You are on page 1of 22

GOVERNMENT OF TELANGANA

ABSTRACT
PRED ESTABLISHMENT Rationalisation of PRI and PIU Wings for effective
implementation of works programme in Panchayat Raj Engineering Department and
uniform work distribution among all the Engineers utilize their efficiency and
achieving targets Orders Issued.
-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-xPANCHAYAT RAJ & RURAL DEVELOPMENT (ESTT.I) DEPARTMENT
G.O.Ms.No.5
1
2
3
4

Dated:16-1-2015.
Read the following:

G.O.Ms.No.383, PR&RD (E.I.2) Department, Dt: 09.12.2009.


From
the
Engineer-in-Chief
(PR),
Letter.No.
B.PR-I/3281/2014,
dated:24.11.2014.
From
the
Engineer-in-Chief
(PR),
Letter.No.
B.PR-I/3281/2014,
dated:29.11.2014.
From
the
Engineer-in-Chief
(PR),
Letter.No.
B.PR-I/3281/2014,
dated:01.12.2014.
--:o:--

ORDER:
In the G.O. 1st read above, the organization structure of Panchayat Raj
Engineering Department was redefined, duly creating exclusive divisions/
subdivisions separately for Projects and PRI Wings restructuring the Divisions, SubDivisions and posts by categorising into 4 types and the existing PRI and PIU
divisions have been converted into PRI, PIU, PR (PRI +PIU) and QC for effective
implementation of PMGSY programme, which is grant in aid from Government of
India. The PIU Divisions and Sub-divisions are being under taking all the project
works including the PMGSY programme and to ensure that the PMGSY works and
RIDF works are executed on top priority through dedicated project implementation
units, and also to ensure that the works of ZP, MPP, Gram Panchayats and the
NREGS are properly supervised, the Department has to provide separate field staff
for the projects and PRI works with the existing and proposed additional field staff
under PMGSY. The Government have also issued orders to reallocate the
subdivisions and sections within the zone from time to time depending upon the
workload as it varies based on the sanctions.
2.
In the letters 2nd to 4th read above, the Engineer-in-Chief, Panchayat Raj,
Hyderabad, has stated that the Government have taken up massive programme of
rural roads i.e., B.T. Renewals, Maintenance of WBM/gravel/earthern roads, B.T. Upgradation of existing roads to BT standards and at present there is a work load of
Rs.7171.60 crore under PRI and Rs.1173.58 crore only under PIU. There is a lot of
visible difference in work load among Section Officers working under PRI and PIU
Wings in the Department. The present work load for each Section Officer in PRI is
Rs.11.14 crore whereas in PIU, it is Rs.4.83 crore only. Subsequently, the funds
flow of the external aided projects and Government of India funds has been
gradually declined, due to which the staff working in Project Implementation Units
are not having sufficient work load except in two districts (Khammam and
Adilabad). As such, there is every need to have uniform work distribution among all
the Engineers and utilizing their services efficiently and achieving the targets of the
Government. In view of the above, there is need to rationalize the present set up
by continuing one PIU Division for each district and in the field, one or two PIU
AEEs/AEs exclusively for one Sub-division to execute the Project works such as
PMGSY, NABARD etc., as per the prevailing work load duly rationalizing the
jurisdiction of Sub-divisions as PR Sub-divisions and rationalizing the PRI and PIU
with the existing sanctioned posts only. Accordingly, the Engineer-in-Chief
(Panchayat Raj) has furnished proposals for rationalization of PRI and PIU Wings for
effective implementation of works programme in Panchayat Raj Engineering
Department, to achieve the targets of the Government and requested to issue
necessary orders accordingly.
3.
Government, after careful examination of the matter and in supersession of
the orders issued in the G.O. 1st read above, to the extent of Zone-V and Zone-VI
including Head of the Department hereby order for rationalization of PRI and PIU

