The Item Revisions page enables you to define any number of revisions for an item and any
number of routing revisions for an item's routing. You can assign each revision a unique three
character alphanumeric revision identifier (such as A, B, B1, and so on) and a revision date. Use
letters and/or numbers to label revisions. Letters are always upper case and numbers may include
decimals. When you create an item or a routing, the beginning revision defaults to the value for
Starting Revision in the Organization Parameters page.
When you create or update a bill of material or routing, you can choose to create a new revision
or modify an existing revision. When adding new revisions, you must be sure that the revision
date you enter does not overlap with other existing revision dates. Revisions are time-stamped, so
you can determine the latest revision for multiple revisions defined on the same date. New
revision numbers must be greater than the revision number of the currently effective revision.
Different versions of a bill of material or routing can be defined within the same revision.
In this topic, you will define an Item Revision.
Additional Information
Procedure
Step Action
1. Begin by navigating to the Bills of Material page.
Step Action
2. Click the Manufacturing and Distribution Manager link.
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Bills link.
Step Action
5. Use the Organizations page to select your organization.
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OK button.
or Press [Alt+O].
Step Action
8. Use the Bills of Material page to enter an item and define its revision.
Step Action
9. Click in the Item field.
Step Action
10. Press [F11].
Step Action
11. Enter the desired information into the Item field. Enter "RT1000".
Step Action
12. Press [Ctrl+F11].
Step Action
13. Click the Revision button.
or Press [Alt+R].
Step Action
14. Use the Item Revisions page to define an item revision.
When you create an item or a routing, the beginning revision defaults to the value
for Starting Revision in the Organization Parameters page.
Step Action
15. Click in the Revision field.
Step Action
16. Enter the desired information into the Revision field. Enter "A1".
Step Action
17. Click in the Revision Label field.
Step Action
18. Click in the Effective Date field.
Step Action
19. Use the Calendar page to select the desired date.
Step Action
20. Click the desired date.
Step Action
21. Click the OK button.
Step Action
22. Click the Save button.
Step Action
23. You have completed the Defining an Item Revision procedure.
End of Procedure.