Activity Name
Original Start
Duration
Finish
Resources
Nov
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Comprises the execution of the remaining works of buildings 172, 173, 62, 63, 285, and 286
0
15-Aug-15*
GPM0102450
Comprises the execution of the remaining works of buildings 289, 289, 174 and 64.
28-Oct-15*
28-Oct-15, Project
Start of Phase 1, 02-Aug-14 A
0
74 28-Jan-15
0
0
19-Apr-15
28-Jan-15*
19-Apr-15*
Comprises the skeleton works of buildings 172, 173, 62, 63, 285 and 286,
Construction
28-Oct-15, Constr
11-Apr-15, Moblization
<Mob> Mobilization and preparation site
CMB0501150
60 30-Nov-14
05-Feb-15
CMB0501170
60 30-Nov-14
05-Feb-15
CMB0501200
60 30-Nov-14
05-Feb-15
CMB0501210
50 30-Nov-14
24-Jan-15
CMB0501100
120 30-Nov-14
11-Apr-15
CMB0501110
120 30-Nov-14
11-Apr-15
CMB0501120
30 30-Nov-14
31-Dec-14
CMB0501130
60 30-Nov-14
05-Feb-15
384
350
321
187
1
Buildings
Phase 1
Building 62 (Type# I.A4')
Site Preparation
C062G10130
<BLDG-62> Prep for Excavation
16-Aug-14 A
16-Aug-14 A
16-Aug-14 A
16-Aug-14 A
16-Aug-14 A
28-Oct-15
15-Sep-15
15-Aug-15
17-Mar-15
16-Aug-14 A
28-Oct-15, Buildin
15-Sep-15, Phase 1
15-Aug-15, Building 62 (Type# I.A4')
17-Mar-15, Site Preparation
<BLDG-62> Prep for Excavation
C062G10100
C062G10110
C062G10120
2 27-Dec-14
C062G10140
5 12-Mar-15
17-Mar-15
Substructure
Foundation
Foundation at Level (-2.25)
C062A10100
<BLDG-62> Construct P.C. F oundation Lv (- 2.25)
121
121
121
2
28-Aug-14 A
28-Aug-14 A
28-Aug-14 A
28-Aug-14 A
11-Jan-15
11-Jan-15, Substructure
11-Jan-15
11-Jan-15, Foundation
11-Jan-15
11-Jan-15, Foundation at Level (-2.25)
08-Sep-14 A Supply and cast plain
<BLDG-62>
concrete with
Construct
average
P.C.
compressive
F oundationstrength
Lv (- 2.25)
200 kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c
C062A10110
C062A10240
C062A10120
1 26-Dec-14
27-Dec-14 Supply and apply two (2) coats cold applied waterproofing
<BLDG-62>
paint with Apply
bituminous
Dampproofing
base
for Foundation Lv (-2.25)
C062A10160
4 06-Jan-15
11-Jan-15
C062A10250
C062A10150
C062A10170
Superstructure
Ground Floor Lv (+3.15)
C062B10110
<BLDG-62> Set up Form work for Gr Floor Columns
Nov
28-Oct-15, Milesto
GPM0102440
Comprises the skeleton works of buildings 172, 173, 62, 63, 285 and 286
Jan
28-Oct-15, Mount
0 30-Nov-14*
Interface Milestones
GIM0102110
Comprises the concrete works until ground floor of buildings 289, 289, 174 and 64
Dec
Start of Phase 2
Moblization
CMB0501220
Oct
28-Oct-15, Mount
GPM0102200
GIM0102100
Sep
Start of Phase 1
2015
Aug
1 26-Dec-14
27-Dec-14 Supply and apply two (2) coats cold applied waterproofing
<BLDG-62>
paint with Apply
bituminous
Dampproofing
base
for Foundation Lv (-1.50)
3 01-Jan-15
06-Jan-15
03-Apr-15, Superstructure
13-Dec-14, Ground Floor Lv (+3.15)
<BLDG-62> Set up Form work for Gr Floor Columns
C062B10100
C062B10120
C062B10130
C062B10140
C062B10150
1 03-Dec-14
Remaining Work
Milestone
Actual Work
summary
Activity ID
Activity Name
C062B10190
Original Start
Duration
9 03-Dec-14
33 03-Dec-14
11 03-Dec-14
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
13-Dec-14
09-Jan-15
15-Dec-14 Form Work %
Jul
Aug
Sep
Oct
Nov
C062B10160
9 03-Dec-14
C062B10180
1 15-Dec-14
C062B10200
11 16-Dec-14
C062B10210
10 16-Dec-14
C062B10220
1 28-Dec-14
C062B10260
9 29-Dec-14
09-Jan-15
03-Feb-15
09-Jan-15 Form Work %
31 29-Dec-14
9 29-Dec-14
C062B10240
9 29-Dec-14
09-Jan-15
Steel Fixing
C062B10250
1 10-Jan-15
10-Jan-15
C062B10270
11 11-Jan-15
22-Jan-15
Steel Fixing
C062B10280
11 11-Jan-15
22-Jan-15
Form Work %
C062B10290
1 23-Jan-15
23-Jan-15
C062B10330
9 24-Jan-15
03-Feb-15
31 24-Jan-15
9 24-Jan-15
26-Feb-15
03-Feb-15 Form Work %
9 24-Jan-15
04-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 <BLDG-62>
at 28 days for
Cast
columns,
concrete
Reinforced
for 3rd Floor
concrete
Columns
with average compressive strength 250 kg/cm2 at 28 days fo
C062B10300
C062B10320
1 04-Feb-15
C062B10350
11 05-Feb-15
C062B10340
11 05-Feb-15
C062B10360
1 17-Feb-15
17-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, <BLDG-62>
beams, and slabs
Cast concrete for 3rd Floor Slab
C062B10400
9 18-Feb-15
26-Feb-15
22-Mar-15
26-Feb-15 Steel Fixing
31 18-Feb-15
9 18-Feb-15
C062B10380
9 18-Feb-15
C062B10390
1 28-Feb-15
28-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
<BLDG-62>
for columns,
CastReinforced
concrete for
concrete
4th Floor
withColumns
average compressive strength 250 kg/cm2 at 28 days fo
C062B10420
11 01-Mar-15
11-Mar-15
Form Work %
C062B10410
11 01-Mar-15
11-Mar-15
Steel Fixing
C062B10430
1 12-Mar-15
12-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,<BLDG-62>
and slabs Cast concrete for 4th Floor Slab
C062B10470
9 14-Mar-15
22-Mar-15
20 14-Mar-15
5 14-Mar-15
03-Apr-15
18-Mar-15 Steel Fixing
C062B10450
5 14-Mar-15
C062B10460
1 19-Mar-15
19-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for <BLDG-62>
columns, Reinforced
Cast concrete
concrete
for Roof
with average
Floor Columns/Planted
compressive strength
Columns
250 kg/cm2 at 28 days fo
C062B10480
7 20-Mar-15
C062B10490
7 20-Mar-15
C062B10500
1 28-Mar-15
28-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-62> Cast concrete for Roof Slab
C062B10510
Exterior Enclosure
C062B20130
<BLDG-62> Erect Scaffold
6 28-Mar-15
03-Apr-15
92 18-Mar-15
9 18-Mar-15
26-Jun-15
26-Mar-15
C062B20160
25 28-Mar-15
23-Apr-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and
<BLDG-62>
apply O.P cement-sand
Apply Facades
plaster
Plaster
in two-coat work (base and finish coats)for ext
C062B20250
12 15-Apr-15
28-Apr-15
C062B20220
10 26-Apr-15
05-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502,<BLDG-62>
Supply and Install
install Gypsum
gypsum cornices
Cornicheincluding paint, 105 mm height middle g
C062B20240
10 06-May-15
16-May-15
C062B20170
10 17-May-15
27-May-15
C062B20260
8 28-May-15
04-Jun-15
Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-62> paint
Installhandrail
Handrails
900formm
balconies
height 3/A-501, Supply and ins
C062B20290
6 06-Jun-15
11-Jun-15
C062B20150
14 12-Jun-15
26-Jun-15
Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer <BLDG-62>
forge leavesInstall
1400 mm
Steelx &
2850
UPVC
mm,
Doors
UPVC
& Windows
Door type (D03)
C062B20280
3 12-Jun-15
14-Jun-15
C062B20320
12 12-Jun-15
24-Jun-15
Remaining Work
Milestone
Actual Work
summary
Page 2 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
C062B20480
6 12-Jun-15
17-Jun-15
C062B20270
8 18-Jun-15
26-Jun-15
Roofing
C062B30100
C062B30110
C062B30180
C062B30120
C062B30130
87 18-Mar-15
4 18-Mar-15
9 22-Mar-15
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
21-Jun-15
21-Jun-15, Roofing
21-Mar-15 Supply and cast 80 mm thick. maximum well finished surface of light weight concrete<BLDG-62>
max. 1200 kg/m
Cast Light Weight Concrete for slopes
31-Mar-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
10 01-Apr-15
11-Apr-15
Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508<BLDG-62> Install Steel Ladder
6 01-Apr-15
06-Apr-15
4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof.
<BLDG-62> Apply reinforced bituminous water proofing membrane
3 07-Apr-15
09-Apr-15
C062B30140
4 11-Apr-15
15-Apr-15
C062B30150
3 16-Apr-15
18-Apr-15
C062B30160
2 19-Apr-15
20-Apr-15
C062B30170
10 05-May-15
15-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting.
<BLDG-62> Install Terr azzo Tiles
C062B30190
18 16-May-15
03-Jun-15
Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for
<BLDG-62>
floors, 100Install
mm height
Ceramic
ceramic
Tiles tiles for skirting.
C062B30200
10 04-Jun-15
14-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C062B30210
6 15-Jun-15
21-Jun-15
Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf
Interior Construction
C062C10100
<BLDG-62> Construct CUM Works for Gr floor
189 06-Jan-15
10 06-Jan-15
05-Aug-15
05-Aug-15, Interior Construction
18-Jan-15 Supply and build solid cement block unit machine-made with density
<BLDG-62>
not exceed
Construct
2000 kg/m3,
CUM Works
Supplyfor
andGrbuild
floorsolid cement block unit machine-made with density not exceed 20
C062C10110
10 26-Jan-15
05-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-62>
exceed 2000
Construct
kg/m3, CUM
Supply
Works
and build
for 1st
solid
floor
cement block unit machine-made with density not exceed 20
C062C10120
10 06-Feb-15
16-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-62>
2000 kg/m3,
Construct
Supply
CUMand
Works
buildfor
solid
2nd
cement
floor block unit machine-made with density not exceed 20
C062C10130
12 28-Feb-15
11-Mar-15
C062C10150
C062C10140
C062C10160
C062C10190
4 14-Mar-15
Supply and build solid cement block unit machine-made with density not exceed 2000
<BLDG-62>
kg/m3, Supply
Construct
andCUM
buildWorks
solid cement
for 3rdblock
floor unit machine-made with density not exceed 20
17-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000
<BLDG-62>
kg/m3, Supply
Construct
and build
CUMhollow
for Parapet
cement block unit machine-made with density not exceed
12 23-Mar-15
04-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-62>
Supply and
Construct
build solid
CUM
cement
Worksblock
for 4th
unitfloor
machine-made with density not exceed 20
4 03-Apr-15
07-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-62>
Supply and
Construct
build solid
Interior
cement
CUM
block
Works
unit machine-made
for Roof
with density not exceed 20
2 26-Jul-15
27-Jul-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C062C10200
2 28-Jul-15
29-Jul-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C062C10210
2 30-Jul-15
01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C062C10220
2 02-Aug-15
03-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C062C10230
2 04-Aug-15
05-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C062C20140
C062C20170
C062C20160
C062C20120
Plumbing
C062D20100
76 05-Apr-15
26 05-Apr-15
27-Jun-15
04-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
12 05-May-15
17-May-15 terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs<BLDG-62>
340 mm width,
Install
Stone
Marble
Paving
for Stairs
and Flooring Light beige terriesta marble
6 18-May-15
24-May-15 30 mm thick. light beige terriesta marble polished landing, set on 20 mm thick. mortar bed, 20 mm thick., and
<BLDG-62>
100 mm Install
heightMarble
light beige
for Entrance
terriesta marble skirting.
10 25-May-15
03-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
6 04-Jun-15
10-Jun-15
Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.
16 11-Jun-15
27-Jun-15
wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door type (D09)
<BLDG-62>
- hinged
Install
leaf Units
- 900Wooden
mm x 2200
Doors
mm.
185 29-Dec-14
3 29-Dec-14
25-Jul-15
01-Jan-15
25-Jul-15, Plumbing
UPVC pipes and fittings, underground 75mm, UPVC pipes<BLDG-62>
and fittings,Install
underground
Plumbing110mm,
FittingsUPVC
Underpipes
SOGand fittings, underground 160mm, Polypropylene Pipes and Fittings
C062D20110
14 05-Apr-15
20-Apr-15
Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground
<BLDG-62>
50mm, UPVC
Install
Pipes
Drainage
and Fittings
RisersFor Drainage above ground 75mm, UPVC Pip
C062D20120
14 05-Apr-15
20-Apr-15
Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and <BLDG-62>
Fittings including
Install
items
water
mentioned
Risers 25mm, Polypropylene Pipes and Fittings includ
C062D20130
12 21-Apr-15
04-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron
<BLDG-62>
oblique grate,
Installside
Roofoutlet
sainatary
100mm
work
C062D20140
21 18-Jun-15
10-Jul-15
C062D20150
10 11-Jul-15
25-Jul-15
Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25<BLDG-62>
mm, ValvesConstruct
are classified
Inspection
according
chambers
to type &Gate
connect
Valv
<BLDG-62> Test Drainage & water R iser s
Electrical
C062D50110
193 30-Nov-14
2 30-Nov-14
30-Jun-15
01-Dec-14 Indoor wiring for one lighting outlet including wires
<BLDG-62>
3(1x3) mm,
Install
One
Electrical
lighting conduits
outlet including
for Gr Floor
emptySlab
"PVC" conduits
C062D50120
2 16-Dec-14
17-Dec-14 Indoor wiring for one lighting outlet including wires 3(1x3)
<BLDG-62>
mm, One
Install
lighting
Electrical
outletconduits
includingfor
empty
1st Floor
"PVC"
Slab
conduits
C062D50130
2 12-Jan-15
13-Jan-15
C062D50140
2 06-Feb-15
07-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-62>
outlet including
Install Electrical
empty conduits
"PVC" conduits
for 3rd Floor Slab
C062D50150
2 02-Mar-15
C062D50180
6 18-Mar-15
23-Mar-15 Light Current Systems Triple Play System Tie in point for unit, Light Current Systems<BLDG-62>
Triple Play System
Install Electrical
Floor pullRisers
box, Light Current Systems Two UPVC 25 mm Conduits for
C062D50100
6 18-Mar-15
23-Mar-15 power network including main earthing networks, 600/1000 V, multicore copper conductor,
<BLDG-62>
PVC/PVC
Install
cables
Earthing
(4 x System
10) mm, 600/1000 V, multicore copper conductor, PVC/PVC
C062D50160
1 22-Mar-15
22-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-62>
empty
Install
"PVC"
Electrical
conduits
conduits for Roof Slab
C062D50170
3 05-May-15
07-May-15 Intercom System Provision for door master unit, Intercom System One UPVC 25 mm conduit for risers/
<BLDG-62>
unit
Install Conduits for intercom system
Remaining Work
Milestone
Actual Work
summary
Page 3 of 29
30-Jun-15, Electrical
Activity ID
Activity Name
Original Start
Duration
3 05-May-15
Finish
Resources
2015
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C062D50200
C062D50210
C062D50220
C062D50230
C062D50190
2 27-May-15
28-May-15 Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power
<BLDG-62>
outlet withInstall
3(1x6)Wiring
mm, Devices&Disconnect
Wiring Devices and Disconnectors
switches
Load B
C062D50240
6 15-Jun-15
21-Jun-15
C062D50250
3 28-Jun-15
30-Jun-15
9 06-Aug-15
3 06-Aug-15
15-Aug-15
08-Aug-15
14 09-May-15
3 24-May-15
21 24-May-15
Completion Inspection
C062H10100
<BLDG-62> Punch Out
07-May-15 Lighting Switches Type Push Button (P.B), 40mm PVC empty conduit from (KWHM) box to panel board
<BLDG-62>
of customer
Install of Panel board
23-May-15 Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution
<BLDG-62>
Panels
Install
(DB-SER-1),
DistributionLow
Panel
Voltage Distribution Panels (DB-SER
26-May-15 Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
14-Jun-15
450/750 V Single Core Copper Conductor, PVC cables (1x 35) mm, 450/750 V Single Core Copper Conductor,<BLDG-62>
PVC cablesInstall
(1x 70)
Cables
mm, 450/750 V Single Core Copper Con
<BLDG-62> Test elec. system
Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5
C062H10110
3 09-Aug-15
11-Aug-15
C062H10120
3 12-Aug-15
15-Aug-15
C063G10100
C063G10110
1 25-Aug-14 A 25-Aug-14 A
C063G10120
2 25-Dec-14
C063G10140
5 06-Mar-15
10-Mar-15
Substructure
Foundation
Foundation at Level (-2.25)
C063A10100
<BLDG-63> Construct P.C. F oundation Lv (- 2.25)
119
119
119
2
23-Aug-14 A
23-Aug-14 A
23-Aug-14 A
23-Aug-14 A
08-Jan-15
08-Jan-15, Substructure
08-Jan-15
08-Jan-15, Foundation
08-Jan-15
08-Jan-15, Foundation at Level (-2.25)
04-Sep-14 A Supply and cast plain
<BLDG-63>
concrete with
Construct
average
P.C.compressive
F oundation strength
Lv (- 2.25)
200 kg/cm2 at 28 days 100mm, Supply and cast plain concrete with average compressive strength 200 kg/c
C063A10110
C063A10240
C063A10120
2 23-Dec-14
24-Dec-14 Supply and apply two (2) coats cold applied waterproofing
<BLDG-63>
paint withApply
bituminous
Dampproofing
base
for Foundation Lv (-2.25)
C063A10160
4 04-Jan-15
08-Jan-15
C063A10140
C063A10250
C063A10150
1 23-Dec-14
23-Dec-14 Supply and apply two (2) coats cold applied waterproofing
<BLDG-63>
paint withApply
bituminous
Dampproofing
base for Foundation Lv (-1.50)
C063A10170
3 30-Dec-14
01-Jan-15
Superstructure
Ground Floor Lv (+3.15)
C063B10110
<BLDG-63> Set up Form work for Gr Floor Columns
24-Mar-15, Superstructure
09-Dec-14, Ground Floor Lv (+3.15)
<BLDG-63> Set up Form work for Gr Floor Columns
C063B10100
C063B10120
C063B10130
C063B10140
C063B10150
C063B10190
9 30-Nov-14
09-Dec-14
36 29-Nov-14 A 28-Dec-14
9 29-Nov-14 A 04-Dec-14 Form Work %
C063B10160
C063B10180
1 06-Dec-14
C063B10200
11 07-Dec-14
C063B10210
11 07-Dec-14
C063B10220
C063B10260
1 18-Dec-14
9 20-Dec-14
28-Dec-14
23-Jan-15
28-Dec-14 Form Work %
31 20-Dec-14
9 20-Dec-14
C063B10230
9 20-Dec-14
C063B10250
1 29-Dec-14
Remaining Work
Milestone
Actual Work
summary
Page 4 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
C063B10280
11 30-Dec-14
12-Jan-15
Form Work %
C063B10270
11 30-Dec-14
12-Jan-15
Steel Fixing
C063B10290
1 13-Jan-15
13-Jan-15
C063B10330
9 14-Jan-15
23-Jan-15
31 14-Jan-15
9 14-Jan-15
17-Feb-15
23-Jan-15 Form Work %
Aug
Sep
Oct
Nov
C063B10300
9 14-Jan-15
23-Jan-15
Steel Fixing
C063B10320
1 24-Jan-15
24-Jan-15
C063B10350
11 26-Jan-15
C063B10340
11 26-Jan-15
C063B10360
1 07-Feb-15
07-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,
<BLDG-63>
beams, and
Cast
slabs
concrete for 3rd Floor Slab
C063B10400
9 08-Feb-15
17-Feb-15
12-Mar-15
17-Feb-15 Form Work %
31 08-Feb-15
9 08-Feb-15
C063B10370
9 08-Feb-15
C063B10390
1 18-Feb-15
18-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28<BLDG-63>
days for columns,
Cast concrete
Reinforced
for 4th
concrete
Floor with
Columns
average compressive strength 250 kg/cm2 at 28 days fo
C063B10420
11 19-Feb-15
C063B10410
11 19-Feb-15
C063B10430
C063B10470
1 03-Mar-15
03-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,
<BLDG-63>
and slabsCast concrete for 4th Floor Slab
9 04-Mar-15
12-Mar-15
20 04-Mar-15
5 04-Mar-15
24-Mar-15
08-Mar-15 Form Work %
C063B10440
5 04-Mar-15
C063B10460
1 09-Mar-15
09-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days<BLDG-63>
for columns,Cast
Reinforced
concrete
concrete
for Roof
with
Floor
average
Columns/Planted
compressiveColumns
strength 250 kg/cm2 at 28 days fo
C063B10480
7 10-Mar-15
C063B10490
7 10-Mar-15
C063B10500
1 18-Mar-15
18-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and
<BLDG-63>
slabs
Cast concrete for Roof Slab
C063B10510
6 19-Mar-15
24-Mar-15
98 11-Mar-15
8 11-Mar-15
26-Jun-15
19-Mar-15
Exterior Enclosure
C063B20130
<BLDG-63> Erect Scaffold
C063B20160
28 20-Mar-15
19-Apr-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)for external
<BLDG-63>
walls., Supply
Apply
and
Facades
apply O.P
Plaster
cement-sand plaster in two-coat work (base and f
C063B20250
6 17-Apr-15
22-Apr-15
C063B20220
10 20-Apr-15
01-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502,
<BLDG-63>
Supply andInstall
installGypsum
gypsumCorniche
cornices including paint, 105 mm height middle g
C063B20240
12 02-May-15
14-May-15
C063B20300
12 15-May-15
27-May-15
C063B20260
8 28-May-15
04-Jun-15
Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-63> paint
Installhandrail
Handrails
900formm
balconies
height 3/A-501, Supply and ins
C063B20290
6 06-Jun-15
11-Jun-15
C063B20150
14 12-Jun-15
26-Jun-15
UPVC Window type (W11) - hinged leaf - 600 mm x 1300 mm., UPVC Window type (W12) - tilt leaf - 600 mm x 900
<BLDG-63>
mm., UPVCInstall
Window
Steeltype
& UPVC
(W13)Doors
- tilt leaf
& Windows
- 500 mm x 900
C063B20320
12 12-Jun-15
24-Jun-15
Window type (W16) - hinged leaf - with plexi fill - 400 mm x 1200 mm., Aluminum Window type (W15) - hinged leaf<BLDG-63>
- with plexi fill
Install
- 500Aluminum
mm x 1200
Windows
mm.