2
Wings as indicated in the Annexures to this order with immediate effect. Annexure-I
indicates the district wise Divisions and Sub Divisions and cadre strength of Section
Officers under each sector i.e., PR, V&QC and office posts. Annexure-II indicates
the jurisdiction of each division, sub-division and number of Assistant Executive
Engineers/Assistant Engineers allocated to subdivisions and number of Assistant
Executive Engineers/Assistant Engineers allocated to each Circle office and division
office. Annexure-III indicates the shifting of posts of PIU Sub-Division Madhira.
Annexure-IV indicates the Shifting of surplus Assistant Executive Engineer/Assistant
Engineer posts. Annexure-V indicates the distribution of posts of Deputy Executive
Engineers and Assistant Executive Engineers/ Assistant Engineers in the office of
Engineer-in-Chief (PR), Hyderabad.
4.
At present two V&QC sub divisions exist in each district and located one in
district Head Quarters and another one sub division is located in outside District
Head Quarters at appropriate location. In view of the present work load it is
necessary to strengthen the Quality Control Wing. As such now one Quality Control
Division in Mahabubnagar District and Two more Quality Control sub-divisions i.e.,
one in Khammam District and another in Mahabubnagar district are reorganized by
converting regular Division/Sub-division. Further one Sub-division is proposed at
Nakirekal by shifting one post of PA to Superintending Engineer, Panchayat Raj,
Nalgonda (Deputy Executive Engineer). Keeping in view of the above, two or three
Mandals to one PR sub-division and in some cases more than three Mandals and
one Section Officer to each Mandal and one or two Special Section Officers to each
Sub-division as the case may be, with the existing cadre strength and one Deputy
Executive Engineer post and twenty Section Officers posts from certain districts are
hereby shifted to the Engineer-in-Chief office as there is a lot of work load in the
Engineering-in-Chief office.
5.
The salaries of the Mandal Engineering Officers (MEOs) are being drawn by
the concerned Mandal Parishad Development Officers and the salaries of the Deputy
Executive Engineers/Assistant Executive Engineers/Assistant Engineers are being
drawn by the concerned Executive Engineer and the same will continue.
6.
The Director of Treasuries and Accounts, Hyderabad is requested to allow pay
bills for the posts designated in the Annexures-I to V.
7.
The Engineer-in-Chief, Panchayat Raj, Hyderabad shall take further action
accordingly.
8.
This orders issued with the concurrence of Finance Department vide their
U.O.Note.No.8024/295/A1/HRM.I/14, Dt:02.01.2015.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA)
J. RAYMOND PETER
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Engineer-in-Chief (PR), Hyderabad.
The Accountant General, A.P. & Telangana, Hyderabad.
The Director of Treasuries & Accounts, Hyderabad.
The Pay and Accounts Officer, Hyderabad.
The Director of Works, M.J. Road, Hyderabad.
The Director of Work Accounts (W&P), M.J. Road, Hyderabad.
Copy to:
The PS to M(PR&IT).
The PS to Prl. Secy. to Govt. (PR).
SF/SC
//FORWARDED::BY ORDER//
SECTION OFFICER

3
ABSTRACT
ANNEXURE-I
(Annexure to G.O.Ms.No.5, PR & RD (Estt.I) Deptt., dt:16.1.2015)
Divisions

S.
No
.

District

SUB DIVISIONS

SECTION OFFICERS

P
R

PIU

V&Q
C

Total

PR

V&
QC

PA
to
SE

Tota
l

ENC
office

PR

Divn
office

V&
QC

SE
offic
e

Total

ENC
office

10

11

12

13

14

15

16

17

Warangal

20

23

79

16

15

116

Khammam

17

21

65

20

12

103

Karimnagar

23

26

90

16

10

122

Adilabad

18

21

84

16

12

118

Rangareddy

16

19

57

17

16

96

Mahabubnag
ar

26

30

101

17

16

140

Nalgonda

19

22

91

16

121

Medak

15

18

73

16

103

Nizamabad

13

16

56

16

86

10

ENC office

Total

31

43

167

20

196

10

696

150

105

54

1005

60

27

J. RAYMOND PETER
PRINCIPAL SECRETARY TO GOVERNMENT
//FORWARDED::BY ORDER//
SECTION OFFICER

ANNEXURE-II

33

4
(Annexure to G.O.Ms.No.5, PR & RD (Estt.I) Deptt., dt:16.1.2015)

Name of the Sub Division

Sl.
N
o

Existing

S.N
o

Proposed

PRI
Mahabubnagar

PR
Mahabubnag
ar

PRI Jadcherla

PR JadcherlaI

PIU
Mahabubnagar

PR JadcherlaII

PRI Shadnagar

PR
Shadnagar-I

PIU Shadnagar

PR
Shadnagar-II

No of AEE/AE

Spl

Total

10

11

FIELD PATTERN

PIU
Mahabubnagar

Propose
d

PIU
Mahabubnagar

Existing

Name of
Mandal

Mandal

Name of the
Division

MandalsNo. of

RATIONALISATION OF PIU AND PR SUB DIVISION IN MAHABUBNAGAR DISTRICT

Mahabubnagar
Hanwada
Jadcherla
Midjil
Balanagar
Nawabpet
Farooqnagar
Kondurg
Kothur
Keshampet

