Professional Documents
Culture Documents
APR 2013
PROPOSED SITE CLEARANCE AND EARTHWORK (PACKAGE 4 - EASTERN DIVISION)
AT PROPOSED INTEGRATED TOWNSHIP DEVELOPMENT OF BANDAR BUKIT RAJA
(STAGE 1) ON LOTS 19, 25, 27, 52,1635, 13046 AND 13047 MUKIM KAPAR,
DAERAH KLANG, SELANGOR DARUL EHSAN
No.
Occupational Safety and Health Act 1994 (Safety and Health Officer)
Regulations 1997, Regulations 19 (to be submitted before the 10th of a preceeding month)
Description
No.
Type
Remarks/Action Taken
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
SHO REPORT
9
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
o.
p.
Any work related to safety, health and environmental which has been carried out by any persons, or group of
persons, engaged by the employer in order to promote safety, health environmental in the place of work.
Company appoint new safety officer as OSHA 1994, FMA 1967 and Sime Darby requirements.
Regulate EHS meeting and toolbox talk once a month.
Fogging fortnightly stress at 'kongsi' and office area.
Had EHS Committee and Emergency Response Team at site. Will train the committee and team time to time.
Water bowser keep on running during hot and windy day. Worry of complaint from public and local authority.
Silt trap and wash through regularly maintained and reinstate
Safety promoting-now in progress and will raise up more signages at workplace area, site office, 'kongsi', store
and hazardous area.
Start conduct safety, health and environmental training based on Sime Darby requirements.
Took water sampling on monthly basis by our environmental consultant-Environmental Science Sdn Bhd.
Noise and air will be monitored every three month.
Workshop for lorry to do maintenance has been erected. They must change the black oil and repair at the
concrete base.
More signages have been raised at site office, 'kongsi' and working area.
Livestocks had been removed from site.
SIRIM audit had been conducted on 29-30th August 2012. This IMS audit conclude Safety & Health,
Environmental and also Quality.
DOE visit on 12th September 2012. DOE advise Condolink to make protection on slope and platform. No ncr
given.
Drowning hazard - signage has been putted at all pond area. No swimming and fishing allowed. Condolink and
Sime Darby do not take any responsibility if accident happen there.
Sime Darby EHS Department has been audit site on 4th December 2012. Observation on environmental has
been given.
11 Any other matters related to safety, health and environmental of persons working in the place of work.
None
FUTURE PLANS
a. Try to achieve highest Safe Man Hours for this project. Suggest site management to make small occasion
or 'makan makan' if the team can work without accident until end of project.
b. HIRADC and EAIIA need to be revised.
SHO REPORT
Singature:
Name:
Position : Safety & Health Officer
Date:
8/5/2013
14 Remarks by:
Singature:
Name:
Position:
Project Manager
Date:
8/5/2013
SHO REPORT
This Month
Cumulative
Previous
Cumulative
205972
205972
19744
19744
186228
186228
842
842
Medical Treatment
Property Damaged
Near Miss
487
487
487
487
LTI Frequency
LTI Severity
ACCIDENT STATISTIC
NO
1
2
3
4
5
2013
TYPE
Fatality
Major injury
Minor injury
Near misses
Vehicle accident
Total
JAN
0
FEB
0
MAR
0
APR
0
MAY
JUN
JUL
AUG
SEP
OCT
NOV
TOTAL
Remarks
0
0
0
0
0
0
DEC
-
2013
TYPE
Demam
Batuk
Selsema
Gatal-gatal
Cirit birit
Total
JAN
0
FEB
0
MAR
0
APR
0
MAY
JUN
JUL
AUG
SEP
OCT
NOV
TOTAL
Remarks
0
0
0
0
0
0
DEC