SCHEDULE OF WORKS FOR FACTORY BUILDING AT NADAL KANNUR

Sl.No:

Estimate
d
quantity

unit

a. Chipping / Demolishing the R.C.C. pile top to remove


the clay content in the pile top with or with out compressor
/ hammering machine including cost and conveyance of all
machineries, materials to site labour charges etc
complete. 60 piles each a minimum of 1m.

60.00

b. Earth work escavation in ordinary soil / clayey soil /


lateritic soil up to a depth of 160 cm from the ground level
as per the drawing issuied.The excavated pit should be of
perfect in shape and the base should compacted by
machine hammering to receive the P.C.C., including cost
and conveyance of all men, machineries and materials to
site, labour charges etc complete..

170.00

m3

c. P.C.C. 1:4:8, ( One part Cement,4 parts river sand, and


8 parts 40 mm blue metal) including all centering work as
per drawing, securly placed in position using 170 kg. of
cement per m3 of concrete. Cost shall include curing of
concrete for four days two times per day including cost
and conveyance of all machineries, materials to site labour
charges etc complete, excluding the cost of cement.

16.00

m3

d. R.C.C. 1:1.5:3 ( One part Cement 1.5 part of graded


river sand and three parts of 20 mm blue metal) machine
mixed , mechanically vibrated including all required
centering securly fixed in position and made rigid, framed
and placed so as to be practically water tight, bar bending,
placing, tying with binding wire as per structural drawing
using 420kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges, curing etc.
complete excluding cost of cement, steel and binding wire.
Curing shall be done at least for seven days using gunny
sacks or equivalent materials. Reinforcement for lateral
plinth beam shall be placed through the holes in the pile
cap boxes.

75.00

m3

e. Back filling the pit with excavated available earth,


watering and compacting the sides , including cost and
conveyance of all materials to site labour charges etc,
complete.

100.00

m3

Description of works

R.C.C. Pile cap as per design:-

Page 1 of 36

Rate/unit
Rs. P.s

Rs

Amount
p.s

Page 2 of 36
e. Plastering:- Plastering all sides and top of pile cap in
cm 1:5 (one part of cement and 5 parts of seived river
sand) 12 mm thick to fill all irregularities on the surface to
provide a smooth surface, floated hard and trowelled
smooth. All the exposed surfaces of concrete shall be well
hacked before applying cement mortar. This item includes
the cost and conveyance of all materials to site , labour
charges, specified curing , scaffolding charges etc,
complete, excluding the cost of cement. Mortar shall be
mixed on platform of iron sheets, not directly on floors and
the waste mortar during the work shall be collected and
remixed with the new mortar.

R.C.C Pedestal 1:1.5:3 as per design :-R.C.C. 1:1.5:3 (


One part Cement 1.5 part of graded river sand and three
parts of 20 mm blue metal) machine mixed , mechanically
vibrated including all required centering securly fixed in
position and made rigid, framed and placed so as to be
practically water tight, bar bending, placing, tying with
binding wire as per structural drawing using 420kg of
cement per m3 including cost of all required materials,
conveyance to site, labour charges, curing etc. complete
excluding cost of cement, steel and binding wire. Curing
shall be done at least for seven days using gunny sacks or
equivalent materials. Reinforcement for lateral plinth beam
shall be placed through the holes in the pile cap boxes.
R.C.C 1;2;4 for Plinth beam as per design :a. Earth work escavation: Earrh work escavation in
ordinary soil / clayey soil with or with out using J.C.B up to
a depth of 120 cm from the ground levelincluding cost and
conveyance of all machineries, materials to site labour
charges etc complete.
b. P.C.C 1:4:8 - P.C.C. 1:4:8, ( One part Cement,4 parts
river sand, and 8 parts 40 mm blue metal) including all
centering work as per drawing, securly placed in position
using 170 kg. of cement per m3 of concerete. Cost shall
include curing of concrete for four days two times per day
including cost and conveyance of all machineries, materials
to site labour charges etc complete, excluding the cost of
cement.
c. R.C.C 1:2:4 (one part of cement, 2 parts of river sand, 4
part of 20 mm blue metal) machine mixed, mechanically
vibrated, including all required centering, shuttering,
barbending,fixing, tying with binding wire as per structural
drawing, the centering securly fixed in position and made
rigid so as to be practically water tight using 330kg of
cement per m3 including cost of all required materials,
conveyance to site, labour charges etc. complete excluding
cost of cement, steel and binding wire.

Page 2 of 36

268.00

m2

19.20

m3

70.00

m3

15.00

m3

51.38

m3

Page 3 of 36

R.C.C column 1:1.5:3 as per design :-R.C.C. 1:1.5:3 ( One


part Cement 1.5 part of graded river sand and three parts
of 20 mm blue metal) machine mixed , mechanically
vibrated including all required centering securly fixed in
position and made rigid, framed and placed so as to be
practically water tight, bar bending, placing, tying with
binding wire as per structural drawing using 420kg of
cement per m3 including cost of all required materials,
conveyance to site, labour charges, curing etc. complete
excluding cost of cement, steel and binding wire. Curing
shall be done at least for seven days using gunny sacks or
equivalent materials. Reinforcement for lateral plinth beam
shall be placed through the holes in the pile cap boxes.

Page 3 of 36

Page 4 of 36

a. below 0.00 lvl


b. 0.00 lvl to + 5.10 m.lvl
c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl

8.10
27.54
20.00
20.00
20.00
20.00
20.00
5.00

m3
m3
m3
m3
m3
m3
m3
m3

a. P.C.C. 1:4:8, ( One part Cement,4 parts river sand, and


8 parts 40 mm blue metal) including all centering work as
per drawing, securly placed in position using 170 kg. of
cement per m3 of concerete. Cost shall include curing of
concrete for four days two times per day including cost
and conveyance of all machineries, materials to site labour
charges etc complete, excluding the cost of cement.

170.00

m3

b. R.C.C 1:2:4 (one part of cement, 2 parts of river sand, 4


part of 20 mm blue metal) machine mixed, mechanically
vibrated, including all required centering, shuttering,
barbending,fixing, tying with binding wire as per structural
drawing, the centering securly fixed in position and made
rigid so as to be practically water tight using 330kg of
cement per m3 including cost of all required materials,
conveyance to site, labour charges etc. complete excluding
cost of cement, steel and binding wire.

