Professional Documents
Culture Documents
14. All liquid & vapour connections except SRV and small drains shall
have emergency shut off valve such as excess flow valve, automatically
operated valve or remotely operated valve .
15 SRVs to be tested & certified in every year by competent person under
rule18.(same for static as well as mobile vessels)
15. All vessels to be IE,EE & hydraulically tested in periods not more
than five years.
( in case of corrosive or toxic gases in two years ) under rule 19.
16. All vessels to be entirely above ground level. No vessel to be installed
within bounded area of petroleum or other flammable liquid storages.
17. Liquefied petroleum gasses shall not be filled while engine of tanker
is running.
18. No electrical wire shall pass over any storage vessel. And all electric
wiring to be insulated by approved type and mechanically continuous
throughout and effectively earthed away from vessel.
19. Valves and accessories shall be mounted and protected to prevent
accidental rupture. Brittle materials like CI not to be used.
20. Certificate of safety to be obtained from competent person under rule
43 before putting to use any mobile tanker or after any
repairs/modifications/alterations on vessel, chassis carried out with
permission of CCOE.
21. Road worthiness certificate under rule 44(2) to be obtained from
competent person every six months for mobile vessels.
22. License for vessels to be got renewed by CCOE every three years.
23. All hoses for loading/unloading shall be designed to with stand not
less than 4 times max operating pressure & electrically continuous.
atmospheric pressure.
Each plant to be fitted with 1)Suitable safety valve or other effective
device conveniently located to ensure maximum safe working pressure of
the vessel shall not be exceeded at any time.
2) Suitable pressure gauge with dial range not less than 1.5 times and
not exceeding twice the maximum safe working pressure. And marked
with distinct red mark at Maximum safe working pressure.
3) Suitable stop valve by which Pr. vessel isolated from other vessels or
from other source of supply of pressure.
4) Suitable nipple and globe valve connected for the exclusive purpose of
attaching test gauge for checking accuracy.