PRI Kothakota

PR
Kothakota-I

PIU Kothakota

PR
Kothakota-II

Devarkadra
CC Kunta
Bhoothpur
Addakal
Kothakota

PRI Narayanpet
PIU Marikal

8
9

PR
Narayanpet

PR Marikal

Narayanpet
Damargidda
Dhanwada
Koilakonda

PR
Narayanpet

PIU
Narayanpet

Kodangal
PRI Kodangal

10

PR Kodangal

Bomraspet
Doulthabad

PIU Maddur

11

PR Maddur

Maddur
Kosgi

PR
Nagarkurnool

PRI
Nagarkurnool

Makthal
PRI Makthal

12

PR Makthal-I

PIU Makthal

13

PR Makthal-II

14

PR
Nagarkurnool

Maganoor
Utkoor
Atmakur
Narwa
Nagarkurnool

PRI Nagarkurnool

Tadoor
Telkapally

PIU Bijnepally

15

PR Bijnepally

PRI Achampet

16

PR
Achampet-I

PIU Achampet

17

Bijnepally
Thimmajipet
Achampet
Uppununthala
Vangoor

PR
Achampet-II

Amrabad
Balmoor
Lingal

PRI Kalwakurthy

18

PR
Kalwakurthy

PIU Amangal

19

PR Amangal

PRI Wanaparthy

20

PR
Wanaparthy-I

21

PR
WanaparthyII

Kalwakurthy
Veldanda
Madgul
Amangal
Talakondapally

37

64

101

Wanaparthy
Pebbair

PR
Wanaparthy

PIU
Wanaparthy

Gopalpet
PIU Wanaparthy

Peddamandadi
Ghanpur
Kollapur

PRI Kollapur

22

PR Kollapur-I

PIU Kollapur

23

PR Kollapur-II

Kodair
Peddakothapall
y
Weepangandla
Pangal
Gadwal

PR
Gadwal

PRI
Gadwal

PRI Gadwal

24

PR Gadwal

Dharur
Maldakal
Gattu

PRI Manopad

25

PR ManopadI

Manopad
3

Itikyal
Alampur

PIU Manopad

II

26

PR ManopadII

Total
Mandals

64

Ieeja
Waddepally
Field Total

V&QC PATTERN

PRI
Mahabu
bnagar

V&QC
Divn,
MBNR
(MBNR
&
Nalgond
a Dists)

V&QC SD,
Mahabubnagar

27

V&QC SD,
Nagarkurnool

28

PIU Gadwal

29

V&QC
Divn

V&QC SD,
Mahabubnag
ar

V&QC SD,
Nagarkurnool
V&QC SD,
Gadwal
Mahabubnag
ar

1 to 10 Sub-divns

11 to 19 Sub-divns.

20 to 26 Sub-divns

3
5

V & QC Total

III

16

OFFICE PATTERN
PR Circle office
PR Division office

PIU Divn ofice

PA to
SE

30

PA to SE
Narayanpet

Nagarkurnool

Wanaparthy

Gadwal
Mahabubnag
ar

3
4
Office Total

23

Grand Total

140
Contd..

RATIONALISATION OF PIU AND PR SUB DIVISIONS IN NALGONDA DISTRICT


Sl.
N
o
1
I

Name of the
Division

Name of the Sub Division

Existin
Propose
g
d
2
3
FIELD PATTERN

Existing
4

Nalgonda

NalgondaPIU

PIU

PRI Nalgonda

PIU Mungode

PRI
Mungode

PR
Mungode-2

PR NakrekalI

PR NakrekalII HQ at
Ramannapet

PRI
Thungathurt
hy

Mand
al
10

8
Nalgonda
Kangal
Thiparthy

Mungode
Naryanpur
Choutupal
Chandur
Nampally
Marriguda

Total
11

Nakrekal

PR Suryapet

PR
Thungathurt
hy-1

PR
Thungathurt
hy-2

PIU Kodad

PR Kodad-1

PRI Kodad

10

PR Kodad-2

PR

Suryapet PR

PIU
Thungathurt
hy

PRI
Deverkonda
Miryaguda

NalgondaPRI
MiryagudaPRI

PR
Mungode-1

PRI Suryapet

No of AEE/AE
Spl

PR Nalgonda

PRI
Nakrekal

Mandals

Proposed

PA to SE,
Nalgonda

S.N
o
5

No. of
Mand
als

11

PR
Deverkonda

PIU Haliya

12

PR Haliya-1

PRI Haliya

13

PR Haliya-2

14

PR
Miryalguda

PIU
Huzurnager

15

PR
Huzurnager-1

PRI

16

PR

Narkatpally
Kethepally
Kattangur
Chityala
Ramannapet
Suryapet
Athmakur (S)
Chivemla
Penpahad
Thungathurthy
Arvapally
(jj gudem)
Nuthankal
Shaligouraram
Mothkur
Tirmalgiri
Kodad
Nadigudem
Chilkur
Mothey
Mungala
Deverkonda
Gundlapally
Chandampet
Chinthapally
P.A.Pally
Anmula
Nidmanoor
Tripuraram
Gurrampod
Peddavoora
Miryalguda

