltage Electrical System for M/s. Hascombe Storage Limited
(HSL) Shikarpur, Terminal. The design works was mainly comprising of Sizing of
Equipments like WAPDA Connection Transformers, Standby Diesel Generators, LV
Motors Output Power required to maintain respective BHP at input of Pumps, Low
Voltage Power and Control Cables and Layouts of Cables, Lighting and Earthing. Also
Preparation of Procurement Packages for different electrical items comprising of relevant
BOQs, Specifications and Data sheets.
Detailed Engineering Works for Catalyst Recovery Unit Project of M/s. LOTTE Pakistan
PTA Limited. The scope of work included the detailed engineering works required for the
integration of catalyst Recovery Unit with the existing system. Preparation of
Construction and Procurement packages and Tender which included related documents
like cable schedule, Lighting and Earthing system, Cable tray layouts. System adequacy
checks of the existing system for integration with Catalyst Recovery Unit and preparation
of tie-in reports.
Feed for Expansion and Modification of Truck Loading for M/s. OMAN Refineries and
Petrochemicals Company LLC in Sultanate of OMAN. The scope of work was to perform
Front End Engineering and Design Works for EPC Contractor. Preparation of proposals for
tie-ins of the New system to the existing system. Existing System Adequacy checks to integrate
the New Truck Loading system to the Existing. Preparation of preliminary documents like Cable
Schedule, Electrical Load List, Cable layouts, Earthing and Lighting Layouts in accordance with
the Existing ORPC Philosophy.
Page 5 of 8
Organize and perform the Meter Reading in the days of the monthly billing i.e., First
two weeks of every month
the Load Analysis as per recent load scenario of the consumer, it involved the
check for the load above the 40 KW mostly.
(b)
(c)
All possible checks for theft i.e., verifying the C.T Ratio as per billing record
& etc.
(d)
(e)
(f)
Verification for the correct billing tariff as per recent billing record
(g)
Assessment of the supplementary bills or undercharge bills raised due to any one of
the above findings or the other
Update the findings of the consumers in the billing record and also direct all other
Assistant Managers to update the changes for their respective consumers due to
change of Energy Meter or the other finding evaluated during the site visit.
Organize the activities for the recovery of the revenue raised due to monthly billing
Physically check the status of the consumer as stated in his application and verifying
that status through consumption trend of Sui Gas Bill or other possible / available
alternative i.e., Income Tax or GST submittals etc.
Calling for the Testing of Energy Meters through Mobile Testing Van.
Attending the staff complaints being faced during the execution of the routine
activities and offering them the best possible solutions.
Page 6 of 8
Cost Estimation as per the company price lists and policy discounts over multiple
projects.
Offer the client with technical proposals customized according to their needs and
requirements.
Target the market of upcoming and current projects, maintenance and revamp
solutions.
Construction Supervision of the Installation works for the Electrical Network for the
Metering System on one of the Keamari Oil Terminal (KTC) of M/s. Pakistan State Oil
Company Ltd., The scope was inclusive of installation of equipment as per relevant
drawings specification and standards, excavation of cable trench and cable laying.
Supervision & Coordination for the Installation of the Radar Tank Level Gauging System
on different terminals of M/s. Shell Pakistan Ltd., namely Sheikhpura, Rawalpindi etc.
Construction Supervision for the installation of Radar Tank Level Gauging System
comprising of 76 Nos. of Tank Gauges on premises of M/s. Attock Refinery Ltd., The
scope of supervision including installation of Gauges, Cabling System.
Page 7 of 8
EDUCATIONAL QUALIFICATION
B.Eng. (Electrical): N.E.D University of Engineering & Tech., Pakistan in 1998
MBA (Finance): University of Karachi, Pakistan in 2008.
PROFESSIONAL AFFILIATION
REFERENECE:
Page 8 of 8