Quantity Estimate for the work of "Construction of Boundary Wall around a plot of la

Method of Computation : long wall and short wall method

Serial No

Descripton of Item of work

No

Length
(Mtr.)

Breadth
(Mtr.)

Earth work in excavation of foundation trenches or


drains, in all sorts of soil (including mixed soil but
excluding laterite or sandstone) including
removing, spreading or stacking the spoils within a
lead of 75 m. as directed. The item includes
necessary trimming the sides of trenches,
levelling, dressing and ramming the bottom,
bailing out water as required complete.
Length AB
Length BC
Length CD
Length DE
Length EF
Length FA

1
1
1
1
1
1

99.20
130.20
79.20
40.50
19.50
90.20
458.80

0.50
0.50
0.50
0.50
0.50
0.50

Single Brick Flat Soling of picked jhama bricks


including ramming and dressing bed to proper
level and filling joints with local sand.
Length AB
Length BC
Length CD
Length DE
Length EF
Length FA

1
1
1
1
1
1

99.20
130.20
79.20
40.50
19.50
90.20
458.80

0.50
0.50
0.50
0.50
0.50
0.50

1
1
1
1
1
1

99.20
129.70
79.70
40.00
20.00
89.20
457.80

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood planks
of approved thickness with required bracing for
concrete slabs, beams and columns, lintels curved
or straight including fitting, fixing and striking out
after completion of works (at foundation and upto
roof of ground floor)
at inside portion of Length AB
at inside portion of Length BC
at inside portion of Length CD
at inside portion of Length DE
at inside portion of Length EF
at inside portion of Length FA

Page No 1

Serial No

Descripton of Item of work

No

Length
(Mtr.)

Breadth
(Mtr.)

at outside portion of Length AB


at outside portion of Length BC
at outside portion of Length CD
at outside portion of Length DE
at outside portion of Length EF
at outside portion of Length FA

1
1
1
1
1
1

100.20
130.20
80.20
40.00
20.00
90.20
460.80

Cement concrete with graded jhama khoa (30 mm


size) excluding shuttering
In ground floor and foundation.
Length AB
Length BC
Length CD
Length DE
Length EF
Length FA

1
1
1
1
1
1

99.20
130.20
79.20
40.50
19.50
90.20
458.80

0.50
0.50
0.50
0.50
0.50
0.50

1st class brickwork of Brick Length 200 mm. with


non-modular bricks in cement and sand mortar
(1:4)
In foundation and plinth
(For 300 mm wide Brickwork)
Length AB
Length BC
Length CD
Length DE
Length EF
Length FA

1
1
1
1
1
1

99.60
130.20
79.60
40.30
19.70
90.20
459.60

0.30
0.30
0.30
0.30
0.30
0.30

(For 200 mm wide Brickwork)


Length AB
Length BC
Length CD
Length DE
Length EF
Length FA

1
1
1
1
1
1

99.80
130.20
79.80
40.20
19.80
90.20
460.00

0.20
0.20
0.20
0.20
0.20
0.20

Earth work in filling in foundation trenches or plinth


with good earth, in layers not exceeding 150 mm.
including watering and ramming etc. layer by layer
complete. (Payment to be made on the basis of
measurement of finished quantity of work)
With earth obtained from excavation of
foundation.
Total excavated volume of earth (A)
Less : Total of constructed items (B)
Brick flat soling
Page No 2

Serial No

Descripton of Item of work

No

Length
(Mtr.)

Breadth
(Mtr.)

(For 100 mm wide Brickwork)


Length AB ( 100.10 mtr - 2.30 mtr.)
Length BC
Length CD
Length DE
Length EF
Length FA

1
1
1
1
1
1

0.10
0.10
0.10
0.10
0.10
0.10

Additional Brickwork at column locations


For inside corner cols (3,6,9,13,15)
For Outside col (11) part A
For Outside col (11) part B

11
5
1
1

97.70
130.20
80.00
40.10
19.90
90.20
458.10
0.20
0.10
0.10
0.10

Plain Cement Concrete


Brick work in foundation
Net Quantity of earth filling (A - B)
6

1st class brickwork of Brick Length 200 mm. with


non-modular bricks in cement and sand mortar
(1:4)
In superstructure ground floor

