CONTRACT NO.
SCHEDULE "A"
20.5.4
30621127/00
20.5.5
20.6
Limitation of Liability
20.6.1
20.6.2
Conseguential Damages
CONTRACTOR, its agents and SUBCONTRACTORS shall not be
liable to COMPANY, nor shall COMPANY be liable to CONTRACTOR,
its agents and SUBCONTRACTOR, for any consequential damages,
loss of profit and claims for indirect and consequential losses,
whether such liability is based, or proved to be based upon any
breachof either Party's obligations under this CONTRACT, or
whether such liability is based, or proved to be based, upon any
negligent act or omission of a
Party, its personnei, agents,
appointed representatives or subcontractors, or whether such
liability is based, or proved to be based, upon tort or operation of
law, provided that this exclusion shall not apply to any obligation
of CONTRACTOR to pay liqUidated damages to COMPANY under
this CONTRACT (e.g. Uquidated Damages for Delay of PROJECT,
Paragraph 22 of this Schedule "AN) and shall not limit the
responsibility to the deliberate default or negligent misconduct by
the CONTRACTOR.
20.7
Conversion of Open Cycle Gas Turbines to Combined Cycle at Qurayyah Power Plant
Schedule "A
7
'
SCHEDULE "Au
CONTRACT NO.
30621127100
20.8
20.7.1.1
20.7.1.2
20.7.2
20.7.3
Exclusive Remedies
The remedies set forth in this CONTRACT shali be the sole and exclusive
remedies of CONTRACTOR and COMPANY for their liabilities arising out of or
in connection with this CONTRACT, despite any remedy otherwise available
at law.
20.9
21.
Insurance
21.1
Coverage
Term
CONTRACTOR shali carry and maintain this insurance in fuli
force at ali times from the Effective Date of the CONTRACT
through the Preliminary Acceptance of ali the PROJECT
PORTIONS and thereafter during the warranty period, and until
CONTRACTOR has fuliy demobilized from the WORK SITE.
A-44
Conversion of Open Cycle Gas Turbines to Combined Cycle at Qurayyah Power Plant
SchedUle "AT(
SCHEPULE "A"
CONTRACT NO.
c)
30621127/00
21.1.2
Coverage
CONTRACTOR's All Risk Insurance (CAR) coverage for the
entire PROJECT. The Sum insured per occurrence shall be no
less than the total CONTRACT Price or replacement cost of the
PROJECT and the cost of removing debris following an insured
loss.
b)
c)
Term
CONTRACTOR shall carry and maintain this insurance in full force
at all times from the Effective Date of the CONTRACT through
the Preliminary Acceptance of all the PROJECT PORTIONS and
thereafter during the warranty period, and until CONTRACTOR
has fully demobilized from the WORK SITE.
d)
21.1.3
A-45
Conversion of Open Cycle Gas Turbines to Combined Cycle at Qurayyah Power Plant
Schedule "An