Activity Name
Original
Duration
1
Week
7
10
11
12
13
84
Construction
General
A1250 Secured site access
3
8
0
40
MEP works
Electrical
A2380
Installation of floor conduits & boxes
40
10
A2390
Conduits on walls
10
A2400
Conduits on ceiling
14
P4LP101
Installation of Cable Trays & Trunking
21
P4LP102
Wiring for Lighting and Power
21
P4LC100
Wiring for Fire Alarm
12
P4LC101
Wiring for Emergency lights
P4LP105
Cable Ter minations
10
P4LP114
DATA cables installation
P4LP104
DB Installation & dressing
HVAC works
A2410
Installation of main ducts
24
21
A2420
Installation of branches and connections
14
A2430
FCUs installation & connections
10
Fire fighting
A2090
Installation of main fire fighting pipes
19
14
A2100
Installation of branch fire fighting pipes
A2110
Sprinkler pipe upright
A2120
Pressure test
4
35
Civil works
A2350 Screed laying & drying
14
2
55
Wall finishes
A1110 Framework for gypsum partition
14
14
Actual Work
Remaining Work
Date: 25-Jan-15
84
Page 1 of 3
Date
Revision
Checked Approved
Activity ID
Activity Name
Original
Duration
1
Week
7
10
11
12
13
10
10
7
Floor finishes
A1290 Main run away wooden flooring
3
16
A1170 Installation of client supplied Grestec tiles on inside bulkhead of shop front
4
11
3
11
11
3
11
3
11
Actual Work
Remaining Work
Date: 25-Jan-15
Ceiling finshes
Page 2 of 3
Date
Revision
Checked Approved
Activity ID
Activity Name
Original
Duration
1
Week
7
10
11
12
13
3
11
18
10
7
P4LP107
Light Fittings Installation
P4LC106
Fire Alarm Devices Installation
P4LC108
CCTV Devices Installation
7
17
A1740 CD inspection
A1750 DM inspection
A1770 Handover
Actual Work
Remaining Work
Date: 25-Jan-15
Page 3 of 3
Date
Revision
Checked Approved