Coffee Cart Rewards Management System


Project Plan
Issue <1.4>

Coffee Cart Rewards Management System

Issue:
1.4
Issue Date: 120Jul/14

Project Plan
ProjectPlan.pdf

Revision History
Date

Issue

Description

Author

24/June/14

1.0

Initial Project Plan

Laura Pike

29/June/14

1.1

Revised after review with team members

Laura Pike

06/July/14

1.2

Revised during Elaboration phase

Laura Pike

13/July/14

1.3

Revised during Construction phase

Laura Pike

20/July/14

1.4

Revised during Transition phase

Laura Pike

Confidential

Team 52, 2014

Page 2 of 9

Coffee Cart Rewards Management System

Issue:
1.4
Issue Date: 120Jul/14

Project Plan
ProjectPlan.pdf

Table of Contents
1. Object ives

2. Scope

3. References

4. Phase Plan

5. Schedule

6. Object ives of Each Iteration

7. Releases

8. Resource plan

Confidential

Team 52, 2014

Page 3 of 9

Coffee Cart Rewards Management System

Issue:
1.4
Issue Date: 120Jul/14

Project Plan
ProjectPlan.pdf

Project Plan
1.

Objectives
BeanTracker is an Android based application that provides all the necessary features to operate a coffee
cart rewards system. With this application the coffee cart manager can easily run a rewards program that
allows customers to accrue points based on the amount of money they spend and to get benets based on
their points."

2.

Scope
This Project Plan describes the overall plan to be used by BeanTracker system, including deployment of
the software product. The details of the individual iterations are be described below in the Phase Plan and
Objects of Each Iteration. The plans as outlined in this document are based upon the product requirement s
as defined in the Vision Document.

3.

References
Vision Document, 6300Sum14Pro ject2\Deliverable1\vision.pdf
Use-case Model, 6300Sum14Pro ject2\Deliverable1\UseCase.pdf
Risk Assessment, 6300Sum14Project2\ Deliverable1\ RiskAssessment.pdf
Planning a Project with the IBM Rational Unified Process:
http://www3.software.ibm.com/ ib mdl/pub/software/rational/web/whitepapers/2003/tp151.pdf
Rational Unified Process Best Practices for Software Development Teams
https://www.ibm.com/developerworks/rational/library/content/03July/1000/1251/1251_bestpractices_TP026B.pdf
Planning and Estimating a RUP project using IBM Rational SUM M IT Ascendant

http://www.ibm.com/developerworks/rational/library/4772.ht ml
M icrosoft Word Templates for RUP

http://sce.uhcl.edu/helm/RationalUnifiedProcess/wordtmpl/index.htm#sdp

4.

Phase Plan
Phase

Iteration

Inception

I1

Elaboration

E1
E2

Construction

Confidential

Primary Objective
(Risk/use cases
addressed)

C1

Scheduled
Start/End

Effort
Estimate
(Person
Hrs)

Percent
effort of
total

Staffing

6/23-29

30

20

6/30-7/3

23

15

7/4-7/7

23

15

7/7-8

23

15

Define vision
Initial use-case model
Initial risk assessment
Project plan
VIP Customer
Management
subsystem
Purchase Tracking
subsystem
VIP Customer
Management
subsystem

Team 52, 2014

Page 4 of 9

Coffee Cart Rewards Management System

Issue:
1.4
Issue Date: 120Jul/14

Project Plan
ProjectPlan.pdf
C2

Transition

Project
Summary

5.

T1

Purchase Tracking
subsystem
Deliver beta to
customers
Analyze comments
from beta
Apply corrections
Finalize users
manual
Deliver to customer

7/9-13

23

15

7/14-21

30

20

6/23-7/21

152

100

Schedule

Confidential

Team 52, 2014

Page 5 of 9

Coffee Cart Rewards Management System

Issue:
1.4
Issue Date: 120Jul/14

Project Plan
ProjectPlan.pdf

6.