C063B20480
6 12-Jun-15
17-Jun-15
C063B20280
3 12-Jun-15
14-Jun-15
C063B20270
8 18-Jun-15
26-Jun-15
Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone
<BLDG-63>
skirting. Install Rough Stone Skirting
87 08-Mar-15
4 08-Mar-15
11-Jun-15
11-Mar-15
11-Jun-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete
<BLDG-63>
max. 1200
Cast
kg/m
Light Weight Concrete for slopes
Roofing
C063B30100
9 12-Mar-15
C063B30110
C063B30180
C063B30120
6 22-Mar-15
28-Mar-15 4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for<BLDG-63>
roof.
Apply reinforced bituminous water proofing membrane
C063B30130
3 29-Mar-15
31-Mar-15
C063B30140
4 01-Apr-15
04-Apr-15
C063B30150
3 05-Apr-15
07-Apr-15
C063B30160
2 08-Apr-15
09-Apr-15
C063B30170
15 22-Mar-15
10 26-Apr-15
Remaining Work
Milestone
Actual Work
summary
21-Mar-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats) <BLDG-63> Apply Roofing Plaster
06-Apr-15
Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508
<BLDG-63> Install Steel Ladder
05-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting.
<BLDG-63> Install Terr azzo Tiles
Page 5 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C063B30190
18 06-May-15
25-May-15 Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles
<BLDG-63>
for floors, 100
Install
mm
Ceramic
height ceramic
Tiles tiles for skirting.
C063B30200
10 26-May-15
04-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C063B30210
6 06-Jun-15
11-Jun-15
Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf
Interior Construction
C063C10100
<BLDG-63> Construct CUM Works for Gr floor
191 04-Jan-15
12 04-Jan-15
05-Aug-15
05-Aug-15, Interior Construction
17-Jan-15 Supply and build solid cement block unit machine-made with density
<BLDG-63>
not exceed
Construct
2000 kg/m3,
CUM Works
Supplyfor
and
Grbuild
floorsolid cement block unit machine-made with density not exceed 20
C063C10110
12 26-Jan-15
07-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-63>
exceed 2000
Construct
kg/m3, Supply
CUM Works
and build
for 1st
solid
floor
cement block unit machine-made with density not exceed 20
C063C10120
12 08-Feb-15
20-Feb-15 Supply and build hollow cement block unit machine-made with density not exceed
<BLDG-63>
1600 Construct
kg/m3, Supply
CUMand
Works
buildfor
hollow
2nd floor
cement block unit machine-made with density not excee
C063C10130
12 21-Feb-15
05-Mar-15 Supply and build hollow cement block unit machine-made with density not exceed
<BLDG-63>
1600 kg/m3,
Construct
SupplyCUM
and build
Works
solid
forcement
3rd floor
block unit machine-made with density not exceed
C063C10150
4 04-Mar-15
07-Mar-15 Supply and build solid cement block unit machine-made with density not exceed<BLDG-63>
2000 kg/m3,Construct
Supply and
CUM
build
forsolid
Parapet
cement block unit machine-made with density not exceed 20
C063C10140
12 14-Mar-15
25-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000<BLDG-63>
kg/m3, Supply
Construct
and build
CUM
solidWorks
cement
forblock
4th floor
unit machine-made with density not exceed 20
C063C10160
4 25-Mar-15
29-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-63>
SupplyConstruct
and buildInterior
solid cement
CUM block
Worksunit
formachine-made
Roof
with density not exceed 20
C063C10190
2 26-Jul-15
27-Jul-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement<BLDG-63>
block unit machine-made
Install Ducts work
with for
density
4th floor
not excee
C063C10200
2 28-Jul-15
29-Jul-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement<BLDG-63>
block unit machine-made
Install Ducts work
with density
for 3rd not
floorexcee
C063C10210
2 30-Jul-15
01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-63>
unit machine-made
Install Ducts with
workdensity
for 2ndnot
floor
excee
C063C10220
2 02-Aug-15
03-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-63>
unit machine-made
Install Ductswith
work
density
for 1stnot
floor
excee
C063C10230
2 04-Aug-15
05-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-63>
unit machine-made
Install Ducts
with
work
density
for Grnot
floor
excee
62 26-Mar-15
26 26-Mar-15
02-Jun-15
23-Apr-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C063C20130
12 26-Apr-15
07-May-15 Light beige terriesta marble stairs of 40 mm thick., polished treads, Stone Paving and Flooring Light<BLDG-63>
beige terriesta
Install
marble
Marble
stairs
for320
Entrance
mm width,
& Stairs
Stone Paving and Flooring Lig
C063C20170
12 09-May-15
20-May-15 Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C063C20160
6 21-May-15
27-May-15 Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.
C063C20120
6 28-May-15
02-Jun-15
Plumbing
C063D20100
187 27-Dec-14
3 27-Dec-14
wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door
<BLDG-63>
type (D09)
Install
- hinged
Unitsleaf
Wooden
- 900 mm
Doors
x 2200 mm.
25-Jul-15
25-Jul-15, Plumbing
29-Dec-14 UPVC pipes and fittings, underground 75mm, UPVC pipes
<BLDG-63>
and fittings,Install
underground
Plumbing110mm,
Fittings UPVC
Under pipes
SOG and fittings, underground 160mm, Polypropylene Pipes and Fittings
C063D20110
14 26-Mar-15
09-Apr-15
Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground
<BLDG-63>
50mm, Install
UPVCDrainage
Pipes andRisers
Fittings For Drainage above ground 75mm, UPVC Pip
C063D20120
14 26-Mar-15
09-Apr-15
Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and
<BLDG-63>
Fittings including
Install water
itemsRisers
mentioned 25mm, Polypropylene Pipes and Fittings includ
C063D20130
12 11-Apr-15
23-Apr-15
Roof drains type (RD2), cast iron oblique grate, side outlet 100mm, Roof drains type (RD2), cast
<BLDG-63>
iron oblique
Install
grate,
Roofside
sainatary
outlet 80
work
mm
C063D20140
21 18-Jun-15
10-Jul-15
Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25<BLDG-63>
mm, ValvesConstruct
are classified
Inspection
according
chambers
to type &Gate
connect
Valv
C063D20150
10 11-Jul-15
25-Jul-15
Electrical
C063D50110
182 30-Nov-14
2 30-Nov-14
C063D50120
2 08-Dec-14
09-Dec-14 Indoor wiring for one lighting outlet including wires <BLDG-63>
3(1x3) mm,Install
One lighting
Electrical
outlet
conduits
including
for 1st
empty
Floor
"PVC"
Slab conduits
C063D50130
2 31-Dec-14
01-Jan-15
Indoor wiring for one lighting outlet including wires 3(1x3) <BLDG-63>
mm, One lighting
Install outlet
Electrical
including
conduits
empty
for 2nd
"PVC"
Floor
conduits
Slab
C063D50140
2 27-Jan-15
28-Jan-15
Indoor wiring for one lighting outlet including wires 3(1x3) mm, One
<BLDG-63>
lighting outlet
Install
including
Electrical
empty
conduits
"PVC"for
conduits
3rd Floor Slab
C063D50150
2 20-Feb-15
21-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-63>
outlet including
Install
empty
Electrical
"PVC"
conduits
conduits
for 4th Floor Slab
C063D50180
6 08-Mar-15
14-Mar-15 Light Current Systems Two UPVC 25 mm Conduits for risers and tie in connection<BLDG-63>
/ unit, Light Install
Current
Electrical
Systems
Risers
Triple Play System Floor pull box, Light Current Systems Triple
C063D50100
6 08-Mar-15
14-Mar-15 power network including main earthing networks, 600/1000 V, multicore copper conductor,
<BLDG-63>
PVC/PVC
Install Earthing
cables (4System
x 10) mm, 600/1000 V, multicore copper conductor, PVC/PVC
C063D50160
1 12-Mar-15
12-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet
<BLDG-63>
including empty
Install"PVC"
Electrical
conduits
conduits for Roof Slab
C063D50200
3 26-Apr-15
28-Apr-15
40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type
<BLDG-63>
Push Button
Install
(P.B)of Panel board
C063D50170
3 26-Apr-15
28-Apr-15
Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door <BLDG-63>
master unit Install Conduits for intercom system
C063D50210
C063D50220
C063D50230
C063D50190
5 17-May-15
21-May-15 Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power
<BLDG-63>
outlet with
Install
3(1x6)
Wiring
mm,
Devices&Disconnect
Wiring Devices andswitches
Disconnectors Load B
C063D50240
6 06-Jun-15
11-Jun-15
C063D50250
7 12-Jun-15
18-Jun-15
9 06-Aug-15
3 06-Aug-15
15-Aug-15
08-Aug-15
14 29-Apr-15
3 14-May-15
21 14-May-15
Completion Inspection
C063H10100
<BLDG-63> Punch Out
18-Jun-15
18-Jun-15, Electrical
01-Dec-14 Indoor wiring for one lighting outlet including wires
<BLDG-63>
3(1x3) mm,
Install
One
Electrical
lighting conduits
outlet including
for Gr Floor
emptySlab
"PVC" conduits
13-May-15 Low Voltage Distribution Panels (DB-SER-2 ), Low Voltage Distribution Panels (DB-SER-1), Low Voltage
<BLDG-63>
Distribution
Install
Panels
Distribution
(DB-A4-2),
Panel
Low Voltage Distribution Panels (DB-A
16-May-15 Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
04-Jun-15
450/750 V Single Core Copper Conductor, PVC cables (1x 50) mm ECC, 450/750 V Single Core Copper Conductor,
<BLDG-63>
PVC
Install
cables
Cables
(1x 35) mm, 450/750 V Single Core Coppe
<BLDG-63> Test elec. system
Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5
C063H10110
3 09-Aug-15
11-Aug-15
C063H10120
3 12-Aug-15
15-Aug-15
Remaining Work
Milestone
Actual Work
summary
Page 6 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
C173G20130
C173G20120
1 15-Sep-14 A 15-Sep-14 A
C173G20140
2 13-Jan-15
14-Jan-15
C173G20180
5 24-Mar-15
29-Mar-15
Substructure
Foundation
Foundation at Level (-2.25)
C173A10300
<BLDG-173> Construct P.C. F oundation Lv (- 2.25)
C173A10310
C173A10340
C173A10320
C173A10330
109
109
109
2
13-Sep-14 A
13-Sep-14 A
13-Sep-14 A
13-Sep-14 A
Sep
Oct
Nov
26-Jan-15
26-Jan-15, Substructure
26-Jan-15
26-Jan-15, Foundation
26-Jan-15
26-Jan-15, Foundation at Level (-2.25)
21-Sep-14 A Supply and cast plain concrete
<BLDG-173>
with average
Construct
compressive
P.C. F oundation
strengthLv200
(- 2.25)
kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c
10-Jan-15
2 11-Jan-15
12-Jan-15
Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-173>
with bituminous
Applybase
Dampproofing for Foundation Lv (-2.25)
4 22-Jan-15
26-Jan-15
99 13-Sep-14 A 21-Jan-15
21-Jan-15, Foundation at Level (-1.50)
2 13-Sep-14 A 21-Sep-14 A Supply and cast plain concrete
<BLDG-173>
with average
Construct
compressive
P.C. F oundation
strengthLv200
(- 1.50)
kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c
C173A10270
C173A10350
12 27-Dec-14
10-Jan-15
C173A10280
1 11-Jan-15
11-Jan-15
Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-173>
with bituminous
Applybase
Dampproofing for Foundation Lv (-1.50)
C173A10290
3 19-Jan-15
21-Jan-15
Superstructure
Ground Floor Lv (+3.15)
C173B30340
<BLDG-173> Set up Form work for Gr Floor Columns
08-Apr-15, Superstructure
26-Dec-14, Ground Floor Lv (+3.15)
<BLDG-173> Set up Form work for Gr Floor Columns
C173B30360
C173B30350
1 30-Nov-14
C173B30370
14 01-Dec-14
C173B30380
14 01-Dec-14
C173B30390
C173B30400
1 16-Dec-14
9 17-Dec-14
26-Dec-14
21-Jan-15
26-Dec-14 Form Work %
9 17-Dec-14
1 27-Dec-14
31 17-Dec-14
9 17-Dec-14
C173B30420
C173B30430
C173B30440
11 28-Dec-14
10-Jan-15
Steel Fixing
C173B30460
11 28-Dec-14
10-Jan-15
Form Work %
C173B30470
1 11-Jan-15
11-Jan-15
C173B30450
9 12-Jan-15
21-Jan-15
15-Feb-15
21-Jan-15 Form Work %
31 12-Jan-15
9 12-Jan-15
C173B30530
9 12-Jan-15
21-Jan-15
Steel Fixing
C173B30540
1 22-Jan-15
22-Jan-15
C173B30480
11 23-Jan-15
C173B30500
11 23-Jan-15
C173B30490
1 05-Feb-15
05-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,
<BLDG-173>
beams, and
Cast
slabs
concrete for 2nd Floor Slab
C173B30510
9 06-Feb-15
15-Feb-15
10-Mar-15
15-Feb-15 Form Work %
31 06-Feb-15
9 06-Feb-15
C173B30570
9 06-Feb-15
C173B30560
1 16-Feb-15
C173B30580
11 17-Feb-15
C173B30600
11 17-Feb-15
C173B30590
C173B30610
Remaining Work
Milestone
Actual Work
summary
1 01-Mar-15
01-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,
<BLDG-173>
and slabs Cast concrete for 3rd Floor Slab
9 02-Mar-15
10-Mar-15
03-Apr-15
10-Mar-15 Form Work %
31 02-Mar-15
9 02-Mar-15
Page 7 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
C173B30640
9 02-Mar-15
C173B30630
1 11-Mar-15
11-Mar-15
C173B30650
11 12-Mar-15
C173B30660
11 12-Mar-15
C173B30680
C173B30670
Oct
Nov
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for
<BLDG-173>
columns, Reinforced
Cast concrete
concrete
for 4th
with
Floor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo
1 24-Mar-15
24-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and<BLDG-173>
slabs
Cast concrete for 4th Floor Slab
9 25-Mar-15
03-Apr-15
14 25-Mar-15
2 25-Mar-15
08-Apr-15
26-Mar-15 Form Work %
C173B30720
2 25-Mar-15
C173B30710
1 28-Mar-15
28-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-173>
Reinforced
Castconcrete
concretewith
for Roof
average
Floorcompressive
Columns/Planted
strength
Columns
250 kg/cm2 at 28 days fo
C173B30740
4 29-Mar-15
01-Apr-15
Steel Fixing
C173B30750
4 29-Mar-15
01-Apr-15
Form Work %
C173B30690
1 02-Apr-15
02-Apr-15
RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-173> Cast concrete for Roof Slab
C173B30730
6 03-Apr-15
08-Apr-15
87 30-Mar-15
8 30-Mar-15
02-Jul-15
06-Apr-15
04-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply
<BLDG-173>
O.P cement-sand
Apply Facades
plasterPlaster
in two-coat work (base and finish coats)for ext
Exterior Enclosure
C173B30850
<BLDG-173> Erect Scaffold
C173B30810
24 07-Apr-15
C173B30830
6 02-May-15
07-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment
C173B30820
8 05-May-15
13-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply
<BLDG-173>
and install
Install
gypsum
Gypsum
cornices
Corniche
including paint, 105 mm height middle g
C173B30840
8 14-May-15
21-May-15
C173B30880
10 23-May-15
01-Jun-15
C173B30860
8 02-Jun-15
10-Jun-15
Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-173>
paintInstall
handrail
Handrails
900 mm
forheight
balconies
3/A-501, Supply and ins
C173B30770
7 11-Jun-15
17-Jun-15
C173B30760
14 18-Jun-15
02-Jul-15
UPVC Window type (W09) - Two (2) hinged leaves - 900 mm x 800 mm., UPVC Window type (W10) - circular fixed leaf
<BLDG-173>
with double
Install
glassSteel
- diameter
& UPVC
900Doors
mm., &
UPVC
Windows
Window
C173B30780
12 18-Jun-15
30-Jun-15
Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - <BLDG-173>
with plexi fill - Install
400 mm
Aluminum
x 1200 mm.
Windows
C173B30790
6 18-Jun-15
24-Jun-15
C173B30870
3 18-Jun-15
21-Jun-15
C173B30800
8 25-Jun-15
02-Jul-15
Aswan rough stone 110 mm height Aswan rough stone skirting., Aswan rough stone 150 mm height Aswan rough stone
<BLDG-173>
skirting.
Install Rough Stone Skirting
87 30-Mar-15
4 30-Mar-15
02-Jul-15
02-Apr-15
02-Jul-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max.
<BLDG-173>
1200 kg/m Cast Light Weight Concrete for slopes
Roofing
C173B30330
C173B30300
C173B30220
C173B30230
C173B30270
9 03-Apr-15
12-Apr-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
15 14-Apr-15
30-Apr-15
Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508
6 14-Apr-15
19-Apr-15
4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof. <BLDG-173> Apply reinforced bituminous water proofing membrane
3 20-Apr-15
22-Apr-15
C173B30250
4 23-Apr-15
28-Apr-15
C173B30240
3 29-Apr-15
01-May-15
C173B30260
2 02-May-15
03-May-15
C173B30280
10 17-May-15
27-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting. <BLDG-173> Install Terr azzo Tiles
C173B30290
18 28-May-15
15-Jun-15
Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors,
<BLDG-173>
100 mm Install
height Ceramic
ceramic tiles
Tilesfor skirting.