136.00

m3

c. Floor Plastering in cm 1:4. One part of cement and


4parts of graded seived river sand 12 mm thick to fill all
irregularities in the surface to provide a smooth surface,
floated hard and trowelled smooth using power trowel
machine. All the exposed surfaces of concrete shall be well
hacked before applying cement mortar. This item includes
the cost and conveyance of all materials to site , labour
charges, specified curing etc, complete, excluding the cost
of cement.

1420.00

m2

g. +19.50 to +23.10 lvl


h. + 23.10 to 25.60 lvl
5

Constructing R.C.C. Floor Slab at 0.00 m level


(Machine floor):-

Laterite masonry in CM 1:6 up to a height of 4.40 m with


dressed machine cut laterite stone of size
35cmx20cmx20cm of good quality as approved by the
engineer in charge includes the cost and conveyance of all
materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

Page 4 of 36

Page 5 of 36

a. below 0.00 lvl up to top of plinth beam


b. 0.00 lvl to + 5.10 m.lvl
c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl
g. +19.50 to +23.10 lvl
h. + 23.10 to 25.60 lvl

m3
m3
m3
m3
m3
m3
m3
m3

150.00
190.00
190.00
190.00
190.00
185.00
40.00

m3
m3
m3
m3
m3
m3
m3

146.00
93.00
93.00
93.00
53.00
53.00
20.00

m2
m2
m2
m2
m2
m2
m2

R.C.C for Lintel ,Beam, Slab, Stair in 1:2:4 (one part of


cement, 2 parts of river sand, 4 part of 20 mm blue metal)
machine mixed, mechanically vibrated, including all
required centering, shuttering, barbending,fixing, tying with
binding wire as per structural drawing, the centering securly
fixed in position and made rigid so as to be practically
water tight using 330kg of cement per m3 including cost of
all required materials, conveyance to site, labour charges
etc. complete excluding cost of cement, steel and binding
wire.

a. below 0.00 lvl up to top of plinth beam


b. 0.00 lvl to + 5.10 m.lvl
c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl
g. +19.50 to +23.10 lvl
h. + 23.10 to 25.60 lvl

29.00
160.00
120.00
114.00
114.00
90.00
90.00
15.00

R.C.C. for Sunshade, Thin slab etc R.C.C 1:2:4 (one


part of cement, 2 parts of river sand, 4 part of 20 mm blue
metal) machine mixed, mechanically vibrated, including all
required centering, shuttering, barbending,fixing, tying with
binding wire as per structural drawing, the centering securly
fixed in position and made rigid so as to be practically
water tight using 330kg of cement per m3 including cost of
all required materials, conveyance to site, labour charges
etc. complete excluding cost of cement, steel and binding
wire.

b. 0.00 lvl to + 5.10 m.lvl


c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl
g. +19.50 to +23.10 lvl
h. + 23.10 to 25.60 lvl

Page 5 of 36

Page 6 of 36

Wall Plastering in cm 1:5 (one part of cement and 5 parts


of seived river sand) 12 mm thick to fill all irregularities on
the surface to provide a smooth surface, floated hard and
trowelled smooth. All the exposed surfaces of concrete
shall be well hacked before applying cement mortar. This
item includes the cost and conveyance of all materials to
site , labour charges, specified curing , scaffolding charges
etc, complete, with a brushing coat with cement slurry,
excluding cost of cement. Mortar shall be mixed on
platform of iron sheets, not directly on floors and the waste
mortar during the work shall be collected and remixed with
the new mortar.

a. below 0.00 lvl


b. 0.00 lvl to + 5.10 m.lvl
c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl
g. +19.50 to +23.10 lvl
h. + 23.10 to 25.60 lvl

10

150.00
2000.00
1550.00
1600.00
1600.00
1250.00
1250.00
300.00

m2
m2
m2
m2
m2
m2
m2
m2

1350.00
1500.00
1500.00
1500.00
1500.00
1500.00
500.00

m2
m2
m2
m2
m2
m2
m2

Ceiling plastering with cm 1:3 for sunshade top and


bottom and bottom of slabs, with one part of cement and
three parts of seived river sand, 12 mm thick to fill all
irregularities on the surface to provide a smooth surface,
floated hard and trowelled smooth. All the exposed
surfaces of concrete shall be well hacked before applying
cement mortar. This item includes the cost and conveyance
of all materials to site , labour charges, specified curing ,
scaffolding charges etc, complete, excluding the cost of
cement. Mortar shall be mixed on platform of iron sheets,
not directly on floors and the waste mortar during the work
shall be collected and remixed with the new mortar.

a. below 0.00 lvl


b. 0.00 lvl to + 5.10 m.lvl
c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl
g. +19.50 to +23.10 lvl
h. + 23.10 to 25.60 lvl

Page 6 of 36

11

Page 7 of 36
Brick Masonry : Brick work 23cm / 11 cm thick using
country burnt bricks of approved quality initially soaking the
bricks in water for 24 hrs and placing in cement mortar
1:4.This item includes the cost and conveyance of all
materials to site , labour charges, specified curing ,
scaffolding charges etc, complete, excluding the cost of
cement.

a. below 0.00 lvl


b. 0.00 lvl to + 5.10 m.lvl
c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl
g. +19.50 to +23.10 lvl
h. + 23.10 to 25.60 lvl

12

m3
m3
m3
m3
m3
m3
m3

55.00
10.00
55.00
55.00
55.00
55.00

m2
m2
m2
m2
m2
m2

150.00
600.00
830.00
830.00
830.00
830.00

m2
m2
m2
m2
m2
m2

Laying ceramic floor and wall tiles in toilets : Laying of


ceramic floor tiles 12" x 12" size and wall tiles 12" x 18" ,
Jhonson or equalent, premium quality tiles of approved
clour and shades in perfect line and level in cement mortar
1:6 as per design, filling the joint with approved joint fillers,
providing inlays if necessary. Including the cost of all
materials, labour charges, specified curing...etc complete
but excluding the cost cement.

a. below 0.00 lvl


b. 0.00 lvl to + 5.10 m.lvl
c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl
g. +19.50 to +23.10 lvl

