Activity ID

Activity Name

Original Start
Duration

Mountain View Hyde Park new Base Line


Mountain View Hyde Park
Milestones
Project Milestones
GPM0102100

Finish

Resources
Nov

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Comprises the execution of the remaining works of buildings 172, 173, 62, 63, 285, and 286
0

15-Aug-15*

GPM0102450

Comprises the execution of the remaining works of buildings 289, 289, 174 and 64.

28-Oct-15*

28-Oct-15, Project
Start of Phase 1, 02-Aug-14 A

0
74 28-Jan-15
0
0

Start of Phase 2, 30-Nov-14*

Comprises the execution of the remaining w

Comprises the exe

19-Apr-15
28-Jan-15*

19-Apr-15, Interface Milestones


Comprises the concrete works until ground floor of buildings 289, 289, 174 and 64,

19-Apr-15*

Comprises the skeleton works of buildings 172, 173, 62, 63, 285 and 286,

396 02-Aug-14 A 28-Oct-15

Construction

28-Oct-15, Constr

222 02-Aug-14 A 11-Apr-15


14 02-Aug-14 A 15-Aug-14 A

<Mob> Mobilization and preparation site

11-Apr-15, Moblization
<Mob> Mobilization and preparation site

CMB0501150

<Mob> Paint Works Subcontractor

60 30-Nov-14

05-Feb-15

<Mob> Paint Works Subcontractor

CMB0501170

<Mob> Plaster & Gypsum Works Subcontractor

60 30-Nov-14

05-Feb-15

<Mob> Plaster & Gypsum Works Subcontractor

CMB0501200

<Mob> Mechanical Network Subcontractor

60 30-Nov-14

05-Feb-15

<Mob> Mechanical Network Subcontractor

CMB0501210

<Mob> CUM Work Subcontractor

50 30-Nov-14

24-Jan-15

CMB0501100

<Mob> Aluminum Works Subcontractor

120 30-Nov-14

11-Apr-15

<Mob> Aluminum Works Subcontractor

CMB0501110

<Mob> Handrails Works Subcontractor

120 30-Nov-14

11-Apr-15

<Mob> Handrails Works Subcontractor

CMB0501120

<Mob> Marble Works Subcontractor - 2

30 30-Nov-14

31-Dec-14

CMB0501130

<Mob> Marble Works Subcontractor - 1

60 30-Nov-14

05-Feb-15

384
350
321
187
1

Buildings
Phase 1
Building 62 (Type# I.A4')
Site Preparation
C062G10130
<BLDG-62> Prep for Excavation

16-Aug-14 A
16-Aug-14 A
16-Aug-14 A
16-Aug-14 A
16-Aug-14 A

<Mob> CUM Work Subcontractor

<Mob> Marble Works Subcontractor - 2


<Mob> Marble Works Subcontractor - 1

28-Oct-15
15-Sep-15
15-Aug-15
17-Mar-15
16-Aug-14 A

28-Oct-15, Buildin
15-Sep-15, Phase 1
15-Aug-15, Building 62 (Type# I.A4')
17-Mar-15, Site Preparation
<BLDG-62> Prep for Excavation

C062G10100

<BLDG-62> Excavate to Foundation Levels

3 17-Aug-14 A 02-Sep-14 A Excavation in any <BLDG-62>


type of soil except
Excavate
rocktoforFoundation
foundation,Levels
Disposal of surplus materials outside the site boundary to nearest dump.

C062G10110

<BLDG-62> Replace Soil

3 20-Aug-14 A 28-Aug-14 A Soil replacement,


<BLDG-62>
with suitable
Replace
excavated
Soil soil under foundation level

C062G10120

<BLDG-62> Backfill for Foundation

2 27-Dec-14

29-Dec-14 Backfilling, with suitable excavated soil under foundation<BLDG-62>


level
Backfill for Foundation

C062G10140

<BLDG-62> Backfill around Building

5 12-Mar-15

17-Mar-15

Substructure
Foundation
Foundation at Level (-2.25)
C062A10100
<BLDG-62> Construct P.C. F oundation Lv (- 2.25)

121
121
121
2

28-Aug-14 A
28-Aug-14 A
28-Aug-14 A
28-Aug-14 A

<BLDG-62> Backfill around Building

11-Jan-15
11-Jan-15, Substructure
11-Jan-15
11-Jan-15, Foundation
11-Jan-15
11-Jan-15, Foundation at Level (-2.25)
08-Sep-14 A Supply and cast plain
<BLDG-62>
concrete with
Construct
average
P.C.
compressive
F oundationstrength
Lv (- 2.25)
200 kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

C062A10110

<BLDG-62> Construct R.C.Foundation Lv (-2.25)

C062A10240

<BLDG-62> Construct CUM above Ground Beam Lv (-2.25)/Internal Backfill

C062A10120

<BLDG-62> Apply Dampproofing for Foundation Lv (-2.25)

1 26-Dec-14

27-Dec-14 Supply and apply two (2) coats cold applied waterproofing
<BLDG-62>
paint with Apply
bituminous
Dampproofing
base
for Foundation Lv (-2.25)

C062A10160

<BLDG-62> Construct S.O.G Lv (-1.00)

4 06-Jan-15

11-Jan-15

Foundation at Level (-1.50)


C062A10130
<BLDG-62> Construct P.C. F oundation Lv (- 1.50)
C062A10140

<BLDG-62> Construct R.C.Foundation Lv (-1.50)

C062A10250

<BLDG-62> Construct CUM above Ground Beam Lv (-1.50)/Internal Backfill

C062A10150

<BLDG-62> Apply Dampproofing for Foundation Lv (-1.50)

C062A10170

<BLDG-62> Construct S.O.G Lv (+0.05)/Install PE sheets

Superstructure
Ground Floor Lv (+3.15)
C062B10110
<BLDG-62> Set up Form work for Gr Floor Columns

Nov

28-Oct-15, Milesto

GPM0102440

Comprises the skeleton works of buildings 172, 173, 62, 63, 285 and 286

Jan

28-Oct-15, Mount

0 30-Nov-14*

Interface Milestones
GIM0102110
Comprises the concrete works until ground floor of buildings 289, 289, 174 and 64

Dec

396 02-Aug-14 A 28-Oct-15

Start of Phase 2

Moblization
CMB0501220

Oct

28-Oct-15, Mount

GPM0102200

GIM0102100

Sep

396 02-Aug-14 28-Oct-15


A
396 02-Aug-14 A 28-Oct-15

396 02-Aug-14 A 28-Oct-15


0 02-Aug-14 A

Start of Phase 1

2015

Aug

5 09-Sep-14 A 22-Sep-14 A Reinforced concrete with<BLDG-62>


average compressive
Construct R.C.Foundation
strength 250 kg/cm2
Lv (-2.25)
at 28 days for foundation, Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
12 13-Dec-14

26-Dec-14 Backfilling, with suitable excavated soil under foundation<BLDG-62>


level, Supply
Construct
and buildCUM
solid above
cementGround
block unit
Beam
machine-made
Lv (-2.25)/Internal
with density
Backfill
not exceed 2000 kg/m3

Supply and cast plain concrete with average compressive strength


<BLDG-62>
200 kg/cm2
Construct
at 28S.O.G
days 100mm,
Lv (-1.00)
4 mm thick bituminous waterproofing membrane with 50 mm cement morta

110 28-Aug-14 A 06-Jan-15


06-Jan-15, Foundation at Level (-1.50)
2 28-Aug-14 A 08-Sep-14 A Supply and cast plain
<BLDG-62>
concrete with
Construct
average
P.C.
compressive
F oundationstrength
Lv (- 1.50)
200 kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

4 23-Sep-14 A 19-Oct-14 A Reinforced concrete with average<BLDG-62>


compressive
Construct
strength R.C.Foundation
250 kg/cm2 at 28Lvdays
(-1.50)
for foundation, Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
12 13-Dec-14

26-Dec-14 Backfilling, with suitable excavated soil under foundation<BLDG-62>


level, Supply
Construct
and buildCUM
solid above
cementGround
block unit
Beam
machine-made
Lv (-1.50)/Internal
with density
Backfill
not exceed 2000 kg/m3

1 26-Dec-14

27-Dec-14 Supply and apply two (2) coats cold applied waterproofing
<BLDG-62>
paint with Apply
bituminous
Dampproofing
base
for Foundation Lv (-1.50)

3 01-Jan-15

06-Jan-15

Reinforced concrete with average compressive strength 250


<BLDG-62>
kg/cm2 at 28
Construct
days forS.O.G
slab onLvgrade,
(+0.05)/Install
Supply and
PE install
sheets50 mm thick extruded polystyrene insulation boards of 35 k

153 21-Oct-14 A 03-Apr-15


53 21-Oct-14 A 13-Dec-14
10 21-Oct-14 A 08-Nov-14 AForm Work %
10 21-Oct-14 A 08-Nov-14 ASteel Fixing

03-Apr-15, Superstructure
13-Dec-14, Ground Floor Lv (+3.15)
<BLDG-62> Set up Form work for Gr Floor Columns

C062B10100

<BLDG-62> Fix Reinforcement Bars for Gr Floor Columns

<BLDG-62> Fix Reinforcement Bars for Gr Floor Columns

C062B10120

<BLDG-62> Cast concrete for Gr Floor Columns

C062B10130

<BLDG-62> Fix Reinforcement Bars for Gr Floor Slab

15 09-Nov-14 A 02-Dec-14 Steel Fixing

<BLDG-62> Fix Reinforcement Bars for Gr Floor Slab

C062B10140

<BLDG-62> Set up Form work for Gr Floor Slab

15 09-Nov-14 A 02-Dec-14 Form Work %

<BLDG-62> Set up Form work for Gr Floor Slab

C062B10150

<BLDG-62> Cast concrete for Gr Floor Slab

1 09-Nov-14 A 09-Nov-14 AReinforced concrete with average compressive


<BLDG-62>
strength
Cast250
concrete
kg/cm2for
atGr
28 Floor
days for
Columns
columns, Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days fo

1 03-Dec-14

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

03-Dec-14 RC with average compressive strength 250 kg/cm2


<BLDG-62>
at 28 days
Cast
for concrete
stairs, beams,
for Grand
Floor
slabs
Slab
Page 1 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name
C062B10190

Original Start
Duration

<BLDG-62> Dismantle Form work for Gr Floor Slab

First Floor Lv (+6.25)


C062B10170
<BLDG-62> Set up Form work for 1st Floor Columns

9 03-Dec-14
33 03-Dec-14
11 03-Dec-14

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

13-Dec-14

<BLDG-62> Dismantle Form work for Gr Floor Slab

09-Jan-15
15-Dec-14 Form Work %

09-Jan-15, First Floor Lv (+6.25)


<BLDG-62> Set up Form work for 1st Floor Columns
<BLDG-62> Fix Reinforcement Bars for 1st Floor Columns

Jul

Aug

Sep

Oct

Nov

C062B10160

<BLDG-62> Fix Reinforcement Bars for 1st Floor Columns

9 03-Dec-14

13-Dec-14 Steel Fixing

C062B10180

<BLDG-62> Cast concrete for 1st Floor Columns

1 15-Dec-14

15-Dec-14 Reinforced concrete with average compressive strength


<BLDG-62>
250 kg/cm2
Castatconcrete
28 days for columns,
1st Floor Reinforced
Columns concrete with average compressive strength 250 kg/cm2 at 28 days fo

C062B10200

<BLDG-62> Fix Reinforcement Bars for 1st Floor Slab

11 16-Dec-14

27-Dec-14 Steel Fixing

<BLDG-62> Fix Reinforcement Bars for 1st Floor Slab

C062B10210

<BLDG-62> Set up Form work for 1st Floor Slab

10 16-Dec-14

26-Dec-14 Form Work %

<BLDG-62> Set up Form work for 1st Floor Slab

C062B10220

<BLDG-62> Cast concrete for 1st Floor Slab

1 28-Dec-14

28-Dec-14 RC with average compressive strength 250 kg/cm2 at 28<BLDG-62>


days for stairs,
Castbeams,
concrete
and
forslabs
1st Floor Slab

C062B10260

<BLDG-62> Dismantle Form work for 1st Floor Slab

9 29-Dec-14

09-Jan-15

<BLDG-62> Dismantle Form work for 1st Floor Slab

03-Feb-15
09-Jan-15 Form Work %

03-Feb-15, Second Floor Lv (+9.35)


<BLDG-62> Fix Reinforcement Bars for 2nd Floor Columns
<BLDG-62> Set up Form work for 2nd Floor Columns

Second Floor Lv (+9.35)


C062B10230
<BLDG-62> Fix Reinforcement Bars for 2nd Floor Columns

31 29-Dec-14
9 29-Dec-14

C062B10240

<BLDG-62> Set up Form work for 2nd Floor Columns

9 29-Dec-14

09-Jan-15

Steel Fixing

C062B10250

<BLDG-62> Cast concrete for 2nd Floor Columns

1 10-Jan-15

10-Jan-15

Reinforced concrete with average compressive strength 250<BLDG-62>


kg/cm2 at 28Cast
daysconcrete
for columns,
for 2nd
Reinforced
Floor Columns
concrete with average compressive strength 250 kg/cm2 at 28 days fo

C062B10270

<BLDG-62> Fix Reinforcement Bars for 2nd Floor Slab

11 11-Jan-15

22-Jan-15

Steel Fixing

<BLDG-62> Fix Reinforcement Bars for 2nd Floor Slab

C062B10280

<BLDG-62> Set up Form work for 2nd Floor Slab

11 11-Jan-15

22-Jan-15

Form Work %

<BLDG-62> Set up Form work for 2nd Floor Slab

C062B10290

<BLDG-62> Cast concrete for 2nd Floor Slab

1 23-Jan-15

23-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days for<BLDG-62>


stairs, beams,
Cast
and
concrete
slabs for 2nd Floor Slab

C062B10330

<BLDG-62> Dismantle Form work for 2nd Floor Slab

9 24-Jan-15

03-Feb-15

<BLDG-62> Dismantle Form work for 2nd Floor Slab

Third Floor Lv (+12.45)


C062B10310
<BLDG-62> Set up Form work for 3rd Floor Columns

31 24-Jan-15
9 24-Jan-15

26-Feb-15
03-Feb-15 Form Work %

26-Feb-15, Third Floor Lv (+12.45)


<BLDG-62> Set up Form work for 3rd Floor Columns

9 24-Jan-15

03-Feb-15 Steel Fixing

<BLDG-62> Fix Reinforcement Bars for 3rd Floor Columns

04-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 <BLDG-62>
at 28 days for
Cast
columns,
concrete
Reinforced
for 3rd Floor
concrete
Columns
with average compressive strength 250 kg/cm2 at 28 days fo

C062B10300

<BLDG-62> Fix Reinforcement Bars for 3rd Floor Columns

C062B10320

<BLDG-62> Cast concrete for 3rd Floor Columns

1 04-Feb-15

C062B10350

<BLDG-62> Set up Form work for 3rd Floor Slab

11 05-Feb-15

16-Feb-15 Form Work %

<BLDG-62> Set up Form work for 3rd Floor Slab

C062B10340

<BLDG-62> Fix Reinforcement Bars for 3rd Floor Slab

11 05-Feb-15

16-Feb-15 Steel Fixing

<BLDG-62> Fix Reinforcement Bars for 3rd Floor Slab

C062B10360

<BLDG-62> Cast concrete for 3rd Floor Slab

1 17-Feb-15

17-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, <BLDG-62>
beams, and slabs
Cast concrete for 3rd Floor Slab

C062B10400

<BLDG-62> Dismantle Form work for 3rd Floor Slab

9 18-Feb-15

26-Feb-15

<BLDG-62> Dismantle Form work for 3rd Floor Slab

22-Mar-15
26-Feb-15 Steel Fixing

22-Mar-15, Fourth Floor Lv (+15.55)


<BLDG-62> Fix Reinforcement Bars for 4th Floor Columns
<BLDG-62> Set up Form work for 4th Floor Columns

Fourth Floor Lv (+15.55)


C062B10370
<BLDG-62> Fix Reinforcement Bars for 4th Floor Columns

31 18-Feb-15
9 18-Feb-15

C062B10380

<BLDG-62> Set up Form work for 4th Floor Columns

9 18-Feb-15

26-Feb-15 Form Work %

C062B10390

<BLDG-62> Cast concrete for 4th Floor Columns

1 28-Feb-15

28-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
<BLDG-62>
for columns,
CastReinforced
concrete for
concrete
4th Floor
withColumns
average compressive strength 250 kg/cm2 at 28 days fo

C062B10420

<BLDG-62> Set up Form work for 4th Floor Slab

11 01-Mar-15

11-Mar-15

Form Work %

<BLDG-62> Set up Form work for 4th Floor Slab

C062B10410

<BLDG-62> Fix Reinforcement Bars for 4th Floor Slab

11 01-Mar-15

11-Mar-15

Steel Fixing

<BLDG-62> Fix Reinforcement Bars for 4th Floor Slab

C062B10430

<BLDG-62> Cast concrete for 4th Floor Slab

1 12-Mar-15

12-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,<BLDG-62>
and slabs Cast concrete for 4th Floor Slab

C062B10470

<BLDG-62> Dismantle Form work for 4th Floor Slab

9 14-Mar-15

22-Mar-15

Roof Floor Lv (+18.55)


C062B10440
<BLDG-62> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

20 14-Mar-15
5 14-Mar-15

<BLDG-62> Dismantle Form work for 4th Floor Slab

03-Apr-15
18-Mar-15 Steel Fixing

03-Apr-15, Roof Floor Lv (+18.55)


<BLDG-62> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns
<BLDG-62> Set up Form work for Roof Floor Columns/Planted Columns

C062B10450

<BLDG-62> Set up Form work for Roof Floor Columns/Planted Columns

5 14-Mar-15

18-Mar-15 Form Work %

C062B10460

<BLDG-62> Cast concrete for Roof Floor Columns/Planted Columns

1 19-Mar-15

19-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for <BLDG-62>
columns, Reinforced
Cast concrete
concrete
for Roof
with average
Floor Columns/Planted
compressive strength
Columns
250 kg/cm2 at 28 days fo

C062B10480

<BLDG-62> Fix Reinforcement Bars for Roof Slab

7 20-Mar-15

26-Mar-15 Steel Fixing

<BLDG-62> Fix Reinforcement Bars for Roof Slab

C062B10490

<BLDG-62> Set up Form work for Roof Slab

7 20-Mar-15

26-Mar-15 Form Work %

<BLDG-62> Set up Form work for Roof Slab

C062B10500

<BLDG-62> Cast concrete for Roof Slab

1 28-Mar-15

28-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-62> Cast concrete for Roof Slab

C062B10510

<BLDG-62> Dismantle Form work for Roof Slab

Exterior Enclosure
C062B20130
<BLDG-62> Erect Scaffold

6 28-Mar-15

03-Apr-15

92 18-Mar-15
9 18-Mar-15

26-Jun-15
26-Mar-15

<BLDG-62> Dismantle Form work for Roof Slab


26-Jun-15, Exterior Enclosure
<BLDG-62> Erect Scaffold

C062B20160

<BLDG-62> Apply Facades Plaster

25 28-Mar-15

23-Apr-15

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and
<BLDG-62>
apply O.P cement-sand
Apply Facades
plaster
Plaster
in two-coat work (base and finish coats)for ext

C062B20250

<BLDG-62> Install Shingle Sheets

12 15-Apr-15

28-Apr-15

glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment

C062B20220

<BLDG-62> Install Gypsum Corniche

10 26-Apr-15

05-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502,<BLDG-62>
Supply and Install
install Gypsum
gypsum cornices
Cornicheincluding paint, 105 mm height middle g

C062B20240

<BLDG-62> Preparation of shingle ( Supporting System & Insulation Works)

10 06-May-15

16-May-15

C062B20170

<BLDG-62> Apply External Paint 1st Coat

10 17-May-15

27-May-15

C062B20260

<BLDG-62> Install Handrails for balconies

8 28-May-15

04-Jun-15

Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-62> paint
Installhandrail
Handrails
900formm
balconies
height 3/A-501, Supply and ins

C062B20290

<BLDG-62> Apply External Paint 2nd Coat

6 06-Jun-15

11-Jun-15

paint exterior acrylic water-based washable emulsion paint external wall

C062B20150

<BLDG-62> Install Steel & UPVC Doors & Windows

14 12-Jun-15

26-Jun-15

Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer <BLDG-62>
forge leavesInstall
1400 mm
Steelx &
2850
UPVC
mm,
Doors
UPVC
& Windows
Door type (D03)

C062B20280

<BLDG-62> Install Appliqus

3 12-Jun-15

14-Jun-15

C062B20320

<BLDG-62> Install Aluminum Windows

12 12-Jun-15

24-Jun-15

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

<BLDG-62> Install Shingle Sheets

<BLDG-62> Preparation of shingle ( Supporting System & Insulation Wo


<BLDG-62> Apply External Paint 1st Coat
<BLDG-62> Apply External Paint 2nd Coat
<BLDG-62> Install Appliqus
Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf<BLDG-62>
- with plexi fill
Install
- 400
Aluminum
mm x 1200
Windows
mm.

Page 2 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

C062B20480

<BLDG-62> Dismantle Scaffold

6 12-Jun-15

17-Jun-15

C062B20270

<BLDG-62> Install Rough Stone Skirting

8 18-Jun-15

26-Jun-15

Roofing
C062B30100

<BLDG-62> Cast Light Weight Concrete for slopes

C062B30110

<BLDG-62> Apply Roofing Plaster

C062B30180

<BLDG-62> Install Steel Ladder

C062B30120
C062B30130

87 18-Mar-15
4 18-Mar-15
9 22-Mar-15

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

<BLDG-62> Dismantle Scaffold


Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone
<BLDG-62>
skirting. Install Rough Stone Skirting

21-Jun-15
21-Jun-15, Roofing
21-Mar-15 Supply and cast 80 mm thick. maximum well finished surface of light weight concrete<BLDG-62>
max. 1200 kg/m
Cast Light Weight Concrete for slopes
31-Mar-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

<BLDG-62> Apply Roofing Plaster

10 01-Apr-15

11-Apr-15

Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508<BLDG-62> Install Steel Ladder

<BLDG-62> Apply reinforced bituminous water proofing membrane

6 01-Apr-15

06-Apr-15

4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof.
<BLDG-62> Apply reinforced bituminous water proofing membrane

<BLDG-62> Test Water proofing membrane

3 07-Apr-15

09-Apr-15

<BLDG-62> Test Water proofing membrane

C062B30140

<BLDG-62> Apply Cement mortar screed

4 11-Apr-15

15-Apr-15

<BLDG-62> Apply Cement mortar screed

C062B30150

<BLDG-62> Apply Extruded polystyrene

3 16-Apr-15

18-Apr-15

<BLDG-62> Apply Extruded polystyrene

C062B30160

<BLDG-62> Cast protection concrete layer

2 19-Apr-15

20-Apr-15

C062B30170

<BLDG-62> Install Terr azzo Tiles

10 05-May-15

15-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting.
<BLDG-62> Install Terr azzo Tiles

C062B30190

<BLDG-62> Install Ceramic Tiles

18 16-May-15

03-Jun-15

Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for
<BLDG-62>
floors, 100Install
mm height
Ceramic
ceramic
Tiles tiles for skirting.

C062B30200

<BLDG-62> Apply Paint for Roof

10 04-Jun-15

14-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C062B30210

<BLDG-62> Install of Roof Steel Doors

6 15-Jun-15

21-Jun-15

Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf

Interior Construction
C062C10100
<BLDG-62> Construct CUM Works for Gr floor

<BLDG-62> Cast protection concrete layer

<BLDG-62> Apply Paint for Roof


<BLDG-62> Install of Roof Steel Doors

189 06-Jan-15
10 06-Jan-15

05-Aug-15
05-Aug-15, Interior Construction
18-Jan-15 Supply and build solid cement block unit machine-made with density
<BLDG-62>
not exceed
Construct
2000 kg/m3,
CUM Works
Supplyfor
andGrbuild
floorsolid cement block unit machine-made with density not exceed 20

C062C10110

<BLDG-62> Construct CUM Works for 1st floor

10 26-Jan-15

05-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-62>
exceed 2000
Construct
kg/m3, CUM
Supply
Works
and build
for 1st
solid
floor
cement block unit machine-made with density not exceed 20

C062C10120

<BLDG-62> Construct CUM Works for 2nd floor

10 06-Feb-15

16-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-62>
2000 kg/m3,
Construct
Supply
CUMand
Works
buildfor
solid
2nd
cement
floor block unit machine-made with density not exceed 20

C062C10130

<BLDG-62> Construct CUM Works for 3rd floor

12 28-Feb-15

11-Mar-15

C062C10150

<BLDG-62> Construct CUM for Parapet

C062C10140

<BLDG-62> Construct CUM Works for 4th floor

C062C10160
C062C10190

4 14-Mar-15

Supply and build solid cement block unit machine-made with density not exceed 2000
<BLDG-62>
kg/m3, Supply
Construct
andCUM
buildWorks
solid cement
for 3rdblock
floor unit machine-made with density not exceed 20

17-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000
<BLDG-62>
kg/m3, Supply
Construct
and build
CUMhollow
for Parapet
cement block unit machine-made with density not exceed

12 23-Mar-15

04-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-62>
Supply and
Construct
build solid
CUM
cement
Worksblock
for 4th
unitfloor
machine-made with density not exceed 20

<BLDG-62> Construct Interior CUM Works for Roof

4 03-Apr-15

07-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-62>
Supply and
Construct
build solid
Interior
cement
CUM
block
Works
unit machine-made
for Roof
with density not exceed 20

<BLDG-62> Install Ducts work for 4th floor

2 26-Jul-15

27-Jul-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-62> Install Ducts work for 4th floor

C062C10200

<BLDG-62> Install Ducts work for 3rd floor

2 28-Jul-15

29-Jul-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-62> Install Ducts work for 3rd floor

C062C10210

<BLDG-62> Install Ducts work for 2nd floor

2 30-Jul-15

01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-62> Install Ducts work for 2nd floor

C062C10220

<BLDG-62> Install Ducts work for 1st floor

2 02-Aug-15

03-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-62> Install Ducts work for 1st floor

C062C10230

<BLDG-62> Install Ducts work for Gr floor

2 04-Aug-15

05-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-62> Install Ducts work for Gr floor

Entrance & Stairs


C062C20100
<BLDG-62> Apply Plaster to Stair Case
C062C20130

<BLDG-62> Install Marble for Stairs

C062C20140

<BLDG-62> Install Marble for Entrance

C062C20170

<BLDG-62> Apply Paint for Entrance & Stairs

C062C20160

<BLDG-62> Install Handrails for Stairs

C062C20120

<BLDG-62> Install Units Wooden Doors

Plumbing
C062D20100

76 05-Apr-15
26 05-Apr-15

27-Jun-15
04-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

12 05-May-15

17-May-15 terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs<BLDG-62>
340 mm width,
Install
Stone
Marble
Paving
for Stairs
and Flooring Light beige terriesta marble

6 18-May-15

<BLDG-62> Install Plumbing Fittings Under SOG

27-Jun-15, Entrance & Stairs


<BLDG-62> Apply Plaster to Stair Case

24-May-15 30 mm thick. light beige terriesta marble polished landing, set on 20 mm thick. mortar bed, 20 mm thick., and
<BLDG-62>
100 mm Install
heightMarble
light beige
for Entrance
terriesta marble skirting.

10 25-May-15

03-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

6 04-Jun-15

10-Jun-15

Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.

<BLDG-62> Apply Paint for Entrance & Stairs

16 11-Jun-15

27-Jun-15

wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door type (D09)
<BLDG-62>
- hinged
Install
leaf Units
- 900Wooden
mm x 2200
Doors
mm.

185 29-Dec-14
3 29-Dec-14

25-Jul-15
01-Jan-15

25-Jul-15, Plumbing
UPVC pipes and fittings, underground 75mm, UPVC pipes<BLDG-62>
and fittings,Install
underground
Plumbing110mm,
FittingsUPVC
Underpipes
SOGand fittings, underground 160mm, Polypropylene Pipes and Fittings

<BLDG-62> Install Handrails for Stairs

C062D20110

<BLDG-62> Install Drainage Risers

14 05-Apr-15

20-Apr-15

Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground
<BLDG-62>
50mm, UPVC
Install
Pipes
Drainage
and Fittings
RisersFor Drainage above ground 75mm, UPVC Pip

C062D20120

<BLDG-62> Install water Risers

14 05-Apr-15

20-Apr-15

Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and <BLDG-62>
Fittings including
Install
items
water
mentioned
Risers 25mm, Polypropylene Pipes and Fittings includ

C062D20130

<BLDG-62> Install Roof sainatary work

12 21-Apr-15

04-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron
<BLDG-62>
oblique grate,
Installside
Roofoutlet
sainatary
100mm
work

C062D20140

<BLDG-62> Construct Inspection chambers & connections

21 18-Jun-15

10-Jul-15

C062D20150

<BLDG-62> Test Drainage & water Riser s

10 11-Jul-15

25-Jul-15

Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25<BLDG-62>
mm, ValvesConstruct
are classified
Inspection
according
chambers
to type &Gate
connect
Valv
<BLDG-62> Test Drainage & water R iser s

Electrical
C062D50110

<BLDG-62> Install Electrical conduits for Gr Floor Slab

193 30-Nov-14
2 30-Nov-14

30-Jun-15
01-Dec-14 Indoor wiring for one lighting outlet including wires
<BLDG-62>
3(1x3) mm,
Install
One
Electrical
lighting conduits
outlet including
for Gr Floor
emptySlab
"PVC" conduits

C062D50120

<BLDG-62> Install Electrical conduits for 1st Floor Slab

2 16-Dec-14

17-Dec-14 Indoor wiring for one lighting outlet including wires 3(1x3)
<BLDG-62>
mm, One
Install
lighting
Electrical
outletconduits
includingfor
empty
1st Floor
"PVC"
Slab
conduits

C062D50130

<BLDG-62> Install Electrical conduits for 2nd Floor Slab

2 12-Jan-15

13-Jan-15

C062D50140

<BLDG-62> Install Electrical conduits for 3rd Floor Slab

2 06-Feb-15

07-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-62>
outlet including
Install Electrical
empty conduits
"PVC" conduits
for 3rd Floor Slab

C062D50150

<BLDG-62> Install Electrical conduits for 4th Floor Slab

2 02-Mar-15

03-Mar-15 One lighting outlet including empty "PVC" conduits

C062D50180

<BLDG-62> Install Electrical Risers

6 18-Mar-15

23-Mar-15 Light Current Systems Triple Play System Tie in point for unit, Light Current Systems<BLDG-62>
Triple Play System
Install Electrical
Floor pullRisers
box, Light Current Systems Two UPVC 25 mm Conduits for

C062D50100

<BLDG-62> Install Earthing System

6 18-Mar-15

23-Mar-15 power network including main earthing networks, 600/1000 V, multicore copper conductor,
<BLDG-62>
PVC/PVC
Install
cables
Earthing
(4 x System
10) mm, 600/1000 V, multicore copper conductor, PVC/PVC

C062D50160

<BLDG-62> Install Electrical conduits for Roof Slab

1 22-Mar-15

22-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-62>
empty
Install
"PVC"
Electrical
conduits
conduits for Roof Slab

C062D50170

<BLDG-62> Install Conduits for intercom system

3 05-May-15

07-May-15 Intercom System Provision for door master unit, Intercom System One UPVC 25 mm conduit for risers/
<BLDG-62>
unit
Install Conduits for intercom system

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

One lighting outlet including empty "PVC" conduits

Page 3 of 29

30-Jun-15, Electrical

<BLDG-62> Install Electrical conduits for 2nd Floor Slab


<BLDG-62> Install Electrical conduits for 4th Floor Slab

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration
3 05-May-15

Finish

Resources

2015

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

C062D50200

<BLDG-62> Install of Panel board

C062D50210

<BLDG-62> Install Distribution Panel

C062D50220

<BLDG-62> Connect between Riser & DP

C062D50230

<BLDG-62> Install Cables

C062D50190

<BLDG-62> Install Wiring Devices&Disconnect switches

2 27-May-15

28-May-15 Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power
<BLDG-62>
outlet withInstall
3(1x6)Wiring
mm, Devices&Disconnect
Wiring Devices and Disconnectors
switches
Load B

C062D50240

<BLDG-62> Test elec. system

6 15-Jun-15

21-Jun-15

C062D50250

<BLDG-62> Install Lighting fixtures

3 28-Jun-15

30-Jun-15

9 06-Aug-15
3 06-Aug-15

15-Aug-15
08-Aug-15

14 09-May-15
3 24-May-15
21 24-May-15

Completion Inspection
C062H10100
<BLDG-62> Punch Out

07-May-15 Lighting Switches Type Push Button (P.B), 40mm PVC empty conduit from (KWHM) box to panel board
<BLDG-62>
of customer
Install of Panel board

23-May-15 Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution
<BLDG-62>
Panels
Install
(DB-SER-1),
DistributionLow
Panel
Voltage Distribution Panels (DB-SER
26-May-15 Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
14-Jun-15

<BLDG-62> Connect between Riser & DP

450/750 V Single Core Copper Conductor, PVC cables (1x 35) mm, 450/750 V Single Core Copper Conductor,<BLDG-62>
PVC cablesInstall
(1x 70)
Cables
mm, 450/750 V Single Core Copper Con
<BLDG-62> Test elec. system
Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5

<BLDG-62> Install Lighting fixtures


15-Aug-15, Completion Inspection
<BLDG-62> Punch Out

C062H10110

<BLDG-62> Pre-final inspection

3 09-Aug-15

11-Aug-15

<BLDG-62> Pre-final inspection

C062H10120

<BLDG-62> Final inspection

3 12-Aug-15

15-Aug-15

<BLDG-62> Final inspection

321 16-Aug-14 A 15-Aug-15


181 16-Aug-14 A 10-Mar-15
1 16-Aug-14 A 16-Aug-14 A

Building 63 (Type# I.A6 b')


Site Preparation
C063G10130
<BLDG-63> Prep for Excavation

15-Aug-15, Building 63 (Type# I.A6 b')


10-Mar-15, Site Preparation
<BLDG-63> Prep for Excavation

C063G10100

<BLDG-63> Excavate to Foundation Levels

4 17-Aug-14 A 24-Aug-14 A Excavation in any


<BLDG-63>
type of soilExcavate
except rock
to Foundation
for foundation,
Levels
Disposal of surplus materials outside the site boundary to nearest dump.