C173B30310
10 16-Jun-15
26-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C173B30320
6 27-Jun-15
02-Jul-15
Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf
Interior Construction
C173C30280
<BLDG-173> Construct CUM Works for Gr floor
175 22-Jan-15
12 22-Jan-15
05-Aug-15
05-Aug-15, Interior Construction
04-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-173>
exceed 2000
Construct
kg/m3, Supply
CUM Works
and build
for Gr
solid
floor
cement block unit machine-made with density not exceed 20
C173C30300
10 26-Jan-15
05-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-173>
exceed 2000
Construct
kg/m3, Supply
CUM Works
and build
for solid
1st floor
cement block unit machine-made with density not exceed 20
C173C30310
12 16-Feb-15
28-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-173>
2000 kg/m3,
Construct
Supply and
CUM
build
Works
solidfor
cement
2nd floor
block unit machine-made with density not exceed 20
C173C30330
12 11-Mar-15
23-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000<BLDG-173>
kg/m3, Supply
Construct
and buildCUM
solid Works
cementfor
block
3rd unit
floormachine-made with density not exceed 20
C173C30260
4 25-Mar-15
29-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-173>
Supply and
Construct
build solid
CUMcement
for Parapet
block unit machine-made with density not exceed 20
C173C30240
8 04-Apr-15
12-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-173>
Supply and build
Construct
solid cement
CUM Works
block for
unit4th
machine-made
floor
with density not exceed 20
C173C30270
4 09-Apr-15
14-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,<BLDG-173>
Supply and build
Construct
solid cement
Interiorblock
CUMunit
Works
machine-made
for Roof
with density not exceed 20
C173C30250
2 26-Jul-15
27-Jul-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement<BLDG-173>
block unit machine-made
Install Ducts with
workdensity
for 4th not
floorexcee
C173C30220
2 28-Jul-15
29-Jul-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement<BLDG-173>
block unit machine-made
Install Ductswith
workdensity
for 3rdnot
floor
excee
C173C30320
2 30-Jul-15
01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-173>
unit machine-made
Install Ductswith
work
density
for 2nd
notfloor
excee
Remaining Work
Milestone
Actual Work
summary
Page 8 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C173C30230
2 02-Aug-15
03-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-173>
unit machine-made
Install Ducts
with
work
density
for 1st
notfloor
excee
C173C30290
2 04-Aug-15
05-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-173>
unit machine-made
Install Ducts
withwork
density
for Gr
notfloor
excee
59 14-Apr-15
23 14-Apr-15
16-Jun-15
09-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C173C30150
12 10-May-15
21-May-15 terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340
<BLDG-173>
mm width,Install
StoneMarble
Pavingfor
and
Entrance
Flooring& Light
Stairsbeige terriesta marble
C173C30130
12 23-May-15
03-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C173C30180
6 04-Jun-15
10-Jun-15
Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.
C173C30170
6 11-Jun-15
16-Jun-15
wooden solid core doors Door type (D09) - hinged leaf - 900 mm x 2200 mm., wooden solid core doors Door type
<BLDG-173>
(D07) - hinged
Install
leafUnits
- 1100
Wooden
mm x 2200
Doorsmm.
171 15-Jan-15
3 15-Jan-15
25-Jul-15
18-Jan-15
25-Jul-15, Plumbing
UPVC pipes and fittings, underground 75mm, UPVC pipes and <BLDG-173>
fittings, underground
Install Plumbing
110mm, UPVC
Fittingspipes
Under
and
SOG
fittings, underground 160mm, Polypropylene Pipes and Fittings
Plumbing
C173D50470
C173D50420
14 14-Apr-15
29-Apr-15
Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-173>
UPVC Pipes
Installand
Drainage
FittingsRisers
For Drainage above ground 75mm, UPVC Pip
C173D50460
14 14-Apr-15
29-Apr-15
Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings
<BLDG-173>
includingInstall
items water
mentioned
Risers
25mm, Polypropylene Pipes and Fittings includ
C173D50430
12 04-May-15
16-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 100mm, Roof drains type (RD2), cast iron<BLDG-173>
oblique grate,Install
side outlet
Roof sainatary
80 mm work
C173D50450
15 25-Jun-15
10-Jul-15
C173D50440
10 11-Jul-15
25-Jul-15
Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25<BLDG-173>
mm, Valves are
Construct
classified
Inspection
according
chambers
to type Gate
& connec
Valv
<BLDG-173> Test Drainage & water R iser s
Electrical
C173D50310
188 03-Dec-14
2 03-Dec-14
C173D50320
2 29-Dec-14
30-Dec-14 Indoor wiring for one lighting outlet including wires 3(1x3)<BLDG-173>
mm, One lighting
Installoutlet
Electrical
including
conduits
empty
for "PVC"
1st Floor
conduits
Slab
C173D50410
2 24-Jan-15
26-Jan-15
C173D50360
2 18-Feb-15
19-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-173>
outlet including
Install
empty
Electrical
"PVC"
conduits
conduits
for 3rd Floor Slab
C173D50330
2 14-Mar-15
15-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet<BLDG-173>
including empty
Install
"PVC"
Electrical
conduits
conduits for 4th Floor Slab
C173D50340
1 28-Mar-15
28-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-173>
empty "PVC"
Installconduits
Electrical conduits for Roof Slab
C173D50270
6 30-Mar-15
04-Apr-15
Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple
<BLDG-173>
Play SystemInstall
FloorElectrical
pull box,Risers
Light Current Systems Two UPVC 25 mm Conduits for
C173D50390
6 30-Mar-15
04-Apr-15
600/1000 V, multicore copper conductor, PVC/PVC cables (4 x 35) mm, 600/1000 V, multicore
<BLDG-173>
Aluminium
Install
conductor,
Earthing PVC/PVC
System cables (3 x 240+120) mm, 600/1000 V, multico
C173D50280
3 10-May-15
12-May-15 40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type Push
<BLDG-173>
Button (P.B)Install of Panel board
C173D50400
3 10-May-15
12-May-15 Intercom System Provision for door master unit, Intercom System One UPVC 25 mm conduit for risers/
<BLDG-173>
unit
Install Conduits for intercom system
C173D50290
C173D50350
C173D50370
C173D50380
C173D50300
C173D50260
14 13-May-15
3 28-May-15
28-Jun-15
28-Jun-15, Electrical
04-Dec-14 Indoor wiring for one lighting outlet including wires
<BLDG-173>
3(1x3) mm,Install
One lighting
Electrical
outlet
conduits
including
for Gr
empty
Floor"PVC"
Slab conduits
Indoor wiring for one lighting outlet including wires 3(1x3) mm, One
<BLDG-173>
lighting outlet
Install
including
Electrical
empty
conduits
"PVC"for
conduits
2nd Floor Slab
27-May-15 Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution
<BLDG-173>
Panels Install
(DB-SER-1),
Distribution
LowPanel
Voltage Distribution Panels (DB-SER
30-May-15 Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
21 28-May-15
18-Jun-15
450/750 V Single Core Copper Conductor, PVC cables (1x 35) mm, 450/750 V Single Core Copper Conductor, <BLDG-173>
PVC cables (1x
Install
50) mm,
Cables
450/750 V Single Core Copper Con
2 31-May-15
01-Jun-15
Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power<BLDG-173>
outlet with 3(1x6)
Installmm,
Wiring
Wiring
Devices&Disconnect
Devices and Disconnectors
switches Load B
6 20-Jun-15
25-Jun-15
3 26-Jun-15
28-Jun-15
9 06-Aug-15
3 06-Aug-15
15-Aug-15
08-Aug-15
Completion Inspection
C173H10130
<BLDG-173> Punch Out
C173H10140
3 09-Aug-15
11-Aug-15
C173H10150
3 12-Aug-15
15-Aug-15
C172G10110
C172G10100
1 04-Sep-14 A 04-Sep-14 A
C172G10120
2 13-Jan-15
14-Jan-15
C172G10140
5 22-Mar-15
26-Mar-15
Substructure
Foundation
Foundation at Level (-2.25)
C172A10100
<BLDG-172> Construct P.C. F oundation Lv (- 2.25)
C172A10110
C172A10170
C172A10120
133
133
133
2
04-Sep-14 A
04-Sep-14 A
04-Sep-14 A
04-Sep-14 A
24-Jan-15
24-Jan-15, Substructure
24-Jan-15
24-Jan-15, Foundation
24-Jan-15
24-Jan-15, Foundation at Level (-2.25)
14-Sep-14 A Supply and cast plain <BLDG-172>
concrete with average
Constructcompressive
P.C. F oundation
strength
Lv (-200
2.25)
kg/cm2 at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c
10-Jan-15
2 11-Jan-15
12-Jan-15
Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-172>
with bituminous
Applybase
Dampproofing for Foundation Lv (-2.25)
C172A10130
3 19-Jan-15
21-Jan-15
C172A10180
3 22-Jan-15
24-Jan-15
Remaining Work
Milestone
Actual Work
summary
Page 9 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C063A10260
C063A10270
C063A10300
12 27-Dec-14
10-Jan-15
C063A10280
1 11-Jan-15
11-Jan-15
Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-172>
with bituminous
Applybase
Dampproofing for Foundation Lv (-1.50)
C063A10290
3 11-Jan-15
13-Jan-15
Superstructure
Ground Floor Lv (+3.15)
C172B10120
<BLDG-172> Fix Reinforcement Bars for Gr Floor Columns
C172B10100
C172B10110
C172B10130
C172B10140
C172B10150
C172B10160
08-Apr-15, Superstructure
26-Dec-14, Ground Floor Lv (+3.15)
<BLDG-172> Fix Reinforcement Bars for Gr Floor Columns
<BLDG-172> Set up Form work for Gr Floor Columns
1 16-Dec-14
9 17-Dec-14
26-Dec-14
21-Jan-15
26-Dec-14 Form Work %
9 17-Dec-14
31 17-Dec-14
9 17-Dec-14
C172B10180
C172B10190
1 27-Dec-14
C172B10220
11 28-Dec-14
10-Jan-15
Form Work %
C172B10200
11 28-Dec-14
10-Jan-15
Steel Fixing
C172B10230
1 11-Jan-15
11-Jan-15
C172B10210
9 12-Jan-15
21-Jan-15
15-Feb-15
21-Jan-15 Form Work %
31 12-Jan-15
9 12-Jan-15
C172B10250
9 12-Jan-15
21-Jan-15
Steel Fixing
C172B10260
1 22-Jan-15
22-Jan-15
C172B10270
11 23-Jan-15
C172B10290
11 23-Jan-15
C172B10280
1 05-Feb-15
05-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,
<BLDG-172>
beams, and
Cast
slabs
concrete for 2nd Floor Slab
C172B10300
9 06-Feb-15
15-Feb-15
10-Mar-15
15-Feb-15 Form Work %
31 06-Feb-15
9 06-Feb-15
C172B10330
9 06-Feb-15
C172B10320
1 16-Feb-15
C172B10340
11 17-Feb-15
C172B10360
11 17-Feb-15
C172B10350
C172B10370
1 01-Mar-15
01-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,
<BLDG-172>
and slabs Cast concrete for 3rd Floor Slab
9 02-Mar-15
10-Mar-15
03-Apr-15
10-Mar-15 Steel Fixing
9 02-Mar-15
11-Mar-15
31 02-Mar-15
9 02-Mar-15
C172B10380
C172B10390
1 11-Mar-15
C172B10410
11 12-Mar-15
C172B10420
11 12-Mar-15
C172B10440
1 24-Mar-15
24-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and<BLDG-172>
slabs
Cast concrete for 4th Floor Slab
C172B10430
9 25-Mar-15
03-Apr-15
14 25-Mar-15
2 25-Mar-15
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for
<BLDG-172>
columns, Reinforced
Cast concrete
concrete
for 4th
with
Floor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo
08-Apr-15
26-Mar-15 Form Work %
C172B10470
2 25-Mar-15
C172B10460
1 28-Mar-15
28-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-172>
Reinforced
Castconcrete
concretewith
for Roof
average
Floorcompressive
Columns/Planted
strength
Columns
250 kg/cm2 at 28 days fo
C172B10490
3 29-Mar-15
C172B10500
3 29-Mar-15
C172B10510
1 02-Apr-15
02-Apr-15
Remaining Work
Milestone
Actual Work
summary
RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-172> Cast concrete for Roof Slab
Page 10 of 29
Activity ID
Activity Name
C172B10480
Original Start
Duration
Exterior Enclosure
C172B20240
<BLDG-172> Erect Scaffold
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
6 03-Apr-15
08-Apr-15
99 30-Mar-15
12 30-Mar-15
15-Jul-15
11-Apr-15
10-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply
<BLDG-172>
O.P cement-sand
Apply Facades
plaster inPlaster
two-coat work (base and finish coats)for ext
C172B20180
25 12-Apr-15
C172B20220
6 07-May-15
C172B20200
13 11-May-15
24-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply
<BLDG-172>
and install gypsum
Install Gypsum
cornicesCorniche
including paint, 105 mm height middle g
C172B20230
10 25-May-15
03-Jun-15
C172B20190
10 04-Jun-15
14-Jun-15
C172B20250
8 15-Jun-15
23-Jun-15
Supply and install 550 mm height metal unit fixed to block wall, as shown on drawing No. A-203., Supply and install <BLDG-172>
mild steel withInstall
electrostatic
Handrails
paint
forhandrail
balconies
600 mm height, Su
C172B20490
7 24-Jun-15
30-Jun-15
C172B20210
3 01-Jul-15
04-Jul-15
C172B20500
12 01-Jul-15
13-Jul-15
C172B20510
C172B20150
C172B20170
Roofing
C172B30130
13-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment
6 01-Jul-15
07-Jul-15
14 01-Jul-15
15-Jul-15
Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge leaves
<BLDG-172>
1400 mm
Install
x 2850
Steelmm,
& UPVC
UPVCDoors
Door type
& Window
(D03)
8 08-Jul-15
15-Jul-15
Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.
<BLDG-172> Install Rough Stone Skirting
91 30-Mar-15
4 30-Mar-15
07-Jul-15
02-Apr-15
07-Jul-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max.
<BLDG-172>
1200 kg/m Cast Light Weight Concrete for slopes
C172B30190
9 03-Apr-15
12-Apr-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C172B30110
6 14-Apr-15
19-Apr-15
4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof. <BLDG-172> Apply reinforced bituminous water proofing membrane
C172B30160
3 20-Apr-15
22-Apr-15
C172B30140
4 23-Apr-15
28-Apr-15
C172B30120
3 29-Apr-15
01-May-15
C172B30150
2 02-May-15
03-May-15
C172B30170
10 17-May-15
27-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting. <BLDG-172> Install Terr azzo Tiles
C172B30180
18 28-May-15
15-Jun-15
Ceramic tiles for floors, 100 mm height ceramic tiles for skirting., Ceramic tiles for floors, set on 20 mm thick. cement
<BLDG-172>
mortar bed,and
Install Ceramic
30 mm thick.
Tilessand layer.
C172B30200
10 16-Jun-15
26-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C172B30100
10 27-Jun-15
07-Jul-15
Interior Construction
C172C10150
<BLDG-172> Construct CUM Works for Gr floor
184 14-Jan-15
10 14-Jan-15
07-Aug-15
07-Aug-15, Interior Construction
24-Jan-15 Supply and build hollow cement block unit machine-made with density
<BLDG-172>
not exceed
Construct
1600 kg/m3,
CUMSupply
Worksand
for Gr
build
floor
hollow cement block unit machine-made with density not excee
C172C10170
10 26-Jan-15
05-Feb-15 Supply and build hollow cement block unit machine-made with density<BLDG-172>
not exceed 1600
Construct
kg/m3,CUM
Supply
Works
and build
for 1st
hollow
floor cement block unit machine-made with density not excee
C172C10180
10 16-Feb-15
25-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-172>
2000 kg/m3,
Construct
Supply and
CUMbuild
Works
solidforcement
2nd floor
block unit machine-made with density not exceed 20
C172C10200
10 11-Mar-15
21-Mar-15 Supply and build hollow cement block unit machine-made with density not exceed 1600
<BLDG-172>
kg/m3, Supply
Construct
and build
CUM
hollow
Works
cement
for 3rdblock
floorunit machine-made with density not excee
C172C10130
4 25-Mar-15
29-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-172>
Supply and
Construct
build solid
CUMcement
for Parapet
block unit machine-made with density not exceed 20
C172C10110
C172C10140
10 04-Apr-15
15-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,<BLDG-172>
Supply and build
Construct
solid cement
CUM Works
block unit
for 4th
machine-made
floor
with density not exceed 20
3 09-Apr-15
12-Apr-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3,
<BLDG-172>
Supply andConstruct
build hollow
Interior
cement
CUM
block
Works
unitfor
machine-made
Roof
with density not excee
C172C10120
2 28-Jul-15
29-Jul-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C172C10210
2 30-Jul-15
01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C172C10190
2 02-Aug-15
03-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C172C10100
2 04-Aug-15
05-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C172C10160
2 06-Aug-15
07-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
61 16-Apr-15
26 16-Apr-15
21-Jun-15
14-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C172C20130
12 15-May-15
27-May-15 20 mm thick., and 100 mm height light beige terriesta marble skirting., 30 mm thick. light beige terriesta marble
<BLDG-172>
polished landing,
Install Marble
set onfor
20Entrance
mm thick.&mortar
Stairs bed, Stone Paving
C172C20100
12 28-May-15
09-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C172C20170
6 10-Jun-15
15-Jun-15
Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.
C172C20160
5 16-Jun-15
21-Jun-15
wooden solid core doors Door type (D09) - hinged leaf - 900 mm x 2200 mm., wooden solid core doors Door type<BLDG-172>
(D07) - hinged
Install
leaf -Units
1100Wooden
mm x 2200
Doors
mm.