13

0.00
8.00
5.00
8.00
8.00
8.00
8.00
1.00

Laying vetrified tiles : Laying of ceramic tiles in floor etc,


using 24"x24" Jhonson premium quality jointless tiles of
approved colour and design in perfect line and level in
cement mortar 1:6 as per design, filling the joint with
approved joint fillers, providing inlays if necessary.
Including the cost of all materials, tiles, joint filler, labour
charges, specified curing...etc complete but excluding the
cost of cement.

a. below 0.00 lvl


b. 0.00 lvl to + 5.10 m.lvl
c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl
g. +19.50 to +23.10 lvl

Page 7 of 36

Page 8 of 36

14

White washing : at specified surfaces in 2 coats with fresh


and approved quality of white cement. The surface should
be cleaned to remove loose dust or dirt by use of a soft
wire brush. The surface shall then be wetted by sprinkling
with water and be allowed to run-off, and the first coat to be
applied by mixing 2 parts of white cement with 1 part of
water by volume and immediately thinned by adding 1 part
of water to have a uniform solution with broad quality
brush. The second coat may be applied after 24 hours so
as to get a uniform and good appearance. This includes the
cost of all required materials, labour, scaffoldings, curing
as specified ...etc complete.

a. below 0.00 lvl


b. 0.00 lvl to + 5.10 m.lvl
c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl
g. +19.50 to +23.10 lvl

15

Constructing steps : Laterite masonry in CM 1:6 for steps


with dressed machine cut laterite stone of size
35cmx20cmx20cm of good quality as approved by the
engineer in charge includes the cost and conveyance of all
materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.
a. P.C.C. 1:4:8 for base foundation:- P.C.C. 1:4:8, ( One
part Cement,4 parts river sand, and 8 parts 40 mm blue
metal) including all centering work as per drawing, securly
placed in position using 170 kg. of cement per m3 of
concrete. Cost shall include curing of concrete for four days
two times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.
b. Laterite Masonry:-Laterite masonry in CM 1:6 for steps
with dressed machine cut laterite stone of size
35cmx20cmx20cm of good quality as approved by the
engineer in charge includes the cost and conveyance of all
materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.
c. Plastering:- Plastering all sides of the step in cm 1:5
(one part of cement and 5 parts of seived river sand) 12
mm thick to fill all irregularities on the surface to provide a
smooth surface, floated hard and trowelled smooth. All the
exposed surfaces of concrete shall be well hacked before
applying cement mortar. This item includes the cost and
conveyance of all materials to site , labour charges,
specified curing , scaffolding charges etc, complete,
excluding the cost of cement. Mortar shall be mixed on
platform of iron sheets, not directly on floors and the waste
mortar during the work shall be collected and remixed with
the new mortar.

Page 8 of 36

200.00
3500.00
3200.00
3200.00
3200.00
3200.00
1000.00

m2
m2
m2
m2
m2
m2
m2

4.20

m3

12.00

m3

35.00

m2

Page 9 of 36
d. Laying step tiles: Laying of step tiles in perfect line and
level in cement mortar 1:6 as per design, filling the joint
with joint fillers, providing inlays if necessary. Including the
cost of all materials, labour charges, specified curing...etc
complete but excluding the cost of tiles, cement and joint
filler.

Page 9 of 36

31.00

m2

Page 10 of 36

16

17

Constructing Cable trench for M.V. Pannel Room, USS,


and servo rooms.
a. P.C.C. 1:4:8 for base foundation:- P.C.C. 1:4:8, ( One
part Cement,4 parts river sand, and 8 parts 40 mm blue
metal) including all centering work as per drawing, securly
placed in position using 170 kg. of cement per m3 of
concrete. Cost shall include curing of concrete for four days
two times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.

8.00

m3

b. Laterite Masonry:-Laterite masonry in CM 1:6 for steps


with dressed machine cut laterite stone of size
35cmx20cmx20cm of good quality as approved by the
engineer in charge includes the cost and conveyance of all
materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

23.00

m3

c. Plastering the inside of the trench in cm 1:5 (one part of


cement and 5 parts of seived river sand) 12 mm thick to fill
all irregularities on the surface to provide a smooth surface,
floated hard and trowelled smooth. All the exposed
surfaces of concrete shall be well hacked before applying
cement mortar. This item includes the cost and conveyance
of all materials to site , labour charges, specified curing ,
scaffolding charges etc, complete, with a brushing coat
with cement slurry, excluding cost of cement. Mortar shall
be mixed on platform of iron sheets, not directly on floors
and the waste mortar during the work shall be collected and
remixed with the new mortar.

199.00

m2

140.00

m3

192.00

Constructing machine foundation 2 nos of size 3.30m


x 25.00 m including auguring friction pile of dia 0.40 m
dia up to 6.00 m. depth.
a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 120 cm from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.

b. R.C.C 1:1.5:3 for friction pile, (one part of cement, 1.5


parts of river sand, 3 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending, fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 420kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

Page 10 of 36

Page 11 of 36
c. Sand filling : Providing sand cushion below machine
foundation to the required height with good quality, graded
river sand which should not contain organic matters,
objectionable chemicals.etc including the cost of all
materials, labour charges, conveyance...etc complete.

Page 11 of 36

40.00

m3

Page 12 of 36
d. P.C.C. 1:4:8 for base foundation:- P.C.C. 1:4:8, ( One
part Cement,4 parts river sand, and 8 parts 40 mm blue
metal) including all centering work as per drawing, securly
placed in position using 170kg. of cement per m3 of
concrete. Cost shall include curing of concrete for four days
two times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.

27.00

m3

66.00

m3

37.00

m3

b. R.C.C 1:1.5:3 for friction pile, (one part of cement, 1.5


parts of river sand, 3 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending, fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 420kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

72.00

c. Sand filling : Providing sand cushion below machine


foundation to the required height with good quality, graded
river sand which should not contain organic matters,
objectionable chemicals.etc including the cost of all
materials, laboour charges, conveyance...etc complete.

6.00

m3

d. P.C.C. 1:4:8 for base foundation:- P.C.C. 1:4:8, ( One


part Cement,4 parts river sand, and 8 parts 40 mm blue
metal) including all centering work as per drawing, securly
placed in position using 170 kg. of cement per m3 of
concrete. Cost shall include curing of concrete for four days
two times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.