C063G10110

<BLDG-63> Trim the bottoms of Excavate

1 25-Aug-14 A 25-Aug-14 A

C063G10120

<BLDG-63> Backfill for Foundation

2 25-Dec-14

26-Dec-14 Backfilling, with suitable excavated soil under foundation<BLDG-63>


level
Backfill for Foundation

C063G10140

<BLDG-63> Backfill around Building

5 06-Mar-15

10-Mar-15

Substructure
Foundation
Foundation at Level (-2.25)
C063A10100
<BLDG-63> Construct P.C. F oundation Lv (- 2.25)

119
119
119
2

23-Aug-14 A
23-Aug-14 A
23-Aug-14 A
23-Aug-14 A

<BLDG-63> Trim the bottoms of Excavate


<BLDG-63> Backfill around Building

08-Jan-15
08-Jan-15, Substructure
08-Jan-15
08-Jan-15, Foundation
08-Jan-15
08-Jan-15, Foundation at Level (-2.25)
04-Sep-14 A Supply and cast plain
<BLDG-63>
concrete with
Construct
average
P.C.compressive
F oundation strength
Lv (- 2.25)
200 kg/cm2 at 28 days 100mm, Supply and cast plain concrete with average compressive strength 200 kg/c

C063A10110

<BLDG-63> Construct R.C.Foundation Lv (-2.25)

C063A10240

<BLDG-63> Construct CUM above Ground Beam Lv (-2.25)/Internal backfill

C063A10120

<BLDG-63> Apply Dampproofing for Foundation Lv (-2.25)

2 23-Dec-14

24-Dec-14 Supply and apply two (2) coats cold applied waterproofing
<BLDG-63>
paint withApply
bituminous
Dampproofing
base
for Foundation Lv (-2.25)

C063A10160

<BLDG-63> Construct S.O.G Lv (-1.00)

4 04-Jan-15

08-Jan-15

Foundation at Level (-1.50)


C063A10130
<BLDG-63> Construct P.C. F oundation Lv (- 1.50)

4 06-Sep-14 A 17-Sep-14 A Reinforced concrete with


<BLDG-63>
average compressive
Construct R.C.Foundation
strength 250 kg/cm2
Lv (-2.25)
at 28 days for foundation, Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
12 10-Dec-14

22-Dec-14 Backfilling, with suitable excavated soil under foundation


<BLDG-63>
level, Supply
Construct
and build
CUM
solidabove
cement
Ground
block unit
Beam
machine-made
Lv (-2.25)/Internal
with density
backfillnot exceed 2000 kg/m3

Supply and cast plain concrete with average compressive strength


<BLDG-63>
200 kg/cm2
Construct
at 28
S.O.G
days 100mm,
Lv (-1.00)
4 mm thick bituminous waterproofing membrane with 50 mm cement morta

109 30-Aug-14 A 01-Jan-15


01-Jan-15, Foundation at Level (-1.50)
2 30-Aug-14 A 04-Sep-14 A Supply and cast plain
<BLDG-63>
concrete with
Construct
average
P.C.compressive
F oundation strength
Lv (- 1.50)
200 kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

C063A10140

<BLDG-63> Construct R.C.Foundation Lv (-1.50)

C063A10250

<BLDG-63> Construct CUM above Ground Beam Lv (-1.50)/Internal backfill

C063A10150

<BLDG-63> Apply Dampproofing for Foundation Lv (-1.50)

1 23-Dec-14

23-Dec-14 Supply and apply two (2) coats cold applied waterproofing
<BLDG-63>
paint withApply
bituminous
Dampproofing
base for Foundation Lv (-1.50)

C063A10170

<BLDG-63> Construct S.O.G Lv (+0.05)/Install PE sheets

3 30-Dec-14

01-Jan-15

Superstructure
Ground Floor Lv (+3.15)
C063B10110
<BLDG-63> Set up Form work for Gr Floor Columns

4 17-Sep-14 A 25-Sep-14 A Reinforced concrete with <BLDG-63>


average compressive
Constructstrength
R.C.Foundation
250 kg/cm2
Lv (-1.50)
at 28 days for foundation
12 10-Dec-14

22-Dec-14 Backfilling, with suitable excavated soil under foundation


<BLDG-63>
level, Supply
Construct
and build
CUM
solidabove
cement
Ground
block unit
Beam
machine-made
Lv (-1.50)/Internal
with density
backfillnot exceed 2000 kg/m3

Reinforced concrete with average compressive strength 250


<BLDG-63>
kg/cm2 atConstruct
28 days for
S.O.G
slab Lv
on (+0.05)/Install
grade, Supply PE
andsheets
install 50 mm thick extruded polystyrene insulation boards of 35 k

158 11-Oct-14 A 24-Mar-15


63 11-Oct-14 A 09-Dec-14
10 11-Oct-14 A 27-Oct-14 A Form Work %
10 12-Oct-14 A 27-Oct-14 A Steel Fixing

24-Mar-15, Superstructure
09-Dec-14, Ground Floor Lv (+3.15)
<BLDG-63> Set up Form work for Gr Floor Columns

C063B10100

<BLDG-63> Fix Reinforcement Bars for Gr Floor Columns

C063B10120

<BLDG-63> Cast concrete for Gr Floor Columns

<BLDG-63> Fix Reinforcement Bars for Gr Floor Columns

C063B10130

<BLDG-63> Fix Reinforcement Bars for Gr Floor Slab

15 29-Oct-14 A 26-Nov-14 ASteel Fixing

<BLDG-63> Fix Reinforcement Bars for Gr Floor Slab

C063B10140

<BLDG-63> Set up Form work for Gr Floor Slab

15 29-Oct-14 A 26-Nov-14 AForm Work %

<BLDG-63> Set up Form work for Gr Floor Slab

C063B10150

<BLDG-63> Cast concrete for Gr Floor Slab

1 27-Nov-14 A 27-Nov-14 ARC with average compressive strength 250 kg/cm2


<BLDG-63>
at 28 days
Castfor
concrete
stairs, beams,
for Gr Floor
and slabs
Slab

C063B10190

<BLDG-63> Dismantle Form work for Gr Floor Slab

9 30-Nov-14

1 28-Oct-14 A 28-Oct-14 A Reinforced concrete with average compressive


<BLDG-63>strength
Cast concrete
250 kg/cm2
for GratFloor
28 days
Columns
for columns, Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days fo

First Floor Lv (+6.25)


C063B10170
<BLDG-63> Set up Form work for 1st Floor Columns

09-Dec-14

36 29-Nov-14 A 28-Dec-14
9 29-Nov-14 A 04-Dec-14 Form Work %

<BLDG-63> Dismantle Form work for Gr Floor Slab


28-Dec-14, First Floor Lv (+6.25)
<BLDG-63> Set up Form work for 1st Floor Columns

C063B10160

<BLDG-63> Fix Reinforcement Bars for 1st Floor Columns

9 29-Nov-14 A 04-Dec-14 Steel Fixing

C063B10180

<BLDG-63> Cast concrete for 1st Floor Columns

1 06-Dec-14

C063B10200

<BLDG-63> Fix Reinforcement Bars for 1st Floor Slab

11 07-Dec-14

17-Dec-14 Steel Fixing

<BLDG-63> Fix Reinforcement Bars for 1st Floor Slab

C063B10210

<BLDG-63> Set up Form work for 1st Floor Slab

11 07-Dec-14

17-Dec-14 Form Work %

<BLDG-63> Set up Form work for 1st Floor Slab

C063B10220

<BLDG-63> Cast concrete for 1st Floor Slab

C063B10260

<BLDG-63> Dismantle Form work for 1st Floor Slab

Second Floor Lv (+9.35)


C063B10240
<BLDG-63> Set up Form work for 2nd Floor Columns

<BLDG-63> Fix Reinforcement Bars for 1st Floor Columns

06-Dec-14 Reinforced concrete with average compressive strength


<BLDG-63>
250 kg/cm2
Cast concrete
at 28 days
for for
1stcolumns,
Floor Columns
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days fo

1 18-Dec-14

18-Dec-14 RC with average compressive strength 250 kg/cm2 at<BLDG-63>


28 days forCast
stairs,
concrete
beams,for
and1st
slabs
Floor Slab

9 20-Dec-14

28-Dec-14

<BLDG-63> Dismantle Form work for 1st Floor Slab

23-Jan-15
28-Dec-14 Form Work %

23-Jan-15, Second Floor Lv (+9.35)


<BLDG-63> Set up Form work for 2nd Floor Columns
<BLDG-63> Fix Reinforcement Bars for 2nd Floor Columns

31 20-Dec-14
9 20-Dec-14

C063B10230

<BLDG-63> Fix Reinforcement Bars for 2nd Floor Columns

9 20-Dec-14

28-Dec-14 Steel Fixing

C063B10250

<BLDG-63> Cast concrete for 2nd Floor Columns

1 29-Dec-14

29-Dec-14 Reinforced concrete with average compressive strength <BLDG-63>


250 kg/cm2 at
Cast
28 days
concrete
for columns,
for 2nd Floor
Reinforced
Columns
concrete with average compressive strength 250 kg/cm2 at 28 days fo

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 4 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

C063B10280

<BLDG-63> Set up Form work for 2nd Floor Slab

11 30-Dec-14

12-Jan-15

Form Work %

<BLDG-63> Set up Form work for 2nd Floor Slab

C063B10270

<BLDG-63> Fix Reinforcement Bars for 2nd Floor Slab

11 30-Dec-14

12-Jan-15

Steel Fixing

<BLDG-63> Fix Reinforcement Bars for 2nd Floor Slab

C063B10290

<BLDG-63> Cast concrete for 2nd Floor Slab

1 13-Jan-15

13-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days<BLDG-63>


for stairs, beams,
Cast concrete
and slabs
for 2nd Floor Slab

C063B10330

<BLDG-63> Dismantle Form work for 2nd Floor Slab

9 14-Jan-15

23-Jan-15

<BLDG-63> Dismantle Form work for 2nd Floor Slab

Third Floor Lv (+12.45)


C063B10310
<BLDG-63> Set up Form work for 3rd Floor Columns

31 14-Jan-15
9 14-Jan-15

17-Feb-15
23-Jan-15 Form Work %

17-Feb-15, Third Floor Lv (+12.45)


<BLDG-63> Set up Form work for 3rd Floor Columns
<BLDG-63> Fix Reinforcement Bars for 3rd Floor Columns

Aug

Sep

Oct

Nov

C063B10300

<BLDG-63> Fix Reinforcement Bars for 3rd Floor Columns

9 14-Jan-15

23-Jan-15

Steel Fixing

C063B10320

<BLDG-63> Cast concrete for 3rd Floor Columns

1 24-Jan-15

24-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-63>
at 28 days
Cast
for concrete
columns, for
Reinforced
3rd Floorconcrete
Columnswith average compressive strength 250 kg/cm2 at 28 days fo

C063B10350

<BLDG-63> Set up Form work for 3rd Floor Slab

11 26-Jan-15

06-Feb-15 Form Work %

<BLDG-63> Set up Form work for 3rd Floor Slab

C063B10340

<BLDG-63> Fix Reinforcement Bars for 3rd Floor Slab

11 26-Jan-15

06-Feb-15 Steel Fixing

<BLDG-63> Fix Reinforcement Bars for 3rd Floor Slab

C063B10360

<BLDG-63> Cast concrete for 3rd Floor Slab

1 07-Feb-15

07-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,
<BLDG-63>
beams, and
Cast
slabs
concrete for 3rd Floor Slab

C063B10400

<BLDG-63> Dismantle Form work for 3rd Floor Slab

9 08-Feb-15

17-Feb-15

<BLDG-63> Dismantle Form work for 3rd Floor Slab

12-Mar-15
17-Feb-15 Form Work %

12-Mar-15, Fourth Floor Lv (+15.55)


<BLDG-63> Set up Form work for 4th Floor Columns
<BLDG-63> Fix Reinforcement Bars for 4th Floor Columns

Fourth Floor Lv (+15.55)


C063B10380
<BLDG-63> Set up Form work for 4th Floor Columns

31 08-Feb-15
9 08-Feb-15

C063B10370

<BLDG-63> Fix Reinforcement Bars for 4th Floor Columns

9 08-Feb-15

17-Feb-15 Steel Fixing

C063B10390

<BLDG-63> Cast concrete for 4th Floor Columns

1 18-Feb-15

18-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28<BLDG-63>
days for columns,
Cast concrete
Reinforced
for 4th
concrete
Floor with
Columns
average compressive strength 250 kg/cm2 at 28 days fo

C063B10420

<BLDG-63> Set up Form work for 4th Floor Slab

11 19-Feb-15

02-Mar-15 Form Work %

<BLDG-63> Set up Form work for 4th Floor Slab

C063B10410

<BLDG-63> Fix Reinforcement Bars for 4th Floor Slab

11 19-Feb-15

02-Mar-15 Steel Fixing

<BLDG-63> Fix Reinforcement Bars for 4th Floor Slab

C063B10430

<BLDG-63> Cast concrete for 4th Floor Slab

C063B10470

1 03-Mar-15

03-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,
<BLDG-63>
and slabsCast concrete for 4th Floor Slab

<BLDG-63> Dismantle Form work for 4th Floor Slab

9 04-Mar-15

12-Mar-15

Roof Floor Lv (+18.55)


C063B10450
<BLDG-63> Set up Form work for Roof Floor Columns/Planted Columns

20 04-Mar-15
5 04-Mar-15

<BLDG-63> Dismantle Form work for 4th Floor Slab

24-Mar-15
08-Mar-15 Form Work %

24-Mar-15, Roof Floor Lv (+18.55)


<BLDG-63> Set up Form work for Roof Floor Columns/Planted Columns
<BLDG-63> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

C063B10440

<BLDG-63> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

5 04-Mar-15

08-Mar-15 Steel Fixing

C063B10460

<BLDG-63> Cast concrete for Roof Floor Columns/Planted Columns

1 09-Mar-15

09-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days<BLDG-63>
for columns,Cast
Reinforced
concrete
concrete
for Roof
with
Floor
average
Columns/Planted
compressiveColumns
strength 250 kg/cm2 at 28 days fo

C063B10480

<BLDG-63> Fix Reinforcement Bars for Roof Slab

7 10-Mar-15

17-Mar-15 Steel Fixing

<BLDG-63> Fix Reinforcement Bars for Roof Slab

C063B10490

<BLDG-63> Set up Form work for Roof Slab

7 10-Mar-15

17-Mar-15 Form Work %

<BLDG-63> Set up Form work for Roof Slab

C063B10500

<BLDG-63> Cast concrete for Roof Slab

1 18-Mar-15

18-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and
<BLDG-63>
slabs
Cast concrete for Roof Slab

C063B10510

<BLDG-63> Dismantle Form work for Roof Slab

6 19-Mar-15

24-Mar-15

98 11-Mar-15
8 11-Mar-15

26-Jun-15
19-Mar-15

Exterior Enclosure
C063B20130
<BLDG-63> Erect Scaffold

<BLDG-63> Dismantle Form work for Roof Slab


26-Jun-15, Exterior Enclosure
<BLDG-63> Erect Scaffold

C063B20160

<BLDG-63> Apply Facades Plaster

28 20-Mar-15

19-Apr-15

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)for external
<BLDG-63>
walls., Supply
Apply
and
Facades
apply O.P
Plaster
cement-sand plaster in two-coat work (base and f

C063B20250

<BLDG-63> Install Shingle Sheets

6 17-Apr-15

22-Apr-15

glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment

C063B20220

<BLDG-63> Install Gypsum Corniche

10 20-Apr-15

01-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502,
<BLDG-63>
Supply andInstall
installGypsum
gypsumCorniche
cornices including paint, 105 mm height middle g

C063B20240

<BLDG-63> Preparation of shingle ( Supporting System & Insulation Works)

12 02-May-15

14-May-15

C063B20300

<BLDG-63> Apply External Paint 1st Coat

12 15-May-15

27-May-15

C063B20260

<BLDG-63> Install Handrails for balconies

8 28-May-15

04-Jun-15

Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-63> paint
Installhandrail
Handrails
900formm
balconies
height 3/A-501, Supply and ins

C063B20290

<BLDG-63> Apply External Paint 2nd Coat

6 06-Jun-15

11-Jun-15

paint exterior acrylic water-based washable emulsion paint external wall

C063B20150

<BLDG-63> Install Steel & UPVC Doors & Windows

14 12-Jun-15

26-Jun-15

UPVC Window type (W11) - hinged leaf - 600 mm x 1300 mm., UPVC Window type (W12) - tilt leaf - 600 mm x 900
<BLDG-63>
mm., UPVCInstall
Window
Steeltype
& UPVC
(W13)Doors
- tilt leaf
& Windows
- 500 mm x 900

C063B20320

<BLDG-63> Install Aluminum Windows

12 12-Jun-15

24-Jun-15

Window type (W16) - hinged leaf - with plexi fill - 400 mm x 1200 mm., Aluminum Window type (W15) - hinged leaf<BLDG-63>
- with plexi fill
Install
- 500Aluminum
mm x 1200
Windows
mm.

C063B20480

<BLDG-63> Dismantle Scaffold

6 12-Jun-15

17-Jun-15

C063B20280

<BLDG-63> Install Appliqus

3 12-Jun-15

14-Jun-15

C063B20270

<BLDG-63> Install Rough Stone Skirting

8 18-Jun-15

26-Jun-15

Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone
<BLDG-63>
skirting. Install Rough Stone Skirting

87 08-Mar-15
4 08-Mar-15

11-Jun-15
11-Mar-15

11-Jun-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete
<BLDG-63>
max. 1200
Cast
kg/m
Light Weight Concrete for slopes

Roofing
C063B30100

<BLDG-63> Cast Light Weight Concrete for slopes

9 12-Mar-15

<BLDG-63> Install Shingle Sheets

<BLDG-63> Preparation of shingle ( Supporting System & Insulation Wor


<BLDG-63> Apply External Paint 1st Coat
<BLDG-63> Apply External Paint 2nd Coat

<BLDG-63> Dismantle Scaffold


<BLDG-63> Install Appliqus

C063B30110

<BLDG-63> Apply Roofing Plaster

C063B30180

<BLDG-63> Install Steel Ladder

C063B30120

<BLDG-63> Apply reinforced bituminous water proofing membrane

6 22-Mar-15

28-Mar-15 4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for<BLDG-63>
roof.
Apply reinforced bituminous water proofing membrane

C063B30130

<BLDG-63> Test Water proofing membrane

3 29-Mar-15

31-Mar-15

<BLDG-63> Test Water proofing membrane

C063B30140

<BLDG-63> Apply Cement mortar screed

4 01-Apr-15

04-Apr-15

<BLDG-63> Apply Cement mortar screed

C063B30150

<BLDG-63> Apply Extruded polystyrene

3 05-Apr-15

07-Apr-15

<BLDG-63> Apply Extruded polystyrene

C063B30160

<BLDG-63> Cast protection concrete layer

2 08-Apr-15

09-Apr-15

<BLDG-63> Cast protection concrete layer

C063B30170

<BLDG-63> Install Terr azzo Tiles

15 22-Mar-15

10 26-Apr-15

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

21-Mar-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats) <BLDG-63> Apply Roofing Plaster
06-Apr-15

Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508
<BLDG-63> Install Steel Ladder

05-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting.
<BLDG-63> Install Terr azzo Tiles
Page 5 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

C063B30190

<BLDG-63> Install Ceramic Tiles

18 06-May-15

25-May-15 Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles
<BLDG-63>
for floors, 100
Install
mm
Ceramic
height ceramic
Tiles tiles for skirting.

C063B30200

<BLDG-63> Apply Paint for Roof

10 26-May-15

04-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C063B30210

<BLDG-63> Install of Roof Steel Doors

6 06-Jun-15

11-Jun-15

Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf

Interior Construction
C063C10100
<BLDG-63> Construct CUM Works for Gr floor

<BLDG-63> Apply Paint for Roof


<BLDG-63> Install of Roof Steel Doors

191 04-Jan-15
12 04-Jan-15

05-Aug-15
05-Aug-15, Interior Construction
17-Jan-15 Supply and build solid cement block unit machine-made with density
<BLDG-63>
not exceed
Construct
2000 kg/m3,
CUM Works
Supplyfor
and
Grbuild
floorsolid cement block unit machine-made with density not exceed 20

C063C10110

<BLDG-63> Construct CUM Works for 1st floor

12 26-Jan-15

07-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-63>
exceed 2000
Construct
kg/m3, Supply
CUM Works
and build
for 1st
solid
floor
cement block unit machine-made with density not exceed 20

C063C10120

<BLDG-63> Construct CUM Works for 2nd floor

12 08-Feb-15

20-Feb-15 Supply and build hollow cement block unit machine-made with density not exceed
<BLDG-63>
1600 Construct
kg/m3, Supply
CUMand
Works
buildfor
hollow
2nd floor
cement block unit machine-made with density not excee

C063C10130

<BLDG-63> Construct CUM Works for 3rd floor

12 21-Feb-15

05-Mar-15 Supply and build hollow cement block unit machine-made with density not exceed
<BLDG-63>
1600 kg/m3,
Construct
SupplyCUM
and build
Works
solid
forcement
3rd floor
block unit machine-made with density not exceed

C063C10150

<BLDG-63> Construct CUM for Parapet

4 04-Mar-15

07-Mar-15 Supply and build solid cement block unit machine-made with density not exceed<BLDG-63>
2000 kg/m3,Construct
Supply and
CUM
build
forsolid
Parapet
cement block unit machine-made with density not exceed 20

C063C10140

<BLDG-63> Construct CUM Works for 4th floor

12 14-Mar-15

25-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000<BLDG-63>
kg/m3, Supply
Construct
and build
CUM
solidWorks
cement
forblock
4th floor
unit machine-made with density not exceed 20

C063C10160

<BLDG-63> Construct Interior CUM Works for Roof

4 25-Mar-15

29-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-63>
SupplyConstruct
and buildInterior
solid cement
CUM block
Worksunit
formachine-made
Roof
with density not exceed 20

C063C10190

<BLDG-63> Install Ducts work for 4th floor

2 26-Jul-15

27-Jul-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement<BLDG-63>
block unit machine-made
Install Ducts work
with for
density
4th floor
not excee

C063C10200

<BLDG-63> Install Ducts work for 3rd floor

2 28-Jul-15

29-Jul-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement<BLDG-63>
block unit machine-made
Install Ducts work
with density
for 3rd not
floorexcee

C063C10210

<BLDG-63> Install Ducts work for 2nd floor

2 30-Jul-15

01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-63>
unit machine-made
Install Ducts with
workdensity
for 2ndnot
floor
excee

C063C10220

<BLDG-63> Install Ducts work for 1st floor

2 02-Aug-15

03-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-63>
unit machine-made
Install Ductswith
work
density
for 1stnot
floor
excee

C063C10230

<BLDG-63> Install Ducts work for Gr floor

2 04-Aug-15

05-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-63>
unit machine-made
Install Ducts
with
work
density
for Grnot
floor
excee

Entrance & Stairs


C063C20100
<BLDG-63> Apply Plaster to Stair Case

62 26-Mar-15
26 26-Mar-15

02-Jun-15
23-Apr-15

02-Jun-15, Entrance & Stairs


<BLDG-63> Apply Plaster to Stair Case

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

C063C20130

<BLDG-63> Install Marble for Entrance & Stairs

12 26-Apr-15

07-May-15 Light beige terriesta marble stairs of 40 mm thick., polished treads, Stone Paving and Flooring Light<BLDG-63>
beige terriesta
Install
marble
Marble
stairs
for320
Entrance
mm width,
& Stairs
Stone Paving and Flooring Lig

C063C20170

<BLDG-63> Apply Paint for Entrance & Stairs

12 09-May-15

20-May-15 Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C063C20160

<BLDG-63> Install Handrails for Stairs

6 21-May-15

27-May-15 Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.

C063C20120

<BLDG-63> Install Units Wooden Doors

6 28-May-15

02-Jun-15

Plumbing
C063D20100

187 27-Dec-14
3 27-Dec-14

<BLDG-63> Install Plumbing Fittings Under SOG

<BLDG-63> Apply Paint for Entrance & Stairs


<BLDG-63> Install Handrails for Stairs

wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door
<BLDG-63>
type (D09)
Install
- hinged
Unitsleaf
Wooden
- 900 mm
Doors
x 2200 mm.

25-Jul-15
25-Jul-15, Plumbing
29-Dec-14 UPVC pipes and fittings, underground 75mm, UPVC pipes
<BLDG-63>
and fittings,Install
underground
Plumbing110mm,
Fittings UPVC
Under pipes
SOG and fittings, underground 160mm, Polypropylene Pipes and Fittings

C063D20110

<BLDG-63> Install Drainage Risers

14 26-Mar-15

09-Apr-15

Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground
<BLDG-63>
50mm, Install
UPVCDrainage
Pipes andRisers
Fittings For Drainage above ground 75mm, UPVC Pip

C063D20120

<BLDG-63> Install water Risers

14 26-Mar-15

09-Apr-15

Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and
<BLDG-63>
Fittings including
Install water
itemsRisers
mentioned 25mm, Polypropylene Pipes and Fittings includ

C063D20130

<BLDG-63> Install Roof sainatary work

12 11-Apr-15

23-Apr-15

Roof drains type (RD2), cast iron oblique grate, side outlet 100mm, Roof drains type (RD2), cast
<BLDG-63>
iron oblique
Install
grate,
Roofside
sainatary
outlet 80
work
mm

C063D20140

<BLDG-63> Construct Inspection chambers & connections

21 18-Jun-15

10-Jul-15

Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25<BLDG-63>
mm, ValvesConstruct
are classified
Inspection
according
chambers
to type &Gate
connect
Valv

C063D20150

<BLDG-63> Test Drainage & water Riser s

10 11-Jul-15

25-Jul-15

<BLDG-63> Test Drainage & water R iser s

Electrical
C063D50110

<BLDG-63> Install Electrical conduits for Gr Floor Slab

182 30-Nov-14
2 30-Nov-14

C063D50120

<BLDG-63> Install Electrical conduits for 1st Floor Slab

2 08-Dec-14

09-Dec-14 Indoor wiring for one lighting outlet including wires <BLDG-63>
3(1x3) mm,Install
One lighting
Electrical
outlet
conduits
including
for 1st
empty
Floor
"PVC"
Slab conduits

C063D50130

<BLDG-63> Install Electrical conduits for 2nd Floor Slab

2 31-Dec-14

01-Jan-15

Indoor wiring for one lighting outlet including wires 3(1x3) <BLDG-63>
mm, One lighting
Install outlet
Electrical
including
conduits
empty
for 2nd
"PVC"
Floor
conduits
Slab

C063D50140

<BLDG-63> Install Electrical conduits for 3rd Floor Slab

2 27-Jan-15

28-Jan-15

Indoor wiring for one lighting outlet including wires 3(1x3) mm, One
<BLDG-63>
lighting outlet
Install
including
Electrical
empty
conduits
"PVC"for
conduits
3rd Floor Slab

C063D50150

<BLDG-63> Install Electrical conduits for 4th Floor Slab

2 20-Feb-15

21-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-63>
outlet including
Install
empty
Electrical
"PVC"
conduits
conduits
for 4th Floor Slab

C063D50180

<BLDG-63> Install Electrical Risers

6 08-Mar-15

14-Mar-15 Light Current Systems Two UPVC 25 mm Conduits for risers and tie in connection<BLDG-63>
/ unit, Light Install
Current
Electrical
Systems
Risers
Triple Play System Floor pull box, Light Current Systems Triple

C063D50100

<BLDG-63> Install Earthing System

6 08-Mar-15

14-Mar-15 power network including main earthing networks, 600/1000 V, multicore copper conductor,
<BLDG-63>
PVC/PVC
Install Earthing
cables (4System
x 10) mm, 600/1000 V, multicore copper conductor, PVC/PVC

C063D50160

<BLDG-63> Install Electrical conduits for Roof Slab

1 12-Mar-15

12-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet
<BLDG-63>
including empty
Install"PVC"
Electrical
conduits
conduits for Roof Slab

C063D50200

<BLDG-63> Install of Panel board

3 26-Apr-15

28-Apr-15

40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type
<BLDG-63>
Push Button
Install
(P.B)of Panel board

C063D50170

<BLDG-63> Install Conduits for intercom system

3 26-Apr-15

28-Apr-15

Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door <BLDG-63>
master unit Install Conduits for intercom system

C063D50210

<BLDG-63> Install Distribution Panel

C063D50220

<BLDG-63> Connect between Riser & DP

C063D50230

<BLDG-63> Install Cables

C063D50190

<BLDG-63> Install Wiring Devices&Disconnect switches

5 17-May-15

21-May-15 Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power
<BLDG-63>
outlet with
Install
3(1x6)
Wiring
mm,
Devices&Disconnect
Wiring Devices andswitches
Disconnectors Load B

C063D50240

<BLDG-63> Test elec. system

6 06-Jun-15

11-Jun-15

C063D50250

<BLDG-63> Install Lighting fixtures

7 12-Jun-15

18-Jun-15

9 06-Aug-15
3 06-Aug-15

15-Aug-15
08-Aug-15

14 29-Apr-15
3 14-May-15
21 14-May-15

Completion Inspection
C063H10100
<BLDG-63> Punch Out

18-Jun-15
18-Jun-15, Electrical
01-Dec-14 Indoor wiring for one lighting outlet including wires
<BLDG-63>
3(1x3) mm,
Install
One
Electrical
lighting conduits
outlet including
for Gr Floor
emptySlab
"PVC" conduits

13-May-15 Low Voltage Distribution Panels (DB-SER-2 ), Low Voltage Distribution Panels (DB-SER-1), Low Voltage
<BLDG-63>
Distribution
Install
Panels
Distribution
(DB-A4-2),
Panel
Low Voltage Distribution Panels (DB-A
16-May-15 Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
04-Jun-15

<BLDG-63> Connect between Riser & DP

450/750 V Single Core Copper Conductor, PVC cables (1x 50) mm ECC, 450/750 V Single Core Copper Conductor,
<BLDG-63>
PVC
Install
cables
Cables
(1x 35) mm, 450/750 V Single Core Coppe
<BLDG-63> Test elec. system
Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5

<BLDG-63> Install Lighting fixtures


15-Aug-15, Completion Inspection
<BLDG-63> Punch Out

C063H10110

<BLDG-63> Pre-final inspection

3 09-Aug-15

11-Aug-15

<BLDG-63> Pre-final inspection

C063H10120

<BLDG-63> Final inspection

3 12-Aug-15

15-Aug-15

<BLDG-63> Final inspection

321 16-Aug-14 A 15-Aug-15


198 16-Aug-14 A 29-Mar-15
1 16-Aug-14 A 16-Aug-14 A

Building 173 (Type# I.A6 b')


Site Preparation
C173G20150
<BLDG-173> Prep for Excavation
Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 6 of 29

15-Aug-15, Building 173 (Type# I.A6 b')


29-Mar-15, Site Preparation
<BLDG-173> Prep for Excavation
TASK filter: All Activities
Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

C173G20130

<BLDG-173> Excavate to Foundation Levels

4 17-Aug-14 A 14-Sep-14 A Excavation in any type<BLDG-173>


of soil exceptExcavate
rock for foundation,
to Foundation
Disposal
Levels
of surplus materials outside the site boundary to nearest dump.

C173G20120

<BLDG-173> Trim the bottoms of Excavate

1 15-Sep-14 A 15-Sep-14 A

C173G20140

<BLDG-173> Backfill for Foundation

2 13-Jan-15

14-Jan-15

C173G20180

<BLDG-173> Backfill around Building

5 24-Mar-15

29-Mar-15

Substructure
Foundation
Foundation at Level (-2.25)
C173A10300
<BLDG-173> Construct P.C. F oundation Lv (- 2.25)
C173A10310

<BLDG-173> Construct R.C.Foundation Lv (-2.25)

C173A10340

<BLDG-173> Construct CUM above Ground Beam Lv (-2.25)/Internal backfill

C173A10320

<BLDG-173> Apply Dampproofing for Foundation Lv (-2.25)

C173A10330

<BLDG-173> Construct S.O.G Lv (-1.00)

Foundation at Level (-1.50)


C173A10260
<BLDG-173> Construct P.C. F oundation Lv (- 1.50)

109
109
109
2

13-Sep-14 A
13-Sep-14 A
13-Sep-14 A
13-Sep-14 A

Sep

Oct

Nov

<BLDG-173> Trim the bottoms of Excavate


Backfilling, with suitable excavated soil under foundation level <BLDG-173> Backfill for Foundation
<BLDG-173> Backfill around Building

26-Jan-15
26-Jan-15, Substructure
26-Jan-15
26-Jan-15, Foundation
26-Jan-15
26-Jan-15, Foundation at Level (-2.25)
21-Sep-14 A Supply and cast plain concrete
<BLDG-173>
with average
Construct
compressive
P.C. F oundation
strengthLv200
(- 2.25)
kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

4 16-Oct-14 A 28-Oct-14 A Reinforced concrete with average compressive


<BLDG-173>
strength
Construct
250R.C.Foundation
kg/cm2 at 28 days
Lv for
(-2.25)
foundation, Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
12 27-Dec-14

10-Jan-15

Backfilling, with suitable excavated soil under foundation level,


<BLDG-173>
Supply and Construct
build solid CUM
cement
above
blockGround
unit machine-made
Beam Lv (-2.25)/Internal
with density not
backfill
exceed 2000 kg/m3

2 11-Jan-15

12-Jan-15

Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-173>
with bituminous
Applybase
Dampproofing for Foundation Lv (-2.25)

4 22-Jan-15

26-Jan-15

Supply and cast plain concrete with average compressive strength<BLDG-173>


200 kg/cm2 at
Construct
28 days 100mm,
S.O.G Lv4 (-1.00)
mm thick bituminous waterproofing membrane with 50 mm cement morta

99 13-Sep-14 A 21-Jan-15
21-Jan-15, Foundation at Level (-1.50)
2 13-Sep-14 A 21-Sep-14 A Supply and cast plain concrete
<BLDG-173>
with average
Construct
compressive
P.C. F oundation
strengthLv200
(- 1.50)
kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

C173A10270

<BLDG-173> Construct R.C.Foundation Lv (-1.50)

C173A10350

<BLDG-173> Construct CUM above Ground Beam Lv (-1.50)/Internal backfill

12 27-Dec-14

10-Jan-15

Backfilling, with suitable excavated soil under foundation level,


<BLDG-173>
Supply and Construct
build solid CUM
cement
above
blockGround
unit machine-made
Beam Lv (-1.50)/Internal
with density not
backfill
exceed 2000 kg/m3

C173A10280

<BLDG-173> Apply Dampproofing for Foundation Lv (-1.50)

1 11-Jan-15

11-Jan-15

Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-173>
with bituminous
Applybase
Dampproofing for Foundation Lv (-1.50)

C173A10290

<BLDG-173> Construct S.O.G Lv (+0.05)/Install PE sheets

3 19-Jan-15

21-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-173>
at 28 days
Construct
for slab on
S.O.G
grade,
Lv Supply
(+0.05)/Install
and install
PE 50
sheets
mm thick extruded polystyrene insulation boards of 35 k

Superstructure
Ground Floor Lv (+3.15)
C173B30340
<BLDG-173> Set up Form work for Gr Floor Columns

8 29-Sep-14 A 04-Nov-14 AReinforced concrete with average compressive


<BLDG-173>
strength
Construct
250 kg/cm2
R.C.Foundation
at 28 daysLv
for(-1.50)
foundation

140 06-Nov-14 A 08-Apr-15


47 06-Nov-14 A 26-Dec-14
8 06-Nov-14 A 30-Nov-14 AForm Work %

08-Apr-15, Superstructure
26-Dec-14, Ground Floor Lv (+3.15)
<BLDG-173> Set up Form work for Gr Floor Columns

C173B30360

<BLDG-173> Fix Reinforcement Bars for Gr Floor Columns

8 06-Nov-14 A 30-Nov-14 ASteel Fixing

C173B30350

<BLDG-173> Cast concrete for Gr Floor Columns

1 30-Nov-14

C173B30370

<BLDG-173> Fix Reinforcement Bars for Gr Floor Slab

14 01-Dec-14

15-Dec-14 Steel Fixing

<BLDG-173> Fix Reinforcement Bars for Gr Floor Slab

C173B30380

<BLDG-173> Set up Form work for Gr Floor Slab

14 01-Dec-14

15-Dec-14 Form Work %

<BLDG-173> Set up Form work for Gr Floor Slab

C173B30390

<BLDG-173> Cast concrete for Gr Floor Slab

C173B30400

<BLDG-173> Dismantle Form work for Gr Floor Slab

First Floor Lv (+6.25)


C173B30410
<BLDG-173> Set up Form work for 1st Floor Columns

<BLDG-173> Fix Reinforcement Bars for Gr Floor Columns

30-Nov-14 Reinforced concrete with average compressive<BLDG-173>


strength 250 kg/cm2
Cast concrete
at 28 days
for Gr
forFloor
columns,
Columns
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days fo

1 16-Dec-14

16-Dec-14 RC with average compressive strength 250 kg/cm2 at


<BLDG-173>
28 days for stairs,
Cast concrete
beams, and
for Gr
slabs
Floor Slab

9 17-Dec-14

26-Dec-14

<BLDG-173> Dismantle Form work for Gr Floor Slab

21-Jan-15
26-Dec-14 Form Work %

21-Jan-15, First Floor Lv (+6.25)


<BLDG-173> Set up Form work for 1st Floor Columns

9 17-Dec-14

26-Dec-14 Steel Fixing

<BLDG-173> Fix Reinforcement Bars for 1st Floor Columns

1 27-Dec-14

27-Dec-14 Reinforced concrete with average compressive strength<BLDG-173>


250 kg/cm2 atCast
28 days
concrete
for columns,
for 1st Floor
Reinforced
Columns
concrete with average compressive strength 250 kg/cm2 at 28 days fo

31 17-Dec-14
9 17-Dec-14

C173B30420

<BLDG-173> Fix Reinforcement Bars for 1st Floor Columns

C173B30430

<BLDG-173> Cast concrete for 1st Floor Columns

C173B30440

<BLDG-173> Fix Reinforcement Bars for 1st Floor Slab

11 28-Dec-14

10-Jan-15

Steel Fixing

<BLDG-173> Fix Reinforcement Bars for 1st Floor Slab

C173B30460

<BLDG-173> Set up Form work for 1st Floor Slab

11 28-Dec-14

10-Jan-15

Form Work %

<BLDG-173> Set up Form work for 1st Floor Slab

C173B30470

<BLDG-173> Cast concrete for 1st Floor Slab

1 11-Jan-15

11-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days


<BLDG-173>
for stairs, beams,
Cast concrete
and slabsfor 1st Floor Slab

C173B30450

<BLDG-173> Dismantle Form work for 1st Floor Slab

9 12-Jan-15

21-Jan-15

<BLDG-173> Dismantle Form work for 1st Floor Slab

15-Feb-15
21-Jan-15 Form Work %

15-Feb-15, Second Floor Lv (+9.35)


<BLDG-173> Set up Form work for 2nd Floor Columns
<BLDG-173> Fix Reinforcement Bars for 2nd Floor Columns

Second Floor Lv (+9.35)


C173B30520
<BLDG-173> Set up Form work for 2nd Floor Columns

31 12-Jan-15
9 12-Jan-15

C173B30530

<BLDG-173> Fix Reinforcement Bars for 2nd Floor Columns

9 12-Jan-15

21-Jan-15

Steel Fixing

C173B30540

<BLDG-173> Cast concrete for 2nd Floor Columns

1 22-Jan-15

22-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-173>
at 28 daysCast
for columns,
concrete Reinforced
for 2nd Floor
concrete
Columns
with average compressive strength 250 kg/cm2 at 28 days fo

C173B30480

<BLDG-173> Set up Form work for 2nd Floor Slab

11 23-Jan-15

04-Feb-15 Form Work %

<BLDG-173> Set up Form work for 2nd Floor Slab

C173B30500

<BLDG-173> Fix Reinforcement Bars for 2nd Floor Slab

11 23-Jan-15

04-Feb-15 Steel Fixing

<BLDG-173> Fix Reinforcement Bars for 2nd Floor Slab

C173B30490

<BLDG-173> Cast concrete for 2nd Floor Slab

1 05-Feb-15

05-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,
<BLDG-173>
beams, and
Cast
slabs
concrete for 2nd Floor Slab

C173B30510

<BLDG-173> Dismantle Form work for 2nd Floor Slab

9 06-Feb-15

15-Feb-15

<BLDG-173> Dismantle Form work for 2nd Floor Slab

10-Mar-15
15-Feb-15 Form Work %

10-Mar-15, Third Floor Lv (+12.45)


<BLDG-173> Set up Form work for 3rd Floor Columns
<BLDG-173> Fix Reinforcement Bars for 3rd Floor Columns

Third Floor Lv (+12.45)


