Professional Documents
Culture Documents
Question Excerpt
_________
water consumption
water demand
water potability
none of the above
A.
B.
C.
D.
A.
B.
C.
D.
A.
B.
C.
D.
A.
B.
C.
D.
8. Lead Pipe
- shall be supported at
by____________for entire length with hangers
properly spaced.
A. Stiff aluminum or wooden backing
B. stiff metal or wooden backing
C. stiff plastic or metal sheet
A.
B.
C.
D.
A.
B.
C.
D.
A.
B.
C.
D.
A.
B.
C.
D.
A.
B.
C.
D.
18.
________ m max
61
62
63
64
A.
B.
C.
D.
19.
A.
WASTE TANK
B.
SEPTIC TANK
C. SEWAGE DISPOSAL SYSTEM
D. NONE OF THE ABOVE
20.
A.
B.
C.
D.
A.
B.
C.
D.
21.
A. 22 degrees bend
B.
45 degrees bend
C.60 degrees bend or other approved fittings of longer
sweeps
D.
30 degress bend
22.
NAMPAP
DILG
DPWH
DENR
A.
B.
C.
D.
23.
A.
B.
C.
D.
17. ____________
20mm/m or 2%
30mm/m or 3%
40mm/m or 4 %
10mm/m or 1 %
AIR SEPARATION
AIR BREAK
AIR DEVISOR
NONE OF THE ABOVE
24.
A.
BRANCH INTERVAL
INTERVAL
BRANCH
LENGTH
B.
C.
D.
. position
B. Single or double tee branch
C. Single or double tapped tee branch
D.Side inlet quarter bend, Running thread, band or
saddle
E.
all of the above
25.
1,2
1,1
2,1
2,3
A.
B.
C.
D.
26.
A.
45 wye branches
B. combination wye & 1/8 bend branches
C.
30 wye bend
D. or other approved fittings of longer sweeps.
27.
A.
45 wye branches
B. combination wye & 1/8 bend branches
C. or other approved fittings of longer sweeps.
D.
30 wye bend
28.
A.
B.
C.
D.
INTRAMUROS
BARASOAIN
BATAAN
CEBU
29.
A.
45 wye branches
B. or other approved fittings of longer sweeps.
C.60 degree branches or offsets (only for pipes
installed in true vertical position
D. 45 degree branches
31.
A. single hub sanitary tapped tee
B. double hub sanitary tapped tee
C. triple hub sanitary tapped tee
D.
none of the above
32.
A.
B.
C.
D.
plumbing unit
plumbing fixtures
plumbing system
plumbing minimum
33.
A.
B.
C.
D.
GI soil pipe
cast iron soil pipe
PVC soil Pipe
none of the above
34.
A.
B.
C.
D.
SINK
LAVATORY
BASIN
NONE OF THE ABOVE
35.
A. VENTILATING SYSTEM
B. WATER-SEALED TRAP
C.
SOIL PIPES
D.
WASTE PIPES
36.
30.
A Double hub fitting for leak-caulked joint in vertical
A.
B.
C.
D.
100 mm
102 mm
101 mm
104 mm
A.
B.
C.
D.
A.
B.
C.
D.
A.
B.
C.
D.
A.
B.
C.
D.
45. The minimum air gap for Over rim bath fillers &
A.
B.
C.
D.
A.
B.
C.
D.
46. The minimum air gap for Over rim bath fillers &
A.
B.
C.
D.
A.
B.
C.
D.
B.
C.
D.
37mm
38mm
39mm
A.
B.
C.
D.
A.
B.
C.
D.
A.
B.
C.
D.
56.
A.
B.
C.
D.
No
21
20
25
19
A.
B.
C.
D.
A.
B.
C.
D.
0.70
0.60
0.50
0.65
A.
B.
C.
D.
A.
B.
C.
D.
59. In Ground
A.
B.
C.
D.
Authority.
firm bed
strata
compacted earth
none of the above
A.
B.
C.
D.
A.
B.
C.
D.
64. For vertical piping, cast iron pipes- Bell & Spigot
A.
B.
C.
D.
A.
B.
C.
D.
1
2
A.
B.
C.
D.
1.5
2.0
5
4
3
A.
B.
C.
D.
E.
2.5
2
70.
A.
B.
C.
D.
A.
B.
C.
D.
72.
A.
B.
C.
D.
A.
B.
C.
D.
A.
B.
C.
D.
5
4
3
2
A.
B.
C.
D.
5
4
3
2
A.
B.
C.
D.
A.
B.
C.
D.
5
6
7
8
1
2
A.
B.
C.
D.
1.5
2.5
A.
B.
C.
D.
1
2
1.5
2.5
B.
C.
D.
88. _____________
A.
B.
C.
D.
atmospheric opening.
A. ATMOSPHERIC VACUUM BREAKER (AVB
B.DOUBLE CHECK VALVE BACKFLOW
PREVENTION ASSEMBLY (DC)
C.PRESSURE VACUUM BREAKER BACFLOW
PREVENTION ASSEMBLY (PVB)
D.
none of the above
A.
B.
C.
D.
A.
1m interval.
plastic pipe
pvc pipe
steel pipe
lead pipe
polybuthane sheath
polyethylene sheath
plastic sheath
A.
B.
C.
D.
CATCH BASIN
LAVATORY
BIBB
WATER CLOSET