Professional Documents
Culture Documents
Date: 08/01/15
*1
Sf = staff
St = students
Cr = contractors
Cl = cleaners
V = visitors
Risk Rating
A= Will happen
E= Will not happen
Persons
at risk
*1
St
St
DEGREE OF RISK
Worst
Probability
outcome
*2
*3
NR
R
Min
NR
Min
Risk
Rating
A-E
D
CONTROL MEASURES
Existing control measures taken
against the risk
Stay clear of games area
ACTION PLAN
What further control
measures are required
Be aware of sports
timetable for the day
Location: Theatre
*1
Sf = staff
St = students
Cr = contractors
Cl = cleaners
V = visitors
Risk Rating
A= Will happen
E= Will not happen
Persons
at risk
*1
St
Sf
DEGREE OF RISK
Worst
Probability
outcome
*2
*3
NR
R
Min
St
Sf
NR
Min
Risk
Rating
A-E
D
CONTROL MEASURES
Existing control measures taken
against the risk
Clear all hazards
ACTION PLAN
What further control
measures are required
Check timetable: make sure
no performances are in
progress.
Date: 08/01/15
*1
Sf = staff
St = students
Cr = contractors
Cl = cleaners
V = visitors
Risk Rating
A= Will happen
E= Will not happen
Persons
at risk
*1
St
Sf
St
Sf
DEGREE OF RISK
Worst
Probability
outcome
*2
*3
Min
R
Risk
Rating
A-E
D
Min
CONTROL MEASURES
Existing control measures taken
against the risk
Remove all equipment away so
there are no obstacles
ACTION PLAN
What further control
measures are required
Be aware of who first aid
personnel is