6.00

m3

e. R.C.C 1:2:4 for base, (one part of cement, 2 parts of


river sand, 4 part of 20 mm blue metal) machine mixed,
mechanically vibrated, including all required centering,
shuttering, barbending,fixing, tying with binding wire as per
structural drawing, the centering securly fixed in position
and made rigid so as to be practically water tight using
330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

18

Constructing Generator foundations 2 nos for 1000kv


Generators including friction piles
a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 120 cm from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.

Page 12 of 36

Page 13 of 36

e. R.C.C 1:2:4 for base, (one part of cement, 2 parts of


river sand, 4 part of 20 mm blue metal) machine mixed,
mechanically vibrated, including all required centering,
shuttering, barbending,fixing, tying with binding wire as per
structural drawing, the centering securly fixed in position
and made rigid so as to be practically water tight using
330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

Page 13 of 36

22.00

m3

Page 14 of 36
F. Laterite masonry in CM 1:6 up to a height of 4.40 m with
dressed machine cut laterite stone of size
35cmx20cmx20cm of good quality as approved by the
engineer in charge includes the cost and conveyance of all
materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

19

4.00

m3

260.00

m3

13.80

m3

42.60

m3

72.00

m2

Constructing Rain Water Harvesting Sump of capasity


2.5 lakh litres (included separate tank for Fire fighting,
Open well storage, Muncipal water supply
a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 360 cm from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.
b. P.C.C. 1:4:8 for base foundation:- P.C.C. 1:4:8, ( One
part Cement,4 parts river sand, and 8 parts 40 mm blue
metal) including all centering work as per drawing, securly
placed in position using 170 kg. of cement per m3 of
concrete. Cost shall include curing of concrete for four days
two times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.
c. R.C.C 1:2:4 for sides Double shuttering (one part of
cement, 2 parts of river sand, 4 part of 20 mm blue metal)
machine mixed, mechanically vibrated, including all
required centering, shuttering, barbending,fixing, tying with
binding wire as per structural drawing, the centering securly
fixed in position and made rigid so as to be practically
water tight using 330kg of cement per m3 including cost of
all required materials, conveyance to site, labour charges
etc. complete excluding cost of cement, steel and binding
wire.
d. Celing plastering with cm 1:3 for bottom of slabs, with
one part of cement and three parts of seived river sand, 12
mm thick to fill all irregularities on the surface to provide a
smooth surface, floated hard and trowelled smooth. All the
exposed surfaces of concrete shall be well hacked before
applying cement mortar. This item includes the cost and
conveyance of all materials to site , labour charges,
specified curing , scaffolding charges etc, complete,
excluding the cost of cement. Mortar shall be mixed on
platform of iron sheets, not directly on floors and the waste
mortar during the work shall be collected and remixed with
the new mortar.

Page 14 of 36

Page 15 of 36
e. Wall Plastering in cm 1:5 (one part of cement and 5
parts of seived river sand) 12 mm thick to fill all
irregularities on the surface to provide a smooth surface,
floated hard and trowelled smooth. All the exposed
surfaces of concrete shall be well hacked before applying
cement mortar. This item includes the cost and conveyance
of all materials to site , labour charges, specified curing ,
scaffolding charges etc, complete, with a brushing coat
with cement slurry, excluding cost of cement. Mortar shall
be mixed on platform of iron sheets, not directly on floors
and the waste mortar during the work shall be collected and
remixed with the new mortar.

Page 15 of 36

260.00

m2

Page 16 of 36

20

g. R.C.C 1:1.5:3 for friction pile, (one part of cement, 1.5


parts of river sand, 3 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending, fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 420kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

72.00

h. R.C.C 1:2:4 for covering slab, (one part of cement, 2


parts of river sand, 4 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending,fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

10.80

m3

35.00

m3

1.00

m3

4.00

m3

Constructing septic tank of Capasity 15000 litres with


covering slab, inspection chambers etc.
a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 3.50 m from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.
b. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part
Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.

c. R.C.C 1:2:4 for sides Double shuttering (one part of


cement, 2 parts of river sand, 4 part of 20 mm blue metal)
machine mixed, mechanically vibrated, including all
required centering, shuttering, barbending,fixing, tying with
binding wire as per structural drawing, the centering securly
fixed in position and made rigid so as to be practically
water tight using 330kg of cement per m3 including cost of
all required materials, conveyance to site, labour charges
etc. complete excluding cost of cement, steel and binding
wire.

Page 16 of 36

Page 17 of 36
d. Plastering:- Plastering all sides in cm 1:5 (one part of
cement and 5 parts of seived river sand) 12 mm thick to fill
all irregularities on the surface to provide a smooth surface,
floated hard and trowelled smooth. All the exposed
surfaces of concrete shall be well hacked before applying
cement mortar. This item includes the cost and conveyance
of all materials to site , labour charges, specified curing ,
scaffolding charges etc, complete, excluding the cost of
cement. Mortar shall be mixed on platform of iron sheets,
not directly on floors and the waste mortar during the work
shall be collected and remixed with the new mortar.

Page 17 of 36

43.00

m2

Page 18 of 36

21

e. R.C.C 1:1.5:3 for friction pile, (one part of cement, 1.5


parts of river sand, 3 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending, fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 420kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

36.00

f. R.C.C 1:2:4 for covering slab, (one part of cement, 2


parts of river sand, 4 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending,fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

3.50

m3

f. Back filling earth with available earth, watering and


compacting the sides of the tank including cost and
conveyance of all materials to site labour charges etc,
complete.

19.00

m3

36.00

m3

1.00

m3

1.00

m3

Constructing soakpit for septic tank with covering


slab, inspection chambers etc.
a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 3.00 m from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.
b. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part
Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.

c. R.C.C 1:2:4 for beam at -3.00m lvl, (one part of


cement, 2 parts of river sand, 4 part of 20 mm blue metal)
machine mixed, mechanically vibrated, including all
required centering, shuttering, barbending,fixing, tying with
binding wire as per structural drawing, the centering securly
fixed in position and made rigid so as to be practically
water tight using 330kg of cement per m3 including cost of
all required materials, conveyance to site, labour charges
etc. complete excluding cost of cement, steel and binding
wire.