C173B30550
<BLDG-173> Set up Form work for 3rd Floor Columns

31 06-Feb-15
9 06-Feb-15

C173B30570

<BLDG-173> Fix Reinforcement Bars for 3rd Floor Columns

9 06-Feb-15

15-Feb-15 Steel Fixing

C173B30560

<BLDG-173> Cast concrete for 3rd Floor Columns

1 16-Feb-15

16-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28


<BLDG-173>
days for columns,
Cast concrete
Reinforced
for concrete
3rd Floorwith
Columns
average compressive strength 250 kg/cm2 at 28 days fo

C173B30580

<BLDG-173> Set up Form work for 3rd Floor Slab

11 17-Feb-15

28-Feb-15 Form Work %

<BLDG-173> Set up Form work for 3rd Floor Slab

C173B30600

<BLDG-173> Fix Reinforcement Bars for 3rd Floor Slab

11 17-Feb-15

28-Feb-15 Steel Fixing

<BLDG-173> Fix Reinforcement Bars for 3rd Floor Slab

C173B30590

<BLDG-173> Cast concrete for 3rd Floor Slab

C173B30610

<BLDG-173> Dismantle Form work for 3rd Floor Slab

Fourth Floor Lv (+15.55)


C173B30620
<BLDG-173> Set up Form work for 4th Floor Columns
Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

1 01-Mar-15

01-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,
<BLDG-173>
and slabs Cast concrete for 3rd Floor Slab

9 02-Mar-15

10-Mar-15

<BLDG-173> Dismantle Form work for 3rd Floor Slab

03-Apr-15
10-Mar-15 Form Work %

03-Apr-15, Fourth Floor Lv (+15.55)


<BLDG-173> Set up Form work for 4th Floor Columns

31 02-Mar-15
9 02-Mar-15

Page 7 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

C173B30640

<BLDG-173> Fix Reinforcement Bars for 4th Floor Columns

9 02-Mar-15

10-Mar-15 Steel Fixing

C173B30630

<BLDG-173> Cast concrete for 4th Floor Columns

1 11-Mar-15

11-Mar-15

C173B30650

<BLDG-173> Set up Form work for 4th Floor Slab

11 12-Mar-15

23-Mar-15 Form Work %

<BLDG-173> Set up Form work for 4th Floor Slab

C173B30660

<BLDG-173> Fix Reinforcement Bars for 4th Floor Slab

11 12-Mar-15

23-Mar-15 Steel Fixing

<BLDG-173> Fix Reinforcement Bars for 4th Floor Slab

C173B30680

<BLDG-173> Cast concrete for 4th Floor Slab

C173B30670

Oct

Nov

<BLDG-173> Fix Reinforcement Bars for 4th Floor Columns

Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for
<BLDG-173>
columns, Reinforced
Cast concrete
concrete
for 4th
with
Floor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo

1 24-Mar-15

24-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and<BLDG-173>
slabs
Cast concrete for 4th Floor Slab

<BLDG-173> Dismantle Form work for 4th Floor Slab

9 25-Mar-15

03-Apr-15

Roof Floor Lv (+18.55)


C173B30700
<BLDG-173> Set up Form work for Roof Floor Columns/Planted Columns

14 25-Mar-15
2 25-Mar-15

<BLDG-173> Dismantle Form work for 4th Floor Slab

08-Apr-15
26-Mar-15 Form Work %

08-Apr-15, Roof Floor Lv (+18.55)


<BLDG-173> Set up Form work for Roof Floor Columns/Planted Columns
<BLDG-173> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

C173B30720

<BLDG-173> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

2 25-Mar-15

26-Mar-15 Steel Fixing

C173B30710

<BLDG-173> Cast concrete for Roof Floor Columns/Planted Columns

1 28-Mar-15

28-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-173>
Reinforced
Castconcrete
concretewith
for Roof
average
Floorcompressive
Columns/Planted
strength
Columns
250 kg/cm2 at 28 days fo

C173B30740

<BLDG-173> Fix Reinforcement Bars for Roof Slab

4 29-Mar-15

01-Apr-15

Steel Fixing

<BLDG-173> Fix Reinforcement Bars for Roof Slab

C173B30750

<BLDG-173> Set up Form work for Roof Slab

4 29-Mar-15

01-Apr-15

Form Work %

<BLDG-173> Set up Form work for Roof Slab

C173B30690

<BLDG-173> Cast concrete for Roof Slab

1 02-Apr-15

02-Apr-15

RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-173> Cast concrete for Roof Slab

C173B30730

<BLDG-173> Dismantle Form work for Roof Slab

6 03-Apr-15

08-Apr-15

<BLDG-173> Dismantle Form work for Roof Slab

87 30-Mar-15
8 30-Mar-15

02-Jul-15
06-Apr-15

<BLDG-173> Erect Scaffold

04-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply
<BLDG-173>
O.P cement-sand
Apply Facades
plasterPlaster
in two-coat work (base and finish coats)for ext

Exterior Enclosure
C173B30850
<BLDG-173> Erect Scaffold

02-Jul-15, Exterior Enclosure

C173B30810

<BLDG-173> Apply Facades Plaster

24 07-Apr-15

C173B30830

<BLDG-173> Install Shingle Sheets

6 02-May-15

07-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment

C173B30820

<BLDG-173> Install Gypsum Corniche

8 05-May-15

13-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply
<BLDG-173>
and install
Install
gypsum
Gypsum
cornices
Corniche
including paint, 105 mm height middle g

C173B30840

<BLDG-173> Preparation of shingle ( Supporting System & Insulation Works)

8 14-May-15

21-May-15

C173B30880

<BLDG-173> Apply External Paint 1st Coat

10 23-May-15

01-Jun-15

C173B30860

<BLDG-173> Install Handrails for balconies

8 02-Jun-15

10-Jun-15

Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-173>
paintInstall
handrail
Handrails
900 mm
forheight
balconies
3/A-501, Supply and ins

C173B30770

<BLDG-173> Apply External Paint 2nd Coat

7 11-Jun-15

17-Jun-15

paint exterior acrylic water-based washable emulsion paint external wall

C173B30760

<BLDG-173> Install Steel & UPVC Doors & Windows

14 18-Jun-15

02-Jul-15

UPVC Window type (W09) - Two (2) hinged leaves - 900 mm x 800 mm., UPVC Window type (W10) - circular fixed leaf
<BLDG-173>
with double
Install
glassSteel
- diameter
& UPVC
900Doors
mm., &
UPVC
Windows
Window

C173B30780

<BLDG-173> Install Aluminum Windows

12 18-Jun-15

30-Jun-15

Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - <BLDG-173>
with plexi fill - Install
400 mm
Aluminum
x 1200 mm.
Windows

C173B30790

<BLDG-173> Dismantle Scaffold

6 18-Jun-15

24-Jun-15

C173B30870

<BLDG-173> Install Appliqus

3 18-Jun-15

21-Jun-15

C173B30800

<BLDG-173> Install Rough Stone Skirting

8 25-Jun-15

02-Jul-15

Aswan rough stone 110 mm height Aswan rough stone skirting., Aswan rough stone 150 mm height Aswan rough stone
<BLDG-173>
skirting.
Install Rough Stone Skirting

87 30-Mar-15
4 30-Mar-15

02-Jul-15
02-Apr-15

02-Jul-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max.
<BLDG-173>
1200 kg/m Cast Light Weight Concrete for slopes

Roofing
C173B30330

<BLDG-173> Cast Light Weight Concrete for slopes

C173B30300

<BLDG-173> Apply Roofing Plaster

C173B30220

<BLDG-173> Install Steel Ladder

C173B30230
C173B30270

<BLDG-173> Install Shingle Sheets

<BLDG-173> Preparation of shingle ( Supporting System & Insulation W


<BLDG-173> Apply External Paint 1st Coat
<BLDG-173> Apply External Paint 2nd Coat

<BLDG-173> Dismantle Scaffold


<BLDG-173> Install Appliqus

9 03-Apr-15

12-Apr-15

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

15 14-Apr-15

30-Apr-15

Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508

<BLDG-173> Apply reinforced bituminous water proofing membrane

6 14-Apr-15

19-Apr-15

4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof. <BLDG-173> Apply reinforced bituminous water proofing membrane

<BLDG-173> Test Water proofing membrane

3 20-Apr-15

22-Apr-15

<BLDG-173> Test Water proofing membrane

C173B30250

<BLDG-173> Apply Cement mortar screed

4 23-Apr-15

28-Apr-15

<BLDG-173> Apply Cement mortar screed

C173B30240

<BLDG-173> Apply Extruded polystyrene

3 29-Apr-15

01-May-15

<BLDG-173> Apply Extruded polystyrene

C173B30260

<BLDG-173> Cast protection concrete layer

2 02-May-15

03-May-15

<BLDG-173> Cast protection concrete layer

C173B30280

<BLDG-173> Install Terr azzo Tiles

10 17-May-15

27-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting. <BLDG-173> Install Terr azzo Tiles

C173B30290

<BLDG-173> Install Ceramic Tiles

18 28-May-15

15-Jun-15

Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors,
<BLDG-173>
100 mm Install
height Ceramic
ceramic tiles
Tilesfor skirting.

C173B30310

<BLDG-173> Apply Paint for Roof

10 16-Jun-15

26-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C173B30320

<BLDG-173> Install of Roof Steel Doors

6 27-Jun-15

02-Jul-15

Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf

Interior Construction
C173C30280
<BLDG-173> Construct CUM Works for Gr floor

<BLDG-173> Apply Roofing Plaster


<BLDG-173> Install Steel Ladder

<BLDG-173> Apply Paint for Roof


<BLDG-173> Install of Roof Steel Doors

175 22-Jan-15
12 22-Jan-15

05-Aug-15
05-Aug-15, Interior Construction
04-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-173>
exceed 2000
Construct
kg/m3, Supply
CUM Works
and build
for Gr
solid
floor
cement block unit machine-made with density not exceed 20

C173C30300

<BLDG-173> Construct CUM Works for 1st floor

10 26-Jan-15

05-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-173>
exceed 2000
Construct
kg/m3, Supply
CUM Works
and build
for solid
1st floor
cement block unit machine-made with density not exceed 20

C173C30310

<BLDG-173> Construct CUM Works for 2nd floor

12 16-Feb-15

28-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-173>
2000 kg/m3,
Construct
Supply and
CUM
build
Works
solidfor
cement
2nd floor
block unit machine-made with density not exceed 20

C173C30330

<BLDG-173> Construct CUM Works for 3rd floor

12 11-Mar-15

23-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000<BLDG-173>
kg/m3, Supply
Construct
and buildCUM
solid Works
cementfor
block
3rd unit
floormachine-made with density not exceed 20

C173C30260

<BLDG-173> Construct CUM for Parapet

4 25-Mar-15

29-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-173>
Supply and
Construct
build solid
CUMcement
for Parapet
block unit machine-made with density not exceed 20

C173C30240

<BLDG-173> Construct CUM Works for 4th floor

8 04-Apr-15

12-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-173>
Supply and build
Construct
solid cement
CUM Works
block for
unit4th
machine-made
floor
with density not exceed 20

C173C30270

<BLDG-173> Construct Interior CUM Works for Roof

4 09-Apr-15

14-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,<BLDG-173>
Supply and build
Construct
solid cement
Interiorblock
CUMunit
Works
machine-made
for Roof
with density not exceed 20

C173C30250

<BLDG-173> Install Ducts work for 4th floor

2 26-Jul-15

27-Jul-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement<BLDG-173>
block unit machine-made
Install Ducts with
workdensity
for 4th not
floorexcee

C173C30220

<BLDG-173> Install Ducts work for 3rd floor

2 28-Jul-15

29-Jul-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement<BLDG-173>
block unit machine-made
Install Ductswith
workdensity
for 3rdnot
floor
excee

C173C30320

<BLDG-173> Install Ducts work for 2nd floor

2 30-Jul-15

01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-173>
unit machine-made
Install Ductswith
work
density
for 2nd
notfloor
excee

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 8 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

C173C30230

<BLDG-173> Install Ducts work for 1st floor

2 02-Aug-15

03-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-173>
unit machine-made
Install Ducts
with
work
density
for 1st
notfloor
excee

C173C30290

<BLDG-173> Install Ducts work for Gr floor

2 04-Aug-15

05-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-173>
unit machine-made
Install Ducts
withwork
density
for Gr
notfloor
excee

Entrance & Stairs


C173C30140
<BLDG-173> Apply Plaster to Stair Case

59 14-Apr-15
23 14-Apr-15

16-Jun-15
09-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

16-Jun-15, Entrance & Stairs


<BLDG-173> Apply Plaster to Stair Case

C173C30150

<BLDG-173> Install Marble for Entrance & Stairs

12 10-May-15

21-May-15 terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340
<BLDG-173>
mm width,Install
StoneMarble
Pavingfor
and
Entrance
Flooring& Light
Stairsbeige terriesta marble

C173C30130

<BLDG-173> Apply Paint for Entrance & Stairs

12 23-May-15

03-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C173C30180

<BLDG-173> Install Handrails for Stairs

6 04-Jun-15

10-Jun-15

Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.

C173C30170

<BLDG-173> Install Units Wooden Doors

6 11-Jun-15

16-Jun-15

wooden solid core doors Door type (D09) - hinged leaf - 900 mm x 2200 mm., wooden solid core doors Door type
<BLDG-173>
(D07) - hinged
Install
leafUnits
- 1100
Wooden
mm x 2200
Doorsmm.

171 15-Jan-15
3 15-Jan-15

25-Jul-15
18-Jan-15

25-Jul-15, Plumbing
UPVC pipes and fittings, underground 75mm, UPVC pipes and <BLDG-173>
fittings, underground
Install Plumbing
110mm, UPVC
Fittingspipes
Under
and
SOG
fittings, underground 160mm, Polypropylene Pipes and Fittings

Plumbing
C173D50470

<BLDG-173> Install Plumbing Fittings Under SOG

<BLDG-173> Apply Paint for Entrance & Stairs


<BLDG-173> Install Handrails for Stairs

C173D50420

<BLDG-173> Install Drainage Risers

14 14-Apr-15

29-Apr-15

Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-173>
UPVC Pipes
Installand
Drainage
FittingsRisers
For Drainage above ground 75mm, UPVC Pip

C173D50460

<BLDG-173> Install water Risers

14 14-Apr-15

29-Apr-15

Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings
<BLDG-173>
includingInstall
items water
mentioned
Risers
25mm, Polypropylene Pipes and Fittings includ

C173D50430

<BLDG-173> Install Roof sainatary work

12 04-May-15

16-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 100mm, Roof drains type (RD2), cast iron<BLDG-173>
oblique grate,Install
side outlet
Roof sainatary
80 mm work

C173D50450

<BLDG-173> Construct Inspection chambers & connections

15 25-Jun-15

10-Jul-15

C173D50440

<BLDG-173> Test Drainage & water Riser s

10 11-Jul-15

25-Jul-15

Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25<BLDG-173>
mm, Valves are
Construct
classified
Inspection
according
chambers
to type Gate
& connec
Valv
<BLDG-173> Test Drainage & water R iser s

Electrical
C173D50310

<BLDG-173> Install Electrical conduits for Gr Floor Slab

188 03-Dec-14
2 03-Dec-14

C173D50320

<BLDG-173> Install Electrical conduits for 1st Floor Slab

2 29-Dec-14

30-Dec-14 Indoor wiring for one lighting outlet including wires 3(1x3)<BLDG-173>
mm, One lighting
Installoutlet
Electrical
including
conduits
empty
for "PVC"
1st Floor
conduits
Slab

C173D50410

<BLDG-173> Install Electrical conduits for 2nd Floor Slab

2 24-Jan-15

26-Jan-15

C173D50360

<BLDG-173> Install Electrical conduits for 3rd Floor Slab

2 18-Feb-15

19-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-173>
outlet including
Install
empty
Electrical
"PVC"
conduits
conduits
for 3rd Floor Slab

C173D50330

<BLDG-173> Install Electrical conduits for 4th Floor Slab

2 14-Mar-15

15-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet<BLDG-173>
including empty
Install
"PVC"
Electrical
conduits
conduits for 4th Floor Slab

C173D50340

<BLDG-173> Install Electrical conduits for Roof Slab

1 28-Mar-15

28-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-173>
empty "PVC"
Installconduits
Electrical conduits for Roof Slab

C173D50270

<BLDG-173> Install Electrical Risers

6 30-Mar-15

04-Apr-15

Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple
<BLDG-173>
Play SystemInstall
FloorElectrical
pull box,Risers
Light Current Systems Two UPVC 25 mm Conduits for

C173D50390

<BLDG-173> Install Earthing System

6 30-Mar-15

04-Apr-15

600/1000 V, multicore copper conductor, PVC/PVC cables (4 x 35) mm, 600/1000 V, multicore
<BLDG-173>
Aluminium
Install
conductor,
Earthing PVC/PVC
System cables (3 x 240+120) mm, 600/1000 V, multico

C173D50280

<BLDG-173> Install of Panel board

3 10-May-15

12-May-15 40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type Push
<BLDG-173>
Button (P.B)Install of Panel board

C173D50400

<BLDG-173> Install Conduits for intercom system

3 10-May-15

12-May-15 Intercom System Provision for door master unit, Intercom System One UPVC 25 mm conduit for risers/
<BLDG-173>
unit
Install Conduits for intercom system

C173D50290

<BLDG-173> Install Distribution Panel

C173D50350

<BLDG-173> Connect between Riser & DP

C173D50370

<BLDG-173> Install Cables

C173D50380
C173D50300
C173D50260

14 13-May-15
3 28-May-15

28-Jun-15
28-Jun-15, Electrical
04-Dec-14 Indoor wiring for one lighting outlet including wires
<BLDG-173>
3(1x3) mm,Install
One lighting
Electrical
outlet
conduits
including
for Gr
empty
Floor"PVC"
Slab conduits
Indoor wiring for one lighting outlet including wires 3(1x3) mm, One
<BLDG-173>
lighting outlet
Install
including
Electrical
empty
conduits
"PVC"for
conduits
2nd Floor Slab

27-May-15 Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution
<BLDG-173>
Panels Install
(DB-SER-1),
Distribution
LowPanel
Voltage Distribution Panels (DB-SER
30-May-15 Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m

<BLDG-173> Connect between Riser & DP

21 28-May-15

18-Jun-15

450/750 V Single Core Copper Conductor, PVC cables (1x 35) mm, 450/750 V Single Core Copper Conductor, <BLDG-173>
PVC cables (1x
Install
50) mm,
Cables
450/750 V Single Core Copper Con

<BLDG-173> Install Wiring Devices&Disconnect switches

2 31-May-15

01-Jun-15

Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power<BLDG-173>
outlet with 3(1x6)
Installmm,
Wiring
Wiring
Devices&Disconnect
Devices and Disconnectors
switches Load B

<BLDG-173> Test elec. system

6 20-Jun-15

25-Jun-15

<BLDG-173> Install Lighting fixtures

3 26-Jun-15

28-Jun-15

9 06-Aug-15
3 06-Aug-15

15-Aug-15
08-Aug-15

15-Aug-15, Completion Inspection


<BLDG-173> Punch Out

Completion Inspection
C173H10130
<BLDG-173> Punch Out

<BLDG-173> Test elec. system


Lighting fixtures Type F5, Lighting fixtures Type F4, Lighting fixtures Type F3, Lighting fixtures Type F2

<BLDG-173> Install Lighting fixtures

C173H10140

<BLDG-173> Pre-final inspection

3 09-Aug-15

11-Aug-15

<BLDG-173> Pre-final inspection

C173H10150

<BLDG-173> Final inspection

3 12-Aug-15

15-Aug-15

<BLDG-173> Final inspection

321 16-Aug-14 A 15-Aug-15


196 16-Aug-14 A 26-Mar-15
1 16-Aug-14 A 16-Aug-14 A

Building 172 (Type# I.A6 b)


Site Preparation
C172G10130
<BLDG-172> Prep for Excavation

15-Aug-15, Building 172 (Type# I.A6 b)


26-Mar-15, Site Preparation
<BLDG-172> Prep for Excavation

C172G10110

<BLDG-172> Excavate to Foundation Levels

5 17-Aug-14 A 03-Sep-14 A Excavation in any <BLDG-172>


type of soil except
Excavate
rock for
to Foundation
foundation, Disposal
Levels of surplus materials outside the site boundary to nearest dump.

C172G10100

<BLDG-172> Trim the bottoms of Excavate

1 04-Sep-14 A 04-Sep-14 A

C172G10120

<BLDG-172> Backfill for Foundation

2 13-Jan-15

14-Jan-15

C172G10140

<BLDG-172> Backfill around Building

5 22-Mar-15

26-Mar-15

Substructure
Foundation
Foundation at Level (-2.25)
C172A10100
<BLDG-172> Construct P.C. F oundation Lv (- 2.25)
C172A10110

<BLDG-172> Construct R.C.Foundation Lv (-2.25)

C172A10170

<BLDG-172> Construct CUM above Ground Beam/Internal backfill

C172A10120

133
133
133
2

04-Sep-14 A
04-Sep-14 A
04-Sep-14 A
04-Sep-14 A

<BLDG-172> Trim the bottoms of Excavate


Backfilling, with suitable excavated soil under foundation level <BLDG-172> Backfill for Foundation
<BLDG-172> Backfill around Building

24-Jan-15
24-Jan-15, Substructure
24-Jan-15
24-Jan-15, Foundation
24-Jan-15
24-Jan-15, Foundation at Level (-2.25)
14-Sep-14 A Supply and cast plain <BLDG-172>
concrete with average
Constructcompressive
P.C. F oundation
strength
Lv (-200
2.25)
kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

2 15-Sep-14 A 27-Sep-14 A Reinforced concrete with average


<BLDG-172>
compressive
Construct
strength
R.C.Foundation
250 kg/cm2
Lvat(-2.25)
28 days for foundation
12 27-Dec-14

10-Jan-15

Backfilling, with suitable excavated soil under foundation level,


<BLDG-172>
Supply and Construct
build solid CUM
cement
above
blockGround
unit machine-made
Beam/Internal
with
backfill
density not exceed 2000 kg/m3

<BLDG-172> Apply Dampproofing for Foundation Lv (-2.25)

2 11-Jan-15

12-Jan-15

Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-172>
with bituminous
Applybase
Dampproofing for Foundation Lv (-2.25)

C172A10130

<BLDG-172> Construct S.O.G Lv (+0.05)/Install PE sheets

3 19-Jan-15

21-Jan-15

4 mm thick bituminous waterproofing membrane with 50 mm cement


<BLDG-172>
mortar screed
Construct
for slab
S.O.G
on grade,
Lv (+0.05)/Install
Supply andPE
install
sheets
50 mm thick extruded polystyrene insulation boards of

C172A10180

<BLDG-172> Construct Remaining S.O.G Lv (+0.05)

3 22-Jan-15

24-Jan-15

Supply and cast plain concrete with average compressive strength


<BLDG-172>
200 kg/cm2 at
Construct
28 daysRemaining
100mm, Reinforced
S.O.G Lv concrete
(+0.05) with average compressive strength 250 kg/cm2 at 28 d

118 04-Sep-14 A 13-Jan-15

Foundation at Level (-1.50)


Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 9 of 29

13-Jan-15, Foundation at Level (-1.50)


TASK filter: All Activities
Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

C063A10260

<BLDG-172> Construct P.C. F oundation Lv (- 1.50)

2 04-Sep-14 A 14-Sep-14 A Supply and cast plain <BLDG-172>


concrete with average
Constructcompressive
P.C. F oundation
strength
Lv (-200
1.50)
kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

C063A10270

<BLDG-172> Construct R.C.Foundation Lv (-1.50)

8 01-Oct-14 A 26-Oct-14 A Reinforced concrete with average compressive


<BLDG-172>strength
Construct
250R.C.Foundation
kg/cm2 at 28 days
Lv (-1.50)
for foundation

C063A10300

<BLDG-172> Construct CUM above Ground Beam Lv (-1.50)/Internal backfill

12 27-Dec-14

10-Jan-15

Backfilling, with suitable excavated soil under foundation level,


<BLDG-172>
Supply and Construct
build solid CUM
cement
above
blockGround
unit machine-made
Beam Lv (-1.50)/Internal
with density not
backfill
exceed 2000 kg/m3

C063A10280

<BLDG-172> Apply Dampproofing for Foundation Lv (-1.50)

1 11-Jan-15

11-Jan-15

Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-172>
with bituminous
Applybase
Dampproofing for Foundation Lv (-1.50)

C063A10290

<BLDG-172> Construct S.O.G Lv (+0.05)/Install PE sheets

3 11-Jan-15

13-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-172>
at 28 days
Construct
for slab
S.O.G
on grade,
Lv (+0.05)/Install
Supply and install
PE sheets
50 mm thick extruded polystyrene insulation boards of 35 k

Superstructure
Ground Floor Lv (+3.15)
C172B10120
<BLDG-172> Fix Reinforcement Bars for Gr Floor Columns

160 28-Oct-14 A 08-Apr-15


67 28-Oct-14 A 26-Dec-14
10 28-Oct-14 A 24-Nov-14 ASteel Fixing

C172B10100

<BLDG-172> Set up Form work for Gr Floor Columns

C172B10110

<BLDG-172> Cast concrete for Gr Floor Columns

C172B10130

<BLDG-172> Fix Reinforcement Bars for Gr Floor Slab

15 26-Nov-14 A 15-Dec-14 Steel Fixing

<BLDG-172> Fix Reinforcement Bars for Gr Floor Slab

C172B10140

<BLDG-172> Set up Form work for Gr Floor Slab

15 26-Nov-14 A 15-Dec-14 Form Work %

<BLDG-172> Set up Form work for Gr Floor Slab

C172B10150

<BLDG-172> Cast concrete for Gr Floor Slab

C172B10160

<BLDG-172> Dismantle Form work for Gr Floor Slab

First Floor Lv (+6.25)


C172B10170
<BLDG-172> Set up Form work for 1st Floor Columns

10 29-Oct-14 A 24-Nov-14 AForm Work %

08-Apr-15, Superstructure
26-Dec-14, Ground Floor Lv (+3.15)
<BLDG-172> Fix Reinforcement Bars for Gr Floor Columns
<BLDG-172> Set up Form work for Gr Floor Columns

1 25-Nov-14 A 25-Nov-14 AReinforced concrete with average compressive


<BLDG-172>
strength 250Cast
kg/cm2
concrete
at 28for
days
Grfor
Floor
columns,
Columns
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days fo

1 16-Dec-14

16-Dec-14 RC with average compressive strength 250 kg/cm2 at


<BLDG-172>
28 days for stairs,
Cast concrete
beams, and
for Gr
slabs
Floor Slab

9 17-Dec-14

26-Dec-14

<BLDG-172> Dismantle Form work for Gr Floor Slab

21-Jan-15
26-Dec-14 Form Work %

21-Jan-15, First Floor Lv (+6.25)


<BLDG-172> Set up Form work for 1st Floor Columns

9 17-Dec-14

26-Dec-14 Steel Fixing

<BLDG-172> Fix Reinforcement Bars for 1st Floor Columns

27-Dec-14 Reinforced concrete with average compressive strength<BLDG-172>


250 kg/cm2 atCast
28 days
concrete
for columns,
for 1st Floor
Reinforced
Columns
concrete with average compressive strength 250 kg/cm2 at 28 days fo

31 17-Dec-14
9 17-Dec-14

C172B10180

<BLDG-172> Fix Reinforcement Bars for 1st Floor Columns

C172B10190

<BLDG-172> Cast concrete for 1st Floor Columns

1 27-Dec-14

C172B10220

<BLDG-172> Set up Form work for 1st Floor Slab

11 28-Dec-14

10-Jan-15

Form Work %

<BLDG-172> Set up Form work for 1st Floor Slab

C172B10200

<BLDG-172> Fix Reinforcement Bars for 1st Floor Slab

11 28-Dec-14

10-Jan-15

Steel Fixing

<BLDG-172> Fix Reinforcement Bars for 1st Floor Slab

C172B10230

<BLDG-172> Cast concrete for 1st Floor Slab

1 11-Jan-15

11-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days


<BLDG-172>
for stairs, beams,
Cast concrete
and slabsfor 1st Floor Slab

C172B10210

<BLDG-172> Dismantle Form work for 1st Floor Slab

9 12-Jan-15

21-Jan-15

<BLDG-172> Dismantle Form work for 1st Floor Slab

15-Feb-15
21-Jan-15 Form Work %

15-Feb-15, Second Floor Lv (+9.35)


<BLDG-172> Set up Form work for 2nd Floor Columns
<BLDG-172> Fix Reinforcement Bars for 2nd Floor Columns

Second Floor Lv (+9.35)


C172B10240
<BLDG-172> Set up Form work for 2nd Floor Columns

31 12-Jan-15
9 12-Jan-15

C172B10250

<BLDG-172> Fix Reinforcement Bars for 2nd Floor Columns

9 12-Jan-15

21-Jan-15

Steel Fixing

C172B10260

<BLDG-172> Cast concrete for 2nd Floor Columns

1 22-Jan-15

22-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-172>
at 28 daysCast
for columns,
concrete Reinforced
for 2nd Floor
concrete
Columns
with average compressive strength 250 kg/cm2 at 28 days fo

C172B10270

<BLDG-172> Set up Form work for 2nd Floor Slab

11 23-Jan-15

04-Feb-15 Form Work %

<BLDG-172> Set up Form work for 2nd Floor Slab

C172B10290

<BLDG-172> Fix Reinforcement Bars for 2nd Floor Slab

11 23-Jan-15

04-Feb-15 Steel Fixing

<BLDG-172> Fix Reinforcement Bars for 2nd Floor Slab

C172B10280

<BLDG-172> Cast concrete for 2nd Floor Slab

1 05-Feb-15

05-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,
<BLDG-172>
beams, and
Cast
slabs
concrete for 2nd Floor Slab

C172B10300

<BLDG-172> Dismantle Form work for 2nd Floor Slab

9 06-Feb-15

15-Feb-15

<BLDG-172> Dismantle Form work for 2nd Floor Slab

10-Mar-15
15-Feb-15 Form Work %

10-Mar-15, Third Floor Lv (+12.45)


<BLDG-172> Set up Form work for 3rd Floor Columns
<BLDG-172> Fix Reinforcement Bars for 3rd Floor Columns

Third Floor Lv (+12.45)


C172B10310
<BLDG-172> Set up Form work for 3rd Floor Columns

31 06-Feb-15
9 06-Feb-15

C172B10330

<BLDG-172> Fix Reinforcement Bars for 3rd Floor Columns

9 06-Feb-15

15-Feb-15 Steel Fixing

C172B10320

<BLDG-172> Cast concrete for 3rd Floor Columns

1 16-Feb-15

16-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28


<BLDG-172>
days for columns,
Cast concrete
Reinforced
for concrete
3rd Floorwith
Columns
average compressive strength 250 kg/cm2 at 28 days fo

C172B10340

<BLDG-172> Set up Form work for 3rd Floor Slab

11 17-Feb-15

28-Feb-15 Form Work %

<BLDG-172> Set up Form work for 3rd Floor Slab

C172B10360

<BLDG-172> Fix Reinforcement Bars for 3rd Floor Slab

11 17-Feb-15

28-Feb-15 Steel Fixing

<BLDG-172> Fix Reinforcement Bars for 3rd Floor Slab

C172B10350

<BLDG-172> Cast concrete for 3rd Floor Slab

C172B10370

<BLDG-172> Dismantle Form work for 3rd Floor Slab

Fourth Floor Lv (+15.55)


C172B10400
<BLDG-172> Fix Reinforcement Bars for 4th Floor Columns

1 01-Mar-15

01-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,
<BLDG-172>
and slabs Cast concrete for 3rd Floor Slab

9 02-Mar-15

10-Mar-15

<BLDG-172> Dismantle Form work for 3rd Floor Slab

03-Apr-15
10-Mar-15 Steel Fixing

03-Apr-15, Fourth Floor Lv (+15.55)


<BLDG-172> Fix Reinforcement Bars for 4th Floor Columns

9 02-Mar-15

10-Mar-15 Form Work %

<BLDG-172> Set up Form work for 4th Floor Columns

11-Mar-15

31 02-Mar-15
9 02-Mar-15

C172B10380

<BLDG-172> Set up Form work for 4th Floor Columns

C172B10390

<BLDG-172> Cast concrete for 4th Floor Columns

1 11-Mar-15

C172B10410

<BLDG-172> Set up Form work for 4th Floor Slab

11 12-Mar-15

23-Mar-15 Form Work %

<BLDG-172> Set up Form work for 4th Floor Slab

C172B10420

<BLDG-172> Fix Reinforcement Bars for 4th Floor Slab

11 12-Mar-15

23-Mar-15 Steel Fixing

<BLDG-172> Fix Reinforcement Bars for 4th Floor Slab

C172B10440

<BLDG-172> Cast concrete for 4th Floor Slab

1 24-Mar-15

24-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and<BLDG-172>
slabs
Cast concrete for 4th Floor Slab

C172B10430

<BLDG-172> Dismantle Form work for 4th Floor Slab

9 25-Mar-15

03-Apr-15

Roof Floor Lv (+18.55)


C172B10450
<BLDG-172> Set up Form work for Roof Floor Columns/Planted Columns

14 25-Mar-15
2 25-Mar-15

Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for
<BLDG-172>
columns, Reinforced
Cast concrete
concrete
for 4th
with
Floor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo

<BLDG-172> Dismantle Form work for 4th Floor Slab

08-Apr-15
26-Mar-15 Form Work %

08-Apr-15, Roof Floor Lv (+18.55)


<BLDG-172> Set up Form work for Roof Floor Columns/Planted Columns
<BLDG-172> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

C172B10470

<BLDG-172> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

2 25-Mar-15

26-Mar-15 Steel Fixing

C172B10460

<BLDG-172> Cast concrete for Roof Floor Columns/Planted Columns

1 28-Mar-15

28-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-172>
Reinforced
Castconcrete
concretewith
for Roof
average
Floorcompressive
Columns/Planted
strength
Columns
250 kg/cm2 at 28 days fo

C172B10490

<BLDG-172> Fix Reinforcement Bars for Roof Slab

3 29-Mar-15

31-Mar-15 Steel Fixing

<BLDG-172> Fix Reinforcement Bars for Roof Slab

C172B10500

<BLDG-172> Set up Form work for Roof Slab

3 29-Mar-15

31-Mar-15 Form Work %

<BLDG-172> Set up Form work for Roof Slab

C172B10510

<BLDG-172> Cast concrete for Roof Slab

1 02-Apr-15

02-Apr-15

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-172> Cast concrete for Roof Slab

Page 10 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name
C172B10480

Original Start
Duration

<BLDG-172> Dismantle Form work for Roof Slab

Exterior Enclosure
C172B20240
<BLDG-172> Erect Scaffold

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

6 03-Apr-15

08-Apr-15

<BLDG-172> Dismantle Form work for Roof Slab

99 30-Mar-15
12 30-Mar-15

15-Jul-15
11-Apr-15

10-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply
<BLDG-172>
O.P cement-sand
Apply Facades
plaster inPlaster
two-coat work (base and finish coats)for ext

15-Jul-15, Exterior Enclosure


<BLDG-172> Erect Scaffold

C172B20180

<BLDG-172> Apply Facades Plaster

25 12-Apr-15

C172B20220

<BLDG-172> Install Shingle Sheets

6 07-May-15

C172B20200

<BLDG-172> Install Gypsum Corniche

13 11-May-15

24-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply
<BLDG-172>
and install gypsum
Install Gypsum
cornicesCorniche
including paint, 105 mm height middle g

C172B20230

<BLDG-172> Preparation of shingle ( Supporting System & Insulation Works)

10 25-May-15

03-Jun-15

C172B20190

<BLDG-172> Apply External Paint 1st Coat

10 04-Jun-15

14-Jun-15

C172B20250

<BLDG-172> Install Handrails for balconies

8 15-Jun-15

23-Jun-15

Supply and install 550 mm height metal unit fixed to block wall, as shown on drawing No. A-203., Supply and install <BLDG-172>
mild steel withInstall
electrostatic
Handrails
paint
forhandrail
balconies
600 mm height, Su

C172B20490

<BLDG-172> Apply External Paint 2nd Coat

7 24-Jun-15

30-Jun-15

paint exterior acrylic water-based washable emulsion paint external wall

C172B20210

<BLDG-172> Install Appliqus

3 01-Jul-15

04-Jul-15

C172B20500

<BLDG-172> Install Aluminum Windows

12 01-Jul-15

13-Jul-15

C172B20510

<BLDG-172> Dismantle Scaffold

C172B20150

<BLDG-172> Install Steel & UPVC Doors & Windows

C172B20170

<BLDG-172> Install Rough Stone Skirting

Roofing
C172B30130

<BLDG-172> Cast Light Weight Concrete for slopes

13-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment

<BLDG-172> Install Shingle Sheets

<BLDG-172> Preparation of shingle ( Supporting System & Insulat


<BLDG-172> Apply External Paint 1st Coat
<BLDG-172> Apply External Paint 2nd Coat
<BLDG-172> Install Appliqus
Window type (W16) - hinged leaf - with plexi fill - 400 mm x 1200 mm., Aluminum Window type (W15) - hinged leaf - with<BLDG-172>
plexi fill - 500 Install
mm x Aluminum
1200 mm. Windows

6 01-Jul-15

07-Jul-15

14 01-Jul-15

15-Jul-15

Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge leaves
<BLDG-172>
1400 mm
Install
x 2850
Steelmm,
& UPVC
UPVCDoors
Door type
& Window
(D03)

<BLDG-172> Dismantle Scaffold

8 08-Jul-15

15-Jul-15

Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.
<BLDG-172> Install Rough Stone Skirting

91 30-Mar-15
4 30-Mar-15

07-Jul-15
02-Apr-15

07-Jul-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max.
<BLDG-172>
1200 kg/m Cast Light Weight Concrete for slopes

C172B30190

<BLDG-172> Apply Roofing Plaster

9 03-Apr-15

12-Apr-15

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

C172B30110

<BLDG-172> Apply reinforced bituminous water proofing membrane

6 14-Apr-15

19-Apr-15

4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof. <BLDG-172> Apply reinforced bituminous water proofing membrane

C172B30160

<BLDG-172> Test Water proofing membrane

3 20-Apr-15

22-Apr-15

<BLDG-172> Test Water proofing membrane

C172B30140

<BLDG-172> Apply Cement mortar screed

4 23-Apr-15

28-Apr-15

<BLDG-172> Apply Cement mortar screed

C172B30120

<BLDG-172> Apply Extruded polystyrene

3 29-Apr-15

01-May-15

<BLDG-172> Apply Extruded polystyrene

C172B30150

<BLDG-172> Cast protection concrete layer

2 02-May-15

03-May-15

<BLDG-172> Cast protection concrete layer

C172B30170

<BLDG-172> Install Terr azzo Tiles

10 17-May-15

27-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting. <BLDG-172> Install Terr azzo Tiles

C172B30180

<BLDG-172> Install Ceramic Tiles

18 28-May-15

15-Jun-15

Ceramic tiles for floors, 100 mm height ceramic tiles for skirting., Ceramic tiles for floors, set on 20 mm thick. cement
<BLDG-172>
mortar bed,and
Install Ceramic
30 mm thick.
Tilessand layer.

