Capability Maturity
Model (CMM)
Magister Teknologi Informasi
Fakultas Ilmu Komputer
Universitas Indonesia
Capability
Maturity Model (CMM)
n
Facts:
n
Capability
Maturity Model (CMM)
n
n
n
Organization-wide improvements
Software Engineering
Institute (SEI)
n
n
n
Capability
Maturity Model (CMM)
n
Capability
Maturity Model (CMM)
n
Initial (1)
Optimizing (5)
(4)
Ad hoc process
9
Productivity
& Quality
Process Definition:
Standard, consistent
Defined (3)
process
Basic Mgt Control:
Repeatable (2)
Disciplined
Process
Risk
10
Characterized as:
n
11
Characterized as:
n
n
n
n
n
Quality assurance
Change control
Cost, and schedule
14
18
Distribution
1 Initial
70%
2 Repeatable
15%
3 Defined
<10%
4 Managed
<5%
5 Optimizing
<1%
20
Level 2
n
Level 3
n
Level 4
n
Level 5
n
Technology Innovation,
Process Change
Management.
23
Project Performance
Expectations
Level 5
Level 4
Level 3
Level 2
Level 1
Performance
Cost
Schedule
Quality
Expected Trend
Successive Projects
25
Project Performance
Expectations
n
Duration
(Calendar
Months)
Effort
(Person
Months)
Faults
Detected
during
Development
Faults
Delivered to
Client and
Installed
Total Cost of
Development
Level 1
29.8
593.5
1,348
61
$5,440,000
Level 2
18.5
143.0
328
12
$1,311,000
Level 3
15.2
79.5
182
$728,000
Level 4
12.5
42.8
97
$392,000
Level 5
9.0
16.0
37
$146,000
Implementasi
n
27
Implementasi
n
Contoh lainnya:
n
Implementasi
n