Page 18 of 36

Page 19 of 36
d. Laterite masonry in CM 1:6 up to a height of -3.00m to
00 level with dressed machine cut laterite stone of size
35cmx20cmx20cm of good quality as approved by the
engineer in charge includes the cost and conveyance of all
materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

8.00

m3

e. R.C.C 1:2:4 for covering slab, (one part of cement, 2


parts of river sand, 4 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending,fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

1.00

m3

17.00

m3

71.00

m3

1.50

m3

1.60

m3

15.00

m3

Total
f. Back filling earth with available earth, watering and
compacting the sides of the tank including cost and
conveyance of all materials to site labour charges etc,
complete.
22

Constructing soakpit for machine waste with covering


slab, inspection chambers etc.
a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of -3.00 m from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.
b. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part
Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.
c. R.C.C 1:2:4 for beam below masonry, (one part of
cement, 2 parts of river sand, 4 part of 20 mm blue metal)
machine mixed, mechanically vibrated, including all
required centering, shuttering, barbending,fixing, tying with
binding wire as per structural drawing, the centering securly
fixed in position and made rigid so as to be practically
water tight using 330kg of cement per m3 including cost of
all required materials, conveyance to site, labour charges
etc. complete excluding cost of cement, steel and binding
wire.
d. Laterite masonry in CM 1:6 up to a height of -3.00m to
00 level with dressed machine cut laterite stone of size
35cmx20cmx20cm of good quality as approved by the
engineer in charge includes the cost and conveyance of all
materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

Page 19 of 36

Page 20 of 36

23

e. R.C.C 1:2:4 for covering slab, (one part of cement, 2


parts of river sand, 4 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending,fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

1.80

m3

f. Back filling earth with available earth, watering and


compacting the sides of the tank including cost and
conveyance of all materials to site labour charges etc,
complete.

35.00

m3

79.00

m3

1.50

m3

1.60

m3

14.00

m3

Constructing soakpit for canteen waste with covering


slab, inspection chambers etc.
3.6 x 1.5 x
2.5 2 nos
a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 3.30 m from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.
b. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part
Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.
c. R.C.C 1:2:4 for beam below masonry, (one part of
cement, 2 parts of river sand, 4 part of 20 mm blue metal)
machine mixed, mechanically vibrated, including all
required centering, shuttering, barbending,fixing, tying with
binding wire as per structural drawing, the centering securly
fixed in position and made rigid so as to be practically
water tight using 330kg of cement per m3 including cost of
all required materials, conveyance to site, labour charges
etc. complete excluding cost of cement, steel and binding
wire.
d. Laterite masonry in CM 1:6 up to a height of -3.00m to
00 level with dressed machine cut laterite stone of size
35cmx20cmx20cm of good quality as approved by the
engineer in charge includes the cost and conveyance of all
materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

Page 20 of 36

Page 21 of 36

24

e. R.C.C 1:2:4 for covering slab, (one part of cement, 2


parts of river sand, 4 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending,fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc.
complete, excluding cost of cement, steel and binding wire.

2.70

m3

f. Back filling earth with available earth, watering and


compacting the sides of the tank including cost and
conveyance of all materials to site labour charges etc,
complete.

23.00

m3

8.00

m3

1.00

m3

c. Laterite masonry in CM 1:6 up to a height of 1.00 m


below ground level with dressed machine cut laterite stone
of size 35cmx20cmx20cm of good quality as approved by
the engineer in charge includes the cost and conveyance of
all materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

3.10

m3

d. Plastering:- Plastering all sides of the step in cm 1:5


(one part of cement and 5 parts of seived river sand) 12
mm thick to fill all irregularities on the surface to provide a
smooth surface, floated hard and trowelled smooth. All the
exposed surfaces of concrete shall be well hacked before
applying cement mortar. This item includes the cost and
conveyance of all materials to site , labour charges,
specified curing , scaffolding charges etc, complete,
excluding the cost of cement.Mortar shall be mixed on
platform of iron sheets, not directly on floors and the waste
mortar during the work shall be collected and remixed with
the new mortar.

15.00

m2

Constructing manhole for septic tank, waste water


line, etc. minimum 8 nos
a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 1.20 m from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.
b. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part
Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.

Page 21 of 36

Page 22 of 36

e. R.C.C 1:2:4 for covering slab, (one part of cement, 2


parts of river sand, 4 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending,fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

Page 22 of 36

0.80

m3

Page 23 of 36
25

Constructing earth pit for electrical installation 15 nos


a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 3.00 m from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.
b. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part
Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.

270.00

m3

1.50

m3

c. R.C.C 1:2:4 for base, (one part of cement, 2 parts of


river sand, 4 part of 20 mm blue metal) machine mixed,
mechanically vibrated, including all required centering,
shuttering, barbending,fixing, tying with binding wire as per
structural drawing, the centering securly fixed in position
and made rigid so as to be practically water tight using
330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

1.50

m3

d. Laterite masonry in CM 1:6 up to a height of 0.80 m


below groung level with dressed machine cut laterite stone
of size 35cmx20cmx20cm of good quality as approved by
the engineer in charge includes the cost and conveyance of
all materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

5.80

m3

e. R.C.C 1:2:4 for covering slab, (one part of cement, 2


parts of river sand, 4 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending,fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

1.50

m3

250.00

m3

f. Back filling earth with available earth, watering and


compacting the sides of the tank including cost and
conveyance of all materials to site labour charges etc,
complete.
26

Constructing front gate pillars for fixing cast iron gates


of size 20 feet 2 nos and a pedestrian gate.

Page 23 of 36

Page 24 of 36

a. R.C.C 1:1.5:3 for friction pile, (one part of cement, 1.5


parts of river sand, 3 part of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending, fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 420kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire

30.00

b. Earth work escavation in ordinary soil / clayey soil with


or with out using J.C.B up to a depth of 1.00 m from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.

2.00

m3

Page 24 of 36

Page 25 of 36

27

c. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part


Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.