C172B30200

<BLDG-172> Apply Paint for Roof

10 16-Jun-15

26-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C172B30100

<BLDG-172> Install Steel Ladder

10 27-Jun-15

07-Jul-15

Interior Construction
C172C10150
<BLDG-172> Construct CUM Works for Gr floor

<BLDG-172> Apply Roofing Plaster

<BLDG-172> Apply Paint for Roof


<BLDG-172> Install Steel Ladder

184 14-Jan-15
10 14-Jan-15

07-Aug-15
07-Aug-15, Interior Construction
24-Jan-15 Supply and build hollow cement block unit machine-made with density
<BLDG-172>
not exceed
Construct
1600 kg/m3,
CUMSupply
Worksand
for Gr
build
floor
hollow cement block unit machine-made with density not excee

C172C10170

<BLDG-172> Construct CUM Works for 1st floor

10 26-Jan-15

05-Feb-15 Supply and build hollow cement block unit machine-made with density<BLDG-172>
not exceed 1600
Construct
kg/m3,CUM
Supply
Works
and build
for 1st
hollow
floor cement block unit machine-made with density not excee

C172C10180

<BLDG-172> Construct CUM Works for 2nd floor

10 16-Feb-15

25-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-172>
2000 kg/m3,
Construct
Supply and
CUMbuild
Works
solidforcement
2nd floor
block unit machine-made with density not exceed 20

C172C10200

<BLDG-172> Construct CUM Works for 3rd floor

10 11-Mar-15

21-Mar-15 Supply and build hollow cement block unit machine-made with density not exceed 1600
<BLDG-172>
kg/m3, Supply
Construct
and build
CUM
hollow
Works
cement
for 3rdblock
floorunit machine-made with density not excee

C172C10130

<BLDG-172> Construct CUM for Parapet

4 25-Mar-15

29-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-172>
Supply and
Construct
build solid
CUMcement
for Parapet
block unit machine-made with density not exceed 20

C172C10110

<BLDG-172> Construct CUM Works for 4th floor

C172C10140

10 04-Apr-15

15-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,<BLDG-172>
Supply and build
Construct
solid cement
CUM Works
block unit
for 4th
machine-made
floor
with density not exceed 20

<BLDG-172> Construct Interior CUM Works for Roof

3 09-Apr-15

12-Apr-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3,
<BLDG-172>
Supply andConstruct
build hollow
Interior
cement
CUM
block
Works
unitfor
machine-made
Roof
with density not excee

C172C10120

<BLDG-172> Install Ducts work for 4th floor

2 28-Jul-15

29-Jul-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

C172C10210

<BLDG-172> Install Ducts work for 3rd floor

2 30-Jul-15

01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-172> Install Ducts work for 3rd floor

C172C10190

<BLDG-172> Install Ducts work for 2nd floor

2 02-Aug-15

03-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-172> Install Ducts work for 2nd floor

C172C10100

<BLDG-172> Install Ducts work for 1st floor

2 04-Aug-15

05-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-172> Install Ducts work for 1st floor

C172C10160

<BLDG-172> Install Ducts work for Gr floor

2 06-Aug-15

07-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

Entrance & Stairs


C172C20120
<BLDG-172> Apply Plaster to Stair Case

61 16-Apr-15
26 16-Apr-15

21-Jun-15
14-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

<BLDG-172> Install Ducts work for 4th floor

<BLDG-172> Install Ducts work for Gr floor


21-Jun-15, Entrance & Stairs
<BLDG-172> Apply Plaster to Stair Case

C172C20130

<BLDG-172> Install Marble for Entrance & Stairs

12 15-May-15

27-May-15 20 mm thick., and 100 mm height light beige terriesta marble skirting., 30 mm thick. light beige terriesta marble
<BLDG-172>
polished landing,
Install Marble
set onfor
20Entrance
mm thick.&mortar
Stairs bed, Stone Paving

C172C20100

<BLDG-172> Apply Paint for Entrance & Stairs

12 28-May-15

09-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C172C20170

<BLDG-172> Install Handrails for Stairs

6 10-Jun-15

15-Jun-15

Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.

C172C20160

<BLDG-172> Install Units Wooden Doors

5 16-Jun-15

21-Jun-15

wooden solid core doors Door type (D09) - hinged leaf - 900 mm x 2200 mm., wooden solid core doors Door type<BLDG-172>
(D07) - hinged
Install
leaf -Units
1100Wooden
mm x 2200
Doors
mm.

173 15-Jan-15
3 15-Jan-15

27-Jul-15
18-Jan-15

27-Jul-15, Plumbing
UPVC pipes and fittings, underground 75mm, UPVC pipes and <BLDG-172>
fittings, underground
Install Plumbing
110mm, UPVC
Fittingspipes
Under
and
SOG
fittings, underground 160mm, Polypropylene Pipes and Fittings

Plumbing
C172D20150

<BLDG-172> Install Plumbing Fittings Under SOG

<BLDG-172> Apply Paint for Entrance & Stairs


<BLDG-172> Install Handrails for Stairs

C172D20100

<BLDG-172> Install Drainage Risers

14 16-Apr-15

01-May-15 Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-172>
UPVC Pipes
Installand
Drainage
FittingsRisers
For Drainage above ground 75mm, UPVC Pip

C172D20140

<BLDG-172> Install water Risers

14 16-Apr-15

01-May-15 Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings
<BLDG-172>
including items
Installmentioned
water Risers
25mm, Polypropylene Pipes and Fittings includ

C172D20110

<BLDG-172> Install Roof sainatary work

12 04-May-15

16-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron <BLDG-172>
oblique grate,Install
side outlet
Roof 100mm
sainatary work

C172D20130

<BLDG-172> Construct Inspection chambers & connections

10 08-Jul-15

21-Jul-15

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Strainer 63 mm, Valves
<BLDG-172>
are classified
Construct
according
Inspection
to type
chambers
Check Valves
& con

Page 11 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name
C172D20120

Original Start
Duration

<BLDG-172> Test Drainage & water Riser s

5 22-Jul-15

Finish

Resources

2015

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

27-Jul-15

Aug

Sep

Oct

Nov

<BLDG-172> Test Drainage & water R iser s

Electrical
C172D50180

<BLDG-172> Install Electrical conduits for Gr Floor Slab

193 03-Dec-14
2 03-Dec-14

04-Jul-15
04-Dec-14 Indoor wiring for one lighting outlet including wires
<BLDG-172>
3(1x3) mm,Install
One lighting
Electrical
outlet
conduits
including
for Gr
empty
Floor"PVC"
Slab conduits

04-Jul-15, Electrical

C172D50190

<BLDG-172> Install Electrical conduits for 1st Floor Slab

2 29-Dec-14

30-Dec-14 One lighting outlet including empty "PVC" conduits

C172D50200

<BLDG-172> Install Electrical conduits for 2nd Floor Slab

2 24-Jan-15

26-Jan-15

C172D50210

<BLDG-172> Install Electrical conduits for 3rd Floor Slab

2 06-Feb-15

07-Feb-15 One lighting outlet including empty "PVC" conduits

C172D50100

<BLDG-172> Install Electrical conduits for 4th Floor Slab

2 14-Mar-15

15-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet<BLDG-172>
including empty
Install
"PVC"
Electrical
conduits
conduits for 4th Floor Slab

C172D50140

<BLDG-172> Install Electrical Risers

6 30-Mar-15

04-Apr-15

Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple
<BLDG-172>
Play SystemInstall
FloorElectrical
pull box,Risers
Light Current Systems Two UPVC 25 mm Conduits for

C172D50240

<BLDG-172> Install Earthing System

6 30-Mar-15

04-Apr-15

power network including main earthing networks, 600/1000 V, multicore copper conductor,
<BLDG-172>
PVC/PVC cables
Install (4
Earthing
x 10) mm,
System
600/1000 V, multicore copper conductor, PVC/PVC

C172D50110

<BLDG-172> Install Electrical conduits for Roof Slab

1 01-Apr-15

01-Apr-15

One lighting outlet including empty "PVC" conduits

C172D50150

<BLDG-172> Install of Panel board

3 15-May-15

17-May-15 Lighting Switches Type Push Button (P.B), 40mm PVC empty conduit from (KWHM) box to panel board
<BLDG-172>
of customer Install of Panel board

C172D50250

<BLDG-172> Install Conduits for intercom system

3 15-May-15

17-May-15 Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door master<BLDG-172>
unit
Install Conduits for intercom system

C172D50160

<BLDG-172> Install Distribution Panel

C172D50120

<BLDG-172> Connect between Riser & DP

C172D50220

<BLDG-172> Install Cables

C172D50230
C172D50170
C172D50130

<BLDG-172> Install Electrical conduits for 1st Floor Slab

Indoor wiring for one lighting outlet including wires 3(1x3) mm, One
<BLDG-172>
lighting outlet
Install
including
Electrical
empty
conduits
"PVC"for
conduits
2nd Floor Slab
<BLDG-172> Install Electrical conduits for 3rd Floor Slab

<BLDG-172> Install Electrical conduits for Roof Slab

14 18-May-15

01-Jun-15

Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution
<BLDG-172>
Panels (DB-SER-1),
Install Distribution
Low Voltage
Panel Distribution Panels (DB-SER

3 02-Jun-15

04-Jun-15

Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m

21 02-Jun-15

24-Jun-15

450/750 V Single Core Copper Conductor, PVC cables (1x 35) mm, 450/750 V Single Core Copper Conductor, PVC
<BLDG-172>
cables (1x 70)
Install
mm,
Cables
450/750 V Single Core Copper Con

<BLDG-172> Install Wiring Devices&Disconnect switches

2 06-Jun-15

07-Jun-15

Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power outlet
<BLDG-172>
with 3(1x6)
Install
mm,
Wiring
Wiring
Devices&Disconnect
Devices and Disconnectors
switches Socket

<BLDG-172> Test elec. system

6 25-Jun-15

30-Jun-15

<BLDG-172> Install Lighting fixtures

3 01-Jul-15

04-Jul-15

7 08-Aug-15
2 08-Aug-15

15-Aug-15
09-Aug-15

15-Aug-15, Completion Inspection


<BLDG-172> Punch Out

Completion Inspection
C172H10100
<BLDG-172> Punch Out

<BLDG-172> Connect between Riser & DP

<BLDG-172> Test elec. system


Lighting fixtures Type F5, Lighting fixtures Type F4, Lighting fixtures Type F3, Lighting fixtures Type F2

<BLDG-172> Install Lighting fixtures

C172H10110

<BLDG-172> Pre-final inspection

2 10-Aug-15

11-Aug-15

<BLDG-172> Pre-final inspection

C172H10120

<BLDG-172> Final inspection

3 12-Aug-15

15-Aug-15

<BLDG-172> Final inspection

321 16-Aug-14 A 15-Aug-15


204 16-Aug-14 A 04-Apr-15
1 16-Aug-14 A 16-Aug-14 A

Building 285 (Type# I.A6CR)


Site Preparation
C285G10130
<BLDG-285> Prep for Excavation

15-Aug-15, Building 285 (Type# I.A6CR)


04-Apr-15, Site Preparation
<BLDG-285> Prep for Excavation

C285G10100

<BLDG-285> Excavate to Foundation Levels

4 17-Aug-14 A 13-Sep-14 A Excavation in any type<BLDG-285>


of soil exceptExcavate
rock for foundation,
to Foundation
Disposal
Levelsof surplus materials outside the site boundary to nearest dump.

C285G10110

<BLDG-285> Trim the bottoms of Excavate

1 14-Sep-14 A 27-Sep-14 A

C285G10120

<BLDG-285> Backfill for Foundation

2 20-Jan-15

21-Jan-15

C285G10140

<BLDG-285> Backfill around Building

5 31-Mar-15

04-Apr-15

Substructure
Foundation
Foundation at Level (-2.25)
C285A10100
<BLDG-285> Construct P.C. F oundation Lv (- 2.25)
C285A10110

<BLDG-285> Construct R.C.Foundation Lv (-2.25)

C285A10240

<BLDG-285> Construct CUM above Ground Beam Lv (-2.25)/Internal Backfill

C285A10120

<BLDG-285> Apply Dampproofing for Foundation Lv (-2.25)

C285A10160

<BLDG-285> Construct S.O.G Lv (-1.00)

Foundation at Level (-1.50)


C285A10130
<BLDG-285> Construct P.C. F oundation Lv (- 1.50)

110
110
110
8

28-Sep-14 A
28-Sep-14 A
28-Sep-14 A
28-Sep-14 A

<BLDG-285> Trim the bottoms of Excavate


Backfilling, with suitable excavated soil under foundation level <BLDG-285> Backfill for Foundation
<BLDG-285> Backfill around Building

02-Feb-15
02-Feb-15, Substructure
02-Feb-15
02-Feb-15, Foundation
02-Feb-15
02-Feb-15, Foundation at Level (-2.25)
21-Oct-14 A Supply and cast plain concrete with
<BLDG-285>
average compressive
Construct strength
P.C. F oundation
200 kg/cm2
Lv (-at2.25)
28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

4 23-Oct-14 A 01-Dec-14 Reinforced concrete with average compressive<BLDG-285>


strength 250 kg/cm2
Construct
at 28
R.C.Foundation
days for foundation,
Lv (-2.25)
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
12 04-Jan-15

17-Jan-15

Backfilling, with suitable excavated soil under foundation level, <BLDG-285>


Supply and build
Construct
solid cement
CUM block
aboveunit
Ground
machine-made
Beam Lv (-2.25)/Internal
with density notBackfill
exceed 2000 kg/m3

2 18-Jan-15

19-Jan-15

Supply and apply two (2) coats cold applied waterproofing paint<BLDG-285>
with bituminous
Apply
base
Dampproofing for Foundation Lv (-2.25)

4 29-Jan-15

02-Feb-15 Supply and cast plain concrete with average compressive strength 200
<BLDG-285>
kg/cm2 at 28
Construct
days 100mm,
S.O.G4Lv
mm
(-1.00)
thick bituminous waterproofing membrane with 50 mm cement morta

98 28-Sep-14 A 28-Jan-15
28-Jan-15, Foundation at Level (-1.50)
8 28-Sep-14 A 21-Oct-14 A Supply and cast plain concrete with
<BLDG-285>
average compressive
Construct strength
P.C. F oundation
200 kg/cm2
Lv (-at1.50)
28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

C285A10140

<BLDG-285> Construct R.C.Foundation Lv (-1.50)

C285A10250

<BLDG-285> Construct CUM above Ground Beam Lv (-1.50)/Internal backfill

12 04-Jan-15

17-Jan-15

Backfilling, with suitable excavated soil under foundation level, <BLDG-285>


Supply and build
Construct
solid cement
CUM block
aboveunit
Ground
machine-made
Beam Lv (-1.50)/Internal
with density notbackfill
exceed 2000 kg/m3

C285A10150

<BLDG-285> Apply Dampproofing for Foundation Lv (-1.50)

1 18-Jan-15

18-Jan-15

Supply and apply two (2) coats cold applied waterproofing paint<BLDG-285>
with bituminous
Apply
base
Dampproofing for Foundation Lv (-1.50)

C285A10170

<BLDG-285> Construct S.O.G Lv (+0.05)/Install PE sheets

3 26-Jan-15

28-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-285>
at 28 days for
Construct
slab on S.O.G
grade Lv (+0.05)/Install PE sheets

Superstructure
Ground Floor Lv (+3.15)
C285B10100
<BLDG-285> Fix Reinforcement Bars for Gr Floor Columns

8 28-Oct-14 A 27-Nov-14 AReinforced concrete with average compressive


<BLDG-285>
strength 250Construct
kg/cm2 atR.C.Foundation
28 days for foundation
Lv (-1.50)

148 28-Nov-14 A 22-Apr-15


49 28-Nov-14 A 01-Jan-15
6 28-Nov-14 A 30-Nov-14 Steel Fixing

22-Apr-15, Superstructure
01-Jan-15, Ground Floor Lv (+3.15)
<BLDG-285> Fix Reinforcement Bars for Gr Floor Columns

C285B10110

<BLDG-285> Set up Form work for Gr Floor Columns

6 28-Nov-14 A 06-Dec-14 Form Work %

C285B10120

<BLDG-285> Cast concrete for Gr Floor Columns

1 07-Dec-14

C285B10130

<BLDG-285> Fix Reinforcement Bars for Gr Floor Slab

14 08-Dec-14

22-Dec-14 Steel Fixing

<BLDG-285> Fix Reinforcement Bars for Gr Floor Slab

C285B10140

<BLDG-285> Set up Form work for Gr Floor Slab

14 08-Dec-14

22-Dec-14 Form Work %

<BLDG-285> Set up Form work for Gr Floor Slab

C285B10150

<BLDG-285> Cast concrete for Gr Floor Slab

C285B10190

<BLDG-285> Dismantle Form work for Gr Floor Slab

First Floor Lv (+6.25)


Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

<BLDG-285> Set up Form work for Gr Floor Columns

07-Dec-14 Reinforced concrete with average compressive strength


<BLDG-285>
250 kg/cm2
Cast concrete
at 28 days
forfor
Grelevator
Floor Columns
shaft, Reinforced concrete with average compressive strength 250 kg/cm2 at 28 d

1 23-Dec-14

23-Dec-14 RC with average compressive strength 250 kg/cm2 at <BLDG-285>


28 days for stairs,
Castbeams,
concrete
andforslabs
Gr Floor Slab

9 24-Dec-14

01-Jan-15

31 24-Dec-14

28-Jan-15
Page 12 of 29

<BLDG-285> Dismantle Form work for Gr Floor Slab


28-Jan-15, First Floor Lv (+6.25)
TASK filter: All Activities
Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

C285B10170

<BLDG-285> Set up Form work for 1st Floor Columns

9 24-Dec-14

01-Jan-15

Form Work %

<BLDG-285> Set up Form work for 1st Floor Columns

C285B10160

<BLDG-285> Fix Reinforcement Bars for 1st Floor Columns

9 24-Dec-14

01-Jan-15

Steel Fixing

<BLDG-285> Fix Reinforcement Bars for 1st Floor Columns

C285B10180

<BLDG-285> Cast concrete for 1st Floor Columns

1 04-Jan-15

04-Jan-15

Reinforced concrete with average compressive strength 250


<BLDG-285>
kg/cm2 at 28
Cast
days
concrete
for columns,
for 1st
Reinforced
Floor Columns
concrete with average compressive strength 250 kg/cm2 at 28 days fo

C285B10200

<BLDG-285> Fix Reinforcement Bars for 1st Floor Slab

11 05-Jan-15

17-Jan-15

Steel Fixing

<BLDG-285> Fix Reinforcement Bars for 1st Floor Slab

C285B10210

<BLDG-285> Set up Form work for 1st Floor Slab

11 05-Jan-15

17-Jan-15

Form Work %

<BLDG-285> Set up Form work for 1st Floor Slab

C285B10220

<BLDG-285> Cast concrete for 1st Floor Slab

1 18-Jan-15

18-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days for


<BLDG-285>
stairs, beams,
Castand
concrete
slabs for 1st Floor Slab

C285B10260

<BLDG-285> Dismantle Form work for 1st Floor Slab

9 19-Jan-15

28-Jan-15

<BLDG-285> Dismantle Form work for 1st Floor Slab

21-Feb-15
28-Jan-15 Form Work %

21-Feb-15, Second Floor Lv (+9.35)


<BLDG-285> Set up Form work for 2nd Floor Columns
<BLDG-285> Fix Reinforcement Bars for 2nd Floor Columns

Second Floor Lv (+9.35)


C285B10240
<BLDG-285> Set up Form work for 2nd Floor Columns

31 19-Jan-15
9 19-Jan-15

C285B10230

<BLDG-285> Fix Reinforcement Bars for 2nd Floor Columns

9 19-Jan-15

28-Jan-15

Steel Fixing

C285B10250

<BLDG-285> Cast concrete for 2nd Floor Columns

1 29-Jan-15

29-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-285>
at 28 days for
Cast
columns,
concrete
Reinforced
for 2nd Floor
concrete
Columns
with average compressive strength 250 kg/cm2 at 28 days fo

C285B10280

<BLDG-285> Set up Form work for 2nd Floor Slab

11 31-Jan-15

10-Feb-15 Form Work %

<BLDG-285> Set up Form work for 2nd Floor Slab

C285B10270

<BLDG-285> Fix Reinforcement Bars for 2nd Floor Slab

11 31-Jan-15

10-Feb-15 Steel Fixing

<BLDG-285> Fix Reinforcement Bars for 2nd Floor Slab

C285B10290

<BLDG-285> Cast concrete for 2nd Floor Slab

1 11-Feb-15

11-Feb-15

C285B10330

<BLDG-285> Dismantle Form work for 2nd Floor Slab

9 12-Feb-15

21-Feb-15

<BLDG-285> Dismantle Form work for 2nd Floor Slab

17-Mar-15
21-Feb-15 Form Work %

17-Mar-15, Third Floor Lv (+12.45)


<BLDG-285> Set up Form work for 3rd Floor Columns
<BLDG-285> Fix Reinforcement Bars for 3rd Floor Columns

Third Floor Lv (+12.45)


C285B10310
<BLDG-285> Set up Form work for 3rd Floor Columns

31 12-Feb-15
9 12-Feb-15

RC with average compressive strength 250 kg/cm2 at 28 days for stairs,


<BLDG-285>
beams, and Cast
slabsconcrete for 2nd Floor Slab

C285B10300

<BLDG-285> Fix Reinforcement Bars for 3rd Floor Columns

9 12-Feb-15

21-Feb-15 Steel Fixing

C285B10320

<BLDG-285> Cast concrete for 3rd Floor Columns

1 22-Feb-15

22-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 <BLDG-285>
days for elevator
Castshaft,
concrete
Reinforced
for 3rdconcrete
Floor Columns
with average compressive strength 250 kg/cm2 at 28 d

C285B10350

<BLDG-285> Set up Form work for 3rd Floor Slab

11 23-Feb-15

06-Mar-15 Form Work %

<BLDG-285> Set up Form work for 3rd Floor Slab

C285B10340

<BLDG-285> Fix Reinforcement Bars for 3rd Floor Slab

11 23-Feb-15

06-Mar-15 Steel Fixing

<BLDG-285> Fix Reinforcement Bars for 3rd Floor Slab

C285B10360

<BLDG-285> Cast concrete for 3rd Floor Slab

C285B10400

<BLDG-285> Dismantle Form work for 3rd Floor Slab

Fourth Floor Lv (+15.55)


C285B10380
<BLDG-285> Set up Form work for 4th Floor Columns

1 07-Mar-15

07-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,
<BLDG-285>
and slabs Cast concrete for 3rd Floor Slab

9 08-Mar-15

17-Mar-15

<BLDG-285> Dismantle Form work for 3rd Floor Slab

09-Apr-15
17-Mar-15 Form Work %

09-Apr-15, Fourth Floor Lv (+15.55)


<BLDG-285> Set up Form work for 4th Floor Columns

9 08-Mar-15

17-Mar-15 Steel Fixing

<BLDG-285> Fix Reinforcement Bars for 4th Floor Columns

18-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for<BLDG-285>
columns, Reinforced
Cast concrete
concrete
forwith
4th Floor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo

31 08-Mar-15
9 08-Mar-15

C285B10370

<BLDG-285> Fix Reinforcement Bars for 4th Floor Columns

C285B10390

<BLDG-285> Cast concrete for 4th Floor Columns

1 18-Mar-15

C285B10420

<BLDG-285> Set up Form work for 4th Floor Slab

11 19-Mar-15

30-Mar-15 Form Work %

<BLDG-285> Set up Form work for 4th Floor Slab

C285B10410

<BLDG-285> Fix Reinforcement Bars for 4th Floor Slab

11 19-Mar-15

30-Mar-15 Steel Fixing

<BLDG-285> Fix Reinforcement Bars for 4th Floor Slab

C285B10430

<BLDG-285> Cast concrete for 4th Floor Slab

1 31-Mar-15

31-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-285> Cast concrete for 4th Floor Slab

C285B10470

<BLDG-285> Dismantle Form work for 4th Floor Slab

9 01-Apr-15

09-Apr-15

Roof Floor Lv (+18.55)


C285B10450
<BLDG-285> Set up Form work for Roof Floor Columns/Planted Columns

20 01-Apr-15
5 01-Apr-15

22-Apr-15
05-Apr-15

Form Work %

22-Apr-15, Roof Floor Lv (+18.55)


<BLDG-285> Set up Form work for Roof Floor Columns/Planted Columns
<BLDG-285> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

<BLDG-285> Dismantle Form work for 4th Floor Slab

C285B10440

<BLDG-285> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

5 01-Apr-15

05-Apr-15

Steel Fixing

C285B10460

<BLDG-285> Cast concrete for Roof Floor Columns/Planted Columns

1 06-Apr-15

06-Apr-15

Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-285>
ReinforcedCast
concrete
concrete
withfor
average
Roof Floor
compressive
Columns/Planted
strength 250
Columns
kg/cm2 at 28 days fo

C285B10480

<BLDG-285> Fix Reinforcement Bars for Roof Slab

7 07-Apr-15

15-Apr-15

Steel Fixing

<BLDG-285> Fix Reinforcement Bars for Roof Slab

C285B10490

<BLDG-285> Set up Form work for Roof Slab

7 07-Apr-15

15-Apr-15

Form Work %

<BLDG-285> Set up Form work for Roof Slab

C285B10500

<BLDG-285> Cast concrete for Roof Slab

1 16-Apr-15

16-Apr-15

RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs <BLDG-285> Cast concrete for Roof Slab

C285B10510

<BLDG-285> Dismantle Form work for Roof Slab

6 17-Apr-15

22-Apr-15

97 05-Apr-15
12 05-Apr-15

24-Jul-15
18-Apr-15

16-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply <BLDG-285>
O.P cement-sand
Applyplaster
Facades
in two-coat
Plaster work (base and finish coats)for ext

Exterior Enclosure
C285B20130
<BLDG-285> Erect Scaffold

<BLDG-285> Dismantle Form work for Roof Slab


24-Jul-15, Exterior Enclosure
<BLDG-285> Erect Scaffold

C285B20160

<BLDG-285> Apply Facades Plaster

25 19-Apr-15

C285B20250

<BLDG-285> Install Shingle Sheets

6 14-May-15

19-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment

C285B20220

<BLDG-285> Install Gypsum Corniche

8 17-May-15

25-May-15 Supply and install gypsum cornices including paint,205 mm height gypsum cornice,01/505, Supply and install
<BLDG-285>
gypsum cornices
Install Gypsum
including Corniche
paint,200 mm height gypsum cornice, 0

C285B20230

<BLDG-285> Preparation of shingle ( Supporting System & Insulation Works)

9 26-May-15

03-Jun-15

C285B20240

<BLDG-285> Apply External Paint 1st Coat

8 04-Jun-15

12-Jun-15

C285B20260

<BLDG-285> Install Handrails for balconies

8 13-Jun-15

21-Jun-15

Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-285>
paint handrail
Install Handrails
900 mm height
for balconies
3/A-501, Supply and ins

C285B20460

<BLDG-285> Apply External Paint 2nd Coat

8 28-Jun-15

06-Jul-15

paint exterior acrylic water-based washable emulsion paint external wall

C285B20330

<BLDG-285> Install Aluminum Windows

10 07-Jul-15

16-Jul-15

Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with <BLDG-285>
plexi fill - 400 mm
Install
x 1200
Aluminum
mm. Windows

C285B20480

<BLDG-285> Dismantle Scaffold

5 07-Jul-15

11-Jul-15

<BLDG-285> Dismantle Scaffold

C285B20280

<BLDG-285> Install Appliqus

3 07-Jul-15

09-Jul-15

<BLDG-285> Install Appliqus

C285B20150

<BLDG-285> Install Steel & UPVC Doors & Windows

13 07-Jul-15

24-Jul-15

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

<BLDG-285> Install Shingle Sheets

<BLDG-285> Preparation of shingle ( Supporting System & Insulat


<BLDG-285> Apply External Paint 1st Coat
<BLDG-285> Apply External Paint 2nd Coat

Door type (D14) - double hinged fer forge leaves 1400 mm x 2850 mm, Steel Doors Door type (D13) - hinged leaf with louvers
<BLDG-285>
- 900 mm xInstall
2000Steel
mm.,&UPVC
UPVCDoor
Doors
type
& Windo
(D03)

Page 13 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name
C285B20270
Roofing
C285B30100

Original Start
Duration

<BLDG-285> Install Rough Stone Skirting


<BLDG-285> Cast Light Weight Concrete for slopes

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

8 12-Jul-15

24-Jul-15

Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.
<BLDG-285> Install Rough Stone Skirting

82 05-Apr-15
4 05-Apr-15

04-Jul-15
08-Apr-15

04-Jul-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max.<BLDG-285>
1200 kg/m Cast Light Weight Concrete for slopes

9 09-Apr-15

19-Apr-15

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

C285B30110

<BLDG-285> Apply Roofing Plaster

C285B30180

<BLDG-285> Install Steel Ladder

C285B30120

<BLDG-285> Apply reinforced bituminous water proofing membrane

6 20-Apr-15

27-Apr-15

C285B30130

<BLDG-285> Test Water proofing membrane

3 28-Apr-15

30-Apr-15

<BLDG-285> Test Water proofing membrane

C285B30140

<BLDG-285> Apply Cement mortar screed

4 01-May-15

04-May-15

<BLDG-285> Apply Cement mortar screed

C285B30150

<BLDG-285> Apply Extruded polystyrene

3 05-May-15

07-May-15

<BLDG-285> Apply Extruded polystyrene

C285B30160

<BLDG-285> Cast protection concrete layer

2 09-May-15

10-May-15

C285B30170

<BLDG-285> Install Terr azzo Tiles

10 21-May-15

31-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting.

C285B30190

<BLDG-285> Install Ceramic Tiles

15 01-Jun-15

16-Jun-15

Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors,
<BLDG-285>
100 mm height
Install Ceramic
ceramic tiles
Tilesfor skirting.

C285B30200

<BLDG-285> Apply Paint for Roof

10 17-Jun-15

27-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C285B30210

<BLDG-285> Install of Roof Steel Doors

6 28-Jun-15

04-Jul-15

Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf

15 20-Apr-15

Interior Construction
C285C10100
<BLDG-285> Construct CUM Works for Gr floor

<BLDG-285> Apply Roofing Plaster

06-May-15 Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508, Supply<BLDG-285>
and install 3100
Install
mmSteel
height
Ladder
steel ladder fixed to block wall
4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof.

<BLDG-285> Apply reinforced bituminous water proofing membrane

<BLDG-285> Cast protection concrete layer


<BLDG-285> Install Terr azzo Tiles
<BLDG-285> Apply Paint for Roof
<BLDG-285> Install of Roof Steel Doors

172 29-Jan-15
12 29-Jan-15

08-Aug-15
08-Aug-15, Interior Construction
10-Feb-15 Supply and build solid cement block unit machine-made with density not<BLDG-285>
exceed 2000Construct
kg/m3, Supply
CUMand
Works
buildforhollow
Gr floor
cement block unit machine-made with density not exceed

C285C10110

<BLDG-285> Construct CUM Works for 1st floor

12 29-Jan-15

10-Feb-15 Supply and build solid cement block unit machine-made with density not<BLDG-285>
exceed 2000Construct
kg/m3, Supply
CUMand
Works
buildforhollow
1st floor
cement block unit machine-made with density not exceed

C285C10120

<BLDG-285> Construct CUM Works for 2nd floor

12 22-Feb-15

06-Mar-15 Supply and build solid cement block unit machine-made with density not exceed<BLDG-285>
2000 kg/m3, Supply
Construct
andCUM
buildWorks
hollowfor
cement
2nd floor
block unit machine-made with density not exceed

C285C10140

<BLDG-285> Construct CUM Works for 3rd floor

12 18-Mar-15

30-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-285>
Supply and
Construct
build hollow
CUM cement
Works for
block
3rdunit
floormachine-made with density not exceed

C285C10160

<BLDG-285> Construct CUM for Parapet

C285C10150

<BLDG-285> Construct CUM Works for 4th floor

C285C10170

4 01-Apr-15

04-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-285>
Supply and
Construct
build hollow
CUMcement
for Parapet
block unit machine-made with density not exceed

12 11-Apr-15

23-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-285>
and buildConstruct
hollow cement
CUM Works
block unit
for machine-made
4th floor
with density not exceed

<BLDG-285> Construct Interior CUM Works for Roof

4 23-Apr-15

28-Apr-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply
<BLDG-285>
and buildConstruct
hollow cement
Interiorblock
CUMunit
Works
machine-made
for Roof with density not excee

C285C10200

<BLDG-285> Install Ducts work for 4th floor

1 01-Aug-15

01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-285>
unit machine-made
Install Ductswith
work
density
for 4th
not
floor
excee

C285C10210

<BLDG-285> Install Ducts work for 3rd floor

1 02-Aug-15

02-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-285>
unit machine-made
Install Ducts
with
work
density
for 3rd
notfloor
excee

C285C10220

<BLDG-285> Install Ducts work for 2nd floor

2 03-Aug-15

04-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-285>
unit machine-made
Install Ducts
with
work
density
for 2nd
not floor
excee

C285C10230

<BLDG-285> Install Ducts work for 1st floor

2 05-Aug-15

06-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-285>
unit machine-made
Install Ducts
withwork
density
for 1st
not floor
excee

C285C10240

<BLDG-285> Install Ducts work for Gr floor

2 07-Aug-15

08-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-285>
unit machine-made
Install Ducts
withwork
density
for not
Gr excee
floor

Entrance & Stairs


C285C20100
<BLDG-285> Apply Plaster to Stair Case

63 26-Apr-15
25 26-Apr-15

01-Jul-15
21-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

01-Jul-15, Entrance & Stairs


<BLDG-285> Apply Plaster to Stair Case

C285C20130

<BLDG-285> Install Marble for Entrance & Stairs

12 23-May-15

03-Jun-15

terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340 <BLDG-285>
mm width, Stone
Install
Paving
Marble
andforFlooring
Entrance
Light
& Stairs
beige terriesta marble

C285C20170

<BLDG-285> Apply Paint for Entrance & Stairs

12 04-Jun-15

16-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C285C20160

<BLDG-285> Install Handrails for Stairs

6 17-Jun-15

23-Jun-15

Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.

C285C20120

<BLDG-285> Install Units Wooden Doors

8 24-Jun-15

01-Jul-15

wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm.