PRI
Miryalguda

Damercherla
Vemulapally
Huzurnager
Mattampally
Mellachervu
Neredcherla

7
Huzurnager

17

PIU Bhongir
PR Bhongir

PR Bhongir

PRI Bhongir

PR Bhongir

PR Alair-1
HQ @
Bhongir

18

PRI Alair

19

PR Alair-2

Total Mandals
II

Bhongiri
Bibinager
Pochampally
Voligonda

32

59

91

Bommalaramar
am
3

Thurkapally
Yadgirigutta

4
59

Alair
Athmakur(M)
Gundala
Rajapet
Field Total

V&QC PATTERN

V&QC Divn,
MBNR
(MBNR and Nlg
Dists)

V&QC Nalgonda
V&QC
Bhongir

III

Garedepally

Huzurnager-2

OFFICE PATTERN
PR Circle
PR Divn
office

PIU Divn
office

PA
to
SE

20

V&QC
Nalgonda

21

V&QC
Bhongir

2
2

S.Nos.1 to 5 & 11 to 16 Subdivns


S.No.6 to 10 & 17 to 19 Subdivns
V&QC Total

4
8

PA to SE
6

suryapet

Miryalagud
a
Bhongir

4
4

Nalgonda

Contd

Office Total

4
22

Grand Total

121

RATIONALISATION OF PIU AND PR SUB DIVISIONS IN RANGAREDDY DISTRICT

PR Hyderabad

PIU Hyderabad

II

HyderabadPRI

Existin
Propose
g
d
2
3
FIELD PATTERN

HyderabadPIU

Sl.
No.

Name of the
Division

Name of the Sub Division


Existing
4

S.
No
5

No. of
Mand
als

Name of
Mandal

Proposed
6

No of AEE/AE
Spl

PRI Medchal

PR Medchal-I

PIU Hayath
Nagar

PR Medchal-II

PRI
Quthbullapur

PR Quthbullapur

PRI
Ibrahimpatan

PR
Ibrahimpatan

PIU
Rajendernagar

PR Hayathnagar

PRI HQ at
Hyderabad

PR HQ at Hyd

PRI
Rajendernagar

PR
Rajendernagar

PRI
Maheshwaram

PR
Maheshwaram

Medchal

Mand
al
10

Total
11

Hayathnaga
r

Division HQ

24

33

57

Shamirpet
Keesara
Ghatkesar
Quthbullapu
r
Ibrahimpata
n
Yacharam
Manchal

Rajenderna
gar
Shamshaba
d
Maheshwar
am
Kandukur
Saroornagar
Chevella

PRI Chevella

PR
Chevella-I

Shankarpall
y
Nawabpet

PIU Chevella

10

PR Chevella-II

Shabad
Moinabad
Vikarabad

PRI Vikarabad

11

PR Vikarabad

Mominpet
Dharur

PR Vikarabad

VikarabadPRI

Marpally
PRI Marpally

12

PR Marpally

PRI Tandur

13

PR Tandur-I

PIU Vikarabad

14

PR Tandur-II

Bantawara
m
Tandur
Peddamul
Basheeraba
d
Yalal
Pargi

PRI Pargi

15

PR Pargi-I

Pudur
Doma

PIU Pargi

16

PR Pargi-II
Total Mandals

II

2
33

Kulkacherla
Gandeed
Field Total

V&QC PATTERN
EE
V&QC
Hyderabad (Hyd,
RR,
Medak
&
NZBD dists)

V&QC
Hyderabad

V&QC Vikarabad
V&QC Divn

17

V&QC
Hyderabad

18

V&QC Vikarabad
Hyderabad

S.Nos.1 to 10 Sub-divns

S.Nos.11 to 16 Sub-divns

5
6

9
V&QC Total

III

16

OFFICE PATTERN
PR Circle
office
PR Divn office

PIU Divn office

Contd..

PA
to
SE

19

PA to SE

Hyderabad

Vikarabad

Hyderabad

5
Office Total

23

Grand Total

96

10

RATIONALISATION OF PIU AND PR SUB DIVISIONS IN MEDAK DISTRICT


Sl.
No.
1
I

Name of the
Division
Existin
Proposed
g
2
3
FIELD PATTERN

Name of the Sub Division


Existin
g
4

PR Sangareddy

PIU Sangareddy

PRI
Sangared
dy

PRI
Patancher
u

S.No.