173 15-Jan-15
3 15-Jan-15
27-Jul-15
18-Jan-15
27-Jul-15, Plumbing
UPVC pipes and fittings, underground 75mm, UPVC pipes and <BLDG-172>
fittings, underground
Install Plumbing
110mm, UPVC
Fittingspipes
Under
and
SOG
fittings, underground 160mm, Polypropylene Pipes and Fittings
Plumbing
C172D20150
C172D20100
14 16-Apr-15
01-May-15 Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-172>
UPVC Pipes
Installand
Drainage
FittingsRisers
For Drainage above ground 75mm, UPVC Pip
C172D20140
14 16-Apr-15
01-May-15 Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings
<BLDG-172>
including items
Installmentioned
water Risers
25mm, Polypropylene Pipes and Fittings includ
C172D20110
12 04-May-15
16-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron <BLDG-172>
oblique grate,Install
side outlet
Roof 100mm
sainatary work
C172D20130
10 08-Jul-15
21-Jul-15
Remaining Work
Milestone
Actual Work
summary
Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Strainer 63 mm, Valves
<BLDG-172>
are classified
Construct
according
Inspection
to type
chambers
Check Valves
& con
Page 11 of 29
Activity ID
Activity Name
C172D20120
Original Start
Duration
5 22-Jul-15
Finish
Resources
2015
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
27-Jul-15
Aug
Sep
Oct
Nov
Electrical
C172D50180
193 03-Dec-14
2 03-Dec-14
04-Jul-15
04-Dec-14 Indoor wiring for one lighting outlet including wires
<BLDG-172>
3(1x3) mm,Install
One lighting
Electrical
outlet
conduits
including
for Gr
empty
Floor"PVC"
Slab conduits
04-Jul-15, Electrical
C172D50190
2 29-Dec-14
C172D50200
2 24-Jan-15
26-Jan-15
C172D50210
2 06-Feb-15
C172D50100
2 14-Mar-15
15-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet<BLDG-172>
including empty
Install
"PVC"
Electrical
conduits
conduits for 4th Floor Slab
C172D50140
6 30-Mar-15
04-Apr-15
Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple
<BLDG-172>
Play SystemInstall
FloorElectrical
pull box,Risers
Light Current Systems Two UPVC 25 mm Conduits for
C172D50240
6 30-Mar-15
04-Apr-15
power network including main earthing networks, 600/1000 V, multicore copper conductor,
<BLDG-172>
PVC/PVC cables
Install (4
Earthing
x 10) mm,
System
600/1000 V, multicore copper conductor, PVC/PVC
C172D50110
1 01-Apr-15
01-Apr-15
C172D50150
3 15-May-15
17-May-15 Lighting Switches Type Push Button (P.B), 40mm PVC empty conduit from (KWHM) box to panel board
<BLDG-172>
of customer Install of Panel board
C172D50250
3 15-May-15
17-May-15 Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door master<BLDG-172>
unit
Install Conduits for intercom system
C172D50160
C172D50120
C172D50220
C172D50230
C172D50170
C172D50130
Indoor wiring for one lighting outlet including wires 3(1x3) mm, One
<BLDG-172>
lighting outlet
Install
including
Electrical
empty
conduits
"PVC"for
conduits
2nd Floor Slab
<BLDG-172> Install Electrical conduits for 3rd Floor Slab
14 18-May-15
01-Jun-15
Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution
<BLDG-172>
Panels (DB-SER-1),
Install Distribution
Low Voltage
Panel Distribution Panels (DB-SER
3 02-Jun-15
04-Jun-15
Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
21 02-Jun-15
24-Jun-15
450/750 V Single Core Copper Conductor, PVC cables (1x 35) mm, 450/750 V Single Core Copper Conductor, PVC
<BLDG-172>
cables (1x 70)
Install
mm,
Cables
450/750 V Single Core Copper Con
2 06-Jun-15
07-Jun-15
Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power outlet
<BLDG-172>
with 3(1x6)
Install
mm,
Wiring
Wiring
Devices&Disconnect
Devices and Disconnectors
switches Socket
6 25-Jun-15
30-Jun-15
3 01-Jul-15
04-Jul-15
7 08-Aug-15
2 08-Aug-15
15-Aug-15
09-Aug-15
Completion Inspection
C172H10100
<BLDG-172> Punch Out
C172H10110
2 10-Aug-15
11-Aug-15
C172H10120
3 12-Aug-15
15-Aug-15
C285G10100
C285G10110
1 14-Sep-14 A 27-Sep-14 A
C285G10120
2 20-Jan-15
21-Jan-15
C285G10140
5 31-Mar-15
04-Apr-15
Substructure
Foundation
Foundation at Level (-2.25)
C285A10100
<BLDG-285> Construct P.C. F oundation Lv (- 2.25)
C285A10110
C285A10240
C285A10120
C285A10160
110
110
110
8
28-Sep-14 A
28-Sep-14 A
28-Sep-14 A
28-Sep-14 A
02-Feb-15
02-Feb-15, Substructure
02-Feb-15
02-Feb-15, Foundation
02-Feb-15
02-Feb-15, Foundation at Level (-2.25)
21-Oct-14 A Supply and cast plain concrete with
<BLDG-285>
average compressive
Construct strength
P.C. F oundation
200 kg/cm2
Lv (-at2.25)
28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c
17-Jan-15
2 18-Jan-15
19-Jan-15
Supply and apply two (2) coats cold applied waterproofing paint<BLDG-285>
with bituminous
Apply
base
Dampproofing for Foundation Lv (-2.25)
4 29-Jan-15
02-Feb-15 Supply and cast plain concrete with average compressive strength 200
<BLDG-285>
kg/cm2 at 28
Construct
days 100mm,
S.O.G4Lv
mm
(-1.00)
thick bituminous waterproofing membrane with 50 mm cement morta
98 28-Sep-14 A 28-Jan-15
28-Jan-15, Foundation at Level (-1.50)
8 28-Sep-14 A 21-Oct-14 A Supply and cast plain concrete with
<BLDG-285>
average compressive
Construct strength
P.C. F oundation
200 kg/cm2
Lv (-at1.50)
28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c
C285A10140
C285A10250
12 04-Jan-15
17-Jan-15
C285A10150
1 18-Jan-15
18-Jan-15
Supply and apply two (2) coats cold applied waterproofing paint<BLDG-285>
with bituminous
Apply
base
Dampproofing for Foundation Lv (-1.50)
C285A10170
3 26-Jan-15
28-Jan-15
Superstructure
Ground Floor Lv (+3.15)
C285B10100
<BLDG-285> Fix Reinforcement Bars for Gr Floor Columns
22-Apr-15, Superstructure
01-Jan-15, Ground Floor Lv (+3.15)
<BLDG-285> Fix Reinforcement Bars for Gr Floor Columns
C285B10110
C285B10120
1 07-Dec-14
C285B10130
14 08-Dec-14
C285B10140
14 08-Dec-14
C285B10150
C285B10190
Remaining Work
Milestone
Actual Work
summary
1 23-Dec-14
9 24-Dec-14
01-Jan-15
31 24-Dec-14
28-Jan-15
Page 12 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C285B10170
9 24-Dec-14
01-Jan-15
Form Work %
C285B10160
9 24-Dec-14
01-Jan-15
Steel Fixing
C285B10180
1 04-Jan-15
04-Jan-15
C285B10200
11 05-Jan-15
17-Jan-15
Steel Fixing
C285B10210
11 05-Jan-15
17-Jan-15
Form Work %
C285B10220
1 18-Jan-15
18-Jan-15
C285B10260
9 19-Jan-15
28-Jan-15
21-Feb-15
28-Jan-15 Form Work %
31 19-Jan-15
9 19-Jan-15
C285B10230
9 19-Jan-15
28-Jan-15
Steel Fixing
C285B10250
1 29-Jan-15
29-Jan-15
C285B10280
11 31-Jan-15
C285B10270
11 31-Jan-15
C285B10290
1 11-Feb-15
11-Feb-15
C285B10330
9 12-Feb-15
21-Feb-15
17-Mar-15
21-Feb-15 Form Work %
31 12-Feb-15
9 12-Feb-15
C285B10300
9 12-Feb-15
C285B10320
1 22-Feb-15
22-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 <BLDG-285>
days for elevator
Castshaft,
concrete
Reinforced
for 3rdconcrete
Floor Columns
with average compressive strength 250 kg/cm2 at 28 d
C285B10350
11 23-Feb-15
C285B10340
11 23-Feb-15
C285B10360
C285B10400
1 07-Mar-15
07-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,
<BLDG-285>
and slabs Cast concrete for 3rd Floor Slab
9 08-Mar-15
17-Mar-15
09-Apr-15
17-Mar-15 Form Work %
9 08-Mar-15
18-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for<BLDG-285>
columns, Reinforced
Cast concrete
concrete
forwith
4th Floor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo
31 08-Mar-15
9 08-Mar-15
C285B10370
C285B10390
1 18-Mar-15
C285B10420
11 19-Mar-15
C285B10410
11 19-Mar-15
C285B10430
1 31-Mar-15
31-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-285> Cast concrete for 4th Floor Slab
C285B10470
9 01-Apr-15
09-Apr-15
20 01-Apr-15
5 01-Apr-15
22-Apr-15
05-Apr-15
Form Work %
C285B10440
5 01-Apr-15
05-Apr-15
Steel Fixing
C285B10460
1 06-Apr-15
06-Apr-15
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-285>
ReinforcedCast
concrete
concrete
withfor
average
Roof Floor
compressive
Columns/Planted
strength 250
Columns
kg/cm2 at 28 days fo
C285B10480
7 07-Apr-15
15-Apr-15
Steel Fixing
C285B10490
7 07-Apr-15
15-Apr-15
Form Work %
C285B10500
1 16-Apr-15
16-Apr-15
RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs <BLDG-285> Cast concrete for Roof Slab
C285B10510
6 17-Apr-15
22-Apr-15
97 05-Apr-15
12 05-Apr-15
24-Jul-15
18-Apr-15
16-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply <BLDG-285>
O.P cement-sand
Applyplaster
Facades
in two-coat
Plaster work (base and finish coats)for ext
Exterior Enclosure
C285B20130
<BLDG-285> Erect Scaffold
C285B20160
25 19-Apr-15
C285B20250
6 14-May-15
19-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment
C285B20220
8 17-May-15
25-May-15 Supply and install gypsum cornices including paint,205 mm height gypsum cornice,01/505, Supply and install
<BLDG-285>
gypsum cornices
Install Gypsum
including Corniche
paint,200 mm height gypsum cornice, 0
C285B20230
9 26-May-15
03-Jun-15
C285B20240
8 04-Jun-15
12-Jun-15
C285B20260
8 13-Jun-15
21-Jun-15
Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-285>
paint handrail
Install Handrails
900 mm height
for balconies
3/A-501, Supply and ins
C285B20460
8 28-Jun-15
06-Jul-15
C285B20330
10 07-Jul-15
16-Jul-15
Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with <BLDG-285>
plexi fill - 400 mm
Install
x 1200
Aluminum
mm. Windows
C285B20480
5 07-Jul-15
11-Jul-15
C285B20280
3 07-Jul-15
09-Jul-15
C285B20150
13 07-Jul-15
24-Jul-15
Remaining Work
Milestone
Actual Work
summary
Door type (D14) - double hinged fer forge leaves 1400 mm x 2850 mm, Steel Doors Door type (D13) - hinged leaf with louvers
<BLDG-285>
- 900 mm xInstall
2000Steel
mm.,&UPVC
UPVCDoor
Doors
type
& Windo
(D03)
Page 13 of 29
Activity ID
Activity Name
C285B20270
Roofing
C285B30100
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
8 12-Jul-15
24-Jul-15
Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.
<BLDG-285> Install Rough Stone Skirting
82 05-Apr-15
4 05-Apr-15
04-Jul-15
08-Apr-15
04-Jul-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max.<BLDG-285>
1200 kg/m Cast Light Weight Concrete for slopes
9 09-Apr-15
19-Apr-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C285B30110
C285B30180
C285B30120
6 20-Apr-15
27-Apr-15
C285B30130
3 28-Apr-15
30-Apr-15
C285B30140
4 01-May-15
04-May-15
C285B30150
3 05-May-15
07-May-15
C285B30160
2 09-May-15
10-May-15
C285B30170
10 21-May-15
31-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting.
C285B30190
15 01-Jun-15
16-Jun-15
Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors,
<BLDG-285>
100 mm height
Install Ceramic
ceramic tiles
Tilesfor skirting.
C285B30200
10 17-Jun-15
27-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C285B30210
6 28-Jun-15
04-Jul-15
Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf
15 20-Apr-15
Interior Construction
C285C10100
<BLDG-285> Construct CUM Works for Gr floor
06-May-15 Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508, Supply<BLDG-285>
and install 3100
Install
mmSteel
height
Ladder
steel ladder fixed to block wall
4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof.
172 29-Jan-15
12 29-Jan-15
08-Aug-15
08-Aug-15, Interior Construction
10-Feb-15 Supply and build solid cement block unit machine-made with density not<BLDG-285>
exceed 2000Construct
kg/m3, Supply
CUMand
Works
buildforhollow
Gr floor
cement block unit machine-made with density not exceed
C285C10110
12 29-Jan-15
10-Feb-15 Supply and build solid cement block unit machine-made with density not<BLDG-285>
exceed 2000Construct
kg/m3, Supply
CUMand
Works
buildforhollow
1st floor
cement block unit machine-made with density not exceed
C285C10120
12 22-Feb-15
06-Mar-15 Supply and build solid cement block unit machine-made with density not exceed<BLDG-285>
2000 kg/m3, Supply
Construct
andCUM
buildWorks
hollowfor
cement
2nd floor
block unit machine-made with density not exceed
C285C10140
12 18-Mar-15
30-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-285>
Supply and
Construct
build hollow
CUM cement
Works for
block
3rdunit
floormachine-made with density not exceed
C285C10160
C285C10150
C285C10170
4 01-Apr-15
04-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-285>
Supply and
Construct
build hollow
CUMcement
for Parapet
block unit machine-made with density not exceed
12 11-Apr-15
23-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-285>
and buildConstruct
hollow cement
CUM Works
block unit
for machine-made
4th floor
with density not exceed
4 23-Apr-15
28-Apr-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply
<BLDG-285>
and buildConstruct
hollow cement
Interiorblock
CUMunit
Works
machine-made
for Roof with density not excee
C285C10200
1 01-Aug-15
01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-285>
unit machine-made
Install Ductswith
work
density
for 4th
not
floor
excee
C285C10210
1 02-Aug-15
02-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-285>
unit machine-made
Install Ducts
with
work
density
for 3rd
notfloor
excee
C285C10220
2 03-Aug-15
04-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-285>
unit machine-made
Install Ducts
with
work
density
for 2nd
not floor
excee
C285C10230
2 05-Aug-15
06-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-285>
unit machine-made
Install Ducts
withwork
density
for 1st
not floor
excee
C285C10240
2 07-Aug-15
08-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block
<BLDG-285>
unit machine-made
Install Ducts
withwork
density
for not
Gr excee
floor
63 26-Apr-15
25 26-Apr-15
01-Jul-15
21-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C285C20130
12 23-May-15
03-Jun-15
terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340 <BLDG-285>
mm width, Stone
Install
Paving
Marble
andforFlooring
Entrance
Light
& Stairs
beige terriesta marble
C285C20170
12 04-Jun-15
16-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C285C20160
6 17-Jun-15
23-Jun-15
Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.
C285C20120
8 24-Jun-15
01-Jul-15
wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm.
30-Jul-15
24-Jan-15
30-Jul-15, Plumbing
UPVC pipes and fittings, underground 75mm, UPVC pipes and fittings,
<BLDG-285>
underground
Install110mm,
Plumbing
UPVC
Fittings
pipes
Under
andSOG
fittings, underground 160mm, Polypropylene Pipes and Fittings
Plumbing
C285D20100
170 22-Jan-15
3 22-Jan-15
C285D20110
10 26-Apr-15
05-May-15 Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-285>
UPVC Pipes
Install
andDrainage
Fittings For
Risers
Drainage above ground 75mm, UPVC Pip
C285D20120
10 26-Apr-15
05-May-15 Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings
<BLDG-285>
including items
Install
mentioned
water Risers
25mm, Polypropylene Pipes and Fittings includ
C285D20130
10 11-May-15
20-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron oblique
<BLDG-285>
grate, side
Install
outlet
Roof100mm
sainatary work
C285D20140
10 12-Jul-15
26-Jul-15
C285D20150
Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm,<BLDG-285>
Valves are classified
Construct
according
Inspection
to type
chambers
Gate Valv
&c
4 27-Jul-15
30-Jul-15
194 10-Dec-14
2 10-Dec-14
11-Jul-15
11-Dec-14
One lighting outlet including empty "PVC" conduits <BLDG-285> Install Electrical conduits for Gr Floor Slab
2 06-Jan-15
08-Jan-15
C285D50130
2 01-Feb-15
C285D50140
2 24-Feb-15
C285D50150
2 20-Mar-15
C285D50180
6 05-Apr-15
11-Apr-15
Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple<BLDG-285>
Play System Floor
Installpull
Electrical
box, Light
Risers
Current Systems Two UPVC 25 mm Conduits for
C285D50100
6 05-Apr-15
11-Apr-15
C285D50160
1 09-Apr-15
09-Apr-15
C285D50200
3 23-May-15
25-May-15 40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type Push Button
<BLDG-285>
(P.B) Install of Panel board
C285D50170
3 23-May-15
25-May-15 Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door master unit
<BLDG-285> Install Conduits for intercom system
C285D50210
Electrical
C285D50110
C285D50120
14 26-May-15
Remaining Work
Milestone
Actual Work
summary
09-Jun-15
Low Voltage Distribution Panels (DB-SER-1), Low Voltage Distribution Panels (DB-SER-2 )
Page 14 of 29
Activity ID
Activity Name
C285D50220
C285D50230
C285D50190
C285D50240
C285D50250
Original Start
Duration
Finish
Resources
2015
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
3 10-Jun-15
12-Jun-15
Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
21 10-Jun-15
01-Jul-15
450/750 V Single Core Copper Conductor, PVC cables (1x 10) mm ECC, 450/750 V Single Core Copper Conductor,<BLDG-285>
PVC cables (1x
Install
16)Cables
mm ECC, 450/750 V Single Core C
2 13-Jun-15
14-Jun-15
Wiring Devices and Disconnectors Socket Type SO1, Wiring Devices and Disconnectors Load Break Switch LBS
<BLDG-285>
1 (32A) , 220V
Install
, IP54,
Wiring
Wiring
Devices&Disconnect
Devices and Disconnectors
switches Loa
6 02-Jul-15
08-Jul-15
3 09-Jul-15
11-Jul-15
6 09-Aug-15
2 09-Aug-15
15-Aug-15
10-Aug-15
Completion Inspection
C285H10100
<BLDG-285> Punch Out
C285H10110
2 11-Aug-15
12-Aug-15
C285H10120
2 13-Aug-15
15-Aug-15
C286G20160
C286G20150
1 08-Oct-14 A 08-Oct-14 A
C286G20140
3 24-Jan-15
27-Jan-15
C286G20180
5 03-Apr-15
07-Apr-15
Substructure
Foundation
Foundation at Level (-2.25)
C286A10200
<BLDG-286> Construct P.C. F oundation Lv (- 2.25)
C286A10190
C286A10230
C286A10210
106
106
106
8
25-Oct-14 A
25-Oct-14 A
25-Oct-14 A
25-Oct-14 A
06-Feb-15
06-Feb-15, Substructure
06-Feb-15
06-Feb-15, Foundation
06-Feb-15
06-Feb-15, Foundation at Level (-2.25)
05-Nov-14 ASupply and cast plain concrete with average
<BLDG-286>
compressive
Construct
strength
P.C.200
F oundation
kg/cm2 atLv28(- days
2.25)300mm, Supply and cast plain concrete with average compressive strength 200 kg/c
22-Jan-15
3 23-Jan-15
26-Jan-15
C286A10220
1 23-Jan-15
23-Jan-15
Supply and apply two (2) coats cold applied waterproofing paint with
<BLDG-286>
bituminousApply
baseDampproofing for Foundation Lv (-2.25)
C286A10240
3 04-Feb-15
06-Feb-15 Supply and cast plain concrete with average compressive strength 200
<BLDG-286>
kg/cm2 at 28Construct
days 100mm,
Remaining
Reinforced
S.O.Gconcrete
Lv (+0.05)
with average compressive strength 250 kg/cm2 at 28 d
C285A10300
C285A10280
C285A10290
22-Jan-15
1 23-Jan-15
23-Jan-15
Supply and apply two (2) coats cold applied waterproofing paint with
<BLDG-286>
bituminousApply
baseDampproofing for Foundation Lv (-1.50)
3 01-Feb-15
Superstructure
Ground Floor Lv (+3.15)
C286B30230
<BLDG-286> Fix Reinforcement Bars for Gr Floor Columns
130 03-Dec-14
33 03-Dec-14
10 03-Dec-14
27-Apr-15, Superstructure
09-Jan-15, Ground Floor Lv (+3.15)
<BLDG-286> Fix Reinforcement Bars for Gr Floor Columns
C286B30280
C286B30220
C286B30240
12 15-Dec-14
C286B30250
12 15-Dec-14
C286B30260
1 28-Dec-14
C286B30270
9 29-Dec-14
09-Jan-15
03-Feb-15
09-Jan-15 Form Work %
10 03-Dec-14
27-Apr-15
09-Jan-15
13-Dec-14 Steel Fixing
1 14-Dec-14
31 29-Dec-14
9 29-Dec-14
C286B30460
9 29-Dec-14
09-Jan-15
Steel Fixing
C286B30470
1 10-Jan-15
10-Jan-15
C286B30430
11 11-Jan-15
22-Jan-15
Form Work %
C286B30480
11 11-Jan-15
22-Jan-15
Steel Fixing
C286B30440
1 23-Jan-15
23-Jan-15
C286B30490
9 24-Jan-15
03-Feb-15
26-Feb-15
03-Feb-15 Form Work %
31 24-Jan-15
9 24-Jan-15
C286B30300
9 24-Jan-15
C286B30310
1 04-Feb-15
04-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 <BLDG-286>
at 28 days for Cast
columns,
concrete
Reinforced
for 2ndconcrete
Floor Columns
with average compressive strength 250 kg/cm2 at 28 days fo
C286B30320
11 05-Feb-15
Remaining Work
Milestone
Actual Work
summary
Activity ID
Activity Name
Original Start
Duration
C286B30340
C286B30330
C286B30350
11 05-Feb-15
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Nov
1 17-Feb-15
17-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, <BLDG-286>
beams, and slabs
Cast concrete for 2nd Floor Slab
9 18-Feb-15
26-Feb-15
22-Mar-15
26-Feb-15 Form Work %
9 18-Feb-15
28-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
<BLDG-286>
for columns,
Cast
Reinforced
concreteconcrete
for 3rd Floor
with average
Columnscompressive strength 250 kg/cm2 at 28 days fo
31 18-Feb-15
9 18-Feb-15
C286B30380
C286B30370
1 28-Feb-15
C286B30390
11 01-Mar-15
11-Mar-15
Form Work %
C286B30410
11 01-Mar-15
11-Mar-15
Steel Fixing
C286B30400
1 12-Mar-15
12-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,<BLDG-286>
and slabs
Cast concrete for 3rd Floor Slab
C286B30420
9 14-Mar-15
22-Mar-15
16-Apr-15
22-Mar-15 Steel Fixing
Oct
31 14-Mar-15
9 14-Mar-15
C286B30560
9 14-Mar-15
C286B30500
1 23-Mar-15
23-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-286>
Reinforced
Cast concrete
concretefor
with
4thaverage
Floor Columns
compressive strength 250 kg/cm2 at 28 days fo
C286B30520
11 24-Mar-15
04-Apr-15
Form Work %
C286B30530
11 24-Mar-15
04-Apr-15
Steel Fixing
C286B30550
1 05-Apr-15
05-Apr-15
RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-286> Cast concrete for 4th Floor Slab
C286B30540
9 06-Apr-15
16-Apr-15
18 06-Apr-15
5 06-Apr-15
27-Apr-15
11-Apr-15
Form Work %
C286B30610
5 06-Apr-15
11-Apr-15
Steel Fixing
C286B30600
1 12-Apr-15
12-Apr-15
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-286>
Reinforced concrete
Cast concrete
with average
for Roofcompressive
Floor Columns/Planted
strength 250
Columns
kg/cm2 at 28 days fo
C286B30590
5 14-Apr-15
18-Apr-15
Steel Fixing
C286B30630
5 14-Apr-15
18-Apr-15
Form Work %
C286B30620
1 19-Apr-15
19-Apr-15
RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs <BLDG-286> Cast concrete for Roof Slab
C286B30570
Exterior Enclosure
C286B30750
<BLDG-286> Erect Scaffold
C286B30710
C286B30730
C286B30720
C286B30740
C286B30760
C286B30660
6 20-Apr-15
27-Apr-15
89 11-Apr-15
8 11-Apr-15
16-Jul-15
19-Apr-15
25 20-Apr-15
17-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply <BLDG-286>
O.P cement-sand
Applyplaster
Facades
in two-coat
Plaster work (base and finish coats)for ext
6 15-May-15
12 18-May-15
20-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment
30-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply<BLDG-286>
and install gypsum
Installcornices
Gypsumincluding
Cornichepaint, 105 mm height middle g
8 31-May-15
08-Jun-15
10 09-Jun-15
18-Jun-15
6 20-Jun-15
25-Jun-15
Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-286>
paint handrail
Install900
Handrails
mm height
for balconies
3/A-501, Supply and ins
C286B30680
6 26-Jun-15
01-Jul-15
C286B30650
C286B30670
C286B30690
C286B30770
C286B30700
Roofing
C286B30810
3 02-Jul-15
05-Jul-15
12 02-Jul-15
14-Jul-15
6 02-Jul-15
08-Jul-15
14 02-Jul-15
16-Jul-15
Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge leaves
<BLDG-286>
1400 mm
Install
x 2850
Steel
mm,
& UPVC
UPVCDoors
Door &
type
Window
(D03)
8 09-Jul-15
16-Jul-15
Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.