0.10
0.10
0.20
0.10

Total Brick work for super structure


Ordinary Cement concrete (mix 1:2:4) with graded
stone chips (20 mm nominal size) excluding
shuttering and reinforcement,if any, in gound floor
as per relevant IS codes.
Pakur Variety
For Semi Circle concrete coping work over Bk-Wall
2

Area of semicircular coping = [/4 x (0.1) ] /2 = 0.004 Sqm


Length AB [ 100.10 - {2.30 + 3 x .2 +2 x .15}] mtr
Length BC [ 130.1 - {2 x .2 +2 x .15}] mtr
Length CD [ 80.1 - {2 x .2 +2 x .15}] mtr
Length DE [ 40 - {1 x .2 +1 x .15.+ .05 x 1}] mtr
Length EF [ 20 - {1 x .2 +1 x .15.+ .05 x 1}] mtr
Length FA [ 90.1 - {1 x .2 +2 x .15}] mtr

1
1
1
1
1
1

98.10
129.40
79.40
39.60
19.60
89.60
455.70

Rectangular capping considered over columns.


50 mm thick concreting over columns

16

0.20

0.20

Page No 3

Serial No

Descripton of Item of work

Plaster (to wall, floor, ceiling etc.) with sand and


cement mortar including rounding off or
chamfering corners as directed and raking out
joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground
floor).[Excluding cost of chipping over concrete
surface]
15 mm thick plaster
(at both faces of 100 mm thick brickwork)
Length AB - outer wall( 100.20 mtr - 2.30 mtr.)
Length AB - inner wall( 100.00 mtr - 2.30 mtr.)
Length BC - outer wall
Length BC - inner wall
Length CD - outer wall
Length CD - inner wall
Length DE - outer wall
Length DE - inner wall
Length EF - outer wall
Length EF - inner wall
Length FA - outer wall
Length FA - outer wall

Additional Plastering at column locations ( 2 x 11 sides- 100 mm wide)


(No requirement for Corner inside columns & extra
requirment for col no. 11)

No

Length
(Mtr.)

1
1
1
1
1
1
1
1
1
1
1
1

97.90
97.70
130.20
130.00
80.20
80.00
40.00
40.10
20.00
20.10
90.20
90.00

22

916.40
0.10

Breadth
(Mtr.)

Total Brick Plastering work for super structure

Page No 4

y Wall around a plot of lad as per given Drawing

nd short wall method

Height
(Mtr.)

Quantity

Total Quantity

Unit for Total Qnty

0.65
0.65
0.65
0.65
0.65
0.65

32.24
42.32
25.74
13.16
6.34
29.32

149.11

Cum

49.60
65.10
39.60
20.25
9.75
45.10

229.40

Sqm

0.15
0.15
0.15
0.15
0.15
0.15

14.88
19.46
11.96
6.00
3.00
13.38

Page No 5

Height
(Mtr.)

Quantity

Total Quantity

Unit for Total Qnty

0.15
0.15
0.15
0.15
0.15
0.15

15.03
19.53
12.03
6.00
3.00
13.53

137.79

Sqm

0.15
0.15
0.15
0.15
0.15
0.15

7.44
9.77
5.94
3.04
1.46
6.77

34.41

Cum

0.20
0.20
0.20
0.20
0.20
0.20

5.98
7.81
4.78
2.42
1.18
5.41

0.20
0.20
0.20
0.20
0.20
0.20

3.99
5.21
3.19
1.61
0.79
3.61

45.98

Cum

149.11

Cum

229.40

0.10

22.94
Page No 6

Height
(Mtr.)
Sqm

Quantity

2.10
2.10
2.10
2.10
2.10
2.10

20.52
27.34
16.80
8.42
4.18
18.94

2.10
2.10
2.10
2.10

0.46
0.11
0.04
0.02

Total Quantity

Unit for Total Qnty

34.41
45.98
103.326
45.784

Cum
Cum

96.83

Cum

1.85

Cum

Sectional area

0.004
0.004
0.004
0.004
0.004
0.004

0.39
0.52
0.32
0.16
0.08
0.36

0.05

0.03

Page No 7

Height
(Mtr.)

Quantity

2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10
2.10

205.59
205.17
273.42
273.00
168.42
168.00
84.00
84.21
42.00
42.21
189.42
189.00

2.10

4.62

Total Quantity

Unit for Total Qnty

1929.06

Sqm