Proposed

No. of
Mandal
s

Name of
Mandal
8

No of AEE/AE

Mand
al
10

Spl

Total
11

Sangareddy
1

PR
Sangareddy

Sadashivpet
Kondapur
Patancheru

PR
Patancheru

R.C.Puram
Jinnaram
Zaheerabad

PRI
Zaheerab
ad

PR
Zaheerabad

Kohir
4

Nyalkal
Jharasangam
Andole

PRI
Andole

Pulkal
4

PR Andole

Tekmal

PR Andole

PRI Sangareddy

Alladurg
PIU
Sangared
dy

PRI
Narayank
hed
PIU
Narayank
hed

Regode
5

PR Regode

Munipally
Raikode

PR
Narayankhe
d
PR
Shankaram
pet-A

Narayankhed
3

Manoor
Kangti

ShankarampetA
Kalher

PIU Medak

PIU Medak

Narsapur
PRI
Narsapur

PIU
Narsapur

PR Narsapur

Hathnoora
Shivampet

PR
Kowdipally

Kowdipally
Yeldurthy
Kulcharam
Medak
Papannapet

PR Siddipet

PRI Siddipet

PIU Medak

10

PR Medak

ShankarampetR
Ramayampet
Siddipet

PRI
Siddipet

11

PR Siddipet

Chinnakodur
Nangnoor
Dubbaka

PRI
Dubbak

12

PR Dubbak

Mirdoddi
Thoguta

PRI Medak

13

PR
Doulthabad

PRI Gajwel

14

PR Gajwel

Doulthabad
Chegunta
Gajwel

11
Kondapaka
Jagadevpur
Toopran
PIU
Gajwel

15

PR Wargal

Wargal

27

46

73

Mulugu
Total
Mandals
II

46

Field Total

V&QC PATTERN
V&QC Hyderabad
(Hyd, Medak &
NZBD RR dists)

V&QC
Sangared
dy
V&QC
Medak

16

V&QC
Sangareddy

Sl.No.1 to 7
sub-divisions

17

V&QC
Medak

Sl.No.8 to 15
sub-divisions

V&QC Total

III

OFFICE PATTERN
PR Circle
office
PR Divn
office

PIU Divn
office

PA to SE

18

PA to SE

Sangareddy

Andole

Siddipet

Medak

4
Office Total
Grand Total

22
103

12
RATIONALISATION OF PIU AND PR SUB DIVISIONS IN NIZAMABAD DISTRICT

II

Kamareddy PR

PR Kamareddy
PR Bodhan
PR Nizamabad

PIU Nizamabad

PRI Bodhan

Nizamabad PRI

1
I

Name of the
Division
Existin
Propose
g
d
2
3
FIELD PATTERN

Nizamabad PIU

Sl.
No.

Existing

S.No.

Proposed

No. of
Mandal
s

PRI
Kamareddy

PR
Kamareddy

PIU
Kamareddy

PR
Gandhari

PRI
Yellareddy

PR
Yellareddy

PRI
Banswada

PR
Banswada

PRI
Madnoor

PR
Madnoor

PIU
Madnoor

PR Pitlam

PRI Armoor

PR Armoor

PIU Armoor

PR
Balkonda

PRI
Bheemgal

PR
Bheemgal

PRI
Nizamabad

10

PR
Nizamabad
-I

PIU
Nizamabad

11

PRI Bodhan

12

PIU Bodhan

13

PR
Nizamabad
-II
PR Bodhan
I

2
2

PR Bodhan
II

Total
Mandals

35

No of AEE/AE

Name of
Mandal

Mand
al
10

Spl

8
Kamareddy
Bhiknoor
Domakonda
Machareddy
Sadasivnagar
Tadwai
Yellareddy
Nagireddypet
Lingampet
Banswada
Birkur
Varni
Kotagiri
Madnoor
Bichukunda
Pitlam
Nizamsagar
Jukkal
Armoor
Nandipet
Makloor
Balkonda
Vailpoor
Bheemgal
Kammarpally
Morthad
Nizamabad
Dichpally
Jakranpally
Sirikonda
Dharpally
Bodhan
Yedapally
Navipet
Renjal

Total
11

Field Total

21

35

56

V&QC PATTERN
V&QC Hyderabad
(Hyd, RR, Medak
& NZBD dists)

III

Name of the Sub Division

OFFICE PATTERN
PR
Circle
office

V&QC
Kamareddy

14

V&QC
Kamareddy

Sl.No.1 to 6 sub-divisions

V&QC
Nizamabad

15

V&QC
Nizamabad

Sl.No.7 to 13 sub-divisions

V&QC Total

PA to SE

PR Divn office

16

PA to SE

Kamaredd
y

Bodhan

PIU Divn office

Nizamaba
d
Nizamaba
d

4
4
Office Total

22

Grand Total

86

13

RATIONALISATION OF PIU AND PR SUB DIVISIONS IN WARANGAL DISTRICT

PIU Warangal

Name of the Sub Division


Existing

S.No

Proposed

PRI
Wardhannapet
(HQ at
Hanamkonda)

PIU
Hanamkonda
PIU
Ghanpur(Stn)

PRI
Ghanpur(Stn)

No. of
Mandal
s

PR
Hanamkonda

PR
Ghanpur(Stn)-1

PR
Ghanpur(Stn)-2

No of AEE/AE

Mand
al
10

Tota
l
11

Spl

PR
Wardhannapet
(HQ at
Hanamkonda)

Name of
Mandal

8
Wardhannape
t
Hasanparthi

Hanamkonda
Parvathagiri
Ghanpur
Dharmasagar
Raghunathpall
y
LingalaGhanp
ur
Zaffergadh

PRI Parkal

PR Parkal-1

PIU Parkal

PR Parkal-2

PIU Thorrur

PR Thorrur

Parkal
Athamakur
Geesugonda
Sangem
Thorrur
Rayaparthy
Palkurthy

PR Warangal

PIU Warangal

1
I

Existin
Propose
g
d
2
3
FIELD PATTERN

PRI Warangal

Sl.
No.