30-Jul-15
24-Jan-15

30-Jul-15, Plumbing
UPVC pipes and fittings, underground 75mm, UPVC pipes and fittings,
<BLDG-285>
underground
Install110mm,
Plumbing
UPVC
Fittings
pipes
Under
andSOG
fittings, underground 160mm, Polypropylene Pipes and Fittings

Plumbing
C285D20100

<BLDG-285> Install Plumbing Fittings Under SOG

170 22-Jan-15
3 22-Jan-15

<BLDG-285> Apply Paint for Entrance & Stairs


<BLDG-285> Install Handrails for Stairs
<BLDG-285> Install Units Wooden Doors

C285D20110

<BLDG-285> Install Drainage Risers

10 26-Apr-15

05-May-15 Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-285>
UPVC Pipes
Install
andDrainage
Fittings For
Risers
Drainage above ground 75mm, UPVC Pip

C285D20120

<BLDG-285> Install water Risers

10 26-Apr-15

05-May-15 Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings
<BLDG-285>
including items
Install
mentioned
water Risers
25mm, Polypropylene Pipes and Fittings includ

C285D20130

<BLDG-285> Install Roof sainatary work

10 11-May-15

20-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron oblique
<BLDG-285>
grate, side
Install
outlet
Roof100mm
sainatary work

C285D20140

<BLDG-285> Construct Inspection chambers & connections

10 12-Jul-15

26-Jul-15

C285D20150

<BLDG-285> Test Drainage & water Riser s

Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm,<BLDG-285>
Valves are classified
Construct
according
Inspection
to type
chambers
Gate Valv
&c

4 27-Jul-15

30-Jul-15

<BLDG-285> Install Electrical conduits for Gr Floor Slab

194 10-Dec-14
2 10-Dec-14

11-Jul-15
11-Dec-14

One lighting outlet including empty "PVC" conduits <BLDG-285> Install Electrical conduits for Gr Floor Slab

<BLDG-285> Install Electrical conduits for 1st Floor Slab

2 06-Jan-15

08-Jan-15

One lighting outlet including empty "PVC" conduits

C285D50130

<BLDG-285> Install Electrical conduits for 2nd Floor Slab

2 01-Feb-15

02-Feb-15 One lighting outlet including empty "PVC" conduits

C285D50140

<BLDG-285> Install Electrical conduits for 3rd Floor Slab

2 24-Feb-15

25-Feb-15 One lighting outlet including empty "PVC" conduits

C285D50150

<BLDG-285> Install Electrical conduits for 4th Floor Slab

2 20-Mar-15

21-Mar-15 One lighting outlet including empty "PVC" conduits

C285D50180

<BLDG-285> Install Electrical Risers

6 05-Apr-15

11-Apr-15

Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple<BLDG-285>
Play System Floor
Installpull
Electrical
box, Light
Risers
Current Systems Two UPVC 25 mm Conduits for

C285D50100

<BLDG-285> Install Earthing System

6 05-Apr-15

11-Apr-15

600/1000 V, multicore Aluminium conductor, PVC/PVC cables (3 x 240+120) mm, 600/1000


<BLDG-285>
V, multicore Install
copperEarthing
conductor,
System
PVC/PVC cables (4 x 25) mm, 600/1000 V, multico

C285D50160

<BLDG-285> Install Electrical conduits for Roof Slab

1 09-Apr-15

09-Apr-15

One lighting outlet including empty "PVC" conduits

C285D50200

<BLDG-285> Install of Panel board

3 23-May-15

25-May-15 40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type Push Button
<BLDG-285>
(P.B) Install of Panel board

C285D50170

<BLDG-285> Install Conduits for intercom system

3 23-May-15

25-May-15 Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door master unit
<BLDG-285> Install Conduits for intercom system

C285D50210

<BLDG-285> Install Distribution Panel

Electrical
C285D50110
C285D50120

14 26-May-15

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

09-Jun-15

<BLDG-285> Test Drainage & water Riser s


11-Jul-15, Electrical
<BLDG-285> Install Electrical conduits for 1st Floor Slab
<BLDG-285> Install Electrical conduits for 2nd Floor Slab
<BLDG-285> Install Electrical conduits for 3rd Floor Slab
<BLDG-285> Install Electrical conduits for 4th Floor Slab

<BLDG-285> Install Electrical conduits for Roof Slab

Low Voltage Distribution Panels (DB-SER-1), Low Voltage Distribution Panels (DB-SER-2 )

Page 14 of 29

<BLDG-285> Install Distribution Panel

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name
C285D50220

<BLDG-285> Connect between Riser & DP

C285D50230

<BLDG-285> Install Cables

C285D50190
C285D50240
C285D50250

Original Start
Duration

Finish

Resources

2015

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

3 10-Jun-15

12-Jun-15

Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m

21 10-Jun-15

01-Jul-15

450/750 V Single Core Copper Conductor, PVC cables (1x 10) mm ECC, 450/750 V Single Core Copper Conductor,<BLDG-285>
PVC cables (1x
Install
16)Cables
mm ECC, 450/750 V Single Core C

<BLDG-285> Install Wiring Devices&Disconnect switches

2 13-Jun-15

14-Jun-15

Wiring Devices and Disconnectors Socket Type SO1, Wiring Devices and Disconnectors Load Break Switch LBS
<BLDG-285>
1 (32A) , 220V
Install
, IP54,
Wiring
Wiring
Devices&Disconnect
Devices and Disconnectors
switches Loa

<BLDG-285> Test elec. system

6 02-Jul-15

08-Jul-15

<BLDG-285> Install Lighting fixtures

3 09-Jul-15

11-Jul-15

6 09-Aug-15
2 09-Aug-15

15-Aug-15
10-Aug-15

15-Aug-15, Completion Inspection


<BLDG-285> Punch Out
<BLDG-285> Pre-final inspection

Completion Inspection
C285H10100
<BLDG-285> Punch Out
C285H10110

<BLDG-285> Pre-final inspection

2 11-Aug-15

12-Aug-15

C285H10120

<BLDG-285> Final inspection

2 13-Aug-15

15-Aug-15

<BLDG-285> Test elec. system


Lighting fixtures Type F5, Lighting fixtures Type F4, Lighting fixtures Type F2, Lighting fixtures Type F3

<BLDG-285> Install Lighting fixtures

<BLDG-285> Final inspection

321 16-Aug-14 A 15-Aug-15


207 16-Aug-14 A 07-Apr-15
1 16-Aug-14 A 16-Aug-14 A

Building 286 (Type# I.A6 b)


Site Preparation
C286G20170
<BLDG-286> Prep for Excavation

<BLDG-285> Connect between Riser & DP

15-Aug-15, Building 286 (Type# I.A6 b)


07-Apr-15, Site Preparation
<BLDG-286> Prep for Excavation

C286G20160

<BLDG-286> Excavate to Foundation Levels

4 17-Aug-14 A 02-Oct-14 A Excavation in any type of soil<BLDG-286>


except rock for
Excavate
foundation,
to Foundation
Disposal of
Levels
surplus materials outside the site boundary to nearest dump.

C286G20150

<BLDG-286> Trim the bottoms of Excavate

1 08-Oct-14 A 08-Oct-14 A

C286G20140

<BLDG-286> Backfill for Foundation

3 24-Jan-15

27-Jan-15

C286G20180

<BLDG-286> Backfill around Building

5 03-Apr-15

07-Apr-15

Substructure
Foundation
Foundation at Level (-2.25)
C286A10200
<BLDG-286> Construct P.C. F oundation Lv (- 2.25)
C286A10190

<BLDG-286> Construct R.C.Foundation Lv (-2.25)

C286A10230

<BLDG-286> Construct CUM above Ground Beam/Internal backfill

C286A10210

106
106
106
8

25-Oct-14 A
25-Oct-14 A
25-Oct-14 A
25-Oct-14 A

<BLDG-286> Trim the bottoms of Excavate


Backfilling, with suitable excavated soil under foundation level

<BLDG-286> Backfill for Foundation


<BLDG-286> Backfill around Building

06-Feb-15
06-Feb-15, Substructure
06-Feb-15
06-Feb-15, Foundation
06-Feb-15
06-Feb-15, Foundation at Level (-2.25)
05-Nov-14 ASupply and cast plain concrete with average
<BLDG-286>
compressive
Construct
strength
P.C.200
F oundation
kg/cm2 atLv28(- days
2.25)300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

4 06-Nov-14 A 29-Nov-14 AReinforced concrete with average compressive<BLDG-286>


strength 250Construct
kg/cm2 atR.C.Foundation
28 days for foundation
Lv (-2.25)
12 10-Jan-15

22-Jan-15

Backfilling, with suitable excavated soil under foundation level, Supply


<BLDG-286>
and buildConstruct
solid cement
CUMblock
above
unitGround
machine-made
Beam/Internal
with density
backfillnot exceed 2000 kg/m3

<BLDG-286> Construct S.O.G Lv (+0.05)/Install PE sheets

3 23-Jan-15

26-Jan-15

4 mm thick bituminous waterproofing membrane with 50 mm cement


<BLDG-286>
mortar screed
Construct
for slab
S.O.G
on grade,
Lv (+0.05)/Install
Supply and install
PE sheets
50 mm thick extruded polystyrene insulation boards of

C286A10220

<BLDG-286> Apply Dampproofing for Foundation Lv (-2.25)

1 23-Jan-15

23-Jan-15

Supply and apply two (2) coats cold applied waterproofing paint with
<BLDG-286>
bituminousApply
baseDampproofing for Foundation Lv (-2.25)

C286A10240

<BLDG-286> Construct Remaining S.O.G Lv (+0.05)

3 04-Feb-15

06-Feb-15 Supply and cast plain concrete with average compressive strength 200
<BLDG-286>
kg/cm2 at 28Construct
days 100mm,
Remaining
Reinforced
S.O.Gconcrete
Lv (+0.05)
with average compressive strength 250 kg/cm2 at 28 d

Foundation at Level (-1.50)


C285A10260
<BLDG-286> Construct P.C. F oundation Lv (- 1.50)
C285A10270

<BLDG-286> Construct R.C.Foundation Lv (-1.50)

C285A10300

<BLDG-286> Construct CUM above Ground Beam Lv (-1.50)/Internal backfill

C285A10280

<BLDG-286> Apply Dampproofing for Foundation Lv (-1.50)

C285A10290

103 25-Oct-14 A 03-Feb-15


03-Feb-15, Foundation at Level (-1.50)
8 25-Oct-14 A 05-Nov-14 ASupply and cast plain concrete with average
<BLDG-286>
compressive
Construct
strength
P.C.200
F oundation
kg/cm2 atLv28(- days
1.50)300mm, Supply and cast plain concrete with average compressive strength 200 kg/c
8 08-Nov-14 A 02-Dec-14 Reinforced concrete with average compressive <BLDG-286>
strength 250 kg/cm2
Construct
at 28
R.C.Foundation
days for foundation
Lv (-1.50)
12 10-Jan-15

22-Jan-15

Backfilling, with suitable excavated soil under foundation level, Supply


<BLDG-286>
and buildConstruct
solid cement
CUMblock
above
unitGround
machine-made
Beam Lvwith
(-1.50)/Internal
density not exceed
backfill 2000 kg/m3

1 23-Jan-15

23-Jan-15

Supply and apply two (2) coats cold applied waterproofing paint with
<BLDG-286>
bituminousApply
baseDampproofing for Foundation Lv (-1.50)

<BLDG-286> Construct S.O.G Lv (+0.05)/Install PE sheets

3 01-Feb-15

03-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2<BLDG-286>


at 28 days forConstruct
slab on grade
S.O.G Lv (+0.05)/Install PE sheets

Superstructure
Ground Floor Lv (+3.15)
C286B30230
<BLDG-286> Fix Reinforcement Bars for Gr Floor Columns

130 03-Dec-14
33 03-Dec-14
10 03-Dec-14

27-Apr-15, Superstructure
09-Jan-15, Ground Floor Lv (+3.15)
<BLDG-286> Fix Reinforcement Bars for Gr Floor Columns

13-Dec-14 Form Work %

<BLDG-286> Set up Form work for Gr Floor Columns

C286B30280

<BLDG-286> Set up Form work for Gr Floor Columns

C286B30220

<BLDG-286> Cast concrete for Gr Floor Columns

C286B30240

<BLDG-286> Fix Reinforcement Bars for Gr Floor Slab

12 15-Dec-14

27-Dec-14 Steel Fixing

<BLDG-286> Fix Reinforcement Bars for Gr Floor Slab

C286B30250

<BLDG-286> Set up Form work for Gr Floor Slab

12 15-Dec-14

27-Dec-14 Form Work %

<BLDG-286> Set up Form work for Gr Floor Slab

C286B30260

<BLDG-286> Cast concrete for Gr Floor Slab

1 28-Dec-14

28-Dec-14 RC with average compressive strength 250 kg/cm2 at 28<BLDG-286>


days for stairs,
Cast
beams,
concrete
and slabs
for Gr Floor Slab

C286B30270

<BLDG-286> Dismantle Form work for Gr Floor Slab

9 29-Dec-14

09-Jan-15

<BLDG-286> Dismantle Form work for Gr Floor Slab

03-Feb-15
09-Jan-15 Form Work %

03-Feb-15, First Floor Lv (+6.25)


<BLDG-286> Set up Form work for 1st Floor Columns
<BLDG-286> Fix Reinforcement Bars for 1st Floor Columns

First Floor Lv (+6.25)


C286B30450
<BLDG-286> Set up Form work for 1st Floor Columns

10 03-Dec-14

27-Apr-15
09-Jan-15
13-Dec-14 Steel Fixing

1 14-Dec-14

31 29-Dec-14
9 29-Dec-14

14-Dec-14 Reinforced concrete with average compressive strength


<BLDG-286>
250 kg/cm2
Cast
atconcrete
28 days for
for columns,
Gr Floor Reinforced
Columns concrete with average compressive strength 250 kg/cm2 at 28 days fo

C286B30460

<BLDG-286> Fix Reinforcement Bars for 1st Floor Columns

9 29-Dec-14

09-Jan-15

Steel Fixing

C286B30470

<BLDG-286> Cast concrete for 1st Floor Columns

1 10-Jan-15

10-Jan-15

Reinforced concrete with average compressive strength 250<BLDG-286>


kg/cm2 at 28 Cast
days concrete
for columns,
for Reinforced
1st Floor Columns
concrete with average compressive strength 250 kg/cm2 at 28 days fo

C286B30430

<BLDG-286> Set up Form work for 1st Floor Slab

11 11-Jan-15

22-Jan-15

Form Work %

<BLDG-286> Set up Form work for 1st Floor Slab

C286B30480

<BLDG-286> Fix Reinforcement Bars for 1st Floor Slab

11 11-Jan-15

22-Jan-15

Steel Fixing

<BLDG-286> Fix Reinforcement Bars for 1st Floor Slab

C286B30440

<BLDG-286> Cast concrete for 1st Floor Slab

1 23-Jan-15

23-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days for<BLDG-286>


stairs, beams,
Cast
andconcrete
slabs for 1st Floor Slab

C286B30490

<BLDG-286> Dismantle Form work for 1st Floor Slab

9 24-Jan-15

03-Feb-15

<BLDG-286> Dismantle Form work for 1st Floor Slab

26-Feb-15
03-Feb-15 Form Work %

26-Feb-15, Second Floor Lv (+9.35)


<BLDG-286> Set up Form work for 2nd Floor Columns
<BLDG-286> Fix Reinforcement Bars for 2nd Floor Columns

Second Floor Lv (+9.35)


C286B30290
<BLDG-286> Set up Form work for 2nd Floor Columns

31 24-Jan-15
9 24-Jan-15

C286B30300

<BLDG-286> Fix Reinforcement Bars for 2nd Floor Columns

9 24-Jan-15

03-Feb-15 Steel Fixing

C286B30310

<BLDG-286> Cast concrete for 2nd Floor Columns

1 04-Feb-15

04-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 <BLDG-286>
at 28 days for Cast
columns,
concrete
Reinforced
for 2ndconcrete
Floor Columns
with average compressive strength 250 kg/cm2 at 28 days fo

C286B30320

<BLDG-286> Set up Form work for 2nd Floor Slab

11 05-Feb-15

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

16-Feb-15 Form Work %


Page 15 of 29

<BLDG-286> Set up Form work for 2nd Floor Slab


TASK filter: All Activities
Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

C286B30340

<BLDG-286> Fix Reinforcement Bars for 2nd Floor Slab

C286B30330

<BLDG-286> Cast concrete for 2nd Floor Slab

C286B30350

<BLDG-286> Dismantle Form work for 2nd Floor Slab

Third Floor Lv (+12.45)


C286B30360
<BLDG-286> Set up Form work for 3rd Floor Columns

11 05-Feb-15

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

16-Feb-15 Steel Fixing

Mar

Apr

May

Jun

Jul

Aug

Sep

Nov

1 17-Feb-15

17-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, <BLDG-286>
beams, and slabs
Cast concrete for 2nd Floor Slab

9 18-Feb-15

26-Feb-15

<BLDG-286> Dismantle Form work for 2nd Floor Slab

22-Mar-15
26-Feb-15 Form Work %

22-Mar-15, Third Floor Lv (+12.45)


<BLDG-286> Set up Form work for 3rd Floor Columns

9 18-Feb-15

26-Feb-15 Steel Fixing

<BLDG-286> Fix Reinforcement Bars for 3rd Floor Columns

28-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
<BLDG-286>
for columns,
Cast
Reinforced
concreteconcrete
for 3rd Floor
with average
Columnscompressive strength 250 kg/cm2 at 28 days fo

31 18-Feb-15
9 18-Feb-15

C286B30380

<BLDG-286> Fix Reinforcement Bars for 3rd Floor Columns

C286B30370

<BLDG-286> Cast concrete for 3rd Floor Columns

1 28-Feb-15

C286B30390

<BLDG-286> Set up Form work for 3rd Floor Slab

11 01-Mar-15

11-Mar-15

Form Work %

<BLDG-286> Set up Form work for 3rd Floor Slab

C286B30410

<BLDG-286> Fix Reinforcement Bars for 3rd Floor Slab

11 01-Mar-15

11-Mar-15

Steel Fixing

<BLDG-286> Fix Reinforcement Bars for 3rd Floor Slab

C286B30400

<BLDG-286> Cast concrete for 3rd Floor Slab

1 12-Mar-15

12-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,<BLDG-286>
and slabs
Cast concrete for 3rd Floor Slab

C286B30420

<BLDG-286> Dismantle Form work for 3rd Floor Slab

9 14-Mar-15

22-Mar-15

<BLDG-286> Dismantle Form work for 3rd Floor Slab

16-Apr-15
22-Mar-15 Steel Fixing

16-Apr-15, Fourth Floor Lv (+15.55)


<BLDG-286> Fix Reinforcement Bars for 4th Floor Columns
<BLDG-286> Set up Form work for 4th Floor Columns

Fourth Floor Lv (+15.55)


C286B30510
<BLDG-286> Fix Reinforcement Bars for 4th Floor Columns

Oct

<BLDG-286> Fix Reinforcement Bars for 2nd Floor Slab

31 14-Mar-15
9 14-Mar-15

C286B30560

<BLDG-286> Set up Form work for 4th Floor Columns

9 14-Mar-15

22-Mar-15 Form Work %

C286B30500

<BLDG-286> Cast concrete for 4th Floor Columns

1 23-Mar-15

23-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-286>
Reinforced
Cast concrete
concretefor
with
4thaverage
Floor Columns
compressive strength 250 kg/cm2 at 28 days fo

C286B30520

<BLDG-286> Set up Form work for 4th Floor Slab

11 24-Mar-15

04-Apr-15

Form Work %

<BLDG-286> Set up Form work for 4th Floor Slab

C286B30530

<BLDG-286> Fix Reinforcement Bars for 4th Floor Slab

11 24-Mar-15

04-Apr-15

Steel Fixing

<BLDG-286> Fix Reinforcement Bars for 4th Floor Slab

C286B30550

<BLDG-286> Cast concrete for 4th Floor Slab

1 05-Apr-15

05-Apr-15

RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-286> Cast concrete for 4th Floor Slab

C286B30540

<BLDG-286> Dismantle Form work for 4th Floor Slab

9 06-Apr-15

16-Apr-15

Roof Floor Lv (+18.55)


C286B30580
<BLDG-286> Set up Form work for Roof Floor Columns/Planted Columns

18 06-Apr-15
5 06-Apr-15

27-Apr-15
11-Apr-15

Form Work %

27-Apr-15, Roof Floor Lv (+18.55)


<BLDG-286> Set up Form work for Roof Floor Columns/Planted Columns
<BLDG-286> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

<BLDG-286> Dismantle Form work for 4th Floor Slab

C286B30610

<BLDG-286> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

5 06-Apr-15

11-Apr-15

Steel Fixing

C286B30600

<BLDG-286> Cast concrete for Roof Floor Columns/Planted Columns

1 12-Apr-15

12-Apr-15

Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-286>
Reinforced concrete
Cast concrete
with average
for Roofcompressive
Floor Columns/Planted
strength 250
Columns
kg/cm2 at 28 days fo

C286B30590

<BLDG-286> Fix Reinforcement Bars for Roof Slab

5 14-Apr-15

18-Apr-15

Steel Fixing

<BLDG-286> Fix Reinforcement Bars for Roof Slab

C286B30630

<BLDG-286> Set up Form work for Roof Slab

5 14-Apr-15

18-Apr-15

Form Work %

<BLDG-286> Set up Form work for Roof Slab

C286B30620

<BLDG-286> Cast concrete for Roof Slab

1 19-Apr-15

19-Apr-15

RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs <BLDG-286> Cast concrete for Roof Slab

C286B30570

<BLDG-286> Dismantle Form work for Roof Slab

Exterior Enclosure
C286B30750
<BLDG-286> Erect Scaffold
C286B30710

<BLDG-286> Apply Facades Plaster

C286B30730

<BLDG-286> Install Shingle Sheets

C286B30720

<BLDG-286> Install Gypsum Corniche

C286B30740

<BLDG-286> Preparation of shingle ( Supporting System & Insulation Works)

C286B30760
C286B30660

6 20-Apr-15

27-Apr-15

89 11-Apr-15
8 11-Apr-15

16-Jul-15
19-Apr-15

25 20-Apr-15

17-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply <BLDG-286>
O.P cement-sand
Applyplaster
Facades
in two-coat
Plaster work (base and finish coats)for ext

6 15-May-15
12 18-May-15

<BLDG-286> Dismantle Form work for Roof Slab


16-Jul-15, Exterior Enclosure
<BLDG-286> Erect Scaffold

20-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment

<BLDG-286> Install Shingle Sheets

30-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply<BLDG-286>
and install gypsum
Installcornices
Gypsumincluding
Cornichepaint, 105 mm height middle g

8 31-May-15

08-Jun-15

<BLDG-286> Apply External Paint 1st Coat

10 09-Jun-15

18-Jun-15

<BLDG-286> Install Handrails for balconies

6 20-Jun-15

25-Jun-15

Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-286>
paint handrail
Install900
Handrails
mm height
for balconies
3/A-501, Supply and ins

C286B30680

<BLDG-286> Apply External Paint 2nd Coat

6 26-Jun-15

01-Jul-15

paint exterior acrylic water-based washable emulsion paint external wall

C286B30650

<BLDG-286> Install Appliqus

C286B30670

<BLDG-286> Install Aluminum Windows

C286B30690

<BLDG-286> Dismantle Scaffold

C286B30770

<BLDG-286> Install Steel & UPVC Doors & Windows

C286B30700

<BLDG-286> Install Rough Stone Skirting

Roofing
C286B30810

<BLDG-286> Cast Light Weight Concrete for slopes

<BLDG-286> Preparation of shingle ( Supporting System & Insul


<BLDG-286> Apply External Paint 1st Coat
<BLDG-286> Apply External Paint 2nd Coat

3 02-Jul-15

05-Jul-15

12 02-Jul-15

14-Jul-15

<BLDG-286> Install Appliqus

6 02-Jul-15

08-Jul-15

14 02-Jul-15

16-Jul-15

Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge leaves
<BLDG-286>
1400 mm
Install
x 2850
Steel
mm,
& UPVC
UPVCDoors
Door &
type
Window
(D03)

8 09-Jul-15

16-Jul-15

Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.
<BLDG-286> Install Rough Stone Skirting

81 11-Apr-15
4 11-Apr-15

08-Jul-15
15-Apr-15

08-Jul-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max. 1200
<BLDG-286>
kg/m
Cast Light Weight Concrete for slopes

9 16-Apr-15

26-Apr-15

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

10 27-Apr-15

06-May-15

Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with<BLDG-286>
plexi fill - 400 Install
mm x Aluminum
1200 mm. Windows
<BLDG-286> Dismantle Scaffold

C286B30870

<BLDG-286> Apply Roofing Plaster

C286B30780

<BLDG-286> Install Steel Ladder

C286B30790

<BLDG-286> Apply reinforced bituminous water proofing membrane

6 27-Apr-15

02-May-15 4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof.

C286B30840

<BLDG-286> Test Water proofing membrane

3 03-May-15

05-May-15

<BLDG-286> Test Water proofing membrane

C286B30820

<BLDG-286> Apply Cement mortar screed

4 06-May-15

10-May-15

<BLDG-286> Apply Cement mortar screed

C286B30800

<BLDG-286> Apply Extruded polystyrene

3 11-May-15

13-May-15

<BLDG-286> Apply Extruded polystyrene

C286B30830

<BLDG-286> Cast protection concrete layer

2 14-May-15

15-May-15

C286B30850

<BLDG-286> Install Terr azzo Tiles

10 29-May-15

08-Jun-15

Terrazzo tiles for floors, 100 mm height ceramic tiles for skirting., Terrazzo tiles 300 x 300 x 30 mm thick.

C286B30860

<BLDG-286> Install Ceramic Tiles

18 09-Jun-15

27-Jun-15

Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors,<BLDG-286>
100 mm height
Install
ceramic
Ceramic
tiles Tiles
for skirting.

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

<BLDG-286> Apply Roofing Plaster


<BLDG-286> Install Steel Ladder
<BLDG-286> Apply reinforced bituminous water proofing membrane

<BLDG-286> Cast protection concrete layer

Page 16 of 29

<BLDG-286> Install Terr azzo Tiles

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name
C286B30880

Original Start
Duration

<BLDG-286> Apply Paint for Roof

10 28-Jun-15

Interior Construction
C286C30270
<BLDG-286> Construct CUM Works for Gr floor

Finish

Resources
Aug

08-Jul-15

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

Aug

Sep

Oct

Nov

<BLDG-286> Apply Paint for Roof

166 04-Feb-15
10 04-Feb-15

07-Aug-15
07-Aug-15, Interior Construction
14-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-286>
2000 kg/m3,
Construct
Supply
CUM
and
Works
build for
solid
Grcement
floor block unit machine-made with density not exceed 20

C286C30290

<BLDG-286> Construct CUM Works for 1st floor

10 04-Feb-15

14-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-286>
2000 kg/m3,
Construct
Supply
CUM
and
Works
build for
solid
1stcement
floor block unit machine-made with density not exceed 20

C286C30300

<BLDG-286> Construct CUM Works for 2nd floor

10 28-Feb-15

09-Mar-15 Supply and build hollow cement block unit machine-made with density not exceed
<BLDG-286>
1600 kg/m3,Construct
Supply and
CUM
build
Works
hollowforcement
2nd floor
block unit machine-made with density not excee

C286C30320

<BLDG-286> Construct CUM Works for 3rd floor

10 23-Mar-15

02-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-286>
Supply and
Construct
build solid
CUM
cement
Works
block
for 3rd
unit floor
machine-made with density not exceed 20

C286C30250

<BLDG-286> Construct CUM for Parapet

C286C30230

<BLDG-286> Construct CUM Works for 4th floor

C286C30260

4 06-Apr-15

09-Apr-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3,
<BLDG-286>
Supply and
Construct
build hollow
CUMcement
for Parapet
block unit machine-made with density not excee

10 17-Apr-15

28-Apr-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply
<BLDG-286>
and buildConstruct
hollow cement
CUM Works
block unit
for machine-made
4th floor
with density not excee

<BLDG-286> Construct Interior CUM Works for Roof

3 28-Apr-15

30-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-286>
and build solid
Construct
cement
Interior
block unit
CUM
machine-made
Works for Roof
with density not exceed 20

C286C30240

<BLDG-286> Install Ducts work for 4th floor

2 28-Jul-15

29-Jul-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

C286C30330

<BLDG-286> Install Ducts work for 3rd floor

2 30-Jul-15

01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-286> Install Ducts work for 3rd floor

C286C30310

<BLDG-286> Install Ducts work for 2nd floor

2 02-Aug-15

03-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-286> Install Ducts work for 2nd floor

C286C30220

<BLDG-286> Install Ducts work for 1st floor

2 04-Aug-15

05-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

<BLDG-286> Install Ducts work for 1st floor

C286C30280

<BLDG-286> Install Ducts work for Gr floor

2 06-Aug-15

07-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3

Entrance & Stairs


C286C30160
<BLDG-286> Apply Plaster to Stair Case

61 29-Apr-15
26 29-Apr-15

02-Jul-15
26-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

<BLDG-286> Install Ducts work for 4th floor

<BLDG-286> Install Ducts work for Gr floor


02-Jul-15, Entrance & Stairs
<BLDG-286> Apply Plaster to Stair Case

C286C30170

<BLDG-286> Install Marble for Entrance & Stairs

12 27-May-15

08-Jun-15

terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340 mm
<BLDG-286>
width, Stone
Install
Paving
Marble
and Flooring
for Entrance
Light&beige
Stairsterriesta marble

C286C30210

<BLDG-286> Apply Paint for Entrance & Stairs

12 09-Jun-15

21-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C286C30200

<BLDG-286> Install Handrails for Stairs

6 22-Jun-15

27-Jun-15

Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.

C286C30190

<BLDG-286> Install Units Wooden Doors

5 28-Jun-15

02-Jul-15

wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door type (D09)
<BLDG-286>
- hinged leaf
Install
- 900
Units
mm
Wooden
x 2200 Doors
mm.

27-Jul-15
31-Jan-15

27-Jul-15, Plumbing
UPVC pipes and fittings, underground 75mm, UPVC pipes and fittings,
<BLDG-286>
underground
Install
110mm,
Plumbing
UPVC
Fittings
pipesUnder
and fittings,
SOG underground 160mm, Polypropylene Pipes and Fittings

Plumbing
C286D50490

<BLDG-286> Install Plumbing Fittings Under SOG

162 28-Jan-15
3 28-Jan-15

<BLDG-286> Apply Paint for Entrance & Stairs


<BLDG-286> Install Handrails for Stairs

C286D50450

<BLDG-286> Install Drainage Risers

14 29-Apr-15

13-May-15 Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-286>
UPVC PipesInstall
and Fittings
Drainage
ForRisers
Drainage above ground 75mm, UPVC Pip

C286D50480

<BLDG-286> Install water Risers

14 29-Apr-15

13-May-15 Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings<BLDG-286>
including items
Install
mentioned
water Risers
25mm, Polypropylene Pipes and Fittings includ

C286D50460

<BLDG-286> Install Roof sainatary work

12 16-May-15

28-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron oblique
<BLDG-286>
grate, sideInstall
outletRoof
100mm
sainatary work

C286D50470

<BLDG-286> Construct Inspection chambers & connections

C286D50500

<BLDG-286> Test Drainage & water Riser s

8 09-Jul-15

16-Jul-15

6 21-Jul-15

27-Jul-15

Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm,
<BLDG-286>
Valves areConstruct
classifiedInspection
according chambers
to type Gate
& conn
Valv
<BLDG-286> Test Drainage & water R iser s

Electrical
C286D50370

<BLDG-286> Install Electrical conduits for Gr Floor Slab

193 15-Dec-14
2 15-Dec-14

15-Jul-15
16-Dec-14 Indoor wiring for one lighting outlet including wires 3(1x3)
<BLDG-286>
mm, One
Install
lighting
Electrical
outlet conduits
including for
empty
Gr Floor
"PVC"Slab
conduits

C286D50380

<BLDG-286> Install Electrical conduits for 1st Floor Slab

2 12-Jan-15

13-Jan-15

C286D50390

<BLDG-286> Install Electrical conduits for 2nd Floor Slab

2 06-Feb-15

07-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-286>
outlet including
Install Electrical
empty "PVC"
conduits
conduits
for 2nd Floor Slab

C286D50400

<BLDG-286> Install Electrical conduits for 3rd Floor Slab

2 18-Feb-15

19-Feb-15 One lighting outlet including empty "PVC" conduits

C286D50290

<BLDG-286> Install Electrical conduits for 4th Floor Slab

2 25-Mar-15

26-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-286>
empty "PVC"
Install conduits
Electrical conduits for 4th Floor Slab

C286D50330

<BLDG-286> Install Electrical Risers

6 11-Apr-15

17-Apr-15

Light Current Systems Triple Play System Floor pull box, Light Current Systems Triple Play System
<BLDG-286>
Tie in point
Install
forElectrical
unit, Light
Risers
Current Systems Two UPVC 25 mm Conduits for

C286D50430

<BLDG-286> Install Earthing System

6 11-Apr-15

17-Apr-15

power network including main earthing networks, 600/1000 V, multicore Aluminium conductor,<BLDG-286>
PVC/PVC cables
Install(3Earthing
x 240+120)
System
mm, 600/1000 V, multicore copper conductor, P

C286D50300

<BLDG-286> Install Electrical conduits for Roof Slab

1 14-Apr-15

14-Apr-15

Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including <BLDG-286>
empty "PVC" conduits
Install Electrical conduits for Roof Slab

C286D50340

<BLDG-286> Install of Panel board

3 27-May-15

29-May-15 Lighting Switches Type Push Button (P.B), 40mm PVC empty conduit from (KWHM) box to panel board of <BLDG-286>
customer
Install of Panel board

C286D50440

<BLDG-286> Install Conduits for intercom system

3 27-May-15

29-May-15 Intercom System Provision for door master unit, Intercom System One UPVC 25 mm conduit for risers/ unit
<BLDG-286> Install Conduits for intercom system

C286D50350

<BLDG-286> Install Distribution Panel

C286D50310

<BLDG-286> Connect between Riser & DP

C286D50410

<BLDG-286> Install Cables

C286D50420

One lighting outlet including empty "PVC" conduits

15-Jul-15, Electrical

<BLDG-286> Install Electrical conduits for 1st Floor Slab


<BLDG-286> Install Electrical conduits for 3rd Floor Slab

14 30-May-15

13-Jun-15

Low Voltage Distribution Panels (DB-SER-2 ), Low Voltage Distribution Panels (DB-SER-1), Low Voltage Distribution
<BLDG-286>
Panels (DB-A4-2),
Install Distribution
Low Voltage
Panel Distribution Panels (DB-A

3 14-Jun-15

16-Jun-15

Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m

21 14-Jun-15

06-Jul-15

450/750 V Single Core Aluminium Conductor, PVC cables (1x 120) mm ECC, 450/750 V Single Core Copper Conductor,
<BLDG-286>
PVC cablesInstall
(1x 35)
Cables
mm ECC, 450/750 V Single Co

<BLDG-286> Install Wiring Devices&Disconnect switches

2 17-Jun-15

18-Jun-15

Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Socket Type<BLDG-286>
SO1, WiringInstall
Devices
Wiring
and Devices&Disconnect
Disconnectors Load Break
switches
Switch

C286D50360

<BLDG-286> Test elec. system

6 07-Jul-15

12-Jul-15

C286D50320

<BLDG-286> Install Lighting fixtures

3 13-Jul-15

15-Jul-15

7 08-Aug-15
2 08-Aug-15

15-Aug-15
09-Aug-15

15-Aug-15, Completion Inspection


<BLDG-286> Punch Out

Completion Inspection
C286H10130
<BLDG-286> Punch Out

<BLDG-286> Connect between Riser & DP

<BLDG-286> Test elec. system


Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5

<BLDG-286> Install Lighting fixtures

C286H10140

<BLDG-286> Pre-final inspection

2 10-Aug-15

11-Aug-15

<BLDG-286> Pre-final inspection

C286H10150

<BLDG-286> Final inspection

3 12-Aug-15

15-Aug-15

<BLDG-286> Final inspection

300 28-Aug-14 A 15-Sep-15


136 28-Aug-14 A 30-Mar-15
1 28-Aug-14 A 01-Sep-14 A

Building 174 (Type# I.A6CR)


Site Preparation
C174G20170
<BLDG-174> Prep for Excavation

15-Sep-15, Building 174 (Type#


30-Mar-15, Site Preparation
<BLDG-174> Prep for Excavation

C174G20150

<BLDG-174> Excavate to Foundation Levels

4 02-Sep-14 A 17-Sep-14 A Disposal of surplus materials


<BLDG-174>
outside Excavate
the site boundary
to Foundation
to nearest
Levels
dump., Excavation in any type of soil except rock for foundation

C174G20140

<BLDG-174> Trim the bottoms of Excavate

1 18-Sep-14 A 18-Sep-14 A

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 17 of 29

<BLDG-174> Trim the bottoms of Excavate


TASK filter: All Activities
Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

C174G20160

<BLDG-174> Backfill for Foundation

2 14-Jan-15

15-Jan-15

C174G20180

<BLDG-174> Backfill around Building

5 25-Mar-15

30-Mar-15

Substructure
Foundation
Foundation at Level (-2.25)
C174A10300
<BLDG-174> Construct P.C. F oundation Lv (- 2.25)
C174A10310

<BLDG-174> Construct R.C.Foundation Lv (-2.25)

C174A10340

<BLDG-174> Construct CUM above Ground Beam Lv (-2.25)/Internal Backfill

C174A10320
C174A10330

92
92
79
8

23-Sep-14 A
23-Sep-14 A
23-Sep-14 A
23-Sep-14 A

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Backfilling, with suitable excavated soil under foundation level <BLDG-174> Backfill for Foundation
<BLDG-174> Backfill around Building

27-Jan-15
27-Jan-15, Substructure
27-Jan-15
27-Jan-15, Foundation
27-Jan-15
27-Jan-15, Foundation at Level (-2.25)
01-Oct-14 A Supply and cast plain concrete
<BLDG-174>
with average
Construct
compressive
P.C. F strength
oundation200
Lv kg/cm2
(- 2.25) at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c

4 02-Oct-14 A 28-Oct-14 A Reinforced concrete with average compressive


<BLDG-174>
strength
Construct
250R.C.Foundation
kg/cm2 at 28 days
Lv for
(-2.25)
foundation, Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
12 28-Dec-14

11-Jan-15

Backfilling, with suitable excavated soil under foundation level,


<BLDG-174>
Supply and build
Construct
solid cement
CUM above
blockGround
unit machine-made
Beam Lv (-2.25)/Internal
with density not
Backfill
exceed 2000 kg/m3

<BLDG-174> Apply Dampproofing for Foundation Lv (-2.25)

2 12-Jan-15

13-Jan-15

Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-174>
with bituminous
Applybase
Dampproofing for Foundation Lv (-2.25)

<BLDG-174> Construct S.O.G Lv (-1.00)

4 23-Jan-15

27-Jan-15

Supply and cast plain concrete with average compressive strength<BLDG-174>


200 kg/cm2 atConstruct
28 days 100mm,
S.O.G Lv
4 mm
(-1.00)
thick bituminous waterproofing membrane with 50 mm cement morta

Foundation at Level (-1.50)


C174A10260
<BLDG-174> Construct P.C. F oundation Lv (- 1.50)
C174A10270

<BLDG-174> Construct R.C.Foundation Lv (-1.50)

C174A10350

<BLDG-174> Construct CUM above Ground Beam Lv (-1.50)/Internal backfill

C174A10280

<BLDG-174> Apply Dampproofing for Foundation Lv (-1.50)

C174A10290

<BLDG-174> Construct S.O.G Lv (+0.05)/Install PE sheets

Superstructure
Ground Floor Lv (+3.15)
C174B30480
<BLDG-174> Fix Reinforcement Bars for Gr Floor Columns