Objectives of Each Iteration


Inception Iteration Plan BeanCoffee Cart Rewards Management System
Artifact

State of
Artifact

Risk
Addressed

Starr/End Dates

Effort (person hrs)

Scheduled

Actual

Scheduled

Actual

Role
Responsible

Vision

Complete

6/24-29

6/24-29

10

10

Scott

Use-case
Model

Draft

6/24-29

6/24-29

10

10

Ben

Risk
Assessment

Draft

6/24-29

6/24-29

Laura

Project Plan

Draft

6/24-29

6/24-29

Laura

Elaboration Iteration Plan Coffee Cart Rewards Management System


Artifact

State of
Artifact

Risk
Addressed

Start/End Dates

Effort (person hrs)

Scheduled

Actual

Scheduled

Actual

Role
Responsible

Use-case
Model

Revised

6/30-7/3

6/307/3

Ben

Supplementary
Requirements

Complete

6/30-7/3

6/307/3

Laura

Software
Architecture

Complete

6/30-7/3

6/307/3

Ben

Design Model

Draft

6/30-7/3

6/307/3

Scott

Test Cases

Complete

6/30-7/3

7/4-7/7

10

Scott, Ben,
Laura

Prototype

Complete

7/4-7/7

6/307/3

10

Scott

Risk
Assessment

Revised

7/4-7/7

7/4-7/7

Laura

Project Plan

Revised

7/4-7/7

7/4-7/7

Laura

Users Manual

Draft

7/4-7/7

7/4-7/7

Ben

Upgrade
SDK

Construction Iteration Plan Coffee Cart Rewards Management System


Artifact

Use-Case
Model

Confidential

State of
Artifact
Complete

Risk
Addressed

Starr/End Dates

Effort (person hrs)

Scheduled

Actual

Scheduled

Actual

7/7-13

7/7-13

Team 52, 2014

Role
Responsible
Ben

Page 6 of 9

Coffee Cart Rewards Management System

Issue:
1.4
Issue Date: 120Jul/14

Project Plan
ProjectPlan.pdf
Traceability
information
on some use
cases

Complete

7/7-13

7/13

Laura

Android
Program

Beta

7/7-13

7/7-13

38

64

Scott,
Laura, Ben

System Test
Results

Draft

7/7-13

7/12-13

Scott,
Laura, Ben

Users
Manual

Revised

7/7-13

7/13

.5

Ben

Transition Iteration Plan Coffee Cart Rewards Management System


Artifact

7.

State of
Artifact

Risk
Addressed

Starr/End Dates

Effort (person hrs)

Scheduled

Actual

Scheduled

Actual

Role
Responsible

Android
Program

Complete

7/14-21

7/14-21

30

36

Ben
Scott
Laura

Users
Manual

Complete

7/14-21

7/14-21

Ben

System
Test
Results

Complete

7/14-21

7/14-21

Ben
Scott
Laura

Project
Plan

Complete

7/14-21

7/14-21

.5

Laura

Releases
Brief descriptions of each release, whether demo, beta, etc.
Product

State of Product

End Date

Sample Coffee Cart Rewards


Management System

Prototype

7/7

Coffee Cart Rewards


Management System

Beta

7/13

Coffee Cart Rewards


Management System

Complete

7/21

Confidential

Team 52, 2014

Page 7 of 9

Coffee Cart Rewards Management System

Issue:
1.4
Issue Date: 120Jul/14

Project Plan
ProjectPlan.pdf

8.

Project Organization

8.1

Organizational Structure

Laura Pike
Project Manager

8.2

8.3

Scott Dickerson

Ben Chung

Documentation Lead

Development Lead

External Interfaces
Person

Rational Unified Process Role

Brad

LameDucks, Co-Owner

Janet

LameDucks, Co-Owner

Tim, Sue, and Tom

Coffee Cart Employees

Roles and Responsibilities


Person

Rational Unified Process Role


Project Manager
Deployment Manager
Requirements Reviewer
Architecture Reviewer
Configuration Manager
Change Control Manager

Laura Pike
and to a lesser extent the following roles :
Design Reviewer
Implementer
Code Reviewer
Tester

Scott Dickerson

Documentation Lead
Project Reviewer
Requirements Reviewer
Technical Writer
and to a lesser extent the following roles:

Confidential

Team 52, 2014

Page 8 of 9

Coffee Cart Rewards Management System

Issue:
1.4
Issue Date: 120Jul/14

Project Plan
ProjectPlan.pdf
Design Reviewer
Implementer
Code Reviewer
Tester

Ben Chung

Development
LeadC:\Users\laura\process\workers\wk_sysan.htm
Requirements Specifier
User Interface Designer
Software Architect
Design Reviewer
Test Manager
and to a lesser extent the following roles:
Project Reviewer
Requirements Reviewer
Technical Writer