Name of the
Division

PRI Palkurhty

PR Palkurhty

Kodakandla
Devaruppula
Jangaon

PRI Jangaon

PR Jangaon

Maddur
Narmetta

PIU Cherial

10

PR Cherial

Cherial
Bachannapet
Eturnagaram

PIU
Eturnagaram

Mangapet
11

PR Eturnagaram

Tadvai
Govindaraope
t

PR Mulug

PRI Mulug

Mulug
PRI Mulug

12

PR Mulug

Venkatapur
Kothaguda
Bhupalpally

PRI
Bhupalpally

13

PR Bhupalpally

Ghanpur(mulu
g)
Chityal
Regonda

PIU Regonda

14

PR Regonda

Shaympet

PR

PR

Mogulapally
4

PRI
Mahabubabad

15

PR
Mahabubabad

PIU
Mahabubabad

16

PR Gudur

PRI Maripeda

17

PR Maripeda-1

Mahabubabad
Nellikudur
Gudur
Kesamudram
Maripeda

14
Narsimhulape
t

PIU Maripeda

18

PR Maripeda-2
(HQ at
Mahabubabad)

Dornakal
2

Kuravi

29

50

79

Mahabubabad

Mahabubabad

Narsampet
PRI
Narsampet

19

PR Narsampet-1

Duggondi
Nallabelli
Chennaraopet

PIU Narsampet

20

PR Narsampet-2

Khanapur
Nekkonda

Total Mandals
II

50

Field Total

V&QC PATTERN
V&QC
Warangal
( Wgl & Kmm)

Divn

V&QC
Warangal

21

V&QC Warangal

Sl.No.1 to 4, 7 to 10 &
15 to 18 sub-divisions

V&QC
Mulugu

22

V&QC Mulugu

Sl.No.5, 6, 11 to 14,
19 & 20 sub-divisions

V&QC
Divn
Office

Warangal

5
V&QC Total

III

15

OFFICE PATTERN
Circle
Office
PR Divn
Office

PA to SE

23

PA to SE

Warangal

Mulugu

Mahabubabad
PIU Divn
Office

Warangal
Office Total

4
22

Grand Total

116

15
RATIONALISATION OF PIU AND PR SUB DIVISIONS IN KHAMMAM DISTRICT
Sl.
No.
1

Name of the
Division

Name of the Sub Division

Existing

Proposed

Existing

S.No.

Proposed

PR
Khammam-I

PR
Khammam-II

No. of
Mandal
s

Name of Mandal

Raghunadhapal
em
Khammam
Rural

No of AEE
Spl.

Mand
al

24

41

FIELD PATTERN
PIU
Khammam

PR
Khammam

PRI
Khammam

Kusumanchi
PRI
Khammam

Nelakondapally
Tirumalaipalem
Madhira

PRI Madhira

PR Madhira

Yerrupalem
Bonakal

PRI
Mudigonda

PR Mudigonda

Chinthakani
Mudigonda
Singareni

PIU Wyra

PR Wyra-I

Enkoor

PIU
Khammam

PIU
Khammam

Julurpad
PRI Wyra

PR Wyra-II

PRI Kalluru

PR Kalluru

Wyra
Konijerla
Thallada
Kalluru
Sathupally

PIU
Sathupally

PR Sathupally

Vemsoor

PR
Kothagudem

PRI
Kothagudem

Penubally
PIU
Kothagudem

PR
Kothagudem

PRI
Aswaraopeta

10

PR
Awaraopeta-I

PIU
Aswaraopeta

11

PR
Awaraopeta-II

Kothagudem
Palwancha
Aswaraopeta
Dammapeta
Chandrugonda
Mulakalapally
Yellandu

PRI Yellandu

12

PR Yellandu

Tekulapally
Kamepally

PR
Bhadrachalam

PR
Bhadrachalam

PIU Yellandu
at
Garla

13

PR Garla

PRI
Bhadrachala
m

14

PR
Bhadrachalam
-I

PIU
Bhadrachala
m

15

PR
Bhadrachalam
-II

PRI
Manuguru

16

PR Manuguru

17

PR
Burgampahad

Total

41

PIU
Burgampaha
d

Garla
Bayyaram
Bhadrachalam
Dummugudem
Cherla
Wazeedu
Venkatapuram
Pinapaka
Gundala
Burgampahad
Manuguru
Aswapuram
Field Total

16
Mandals
II

V&QC PATTERN
V&QC Divn
Warangal
( Wgl & Kmm)

V&QC
Khammam
V&QC
Bhadrachala
m
PRI
Kothagudem

18

V&QC
Khammam

S.No.1 to 8 Sub-divns.