88 23-Sep-14 A 22-Jan-15
22-Jan-15, Foundation at Level (-1.50)
8 23-Sep-14 A 01-Oct-14 A Supply and cast plain concrete
<BLDG-174>
with average
Construct
compressive
P.C. F strength
oundation200
Lv kg/cm2
(- 1.50) at 28 days 100mm, Supply and cast plain concrete with average compressive strength 200 kg/c
8 18-Oct-14 A 12-Nov-14 AReinforced concrete with average compressive
<BLDG-174>
strengthConstruct
250 kg/cm2
R.C.Foundation
at 28 days forLv
foundation
(-1.50)
12 28-Dec-14

11-Jan-15

Backfilling, with suitable excavated soil under foundation level,


<BLDG-174>
Supply and build
Construct
solid cement
CUM above
blockGround
unit machine-made
Beam Lv (-1.50)/Internal
with density not
backfill
exceed 2000 kg/m3

2 12-Jan-15

13-Jan-15

Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-174>
with bituminous
Applybase
Dampproofing for Foundation Lv (-1.50)

3 20-Jan-15

22-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-174>
at 28 daysConstruct
for slab on
S.O.G
gradeLv (+0.05)/Install PE sheets

147 13-Nov-14 A 20-Apr-15


45 13-Nov-14 A 27-Dec-14
8 13-Nov-14 A 29-Nov-14 ASteel Fixing

C174B30510

<BLDG-174> Set up Form work for Gr Floor Columns

C174B30470

<BLDG-174> Cast concrete for Gr Floor Columns

C174B30490

<BLDG-174> Fix Reinforcement Bars for Gr Floor Slab

15 01-Dec-14

16-Dec-14 Steel Fixing

<BLDG-174> Fix Reinforcement Bars for Gr Floor Slab

C174B30500

<BLDG-174> Set up Form work for Gr Floor Slab

15 01-Dec-14

16-Dec-14 Form Work %

<BLDG-174> Set up Form work for Gr Floor Slab

C174B30520

<BLDG-174> Cast concrete for Gr Floor Slab

1 17-Dec-14

17-Dec-14 RC with average compressive strength 250 kg/cm2 at


<BLDG-174>
28 days for stairs,
Cast concrete
beams, and
for Gr
slabs
Floor Slab

C174B30530

<BLDG-174> Dismantle Form work for Gr Floor Slab

9 18-Dec-14

27-Dec-14

<BLDG-174> Dismantle Form work for Gr Floor Slab

22-Jan-15
27-Dec-14 Form Work %

22-Jan-15, First Floor Lv (+6.25)


<BLDG-174> Set up Form work for 1st Floor Columns
<BLDG-174> Fix Reinforcement Bars for 1st Floor Columns

First Floor Lv (+6.25)


C174B30540
<BLDG-174> Set up Form work for 1st Floor Columns

8 13-Nov-14 A 29-Nov-14 AForm Work %

20-Apr-15, Superstructure
27-Dec-14, Ground Floor Lv (+3.15)
<BLDG-174> Fix Reinforcement Bars for Gr Floor Columns

1 30-Nov-14

31 18-Dec-14
9 18-Dec-14

<BLDG-174> Set up Form work for Gr Floor Columns

30-Nov-14 Reinforced concrete with average compressive<BLDG-174>


strength 250 kg/cm2
Cast concrete
at 28 days
for Gr
forFloor
columns,
Columns
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days fo

C174B30550

<BLDG-174> Fix Reinforcement Bars for 1st Floor Columns

9 18-Dec-14

27-Dec-14 Steel Fixing

C174B30560

<BLDG-174> Cast concrete for 1st Floor Columns

1 28-Dec-14

28-Dec-14 Reinforced concrete with average compressive strength<BLDG-174>


250 kg/cm2 atCast
28 days
concrete
for columns,
for 1st Floor
Reinforced
Columns
concrete with average compressive strength 250 kg/cm2 at 28 days fo

C174B30570

<BLDG-174> Fix Reinforcement Bars for 1st Floor Slab

11 29-Dec-14

11-Jan-15

Steel Fixing

<BLDG-174> Fix Reinforcement Bars for 1st Floor Slab

C174B30590

<BLDG-174> Set up Form work for 1st Floor Slab

11 29-Dec-14

11-Jan-15

Form Work %

<BLDG-174> Set up Form work for 1st Floor Slab

C174B30600

<BLDG-174> Cast concrete for 1st Floor Slab

1 12-Jan-15

12-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days


<BLDG-174>
for stairs, beams,
Cast concrete
and slabsfor 1st Floor Slab

C174B30580

<BLDG-174> Dismantle Form work for 1st Floor Slab

9 13-Jan-15

22-Jan-15

<BLDG-174> Dismantle Form work for 1st Floor Slab

16-Feb-15
22-Jan-15 Form Work %

16-Feb-15, Second Floor Lv (+9.35)


<BLDG-174> Set up Form work for 2nd Floor Columns
<BLDG-174> Fix Reinforcement Bars for 2nd Floor Columns

Second Floor Lv (+9.35)


C174B30610
<BLDG-174> Set up Form work for 2nd Floor Columns

31 13-Jan-15
9 13-Jan-15

C174B30620

<BLDG-174> Fix Reinforcement Bars for 2nd Floor Columns

9 13-Jan-15

22-Jan-15

Steel Fixing

C174B30630

<BLDG-174> Cast concrete for 2nd Floor Columns

1 23-Jan-15

23-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-174>
at 28 daysCast
for columns,
concreteReinforced
for 2nd Floor
concrete
Columns
with average compressive strength 250 kg/cm2 at 28 days fo

C174B30640

<BLDG-174> Set up Form work for 2nd Floor Slab

11 24-Jan-15

05-Feb-15 Form Work %

<BLDG-174> Set up Form work for 2nd Floor Slab

C174B30660

<BLDG-174> Fix Reinforcement Bars for 2nd Floor Slab

11 24-Jan-15

05-Feb-15 Steel Fixing

<BLDG-174> Fix Reinforcement Bars for 2nd Floor Slab

C174B30650

<BLDG-174> Cast concrete for 2nd Floor Slab

C174B30670

<BLDG-174> Dismantle Form work for 2nd Floor Slab

Third Floor Lv (+12.45)


C174B30680
<BLDG-174> Set up Form work for 3rd Floor Columns

1 06-Feb-15

06-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,
<BLDG-174>
beams, and
Cast
slabs
concrete for 2nd Floor Slab

9 07-Feb-15

16-Feb-15

<BLDG-174> Dismantle Form work for 2nd Floor Slab

11-Mar-15
16-Feb-15 Form Work %

11-Mar-15, Third Floor Lv (+12.45)


<BLDG-174> Set up Form work for 3rd Floor Columns

9 07-Feb-15

16-Feb-15 Steel Fixing

<BLDG-174> Fix Reinforcement Bars for 3rd Floor Columns

17-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28


<BLDG-174>
days for columns,
Cast concrete
Reinforced
for concrete
3rd Floorwith
Columns
average compressive strength 250 kg/cm2 at 28 days fo

31 07-Feb-15
9 07-Feb-15

C174B30700

<BLDG-174> Fix Reinforcement Bars for 3rd Floor Columns

C174B30690

<BLDG-174> Cast concrete for 3rd Floor Columns

1 17-Feb-15

C174B30710

<BLDG-174> Set up Form work for 3rd Floor Slab

11 18-Feb-15

01-Mar-15 Form Work %

<BLDG-174> Set up Form work for 3rd Floor Slab

C174B30730

<BLDG-174> Fix Reinforcement Bars for 3rd Floor Slab

11 18-Feb-15

01-Mar-15 Steel Fixing

<BLDG-174> Fix Reinforcement Bars for 3rd Floor Slab

C174B30720

<BLDG-174> Cast concrete for 3rd Floor Slab

1 02-Mar-15

02-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,
<BLDG-174>
and slabs Cast concrete for 3rd Floor Slab

C174B30740

<BLDG-174> Dismantle Form work for 3rd Floor Slab

9 03-Mar-15

11-Mar-15

31 03-Mar-15
9 03-Mar-15

04-Apr-15
11-Mar-15

Form Work %

04-Apr-15, Fourth Floor Lv (+15.55)


<BLDG-174> Set up Form work for 4th Floor Columns

Steel Fixing

<BLDG-174> Fix Reinforcement Bars for 4th Floor Columns

Fourth Floor Lv (+15.55)


C174B30820
<BLDG-174> Set up Form work for 4th Floor Columns

<BLDG-174> Dismantle Form work for 3rd Floor Slab

C174B30840

<BLDG-174> Fix Reinforcement Bars for 4th Floor Columns

9 03-Mar-15

11-Mar-15

C174B30830

<BLDG-174> Cast concrete for 4th Floor Columns

1 12-Mar-15

12-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for
<BLDG-174>
columns, Reinforced
Cast concrete
concrete
for 4th
with
Floor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 18 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

C174B30850

<BLDG-174> Set up Form work for 4th Floor Slab

11 14-Mar-15

24-Mar-15 Form Work %

<BLDG-174> Set up Form work for 4th Floor Slab

C174B30860

<BLDG-174> Fix Reinforcement Bars for 4th Floor Slab

11 14-Mar-15

24-Mar-15 Steel Fixing

<BLDG-174> Fix Reinforcement Bars for 4th Floor Slab

C174B30870

<BLDG-174> Cast concrete for 4th Floor Slab

1 25-Mar-15

25-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and<BLDG-174>
slabs
Cast concrete for 4th Floor Slab

C174B30880

<BLDG-174> Dismantle Form work for 4th Floor Slab

9 26-Mar-15

04-Apr-15

Roof Floor Lv (+18.55)


C174B30750
<BLDG-174> Set up Form work for Roof Floor Columns/Planted Columns

23 26-Mar-15
5 26-Mar-15

Oct

Nov

<BLDG-174> Dismantle Form work for 4th Floor Slab

20-Apr-15
31-Mar-15 Form Work %

20-Apr-15, Roof Floor Lv (+18.55)


<BLDG-174> Set up Form work for Roof Floor Columns/Planted Columns
<BLDG-174> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

C174B30770

<BLDG-174> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

5 26-Mar-15

31-Mar-15 Steel Fixing

C174B30760

<BLDG-174> Cast concrete for Roof Floor Columns/Planted Columns

1 01-Apr-15

01-Apr-15

Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-174>
Reinforced
Cast
concrete
concrete
with
foraverage
Roof Floor
compressive
Columns/Planted
strengthColumns
250 kg/cm2 at 28 days fo

C174B30790

<BLDG-174> Fix Reinforcement Bars for Roof Slab

7 05-Apr-15

12-Apr-15

Steel Fixing

<BLDG-174> Fix Reinforcement Bars for Roof Slab

C174B30800

<BLDG-174> Set up Form work for Roof Slab

7 05-Apr-15

12-Apr-15

Form Work %

<BLDG-174> Set up Form work for Roof Slab

C174B30810

<BLDG-174> Cast concrete for Roof Slab

1 14-Apr-15

14-Apr-15

RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs <BLDG-174> Cast concrete for Roof Slab

C174B30780

<BLDG-174> Dismantle Form work for Roof Slab

6 15-Apr-15

20-Apr-15

104 31-Mar-15
10 31-Mar-15

26-Jul-15
09-Apr-15

Exterior Enclosure
C174B30270
<BLDG-174> Erect Scaffold

26-Jul-15, Exterior Enclosure


<BLDG-174> Erect Scaffold

C174B30290

<BLDG-174> Apply Facades Plaster

C174B30310

<BLDG-174> Install Shingle Sheets

C174B30300

<BLDG-174> Install Gypsum Corniche

C174B30260

<BLDG-174> Preparation of shingle ( Supporting System & Insulation Works)

10 29-May-15

08-Jun-15

C174B30340

<BLDG-174> Apply External Paint 1st Coat

14 09-Jun-15

23-Jun-15

C174B30280

<BLDG-174> Install Handrails for balconies

7 24-Jun-15

30-Jun-15

Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-174>
paint handrail
Install
900
Handrails
mm height
for balconies
3/A-501, Supply and ins

C174B30230

<BLDG-174> Apply External Paint 2nd Coat

6 01-Jul-15

07-Jul-15

paint exterior acrylic water-based washable emulsion paint external wall

C174B30220

<BLDG-174> Install Steel & UPVC Doors & Windows

12 08-Jul-15

24-Jul-15

Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge leaves
<BLDG-174>
1400 mm Install
x 2850Steel
mm,&UPVC
UPVCDoor
Doors
type
& Windo
(D03)

C174B30240

<BLDG-174> Install Aluminum Windows

8 08-Jul-15

15-Jul-15

Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with <BLDG-174>
plexi fill - 400 mm
Install
x 1200
Aluminum
mm. Windows

C174B30250

<BLDG-174> Dismantle Scaffold

6 08-Jul-15

13-Jul-15

C174B30320

<BLDG-174> Install Appliqus

3 08-Jul-15

10-Jul-15

C174B30330

<BLDG-174> Install Rough Stone Skirting

Roofing
C174B30380

35 11-Apr-15

<BLDG-174> Dismantle Form work for Roof Slab

<BLDG-174> Cast Light Weight Concrete for slopes

19-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply O.P
<BLDG-174>
cement-sand
Apply
plaster
Facades
in two-coat
Plaster work (base and finish coats)for ext

6 17-May-15

23-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment

<BLDG-174> Install Shingle Sheets

8 20-May-15

28-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply<BLDG-174>
and install gypsum
Install cornices
Gypsum including
Cornichepaint, 105 mm height middle g

<BLDG-174> Preparation of shingle ( Supporting System & Insul


<BLDG-174> Apply External Paint 1st Coat
<BLDG-174> Apply External Paint 2nd Coat

<BLDG-174> Dismantle Scaffold


<BLDG-174> Install Appliqus

8 14-Jul-15

26-Jul-15

Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.
<BLDG-174> Install Rough Stone Skirting

77 31-Mar-15
4 31-Mar-15

23-Jun-15
03-Apr-15

23-Jun-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max.
<BLDG-174>
1200 kg/m Cast Light Weight Concrete for slopes

9 04-Apr-15

14-Apr-15

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

C174B30440

<BLDG-174> Apply Roofing Plaster

C174B30350

<BLDG-174> Install Steel Ladder

C174B30360

<BLDG-174> Apply reinforced bituminous water proofing membrane

6 15-Apr-15

20-Apr-15

C174B30410

<BLDG-174> Test Water proofing membrane

3 21-Apr-15

23-Apr-15

<BLDG-174> Test Water proofing membrane

C174B30390

<BLDG-174> Apply Cement mortar screed

4 26-Apr-15

29-Apr-15

<BLDG-174> Apply Cement mortar screed

C174B30370

<BLDG-174> Apply Extruded polystyrene

3 30-Apr-15

02-May-15

<BLDG-174> Apply Extruded polystyrene

C174B30400

<BLDG-174> Cast protection concrete layer

2 03-May-15

04-May-15

<BLDG-174> Cast protection concrete layer

C174B30420

<BLDG-174> Install Terr azzo Tiles

8 18-May-15

26-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting. <BLDG-174> Install Terr azzo Tiles

C174B30430

<BLDG-174> Install Ceramic Tiles

12 27-May-15

08-Jun-15

Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for<BLDG-174>
floors, 100 mm
Install
height
Ceramic
ceramic
Tiles
tiles for skirting.

C174B30460

<BLDG-174> Apply Paint for Roof

8 09-Jun-15

16-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C174B30450

<BLDG-174> Install of Roof Steel Doors

6 17-Jun-15

23-Jun-15

Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf

15 15-Apr-15

Interior Construction
C174C30250
<BLDG-174> Construct CUM Works for Gr floor

<BLDG-174> Apply Roofing Plaster

01-May-15 Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508, Supply
<BLDG-174>
and install 3100
Installmm
Steel
height
Ladder
steel ladder fixed to block wall
4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof. <BLDG-174> Apply reinforced bituminous water proofing membrane

<BLDG-174> Apply Paint for Roof


<BLDG-174> Install of Roof Steel Doors

206 23-Jan-15
12 23-Jan-15

08-Sep-15
08-Sep-15, Interior Construction
05-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-174>
exceed 2000
Construct
kg/m3, Supply
CUM Works
and build
for solid
Gr floor
cement block unit machine-made with density not exceed 20

C174C30270

<BLDG-174> Construct CUM Works for 1st floor

12 23-Jan-15

05-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-174>
exceed 2000
Construct
kg/m3, Supply
CUM Works
and build
for solid
1st floor
cement block unit machine-made with density not exceed 20

C174C30280

<BLDG-174> Construct CUM Works for 2nd floor

12 17-Feb-15

01-Mar-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-174>
2000 kg/m3,Construct
Supply and
CUM
build
Works
solid for
cement
2nd floor
block unit machine-made with density not exceed 20

C174C30300

<BLDG-174> Construct CUM Works for 3rd floor

12 12-Mar-15

24-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000<BLDG-174>
kg/m3, SupplyConstruct
and buildCUM
solid cement
Works for
block
3rdunit
floormachine-made with density not exceed 20

C174C30230

<BLDG-174> Construct CUM for Parapet

4 26-Mar-15

30-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-174>
Supply and
Construct
build hollow
CUM cement
for Parapet
block unit machine-made with density not exceed

C174C30210

<BLDG-174> Construct CUM Works for 4th floor

12 05-Apr-15

18-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, <BLDG-174>
Supply and build
Construct
solid cement
CUM block
Worksunit
formachine-made
4th floor
with density not exceed 20

C174C30240

<BLDG-174> Construct Interior CUM Works for Roof

4 21-Apr-15

26-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-174>
and build Construct
hollow cement
Interior
block
CUM
unitWorks
machine-made
for Roof with density not exceed

C174C30220

<BLDG-174> Install Ducts work for 4th floor

2 21-Aug-15

22-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit
<BLDG-174>
machine-made
Install
with
Ducts
density
work
not
forexcee
4th f

C174C30310

<BLDG-174> Install Ducts work for 3rd floor

4 23-Aug-15

26-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit<BLDG-174>
machine-made
Install
withDucts
density
work
notfor
excee
3rd

C174C30290

<BLDG-174> Install Ducts work for 2nd floor

4 27-Aug-15

31-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-174> Install
with density
Ducts work
not excee
for 2n

C174C30200

<BLDG-174> Install Ducts work for 1st floor

4 01-Sep-15

04-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-174> with
Installdensity
Ducts not
work
excee
for 1

C174C30260

<BLDG-174> Install Ducts work for Gr floor

4 05-Sep-15

08-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-174>with
Install
density
Ducts
not
work
excee
for

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 19 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Entrance & Stairs


C174C30150
<BLDG-174> Apply Plaster to Stair Case

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

61 19-Apr-15
25 19-Apr-15

24-Jun-15
16-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

24-Jun-15, Entrance & Stairs


<BLDG-174> Apply Plaster to Stair Case

C174C30160

<BLDG-174> Install Marble for Entrance & Stairs

12 17-May-15

29-May-15 terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340
<BLDG-174>
mm width, Stone
InstallPaving
Marbleand
for Flooring
EntranceLight
& Stairs
beige terriesta marble

C174C30140

<BLDG-174> Apply Paint for Entrance & Stairs

12 30-May-15

11-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C174C30190

<BLDG-174> Install Handrails for Stairs

6 12-Jun-15

17-Jun-15

Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.

C174C30180

<BLDG-174> Install Units Wooden Doors

6 18-Jun-15

24-Jun-15

wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm.

Plumbing
C174D50310

<BLDG-174> Install Plumbing Fittings Under SOG

<BLDG-174> Apply Paint for Entrance & Stairs


<BLDG-174> Install Handrails for Stairs
<BLDG-174> Install Units Wooden Doors

194 17-Jan-15
3 17-Jan-15

20-Aug-15
20-Aug-15, Plumbing
19-Jan-15 UPVC pipes and fittings, underground 75mm, UPVC pipes and <BLDG-174>
fittings, underground
Install Plumbing
110mm, UPVC
Fittingspipes
Under
and
SOG
fittings, underground 160mm, Polypropylene Pipes and Fittings

C174D50260

<BLDG-174> Install Drainage Risers

14 19-Apr-15

04-May-15 Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-174>
UPVC Pipes
Install
and
Drainage
Fittings For
Risers
Drainage above ground 75mm, UPVC Pip

C174D50300

<BLDG-174> Install water Risers

14 19-Apr-15

04-May-15 Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings
<BLDG-174>
including items
Installmentioned
water Risers
25mm, Polypropylene Pipes and Fittings includ

C174D50270

<BLDG-174> Install Roof sainatary work

12 05-May-15

17-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron <BLDG-174>
oblique grate, Install
side outlet
Roof100mm
sainatary work

C174D50290

<BLDG-174> Construct Inspection chambers & connections

21 14-Jul-15

09-Aug-15 Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm, Valves
<BLDG-174>
are classified
Construct
according
Inspection
to type Gate
chambers
Valv

C174D50280

<BLDG-174> Test Drainage & water Riser s

10 10-Aug-15

20-Aug-15

<BLDG-174> Test Drainage & water Ris

Electrical
C174D50400

<BLDG-174> Install Electrical conduits for Gr Floor Slab

193 04-Dec-14
2 04-Dec-14

05-Jul-15
06-Dec-14 Indoor wiring for one lighting outlet including wires<BLDG-174>
3(1x3) mm, Install
One lighting
Electrical
outlet
conduits
including
for Gr
empty
Floor
"PVC"
Slab conduits

05-Jul-15, Electrical

C174D50410

<BLDG-174> Install Electrical conduits for 1st Floor Slab

2 30-Dec-14

31-Dec-14 Indoor wiring for one lighting outlet including wires 3(1x3) <BLDG-174>
mm, One lighting
Installoutlet
Electrical
including
conduits
empty
for"PVC"
1st Floor
conduits
Slab

C174D50420

<BLDG-174> Install Electrical conduits for 2nd Floor Slab

2 26-Jan-15

27-Jan-15

C174D50430

<BLDG-174> Install Electrical conduits for 3rd Floor Slab

2 19-Feb-15

20-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-174>
outlet including
Install
empty
Electrical
"PVC"conduits
conduitsfor 3rd Floor Slab

C174D50320

<BLDG-174> Install Electrical conduits for 4th Floor Slab

2 15-Mar-15

16-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet<BLDG-174>
including empty
Install
"PVC"
Electrical
conduits
conduits for 4th Floor Slab

C174D50350

<BLDG-174> Install Electrical Risers

6 31-Mar-15

05-Apr-15

Light Current Systems Two UPVC 25 mm Conduits for risers and tie in connection / unit, <BLDG-174>
Light Current Install
Systems
Electrical
Triple Play
Risers
System Floor pull box, Light Current Systems Triple

C174D50460

<BLDG-174> Install Earthing System

6 31-Mar-15

05-Apr-15

power network including main earthing networks, 600/1000 V, multicore copper conductor,
<BLDG-174>
PVC/PVC cables
Install(4
Earthing
x 10) mm,
System
600/1000 V, multicore copper conductor, PVC/PVC

C174D50330

<BLDG-174> Install Electrical conduits for Roof Slab

2 07-Apr-15

08-Apr-15

Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-174>
empty "PVC"
Install
conduits
Electrical conduits for Roof Slab

C174D50360

<BLDG-174> Install of Panel board

3 17-May-15

19-May-15 40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type Push<BLDG-174>
Button (P.B) Install of Panel board

C174D50470

<BLDG-174> Install Conduits for intercom system

3 17-May-15

19-May-15 Intercom System Provision for door master unit, Intercom System One UPVC 25 mm conduit for risers/<BLDG-174>
unit
Install Conduits for intercom system

C174D50370

<BLDG-174> Install Distribution Panel

C174D50380

<BLDG-174> Connect between Riser & DP

C174D50440

<BLDG-174> Install Cables

C174D50450

<BLDG-174> Install Wiring Devices&Disconnect switches

C174D50390
C174D50340

Indoor wiring for one lighting outlet including wires 3(1x3) mm, One
<BLDG-174>
lighting outlet
Install
including
Electrical
empty
conduits
"PVC" for
conduits
2nd Floor Slab

14 20-May-15

03-Jun-15

Low Voltage Distribution Panels (DB-SER-2 ), Low Voltage Distribution Panels (DB-SER-1)

3 04-Jun-15

07-Jun-15

Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m

21 04-Jun-15

26-Jun-15

450/750 V Single Core Copper Conductor, PVC cables (1x 70) mm, 450/750 V Single Core Copper Conductor, PVC
<BLDG-174>
cables (1x 35)
Install
mm,
Cables
450/750 V Single Core Copper Con

2 08-Jun-15

09-Jun-15

Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power outlet
<BLDG-174>
with 3(1x6)
Install
mm,
Wiring
Wiring
Devices&Disconnect
Devices and Disconnectors
switches Load B

<BLDG-174> Test elec. system

6 27-Jun-15

02-Jul-15

<BLDG-174> Install Lighting fixtures

2 04-Jul-15

05-Jul-15

6 09-Sep-15
2 09-Sep-15

15-Sep-15
10-Sep-15

15-Sep-15, Completion Inspectio


<BLDG-174> Punch Out

2 12-Sep-15

13-Sep-15

<BLDG-174> Pre-final inspection

2 14-Sep-15

15-Sep-15

<BLDG-174> Final inspection

Completion Inspection
C174H10140
<BLDG-174> Punch Out
C174H10150

<BLDG-174> Pre-final inspection

C174H10130

<BLDG-174> Final inspection

316
294
144
2

Phase 2
Building 61 (Type# I.A6 C''')
Site Preparation
C061G10130
<BLDG-61> Prep for Excavation

10-Nov-14 A
30-Nov-14
30-Nov-14
30-Nov-14

10 02-Dec-14

Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5

28-Oct-15
28-Oct-15
09-May-15
01-Dec-14

09-May-15, Site Preparation


<BLDG-61> Prep for Excavation

C061G10110

<BLDG-61> Trim the bottoms of Excavate

2 13-Dec-14

14-Dec-14

C061G10120

<BLDG-61> Backfill for Foundation

2 23-Mar-15

24-Mar-15 Backfilling, with suitable excavated soil under foundation level

C061G10140

<BLDG-61> Backfill around Building

5 04-May-15

09-May-15

15-Dec-14
15-Dec-14
15-Dec-14
15-Dec-14

12-Dec-14 Excavation in any type of soil except rock for foundation,


<BLDG-61>
Disposal
Excavate
of surplus
to materials
Foundation
outside
Levels
the site boundary to nearest dump.
<BLDG-61> Trim the bottoms of Excavate
<BLDG-61> Backfill for Foundation
<BLDG-61> Backfill around Building

17-Apr-15
17-Apr-15, Substructure
17-Apr-15
17-Apr-15, Foundation
17-Apr-15
17-Apr-15, Foundation at Level (-2.25)
23-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-61>
strength 200
Construct
kg/cm2P.C.
at 28
F oundation
days 300mm,
Lv (-Supply
2.25) and cast plain concrete with average compressive strength 200 kg/c

C061A10110

<BLDG-61> Construct R.C.Foundation Lv (-2.25)

C061A10240

<BLDG-61> Construct CUM above Ground Beam Lv (-2.25)/Internal backfill

C061A10120

<BLDG-61> Apply Dampproofing for Foundation Lv (-2.25)

2 21-Mar-15

22-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous base<BLDG-61> Apply Dampproofing for Foundation Lv (-2.25)

C061A10160

<BLDG-61> Construct S.O.G Lv (-1.00)

4 14-Apr-15

17-Apr-15

Foundation at Level (-1.50)


C061A10130
<BLDG-61> Construct P.C. F oundation Lv (- 1.50)
C061A10140

<BLDG-61> Construct R.C.Foundation Lv (-1.50)

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

4 24-Dec-14

<BLDG-174> Install Lighting fixtures

28-Oct-15, Phase
28-Oct-15, Buildin

<BLDG-61> Excavate to Foundation Levels

111
111
111
8

<BLDG-174> Connect between Riser & DP

<BLDG-174> Test elec. system

C061G10100

Substructure
Foundation
Foundation at Level (-2.25)
C061A10100
<BLDG-61> Construct P.C. F oundation Lv (- 2.25)

<BLDG-174> Install Distribution Panel

12 08-Mar-15

107 15-Dec-14
8 15-Dec-14
8 28-Dec-14

27-Dec-14 Reinforced concrete with average compressive strength<BLDG-61>


250 kg/cm2 Construct
at 28 daysR.C.Foundation
for foundation Lv (-2.25)
20-Mar-15 Backfilling, with suitable excavated soil under foundation level, Supply and build solid
<BLDG-61>
cement block
Construct
unit machine-made
CUM above with
Ground
density
Beam
notLv
exceed
(-2.25)/Internal
2000 kg/m3
backfill
Supply and cast plain concrete with average compressive strength 200 kg/cm2 at 28 days 100mm
<BLDG-61> Construct S.O.G Lv (-1.00)

12-Apr-15
12-Apr-15, Foundation at Level (-1.50)
23-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-61>
strength 200
Construct
kg/cm2P.C.
at 28
F oundation
days 300mm,
Lv (-Supply
1.50) and cast plain concrete with average compressive strength 200 kg/c
06-Jan-15

Reinforced concrete with average compressive strength 250


<BLDG-61>
kg/cm2 at 28
Construct
days forR.C.Foundation
foundation, Reinforced
Lv (-1.50)
concrete with average compressive strength 250 kg/cm2 at 28 days

Page 20 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

C061A10250

<BLDG-61> Construct CUM above Ground Beam Lv (-1.50)/Intenal Backfill

C061A10150

<BLDG-61> Apply Dampproofing for Foundation Lv (-1.50)

C061A10170

<BLDG-61> Construct S.O.G Lv (+0.05)/Install PE sheets

Superstructure
Ground Floor Lv (+3.15)
C061B10110
<BLDG-61> Set up Form work for Gr Floor Columns

12 08-Mar-15

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

2 21-Mar-15

22-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous base<BLDG-61> Apply Dampproofing for Foundation Lv (-1.50)

3 09-Apr-15

12-Apr-15

134 08-Jan-15
28 08-Jan-15
5 08-Jan-15

Oct

Nov

20-Mar-15 Backfilling, with suitable excavated soil under foundation level, Supply and build solid
<BLDG-61>
cement block
Construct
unit machine-made
CUM above with
Ground
density
Beam
notLv
exceed
(-1.50)/Intenal
2000 kg/m3
Backfill

Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for slab on<BLDG-61>
grade, 4 mmConstruct
thick bituminous
S.O.G Lv
waterproofing
(+0.05)/Install
membrane
PE sheets
with 50 mm cement mortar

03-Jun-15
07-Feb-15
12-Jan-15 Form Work %

03-Jun-15, Superstructure
07-Feb-15, Ground Floor Lv (+3.15)
<BLDG-61> Set up Form work for Gr Floor Columns

5 08-Jan-15

12-Jan-15

Steel Fixing

<BLDG-61> Fix Reinforcement Bars for Gr Floor Columns

C061B10100

<BLDG-61> Fix Reinforcement Bars for Gr Floor Columns

C061B10120

<BLDG-61> Cast concrete for Gr Floor Columns

1 13-Jan-15

13-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-61>
at 28 Cast
days concrete
for columns,
for Gr
Reinforced
Floor Columns
concrete with average compressive strength 250 kg/cm2 at 28 days fo

C061B10130

<BLDG-61> Fix Reinforcement Bars for Gr Floor Slab

12 14-Jan-15

27-Jan-15

Steel Fixing

<BLDG-61> Fix Reinforcement Bars for Gr Floor Slab

C061B10140

<BLDG-61> Set up Form work for Gr Floor Slab

12 14-Jan-15

27-Jan-15

Form Work %

<BLDG-61> Set up Form work for Gr Floor Slab

C061B10150

<BLDG-61> Cast concrete for Gr Floor Slab

1 28-Jan-15

28-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days for <BLDG-61>


stairs, beams,
Cast
andconcrete
slabs
for Gr Floor Slab

C061B10190

<BLDG-61> Dismantle Form work for Gr Floor Slab

9 29-Jan-15

07-Feb-15

First Floor Lv (+6.25)


C061B10170
<BLDG-61> Set up Form work for 1st Floor Columns

23 29-Jan-15
4 29-Jan-15

<BLDG-61> Dismantle Form work for Gr Floor Slab

22-Feb-15
02-Feb-15 Form Work %

22-Feb-15, First Floor Lv (+6.25)


<BLDG-61> Set up Form work for 1st Floor Columns
<BLDG-61> Fix Reinforcement Bars for 1st Floor Columns

C061B10160

<BLDG-61> Fix Reinforcement Bars for 1st Floor Columns

4 29-Jan-15

02-Feb-15 Steel Fixing

C061B10180

<BLDG-61> Cast concrete for 1st Floor Columns

1 03-Feb-15

03-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2<BLDG-61>


at 28 days for
Cast
columns,
concrete
Reinforced
for 1st Floor
concrete
Columns
with average compressive strength 250 kg/cm2 at 28 days fo

C061B10200

<BLDG-61> Fix Reinforcement Bars for 1st Floor Slab

8 04-Feb-15

11-Feb-15

Steel Fixing

<BLDG-61> Fix Reinforcement Bars for 1st Floor Slab

C061B10210

<BLDG-61> Set up Form work for 1st Floor Slab

8 04-Feb-15

11-Feb-15

Form Work %

<BLDG-61> Set up Form work for 1st Floor Slab

C061B10220

<BLDG-61> Cast concrete for 1st Floor Slab

1 12-Feb-15

12-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,<BLDG-61>
beams, andCast
slabsconcrete for 1st Floor Slab

C061B10260

<BLDG-61> Dismantle Form work for 1st Floor Slab

9 14-Feb-15

22-Feb-15

<BLDG-61> Dismantle Form work for 1st Floor Slab

20-Mar-15
20-Feb-15 Steel Fixing

20-Mar-15, Second Floor Lv (+9.35)


<BLDG-61> Fix Reinforcement Bars for 2nd Floor Columns
<BLDG-61> Set up Form work for 2nd Floor Columns

Second Floor Lv (+9.35)


C061B10230
<BLDG-61> Fix Reinforcement Bars for 2nd Floor Columns

33 14-Feb-15
7 14-Feb-15

C061B10240

<BLDG-61> Set up Form work for 2nd Floor Columns

7 14-Feb-15

20-Feb-15 Form Work %

C061B10250

<BLDG-61> Cast concrete for 2nd Floor Columns

1 21-Feb-15

21-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 <BLDG-61>
days for columns,
Cast concrete
Reinforced
forconcrete
2nd Floorwith
Columns
average compressive strength 250 kg/cm2 at 28 days fo

C061B10280

<BLDG-61> Set up Form work for 2nd Floor Slab

15 22-Feb-15

09-Mar-15 Form Work %

<BLDG-61> Set up Form work for 2nd Floor Slab

C061B10270

<BLDG-61> Fix Reinforcement Bars for 2nd Floor Slab

15 22-Feb-15

09-Mar-15 Steel Fixing

<BLDG-61> Fix Reinforcement Bars for 2nd Floor Slab

C061B10290

<BLDG-61> Cast concrete for 2nd Floor Slab

C061B10330

1 10-Mar-15

10-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,<BLDG-61>
and slabs Cast concrete for 2nd Floor Slab

<BLDG-61> Dismantle Form work for 2nd Floor Slab

9 11-Mar-15

20-Mar-15

<BLDG-61> Dismantle Form work for 2nd Floor Slab

Third Floor Lv (+12.45)


C061B10310
<BLDG-61> Set up Form work for 3rd Floor Columns

36 11-Mar-15
7 11-Mar-15

19-Apr-15
18-Mar-15 Form Work %

19-Apr-15, Third Floor Lv (+12.45)


<BLDG-61> Set up Form work for 3rd Floor Columns

7 11-Mar-15

18-Mar-15 Steel Fixing

<BLDG-61> Fix Reinforcement Bars for 3rd Floor Columns

19-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for <BLDG-61>
columns, Reinforced
Cast concrete
concrete
for 3rd
withFloor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo

C061B10300

<BLDG-61> Fix Reinforcement Bars for 3rd Floor Columns

C061B10320

<BLDG-61> Cast concrete for 3rd Floor Columns

1 19-Mar-15

C061B10350

<BLDG-61> Set up Form work for 3rd Floor Slab

18 20-Mar-15

07-Apr-15

Form Work %

<BLDG-61> Set up Form work for 3rd Floor Slab

C061B10340

<BLDG-61> Fix Reinforcement Bars for 3rd Floor Slab

18 20-Mar-15

07-Apr-15

Steel Fixing

<BLDG-61> Fix Reinforcement Bars for 3rd Floor Slab

C061B10360

<BLDG-61> Cast concrete for 3rd Floor Slab

1 08-Apr-15

08-Apr-15

RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-61> Cast concrete for 3rd Floor Slab

C061B10400

<BLDG-61> Dismantle Form work for 3rd Floor Slab

9 09-Apr-15

19-Apr-15

<BLDG-61> Dismantle Form work for 3rd Floor Slab

19-May-15
17-Apr-15 Steel Fixing

19-May-15, Fourth Floor Lv (+15.55)


<BLDG-61> Fix Reinforcement Bars for 4th Floor Columns
<BLDG-61> Set up Form work for 4th Floor Columns

Fourth Floor Lv (+15.55)


C061B10370
<BLDG-61> Fix Reinforcement Bars for 4th Floor Columns

36 09-Apr-15
7 09-Apr-15

C061B10380

<BLDG-61> Set up Form work for 4th Floor Columns

7 09-Apr-15

17-Apr-15

Form Work %

C061B10390

<BLDG-61> Cast concrete for 4th Floor Columns

1 18-Apr-15

18-Apr-15

Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns, <BLDG-61>
Reinforced concrete
Cast concrete
with average
for 4th Floor
compressive
Columns
strength 250 kg/cm2 at 28 days fo

C061B10420

<BLDG-61> Set up Form work for 4th Floor Slab

18 19-Apr-15

09-May-15 Form Work %

<BLDG-61> Set up Form work for 4th Floor Slab

C061B10410

<BLDG-61> Fix Reinforcement Bars for 4th Floor Slab

18 19-Apr-15

09-May-15 Steel Fixing

<BLDG-61> Fix Reinforcement Bars for 4th Floor Slab

C061B10430

<BLDG-61> Cast concrete for 4th Floor Slab

1 10-May-15

10-May-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs

<BLDG-61> Cast concrete for 4th Floor Slab

C061B10470

<BLDG-61> Dismantle Form work for 4th Floor Slab

9 11-May-15

19-May-15

Roof Floor Lv (+18.55)


C061B10450
<BLDG-61> Set up Form work for Roof Floor Columns/Planted Columns

23 11-May-15
5 11-May-15

<BLDG-61> Dismantle Form work for 4th Floor Slab

03-Jun-15
15-May-15 Form Work %

03-Jun-15, Roof Floor Lv (+18.55)


<BLDG-61> Set up Form work for Roof Floor Columns/Planted Columns

<BLDG-61> Fix Reinforcement Bars for Roof Floor Columns/Planted Co

C061B10440

<BLDG-61> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

5 11-May-15

15-May-15 Steel Fixing

C061B10460

<BLDG-61> Cast concrete for Roof Floor Columns/Planted Columns

1 16-May-15

16-May-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns, Reinforced
<BLDG-61>
concrete with
Castaverage
concretecompressive
for Roof Floor
strength
Columns/Planted
250 kg/cm2 Columns
at 28 days fo

C061B10480

<BLDG-61> Fix Reinforcement Bars for Roof Slab

10 17-May-15

27-May-15 Steel Fixing

<BLDG-61> Fix Reinforcement Bars for Roof Slab

C061B10490

<BLDG-61> Set up Form work for Roof Slab

10 17-May-15

27-May-15 Form Work %

<BLDG-61> Set up Form work for Roof Slab

C061B10500

<BLDG-61> Cast concrete for Roof Slab

1 28-May-15

28-May-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs

<BLDG-61> Cast concrete for Roof Slab

C061B10510

<BLDG-61> Dismantle Form work for Roof Slab

6 29-May-15

03-Jun-15

87 14-May-15

19-Aug-15

Exterior Enclosure
Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 21 of 29

<BLDG-61> Dismantle Form work for Roof Slab


19-Aug-15, Exterior Enclosure
TASK filter: All Activities
Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

C061B20130

<BLDG-61> Erect Scaffold

12 14-May-15

26-May-15

C061B20160

<BLDG-61> Apply Facades Plaster

24 27-May-15

21-Jun-15

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply O.P cement-sand
<BLDG-61>
plasterApply
in two-coat
Facades
work
Plaster
(base and finish coats)for ext

C061B20220

<BLDG-61> Install Gypsum Corniche

11 14-Jun-15

25-Jun-15

Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply and install
<BLDG-61>
gypsum cornices
Install Gypsum
includingCorniche
paint,121 mm height gypsum c

C061B20250

<BLDG-61> Install Shingle Sheets

6 18-Jun-15

24-Jun-15

glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment

C061B20230

<BLDG-61> Preparation of shingle ( Supporting System & Insulation Works)

7 26-Jun-15

02-Jul-15

C061B20140

<BLDG-61> Apply External Paint 1st Coat

6 04-Jul-15

09-Jul-15

C061B20260

<BLDG-61> Install Handrails for balconies

8 10-Jul-15

21-Jul-15

C061B20300

<BLDG-61> Apply External Paint 2nd Coat

5 30-Jul-15

04-Aug-15 paint exterior acrylic water-based washable emulsion paint external wall

C061B20330

<BLDG-61> Install Aluminum Windows

C061B20480

<BLDG-61> Dismantle Scaffold

6 05-Aug-15

10-Aug-15

C061B20280

<BLDG-61> Install Appliqus

3 05-Aug-15

07-Aug-15

C061B20150

<BLDG-61> Install Steel & UPVC Doors & Windows

C061B20270

<BLDG-61> Install Rough Stone Skirting

Roofing
C061B30100

12 05-Aug-15

12 05-Aug-15
8 11-Aug-15

<BLDG-61> Cast Light Weight Concrete for slopes

74 14-May-15
4 14-May-15
9 18-May-15

<BLDG-61> Erect Scaffold

<BLDG-61> Install Shingle Sheets

<BLDG-61> Preparation of shingle ( Supporting System &


<BLDG-61> Apply External Paint 1st Coat

Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic paint
<BLDG-61>
handrail 900
Install
mmHandrails
height 3/A-501,
for balconies
Supply and ins
<BLDG-61> Apply External Paint 2nd Coat

17-Aug-15 Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with plexi fill - 400
<BLDG-61>
mm x 1200
Install
mm.Aluminum Windows
<BLDG-61> Dismantle Scaffold
<BLDG-61> Install Appliqus

17-Aug-15 Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge leaves 1400
<BLDG-61>
mm x 2850Install
mm, UPVC
Steel &Door
UPVC
type
Doors
(D03)
&
19-Aug-15 Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.

