1.
Meeting Opening by Act. HSE Superintendent (Andi Gustawan) regarding topics that will be discussed.
Pembukaan meeting oleh Akting HSE Superintendent (Andi gustawan) mengenai hal-hal yang akan didiskusikan
2.
Discussed Vehicle Contractor Risk Assessment, HSE Requirements (Procedure, JSA and PPE), Emergency Response Plan, Uniform, ID
Badge and Contractor Safety Representative in the Field with details as follow :
Mendiskusikan mengenai Penaksiran Resiko, HSE Requirements (Prosedur, JSA, dan PPE), Rencana Tanggap Darurat, Seragam, ID Badge,
dan Perwakilan Safety Kontraktor di Lapangan dengan rincian sbb :
3. List of Contractor :
No. Contractor
Contact Person
Contact Number
1.
PT. Meindo
Ken Yeo
08125425087
2.
PT. Ulima Nitra
Ridwan
081373015476
3.
PT. KLM
Doyok
081366763048
4.
PT. Tomda
Gon Guo F
5.
PT. CND
Saprudin
08129758720
6.
PT. Ken Brothers
Harianto Saragih
081364508479
7.
PT. Pelita
Edi Usman
081274901133
8.
CV. Media
Rahmat Fadli
081278655413
9.
PT. SNP
Rio Aristo
085266946681
10. PT. Enecal
Edward
081280960772
No.
1.
Subject
HSE Performance
Form
Discussion
HSE Performance Form (Safety Meeting
Summary, Tool Box Meeting summary,
Inspection Summary, accident / incident
report summary, etc.
Follow up Action
Action by
All Contractors must submit HSE All Contractor
Performance Summary to Petrochina
monthly and Petrochina will audit the
record based on summary that has
Remarks
HSE
2.
Risk
Form
Assessment
3.
Permit System
4.
HSE Representative
5.
Id
Badge
Uniform
and
PT. Meindo
1. Procedure and JSA
daily
2.
Contractors
will
assign
HSE All Contractor
representative at field with active
contact number.
Kontraktor
akan
menugaskan
Perwakilan HSE di lapangan lengkap
dengan nomor telpon aktif yang bisa
dihubungi
HSE
Project
PetroChina
PT.
Meindo PT. Meindo
and contractors
/ PCI HSE
Dept.
Kontraktor PT.
Meindo / Dept.
HSE
PetroChina
3.
Permit System
4.
Activities Report
Laporan Kegiatan
5.
Uniform
Seragam
Ulima
2.
Ulima
3.
PPE
PPE
Ulima
4.
Safety Meeting
Ulima
5.
Uniform
Ulima
Ulima
7.
Accident Report
Ulima
8.
Internal Inspection
Ulima
9.
Re-Inspection
PCI
10.
by
Re inspection by PCI Inspection team
should be conducted once every 6 (six)
months regularly
Inspeksi Ulang oleh tim Inspeksi
PetroChina harus dilakukan sekali
dalam 6 bulan secara teratur
ID badge
Still there is no ID Badge for PT. Ulima
Ulima
PT. KLM
1. Procedure and JSA
daily
Nitra Employee
ID Badge untuk karyawan PT. Ulima
Nitra masih belum ada
2.
3.
PPE
PPE
4.
Safety Meeting
Kontraktor
akan
membuat
dokumentasi setiap Safety Meeting
dan Menyerahkannya ke PetroChina
5.
Uniform
6.
7.
Accident Report
8.
Internal Inspection
9.
Re-Inspection
PCI
10.
ID badge
by
PT. Tomda
1. Procedure and JSA
daily
PetroChina
2.
Emergency Contact
Person
3.
Uniform
karyawannya.
PT. Ken Brothers
1. Procedure and JSA
daily
Ken
2.
Ken
3.
PPE
PPE
Ken
4.
Safety Meeting
Ken
Uniform
Ken
6.
Ken
7.
Accident Report
Ken
8.
Internal Inspection
Ken
9.
Re-Inspection
PCI
10.
ID badge
by
PT. Pelita
1. Procedure and JSA
daily
2.
3.
PPE
PPE
Ken
Safety Meeting
5.
Uniform
6.
7.
Accident Report
8.
Internal Inspection
9.
Re-Inspection
PCI
10.
ID badge
by
CV. Media
1. Procedure and JSA
daily
2.
3.
PPE
PPE
4.
Uniform
PT. SNP
1. Procedure and JSA
daily
2.
3.
PPE
PPE
4.
Safety Meeting
5.
Uniform
7.
Accident Report
8.
Internal Inspection
9.
Re-Inspection
PCI
10.
ID badge
by
2.
3.
PPE
PPE
4.
Safety Meeting
5.
Uniform
6.
7.
Accident Report
8.
Internal Inspection
by
PetroChina
9.
Re-Inspection
PCI
10.
ID badge
11.
Safety
Representative
Reviewed By,
Approved By,
Thomas Edison
Act. HSE Superintendent
Hu Yucheng