0.50

m3

d. R.C.C 1:2:4 for pedestal, (one part of cement, 2 parts


of river sand, 4 parts of 20 mm blue metal) machine mixed,
mechanically vibrated, including all required centering,
shuttering, barbending,fixing, tying with binding wire as per
structural drawing, the centering securly fixed in position
and made rigid so as to be practically water tight using
330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

1.30

m3

e. R.C.C 1:2:4 for pillers dia 60 cm, (one part of cement,


2 parts of river sand, 4 parts of 20 mm blue metal) machine
mixed, mechanically vibrated, including all required
centering, shuttering, barbending,fixing, tying with binding
wire as per structural drawing, the centering securly fixed in
position and made rigid so as to be practically water tight
using 330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

4.00

m3

f. Plastering:- Plastering the round piller in cm 1:5 (one


part of cement and 5 parts of seived river sand) 12 mm
thick to fill all irregularities on the surface to provide a
smooth surface, floated hard and trowelled smooth. All the
exposed surfaces of concrete shall be well hacked before
applying cement mortar. This item includes the cost and
conveyance of all materials to site , labour charges,
specified curing , scaffolding charges etc, complete,
excluding the cost of cement. Mortar shall be mixed on
platform of iron sheets, not directly on floors and the waste
mortar during the work shall be collected and remixed with
the new mortar.

30.00

m2

115.00

m3

Constructing drainage with laterite masonry all round


the plot
a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 1.00 m from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.

Page 25 of 36

Page 26 of 36
b. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part
Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.
c. Laterite masonry in CM 1:6 up to a height of 0.60 m
below ground level with dressed machine cut laterite stone
of size 35cmx20cmx20cm of good quality as approved by
the engineer in charge includes the cost and conveyance of
all materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

Page 26 of 36

22.00

m3

70.00

m3

Page 27 of 36
f. Plastering:- Plastering the sides and base with proper
slope in cm 1:5 (one part of cement and 5 parts of seived
river sand) 12 mm thick to fill all irregularities on the
surface to provide a smooth surface, floated hard and
trowelled smooth. All the exposed surfaces of concrete
shall be well hacked before applying cement mortar. This
item includes the cost and conveyance of all materials to
site , labour charges, specified curing , scaffolding charges
etc, complete, excluding the cost of cement. Mortar shall be
mixed on platform of iron sheets, not directly on floors and
the waste mortar during the work shall be collected and
remixed with the new mortar.

28

540.00

m2

a. R.C.C 1:1.5:3 for column (one part of cement,


1.5parts of river sand, 3 part of 20 mm blue metal)
machine mixed, mechanically vibrated, including all
required centering, shuttering, barbending,fixing, tying with
binding wire as per structural drawing, the centering securly
fixed in position and made rigid so as to be practically
water tight using 420kg of cement per m3 including cost of
all required materials, conveyance to site, labour charges
etc. complete excluding cost of cement, steel and binding
wire.

1.30

m3

b. R.C.C 1:2:4 for slab above 15.65 m level (water tank


base, beam, covering slab) (one part of cement, 2parts of
river sand, 4part of 20 mm blue metal) machine mixed,
mechanically vibrated, including all required centering,
shuttering, barbending,fixing, tying with binding wire as per
structural drawing, the centering securly fixed in position
and made rigid so as to be practically water tight using
330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

22.00

m3

c. R.C.C 1:2:4 for sides Double shuttering (water tank


sides at 18 m height) (one part of cement, 2 parts of river
sand, 4 part of 20 mm blue metal) machine mixed,
mechanically vibrated, including all required centering,
shuttering, barbending,fixing, tying with binding wire as per
structural drawing, the centering securly fixed in position
and made rigid so as to be practically water tight using
330kg of cement per m3 including cost of all required
materials, conveyance to site, labour charges etc. complete
excluding cost of cement, steel and binding wire.

7.20

m3

Constructing separate overhead water tank at terrace


floor of capasity 63000 lit. for fire fighting purposes.

Page 27 of 36

Page 28 of 36
d. Plastering:- Plastering with flusing coat the sides and
base of water tank at 18 m lvl with proper slope in cm 1:5
(one part of cement and 5 parts of seived river sand) 12
mm thick to fill all irregularities on the surface to provide a
smooth surface, floated hard and trowelled smooth. All the
exposed surfaces of concrete shall be well hacked before
applying cement mortar. This item includes the cost and
conveyance of all materials to site , labour charges,
specified curing , scaffolding charges etc, complete,
excluding the cost of cement.Mortar shall be mixed on
platform of on platform of iron sheets, not directly on floors
and the waste mortar during the work shall be collected and
remixed with the new mortar.

160.00

m2

e. Ceiling plastering with cm 1:3 for sunshade top and


bottom and bottom of slabs, with one part of cement and
three parts of seived river sand, 12 mm thick to fill all
irregularities on the surface to provide a smooth surface,
floated hard and trowelled smooth. All the exposed
surfaces of concrete shall be well hacked before applying
cement mortar. This item includes the cost and conveyance
of all materials to site , labour charges, specified curing ,
scaffolding charges etc, complete, excluding the cost of
cement. Mortar shall be mixed on platform of iron sheets,
not directly on floors and the waste mortar during the work
shall be collected and remixed with the new mortar.

185.00

m3

1529.00

m3

1500.00

m2

3.00

m3

Earth filling : Filling inside the main building basement to


29

30

31

the required level ( 90 cm) with good quality red earth after
removing organic particles, clods etc. compacting at
every 30cm of height, ramming,levelling, including the cost
& conveyance of all materials to site, labour charges etc
complete.

Scaffolding work : fixing standard "H sections" or "GI Pipe


frames" all around the building from ground to the top of
the building for laying roofing sheet, fixing I section for hoist
fixing and for vertical cladding work etc including cost and
conveyance of all materials to site, labour charges etc,
complete.
Constructing Filter tank for RWH tank
a. Earrh work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 70 cm from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.

Page 28 of 36

Page 29 of 36
b. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part
Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.

Page 29 of 36

1.60

m3

Page 30 of 36
c. R.R masonry in cm 1:6, using granite bolder hammer
dressed fairly equal in size not less than 15 cm in size,
joints shall be thicker than 2 cm. the work includes cost and
conveyance of all materials to site labour charges etc.
complete, excluding the cost of cement.