19

V&QC
Bhadrachalam

S.No.9 to 13 Sub-divns

20

V&QC
Kothagudem

PIU SD,
Madhira

S.No.14 to 17 Sub-divns

Shifting of all posts is shown in the separate annexure


V&QC Total

III

OFFICE PATTERN
Circle
office
PR Divn
office

21

PA to SE
Khammam
Kothagudem
Bhadrachala
m

PIU Divn
office

Khammam
Office Total
Grand Total

Contd..

17

RATIONALISATION OF PIU AND PR SUB DIVISIONS OF KARIMNAGAR DISTRICT

Existing

Proposed

2
3
FIELD PATTERN

PIU Karimnagar

1
I

Name of the
Division

PIU Karimnagar

Sl.
No.

Name of the Sub Division


Existing

S.No.

Proposed

No of AEE/AE

No. of
Mandals

Name of Mandal

PRI
Karimnagar

PR
Karimnagar

PIU
Manakondur

PR
Manakondur-I

PIU Jagtial

PR
Manakondur-II

PRI
Huzurabad

PR
Huzurabad-I

PIU
Huzurabad

PR
Huzurabad-II

Mand
al
10

Spl.

Karimnagar
Ellanthakunta

Total
11

Manakondur
Shankarapatna
m
Thimmapur
Bejjanki
Huzurabad
Kamalapur
Jammikunta
Veenavanka
Husnabad

PRI Husnabad

PR Husnabad

Chigurumamidi
Koheda

Bheemadevarap
alli

PR
Bheemadevar
apalli

PR Sircilla-I

PIU Sircilla

PR Sircilla-II

10

PR
Vemulawada-I

11

PR
VemulawadaII

PRI
Vemulawada

Elkaturthy
Saidapur

PRI Sircilla

PIU
Vemulawada

PR Sircilla

PRI Karimnagar

PIU
Bheemadeva
rapalli

Sircilla
Mustabad
Gambhiraopet
Yellareddypet
Vemulawada
Konaraopet
Chendurthy

Kathlapur
Maidipally
Gangadhara

PRI
Gangadhara

12

PR
Gangadhara

Ramadugu
Choppadandi
Mallial

PIU Mallial

13

PR Mallial

Boinpalli
Kodimial
Jagtial

PRI Jagtial

14

PR Jagtial

Raikal
Sarangapur

PR Jagtial

PRI Jagtial

Metpalli
PRI Metpalli

15

PR Metpalli

PIU Korutla

16

PR Korutla

17

PR
Dharmapuri-I

Ibrahimpatnam
Korutla
Mallapoor
Dharmaram

PRI
Dharmapuri

Gollapally
Pegadapally

PIU
Dharmapuri

18

PR
Dharmapuri-II

Dharmapuri
Velgatoor

18
Peddapalli
PRI Peddaplli

19

PR Peddapalli

Eliged
Julapally

33

57

90

Ramagundam

II

PR Peddapalli

PR Peddapalli

Sulthanabad
PIU
Sulthanabad

20

PR
Sulthanabad

Srirampur
Odela
Manthani

PRI Manthani

21

PR Manthani

Kamanpur
Mutharam
(Man)

PIU Kataram

22

PR Kataram

PRI
Mahadevpur

23

PR
Mahadevpoor

Total
Mandals

57

Malharrao
Mahamutharam
Mahadevpoor
Kataram
Field Total

V&QC PATTERN
V&QC Divn. Nirmal
(Adilabad
&
Karimnagar dists)

V&QC
Karimnagar

24

V&QC
Karimnagar

S.No.1 to 13 Sub-divns.

V&QC
Peddapally

25

V&QC
Peddapally

S.No.14 to 23 Sub-divns

V&QC Total

III

10

OFFICE PATTERN
Circle
office
PR Divn
office

PIU Divn
office

26

PA to SE

Siricilla

Jagityal

Peddapally

Karimnagar

4
Office Total
Grand Total

22
122

19

Contd.
RATIONALISATION OF PIU AND PR SUB DIVISIONS ADILABAD DISTRICT
Sl.
No.
1
I

Name of the
Division
Existin
Proposed
g
2
3
FIELD PATTERN

Name of the Sub Division


Existing

S.No.