<BLDG-286> Install Rough Stone Skirting
81 11-Apr-15
4 11-Apr-15
08-Jul-15
15-Apr-15
08-Jul-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max. 1200
<BLDG-286>
kg/m
Cast Light Weight Concrete for slopes
9 16-Apr-15
26-Apr-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
10 27-Apr-15
06-May-15
Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with<BLDG-286>
plexi fill - 400 Install
mm x Aluminum
1200 mm. Windows
<BLDG-286> Dismantle Scaffold
C286B30870
C286B30780
C286B30790
6 27-Apr-15
02-May-15 4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof.
C286B30840
3 03-May-15
05-May-15
C286B30820
4 06-May-15
10-May-15
C286B30800
3 11-May-15
13-May-15
C286B30830
2 14-May-15
15-May-15
C286B30850
10 29-May-15
08-Jun-15
Terrazzo tiles for floors, 100 mm height ceramic tiles for skirting., Terrazzo tiles 300 x 300 x 30 mm thick.
C286B30860
18 09-Jun-15
27-Jun-15
Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors,<BLDG-286>
100 mm height
Install
ceramic
Ceramic
tiles Tiles
for skirting.
Remaining Work
Milestone
Actual Work
summary
Page 16 of 29
Activity ID
Activity Name
C286B30880
Original Start
Duration
10 28-Jun-15
Interior Construction
C286C30270
<BLDG-286> Construct CUM Works for Gr floor
Finish
Resources
Aug
08-Jul-15
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
Aug
Sep
Oct
Nov
166 04-Feb-15
10 04-Feb-15
07-Aug-15
07-Aug-15, Interior Construction
14-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-286>
2000 kg/m3,
Construct
Supply
CUM
and
Works
build for
solid
Grcement
floor block unit machine-made with density not exceed 20
C286C30290
10 04-Feb-15
14-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-286>
2000 kg/m3,
Construct
Supply
CUM
and
Works
build for
solid
1stcement
floor block unit machine-made with density not exceed 20
C286C30300
10 28-Feb-15
09-Mar-15 Supply and build hollow cement block unit machine-made with density not exceed
<BLDG-286>
1600 kg/m3,Construct
Supply and
CUM
build
Works
hollowforcement
2nd floor
block unit machine-made with density not excee
C286C30320
10 23-Mar-15
02-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-286>
Supply and
Construct
build solid
CUM
cement
Works
block
for 3rd
unit floor
machine-made with density not exceed 20
C286C30250
C286C30230
C286C30260
4 06-Apr-15
09-Apr-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3,
<BLDG-286>
Supply and
Construct
build hollow
CUMcement
for Parapet
block unit machine-made with density not excee
10 17-Apr-15
28-Apr-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply
<BLDG-286>
and buildConstruct
hollow cement
CUM Works
block unit
for machine-made
4th floor
with density not excee
3 28-Apr-15
30-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-286>
and build solid
Construct
cement
Interior
block unit
CUM
machine-made
Works for Roof
with density not exceed 20
C286C30240
2 28-Jul-15
29-Jul-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C286C30330
2 30-Jul-15
01-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C286C30310
2 02-Aug-15
03-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C286C30220
2 04-Aug-15
05-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
C286C30280
2 06-Aug-15
07-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3
61 29-Apr-15
26 29-Apr-15
02-Jul-15
26-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C286C30170
12 27-May-15
08-Jun-15
terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340 mm
<BLDG-286>
width, Stone
Install
Paving
Marble
and Flooring
for Entrance
Light&beige
Stairsterriesta marble
C286C30210
12 09-Jun-15
21-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C286C30200
6 22-Jun-15
27-Jun-15
Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.
C286C30190
5 28-Jun-15
02-Jul-15
wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door type (D09)
<BLDG-286>
- hinged leaf
Install
- 900
Units
mm
Wooden
x 2200 Doors
mm.
27-Jul-15
31-Jan-15
27-Jul-15, Plumbing
UPVC pipes and fittings, underground 75mm, UPVC pipes and fittings,
<BLDG-286>
underground
Install
110mm,
Plumbing
UPVC
Fittings
pipesUnder
and fittings,
SOG underground 160mm, Polypropylene Pipes and Fittings
Plumbing
C286D50490
162 28-Jan-15
3 28-Jan-15
C286D50450
14 29-Apr-15
13-May-15 Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-286>
UPVC PipesInstall
and Fittings
Drainage
ForRisers
Drainage above ground 75mm, UPVC Pip
C286D50480
14 29-Apr-15
13-May-15 Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings<BLDG-286>
including items
Install
mentioned
water Risers
25mm, Polypropylene Pipes and Fittings includ
C286D50460
12 16-May-15
28-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron oblique
<BLDG-286>
grate, sideInstall
outletRoof
100mm
sainatary work
C286D50470
C286D50500
8 09-Jul-15
16-Jul-15
6 21-Jul-15
27-Jul-15
Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm,
<BLDG-286>
Valves areConstruct
classifiedInspection
according chambers
to type Gate
& conn
Valv
<BLDG-286> Test Drainage & water R iser s
Electrical
C286D50370
193 15-Dec-14
2 15-Dec-14
15-Jul-15
16-Dec-14 Indoor wiring for one lighting outlet including wires 3(1x3)
<BLDG-286>
mm, One
Install
lighting
Electrical
outlet conduits
including for
empty
Gr Floor
"PVC"Slab
conduits
C286D50380
2 12-Jan-15
13-Jan-15
C286D50390
2 06-Feb-15
07-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-286>
outlet including
Install Electrical
empty "PVC"
conduits
conduits
for 2nd Floor Slab
C286D50400
2 18-Feb-15
C286D50290
2 25-Mar-15
26-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-286>
empty "PVC"
Install conduits
Electrical conduits for 4th Floor Slab
C286D50330
6 11-Apr-15
17-Apr-15
Light Current Systems Triple Play System Floor pull box, Light Current Systems Triple Play System
<BLDG-286>
Tie in point
Install
forElectrical
unit, Light
Risers
Current Systems Two UPVC 25 mm Conduits for
C286D50430
6 11-Apr-15
17-Apr-15
power network including main earthing networks, 600/1000 V, multicore Aluminium conductor,<BLDG-286>
PVC/PVC cables
Install(3Earthing
x 240+120)
System
mm, 600/1000 V, multicore copper conductor, P
C286D50300
1 14-Apr-15
14-Apr-15
Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including <BLDG-286>
empty "PVC" conduits
Install Electrical conduits for Roof Slab
C286D50340
3 27-May-15
29-May-15 Lighting Switches Type Push Button (P.B), 40mm PVC empty conduit from (KWHM) box to panel board of <BLDG-286>
customer
Install of Panel board
C286D50440
3 27-May-15
29-May-15 Intercom System Provision for door master unit, Intercom System One UPVC 25 mm conduit for risers/ unit
<BLDG-286> Install Conduits for intercom system
C286D50350
C286D50310
C286D50410
C286D50420
15-Jul-15, Electrical
14 30-May-15
13-Jun-15
Low Voltage Distribution Panels (DB-SER-2 ), Low Voltage Distribution Panels (DB-SER-1), Low Voltage Distribution
<BLDG-286>
Panels (DB-A4-2),
Install Distribution
Low Voltage
Panel Distribution Panels (DB-A
3 14-Jun-15
16-Jun-15
Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
21 14-Jun-15
06-Jul-15
450/750 V Single Core Aluminium Conductor, PVC cables (1x 120) mm ECC, 450/750 V Single Core Copper Conductor,
<BLDG-286>
PVC cablesInstall
(1x 35)
Cables
mm ECC, 450/750 V Single Co
2 17-Jun-15
18-Jun-15
Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Socket Type<BLDG-286>
SO1, WiringInstall
Devices
Wiring
and Devices&Disconnect
Disconnectors Load Break
switches
Switch
C286D50360
6 07-Jul-15
12-Jul-15
C286D50320
3 13-Jul-15
15-Jul-15
7 08-Aug-15
2 08-Aug-15
15-Aug-15
09-Aug-15
Completion Inspection
C286H10130
<BLDG-286> Punch Out
C286H10140
2 10-Aug-15
11-Aug-15
C286H10150
3 12-Aug-15
15-Aug-15
C174G20150
C174G20140
1 18-Sep-14 A 18-Sep-14 A
Remaining Work
Milestone
Actual Work
summary
Page 17 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
C174G20160
2 14-Jan-15
15-Jan-15
C174G20180
5 25-Mar-15
30-Mar-15
Substructure
Foundation
Foundation at Level (-2.25)
C174A10300
<BLDG-174> Construct P.C. F oundation Lv (- 2.25)
C174A10310
C174A10340
C174A10320
C174A10330
92
92
79
8
23-Sep-14 A
23-Sep-14 A
23-Sep-14 A
23-Sep-14 A
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Backfilling, with suitable excavated soil under foundation level <BLDG-174> Backfill for Foundation
<BLDG-174> Backfill around Building
27-Jan-15
27-Jan-15, Substructure
27-Jan-15
27-Jan-15, Foundation
27-Jan-15
27-Jan-15, Foundation at Level (-2.25)
01-Oct-14 A Supply and cast plain concrete
<BLDG-174>
with average
Construct
compressive
P.C. F strength
oundation200
Lv kg/cm2
(- 2.25) at 28 days 300mm, Supply and cast plain concrete with average compressive strength 200 kg/c
11-Jan-15
2 12-Jan-15
13-Jan-15
Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-174>
with bituminous
Applybase
Dampproofing for Foundation Lv (-2.25)
4 23-Jan-15
27-Jan-15
C174A10350
C174A10280
C174A10290
Superstructure
Ground Floor Lv (+3.15)
C174B30480
<BLDG-174> Fix Reinforcement Bars for Gr Floor Columns
88 23-Sep-14 A 22-Jan-15
22-Jan-15, Foundation at Level (-1.50)
8 23-Sep-14 A 01-Oct-14 A Supply and cast plain concrete
<BLDG-174>
with average
Construct
compressive
P.C. F strength
oundation200
Lv kg/cm2
(- 1.50) at 28 days 100mm, Supply and cast plain concrete with average compressive strength 200 kg/c
8 18-Oct-14 A 12-Nov-14 AReinforced concrete with average compressive
<BLDG-174>
strengthConstruct
250 kg/cm2
R.C.Foundation
at 28 days forLv
foundation
(-1.50)
12 28-Dec-14
11-Jan-15
2 12-Jan-15
13-Jan-15
Supply and apply two (2) coats cold applied waterproofing paint
<BLDG-174>
with bituminous
Applybase
Dampproofing for Foundation Lv (-1.50)
3 20-Jan-15
22-Jan-15
C174B30510
C174B30470
C174B30490
15 01-Dec-14
C174B30500
15 01-Dec-14
C174B30520
1 17-Dec-14
C174B30530
9 18-Dec-14
27-Dec-14
22-Jan-15
27-Dec-14 Form Work %
20-Apr-15, Superstructure
27-Dec-14, Ground Floor Lv (+3.15)
<BLDG-174> Fix Reinforcement Bars for Gr Floor Columns
1 30-Nov-14
31 18-Dec-14
9 18-Dec-14
C174B30550
9 18-Dec-14
C174B30560
1 28-Dec-14
C174B30570
11 29-Dec-14
11-Jan-15
Steel Fixing
C174B30590
11 29-Dec-14
11-Jan-15
Form Work %
C174B30600
1 12-Jan-15
12-Jan-15
C174B30580
9 13-Jan-15
22-Jan-15
16-Feb-15
22-Jan-15 Form Work %
31 13-Jan-15
9 13-Jan-15
C174B30620
9 13-Jan-15
22-Jan-15
Steel Fixing
C174B30630
1 23-Jan-15
23-Jan-15
C174B30640
11 24-Jan-15
C174B30660
11 24-Jan-15
C174B30650
C174B30670
1 06-Feb-15
06-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,
<BLDG-174>
beams, and
Cast
slabs
concrete for 2nd Floor Slab
9 07-Feb-15
16-Feb-15
11-Mar-15
16-Feb-15 Form Work %
9 07-Feb-15
31 07-Feb-15
9 07-Feb-15
C174B30700
C174B30690
1 17-Feb-15
C174B30710
11 18-Feb-15
C174B30730
11 18-Feb-15
C174B30720
1 02-Mar-15
02-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,
<BLDG-174>
and slabs Cast concrete for 3rd Floor Slab
C174B30740
9 03-Mar-15
11-Mar-15
31 03-Mar-15
9 03-Mar-15
04-Apr-15
11-Mar-15
Form Work %
Steel Fixing
C174B30840
9 03-Mar-15
11-Mar-15
C174B30830
1 12-Mar-15
12-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for
<BLDG-174>
columns, Reinforced
Cast concrete
concrete
for 4th
with
Floor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo
Remaining Work
Milestone
Actual Work
summary
Page 18 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
C174B30850
11 14-Mar-15
C174B30860
11 14-Mar-15
C174B30870
1 25-Mar-15
25-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and<BLDG-174>
slabs
Cast concrete for 4th Floor Slab
C174B30880
9 26-Mar-15
04-Apr-15
23 26-Mar-15
5 26-Mar-15
Oct
Nov
20-Apr-15
31-Mar-15 Form Work %
C174B30770
5 26-Mar-15
C174B30760
1 01-Apr-15
01-Apr-15
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-174>
Reinforced
Cast
concrete
concrete
with
foraverage
Roof Floor
compressive
Columns/Planted
strengthColumns
250 kg/cm2 at 28 days fo
C174B30790
7 05-Apr-15
12-Apr-15
Steel Fixing
C174B30800
7 05-Apr-15
12-Apr-15
Form Work %
C174B30810
1 14-Apr-15
14-Apr-15
RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs <BLDG-174> Cast concrete for Roof Slab
C174B30780
6 15-Apr-15
20-Apr-15
104 31-Mar-15
10 31-Mar-15
26-Jul-15
09-Apr-15
Exterior Enclosure
C174B30270
<BLDG-174> Erect Scaffold
C174B30290
C174B30310
C174B30300
C174B30260
10 29-May-15
08-Jun-15
C174B30340
14 09-Jun-15
23-Jun-15
C174B30280
7 24-Jun-15
30-Jun-15
Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-174>
paint handrail
Install
900
Handrails
mm height
for balconies
3/A-501, Supply and ins
C174B30230
6 01-Jul-15
07-Jul-15
C174B30220
12 08-Jul-15
24-Jul-15
Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge leaves
<BLDG-174>
1400 mm Install
x 2850Steel
mm,&UPVC
UPVCDoor
Doors
type
& Windo
(D03)
C174B30240
8 08-Jul-15
15-Jul-15
Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with <BLDG-174>
plexi fill - 400 mm
Install
x 1200
Aluminum
mm. Windows
C174B30250
6 08-Jul-15
13-Jul-15
C174B30320
3 08-Jul-15
10-Jul-15
C174B30330
Roofing
C174B30380
35 11-Apr-15
19-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply O.P
<BLDG-174>
cement-sand
Apply
plaster
Facades
in two-coat
Plaster work (base and finish coats)for ext
6 17-May-15
23-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment
8 20-May-15
28-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply<BLDG-174>
and install gypsum
Install cornices
Gypsum including
Cornichepaint, 105 mm height middle g
8 14-Jul-15
26-Jul-15
Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.
<BLDG-174> Install Rough Stone Skirting
77 31-Mar-15
4 31-Mar-15
23-Jun-15
03-Apr-15
23-Jun-15, Roofing
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max.
<BLDG-174>
1200 kg/m Cast Light Weight Concrete for slopes
9 04-Apr-15
14-Apr-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C174B30440
C174B30350
C174B30360
6 15-Apr-15
20-Apr-15
C174B30410
3 21-Apr-15
23-Apr-15
C174B30390
4 26-Apr-15
29-Apr-15
C174B30370
3 30-Apr-15
02-May-15
C174B30400
2 03-May-15
04-May-15
C174B30420
8 18-May-15
26-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting. <BLDG-174> Install Terr azzo Tiles
C174B30430
12 27-May-15
08-Jun-15
Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for<BLDG-174>
floors, 100 mm
Install
height
Ceramic
ceramic
Tiles
tiles for skirting.