32

5.00

m3

d. R.C.C. 1:2:4, for base and roof of filter tank. R.C.C


1:2:4 (one part of cement, 2 parts of river sand, 4 part of
20 mm blue metal) machine mixed, mechanically vibrated,
including all required centering, shuttering,
barbending,fixing, tying with binding wire as per structural
drawing, the centering securly fixed in position and made
rigid so as to be practically water tight using 330kg of
cement per m3 including cost of all required materials,
conveyance to site, labour charges etc. complete excluding
cost of cement, steel and binding wire.

1.20

m3

e. Laterite masonry in CM 1:6 up to a height of 2.0 m


above ground level with dressed machine cut laterite stone
of size 35cmx20cmx20cm of good quality as approved by
the engineer in charge includes the cost and conveyance of
all materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

3.00

m3

f. Plastering:- Plastering the filter tank in cm 1:5 (one part


of cement and 5 parts of seived river sand) 12 mm thick to
fill all irregularities on the surface to provide a smooth
surface, floated hard and trowelled smooth. All the exposed
surfaces of concrete shall be well hacked before applying
cement mortar. This item includes the cost and conveyance
of all materials to site , labour charges, specified curing ,
scaffolding charges etc, complete, excluding the cost of
cement. Mortar shall be mixed on platform of iron sheets,
not directly on floors and the waste mortar during the work
shall be collected and remixed with the new mortar.

45.00

m2

7.00

m3

3.50

m3

8.00

m3

Constructing Fire Pump Shed / Station


a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 70 cm from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.
b. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part
Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.
c. R.R masonry in cm 1:6, using granite bolder hammer
dressed fairly equal in size not less than 15 cm in size,
joints shall be thicker than 2 cm. the work includes cost and
conveyance of all materials to site labour charges etc.
complete, excluding the cost of cement.
Page 30 of 36

Page 31 of 36
d. R.C.C. 1:2:4, for base of fire pump platform, R.C.C
1:2:4 (one part of cement, 2 parts of river sand, 4 part of
20 mm blue metal) machine mixed, mechanically vibrated,
including all required centering, shuttering,
barbending,fixing, tying with binding wire as per structural
drawing, the centering securly fixed in position and made
rigid so as to be practically water tight using 330kg of
cement per m3 including cost of all required materials,
conveyance to site, labour charges etc. complete excluding
cost of cement, steel and binding wire.
e. Plastering:- Plastering basement and floor top in cm
1:5 (one part of cement and 5 parts of seived river sand) 12
mm thick to fill all irregularities on the surface to provide a
smooth surface, floated hard and trowelled smooth. All the
exposed surfaces of concrete shall be well hacked before
applying cement mortar. This item includes the cost and
conveyance of all materials to site , labour charges,
specified curing , scaffolding charges etc, complete,
excluding the cost of cement. Mortar shall be mixed on
platform of iron sheets, not directly on floors and the waste
mortar during the work shall be collected and remixed with
the new mortar.
Total
33

Constructing Security cabin


a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 70 cm from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.
b. P.C.C. 1:4:8 for base :- P.C.C. 1:4:8, ( One part
Cement,4 parts river sand, and 8 parts 40 mm blue metal)
including all centering work as per drawing, securly placed
in position using 170 kg. of cement per m3 of concrete.
Cost shall include curing of concrete for four days two
times per day including cost and conveyance of all
machineries, materials to site labour charges etc
complete, excluding the cost of cement.
c. R.R masonry in cm 1:6, using granite bolder hammer
dressed fairly equal in size not less than 15 cm in size,
joints shall be thicker than 2 cm. the work includes cost and
conveyance of all materials to site labour charges etc.
complete.excluding cost of cement.
d. Filling the basement to the required level with good
quality red earth after removing organic particles, clods
etc. compacting at every 30cm of height, ramming,
levelling, including the cost & conveyance of all materials to
site, labour charges etc complete.

Page 31 of 36

1.80

m3

21.00

m2

8.50

m3

2.50

m3

9.50

m3

3.00

m3

Page 32 of 36
e. R.C.C. 1:2:4, for plinth beam . R.C.C 1:2:4 (one part
of cement, 2 parts of river sand, 4 part of 20 mm blue
metal) machine mixed, mechanically vibrated, including all
required centering, shuttering, barbending,fixing, tying with
binding wire as per structural drawing, the centering securly
fixed in position and made rigid so as to be practically
water tight using 330kg of cement per m3 including cost of
all required materials, conveyance to site, labour charges
etc. complete excluding cost of cement, steel and binding
wire.

1.90

m3

f. Laterite masonry in CM 1:6 up to a height of 2.40 m


above ground level with dressed machine cut laterite stone
of size 35cmx20cmx20cm of good quality as approved by
the engineer in charge includes the cost and conveyance of
all materials to site , labour charges, specified curing etc,
complete, excluding the cost of cement.

6.00

m3

Page 32 of 36

Page 33 of 36
g. Plastering:- Plastering the walls of the security cabin in
cm 1:5 (one part of cement and 5 parts of seived river
sand) 12 mm thick to fill all irregularities on the surface to
provide a smooth surface, floated hard and trowelled
smooth. All the exposed surfaces of concrete shall be well
hacked before applying cement mortar. This item includes
the cost and conveyance of all materials to site , labour
charges, specified curing , scaffolding charges etc,
complete, excluding the cost of cement. Mortar shall be
mixed on platform of iron sheets, not directly on floors and
the waste mortar during the work shall be collected and
remixed with the new mortar.

77.00

m2

8.50

m2

3.00

m2

90.00

m3

b. R.C.C. 1:2:4, for concrete ring beam . R.C.C 1:2:4


(one part of cement, 2 parts of river sand, 4 part of 20 mm
blue metal) machine mixed, mechanically vibrated,
including all required centering, shuttering,
barbending,fixing, tying with binding wire as per structural
drawing, the centering securly fixed in position and made
rigid so as to be practically water tight using 330kg of
cement per m3 including cost of all required materials,
conveyance to site, labour charges etc. complete excluding
cost of cement, steel and binding wire.