Proposed

No. of
Mandal
s

PR
Adilabad-I

Name of
Mandal
8

No of AEE/AE
Spl
.

Mandal

Total

10

11

Adilabad
PRI
Adilabad

Jainad

PR Adilabad
(PR+PIU)

PR Adilabad

Bela
Echoda
PRI
Echoda

PIU
Adilabad

PR Echoda

PR
Adilabad-II

Boath
Bazarhatnoor
Neredigonda
Gudihathnoo
r
Tamsi
Talamadugu
Nirmal

PRI Nirmal

PR Nirmal-I

Sarangapur

PR Nirmal

PRI Nirmal

Dilwarpur
PIU Nirmal

PR NirmalII

PRI
Khanapur

PR
Khanapur

Mamda
Laxmanchan
da
Khanapur
Kadam
Jannaram

PIU
Utnoor

PR Utnoor

Utnoor
Indervelli
Mudhole

PRI
Mudhole

PR
Mudhole-I

Tanoor
Lokeshwara
m
Bhainsa

PIU
Mudhole

PR
Mudhole-II

Kuntala

Kubeer

PR Mancherial

PRI Mancherial

PRI
Mancheria
l
PIU
Mancheria
l

Mancherial
10

PR
Mancherial

Luxettipet
Dandepalli

11

PR
Bellampall
y

Bellampally
3

Nennel
Vemanpally
Tandur

PRI Tandur

12

PR Tandur

Kasipet
Bheemini
Chennur

PRI
Chennur

13

PR
Chennur

Kotapally
Jaipur

PR Asifabad

PIU Asifabad

Mandamarri
4

Asifabad
PRI
Asifabad

14

PR
Asifabad-I

Wankidi
Kerameri

PIU
Asifabad
PRI
Jainoor

15

PR
Asifabad-II

16

PR Jainoor

Rebbena
Tiryani
Sirpur- U
Narnoor

20
Jainoor

II

PRI Sirpur
Khagazna
gar

17

PIU Sirpur
Khagazna
gar

18

PR
Khagaznag
ar-I
PR
Khagaznag
ar-II
Total
Mandals

Kagaznagar
3

Sirpur-T

32

52

84

Dahegaon
2
52

Koutala
Bejjur
Field Total

V&QC PATTERN
V&QC
Divn
Nirmal

V&QC Divn
Nirmal
(Adilabad
&
Karimnaga
r)

V&QC SD,
19
Adilabad

V&QC SD,
Adilabad

V&QC SD,
20
Asifabad
V&QC Divn

V&QC SD,
Asifabad
Nirmal

1 to 9
Sub-divns

10 to 18
Sub-divns.

4
4

V&QC Total
III

OFFICE PATTERN
PR Circle
office
PR
Division
office

PA to SE

21

12

PA to SE

Adilabad

Nirmal

Mancherial

Asifabad

4
Office Total

22

Grand Total

118

J. RAYMOND PETER
PRINCIPAL SECRETARY TO GOVERNMENT
//FORWARDED::BY ORDER//
SECTION OFFICER

21
ANNEXURE-III
(Annexure to G.O.Ms.No.5, PR & RD (Estt.I) Deptt., dt:16.1.2015)
SHIFTING OF POSTS OF PIU SD MADHIRA
S.N.

Name of the post

No of posts

Shifting proposed to the office

Deputy Executive Engineer

Engineer-in-Chief office

Junior Technical Officer

PIU SD Khammam

Senior Assistant

PIU SD Khammam

Junior Assistant

PIU SD Wyra

Office Subordinate

PIU SD Wyra
PIU SD Mudigonda

J. RAYMOND PETER
PRINCIPAL SECRETARY TO GOVERNMENT
//FORWARDED::BY ORDER//
SECTION OFFICER

22
ANNEXURE-IV
(Annexure to G.O.Ms.No.5, PR & RD (Estt.I) Deptt., dt:16.1.2015)
Shifting of surplus AEE/AE posts to O/o the ENC, PR, Hyderabad from the following
Circles
S.No.

District

No of surplus posts

Nizamabad

Warangal

Khammam

Karimnagar

Total

20

J. RAYMOND PETER
PRINCIPAL SECRETARY TO GOVERNMENT
//FORWARDED::BY ORDER//
SECTION OFFICER

ANNEXURE-V
(Annexure to G.O.Ms.No.5, PR & RD (Estt.I) Deptt., dt:16.1.2015)
ALLOCATION OF POSTS OF DEES AND AEE/AE IN O/O ENC PR HYDERABAD
S.No.

Zone

DEE

AEE/AE

Existing

New

Total

Existing

New

Total

19

27

VI

21

12

33

Total

10

40

20

60

J. RAYMOND PETER
PRINCIPAL SECRETARY TO GOVERNMENT
//FORWARDED::BY ORDER//
SECTION OFFICER

You might also like