C174B30460
8 09-Jun-15
16-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C174B30450
6 17-Jun-15
23-Jun-15
Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf
15 15-Apr-15
Interior Construction
C174C30250
<BLDG-174> Construct CUM Works for Gr floor
01-May-15 Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508, Supply
<BLDG-174>
and install 3100
Installmm
Steel
height
Ladder
steel ladder fixed to block wall
4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof. <BLDG-174> Apply reinforced bituminous water proofing membrane
206 23-Jan-15
12 23-Jan-15
08-Sep-15
08-Sep-15, Interior Construction
05-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-174>
exceed 2000
Construct
kg/m3, Supply
CUM Works
and build
for solid
Gr floor
cement block unit machine-made with density not exceed 20
C174C30270
12 23-Jan-15
05-Feb-15 Supply and build solid cement block unit machine-made with density not
<BLDG-174>
exceed 2000
Construct
kg/m3, Supply
CUM Works
and build
for solid
1st floor
cement block unit machine-made with density not exceed 20
C174C30280
12 17-Feb-15
01-Mar-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-174>
2000 kg/m3,Construct
Supply and
CUM
build
Works
solid for
cement
2nd floor
block unit machine-made with density not exceed 20
C174C30300
12 12-Mar-15
24-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000<BLDG-174>
kg/m3, SupplyConstruct
and buildCUM
solid cement
Works for
block
3rdunit
floormachine-made with density not exceed 20
C174C30230
4 26-Mar-15
30-Mar-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-174>
Supply and
Construct
build hollow
CUM cement
for Parapet
block unit machine-made with density not exceed
C174C30210
12 05-Apr-15
18-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, <BLDG-174>
Supply and build
Construct
solid cement
CUM block
Worksunit
formachine-made
4th floor
with density not exceed 20
C174C30240
4 21-Apr-15
26-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-174>
and build Construct
hollow cement
Interior
block
CUM
unitWorks
machine-made
for Roof with density not exceed
C174C30220
2 21-Aug-15
22-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit
<BLDG-174>
machine-made
Install
with
Ducts
density
work
not
forexcee
4th f
C174C30310
4 23-Aug-15
26-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit<BLDG-174>
machine-made
Install
withDucts
density
work
notfor
excee
3rd
C174C30290
4 27-Aug-15
31-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-174> Install
with density
Ducts work
not excee
for 2n
C174C30200
4 01-Sep-15
04-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-174> with
Installdensity
Ducts not
work
excee
for 1
C174C30260
4 05-Sep-15
08-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-174>with
Install
density
Ducts
not
work
excee
for
Remaining Work
Milestone
Actual Work
summary
Page 19 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
61 19-Apr-15
25 19-Apr-15
24-Jun-15
16-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C174C30160
12 17-May-15
29-May-15 terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340
<BLDG-174>
mm width, Stone
InstallPaving
Marbleand
for Flooring
EntranceLight
& Stairs
beige terriesta marble
C174C30140
12 30-May-15
11-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C174C30190
6 12-Jun-15
17-Jun-15
Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.
C174C30180
6 18-Jun-15
24-Jun-15
wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm.
Plumbing
C174D50310
194 17-Jan-15
3 17-Jan-15
20-Aug-15
20-Aug-15, Plumbing
19-Jan-15 UPVC pipes and fittings, underground 75mm, UPVC pipes and <BLDG-174>
fittings, underground
Install Plumbing
110mm, UPVC
Fittingspipes
Under
and
SOG
fittings, underground 160mm, Polypropylene Pipes and Fittings
C174D50260
14 19-Apr-15
04-May-15 Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-174>
UPVC Pipes
Install
and
Drainage
Fittings For
Risers
Drainage above ground 75mm, UPVC Pip
C174D50300
14 19-Apr-15
04-May-15 Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings
<BLDG-174>
including items
Installmentioned
water Risers
25mm, Polypropylene Pipes and Fittings includ
C174D50270
12 05-May-15
17-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron <BLDG-174>
oblique grate, Install
side outlet
Roof100mm
sainatary work
C174D50290
21 14-Jul-15
09-Aug-15 Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm, Valves
<BLDG-174>
are classified
Construct
according
Inspection
to type Gate
chambers
Valv
C174D50280
10 10-Aug-15
20-Aug-15
Electrical
C174D50400
193 04-Dec-14
2 04-Dec-14
05-Jul-15
06-Dec-14 Indoor wiring for one lighting outlet including wires<BLDG-174>
3(1x3) mm, Install
One lighting
Electrical
outlet
conduits
including
for Gr
empty
Floor
"PVC"
Slab conduits
05-Jul-15, Electrical
C174D50410
2 30-Dec-14
31-Dec-14 Indoor wiring for one lighting outlet including wires 3(1x3) <BLDG-174>
mm, One lighting
Installoutlet
Electrical
including
conduits
empty
for"PVC"
1st Floor
conduits
Slab
C174D50420
2 26-Jan-15
27-Jan-15
C174D50430
2 19-Feb-15
20-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-174>
outlet including
Install
empty
Electrical
"PVC"conduits
conduitsfor 3rd Floor Slab
C174D50320
2 15-Mar-15
16-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet<BLDG-174>
including empty
Install
"PVC"
Electrical
conduits
conduits for 4th Floor Slab
C174D50350
6 31-Mar-15
05-Apr-15
Light Current Systems Two UPVC 25 mm Conduits for risers and tie in connection / unit, <BLDG-174>
Light Current Install
Systems
Electrical
Triple Play
Risers
System Floor pull box, Light Current Systems Triple
C174D50460
6 31-Mar-15
05-Apr-15
power network including main earthing networks, 600/1000 V, multicore copper conductor,
<BLDG-174>
PVC/PVC cables
Install(4
Earthing
x 10) mm,
System
600/1000 V, multicore copper conductor, PVC/PVC
C174D50330
2 07-Apr-15
08-Apr-15
Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-174>
empty "PVC"
Install
conduits
Electrical conduits for Roof Slab
C174D50360
3 17-May-15
19-May-15 40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type Push<BLDG-174>
Button (P.B) Install of Panel board
C174D50470
3 17-May-15
19-May-15 Intercom System Provision for door master unit, Intercom System One UPVC 25 mm conduit for risers/<BLDG-174>
unit
Install Conduits for intercom system
C174D50370
C174D50380
C174D50440
C174D50450
C174D50390
C174D50340
Indoor wiring for one lighting outlet including wires 3(1x3) mm, One
<BLDG-174>
lighting outlet
Install
including
Electrical
empty
conduits
"PVC" for
conduits
2nd Floor Slab
14 20-May-15
03-Jun-15
Low Voltage Distribution Panels (DB-SER-2 ), Low Voltage Distribution Panels (DB-SER-1)
3 04-Jun-15
07-Jun-15
Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
21 04-Jun-15
26-Jun-15
450/750 V Single Core Copper Conductor, PVC cables (1x 70) mm, 450/750 V Single Core Copper Conductor, PVC
<BLDG-174>
cables (1x 35)
Install
mm,
Cables
450/750 V Single Core Copper Con
2 08-Jun-15
09-Jun-15
Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power outlet
<BLDG-174>
with 3(1x6)
Install
mm,
Wiring
Wiring
Devices&Disconnect
Devices and Disconnectors
switches Load B
6 27-Jun-15
02-Jul-15
2 04-Jul-15
05-Jul-15
6 09-Sep-15
2 09-Sep-15
15-Sep-15
10-Sep-15
2 12-Sep-15
13-Sep-15
2 14-Sep-15
15-Sep-15
Completion Inspection
C174H10140
<BLDG-174> Punch Out
C174H10150
C174H10130
316
294
144
2
Phase 2
Building 61 (Type# I.A6 C''')
Site Preparation
C061G10130
<BLDG-61> Prep for Excavation
10-Nov-14 A
30-Nov-14
30-Nov-14
30-Nov-14
10 02-Dec-14
Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5
28-Oct-15
28-Oct-15
09-May-15
01-Dec-14
C061G10110
2 13-Dec-14
14-Dec-14
C061G10120
2 23-Mar-15
C061G10140
5 04-May-15
09-May-15
15-Dec-14
15-Dec-14
15-Dec-14
15-Dec-14
17-Apr-15
17-Apr-15, Substructure
17-Apr-15
17-Apr-15, Foundation
17-Apr-15
17-Apr-15, Foundation at Level (-2.25)
23-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-61>
strength 200
Construct
kg/cm2P.C.
at 28
F oundation
days 300mm,
Lv (-Supply
2.25) and cast plain concrete with average compressive strength 200 kg/c
C061A10110
C061A10240
C061A10120
2 21-Mar-15
22-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous base<BLDG-61> Apply Dampproofing for Foundation Lv (-2.25)
C061A10160
4 14-Apr-15
17-Apr-15
Remaining Work
Milestone
Actual Work
summary
4 24-Dec-14
28-Oct-15, Phase
28-Oct-15, Buildin
111
111
111
8
C061G10100
Substructure
Foundation
Foundation at Level (-2.25)
C061A10100
<BLDG-61> Construct P.C. F oundation Lv (- 2.25)
12 08-Mar-15
107 15-Dec-14
8 15-Dec-14
8 28-Dec-14
12-Apr-15
12-Apr-15, Foundation at Level (-1.50)
23-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-61>
strength 200
Construct
kg/cm2P.C.
at 28
F oundation
days 300mm,
Lv (-Supply
1.50) and cast plain concrete with average compressive strength 200 kg/c
06-Jan-15
Page 20 of 29
Activity ID
Activity Name
Original Start
Duration
C061A10250
C061A10150
C061A10170
Superstructure
Ground Floor Lv (+3.15)
C061B10110
<BLDG-61> Set up Form work for Gr Floor Columns
12 08-Mar-15
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
2 21-Mar-15
22-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous base<BLDG-61> Apply Dampproofing for Foundation Lv (-1.50)
3 09-Apr-15
12-Apr-15
134 08-Jan-15
28 08-Jan-15
5 08-Jan-15
Oct
Nov
20-Mar-15 Backfilling, with suitable excavated soil under foundation level, Supply and build solid
<BLDG-61>
cement block
Construct
unit machine-made
CUM above with
Ground
density
Beam
notLv
exceed
(-1.50)/Intenal
2000 kg/m3
Backfill
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for slab on<BLDG-61>
grade, 4 mmConstruct
thick bituminous
S.O.G Lv
waterproofing
(+0.05)/Install
membrane
PE sheets
with 50 mm cement mortar
03-Jun-15
07-Feb-15
12-Jan-15 Form Work %
03-Jun-15, Superstructure
07-Feb-15, Ground Floor Lv (+3.15)
<BLDG-61> Set up Form work for Gr Floor Columns
5 08-Jan-15
12-Jan-15
Steel Fixing
C061B10100
C061B10120
1 13-Jan-15
13-Jan-15
C061B10130
12 14-Jan-15
27-Jan-15
Steel Fixing
C061B10140
12 14-Jan-15
27-Jan-15
Form Work %
C061B10150
1 28-Jan-15
28-Jan-15
C061B10190
9 29-Jan-15
07-Feb-15
23 29-Jan-15
4 29-Jan-15
22-Feb-15
02-Feb-15 Form Work %
C061B10160
4 29-Jan-15
C061B10180
1 03-Feb-15
C061B10200
8 04-Feb-15
11-Feb-15
Steel Fixing
C061B10210
8 04-Feb-15
11-Feb-15
Form Work %
C061B10220
1 12-Feb-15
12-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,<BLDG-61>
beams, andCast
slabsconcrete for 1st Floor Slab
C061B10260
9 14-Feb-15
22-Feb-15
20-Mar-15
20-Feb-15 Steel Fixing
33 14-Feb-15
7 14-Feb-15
C061B10240
7 14-Feb-15
C061B10250
1 21-Feb-15
21-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 <BLDG-61>
days for columns,
Cast concrete
Reinforced
forconcrete
2nd Floorwith
Columns
average compressive strength 250 kg/cm2 at 28 days fo
C061B10280
15 22-Feb-15
C061B10270
15 22-Feb-15
C061B10290
C061B10330
1 10-Mar-15
10-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,<BLDG-61>
and slabs Cast concrete for 2nd Floor Slab
9 11-Mar-15
20-Mar-15
36 11-Mar-15
7 11-Mar-15
19-Apr-15
18-Mar-15 Form Work %
7 11-Mar-15
19-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for <BLDG-61>
columns, Reinforced
Cast concrete
concrete
for 3rd
withFloor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo
C061B10300
C061B10320
1 19-Mar-15
C061B10350
18 20-Mar-15
07-Apr-15
Form Work %
C061B10340
18 20-Mar-15
07-Apr-15
Steel Fixing
C061B10360
1 08-Apr-15
08-Apr-15
RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-61> Cast concrete for 3rd Floor Slab
C061B10400
9 09-Apr-15
19-Apr-15
19-May-15
17-Apr-15 Steel Fixing
36 09-Apr-15
7 09-Apr-15
C061B10380
7 09-Apr-15
17-Apr-15
Form Work %
C061B10390
1 18-Apr-15
18-Apr-15
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns, <BLDG-61>
Reinforced concrete
Cast concrete
with average
for 4th Floor
compressive
Columns
strength 250 kg/cm2 at 28 days fo
C061B10420
18 19-Apr-15
C061B10410
18 19-Apr-15
C061B10430
1 10-May-15
10-May-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
C061B10470
9 11-May-15
19-May-15
23 11-May-15
5 11-May-15
03-Jun-15
15-May-15 Form Work %
C061B10440
5 11-May-15
C061B10460
1 16-May-15
16-May-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns, Reinforced
<BLDG-61>
concrete with
Castaverage
concretecompressive
for Roof Floor
strength
Columns/Planted
250 kg/cm2 Columns
at 28 days fo
C061B10480
10 17-May-15
C061B10490
10 17-May-15
C061B10500
1 28-May-15
28-May-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
C061B10510
6 29-May-15
03-Jun-15
87 14-May-15
19-Aug-15
Exterior Enclosure
Actual Level of Effort
Remaining Work
Milestone
Actual Work
summary
Page 21 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C061B20130
12 14-May-15
26-May-15
C061B20160
24 27-May-15
21-Jun-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply O.P cement-sand
<BLDG-61>
plasterApply
in two-coat
Facades
work
Plaster
(base and finish coats)for ext
C061B20220
11 14-Jun-15
25-Jun-15
Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply and install
<BLDG-61>
gypsum cornices
Install Gypsum
includingCorniche
paint,121 mm height gypsum c
C061B20250
6 18-Jun-15
24-Jun-15
C061B20230
7 26-Jun-15
02-Jul-15
C061B20140
6 04-Jul-15
09-Jul-15
C061B20260
8 10-Jul-15
21-Jul-15
C061B20300
5 30-Jul-15
04-Aug-15 paint exterior acrylic water-based washable emulsion paint external wall
C061B20330
C061B20480
6 05-Aug-15
10-Aug-15
C061B20280
3 05-Aug-15
07-Aug-15
C061B20150
C061B20270
Roofing
C061B30100
12 05-Aug-15
12 05-Aug-15
8 11-Aug-15
74 14-May-15
4 14-May-15
9 18-May-15
Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic paint
<BLDG-61>
handrail 900
Install
mmHandrails
height 3/A-501,
for balconies
Supply and ins
<BLDG-61> Apply External Paint 2nd Coat
17-Aug-15 Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with plexi fill - 400
<BLDG-61>
mm x 1200
Install
mm.Aluminum Windows
<BLDG-61> Dismantle Scaffold
<BLDG-61> Install Appliqus
17-Aug-15 Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge leaves 1400
<BLDG-61>
mm x 2850Install
mm, UPVC
Steel &Door
UPVC
type
Doors
(D03)
&
19-Aug-15 Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.
05-Aug-15
05-Aug-15, Roofing
17-May-15 Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max. 1200 kg/m <BLDG-61> Cast Light Weight Concrete for slopes
C061B30110
C061B30180
C061B30120
4 28-May-15
31-May-15 4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof.
C061B30130
3 01-Jun-15
03-Jun-15
C061B30140
3 04-Jun-15
07-Jun-15
C061B30150
2 08-Jun-15
09-Jun-15
C061B30160
2 10-Jun-15
11-Jun-15
C061B30170
7 26-Jun-15
02-Jul-15
Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting.
C061B30190
14 04-Jul-15
21-Jul-15
Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors, 100 mm
<BLDG-61>
height ceramic
Installtiles
Ceramic
for skirting.
Tiles
C061B30200
7 22-Jul-15
29-Jul-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C061B30210
6 30-Jul-15
05-Aug-15 Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf
15 28-May-15
209 23-Feb-15
12 23-Feb-15
Interior Construction
C061C10110
<BLDG-61> Construct CUM Works for 1st floor
27-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
12-Jun-15
Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508
18-Oct-15
18-Oct-15, Interior Co
07-Mar-15 Supply and build solid cement block unit machine-made with density not exceed<BLDG-61>
2000 kg/m3,Construct
Supply and
CUM
build
Works
solid cement
for 1st floor
block unit machine-made with density not exceed 20
C061C10120
12 21-Mar-15
02-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-61>
Supply and
Construct
build solid
CUMcement
Worksblock
for 2nd
unitfloor
machine-made with density not exceed 20
C061C10100
12 14-Apr-15
27-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-61>
and buildConstruct
solid cement
CUMblock
Works
unitfor
machine-made
Gr floor
with density not exceed 20
C061C10130
12 20-Apr-15
03-May-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-61>
and build solid
Construct
cement
CUM
block
Works
unit machine-made
for 3rd floor with density not exceed 20
C061C10150
C061C10140
C061C10160
3 11-May-15
13-May-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and
<BLDG-61>
build hollow
Construct
cementCUM
blockfor
unitParapet
machine-made with density not exceed
12 20-May-15
01-Jun-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and build
<BLDG-61>
solid cement
Construct
block unit
CUM
machine-made
Works for 4th
with
floor
density not exceed 20
4 04-Jun-15
08-Jun-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and build <BLDG-61>
hollow cement
Construct
block unit
Interior
machine-made
CUM Works
withfor
density
Roof not exceed
C061C10190
6 14-Sep-15
19-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-61>
withInstall
density
Ducts
not excee
work
C061C10200
6 20-Sep-15
28-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-61>
with density
Installnot
Ducts
excee
wo
C061C10210
5 29-Sep-15
03-Oct-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-61>
with density
Install
notDucts
exceew
C061C10220
5 04-Oct-15
10-Oct-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-61>
with densityInstall
not excee
Ducts
C061C10230
5 11-Oct-15
18-Oct-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made with
<BLDG-61>
density not
Install
excee
Du
55 02-Jun-15
19 02-Jun-15
04-Aug-15
22-Jun-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C061C20130
12 23-Jun-15
05-Jul-15
terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340 mm width,<BLDG-61>
Stone Paving
Install
and Marble
Flooringfor
Light
Entrance
beige terriesta
& Stairs marble
C061C20170
12 06-Jul-15
21-Jul-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C061C20160
6 22-Jul-15
28-Jul-15
Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.
C061C20120
6 29-Jul-15
04-Aug-15 wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door type (D09) - hinged
<BLDG-61>
leaf - 900 Install
mm x 2200
Units mm.