<BLDG-61> Install Rough Stone Skirting

05-Aug-15
05-Aug-15, Roofing
17-May-15 Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max. 1200 kg/m <BLDG-61> Cast Light Weight Concrete for slopes

C061B30110

<BLDG-61> Apply Roofing Plaster

C061B30180

<BLDG-61> Install Steel Ladder

C061B30120

<BLDG-61> Apply reinforced bituminous water proofing membrane

4 28-May-15

31-May-15 4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof.

C061B30130

<BLDG-61> Test Water proofing membrane

3 01-Jun-15

03-Jun-15

<BLDG-61> Test Water proofing membrane

C061B30140

<BLDG-61> Apply Cement mortar screed

3 04-Jun-15

07-Jun-15

<BLDG-61> Apply Cement mortar screed

C061B30150

<BLDG-61> Apply Extruded polystyrene

2 08-Jun-15

09-Jun-15

<BLDG-61> Apply Extruded polystyrene

C061B30160

<BLDG-61> Cast protection concrete layer

2 10-Jun-15

11-Jun-15

C061B30170

<BLDG-61> Install Terr azzo Tiles

7 26-Jun-15

02-Jul-15

Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting.

C061B30190

<BLDG-61> Install Ceramic Tiles

14 04-Jul-15

21-Jul-15

Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors, 100 mm
<BLDG-61>
height ceramic
Installtiles
Ceramic
for skirting.
Tiles

C061B30200

<BLDG-61> Apply Paint for Roof

7 22-Jul-15

29-Jul-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C061B30210

<BLDG-61> Install of Roof Steel Doors

6 30-Jul-15

05-Aug-15 Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf

15 28-May-15

209 23-Feb-15
12 23-Feb-15

Interior Construction
C061C10110
<BLDG-61> Construct CUM Works for 1st floor

27-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
12-Jun-15

Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508

<BLDG-61> Apply Roofing Plaster


<BLDG-61> Install Steel Ladder

<BLDG-61> Apply reinforced bituminous water proofing membrane

<BLDG-61> Cast protection concrete layer


<BLDG-61> Install Terr azzo Tiles
<BLDG-61> Apply Paint for Roof
<BLDG-61> Install of Roof Steel Doors

18-Oct-15
18-Oct-15, Interior Co
07-Mar-15 Supply and build solid cement block unit machine-made with density not exceed<BLDG-61>
2000 kg/m3,Construct
Supply and
CUM
build
Works
solid cement
for 1st floor
block unit machine-made with density not exceed 20

C061C10120

<BLDG-61> Construct CUM Works for 2nd floor

12 21-Mar-15

02-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-61>
Supply and
Construct
build solid
CUMcement
Worksblock
for 2nd
unitfloor
machine-made with density not exceed 20

C061C10100

<BLDG-61> Construct CUM Works for Gr floor

12 14-Apr-15

27-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-61>
and buildConstruct
solid cement
CUMblock
Works
unitfor
machine-made
Gr floor
with density not exceed 20

C061C10130

<BLDG-61> Construct CUM Works for 3rd floor

12 20-Apr-15

03-May-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-61>
and build solid
Construct
cement
CUM
block
Works
unit machine-made
for 3rd floor with density not exceed 20

C061C10150

<BLDG-61> Construct CUM for Parapet

C061C10140

<BLDG-61> Construct CUM Works for 4th floor

C061C10160

3 11-May-15

13-May-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and
<BLDG-61>
build hollow
Construct
cementCUM
blockfor
unitParapet
machine-made with density not exceed

12 20-May-15

01-Jun-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and build
<BLDG-61>
solid cement
Construct
block unit
CUM
machine-made
Works for 4th
with
floor
density not exceed 20

<BLDG-61> Construct Interior CUM Works for Roof

4 04-Jun-15

08-Jun-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and build <BLDG-61>
hollow cement
Construct
block unit
Interior
machine-made
CUM Works
withfor
density
Roof not exceed

C061C10190

<BLDG-61> Install Ducts work for 4th floor

6 14-Sep-15

19-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-61>
withInstall
density
Ducts
not excee
work

C061C10200

<BLDG-61> Install Ducts work for 3rd floor

6 20-Sep-15

28-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-61>
with density
Installnot
Ducts
excee
wo

C061C10210

<BLDG-61> Install Ducts work for 2nd floor

5 29-Sep-15

03-Oct-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-61>
with density
Install
notDucts
exceew

C061C10220

<BLDG-61> Install Ducts work for 1st floor

5 04-Oct-15

10-Oct-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-61>
with densityInstall
not excee
Ducts

C061C10230

<BLDG-61> Install Ducts work for Gr floor

5 11-Oct-15

18-Oct-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made with
<BLDG-61>
density not
Install
excee
Du

Entrance & Stairs


C061C20100
<BLDG-61> Apply Plaster to Stair Case

55 02-Jun-15
19 02-Jun-15

04-Aug-15
22-Jun-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

04-Aug-15, Entrance & Stairs


<BLDG-61> Apply Plaster to Stair Case

C061C20130

<BLDG-61> Install Marble for Entrance & Stairs

12 23-Jun-15

05-Jul-15

terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340 mm width,<BLDG-61>
Stone Paving
Install
and Marble
Flooringfor
Light
Entrance
beige terriesta
& Stairs marble

C061C20170

<BLDG-61> Apply Paint for Entrance & Stairs

12 06-Jul-15

21-Jul-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C061C20160

<BLDG-61> Install Handrails for Stairs

6 22-Jul-15

28-Jul-15

Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.

C061C20120

<BLDG-61> Install Units Wooden Doors

6 29-Jul-15

04-Aug-15 wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door type (D09) - hinged
<BLDG-61>
leaf - 900 Install
mm x 2200
Units mm.
Wooden Doors

Plumbing
C061D20100

154 25-Mar-15
14 25-Mar-15

<BLDG-61> Install Plumbing Fittings Under SOG

<BLDG-61> Apply Paint for Entrance & Stairs


<BLDG-61> Install Handrails for Stairs

13-Sep-15
13-Sep-15, Plumbing
08-Apr-15 UPVC pipes and fittings, underground 75mm, UPVC pipes and fittings, underground 110mm,
<BLDG-61>
UPVC pipes
Install
and
Plumbing
fittings, underground
Fittings Under160mm,
SOG Polypropylene Pipes and Fittings

C061D20110

<BLDG-61> Install Drainage Risers

12 02-Jun-15

14-Jun-15

Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm, UPVC Pipes
<BLDG-61>
and Fittings
Install
ForDrainage
Drainage
Risers
above ground 75mm, UPVC Pip

C061D20120

<BLDG-61> Install water Risers

14 02-Jun-15

16-Jun-15

Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings including items
<BLDG-61>
mentioned
Install
25mm,
water
Polypropylene
Risers
Pipes and Fittings includ

C061D20130

<BLDG-61> Install Roof sainatary work

10 15-Jun-15

25-Jun-15

Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron oblique grate,<BLDG-61>
side outlet 100mm
Install Roof sainatary work

C061D20140

<BLDG-61> Construct Inspection chambers & connections

21 11-Aug-15

02-Sep-15 Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm, Valves are classified
<BLDG-61>
according
Construct
to type
Inspection
Gate Valv
cha

C061D20150

<BLDG-61> Test Drainage & water Riser s

10 03-Sep-15

13-Sep-15

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 22 of 29

<BLDG-61> Test Drainage & wat


TASK filter: All Activities
Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Oct

Nov

<BLDG-61> Install Electrical conduits for Gr Floor Slab

192 14-Jan-15
2 14-Jan-15

C061D50120

<BLDG-61> Install Electrical conduits for 1st Floor Slab

2 02-Feb-15

03-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One <BLDG-61>
lighting outletInstall
including
Electrical
emptyconduits
"PVC" conduits
for 1st Floor Slab

C061D50130

<BLDG-61> Install Electrical conduits for 2nd Floor Slab

2 28-Feb-15

01-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet
<BLDG-61>
including
Install
empty
Electrical
"PVC" conduits
conduits for 2nd Floor Slab

C061D50140

<BLDG-61> Install Electrical conduits for 3rd Floor Slab

2 29-Mar-15

30-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-61>
empty "PVC"
Install conduits
Electrical conduits for 3rd Floor Slab

C061D50150

<BLDG-61> Install Electrical conduits for 4th Floor Slab

2 29-Apr-15

30-Apr-15

C061D50100

<BLDG-61> Install Earthing System

6 14-May-15

19-May-15 power network including main earthing networks

C061D50180

<BLDG-61> Install Electrical Risers

6 14-May-15

19-May-15 Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple Play System<BLDG-61>
Floor pull box,
Install
Light
Electrical
CurrentRisers
Systems Two UPVC 25 mm Conduits for

C061D50160

<BLDG-61> Install Electrical conduits for Roof Slab

2 23-May-15

24-May-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including empty "PVC"<BLDG-61>
conduits
Install Electrical conduits for Roof Slab

C061D50170

<BLDG-61> Install Conduits for intercom system

3 23-Jun-15

25-Jun-15

Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door master unit

C061D50200

<BLDG-61> Install of Panel board

3 23-Jun-15

25-Jun-15

40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type Push Button (P.B)<BLDG-61> Install of Panel board

C061D50210

<BLDG-61> Install Distribution Panel

14 26-Jun-15

10-Jul-15

Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution Panels <BLDG-61>
(DB-SER-1),Install
Low Voltage
Distribution
Distribution
Panel Panels (DB-SER

C061D50230

<BLDG-61> Install Cables

21 11-Jul-15

06-Aug-15 600/1000 V, multicore copper conductor, PVC/PVC cables (4 x 10) mm, 600/1000 V, multicore copper conductor, PVC/PVC cables
<BLDG-61>
(4 x 16) mm,
Install
600/1000
Cables V, multicore coppe

C061D50220

<BLDG-61> Connect between Riser & DP

3 11-Jul-15

13-Jul-15

Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m

C061D50190

<BLDG-61> Install Wiring Devices&Disconnect switches

2 14-Jul-15

15-Jul-15

Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power outlet with 3(1x6)
<BLDG-61>
mm, Wiring
InstallDevices
Wiring Devices&Disconnect
and Disconnectors Load
switch
B

C061D50240

<BLDG-61> Test elec. system

6 07-Aug-15

12-Aug-15

C061D50250

<BLDG-61> Install Lighting fixtures

3 13-Aug-15

16-Aug-15 Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5

9 19-Oct-15
3 19-Oct-15

28-Oct-15
21-Oct-15

28-Oct-15, Compl
<BLDG-61> Punch O

<BLDG-61> Pre-fin

Completion Inspection
C061H10100
<BLDG-61> Punch Out

16-Aug-15
15-Jan-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm,<BLDG-61>
One lightingInstall
outletElectrical
includingconduits
empty "PVC"
for Grconduits
Floor Slab

Sep

Electrical
C061D50110

C061H10110

<BLDG-61> Pre-final inspection

3 22-Oct-15

25-Oct-15

C061H10120

<BLDG-61> Final inspection

3 26-Oct-15

28-Oct-15

Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including empty
<BLDG-61>
"PVC" conduits
Install Electrical conduits for 4th Floor Slab
<BLDG-61> Install Earthing System

<BLDG-61> Install Conduits for intercom system

<BLDG-61> Connect between Riser & DP


<BLDG-61> Test elec. system

15-Sep-15, Building 64 (Type# I.


06-Apr-15, Site Preparation
<BLDG-64> Prep for Excavation

C064G10100

<BLDG-64> Excavate to Foundation Levels

6 15-Nov-14 A 23-Nov-14 AExcavation in any type of soil except rock for <BLDG-64>
foundation, Disposal
Excavateoftosurplus
Foundation
materials
Levels
outside the site boundary to nearest dump.

C064G10110

<BLDG-64> Trim the bottoms of Excavate

2 24-Nov-14 A 28-Nov-14 A

C064G10120

<BLDG-64> Backfill for Foundation

2 07-Mar-15

08-Mar-15 Backfilling, with suitable excavated soil under foundation level

C064G10140

<BLDG-64> Backfill around Building

5 02-Apr-15

06-Apr-15

Substructure
Foundation
Foundation at Level (-2.25)
C064A10100
<BLDG-64> Construct P.C. F oundation Lv (- 2.25)

110
110
110
8

30-Nov-14
30-Nov-14
30-Nov-14
30-Nov-14

<BLDG-64> Trim the bottoms of Excavate


<BLDG-64> Backfill for Foundation
<BLDG-64> Backfill around Building

31-Mar-15
31-Mar-15, Substructure
31-Mar-15
31-Mar-15, Foundation
31-Mar-15
31-Mar-15, Foundation at Level (-2.25)
08-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-64>
strength
Construct
200 kg/cm2
P.C. F at
oundation
28 days Lv
300mm,
(- 2.25)Supply and cast plain concrete with average compressive strength 200 kg/c

C064A10110

<BLDG-64> Construct R.C.Foundation Lv (-2.25)

C064A10240

<BLDG-64> Construct CUM above Ground Beam Lv (-2.25)/Internal backfill

C064A10120

<BLDG-64> Apply Dampproofing for Foundation Lv (-2.25)

2 05-Mar-15

06-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous<BLDG-64>
base
Apply Dampproofing for Foundation Lv (-2.25)

C064A10160

<BLDG-64> Construct S.O.G Lv (-1.00)

4 28-Mar-15

31-Mar-15 Supply and cast plain concrete with average compressive strength 200 kg/cm2 at 28 days
<BLDG-64>
100mm Construct S.O.G Lv (-1.00)

Foundation at Level (-1.50)


C064A10130
<BLDG-64> Construct P.C. F oundation Lv (- 1.50)

4 09-Dec-14

<BLDG-61> Install Lighting fixtures

<BLDG-61> Final

282 10-Nov-14 A 15-Sep-15


138 10-Nov-14 A 06-Apr-15
2 10-Nov-14 A 14-Nov-14 A

Building 64 (Type# I.A6 CL)


Site Preparation
C064G10130
<BLDG-64> Prep for Excavation

16-Aug-15, Electrical

12 20-Feb-15

12-Dec-14 Reinforced concrete with average compressive strength


<BLDG-64>
250 kg/cm2
Construct
at 28R.C.Foundation
days for foundation
Lv (-2.25)
04-Mar-15 Backfilling, with suitable excavated soil under foundation level, Supply and build
<BLDG-64>
solid cement
Construct
block unit
CUM
machine-made
above Ground
withBeam
density
Lvnot
(-2.25)/Internal
exceed 2000 backfill
kg/m3

106 30-Nov-14
8 30-Nov-14

26-Mar-15
26-Mar-15, Foundation at Level (-1.50)
08-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-64>
strength
Construct
200 kg/cm2
P.C. F at
oundation
28 days Lv
300mm,
(- 1.50)Supply and cast plain concrete with average compressive strength 200 kg/c

6 13-Dec-14

18-Dec-14 Reinforced concrete with average compressive strength


<BLDG-64>
250 kg/cm2
Construct
at 28 days
R.C.Foundation
for foundation,
LvReinforced
(-1.50)
concrete with average compressive strength 250 kg/cm2 at 28 days

C064A10140

<BLDG-64> Construct R.C.Foundation Lv (-1.50)

C064A10250

<BLDG-64> Construct CUM above Ground Beam Lv (-1.50)/Intenal Backfill

C064A10150

<BLDG-64> Apply Dampproofing for Foundation Lv (-1.50)

2 05-Mar-15

06-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous<BLDG-64>
base
Apply Dampproofing for Foundation Lv (-1.50)

C064A10170

<BLDG-64> Construct S.O.G Lv (+0.05)/Install PE sheets

3 24-Mar-15

26-Mar-15 4 mm thick bituminous waterproofing membrane with 50 mm cement mortar screed for
<BLDG-64>
slab on grade,
Construct
SupplyS.O.G
and install
Lv (+0.05)/Install
50 mm thick extruded
PE sheetspolystyrene insulation boards of

Superstructure
Ground Floor Lv (+3.15)
C064B10110
<BLDG-64> Set up Form work for Gr Floor Columns

12 20-Feb-15

116 20-Dec-14
27 20-Dec-14
5 20-Dec-14

04-Mar-15 Backfilling, with suitable excavated soil under foundation level, Supply and build
<BLDG-64>
solid cement
Construct
block unit
CUM
machine-made
above Ground
withBeam
density
Lvnot
(-1.50)/Intenal
exceed 2000Backfill
kg/m3

28-Apr-15
19-Jan-15
24-Dec-14 Form Work %

28-Apr-15, Superstructure
19-Jan-15, Ground Floor Lv (+3.15)
<BLDG-64> Set up Form work for Gr Floor Columns
<BLDG-64> Fix Reinforcement Bars for Gr Floor Columns

C064B10100

<BLDG-64> Fix Reinforcement Bars for Gr Floor Columns

5 20-Dec-14

24-Dec-14 Steel Fixing

C064B10120

<BLDG-64> Cast concrete for Gr Floor Columns

1 25-Dec-14

25-Dec-14 Reinforced concrete with average compressive strength<BLDG-64>


250 kg/cm2Cast
at 28concrete
days for for
columns,
Gr Floor
Reinforced
Columnsconcrete with average compressive strength 250 kg/cm2 at 28 days fo

C064B10130

<BLDG-64> Fix Reinforcement Bars for Gr Floor Slab

11 26-Dec-14

08-Jan-15

Steel Fixing

<BLDG-64> Fix Reinforcement Bars for Gr Floor Slab

C064B10140

<BLDG-64> Set up Form work for Gr Floor Slab

11 26-Dec-14

08-Jan-15

Form Work %

<BLDG-64> Set up Form work for Gr Floor Slab

C064B10150

<BLDG-64> Cast concrete for Gr Floor Slab

1 09-Jan-15

09-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days


<BLDG-64>
for stairs, beams,
Cast concrete
and slabs
for Gr Floor Slab

C064B10190

<BLDG-64> Dismantle Form work for Gr Floor Slab

9 10-Jan-15

19-Jan-15

First Floor Lv (+6.25)


C064B10170
<BLDG-64> Set up Form work for 1st Floor Columns
Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

25 10-Jan-15
4 10-Jan-15

06-Feb-15
13-Jan-15 Form Work %
Page 23 of 29

<BLDG-64> Dismantle Form work for Gr Floor Slab


06-Feb-15, First Floor Lv (+6.25)
<BLDG-64> Set up Form work for 1st Floor Columns
TASK filter: All Activities
Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

C064B10160

<BLDG-64> Fix Reinforcement Bars for 1st Floor Columns

4 10-Jan-15

13-Jan-15

Steel Fixing

C064B10180

<BLDG-64> Cast concrete for 1st Floor Columns

1 14-Jan-15

14-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-64>
at 28 days
Cast for
concrete
columns,
for Reinforced
1st Floor Columns
concrete with average compressive strength 250 kg/cm2 at 28 days fo

C064B10200

<BLDG-64> Fix Reinforcement Bars for 1st Floor Slab

10 15-Jan-15

26-Jan-15

Steel Fixing

<BLDG-64> Fix Reinforcement Bars for 1st Floor Slab

C064B10210

<BLDG-64> Set up Form work for 1st Floor Slab

10 15-Jan-15

26-Jan-15

Form Work %

<BLDG-64> Set up Form work for 1st Floor Slab

C064B10220

<BLDG-64> Cast concrete for 1st Floor Slab

1 27-Jan-15

27-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days for <BLDG-64>


stairs, beams,
Cast
andconcrete
slabs for 1st Floor Slab

C064B10260

<BLDG-64> Dismantle Form work for 1st Floor Slab

9 28-Jan-15

06-Feb-15

<BLDG-64> Dismantle Form work for 1st Floor Slab

26-Feb-15
04-Feb-15 Steel Fixing

26-Feb-15, Second Floor Lv (+9.35)


<BLDG-64> Fix Reinforcement Bars for 2nd Floor Columns

7 28-Jan-15

04-Feb-15 Form Work %

<BLDG-64> Set up Form work for 2nd Floor Columns

05-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at


<BLDG-64>
28 days forCast
columns,
concrete
Reinforced
for 2nd Floor
concrete
Columns
with average compressive strength 250 kg/cm2 at 28 days fo

Second Floor Lv (+9.35)


C064B10230
<BLDG-64> Fix Reinforcement Bars for 2nd Floor Columns

28 28-Jan-15
7 28-Jan-15

<BLDG-64> Fix Reinforcement Bars for 1st Floor Columns

C064B10240

<BLDG-64> Set up Form work for 2nd Floor Columns

C064B10250

<BLDG-64> Cast concrete for 2nd Floor Columns

1 05-Feb-15

C064B10280

<BLDG-64> Set up Form work for 2nd Floor Slab

10 06-Feb-15

16-Feb-15 Form Work %

<BLDG-64> Set up Form work for 2nd Floor Slab

C064B10270

<BLDG-64> Fix Reinforcement Bars for 2nd Floor Slab

10 06-Feb-15

16-Feb-15 Steel Fixing

<BLDG-64> Fix Reinforcement Bars for 2nd Floor Slab

C064B10290

<BLDG-64> Cast concrete for 2nd Floor Slab

1 17-Feb-15

17-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, <BLDG-64>
beams, and slabs
Cast concrete for 2nd Floor Slab

C064B10330

<BLDG-64> Dismantle Form work for 2nd Floor Slab

9 18-Feb-15

26-Feb-15

<BLDG-64> Dismantle Form work for 2nd Floor Slab

Third Floor Lv (+12.45)


C064B10310
<BLDG-64> Set up Form work for 3rd Floor Columns

28 18-Feb-15
7 18-Feb-15

19-Mar-15
24-Feb-15 Form Work %

19-Mar-15, Third Floor Lv (+12.45)


<BLDG-64> Set up Form work for 3rd Floor Columns
<BLDG-64> Fix Reinforcement Bars for 3rd Floor Columns

C064B10300

<BLDG-64> Fix Reinforcement Bars for 3rd Floor Columns

7 18-Feb-15

24-Feb-15 Steel Fixing

C064B10320

<BLDG-64> Cast concrete for 3rd Floor Columns

1 25-Feb-15

25-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
<BLDG-64>
for columns,
CastReinforced
concrete for
concrete
3rd Floor
with
Columns
average compressive strength 250 kg/cm2 at 28 days fo

C064B10350

<BLDG-64> Set up Form work for 3rd Floor Slab

10 26-Feb-15

08-Mar-15 Form Work %

<BLDG-64> Set up Form work for 3rd Floor Slab

C064B10340

<BLDG-64> Fix Reinforcement Bars for 3rd Floor Slab

10 26-Feb-15

08-Mar-15 Steel Fixing

<BLDG-64> Fix Reinforcement Bars for 3rd Floor Slab

C064B10360

<BLDG-64> Cast concrete for 3rd Floor Slab

1 09-Mar-15

09-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,<BLDG-64>
and slabs Cast concrete for 3rd Floor Slab

C064B10400

<BLDG-64> Dismantle Form work for 3rd Floor Slab

9 10-Mar-15

19-Mar-15

<BLDG-64> Dismantle Form work for 3rd Floor Slab

11-Apr-15
17-Mar-15 Steel Fixing

11-Apr-15, Fourth Floor Lv (+15.55)


<BLDG-64> Fix Reinforcement Bars for 4th Floor Columns
<BLDG-64> Set up Form work for 4th Floor Columns

Fourth Floor Lv (+15.55)


C064B10370
<BLDG-64> Fix Reinforcement Bars for 4th Floor Columns

30 10-Mar-15
7 10-Mar-15

C064B10380

<BLDG-64> Set up Form work for 4th Floor Columns

7 10-Mar-15

17-Mar-15 Form Work %

C064B10390

<BLDG-64> Cast concrete for 4th Floor Columns

1 18-Mar-15

18-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for<BLDG-64>
columns, Reinforced
Cast concrete
concrete
for 4th
withFloor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo

C064B10420

<BLDG-64> Set up Form work for 4th Floor Slab

12 19-Mar-15

31-Mar-15 Form Work %

<BLDG-64> Set up Form work for 4th Floor Slab

C064B10410

<BLDG-64> Fix Reinforcement Bars for 4th Floor Slab

12 19-Mar-15

31-Mar-15 Steel Fixing

<BLDG-64> Fix Reinforcement Bars for 4th Floor Slab

C064B10430

<BLDG-64> Cast concrete for 4th Floor Slab

C064B10470

1 01-Apr-15

01-Apr-15

RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-64> Cast concrete for 4th Floor Slab

<BLDG-64> Dismantle Form work for 4th Floor Slab

9 02-Apr-15

11-Apr-15

Roof Floor Lv (+18.55)


C064B10450
<BLDG-64> Set up Form work for Roof Floor Columns/Planted Columns

23 02-Apr-15
5 02-Apr-15

28-Apr-15
06-Apr-15

Form Work %

28-Apr-15, Roof Floor Lv (+18.55)


<BLDG-64> Set up Form work for Roof Floor Columns/Planted Columns

5 02-Apr-15

06-Apr-15

Steel Fixing

<BLDG-64> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

<BLDG-64> Dismantle Form work for 4th Floor Slab

C064B10440

<BLDG-64> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

C064B10460

<BLDG-64> Cast concrete for Roof Floor Columns/Planted Columns

1 07-Apr-15

07-Apr-15

Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-64>
Reinforced
Cast
concrete
concrete
with
foraverage
Roof Floor
compressive
Columns/Planted
strengthColumns
250 kg/cm2 at 28 days fo

C064B10480

<BLDG-64> Fix Reinforcement Bars for Roof Slab

10 08-Apr-15

19-Apr-15

Steel Fixing

<BLDG-64> Fix Reinforcement Bars for Roof Slab

C064B10490

<BLDG-64> Set up Form work for Roof Slab

10 08-Apr-15

19-Apr-15

Form Work %

<BLDG-64> Set up Form work for Roof Slab

C064B10500

<BLDG-64> Cast concrete for Roof Slab

1 20-Apr-15

20-Apr-15

RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs

<BLDG-64> Cast concrete for Roof Slab

C064B10510

<BLDG-64> Dismantle Form work for Roof Slab

6 21-Apr-15

28-Apr-15

85 07-Apr-15
12 07-Apr-15

09-Jul-15
20-Apr-15

Exterior Enclosure
C064B20130
<BLDG-64> Erect Scaffold

<BLDG-64> Dismantle Form work for Roof Slab


09-Jul-15, Exterior Enclosure
<BLDG-64> Erect Scaffold

C064B20160

<BLDG-64> Apply Facades Plaster

25 21-Apr-15

18-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply O.P
<BLDG-64>
cement-sand
Applyplaster
Facades
in two-coat
Plaster work (base and finish coats)for ext

C064B20220

<BLDG-64> Install Gypsum Corniche

11 12-May-15

23-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply
<BLDG-64>
and installInstall
gypsum
Gypsum
cornices
Corniche
including paint,121 mm height gypsum c

C064B20250

<BLDG-64> Install Shingle Sheets

6 16-May-15

21-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment

C064B20230

<BLDG-64> Preparation of shingle ( Supporting System & Insulation Works)

7 24-May-15

30-May-15

C064B20140

<BLDG-64> Apply External Paint 1st Coat

6 31-May-15

06-Jun-15

C064B20260

<BLDG-64> Install Handrails for balconies

8 07-Jun-15

14-Jun-15

Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-64>
paintInstall
handrail
Handrails
900 mm
forheight
balconies
3/A-501, Supply and ins

C064B20300

<BLDG-64> Apply External Paint 2nd Coat

C064B20330

<BLDG-64> Install Aluminum Windows

C064B20480
C064B20280
C064B20150

<BLDG-64> Install Steel & UPVC Doors & Windows

C064B20270

<BLDG-64> Install Rough Stone Skirting

<BLDG-64> Install Shingle Sheets

<BLDG-64> Preparation of shingle ( Supporting System & Insulation


<BLDG-64> Apply External Paint 1st Coat

5 20-Jun-15

24-Jun-15

paint exterior acrylic water-based washable emulsion paint external wall

12 25-Jun-15

07-Jul-15

Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with
<BLDG-64>
plexi fill - 400
Install
mm
Aluminum
x 1200 mm.
Windows

<BLDG-64> Dismantle Scaffold

6 25-Jun-15

30-Jun-15

<BLDG-64> Install Appliqus

3 25-Jun-15

27-Jun-15

12 25-Jun-15

07-Jul-15

Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge
<BLDG-64>
leaves 1400
Install
mmSteel
x 2850
& UPVC
mm, UPVC
DoorsDoor
& Windows
type (D03)

8 01-Jul-15

09-Jul-15

Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone <BLDG-64>
skirting.
Install Rough Stone Skirting

74 05-Apr-15

25-Jun-15

Roofing
Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

<BLDG-64> Apply External Paint 2nd Coat


<BLDG-64> Dismantle Scaffold
<BLDG-64> Install Appliqus

Page 24 of 29

25-Jun-15, Roofing
TASK filter: All Activities
Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

C064B30100

<BLDG-64> Cast Light Weight Concrete for slopes

4 05-Apr-15

08-Apr-15

Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max.<BLDG-64>
1200 kg/m Cast Light Weight Concrete for slopes

C064B30110

<BLDG-64> Apply Roofing Plaster

9 09-Apr-15

19-Apr-15

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

C064B30180

<BLDG-64> Install Steel Ladder

C064B30120

<BLDG-64> Apply reinforced bituminous water proofing membrane

4 20-Apr-15

23-Apr-15

C064B30130

<BLDG-64> Test Water proofing membrane

3 26-Apr-15

28-Apr-15

<BLDG-64> Test Water proofing membrane

C064B30140

<BLDG-64> Apply Cement mortar screed

3 29-Apr-15

01-May-15

<BLDG-64> Apply Cement mortar screed

C064B30150

<BLDG-64> Apply Extruded polystyrene

2 02-May-15

03-May-15

<BLDG-64> Apply Extruded polystyrene

C064B30160

<BLDG-64> Cast protection concrete layer

2 04-May-15

05-May-15

<BLDG-64> Cast protection concrete layer

C064B30170

<BLDG-64> Install Terr azzo Tiles

7 20-May-15

27-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting. <BLDG-64> Install Terr azzo Tiles

C064B30190

<BLDG-64> Install Ceramic Tiles

14 28-May-15

11-Jun-15

Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors,
<BLDG-64>
100 mm
Install
height
Ceramic
ceramic
Tiles
tiles for skirting.

C064B30200

<BLDG-64> Apply Paint for Roof

7 12-Jun-15

18-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C064B30210

<BLDG-64> Install of Roof Steel Doors

6 20-Jun-15

25-Jun-15

Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf

15 20-Apr-15

190 07-Feb-15
12 07-Feb-15

Interior Construction
C064C10110
<BLDG-64> Construct CUM Works for 1st floor

<BLDG-64> Apply Roofing Plaster

06-May-15 Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508

<BLDG-64> Install Steel Ladder

4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof. <BLDG-64> Apply reinforced bituminous water proofing membrane

<BLDG-64> Apply Paint for Roof


<BLDG-64> Install of Roof Steel Doors

05-Sep-15
05-Sep-15, Interior Construction
19-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-64>
2000 kg/m3,
Construct
Supply
CUM
and
Works
build solid
for 1st
cement
floor block unit machine-made with density not exceed 20

C064C10120

<BLDG-64> Construct CUM Works for 2nd floor

12 28-Feb-15

11-Mar-15

Supply and build solid cement block unit machine-made with density not exceed 2000
<BLDG-64>
kg/m3, Supply
Construct
andCUM
buildWorks
solid cement
for 2ndblock
floorunit machine-made with density not exceed 20

C064C10130

<BLDG-64> Construct CUM Works for 3rd floor

12 20-Mar-15

01-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-64>
Supply Construct
and build solid
CUMcement
Worksblock
for 3rd
unit
floor
machine-made with density not exceed 20

C064C10100

<BLDG-64> Construct CUM Works for Gr floor

12 28-Mar-15

08-Apr-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3,
<BLDG-64>
Supply and
Construct
build solid
CUMcement
Worksblock
for Gr
unit
floor
machine-made with density not exceed

C064C10150

<BLDG-64> Construct CUM for Parapet

3 02-Apr-15

04-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-64>
Supply and
Construct
build hollow
CUM cement
for Parapet
block unit machine-made with density not exceed

C064C10140

<BLDG-64> Construct CUM Works for 4th floor

12 12-Apr-15

26-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-64>
and buildConstruct
solid cement
CUMblock
Works
unitfor
machine-made
4th floor
with density not exceed 20

C064C10160

<BLDG-64> Construct Interior CUM Works for Roof

4 29-Apr-15

02-May-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-64>
and build hollow
Construct
cement
Interior
block
CUM
unitWorks
machine-made
for Roof with density not exceed

C064C10190

<BLDG-64> Install Ducts work for 4th floor

6 08-Aug-15

13-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block<BLDG-64>
unit machine-made
Install Ducts
with work
density
fornot
4thexcee
floor

C064C10200

<BLDG-64> Install Ducts work for 3rd floor

6 15-Aug-15

20-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit
<BLDG-64>
machine-made
Install with
Ducts
density
work for
not3rd
excee
flo

C064C10210

<BLDG-64> Install Ducts work for 2nd floor

5 21-Aug-15

25-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit<BLDG-64>
machine-made
Install
with
Ducts
density
worknot
forexcee
2nd f

C064C10220

<BLDG-64> Install Ducts work for 1st floor

5 26-Aug-15

31-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-64> Install
withDucts
density
work
not for
excee
1st

C064C10230

<BLDG-64> Install Ducts work for Gr floor

5 01-Sep-15

05-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-64> Install
with density
Ducts work
not excee
for G

Entrance & Stairs


C064C20100
<BLDG-64> Apply Plaster to Stair Case

55 27-Apr-15
19 27-Apr-15

24-Jun-15
16-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

24-Jun-15, Entrance & Stairs


<BLDG-64> Apply Plaster to Stair Case

C064C20130

<BLDG-64> Install Marble for Entrance & Stairs

12 17-May-15

29-May-15 terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340
<BLDG-64>
mm width, Stone
Install Marble
Paving for
andEntrance
Flooring &
Light
Stairs
beige terriesta marble

C064C20170

<BLDG-64> Apply Paint for Entrance & Stairs

12 30-May-15

11-Jun-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C064C20160

<BLDG-64> Install Handrails for Stairs

6 12-Jun-15

17-Jun-15

Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.

