DATE: 18/07/2009
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Date: 19/07/09
Ambient Temp. 30 degree centigrade.
1.
2.
3.
Voltage ( A.C.Volt)
20
40
60
80
100
120
Current (Amp)
0.3
0.62
0.94
1.23
1.51
1.78
Impedance (Ohm)
66.67
64.52
63.83
65.04
66.23
67.42
4.
Front top
Front right
Front left
Front bottom
Rear top
Rear right
Rear left
Rear bottom
: 16.0 mm
: 16.2mm
: 16.8mm
: Not measured
: 15.8mm
: 16.5mm
: 16.0mm
: Not measured.
Date: 20/07/2009
1.
Generator rotor threading out not completed due to touching of
retaining ring
to the inner core of Stator.
2.
3.
Date: 21/07/2009
1. Generator rotor comes out side from stator.
2. Generator rear side journal bearing top cover removed & kept on TG
floor.
3. Glass sheet of Front pedestal removed & kep to TG floor.
4. Generator covered with help of tarpoline.
5. Materials given turbo engineering.
Locktite 495.
5.
6.
7.
2.5mm
Generator out put terminal mica sheet thickness.
20.0mm
Date: 22/07/2009
1.
2.
3.
4.
5.
Date: 23/07/2009
1. Martial given Turbo Engineering.
Petrol: 25 lt.
Paint brush: 4nos.
2. Stator & rotor cleaning work under progress with help of petrol.
3. Stator & rotor varnish material issue from store.
4.
5.
: 100%
: 25%
: 100%
: 25%
: 40%
: 10%
6.
7.
Date: 24/07/2009.
1. Material issue from store.
DP kit.
2. Testing of rotor.
Diode no.
2
271
146
Diode no.
3
89.8
98.5
Diode no.
4
93.4
156
Diode no.
5
94.9
229
Diode
no.6
86
109
Diode no.
3
78.1
134
Diode no.
4
130
135
Diode no.
5
158
152
Diode
no.6
142
100
42.9
32.7
658
382
Rear side:
Diode
no.1
67.5
25
Diode no.
2
169
191
41.8
28.6
33.1
309
364
190
565
243
301
227
395
127M
127M
127M
Current
0.41
0.85
1.29
1.69
2.12
2.52
2.94
Impedance
50.49
47.53
46.90
47.34
47.36
47.70
47.86
160.1
180.1
201.2
220
3.33
3.71
4.12
4.49
48.08
48.54
48.83
48.00
Forward voltage
value
0.336
0.328
0.344
0.336
0.341
0.341
Reverse voltage
value
0
0
0
0
0
0
Testing of stator.
Insulation resistance.
Short & Earth
R-Y
B-R
B-Y
Phase
B
Y
R
Winding resistance.
R PHASE: -
7.34 m
Y PHASE: -
7.5 m
B PHASE: -
8.5m
B & Y PHASE: -
18.8 m
1 Min
4000 M
5000 M
4500 M
5 Min
10000 M
10000 M
10000 M
B & R PHASE: -
17.47 m
Y & R PHASE: -
13.75 m
Date: - 25/07/2009