Wooden Doors
Plumbing
C061D20100
154 25-Mar-15
14 25-Mar-15
13-Sep-15
13-Sep-15, Plumbing
08-Apr-15 UPVC pipes and fittings, underground 75mm, UPVC pipes and fittings, underground 110mm,
<BLDG-61>
UPVC pipes
Install
and
Plumbing
fittings, underground
Fittings Under160mm,
SOG Polypropylene Pipes and Fittings
C061D20110
12 02-Jun-15
14-Jun-15
Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm, UPVC Pipes
<BLDG-61>
and Fittings
Install
ForDrainage
Drainage
Risers
above ground 75mm, UPVC Pip
C061D20120
14 02-Jun-15
16-Jun-15
Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings including items
<BLDG-61>
mentioned
Install
25mm,
water
Polypropylene
Risers
Pipes and Fittings includ
C061D20130
10 15-Jun-15
25-Jun-15
Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron oblique grate,<BLDG-61>
side outlet 100mm
Install Roof sainatary work
C061D20140
21 11-Aug-15
02-Sep-15 Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm, Valves are classified
<BLDG-61>
according
Construct
to type
Inspection
Gate Valv
cha
C061D20150
10 03-Sep-15
13-Sep-15
Remaining Work
Milestone
Actual Work
summary
Page 22 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Oct
Nov
192 14-Jan-15
2 14-Jan-15
C061D50120
2 02-Feb-15
03-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One <BLDG-61>
lighting outletInstall
including
Electrical
emptyconduits
"PVC" conduits
for 1st Floor Slab
C061D50130
2 28-Feb-15
01-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet
<BLDG-61>
including
Install
empty
Electrical
"PVC" conduits
conduits for 2nd Floor Slab
C061D50140
2 29-Mar-15
30-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-61>
empty "PVC"
Install conduits
Electrical conduits for 3rd Floor Slab
C061D50150
2 29-Apr-15
30-Apr-15
C061D50100
6 14-May-15
C061D50180
6 14-May-15
19-May-15 Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple Play System<BLDG-61>
Floor pull box,
Install
Light
Electrical
CurrentRisers
Systems Two UPVC 25 mm Conduits for
C061D50160
2 23-May-15
24-May-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including empty "PVC"<BLDG-61>
conduits
Install Electrical conduits for Roof Slab
C061D50170
3 23-Jun-15
25-Jun-15
Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door master unit
C061D50200
3 23-Jun-15
25-Jun-15
40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type Push Button (P.B)<BLDG-61> Install of Panel board
C061D50210
14 26-Jun-15
10-Jul-15
Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution Panels <BLDG-61>
(DB-SER-1),Install
Low Voltage
Distribution
Distribution
Panel Panels (DB-SER
C061D50230
21 11-Jul-15
06-Aug-15 600/1000 V, multicore copper conductor, PVC/PVC cables (4 x 10) mm, 600/1000 V, multicore copper conductor, PVC/PVC cables
<BLDG-61>
(4 x 16) mm,
Install
600/1000
Cables V, multicore coppe
C061D50220
3 11-Jul-15
13-Jul-15
Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
C061D50190
2 14-Jul-15
15-Jul-15
Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power outlet with 3(1x6)
<BLDG-61>
mm, Wiring
InstallDevices
Wiring Devices&Disconnect
and Disconnectors Load
switch
B
C061D50240
6 07-Aug-15
12-Aug-15
C061D50250
3 13-Aug-15
16-Aug-15 Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5
9 19-Oct-15
3 19-Oct-15
28-Oct-15
21-Oct-15
28-Oct-15, Compl
<BLDG-61> Punch O
<BLDG-61> Pre-fin
Completion Inspection
C061H10100
<BLDG-61> Punch Out
16-Aug-15
15-Jan-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm,<BLDG-61>
One lightingInstall
outletElectrical
includingconduits
empty "PVC"
for Grconduits
Floor Slab
Sep
Electrical
C061D50110
C061H10110
3 22-Oct-15
25-Oct-15
C061H10120
3 26-Oct-15
28-Oct-15
Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including empty
<BLDG-61>
"PVC" conduits
Install Electrical conduits for 4th Floor Slab
<BLDG-61> Install Earthing System
C064G10100
6 15-Nov-14 A 23-Nov-14 AExcavation in any type of soil except rock for <BLDG-64>
foundation, Disposal
Excavateoftosurplus
Foundation
materials
Levels
outside the site boundary to nearest dump.
C064G10110
2 24-Nov-14 A 28-Nov-14 A
C064G10120
2 07-Mar-15
C064G10140
5 02-Apr-15
06-Apr-15
Substructure
Foundation
Foundation at Level (-2.25)
C064A10100
<BLDG-64> Construct P.C. F oundation Lv (- 2.25)
110
110
110
8
30-Nov-14
30-Nov-14
30-Nov-14
30-Nov-14
31-Mar-15
31-Mar-15, Substructure
31-Mar-15
31-Mar-15, Foundation
31-Mar-15
31-Mar-15, Foundation at Level (-2.25)
08-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-64>
strength
Construct
200 kg/cm2
P.C. F at
oundation
28 days Lv
300mm,
(- 2.25)Supply and cast plain concrete with average compressive strength 200 kg/c
C064A10110
C064A10240
C064A10120
2 05-Mar-15
06-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous<BLDG-64>
base
Apply Dampproofing for Foundation Lv (-2.25)
C064A10160
4 28-Mar-15
31-Mar-15 Supply and cast plain concrete with average compressive strength 200 kg/cm2 at 28 days
<BLDG-64>
100mm Construct S.O.G Lv (-1.00)
4 09-Dec-14
<BLDG-61> Final
16-Aug-15, Electrical
12 20-Feb-15
106 30-Nov-14
8 30-Nov-14
26-Mar-15
26-Mar-15, Foundation at Level (-1.50)
08-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-64>
strength
Construct
200 kg/cm2
P.C. F at
oundation
28 days Lv
300mm,
(- 1.50)Supply and cast plain concrete with average compressive strength 200 kg/c
6 13-Dec-14
C064A10140
C064A10250
C064A10150
2 05-Mar-15
06-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous<BLDG-64>
base
Apply Dampproofing for Foundation Lv (-1.50)
C064A10170
3 24-Mar-15
26-Mar-15 4 mm thick bituminous waterproofing membrane with 50 mm cement mortar screed for
<BLDG-64>
slab on grade,
Construct
SupplyS.O.G
and install
Lv (+0.05)/Install
50 mm thick extruded
PE sheetspolystyrene insulation boards of
Superstructure
Ground Floor Lv (+3.15)
C064B10110
<BLDG-64> Set up Form work for Gr Floor Columns
12 20-Feb-15
116 20-Dec-14
27 20-Dec-14
5 20-Dec-14
04-Mar-15 Backfilling, with suitable excavated soil under foundation level, Supply and build
<BLDG-64>
solid cement
Construct
block unit
CUM
machine-made
above Ground
withBeam
density
Lvnot
(-1.50)/Intenal
exceed 2000Backfill
kg/m3
28-Apr-15
19-Jan-15
24-Dec-14 Form Work %
28-Apr-15, Superstructure
19-Jan-15, Ground Floor Lv (+3.15)
<BLDG-64> Set up Form work for Gr Floor Columns
<BLDG-64> Fix Reinforcement Bars for Gr Floor Columns
C064B10100
5 20-Dec-14
C064B10120
1 25-Dec-14
C064B10130
11 26-Dec-14
08-Jan-15
Steel Fixing
C064B10140
11 26-Dec-14
08-Jan-15
Form Work %
C064B10150
1 09-Jan-15
09-Jan-15
C064B10190
9 10-Jan-15
19-Jan-15
Remaining Work
Milestone
Actual Work
summary
25 10-Jan-15
4 10-Jan-15
06-Feb-15
13-Jan-15 Form Work %
Page 23 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C064B10160
4 10-Jan-15
13-Jan-15
Steel Fixing
C064B10180
1 14-Jan-15
14-Jan-15
C064B10200
10 15-Jan-15
26-Jan-15
Steel Fixing
C064B10210
10 15-Jan-15
26-Jan-15
Form Work %
C064B10220
1 27-Jan-15
27-Jan-15
C064B10260
9 28-Jan-15
06-Feb-15
26-Feb-15
04-Feb-15 Steel Fixing
7 28-Jan-15
28 28-Jan-15
7 28-Jan-15
C064B10240
C064B10250
1 05-Feb-15
C064B10280
10 06-Feb-15
C064B10270
10 06-Feb-15
C064B10290
1 17-Feb-15
17-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, <BLDG-64>
beams, and slabs
Cast concrete for 2nd Floor Slab
C064B10330
9 18-Feb-15
26-Feb-15
28 18-Feb-15
7 18-Feb-15
19-Mar-15
24-Feb-15 Form Work %
C064B10300
7 18-Feb-15
C064B10320
1 25-Feb-15
25-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
<BLDG-64>
for columns,
CastReinforced
concrete for
concrete
3rd Floor
with
Columns
average compressive strength 250 kg/cm2 at 28 days fo
C064B10350
10 26-Feb-15
C064B10340
10 26-Feb-15
C064B10360
1 09-Mar-15
09-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,<BLDG-64>
and slabs Cast concrete for 3rd Floor Slab
C064B10400
9 10-Mar-15
19-Mar-15
11-Apr-15
17-Mar-15 Steel Fixing
30 10-Mar-15
7 10-Mar-15
C064B10380
7 10-Mar-15
C064B10390
1 18-Mar-15
18-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for<BLDG-64>
columns, Reinforced
Cast concrete
concrete
for 4th
withFloor
average
Columns
compressive strength 250 kg/cm2 at 28 days fo
C064B10420
12 19-Mar-15
C064B10410
12 19-Mar-15
C064B10430
C064B10470
1 01-Apr-15
01-Apr-15
RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-64> Cast concrete for 4th Floor Slab
9 02-Apr-15
11-Apr-15
23 02-Apr-15
5 02-Apr-15
28-Apr-15
06-Apr-15
Form Work %
5 02-Apr-15
06-Apr-15
Steel Fixing
C064B10440
C064B10460
1 07-Apr-15
07-Apr-15
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-64>
Reinforced
Cast
concrete
concrete
with
foraverage
Roof Floor
compressive
Columns/Planted
strengthColumns
250 kg/cm2 at 28 days fo
C064B10480
10 08-Apr-15
19-Apr-15
Steel Fixing
C064B10490
10 08-Apr-15
19-Apr-15
Form Work %
C064B10500
1 20-Apr-15
20-Apr-15
RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
C064B10510
6 21-Apr-15
28-Apr-15
85 07-Apr-15
12 07-Apr-15
09-Jul-15
20-Apr-15
Exterior Enclosure
C064B20130
<BLDG-64> Erect Scaffold
C064B20160
25 21-Apr-15
18-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply O.P
<BLDG-64>
cement-sand
Applyplaster
Facades
in two-coat
Plaster work (base and finish coats)for ext
C064B20220
11 12-May-15
23-May-15 Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply
<BLDG-64>
and installInstall
gypsum
Gypsum
cornices
Corniche
including paint,121 mm height gypsum c
C064B20250
6 16-May-15
21-May-15 glass fiber reinforced colored asphalt shingles on waterproofed wooden underlayment
C064B20230
7 24-May-15
30-May-15
C064B20140
6 31-May-15
06-Jun-15
C064B20260
8 07-Jun-15
14-Jun-15
Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic
<BLDG-64>
paintInstall
handrail
Handrails
900 mm
forheight
balconies
3/A-501, Supply and ins
C064B20300
C064B20330
C064B20480
C064B20280
C064B20150
C064B20270
5 20-Jun-15
24-Jun-15
12 25-Jun-15
07-Jul-15
Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with
<BLDG-64>
plexi fill - 400
Install
mm
Aluminum
x 1200 mm.
Windows
6 25-Jun-15
30-Jun-15
3 25-Jun-15
27-Jun-15
12 25-Jun-15
07-Jul-15
Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge
<BLDG-64>
leaves 1400
Install
mmSteel
x 2850
& UPVC
mm, UPVC
DoorsDoor
& Windows
type (D03)
8 01-Jul-15
09-Jul-15
Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone <BLDG-64>
skirting.
Install Rough Stone Skirting
74 05-Apr-15
25-Jun-15
Roofing
Actual Level of Effort
Remaining Work
Milestone
Actual Work
summary
Page 24 of 29
25-Jun-15, Roofing
TASK filter: All Activities
Oracle Corporation
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C064B30100
4 05-Apr-15
08-Apr-15
Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max.<BLDG-64>
1200 kg/m Cast Light Weight Concrete for slopes
C064B30110
9 09-Apr-15
19-Apr-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C064B30180
C064B30120
4 20-Apr-15
23-Apr-15
C064B30130
3 26-Apr-15
28-Apr-15
C064B30140
3 29-Apr-15
01-May-15
C064B30150
2 02-May-15
03-May-15
C064B30160
2 04-May-15
05-May-15
C064B30170
7 20-May-15
27-May-15 Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting. <BLDG-64> Install Terr azzo Tiles
C064B30190
14 28-May-15
11-Jun-15
Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors,
<BLDG-64>
100 mm
Install
height
Ceramic
ceramic
Tiles
tiles for skirting.
C064B30200
7 12-Jun-15
18-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C064B30210
6 20-Jun-15
25-Jun-15
Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf
15 20-Apr-15
190 07-Feb-15
12 07-Feb-15
Interior Construction
C064C10110
<BLDG-64> Construct CUM Works for 1st floor
06-May-15 Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508
4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof. <BLDG-64> Apply reinforced bituminous water proofing membrane
05-Sep-15
05-Sep-15, Interior Construction
19-Feb-15 Supply and build solid cement block unit machine-made with density not exceed
<BLDG-64>
2000 kg/m3,
Construct
Supply
CUM
and
Works
build solid
for 1st
cement
floor block unit machine-made with density not exceed 20
C064C10120
12 28-Feb-15
11-Mar-15
Supply and build solid cement block unit machine-made with density not exceed 2000
<BLDG-64>
kg/m3, Supply
Construct
andCUM
buildWorks
solid cement
for 2ndblock
floorunit machine-made with density not exceed 20
C064C10130
12 20-Mar-15
01-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-64>
Supply Construct
and build solid
CUMcement
Worksblock
for 3rd
unit
floor
machine-made with density not exceed 20
C064C10100
12 28-Mar-15
08-Apr-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3,
<BLDG-64>
Supply and
Construct
build solid
CUMcement
Worksblock
for Gr
unit
floor
machine-made with density not exceed
C064C10150
3 02-Apr-15
04-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-64>
Supply and
Construct
build hollow
CUM cement
for Parapet
block unit machine-made with density not exceed
C064C10140
12 12-Apr-15
26-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-64>
and buildConstruct
solid cement
CUMblock
Works
unitfor
machine-made
4th floor
with density not exceed 20
C064C10160
4 29-Apr-15
02-May-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-64>
and build hollow
Construct
cement
Interior
block
CUM
unitWorks
machine-made
for Roof with density not exceed
C064C10190
6 08-Aug-15
13-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block<BLDG-64>
unit machine-made
Install Ducts
with work
density
fornot
4thexcee
floor
C064C10200
6 15-Aug-15
20-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit
<BLDG-64>
machine-made
Install with
Ducts
density
work for
not3rd
excee
flo
C064C10210
5 21-Aug-15
25-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit<BLDG-64>
machine-made
Install
with
Ducts
density
worknot
forexcee
2nd f
C064C10220
5 26-Aug-15
31-Aug-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-64> Install
withDucts
density
work
not for
excee
1st
C064C10230
5 01-Sep-15
05-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-64> Install
with density
Ducts work
not excee
for G
55 27-Apr-15
19 27-Apr-15
24-Jun-15
16-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C064C20130
12 17-May-15
29-May-15 terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340
<BLDG-64>
mm width, Stone
Install Marble
Paving for
andEntrance
Flooring &
Light
Stairs
beige terriesta marble
C064C20170
12 30-May-15
11-Jun-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C064C20160
6 12-Jun-15
17-Jun-15
Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.
C064C20120
6 18-Jun-15
24-Jun-15
wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door type<BLDG-64>
(D09) - hinged
Install
leafUnits
- 900Wooden
mm x 2200
Doors
mm.
Plumbing
C064D20100
135 09-Mar-15
14 09-Mar-15
07-Aug-15
07-Aug-15, Plumbing
23-Mar-15 UPVC pipes and fittings, underground 75mm, UPVC pipes and fittings, underground<BLDG-64>
110mm, UPVC
Install
pipes
Plumbing
and fittings,
Fittings
underground
Under SOG160mm, Polypropylene Pipes and Fittings
C064D20110
12 27-Apr-15
09-May-15 Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm,
<BLDG-64>
UPVC Pipes
Install
andDrainage
Fittings For
Risers
Drainage above ground 75mm, UPVC Pip
C064D20120
14 27-Apr-15
11-May-15 Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings<BLDG-64>
including items
Install
mentioned
water Risers
25mm, Polypropylene Pipes and Fittings includ
C064D20130
10 10-May-15
19-May-15 Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron oblique
<BLDG-64>
grate,Install
side outlet
Roof 100mm
sainatary work
C064D20140
21 01-Jul-15
27-Jul-15
C064D20150
10 28-Jul-15
07-Aug-15
Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm,<BLDG-64>
Valves are classified
Constructaccording
Inspection
to chambers
type Gate &Valv
co
<BLDG-64> Test Drainage & water R iser s
Electrical
C064D50110
175 25-Dec-14
2 25-Dec-14
C064D50120
2 15-Jan-15
17-Jan-15
C064D50130
2 06-Feb-15
07-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-64>
outlet including
Install Electrical
empty conduits
"PVC" conduits
for 2nd Floor Slab
C064D50140
2 26-Feb-15
28-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet
<BLDG-64>
including
Install
empty
Electrical
"PVC" conduits
conduits for 3rd Floor Slab
C064D50150
2 21-Mar-15
22-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-64>
emptyInstall
"PVC"
Electrical
conduits
conduits for 4th Floor Slab
C064D50100
6 05-Apr-15
11-Apr-15
C064D50180
6 05-Apr-15
11-Apr-15
Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple<BLDG-64>
Play SystemInstall
Floor Electrical
pull box, Light
Risers
Current Systems Two UPVC 25 mm Conduits for
C064D50160
2 15-Apr-15
16-Apr-15
Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including empty
<BLDG-64>
"PVC"Install
conduits
Electrical conduits for Roof Slab
C064D50170
3 17-May-15
19-May-15 Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door master<BLDG-64>
unit
Install Conduits for intercom system
C064D50200
3 17-May-15
19-May-15 Lighting Switches Type Push Button (P.B), 40mm PVC empty conduit from (KWHM) box to panel board<BLDG-64>
of customerInstall of Panel board
C064D50210
14 20-May-15
03-Jun-15
Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution
<BLDG-64>
Panels (DB-SER-1),
Install Distribution
Low Voltage
Panel Distribution Panels (DB-SER
C064D50230
21 04-Jun-15
26-Jun-15
600/1000 V, multicore copper conductor, PVC/PVC cables (4 x 10) mm, 600/1000 V, multicore copper conductor, PVC/PVC
<BLDG-64>
cables
Install
(4 xCables
16) mm, 600/1000 V, multicore coppe
C064D50220
3 04-Jun-15
07-Jun-15
Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
Remaining Work
Milestone
Actual Work
summary
06-Jul-15
26-Dec-14 Indoor wiring for one lighting outlet including wires 3(1x3)
<BLDG-64>
mm, One Install
lightingElectrical
outlet including
conduitsempty
for Gr"PVC"
Floor conduits
Slab
06-Jul-15, Electrical
Indoor wiring for one lighting outlet including wires 3(1x3) mm,<BLDG-64>
One lightingInstall
outlet Electrical
including conduits
empty "PVC"
for 1st
conduits
Floor Slab
Page 25 of 29
Activity ID
Activity Name
Original Start
Duration
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C064D50190
2 08-Jun-15
09-Jun-15
C064D50240
6 27-Jun-15
02-Jul-15
C064D50250
3 04-Jul-15
06-Jul-15
9 06-Sep-15
3 06-Sep-15
15-Sep-15
08-Sep-15
3 09-Sep-15
12-Sep-15
3 13-Sep-15
15-Sep-15
294 30-Nov-14
144 30-Nov-14
2 30-Nov-14
28-Oct-15
09-May-15
01-Dec-14
Completion Inspection
C064H10100
<BLDG-64> Punch Out
C064H10110
C064H10120
10 02-Dec-14
Lighting Switches Type S3, Lighting Switches Type S4, Wiring Devices and Disconnectors Socket outlet with 3(1x4)
<BLDG-64>
mm, Wiring
Install Devices
Wiring Devices&Disconnect
and Disconnectors Power
switches
outlet with
<BLDG-64> Test elec. system
Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5
28-Oct-15, Buildin
09-May-15, Site Preparation
<BLDG-289> Prep for Excavation
C289G10100
C289G10110
2 13-Dec-14
14-Dec-14
C289G10120
2 25-Mar-15
C289G10140
5 04-May-15
09-May-15
Substructure
Foundation
Foundation at Level (-2.25)
C289A10100
<BLDG-289> Construct P.C. F oundation Lv (- 2.25)
113
113
113
8
15-Dec-14
15-Dec-14
15-Dec-14
15-Dec-14
19-Apr-15
19-Apr-15, Substructure
19-Apr-15
19-Apr-15, Foundation
19-Apr-15
19-Apr-15, Foundation at Level (-2.25)
23-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-289>
strength 200
Construct
kg/cm2 P.C.