C064C20120

<BLDG-64> Install Units Wooden Doors

6 18-Jun-15

24-Jun-15

wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door type<BLDG-64>
(D09) - hinged
Install
leafUnits
- 900Wooden
mm x 2200
Doors
mm.

Plumbing
C064D20100

<BLDG-64> Install Plumbing Fittings Under SOG

<BLDG-64> Apply Paint for Entrance & Stairs


<BLDG-64> Install Handrails for Stairs

135 09-Mar-15
14 09-Mar-15

07-Aug-15
07-Aug-15, Plumbing
23-Mar-15 UPVC pipes and fittings, underground 75mm, UPVC pipes and fittings, underground<BLDG-64>
110mm, UPVC
Install
pipes
Plumbing
and fittings,
Fittings
underground
Under SOG160mm, Polypropylene Pipes and Fittings

C064D20110

<BLDG-64> Install Drainage Risers

12 27-Apr-15

09-May-15 Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-64>
UPVC Pipes
Install
andDrainage
Fittings For
Risers
Drainage above ground 75mm, UPVC Pip

C064D20120

<BLDG-64> Install water Risers

14 27-Apr-15

11-May-15 Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings<BLDG-64>
including items
Install
mentioned
water Risers
25mm, Polypropylene Pipes and Fittings includ

C064D20130

<BLDG-64> Install Roof sainatary work

10 10-May-15

19-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron oblique
<BLDG-64>
grate,Install
side outlet
Roof 100mm
sainatary work

C064D20140

<BLDG-64> Construct Inspection chambers & connections

21 01-Jul-15

27-Jul-15

C064D20150

<BLDG-64> Test Drainage & water Riser s

10 28-Jul-15

07-Aug-15

Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm,<BLDG-64>
Valves are classified
Constructaccording
Inspection
to chambers
type Gate &Valv
co
<BLDG-64> Test Drainage & water R iser s

Electrical
C064D50110

<BLDG-64> Install Electrical conduits for Gr Floor Slab

175 25-Dec-14
2 25-Dec-14

C064D50120

<BLDG-64> Install Electrical conduits for 1st Floor Slab

2 15-Jan-15

17-Jan-15

C064D50130

<BLDG-64> Install Electrical conduits for 2nd Floor Slab

2 06-Feb-15

07-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-64>
outlet including
Install Electrical
empty conduits
"PVC" conduits
for 2nd Floor Slab

C064D50140

<BLDG-64> Install Electrical conduits for 3rd Floor Slab

2 26-Feb-15

28-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet
<BLDG-64>
including
Install
empty
Electrical
"PVC" conduits
conduits for 3rd Floor Slab

C064D50150

<BLDG-64> Install Electrical conduits for 4th Floor Slab

2 21-Mar-15

22-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-64>
emptyInstall
"PVC"
Electrical
conduits
conduits for 4th Floor Slab

C064D50100

<BLDG-64> Install Earthing System

6 05-Apr-15

11-Apr-15

power network including main earthing networks

C064D50180

<BLDG-64> Install Electrical Risers

6 05-Apr-15

11-Apr-15

Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple<BLDG-64>
Play SystemInstall
Floor Electrical
pull box, Light
Risers
Current Systems Two UPVC 25 mm Conduits for

C064D50160

<BLDG-64> Install Electrical conduits for Roof Slab

2 15-Apr-15

16-Apr-15

Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including empty
<BLDG-64>
"PVC"Install
conduits
Electrical conduits for Roof Slab

C064D50170

<BLDG-64> Install Conduits for intercom system

3 17-May-15

19-May-15 Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door master<BLDG-64>
unit
Install Conduits for intercom system

C064D50200

<BLDG-64> Install of Panel board

3 17-May-15

19-May-15 Lighting Switches Type Push Button (P.B), 40mm PVC empty conduit from (KWHM) box to panel board<BLDG-64>
of customerInstall of Panel board

C064D50210

<BLDG-64> Install Distribution Panel

14 20-May-15

03-Jun-15

Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution
<BLDG-64>
Panels (DB-SER-1),
Install Distribution
Low Voltage
Panel Distribution Panels (DB-SER

C064D50230

<BLDG-64> Install Cables

21 04-Jun-15

26-Jun-15

600/1000 V, multicore copper conductor, PVC/PVC cables (4 x 10) mm, 600/1000 V, multicore copper conductor, PVC/PVC
<BLDG-64>
cables
Install
(4 xCables
16) mm, 600/1000 V, multicore coppe

C064D50220

<BLDG-64> Connect between Riser & DP

3 04-Jun-15

07-Jun-15

Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

06-Jul-15
26-Dec-14 Indoor wiring for one lighting outlet including wires 3(1x3)
<BLDG-64>
mm, One Install
lightingElectrical
outlet including
conduitsempty
for Gr"PVC"
Floor conduits
Slab

06-Jul-15, Electrical

Indoor wiring for one lighting outlet including wires 3(1x3) mm,<BLDG-64>
One lightingInstall
outlet Electrical
including conduits
empty "PVC"
for 1st
conduits
Floor Slab

Page 25 of 29

<BLDG-64> Install Earthing System

<BLDG-64> Connect between Riser & DP

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

C064D50190

<BLDG-64> Install Wiring Devices&Disconnect switches

2 08-Jun-15

09-Jun-15

C064D50240

<BLDG-64> Test elec. system

6 27-Jun-15

02-Jul-15

C064D50250

<BLDG-64> Install Lighting fixtures

3 04-Jul-15

06-Jul-15

9 06-Sep-15
3 06-Sep-15

15-Sep-15
08-Sep-15

15-Sep-15, Completion Inspectio


<BLDG-64> Punch Out

3 09-Sep-15

12-Sep-15

<BLDG-64> Pre-final inspection

3 13-Sep-15

15-Sep-15

294 30-Nov-14
144 30-Nov-14
2 30-Nov-14

28-Oct-15
09-May-15
01-Dec-14

Completion Inspection
C064H10100
<BLDG-64> Punch Out
C064H10110

<BLDG-64> Pre-final inspection

C064H10120

<BLDG-64> Final inspection

Building 289 (Type# I.A6 C''')


Site Preparation
C289G10130
<BLDG-289> Prep for Excavation

10 02-Dec-14

Lighting Switches Type S3, Lighting Switches Type S4, Wiring Devices and Disconnectors Socket outlet with 3(1x4)
<BLDG-64>
mm, Wiring
Install Devices
Wiring Devices&Disconnect
and Disconnectors Power
switches
outlet with
<BLDG-64> Test elec. system
Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5

<BLDG-64> Final inspection

28-Oct-15, Buildin
09-May-15, Site Preparation
<BLDG-289> Prep for Excavation

C289G10100

<BLDG-289> Excavate to Foundation Levels

C289G10110

<BLDG-289> Trim the bottoms of Excavate

2 13-Dec-14

14-Dec-14

C289G10120

<BLDG-289> Backfill for Foundation

2 25-Mar-15

26-Mar-15 Backfilling, with suitable excavated soil under foundation level

C289G10140

<BLDG-289> Backfill around Building

5 04-May-15

09-May-15

Substructure
Foundation
Foundation at Level (-2.25)
C289A10100
<BLDG-289> Construct P.C. F oundation Lv (- 2.25)

113
113
113
8

15-Dec-14
15-Dec-14
15-Dec-14
15-Dec-14

12-Dec-14 Excavation in any type of soil except rock for foundation,


<BLDG-289>
DisposalExcavate
of surplustomaterials
Foundation
outside
Levels
the site boundary to nearest dump.
<BLDG-289> Trim the bottoms of Excavate
<BLDG-289> Backfill for Foundation
<BLDG-289> Backfill around Building

19-Apr-15
19-Apr-15, Substructure
19-Apr-15
19-Apr-15, Foundation
19-Apr-15
19-Apr-15, Foundation at Level (-2.25)
23-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-289>
strength 200
Construct
kg/cm2 P.C.
at 28Fdays
oundation
300mm,
Lv Supply
(- 2.25) and cast plain concrete with average compressive strength 200 kg/c

C289A10110

<BLDG-289> Construct R.C.Foundation Lv (-2.25)

C289A10240

<BLDG-289> Construct CUM above Ground Beam Lv (-2.25)/Internal backfill

C289A10120

<BLDG-289> Apply Dampproofing for Foundation Lv (-2.25)

2 23-Mar-15

24-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous base<BLDG-289> Apply Dampproofing for Foundation Lv (-2.25)

C289A10160

<BLDG-289> Construct S.O.G Lv (-1.00)

4 16-Apr-15

19-Apr-15

Foundation at Level (-1.50)


C289A10130
<BLDG-289> Construct P.C. F oundation Lv (- 1.50)
C289A10140

<BLDG-289> Construct R.C.Foundation Lv (-1.50)

C289A10250

<BLDG-289> Construct CUM above Ground Beam Lv (-1.50)/Intenal Backfill

C289A10150

<BLDG-289> Apply Dampproofing for Foundation Lv (-1.50)

C289A10170

<BLDG-289> Construct S.O.G Lv (+0.05)/Install PE sheets

Superstructure
Ground Floor Lv (+3.15)
C289B10110
<BLDG-289> Set up Form work for Gr Floor Columns

4 24-Dec-14

<BLDG-64> Install Lighting fixtures

12 10-Mar-15

109 15-Dec-14
8 15-Dec-14
8 28-Dec-14
12 10-Mar-15

27-Dec-14 Reinforced concrete with average compressive strength<BLDG-289>


250 kg/cm2 atConstruct
28 days for
R.C.Foundation
foundation Lv (-2.25)
22-Mar-15 Backfilling, with suitable excavated soil under foundation level, Supply and build solid<BLDG-289>
cement blockConstruct
unit machine-made
CUM above
with
Ground
densityBeam
not exceed
Lv (-2.25)/Internal
2000 kg/m3 backfill
Supply and cast plain concrete with average compressive strength 200 kg/cm2 at 28 days 100mm
<BLDG-289> Construct S.O.G Lv (-1.00)

15-Apr-15
15-Apr-15, Foundation at Level (-1.50)
23-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-289>
strength 200
Construct
kg/cm2 P.C.
at 28Fdays
oundation
300mm,
Lv Supply
(- 1.50) and cast plain concrete with average compressive strength 200 kg/c
06-Jan-15

Reinforced concrete with average compressive strength 250


<BLDG-289>
kg/cm2 at 28Construct
days for foundation,
R.C.Foundation
Reinforced
Lv (-1.50)
concrete with average compressive strength 250 kg/cm2 at 28 days

22-Mar-15 Backfilling, with suitable excavated soil under foundation level, Supply and build solid<BLDG-289>
cement blockConstruct
unit machine-made
CUM above
with
Ground
densityBeam
not exceed
Lv (-1.50)/Intenal
2000 kg/m3Backfill

2 23-Mar-15

24-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous base<BLDG-289> Apply Dampproofing for Foundation Lv (-1.50)

3 12-Apr-15

15-Apr-15

134 08-Jan-15
28 08-Jan-15
5 08-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for slab on grade,
<BLDG-289>
4 mm thick
Construct
bituminous
S.O.G
waterproofing
Lv (+0.05)/Install
membrane
PE sheets
with 50 mm cement mortar

03-Jun-15
07-Feb-15
12-Jan-15 Form Work %

03-Jun-15, Superstructure
07-Feb-15, Ground Floor Lv (+3.15)
<BLDG-289> Set up Form work for Gr Floor Columns

5 08-Jan-15

12-Jan-15

Steel Fixing

<BLDG-289> Fix Reinforcement Bars for Gr Floor Columns

C289B10100

<BLDG-289> Fix Reinforcement Bars for Gr Floor Columns

C289B10120

<BLDG-289> Cast concrete for Gr Floor Columns

1 13-Jan-15

13-Jan-15

Reinforced concrete with average compressive strength 250 kg/cm2


<BLDG-289>
at 28 days
Castfor
concrete
columns,
forReinforced
Gr Floor Columns
concrete with average compressive strength 250 kg/cm2 at 28 days fo

C289B10130

<BLDG-289> Fix Reinforcement Bars for Gr Floor Slab

12 14-Jan-15

27-Jan-15

Steel Fixing

<BLDG-289> Fix Reinforcement Bars for Gr Floor Slab

C289B10140

<BLDG-289> Set up Form work for Gr Floor Slab

12 14-Jan-15

27-Jan-15

Form Work %

<BLDG-289> Set up Form work for Gr Floor Slab

C289B10150

<BLDG-289> Cast concrete for Gr Floor Slab

1 28-Jan-15

28-Jan-15

RC with average compressive strength 250 kg/cm2 at 28 days for <BLDG-289>


stairs, beams,Cast
and slabs
concrete for Gr Floor Slab

C289B10190

<BLDG-289> Dismantle Form work for Gr Floor Slab

9 29-Jan-15

07-Feb-15

First Floor Lv (+6.25)


C289B10170
<BLDG-289> Set up Form work for 1st Floor Columns

25 29-Jan-15
4 29-Jan-15

<BLDG-289> Dismantle Form work for Gr Floor Slab

24-Feb-15
02-Feb-15 Form Work %

24-Feb-15, First Floor Lv (+6.25)


<BLDG-289> Set up Form work for 1st Floor Columns
<BLDG-289> Fix Reinforcement Bars for 1st Floor Columns

C289B10160

<BLDG-289> Fix Reinforcement Bars for 1st Floor Columns

4 29-Jan-15

02-Feb-15 Steel Fixing

C289B10180

<BLDG-289> Cast concrete for 1st Floor Columns

1 03-Feb-15

03-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2<BLDG-289>


at 28 days forCast
columns,
concrete
Reinforced
for 1st concrete
Floor Columns
with average compressive strength 250 kg/cm2 at 28 days fo

C289B10200

<BLDG-289> Fix Reinforcement Bars for 1st Floor Slab

10 04-Feb-15

14-Feb-15 Steel Fixing

<BLDG-289> Fix Reinforcement Bars for 1st Floor Slab

C289B10210

<BLDG-289> Set up Form work for 1st Floor Slab

10 04-Feb-15

14-Feb-15 Form Work %

<BLDG-289> Set up Form work for 1st Floor Slab

C289B10220

<BLDG-289> Cast concrete for 1st Floor Slab

1 15-Feb-15

15-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,<BLDG-289>
beams, and slabs
Cast concrete for 1st Floor Slab

C289B10260

<BLDG-289> Dismantle Form work for 1st Floor Slab

9 16-Feb-15

24-Feb-15

<BLDG-289> Dismantle Form work for 1st Floor Slab

22-Mar-15
22-Feb-15 Steel Fixing

22-Mar-15, Second Floor Lv (+9.35)


<BLDG-289> Fix Reinforcement Bars for 2nd Floor Columns
<BLDG-289> Set up Form work for 2nd Floor Columns

Second Floor Lv (+9.35)


C289B10230
<BLDG-289> Fix Reinforcement Bars for 2nd Floor Columns

33 16-Feb-15
7 16-Feb-15

C289B10240

<BLDG-289> Set up Form work for 2nd Floor Columns

7 16-Feb-15

22-Feb-15 Form Work %

C289B10250

<BLDG-289> Cast concrete for 2nd Floor Columns

1 23-Feb-15

23-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
<BLDG-289>
for columns,
CastReinforced
concrete for
concrete
2nd Floor
withColumns
average compressive strength 250 kg/cm2 at 28 days fo

C289B10280

<BLDG-289> Set up Form work for 2nd Floor Slab

15 24-Feb-15

11-Mar-15

Form Work %

<BLDG-289> Set up Form work for 2nd Floor Slab

C289B10270

<BLDG-289> Fix Reinforcement Bars for 2nd Floor Slab

15 24-Feb-15

11-Mar-15

Steel Fixing

<BLDG-289> Fix Reinforcement Bars for 2nd Floor Slab

C289B10290

<BLDG-289> Cast concrete for 2nd Floor Slab

1 12-Mar-15

12-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,<BLDG-289>
and slabs
Cast concrete for 2nd Floor Slab

C289B10330

<BLDG-289> Dismantle Form work for 2nd Floor Slab

9 14-Mar-15

22-Mar-15

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 26 of 29

<BLDG-289> Dismantle Form work for 2nd Floor Slab


TASK filter: All Activities
Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Third Floor Lv (+12.45)


C289B10310
<BLDG-289> Set up Form work for 3rd Floor Columns

34 14-Mar-15
7 14-Mar-15

Finish

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

19-Apr-15, Third Floor Lv (+12.45)


<BLDG-289> Set up Form work for 3rd Floor Columns

7 14-Mar-15

20-Mar-15 Steel Fixing

<BLDG-289> Fix Reinforcement Bars for 3rd Floor Columns

21-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-289>
Reinforced
Cast concrete
concreteforwith
3rdaverage
Floor Columns
compressive strength 250 kg/cm2 at 28 days fo

C289B10300

<BLDG-289> Fix Reinforcement Bars for 3rd Floor Columns

C289B10320

<BLDG-289> Cast concrete for 3rd Floor Columns

1 21-Mar-15

C289B10350

<BLDG-289> Set up Form work for 3rd Floor Slab

16 22-Mar-15

07-Apr-15

Form Work %

<BLDG-289> Set up Form work for 3rd Floor Slab

C289B10340

<BLDG-289> Fix Reinforcement Bars for 3rd Floor Slab

16 22-Mar-15

07-Apr-15

Steel Fixing

<BLDG-289> Fix Reinforcement Bars for 3rd Floor Slab

C289B10360

<BLDG-289> Cast concrete for 3rd Floor Slab

1 08-Apr-15

08-Apr-15

RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-289> Cast concrete for 3rd Floor Slab

C289B10400

<BLDG-289> Dismantle Form work for 3rd Floor Slab

9 09-Apr-15

19-Apr-15

<BLDG-289> Dismantle Form work for 3rd Floor Slab

19-May-15
17-Apr-15 Steel Fixing

19-May-15, Fourth Floor Lv (+15.55)


<BLDG-289> Fix Reinforcement Bars for 4th Floor Columns
<BLDG-289> Set up Form work for 4th Floor Columns

Fourth Floor Lv (+15.55)


C289B10370
<BLDG-289> Fix Reinforcement Bars for 4th Floor Columns

Nov

19-Apr-15
20-Mar-15 Form Work %

36 09-Apr-15
7 09-Apr-15

C289B10380

<BLDG-289> Set up Form work for 4th Floor Columns

7 09-Apr-15

17-Apr-15

Form Work %

C289B10390

<BLDG-289> Cast concrete for 4th Floor Columns

1 18-Apr-15

18-Apr-15

Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns, <BLDG-289>
Reinforced concrete
Cast concrete
with average
for 4thcompressive
Floor Columns
strength 250 kg/cm2 at 28 days fo

C289B10420

<BLDG-289> Set up Form work for 4th Floor Slab

18 19-Apr-15

09-May-15 Form Work %

<BLDG-289> Set up Form work for 4th Floor Slab

C289B10410

<BLDG-289> Fix Reinforcement Bars for 4th Floor Slab

18 19-Apr-15

09-May-15 Steel Fixing

<BLDG-289> Fix Reinforcement Bars for 4th Floor Slab

C289B10430

<BLDG-289> Cast concrete for 4th Floor Slab

1 10-May-15

10-May-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs

<BLDG-289> Cast concrete for 4th Floor Slab

C289B10470

<BLDG-289> Dismantle Form work for 4th Floor Slab

9 11-May-15

19-May-15

Roof Floor Lv (+18.55)


C289B10450
<BLDG-289> Set up Form work for Roof Floor Columns/Planted Columns

23 11-May-15
5 11-May-15

<BLDG-289> Dismantle Form work for 4th Floor Slab

03-Jun-15
15-May-15 Form Work %

03-Jun-15, Roof Floor Lv (+18.55)


<BLDG-289> Set up Form work for Roof Floor Columns/Planted Column

<BLDG-289> Fix Reinforcement Bars for Roof Floor Columns/Planted C

C289B10440

<BLDG-289> Fix Reinforcement Bars for Roof Floor Columns/Planted Columns

5 11-May-15

15-May-15 Steel Fixing

C289B10460

<BLDG-289> Cast concrete for Roof Floor Columns/Planted Columns

1 16-May-15

16-May-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns, Reinforced
<BLDG-289>
concrete with
Cast
average
concrete
compressive
for Roof Floor
strength
Columns/Planted
250 kg/cm2 atColumns
28 days fo

C289B10480

<BLDG-289> Fix Reinforcement Bars for Roof Slab

10 17-May-15

27-May-15 Steel Fixing

<BLDG-289> Fix Reinforcement Bars for Roof Slab

C289B10490

<BLDG-289> Set up Form work for Roof Slab

10 17-May-15

27-May-15 Form Work %

<BLDG-289> Set up Form work for Roof Slab

C289B10500

<BLDG-289> Cast concrete for Roof Slab

1 28-May-15

28-May-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs

<BLDG-289> Cast concrete for Roof Slab

C289B10510

<BLDG-289> Dismantle Form work for Roof Slab

Exterior Enclosure
C289B20130
<BLDG-289> Erect Scaffold

6 29-May-15

03-Jun-15

87 14-May-15
12 14-May-15

19-Aug-15
26-May-15

<BLDG-289> Dismantle Form work for Roof Slab


19-Aug-15, Exterior Enclosure
<BLDG-289> Erect Scaffold

C289B20160

<BLDG-289> Apply Facades Plaster

28 27-May-15

25-Jun-15

Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply O.P cement-sand
<BLDG-289>
plaster inApply
two-coat
Facades
workPlaster
(base and finish coats)for ext

C289B20220

<BLDG-289> Install Gypsum Corniche

11 18-Jun-15

29-Jun-15

Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply and install<BLDG-289>
gypsum cornices
Install
including
Gypsumpaint,121
Cornichemm height gypsum c

C289B20250

<BLDG-289> Install Shingle Sheets

6 23-Jun-15

28-Jun-15

glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment

C289B20230

<BLDG-289> Preparation of shingle ( Supporting System & Insulation Works)

7 30-Jun-15

07-Jul-15

C289B20140

<BLDG-289> Apply External Paint 1st Coat

6 08-Jul-15

13-Jul-15

C289B20260

<BLDG-289> Install Handrails for balconies

8 14-Jul-15

26-Jul-15

C289B20300

<BLDG-289> Apply External Paint 2nd Coat

5 30-Jul-15

04-Aug-15 paint exterior acrylic water-based washable emulsion paint external wall

C289B20150

<BLDG-289> Install Steel & UPVC Doors & Windows

12 05-Aug-15

17-Aug-15 Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge leaves 1400
<BLDG-289>
mm x 2850 mm,
InstallUPVC
Steel Door
& UPVC
typeDoors
(D03)

C289B20330

<BLDG-289> Install Aluminum Windows

12 05-Aug-15

17-Aug-15 Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with plexi fill - 400
<BLDG-289>
mm x 1200Install
mm. Aluminum Windows

C289B20480

<BLDG-289> Dismantle Scaffold

6 05-Aug-15

10-Aug-15

C289B20280

<BLDG-289> Install Appliqus

3 05-Aug-15

07-Aug-15

C289B20270

<BLDG-289> Install Rough Stone Skirting

8 11-Aug-15

19-Aug-15 Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.

Roofing
C289B30100

<BLDG-289> Cast Light Weight Concrete for slopes

74 14-May-15
4 14-May-15
9 18-May-15

<BLDG-289> Install Shingle Sheets

<BLDG-289> Preparation of shingle ( Supporting Syste


<BLDG-289> Apply External Paint 1st Coat

Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic paint<BLDG-289>
handrail 900 mm
Install
height
Handrails
3/A-501,
for balconies
Supply and ins
<BLDG-289> Apply External Paint 2nd Coat

<BLDG-289> Dismantle Scaffold


<BLDG-289> Install Appliqus

<BLDG-289> Install Rough Stone Skirting

05-Aug-15
05-Aug-15, Roofing
17-May-15 Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max. 1200 kg/m <BLDG-289> Cast Light Weight Concrete for slopes

C289B30110

<BLDG-289> Apply Roofing Plaster

C289B30180

<BLDG-289> Install Steel Ladder

C289B30120

<BLDG-289> Apply reinforced bituminous water proofing membrane

4 28-May-15

31-May-15 4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof.

C289B30130

<BLDG-289> Test Water proofing membrane

3 01-Jun-15

03-Jun-15

<BLDG-289> Test Water proofing membrane

C289B30140

<BLDG-289> Apply Cement mortar screed

3 04-Jun-15

07-Jun-15

<BLDG-289> Apply Cement mortar screed

C289B30150

<BLDG-289> Apply Extruded polystyrene

2 08-Jun-15

09-Jun-15

<BLDG-289> Apply Extruded polystyrene

C289B30160

<BLDG-289> Cast protection concrete layer

2 10-Jun-15

11-Jun-15

C289B30170

<BLDG-289> Install Terr azzo Tiles

7 26-Jun-15

02-Jul-15

Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting.

C289B30190

<BLDG-289> Install Ceramic Tiles

14 04-Jul-15

21-Jul-15

Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors, 100 mm
<BLDG-289>
height ceramic
Install
tilesCeramic
for skirting.
Tiles

C289B30200

<BLDG-289> Apply Paint for Roof

7 22-Jul-15

29-Jul-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C289B30210

<BLDG-289> Install of Roof Steel Doors

6 30-Jul-15

05-Aug-15 Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf

15 28-May-15

207 25-Feb-15
12 25-Feb-15

Interior Construction
C289C10110
<BLDG-289> Construct CUM Works for 1st floor
Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

27-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
12-Jun-15

Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508

<BLDG-289> Apply Roofing Plaster


<BLDG-289> Install Steel Ladder

<BLDG-289> Apply reinforced bituminous water proofing membrane

<BLDG-289> Cast protection concrete layer


<BLDG-289> Install Terr azzo Tiles
<BLDG-289> Apply Paint for Roof
<BLDG-289> Install of Roof Steel Doors

18-Oct-15
18-Oct-15, Interior Co
09-Mar-15 Supply and build solid cement block unit machine-made with density not exceed <BLDG-289>
2000 kg/m3, Supply
Construct
andCUM
build solid
Works
cement
for 1stblock
floor unit machine-made with density not exceed 20
Page 27 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Activity Name

Original Start
Duration

Resources
Aug

2015
Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

C289C10120

<BLDG-289> Construct CUM Works for 2nd floor

12 23-Mar-15

04-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-289>
Supply and
Construct
build solid
CUM
cement
Works
block
for unit
2ndmachine-made
floor
with density not exceed 20

C289C10100

<BLDG-289> Construct CUM Works for Gr floor

12 16-Apr-15

29-Apr-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-289>
and build solid
Construct
cement
CUM
block
Works
unit machine-made
for Gr floor
with density not exceed 20

C289C10130

<BLDG-289> Construct CUM Works for 3rd floor

12 20-Apr-15

03-May-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-289>
and build solid
Construct
cementCUM
blockWorks
unit machine-made
for 3rd floor with density not exceed 20

C289C10150

<BLDG-289> Construct CUM for Parapet

C289C10140

<BLDG-289> Construct CUM Works for 4th floor

C289C10160
C289C10190

3 11-May-15

13-May-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and
<BLDG-289>
build hollow
Construct
cement block
CUMunit
for Parapet
machine-made with density not exceed

12 20-May-15

01-Jun-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and build
<BLDG-289>
solid cementConstruct
block unitCUM
machine-made
Works for 4th
withfloor
density not exceed 20

<BLDG-289> Construct Interior CUM Works for Roof

4 04-Jun-15

08-Jun-15

Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and build <BLDG-289>
hollow cementConstruct
block unitInterior
machine-made
CUM Works
with for
density
Roofnot exceed

<BLDG-289> Install Ducts work for 4th floor

6 14-Sep-15

19-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-289>
with density
Install Ducts
not excee
work

C289C10200

<BLDG-289> Install Ducts work for 3rd floor

6 20-Sep-15

28-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-289>
with density
Install
not
Ducts
excee
w

C289C10210

<BLDG-289> Install Ducts work for 2nd floor

5 29-Sep-15

03-Oct-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-289>
with density
Install
not Ducts
excee

C289C10220

<BLDG-289> Install Ducts work for 1st floor

5 04-Oct-15

10-Oct-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-289>
with density Install
not excee
Duc

C289C10230

<BLDG-289> Install Ducts work for Gr floor

5 11-Oct-15

18-Oct-15

Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made with
<BLDG-289>
density notInstall
excee
D

Entrance & Stairs


C289C20100
<BLDG-289> Apply Plaster to Stair Case

55 02-Jun-15
19 02-Jun-15

04-Aug-15
22-Jun-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)

04-Aug-15, Entrance & Stairs


<BLDG-289> Apply Plaster to Stair Case

C289C20130

<BLDG-289> Install Marble for Entrance & Stairs

12 23-Jun-15

05-Jul-15

terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340 mm width,<BLDG-289>
Stone PavingInstall
and Flooring
Marble for
Light
Entrance
beige terriesta
& Stairsmarble

C289C20170

<BLDG-289> Apply Paint for Entrance & Stairs

12 06-Jul-15

21-Jul-15

Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.

C289C20160

<BLDG-289> Install Handrails for Stairs

6 22-Jul-15

28-Jul-15

Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.

C289C20120

<BLDG-289> Install Units Wooden Doors

6 29-Jul-15

04-Aug-15 wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door type (D09) - hinged
<BLDG-289>
leaf - 900 mm
Install
x 2200
Unitsmm.
Wooden Doors

Plumbing
C289D20100

<BLDG-289> Install Plumbing Fittings Under SOG

152 28-Mar-15
14 28-Mar-15

<BLDG-289> Apply Paint for Entrance & Stairs


<BLDG-289> Install Handrails for Stairs

13-Sep-15
13-Sep-15, Plumbing
11-Apr-15 UPVC pipes and fittings, underground 75mm, UPVC pipes and fittings, underground 110mm,
<BLDG-289>
UPVC pipes
Install
and fittings,
Plumbing
underground
Fittings Under
160mm,
SOG Polypropylene Pipes and Fittings

C289D20110

<BLDG-289> Install Drainage Risers

12 02-Jun-15

14-Jun-15

Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm, UPVC Pipes
<BLDG-289>
and Fittings
Install
For Drainage
DrainageRisers
above ground 75mm, UPVC Pip

C289D20120

<BLDG-289> Install water Risers

14 02-Jun-15

16-Jun-15

Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings including items
<BLDG-289>
mentioned
Install
25mm,
water
Polypropylene
Risers
Pipes and Fittings includ

C289D20130

<BLDG-289> Install Roof sainatary work

10 15-Jun-15

25-Jun-15

Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron oblique grate,<BLDG-289>
side outlet 100mm
Install Roof sainatary work

C289D20140

<BLDG-289> Construct Inspection chambers & connections

21 11-Aug-15

02-Sep-15 Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm, Valves are classified
<BLDG-289>
according
Construct
to type
Inspection
Gate Valv
ch

C289D20150

<BLDG-289> Test Drainage & water Riser s

10 03-Sep-15

13-Sep-15

<BLDG-289> Test Drainage & wa

Electrical
C289D50110

<BLDG-289> Install Electrical conduits for Gr Floor Slab

192 14-Jan-15
2 14-Jan-15

C289D50120

<BLDG-289> Install Electrical conduits for 1st Floor Slab

2 04-Feb-15

05-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-289>
outlet including
Install Electrical
empty "PVC"
conduits
conduits
for 1st Floor Slab

C289D50130

<BLDG-289> Install Electrical conduits for 2nd Floor Slab

2 02-Mar-15

03-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet
<BLDG-289>
including Install
empty Electrical
"PVC" conduits
conduits for 2nd Floor Slab

C289D50140

<BLDG-289> Install Electrical conduits for 3rd Floor Slab

2 29-Mar-15

30-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-289>
empty "PVC"
Installconduits
Electrical conduits for 3rd Floor Slab

C289D50150

<BLDG-289> Install Electrical conduits for 4th Floor Slab

2 29-Apr-15

30-Apr-15

C289D50180

<BLDG-289> Install Electrical Risers

6 14-May-15

19-May-15 Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple Play System<BLDG-289>
Floor pull box,
Install
LightElectrical
Current Systems
Risers Two UPVC 25 mm Conduits for

C289D50100

<BLDG-289> Install Earthing System

6 14-May-15

19-May-15 power network including main earthing networks

C289D50160

<BLDG-289> Install Electrical conduits for Roof Slab

2 23-May-15

24-May-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including empty "PVC"<BLDG-289>
conduits
Install Electrical conduits for Roof Slab

C289D50170

<BLDG-289> Install Conduits for intercom system

3 23-Jun-15

25-Jun-15

Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door master unit

C289D50200

<BLDG-289> Install of Panel board

3 23-Jun-15

25-Jun-15

40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type Push Button (P.B)<BLDG-289> Install of Panel board

C289D50210

<BLDG-289> Install Distribution Panel

14 26-Jun-15

10-Jul-15

Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution Panels <BLDG-289>
(DB-SER-1), Low
Install
Voltage
Distribution
Distribution
Panel Panels (DB-SER

C289D50220

<BLDG-289> Connect between Riser & DP

3 11-Jul-15

13-Jul-15

Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m

C289D50230

<BLDG-289> Install Cables

C289D50190

<BLDG-289> Install Wiring Devices&Disconnect switches

2 14-Jul-15

15-Jul-15

C289D50240

<BLDG-289> Test elec. system

6 07-Aug-15

12-Aug-15

C289D50250

<BLDG-289> Install Lighting fixtures

3 13-Aug-15

16-Aug-15 Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5

9 19-Oct-15
3 19-Oct-15

28-Oct-15
21-Oct-15

28-Oct-15, Compl
<BLDG-289> Punch

21 11-Jul-15

Completion Inspection
C289H10100
<BLDG-289> Punch Out

Activity ID

Finish

16-Aug-15
15-Jan-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm,<BLDG-289>
One lighting outlet
Install including
Electrical empty
conduits
"PVC"
for Gr
conduits
Floor Slab

16-Aug-15, Electrical

Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including empty
<BLDG-289>
"PVC" conduits
Install Electrical conduits for 4th Floor Slab
<BLDG-289> Install Earthing System
<BLDG-289> Install Conduits for intercom system

<BLDG-289> Connect between Riser & DP

06-Aug-15 600/1000 V, multicore copper conductor, PVC/PVC cables (4 x 10) mm, 600/1000 V, multicore copper conductor, PVC/PVC cables
<BLDG-289>
(4 x 16) mm,
Install
600/1000
CablesV, multicore coppe

Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power outlet with 3(1x6)
<BLDG-289>
mm, Wiring
Install
Devices
Wiringand
Devices&Disconnect
Disconnectors Load
switB
<BLDG-289> Test elec. system
<BLDG-289> Install Lighting fixtures

C289H10110

<BLDG-289> Pre-final inspection

3 22-Oct-15

25-Oct-15

<BLDG-289> Pre-f

C289H10120

<BLDG-289> Final inspection

3 26-Oct-15

28-Oct-15

<BLDG-289> Fina

Start

28-May-15
Mountain
View

Finish

Remaining
Units

2015
Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

04-Aug-15
Hyde
Park.

Steel, 28-May-15
Flush Wood04-Aug-15
,Aluminum Doors and Windows&UPVC Doors and Windows
wooden
28-May-15
solid core doors
04-Aug-15
Door type (D09) - hinged leaf - 900 mm x 2200 mm.
C172C20160
16-Jun-15

21-Jun-15

C063C20120
28-May-15

02-Jun-15

Apr

May

Jun

Jul

Aug

46

10

16

46

10

16

46

10

16

Sep

Oct

Nov

6
8

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 28 of 29

TASK filter: All Activities


Oracle Corporation

Activity ID

Start

Finish

Remaining
Units

2015
Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

C062C20120
11-Jun-15

27-Jun-15

C173C30170
11-Jun-15

16-Jun-15

12

C286C30190
28-Jun-15

02-Jul-15

C061C20120
29-Jul-15

04-Aug-15

C064C20120
18-Jun-15

24-Jun-15

C289C20120
29-Jul-15

04-Aug-15

Aug

Sep

Oct

Nov

2
4

12

Actual Level of Effort

Remaining Work

Milestone

Actual Work

Critical Remaining Work

summary

Page 29 of 29

TASK filter: All Activities