16.00

m3

c. P.C.C. 1:4:8 for Platform at Ground Level. P.C.C. 1:4:8,


( One part Cement,4 parts river sand, and 8 parts 40 mm
blue metal) including all centering work as per drawing,
securly placed in position using 170 kg. of cement per m3
of concrete. Cost shall include curing of concrete for four
days two times per day including cost and conveyance of
all machineries, materials to site labour charges etc
complete, excluding the cost of cement.

1.15

m3

h. Laying Vitrified floor tiles : Laying of vitrified tiles in


perfect line and level in cement mortar 1:6 as per design,
filling the joint with joint fillers, providing inlays if
necessary. Including the cost of all materials, labour
charges, specified curing...etc complete but excluding the
cost of tiles, cement and joint filler.
i. Laying step tiles: Laying of step tiles in perfect line and
level in cement mortar 1:6 as per design, filling the joint
with joint fillers, providing inlays if necessary. Including the
cost of all materials, labour charges, specified curing...etc
complete but excluding the cost of tiles, cement and joint
filler.
34

Constructing a well of size 3 m inner dia of depth 10 m


:a. Earth work escavation in ordinary soil / clayey soil with
or with out using J.C.B up to a depth of 10 m from the
ground level including cost and conveyance of all
machineries, materials to site labour charges etc
complete.

Page 33 of 36

Page 34 of 36
d. Laterite masonry in CM 1:6 up to a height of 0.90 m.
for parapet wall above ground level with dressed machine
cut laterite stone of size 35cmx20cmx20cm of good quality
as approved by the engineer in charge includes the cost
and conveyance of all materials to site , labour charges,
specified curing etc, complete, excluding the cost of
cement.
e. Plastering:- Plastering parapet wall and platform base
in cm 1:5 (one part of cement and 5 parts of seived river
sand) 12 mm thick to fill all irregularities on the surface to
provide a smooth surface, floated hard and trowelled
smooth. All the exposed surfaces of concrete shall be well
hacked before applying cement mortar. This item includes
the cost and conveyance of all materials to site , labour
charges, specified curing , scaffolding charges etc,
complete, excluding the cost of cement. Mortar shall be
mixed on platform of iron sheets, not directly on floors and
the waste mortar during the work shall be collected and
remixed with the new mortar.

35

m3

60.00

m2

222
140
140
155
60
60.00

m
m
m
m
m
m

2300.00

m2

2300.00

m2

Water cutting ; Boardering from 2.5 cm to 15 cm width


through the edjes of sunshades , slab projections , and
other specifide areas in cm 1: 3 ( One part of cement 3
parts of seived river sand, along with wall and ceiling
plastering excludinfg cost of cement including all other
charges, scaffloldig etc, complete.

a. below 0.00 lvl


b. 0.00 lvl to + 5.10 m.lvl
c. +5.10 lvl to + 8.70 Lvl
d. + 8.70 lvl to + 12.30 lvl
e. + 12.30 to + 15.90 lvl
f. +15.90 lvl to + 19.50 lvl
g. +19.50 to +23.10 lvl

36

2.10

Road work - a. Cutting and sectioning for forming the road


way including all abour charges hire charges etc,
completethe road way is sectioned as per the design
b. Supplying and metalling the road way using 300 mm and
above flat granite bolder for a minimum thickness of 250
mm paving manually filling all the voids using granite of
smaller sizes compacting by spreading broken stones to
template rolling with power roller from side to centre untill
movement of broken stone ceases and takeoff the roller
and allow it to set to harden for 24 hrs, and continue rolling
next day till any deformity in the formation is rectified,
including cost and conveyance of all materials to site,
labour charges etc complete.

Page 34 of 36

Page 35 of 36
c. supplying and metalling the roadway using 100 mm
spreaded thickness using 36 mm granite jelly compact to
75 mm thickness using broken stone 1m3/10 m2 and
binding material 0.15m3/10 m2 spreading broken stone to
template , rolling dry to compact, watering profusely and
rolling until the fine creame up and fill the voids in the
stones. Then spreding gravelly earth and sweeping in the
joints watering and rerolling untill the gravelly earth has
worked in to crevises and only a thin layer of slurry remains
at the top and then take off the roller and allow to set to
harden for 24 hrs and continue rolling next day till any
deformity in the formation is rectified, including cost and
conveyance of all materials to site, labour charges etc
complete.

37

2300.00

m2

d. Supplying and providing 20 mm pre mixed chipping


carpet with broken stones after throughly cleaning the base
with wire brushes and brooms and appling a priming coat
of 7.5 kg of bitumen per 10 m2 and spreading hot premix 9
formed of 0.27 m3of 12 mm metal and 10.46 kg of bitumen
per 10 m2) rolling to clean surfaces then spreding the seal
coat ( Comprising of 0.09 m3 of 6 mm metal and 8.64 kg of
bitumen per 10 m2) again rolling including the cost of
bitumen,oils,fuels, and hire of all tools , machines, power
roller etc complete.

2300.00

m2

a. Fabrication and erection of gear operated Rolling


shutters with IS specification no. 6248/79, curtain made
out of single pieces of CR stripsdeep corrugated lathe
section , bottom plate made out of HR sheets reinforced
with ange iron, inside and out side locking arrangements,
specially designed steel suspension shaft with high tensile
spring ,side guides with necessary cleats for fixing to the
wall, top side brackets plates , hood cover etc with a coat of
sinchromate primer.

188

m2

26

no

13

no

13

no

b. Ball bearing unit including casing shall be provided for


every spring on the pipe shaft for easy and smooth
operation of rolling shutter.( Required for rolling shutter
above 10 Sq.M. area
c. Flat covering over pipe shaft to avoid deflection of the
pipe shaft 4 nos of M.S. flat 25 x 6 mm shall be provided
around the pipe for the entire length and shall be connected
with M.S. flat rings of size 25x5 mm, so that the torque is
distributed uniformly and to avoid the deflection of the
center pipe, there will be 4 nos of M.S. Flat running through
out the length of the roller pipe ( about 12feet width shutter)
including cost and conveyance labour charges etc,
complete.
d. Providing mechanical gear operation for rolling shutter.
A cast iron gear box having two nos of bevel gears which
are been fixed inside the box are mounted on the wall
adjecent to the shutter at chest level including droper rod
turning mechanism etc complete as per standard
specification.
Total value of work .