at 28Fdays
oundation
300mm,
Lv Supply
(- 2.25) and cast plain concrete with average compressive strength 200 kg/c
C289A10110
C289A10240
C289A10120
2 23-Mar-15
24-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous base<BLDG-289> Apply Dampproofing for Foundation Lv (-2.25)
C289A10160
4 16-Apr-15
19-Apr-15
C289A10250
C289A10150
C289A10170
Superstructure
Ground Floor Lv (+3.15)
C289B10110
<BLDG-289> Set up Form work for Gr Floor Columns
4 24-Dec-14
12 10-Mar-15
109 15-Dec-14
8 15-Dec-14
8 28-Dec-14
12 10-Mar-15
15-Apr-15
15-Apr-15, Foundation at Level (-1.50)
23-Dec-14 Supply and cast plain concrete with average compressive
<BLDG-289>
strength 200
Construct
kg/cm2 P.C.
at 28Fdays
oundation
300mm,
Lv Supply
(- 1.50) and cast plain concrete with average compressive strength 200 kg/c
06-Jan-15
22-Mar-15 Backfilling, with suitable excavated soil under foundation level, Supply and build solid<BLDG-289>
cement blockConstruct
unit machine-made
CUM above
with
Ground
densityBeam
not exceed
Lv (-1.50)/Intenal
2000 kg/m3Backfill
2 23-Mar-15
24-Mar-15 Supply and apply two (2) coats cold applied waterproofing paint with bituminous base<BLDG-289> Apply Dampproofing for Foundation Lv (-1.50)
3 12-Apr-15
15-Apr-15
134 08-Jan-15
28 08-Jan-15
5 08-Jan-15
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for slab on grade,
<BLDG-289>
4 mm thick
Construct
bituminous
S.O.G
waterproofing
Lv (+0.05)/Install
membrane
PE sheets
with 50 mm cement mortar
03-Jun-15
07-Feb-15
12-Jan-15 Form Work %
03-Jun-15, Superstructure
07-Feb-15, Ground Floor Lv (+3.15)
<BLDG-289> Set up Form work for Gr Floor Columns
5 08-Jan-15
12-Jan-15
Steel Fixing
C289B10100
C289B10120
1 13-Jan-15
13-Jan-15
C289B10130
12 14-Jan-15
27-Jan-15
Steel Fixing
C289B10140
12 14-Jan-15
27-Jan-15
Form Work %
C289B10150
1 28-Jan-15
28-Jan-15
C289B10190
9 29-Jan-15
07-Feb-15
25 29-Jan-15
4 29-Jan-15
24-Feb-15
02-Feb-15 Form Work %
C289B10160
4 29-Jan-15
C289B10180
1 03-Feb-15
C289B10200
10 04-Feb-15
C289B10210
10 04-Feb-15
C289B10220
1 15-Feb-15
15-Feb-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs,<BLDG-289>
beams, and slabs
Cast concrete for 1st Floor Slab
C289B10260
9 16-Feb-15
24-Feb-15
22-Mar-15
22-Feb-15 Steel Fixing
33 16-Feb-15
7 16-Feb-15
C289B10240
7 16-Feb-15
C289B10250
1 23-Feb-15
23-Feb-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days
<BLDG-289>
for columns,
CastReinforced
concrete for
concrete
2nd Floor
withColumns
average compressive strength 250 kg/cm2 at 28 days fo
C289B10280
15 24-Feb-15
11-Mar-15
Form Work %
C289B10270
15 24-Feb-15
11-Mar-15
Steel Fixing
C289B10290
1 12-Mar-15
12-Mar-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams,<BLDG-289>
and slabs
Cast concrete for 2nd Floor Slab
C289B10330
9 14-Mar-15
22-Mar-15
Remaining Work
Milestone
Actual Work
summary
Page 26 of 29
Activity ID
Activity Name
Original Start
Duration
34 14-Mar-15
7 14-Mar-15
Finish
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
7 14-Mar-15
21-Mar-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns,
<BLDG-289>
Reinforced
Cast concrete
concreteforwith
3rdaverage
Floor Columns
compressive strength 250 kg/cm2 at 28 days fo
C289B10300
C289B10320
1 21-Mar-15
C289B10350
16 22-Mar-15
07-Apr-15
Form Work %
C289B10340
16 22-Mar-15
07-Apr-15
Steel Fixing
C289B10360
1 08-Apr-15
08-Apr-15
RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
<BLDG-289> Cast concrete for 3rd Floor Slab
C289B10400
9 09-Apr-15
19-Apr-15
19-May-15
17-Apr-15 Steel Fixing
Nov
19-Apr-15
20-Mar-15 Form Work %
36 09-Apr-15
7 09-Apr-15
C289B10380
7 09-Apr-15
17-Apr-15
Form Work %
C289B10390
1 18-Apr-15
18-Apr-15
Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns, <BLDG-289>
Reinforced concrete
Cast concrete
with average
for 4thcompressive
Floor Columns
strength 250 kg/cm2 at 28 days fo
C289B10420
18 19-Apr-15
C289B10410
18 19-Apr-15
C289B10430
1 10-May-15
10-May-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
C289B10470
9 11-May-15
19-May-15
23 11-May-15
5 11-May-15
03-Jun-15
15-May-15 Form Work %
C289B10440
5 11-May-15
C289B10460
1 16-May-15
16-May-15 Reinforced concrete with average compressive strength 250 kg/cm2 at 28 days for columns, Reinforced
<BLDG-289>
concrete with
Cast
average
concrete
compressive
for Roof Floor
strength
Columns/Planted
250 kg/cm2 atColumns
28 days fo
C289B10480
10 17-May-15
C289B10490
10 17-May-15
C289B10500
1 28-May-15
28-May-15 RC with average compressive strength 250 kg/cm2 at 28 days for stairs, beams, and slabs
C289B10510
Exterior Enclosure
C289B20130
<BLDG-289> Erect Scaffold
6 29-May-15
03-Jun-15
87 14-May-15
12 14-May-15
19-Aug-15
26-May-15
C289B20160
28 27-May-15
25-Jun-15
Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats), Supply and apply O.P cement-sand
<BLDG-289>
plaster inApply
two-coat
Facades
workPlaster
(base and finish coats)for ext
C289B20220
11 18-Jun-15
29-Jun-15
Supply and install gypsum cornices including paint, 200 mm height upper gypsum cornice 01/A-502, Supply and install<BLDG-289>
gypsum cornices
Install
including
Gypsumpaint,121
Cornichemm height gypsum c
C289B20250
6 23-Jun-15
28-Jun-15
C289B20230
7 30-Jun-15
07-Jul-15
C289B20140
6 08-Jul-15
13-Jul-15
C289B20260
8 14-Jul-15
26-Jul-15
C289B20300
5 30-Jul-15
04-Aug-15 paint exterior acrylic water-based washable emulsion paint external wall
C289B20150
12 05-Aug-15
17-Aug-15 Steel Doors Door type (D13) - hinged leaf with louvers - 900 mm x 2000 mm., Door type (D14) - double hinged fer forge leaves 1400
<BLDG-289>
mm x 2850 mm,
InstallUPVC
Steel Door
& UPVC
typeDoors
(D03)
C289B20330
12 05-Aug-15
17-Aug-15 Aluminum Window type (W15) - hinged leaf - with plexi fill - 500 mm x 1200 mm., Window type (W16) - hinged leaf - with plexi fill - 400
<BLDG-289>
mm x 1200Install
mm. Aluminum Windows
C289B20480
6 05-Aug-15
10-Aug-15
C289B20280
3 05-Aug-15
07-Aug-15
C289B20270
8 11-Aug-15
19-Aug-15 Aswan rough stone 150 mm height Aswan rough stone skirting., Aswan rough stone 110 mm height Aswan rough stone skirting.
Roofing
C289B30100
74 14-May-15
4 14-May-15
9 18-May-15
Supply and install mild steel with electrostatic paint handrail 600 mm height, Supply and install mild steel with electrostatic paint<BLDG-289>
handrail 900 mm
Install
height
Handrails
3/A-501,
for balconies
Supply and ins
<BLDG-289> Apply External Paint 2nd Coat
05-Aug-15
05-Aug-15, Roofing
17-May-15 Supply and cast 80 mm thick. maximum well finished surface of light weight concrete max. 1200 kg/m <BLDG-289> Cast Light Weight Concrete for slopes
C289B30110
C289B30180
C289B30120
4 28-May-15
31-May-15 4 mm thick bituminous waterproofing membrane with 30 mm cement mortar screed for roof.
C289B30130
3 01-Jun-15
03-Jun-15
C289B30140
3 04-Jun-15
07-Jun-15
C289B30150
2 08-Jun-15
09-Jun-15
C289B30160
2 10-Jun-15
11-Jun-15
C289B30170
7 26-Jun-15
02-Jul-15
Terrazzo tiles 300 x 300 x 30 mm thick., Ter razzo tiles for flo ors, 100 mm height ceramic tiles for skirting.
C289B30190
14 04-Jul-15
21-Jul-15
Ceramic tiles for floors, set on 20 mm thick. cement mortar bed,and 30 mm thick. sand layer., Ceramic tiles for floors, 100 mm
<BLDG-289>
height ceramic
Install
tilesCeramic
for skirting.
Tiles
C289B30200
7 22-Jul-15
29-Jul-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C289B30210
6 30-Jul-15
05-Aug-15 Supply and install 1080 mm x 820 mm shop finished single leaf galvanized steel access door leaf
15 28-May-15
207 25-Feb-15
12 25-Feb-15
Interior Construction
C289C10110
<BLDG-289> Construct CUM Works for 1st floor
Actual Level of Effort
Remaining Work
Milestone
Actual Work
summary
27-May-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
12-Jun-15
Supply and install 3150 mm height steel ladder fixed to block wall drawing No. 2b,2c / A-508
18-Oct-15
18-Oct-15, Interior Co
09-Mar-15 Supply and build solid cement block unit machine-made with density not exceed <BLDG-289>
2000 kg/m3, Supply
Construct
andCUM
build solid
Works
cement
for 1stblock
floor unit machine-made with density not exceed 20
Page 27 of 29
Activity ID
Activity Name
Original Start
Duration
Resources
Aug
2015
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
C289C10120
12 23-Mar-15
04-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3,
<BLDG-289>
Supply and
Construct
build solid
CUM
cement
Works
block
for unit
2ndmachine-made
floor
with density not exceed 20
C289C10100
12 16-Apr-15
29-Apr-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-289>
and build solid
Construct
cement
CUM
block
Works
unit machine-made
for Gr floor
with density not exceed 20
C289C10130
12 20-Apr-15
03-May-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply
<BLDG-289>
and build solid
Construct
cementCUM
blockWorks
unit machine-made
for 3rd floor with density not exceed 20
C289C10150
C289C10140
C289C10160
C289C10190
3 11-May-15
13-May-15 Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and
<BLDG-289>
build hollow
Construct
cement block
CUMunit
for Parapet
machine-made with density not exceed
12 20-May-15
01-Jun-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and build
<BLDG-289>
solid cementConstruct
block unitCUM
machine-made
Works for 4th
withfloor
density not exceed 20
4 04-Jun-15
08-Jun-15
Supply and build solid cement block unit machine-made with density not exceed 2000 kg/m3, Supply and build <BLDG-289>
hollow cementConstruct
block unitInterior
machine-made
CUM Works
with for
density
Roofnot exceed
6 14-Sep-15
19-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-289>
with density
Install Ducts
not excee
work
C289C10200
6 20-Sep-15
28-Sep-15 Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-289>
with density
Install
not
Ducts
excee
w
C289C10210
5 29-Sep-15
03-Oct-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-289>
with density
Install
not Ducts
excee
C289C10220
5 04-Oct-15
10-Oct-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made
<BLDG-289>
with density Install
not excee
Duc
C289C10230
5 11-Oct-15
18-Oct-15
Supply and build hollow cement block unit machine-made with density not exceed 1600 kg/m3, Supply and build hollow cement block unit machine-made with
<BLDG-289>
density notInstall
excee
D
55 02-Jun-15
19 02-Jun-15
04-Aug-15
22-Jun-15 Supply and apply O.P cement-sand plaster in two-coat work (base and finish coats)
C289C20130
12 23-Jun-15
05-Jul-15
terriesta marble 600 x 600 x 30 mm thick, Stone Paving and Flooring Light beige terriesta marble stairs 340 mm width,<BLDG-289>
Stone PavingInstall
and Flooring
Marble for
Light
Entrance
beige terriesta
& Stairsmarble
C289C20170
12 06-Jul-15
21-Jul-15
Supply and paint interior acrylic water-based washable emulsion paint,Emulsion paint for walls.
C289C20160
6 22-Jul-15
28-Jul-15
Supply and install 1250 mm height steel ladder fixed to block wall drawing No. A-404.
C289C20120
6 29-Jul-15
04-Aug-15 wooden solid core doors Door type (D07) - hinged leaf - 1100 mm x 2200 mm., wooden solid core doors Door type (D09) - hinged
<BLDG-289>
leaf - 900 mm
Install
x 2200
Unitsmm.
Wooden Doors
Plumbing
C289D20100
152 28-Mar-15
14 28-Mar-15
13-Sep-15
13-Sep-15, Plumbing
11-Apr-15 UPVC pipes and fittings, underground 75mm, UPVC pipes and fittings, underground 110mm,
<BLDG-289>
UPVC pipes
Install
and fittings,
Plumbing
underground
Fittings Under
160mm,
SOG Polypropylene Pipes and Fittings
C289D20110
12 02-Jun-15
14-Jun-15
Cast Iron Pipes and Fittings A/G 80 mm, UPVC Pipes and Fittings For Drainage above ground 50mm, UPVC Pipes
<BLDG-289>
and Fittings
Install
For Drainage
DrainageRisers
above ground 75mm, UPVC Pip
C289D20120
14 02-Jun-15
16-Jun-15
Polypropylene Pipes and Fittings including items mentioned 20mm, Polypropylene Pipes and Fittings including items
<BLDG-289>
mentioned
Install
25mm,
water
Polypropylene
Risers
Pipes and Fittings includ
C289D20130
10 15-Jun-15
25-Jun-15
Roof drains type (RD2), cast iron oblique grate, side outlet 80 mm, Roof drains type (RD2), cast iron oblique grate,<BLDG-289>
side outlet 100mm
Install Roof sainatary work
C289D20140
21 11-Aug-15
02-Sep-15 Water meter, prepaid type, meter cabinet with related dimensions, Valves are classified according to type Gate Valves 25 mm, Valves are classified
<BLDG-289>
according
Construct
to type
Inspection
Gate Valv
ch
C289D20150
10 03-Sep-15
13-Sep-15
Electrical
C289D50110
192 14-Jan-15
2 14-Jan-15
C289D50120
2 04-Feb-15
05-Feb-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting
<BLDG-289>
outlet including
Install Electrical
empty "PVC"
conduits
conduits
for 1st Floor Slab
C289D50130
2 02-Mar-15
03-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet
<BLDG-289>
including Install
empty Electrical
"PVC" conduits
conduits for 2nd Floor Slab
C289D50140
2 29-Mar-15
30-Mar-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including
<BLDG-289>
empty "PVC"
Installconduits
Electrical conduits for 3rd Floor Slab
C289D50150
2 29-Apr-15
30-Apr-15
C289D50180
6 14-May-15
19-May-15 Light Current Systems Triple Play System Tie in point for unit, Light Current Systems Triple Play System<BLDG-289>
Floor pull box,
Install
LightElectrical
Current Systems
Risers Two UPVC 25 mm Conduits for
C289D50100
6 14-May-15
C289D50160
2 23-May-15
24-May-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including empty "PVC"<BLDG-289>
conduits
Install Electrical conduits for Roof Slab
C289D50170
3 23-Jun-15
25-Jun-15
Intercom System One UPVC 25 mm conduit for risers/ unit, Intercom System Provision for door master unit
C289D50200
3 23-Jun-15
25-Jun-15
40mm PVC empty conduit from (KWHM) box to panel board of customer, Lighting Switches Type Push Button (P.B)<BLDG-289> Install of Panel board
C289D50210
14 26-Jun-15
10-Jul-15
Low Voltage Distribution Panels (DB-A4-1), Low Voltage Distribution Panels (DB-A4-2), Low Voltage Distribution Panels <BLDG-289>
(DB-SER-1), Low
Install
Voltage
Distribution
Distribution
Panel Panels (DB-SER
C289D50220
3 11-Jul-15
13-Jul-15
Brick man-hole with a heavy weave fiberglass reinforcing and all necessary (0.6Wx0.6Lx0.6H)m
C289D50230
C289D50190
2 14-Jul-15
15-Jul-15
C289D50240
6 07-Aug-15
12-Aug-15
C289D50250
3 13-Aug-15
16-Aug-15 Lighting fixtures Type F2, Lighting fixtures Type F3, Lighting fixtures Type F4, Lighting fixtures Type F5
9 19-Oct-15
3 19-Oct-15
28-Oct-15
21-Oct-15
28-Oct-15, Compl
<BLDG-289> Punch
21 11-Jul-15
Completion Inspection
C289H10100
<BLDG-289> Punch Out
Activity ID
Finish
16-Aug-15
15-Jan-15 Indoor wiring for one lighting outlet including wires 3(1x3) mm,<BLDG-289>
One lighting outlet
Install including
Electrical empty
conduits
"PVC"
for Gr
conduits
Floor Slab
16-Aug-15, Electrical
Indoor wiring for one lighting outlet including wires 3(1x3) mm, One lighting outlet including empty
<BLDG-289>
"PVC" conduits
Install Electrical conduits for 4th Floor Slab
<BLDG-289> Install Earthing System
<BLDG-289> Install Conduits for intercom system
06-Aug-15 600/1000 V, multicore copper conductor, PVC/PVC cables (4 x 10) mm, 600/1000 V, multicore copper conductor, PVC/PVC cables
<BLDG-289>
(4 x 16) mm,
Install
600/1000
CablesV, multicore coppe
Wiring Devices and Disconnectors Socket outlet with 3(1x4) mm, Wiring Devices and Disconnectors Power outlet with 3(1x6)
<BLDG-289>
mm, Wiring
Install
Devices
Wiringand
Devices&Disconnect
Disconnectors Load
switB
<BLDG-289> Test elec. system
<BLDG-289> Install Lighting fixtures
C289H10110
3 22-Oct-15
25-Oct-15
<BLDG-289> Pre-f
C289H10120
3 26-Oct-15
28-Oct-15
<BLDG-289> Fina
Start
28-May-15
Mountain
View
Finish
Remaining
Units
2015
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
04-Aug-15
Hyde
Park.
Steel, 28-May-15
Flush Wood04-Aug-15
,Aluminum Doors and Windows&UPVC Doors and Windows
wooden
28-May-15
solid core doors
04-Aug-15
Door type (D09) - hinged leaf - 900 mm x 2200 mm.
C172C20160
16-Jun-15
21-Jun-15
C063C20120
28-May-15
02-Jun-15
Apr
May
Jun
Jul
Aug
46
10
16
46
10
16
46
10
16
Sep
Oct
Nov
6
8
Remaining Work
Milestone
Actual Work
summary
Page 28 of 29
Activity ID
Start
Finish
Remaining
Units
2015
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
C062C20120
11-Jun-15
27-Jun-15
C173C30170
11-Jun-15
16-Jun-15
12
C286C30190
28-Jun-15
02-Jul-15
C061C20120
29-Jul-15
04-Aug-15
C064C20120
18-Jun-15
24-Jun-15
C289C20120
29-Jul-15
04-Aug-15
Aug
Sep
Oct
Nov
2
4
12
Remaining Work
Milestone
Actual Work
summary
Page 29 of 29